MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARTXX-9914, Responds to 990525 RAI Re Renewal of Tpdes Permit Number 01854.Explanation & Response to Each Item,Listed1999-06-16016 June 1999 Responds to 990525 RAI Re Renewal of Tpdes Permit Number 01854.Explanation & Response to Each Item,Listed ML20206E7271999-04-29029 April 1999 Submits Original & Four Complete Copies of Application for Renewal of Permit to Discharge,Deposit or Dispose of Wastes Into or Adjacent to Water in State. with Three Oversize Drawings ML20045D3451992-06-16016 June 1992 Discusses Util Review of 920603 Ltr Outlining Thermal Science,Inc Field Surveillance of Application of Thermo-Lag 330 Fire Barrier Sys on Util Test Assemblies at Omega Poing Labs.Supporting Documentation Encl ML20091Q2891992-01-27027 January 1992 Forwards Rev 7 to Quarterly Plant Performance & Other Indicator Data for Fourth Quarter of 1991 & Gross Heat Rate Data Form for 1991 ML20070T7651991-04-0101 April 1991 Forwards 910327 License Amend Request 91-001 Re Addition of Spec 3/4.7.12 & Bases 3/4.7.12 for Safety Chilled Water Sys ML20073D1051991-03-29029 March 1991 Comments on Final Rept Addressing Scaling for Unit 1,dtd Feb 1991 Per Insp Repts 50-445/90-47 & 50-446/90-47.Concerns Raised That Util Selected Criterion XI Re Test Control as Sole Mgt Std to Control safety-related Activities ML20066A5711990-12-19019 December 1990 Forwards Update to ASME Section Iii,Div 1 Code Control Program Documents for Incorporation Into State of Tx Dept of Licensing & Regulation Controlled Manual CCPM-15,authored by Ebasco ML20056B3741990-08-21021 August 1990 Forwards Update to ASME Section Iii,Div 1 Code Control Program Documents for Incorporation Into State of Tx Dept of Licensing & Regulation Controlled Manual CCPM-15 ML20011E1521990-01-27027 January 1990 Forwards Addl Case Concern Repts 89-0025 Re Apparent Substandard Shop Applied Welds Internal to Secondary Side of Steam Generators & 89-0034 on Specific Wiring & Connection Method Damaging safety-related Electrical Wiring ML20248D0661989-09-21021 September 1989 Notifies Util of Case Position on Concerns & Problems in Scaling Calculation Program at Plant.Documentary Info Supporting Util Position on Aspect of Dispute Should Be Provided ML19332C7971989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review & Status of Corrective Actions Initiated, Per 10CFR50.54(t) ML19332E0011989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review Per 10CFR50.54(t) ML19332D4781989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review to Be Conducted Every 12 Months.Review Must Include Evaluation for Adequacy of Interfaces W/State & Local Govts ML19332C8171989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review & Status of Corrective Actions Initiated, Per 10CFR50.54(t) ML20246A0421989-08-18018 August 1989 Advises That S&W Notified by Util That Responsibility for Facility Code Control Program Will Be Terminated Effective on 890823.EBASCO Svcs,Inc Selected to Assume Responsibility for Code Control Program Effective on 890824 ML20247R7291989-07-28028 July 1989 Advises That Status of Suspect molded-case Curcuit Breakers, Identified in Initiative Element One Will Be Provided by 890815.Util Estimates That 750 nonsafety-related Breakers in Warehouse Stock Examined as Part of Initiative Element Two ML20247D2491989-07-12012 July 1989 Forwards Communications Repts Associated W/Design Control Review ML20247A9261989-05-11011 May 1989 Forwards State of Tx & Local Govt Objectives for Graded Exercise Scheduled for 890725-26 ML20245J3341989-04-0707 April 1989 Forwards Summary of Points of Agreement Reached at 890308 Meeting.Agreements Will Be Subj to Further Discussion Among Parties.W/Certificate of Svc.Served on 890427 ML20246H4791989-03-0606 March 1989 Forwards Communications Repts Associated W/Corrective Action Programs for Plant Independent Assessment Program Phases ML20206F7201988-11-14014 November 1988 Forwards Communications Rept Transmittal 47 Re Independent Assessment Program on All Phases of Conduit Support Design Review ML20151X2621988-08-19019 August 1988 Forwards Rev 4 to Independent Assessment Program:Conduit Support Design Review Issues List for Comanche Peak Electric Station - Unit 1 ML20154H6281988-05-21021 May 1988 Requests to Be Advised at Earliest Opportunity Whether Projected Schedule for Issuance of Phase IV Rept Available. Related Correspondence ML20147G2941988-03-0303 March 1988 Forwards Communication Repts Re Cable Tray Audits,Per Independent Assessment Program ML20147F8911988-03-0303 March 1988 Forwards Communications Repts Associated W/Piping/Pipe Support Audits ML20147H4891988-03-0303 March 1988 Forwards Communications Repts Associated W/Independent Assessment Program Conduit Audits ML20147G2261988-03-0303 March 1988 Forwards Communications Repts Associated W/Civil/Structural Audits ML20196F7451988-02-23023 February 1988 Forwards Surveillance Repts Associated W/Phase 4 Independent Assessment Program Obtained During Util Review ML20196D4541988-02-0909 February 1988 Forwards Rev 4 of Mechanical Review Issues List (Ril). Rev Includes Review Issue 10 Re Component Cooling Water Sys Butterfly Valve at Outlet of Residual Heat Removal Hx.Rev of Ril Reflects Info That Cygna Gained Prior to Dec 1987 ML20236X2701987-11-25025 November 1987 Forwards Communications Repts on Independent Assessment Program,Phase 4 Re Cable Tray,Civil/Structural & Conduit Audits ML20236S1281987-11-13013 November 1987 Forwards Communications Repts Associated W/Civil/Structural Audits.List of Communications Repts Encl ML20236R9531987-11-13013 November 1987 Forwards Communications Repts Associated W/Cable Tray Audits.List of Communication Repts Encl ML20236S3231987-11-13013 November 1987 Forwards Communications Repts Associated W/Conduit Audits. List of Communications Repts Encl ML20236R9361987-11-13013 November 1987 Forwards Communications Repts Associated W/Piping/Pipe Support Audits.Repts Also Listed in Attachment ML20236M3131987-11-0909 November 1987 Forwards Communications Repts Associated W/Cable Tray Audits,Per Communication Repts Transmittal 33 for Independent Assessment Program - All Phases.List of Encl Communication Repts Provided on Attachment 1 TXX-6932, Advises That Value of 7.43 Ph Units Reported in Performance Evaluation Rept DMR-QA Study 7 Re 1987 NPDES QA Program Incorrect Due to Clerical Error.Reported Value Should Have Been 8.43 Ph Units,Which Is within Acceptable Range1987-11-0606 November 1987 Advises That Value of 7.43 Ph Units Reported in Performance Evaluation Rept DMR-QA Study 7 Re 1987 NPDES QA Program Incorrect Due to Clerical Error.Reported Value Should Have Been 8.43 Ph Units,Which Is within Acceptable Range ML20235W3331987-10-10010 October 1987 Forwards Communications Repts Re Civil/Structural Audits,Per Independent Assessment Program,Phase 4 ML20235V4691987-10-10010 October 1987 Forwards Communications Repts Re Cable Tray Audits,Per Facility Independent Assessment Program,Phase 4 ML20235R4941987-09-30030 September 1987 Notifies of Confirmation That Util Given Extension Until 871026 to Respond to Case Motion to Compel Applicants to Supply Complete Answers to Consolidated Intervenors Interrogatories & Request for Production of Documents ML20235R1961987-09-18018 September 1987 Forwards Rev 4 of Pipe Support Review Issues List. Any Procedural Control Issues Associated W/Author Original Pipe Support Reviews of Gibbs & Hill Being Processed as Part of Ongoing Design Control Assessments ML20235R0571987-09-18018 September 1987 Forwards Communications Repts Re Cable Tray Audits ML20234B1451987-09-16016 September 1987 Forwards Rev 4 to Pipe Stress Review Issues List (Ril).All Technical Issues Associated W/Discipline Closed.Still Waiting for S&W Calculation 15454-NZ(B)-GENX-035,Rev 2 to Verify Completion of Commitments Associated W/Ril 11 TXX-6718, Forwards Listed Outstanding Documents Requested Through Audits of Ebasco Svcs,Inc1987-09-0404 September 1987 Forwards Listed Outstanding Documents Requested Through Audits of Ebasco Svcs,Inc ML20238E5591987-09-0303 September 1987 Confirms That Brazos Understanding of Phrase,As Set Forth in Objections & Responses of 870814,essentially Correct. Related Correspondence ML20237K7081987-09-0101 September 1987 Forwards Communications Rept Transmittal 28,transmitting Cable Tray Audits Re Independent Assessment Program - Phase 4 for Plant.Delay in Processing Telcons Noted Due to Word Processing Sys Conversion.W/O Encl ML20237K7931987-09-0101 September 1987 Forwards Communications Rept Transmittal 29,transmitting Piping/Pipe Support Audits for Independent Assessment Program Phase 4.W/o Encl ML20237J9981987-09-0101 September 1987 Forwards Communications Rept Transmittal 27,transmitting Conduit Audits Re Independent Assessment Program - Phase 4 for Plant.Delay in Processing Telcons Noted Due to Word Processing Sys Conversion.W/O Encls ML20237K0091987-08-11011 August 1987 Memorializes Recent Conversations & Resulting Agreement Re Extension of Time Until 870908 for Filing Case & M Gregory Response to Applicant 870713 Motion for Reconsideration of Board 870622 Order.Related Correspondence ML20237J1281987-08-10010 August 1987 Forwards Rev 14 of Cable Tray Supports Review Issues List. Rev Based on Info Provided in Util Rev 2 to Generic Issues Rept for Cable Tray Hangers,Transcripts of Public Meetings & Results of Cynga Audits Through 870731 ML20236D3271987-07-22022 July 1987 Forwards Rev 0 to Civil-Structural Review Issues List, Based on Ref Info,Transcripts of Public Meetings,Documents Provided by Util & Results of Cygna Audits Through 870613 1999-06-16
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML20056B3741990-08-21021 August 1990 Forwards Update to ASME Section Iii,Div 1 Code Control Program Documents for Incorporation Into State of Tx Dept of Licensing & Regulation Controlled Manual CCPM-15 ML20011E1521990-01-27027 January 1990 Forwards Addl Case Concern Repts 89-0025 Re Apparent Substandard Shop Applied Welds Internal to Secondary Side of Steam Generators & 89-0034 on Specific Wiring & Connection Method Damaging safety-related Electrical Wiring ML20248D0661989-09-21021 September 1989 Notifies Util of Case Position on Concerns & Problems in Scaling Calculation Program at Plant.Documentary Info Supporting Util Position on Aspect of Dispute Should Be Provided ML19332E0011989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review Per 10CFR50.54(t) ML19332D4781989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review to Be Conducted Every 12 Months.Review Must Include Evaluation for Adequacy of Interfaces W/State & Local Govts ML19332C8171989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review & Status of Corrective Actions Initiated, Per 10CFR50.54(t) ML19332C7971989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review & Status of Corrective Actions Initiated, Per 10CFR50.54(t) ML20246A0421989-08-18018 August 1989 Advises That S&W Notified by Util That Responsibility for Facility Code Control Program Will Be Terminated Effective on 890823.EBASCO Svcs,Inc Selected to Assume Responsibility for Code Control Program Effective on 890824 ML20247R7291989-07-28028 July 1989 Advises That Status of Suspect molded-case Curcuit Breakers, Identified in Initiative Element One Will Be Provided by 890815.Util Estimates That 750 nonsafety-related Breakers in Warehouse Stock Examined as Part of Initiative Element Two ML20247D2491989-07-12012 July 1989 Forwards Communications Repts Associated W/Design Control Review ML20247A9261989-05-11011 May 1989 Forwards State of Tx & Local Govt Objectives for Graded Exercise Scheduled for 890725-26 ML20245J3341989-04-0707 April 1989 Forwards Summary of Points of Agreement Reached at 890308 Meeting.Agreements Will Be Subj to Further Discussion Among Parties.W/Certificate of Svc.Served on 890427 ML20246H4791989-03-0606 March 1989 Forwards Communications Repts Associated W/Corrective Action Programs for Plant Independent Assessment Program Phases ML20206F7201988-11-14014 November 1988 Forwards Communications Rept Transmittal 47 Re Independent Assessment Program on All Phases of Conduit Support Design Review ML20151X2621988-08-19019 August 1988 Forwards Rev 4 to Independent Assessment Program:Conduit Support Design Review Issues List for Comanche Peak Electric Station - Unit 1 ML20154H6281988-05-21021 May 1988 Requests to Be Advised at Earliest Opportunity Whether Projected Schedule for Issuance of Phase IV Rept Available. Related Correspondence ML20147F8911988-03-0303 March 1988 Forwards Communications Repts Associated W/Piping/Pipe Support Audits ML20147G2941988-03-0303 March 1988 Forwards Communication Repts Re Cable Tray Audits,Per Independent Assessment Program ML20147H4891988-03-0303 March 1988 Forwards Communications Repts Associated W/Independent Assessment Program Conduit Audits ML20147G2261988-03-0303 March 1988 Forwards Communications Repts Associated W/Civil/Structural Audits ML20196F7451988-02-23023 February 1988 Forwards Surveillance Repts Associated W/Phase 4 Independent Assessment Program Obtained During Util Review ML20196D4541988-02-0909 February 1988 Forwards Rev 4 of Mechanical Review Issues List (Ril). Rev Includes Review Issue 10 Re Component Cooling Water Sys Butterfly Valve at Outlet of Residual Heat Removal Hx.Rev of Ril Reflects Info That Cygna Gained Prior to Dec 1987 ML20236X2701987-11-25025 November 1987 Forwards Communications Repts on Independent Assessment Program,Phase 4 Re Cable Tray,Civil/Structural & Conduit Audits ML20236S3231987-11-13013 November 1987 Forwards Communications Repts Associated W/Conduit Audits. List of Communications Repts Encl ML20236S1281987-11-13013 November 1987 Forwards Communications Repts Associated W/Civil/Structural Audits.List of Communications Repts Encl ML20236R9531987-11-13013 November 1987 Forwards Communications Repts Associated W/Cable Tray Audits.List of Communication Repts Encl ML20236R9361987-11-13013 November 1987 Forwards Communications Repts Associated W/Piping/Pipe Support Audits.Repts Also Listed in Attachment ML20236M3131987-11-0909 November 1987 Forwards Communications Repts Associated W/Cable Tray Audits,Per Communication Repts Transmittal 33 for Independent Assessment Program - All Phases.List of Encl Communication Repts Provided on Attachment 1 TXX-6932, Advises That Value of 7.43 Ph Units Reported in Performance Evaluation Rept DMR-QA Study 7 Re 1987 NPDES QA Program Incorrect Due to Clerical Error.Reported Value Should Have Been 8.43 Ph Units,Which Is within Acceptable Range1987-11-0606 November 1987 Advises That Value of 7.43 Ph Units Reported in Performance Evaluation Rept DMR-QA Study 7 Re 1987 NPDES QA Program Incorrect Due to Clerical Error.Reported Value Should Have Been 8.43 Ph Units,Which Is within Acceptable Range ML20235V4691987-10-10010 October 1987 Forwards Communications Repts Re Cable Tray Audits,Per Facility Independent Assessment Program,Phase 4 ML20235W3331987-10-10010 October 1987 Forwards Communications Repts Re Civil/Structural Audits,Per Independent Assessment Program,Phase 4 ML20235R4941987-09-30030 September 1987 Notifies of Confirmation That Util Given Extension Until 871026 to Respond to Case Motion to Compel Applicants to Supply Complete Answers to Consolidated Intervenors Interrogatories & Request for Production of Documents ML20235R1961987-09-18018 September 1987 Forwards Rev 4 of Pipe Support Review Issues List. Any Procedural Control Issues Associated W/Author Original Pipe Support Reviews of Gibbs & Hill Being Processed as Part of Ongoing Design Control Assessments ML20235R0571987-09-18018 September 1987 Forwards Communications Repts Re Cable Tray Audits ML20234B1451987-09-16016 September 1987 Forwards Rev 4 to Pipe Stress Review Issues List (Ril).All Technical Issues Associated W/Discipline Closed.Still Waiting for S&W Calculation 15454-NZ(B)-GENX-035,Rev 2 to Verify Completion of Commitments Associated W/Ril 11 TXX-6718, Forwards Listed Outstanding Documents Requested Through Audits of Ebasco Svcs,Inc1987-09-0404 September 1987 Forwards Listed Outstanding Documents Requested Through Audits of Ebasco Svcs,Inc ML20238E5591987-09-0303 September 1987 Confirms That Brazos Understanding of Phrase,As Set Forth in Objections & Responses of 870814,essentially Correct. Related Correspondence ML20237K7931987-09-0101 September 1987 Forwards Communications Rept Transmittal 29,transmitting Piping/Pipe Support Audits for Independent Assessment Program Phase 4.W/o Encl ML20237J9981987-09-0101 September 1987 Forwards Communications Rept Transmittal 27,transmitting Conduit Audits Re Independent Assessment Program - Phase 4 for Plant.Delay in Processing Telcons Noted Due to Word Processing Sys Conversion.W/O Encls ML20237K7081987-09-0101 September 1987 Forwards Communications Rept Transmittal 28,transmitting Cable Tray Audits Re Independent Assessment Program - Phase 4 for Plant.Delay in Processing Telcons Noted Due to Word Processing Sys Conversion.W/O Encl ML20237K0091987-08-11011 August 1987 Memorializes Recent Conversations & Resulting Agreement Re Extension of Time Until 870908 for Filing Case & M Gregory Response to Applicant 870713 Motion for Reconsideration of Board 870622 Order.Related Correspondence ML20237J1281987-08-10010 August 1987 Forwards Rev 14 of Cable Tray Supports Review Issues List. Rev Based on Info Provided in Util Rev 2 to Generic Issues Rept for Cable Tray Hangers,Transcripts of Public Meetings & Results of Cynga Audits Through 870731 ML20236D3271987-07-22022 July 1987 Forwards Rev 0 to Civil-Structural Review Issues List, Based on Ref Info,Transcripts of Public Meetings,Documents Provided by Util & Results of Cygna Audits Through 870613 ML20216D1721987-06-20020 June 1987 Ack Receipt of .Clarifies Agreement Made During Telcon Re Date for Case to File Initial Supplementary Responses Deferred Until 870706.Necessary Discovery & Response Should Be Completed Also.Related Correspondence ML20215D7141987-06-0303 June 1987 Informs All Concerned W/Facility Independent Assessment Program of Address Correction ML20214S0641987-05-26026 May 1987 Ack Receipt of Applicant 870518 Fifth Progress Rept.Requests That Recipient Notify of When Substantive Matls Will Be Made Available So Case May Decide on Course of Action Re Comanche Peak Response Team Adequacy Issues.Related Correspondence ML20234C6731987-05-0101 May 1987 Forwards Communications Repts Associated W/Cygna Audits of S&W Civil/Structural Action Plan Re Plant Independent Assessment Program - Phase 4 ML20234C4401987-05-0101 May 1987 Forwards Communication Repts Re Cygna Audits of S&W Piping & Pipe Support Verification Activities,Per Phase 4 of Independent Assessment Program.Submittal Constitutes Communications Rept Transmittal 23 TXX-6361, Forwards Receipt to Ack Part 21 Rept Re Qualification Test Rept F-C5205-3, Nuclear Qualification - Terminal Blocks1987-03-23023 March 1987 Forwards Receipt to Ack Part 21 Rept Re Qualification Test Rept F-C5205-3, Nuclear Qualification - Terminal Blocks ML20205C0741987-03-18018 March 1987 Forwards Comments & Questions on Ebasco & Util Procedures & Criteria Re Responses to Conduit Support Review Issues List for Upcoming 870324 & 25 Conduit Support Meetings Per Rev 0 to Generic Issues Rept 1990-08-21
[Table view] |
Text
.
d k Vi C A S E (CITIZENS ASSN. FOR SOUND ENERGY)
= =g[j,j% -
2.14/9M-94M August 13, 1984 9NEf5Eb Mr. William A. Horin, Esq.
Bishop, Liberman, Cook, Purcell & Reynolds '84 ASO 15 II 1200 - 17th St., N. W. . . , .
Washington, D. .C. 20036 Dear Bills
Subject:
In the Matter of Texas Utilities Electric Company, et al.
Comanche Peak Steam Electric Station, Units 1 and 2 Docket Nos. 50-445 and 50-446 OL Open Discovery Items for Motions for Summary Disposition I wanted to memoralize our recent discussions regarding information requested by CASE for use in answering Applicants' various Motions for Summary Disposition.
The Board ordered in the Thursday, 7/26/84, on-the-record telephone conference call that ' :_ontact you and discuss the items which we had requested and had s.ot received yet. I telephoned you right after the conference call that day (about 4:45 or 5:00 P.M.) and suggested that you telephone me*the next day (Friday) at your convenience since it was difficult to get in touch with you because of the taking of depositions where you were in Glen Rose. You stated that you also had a lot of things you needed to do that evening (Thursday) and that you would call the next day.
You did not telephone Friday, 7/27/84; I was home all day. (This did not surprise or upset me, since I was aware that you were involved in the taking of depositions and were undoubtedly extremely busy.) On Saturday, 7/28/84, you telephone me (I didn't make a note of the time, but believe it was around 1:00 P.M. or so) while I was working with Mark Walsh on CASE's Answers to Motions for Summary Disposition; since Mark has such a limited amount of time to work on these answers, I asked if I could call you back after Mark left. You said that would be fine, and that you would be there.
However, when I telephone you at about 4:22 P.M., I had to leave word because they couldn't find you right then.
At about 1:00 P.M. on Sunday, 7/29/84, you telephoned me and we went through the open items on discovery from the 6/6/84 and 6/11/84 telephone conference calls with Applicants / Staff / CASE. I am attaching a summary of these open n
0400160114 840813 .
PDR ADOCK 05000445 (_
Q PDR
=~
_ l o i I
,~
items. You were going to check on them and get back with me. I also asked for a conference call to discuss other discovery regarding Motions about which we had not yet asked for discovery items, and suggested Thursday night, 8/2/84, at 7:00 P.M. our time. You indicated that you might want to wait until you got back to Washington Monday, 8/6/84, and that you would check and advise.
On Monday, 7/30/84, about 6:15 P.M., I telephoned you and asked about the conference call for Thursday night, 8/2/84. You indicated that there was no way Applicants could have it at that time, since neither Mr. Finneran nor Dr. Iotti would be available at that time, and that one of them (my notes aren't too clear here, but I believe Dr.- Iotti) would not be back until .the week-end. We set the conference call tentatively for Monday 8/6/84, at 7:00 P.M. our time; you asked that I check with Mark Walsh to see whether he could possibly get off earlier, since 7:00 P.M. In Dallas would be 8:00 P.M.
in Washington. You also stated that you would probably have some answers for us by phone the next day (Tuesday, 7/31/84), maybe not on all, but probably on most of the open items.
On Monday, 8/6/84, you telephoned to confirm that the conference call for later that evening was still scheduled. In response to my inquiry about the open items we had discussed, you stated that you had sent a letter on Saturday (8/4/84) and that we should get it not later than Tuesday, 8/7/84.
We did receive it on 8/7/84; however, because of the deadlines to which we ,
were working, on 8/6/84 we filed Answers to the Motion for Summary Disposition on AWS/ASME (design) without having received all of the requested information.
There are a few things which should be pointed out. One is that, contrary to your representation to the Board during the 7/26/84 on-the-record telephone conference call (Tr.13,836), there is an outstanding discovery request regarding the A500 Steel filing and has been since our 5/17/84 Motion for Discovery (or at least since 6/15/84 when the Board ordered Applicants to supply the documents requested for item 9, as discussed on page 2 of the attached summary).
Another is that there was no mention in your 8/4/84 letter of the open items on gaps or safety factors (see page 7 of attachment). I just wanted to be sure these don't slip through the cracks.
And finally, it frankly appears to us at this point that Applicants are stalling regarding the A500 steel documents we originally requested on 5/17/84, and we have indicated this to the Board in the Motion for Additional Time to respond to the Motions for Summary Disposition, which we are filing at the same time we file this letter. We'll appreciate your
- expediting this as much as possible, since it will take us some time to review the documents once we receive them; we can't just immediately turn around and send in an answer the moment we get the documents.
2
(, _
i We'll appreciate any assistance you can give us in getting the necessary documents.
Sincerely, CASE (Citizens Association for Sound Energy)
_w> h rs.) Juanita Ellis President e Attachment - Summary of Open Discovery Items, Motions for Summary Disposition cct Service List O
e 3
CASE'S REQUESTS FOR INFORMATION AND DOCUMENTS RE: AFFLICANTS' MOTIONS FOR SUletARY DISPOSITION NOTE:
f0 In additior to what has been shown here, CASE also 4s,ked ApplicantstosupplywhatevertheysupplytotheNR04Seg It is our understanding that documents supplied at-the meeting ~
ft Bethesda between Applicants and NRC Staff were boundfintoJche,back of the transcripts.
These are all items requested on or before 6/11/84; they do not include the additional 7 items requested in the 8/6/84 Applicants / Staff / CASE telephone conference call on other Motions.
We have shown the most recent information available to CASE as of 8/13/84.
- * = Items which CASE considers open as of 8/13/84.
(*) = Items regarding which CASE would like to have a written answer but can proceed based on our current understanding if necessary.
- ** = CASE answered without having received' requested information.
- 1. A500 Steel -- to be supplied per Board's verbal order in 6/15/84 telephone conference call:
From CASE's 5/17/84 Motion for Discovery Regarding Applicants' 4/11/84 !
Response to Partial Initial Decision Regarding A500 Steel: 1
(*) Item 6, page 7 (Staff is to send letter to Applicants; Applicants will supply information); on 7/7/84, Mr. Horin advised Mrs. Ellis that there was no documentation on this; Mrs. Ellis asked him to confirm in writing. On 7/29/84, Mr. Horin advised that he would check to be sure and advise. No further response as of 8/13/84.
"Res Page 16, first full paragraph: That portion of the design criteria from PSE, NPSI, and ITT Grinnell that indicates level B allowables are to be used with level C loads. ( Answer for each.)"
Item 8, pages 7 and 8: Received 7/6/84.
- " List of the referenced 182 supports on page 19. ,
"We are asking for a list of the supports which were the 1 basis of Applicants' analysis which ' demonstrates that all stresses in the. sampled tube steel support members remained below even the reduced allowable stresses' etc. We plan to utilize this list in conjunction with item 9. following."
l
o Ites 9, page 8: Not received as of 8/13/84; gave Applicants specific c
criteria 7/29/84; Applicants promised " shortly" in their 8/4/84 letter (received by CASE 8/7/84).
The Board ordered Applicants to supply in 6/15/84 conference call
-(Tr. 14,069). On 7/6/84, CASE received Applicants' 7/5/84 letter, to which was attached a listing of the supports, with Applicants suggestion that CASE select a sample of 20 from this list of the approximately 180 supports for our review of the relevant calculations. i (Mr. Morin had discussed this suggestion in an earlier telephone call; Mrs. Ellis did not agree. The reasons CASE did not want to pick supports from just a list were discussed at length in the 6/6/84 Staff / Applicants / CASE telephone conference call at Tr. 106-111 regarding 60 supports discussed in the generic stiffnesses Notion for Summary Dispasition.)
During the 7/26/84 conference call, the Board ordered that CASE provide Applicants with criteria from which about 20 supports would be selected, for which Applicants are to provide calculations and drawings. The following criteria were given to Mr. Horin on 7/29/84; have not received as of 8/13/84:
Large bore I Large loads (both in magnitude and % of allowable)
With Richmond inserts where there are two or more spans Members that are in bending
" Rat Page 19: Calculations and drawings for the 182 supports reviewed, at the time of the review, referenced on this page." l (See full discussion in CASE's Motion.)
l Ites 12, page 9: Received 7/6/84.
"Re Page 1 of 2 of Attachment Letter Applicants sent to ASME for the interpretation."
(*) Item 13, page 9: It is CASE's understanding that there is no such documentation.
"All documents (construed in the broad sense to include all handwritten notes, etc.; if in doubt, see definition contained within CASE's requests for documents and interrogatories)'which the Applicants made while discussing the interpretation with ASME."
(*) Ites 14, page 9: Mr. Horin advised by phone 7/7/84 that Applicants do not know this information.
" Supply the names of the individuals who were on the ASME Committee who made the code interpretation.
2
"12., 13., and 14. CASE is concerned about what gives the appearance of possible bias on the part of ASME regarding their interpretation. We want to emphasise that we are not making any prejudgements or accusations in this regard. However, as demonstrated below, there are certain questions which have been raised which must be answered if CASE and the Board are to have confidence in Applicants' assertions or in ASME's interpretation.
The reasons we seek reassurance in this regard ares" (see details set forth on pages 10 and 11 of CASE's 5/17/84 Motion for Discovery).
(See also 6/6/84 Conference Call Transcript, pages 62 and 66.)
- 2. Dancing Factors for OBE and SSE 1.oading Conditions - CASE Answer flied 8/6/84 From 6/6/84 Conference Call Transcript (unless otherwise indicated, the items referred to are from Applicants' Statement of Material Facts as to Which There Is No Genuine Issue):
Item 3: Received 6/29/84. Documentation that valves have been properly evaluated at 1% damping (not 2%); Applicants position was that they don't believe it's a requirement, but are going to check and provide something one way or another. Tr. 10-13.
Ites 4: Received 6/29/84. Calculations to back up statement that it is conservative to use the higher damping value ("Fiping stress analysis probles 141, which includes support number . . . used 2 and 4%
critical damping for calculating the coupling factor.) Tr. 13.
- 3. AWS and ASME Code Provisions - Deslan - CASE flied Answer 8/6/84 before receiving requested information **:
From 6/6/84 Conference Call Transcript (unless otherwise indicated, the items referred to are from Applicants' Statement of Material Facts as to Which There Is No Genuine Issue): .
Ites 3: Not received as of 8/6/84; CASE esiled Answer 8/6/84 based on our understanding. Answered in Applicants' 8/4/84 letter (received by
, CASE on 8/7/84).
Re statement that there is documentation to the QA group in
' August of 1982 reflecting that weld design at CPSES were using configurations virtually identical to that noted in Appendix B of AWS D1.1 re effective throat thickness for skewed T-joint welds:
requested some form of written documentation to show that this was incorporated into the design manual for PSE, ITT Grinnell, and NPSI 3
I .
9 '
(whatever exists on it - procedure or whatever); if not
! procedura11 sed, want documentation that they knew to do this and were in fact doing it. Tr. 19-21.
l Ites 5: Received. Ret statement re design procedures being utilised (see Ites 3 above): want those design procedures. Staff to supply L
information ret their statement in the SIT Report on skewed welds. Tr.
! 21-23.
l The Staff later identified this as having been contained in an interoffice meno, C?PA-22,616, amended 8/27/82, which is the same meno attached to Applicants' Motion.
Item 10: Received 6/21/84 (itea #4). Ret statement that the AWS punching shear analysis was required or is incorporated because it
- deals with large tubular structures with relatively large flange width to flange thickness ratios; want documentation that this is correct.
- Applicants stated that there is such a statement in the code, and they will provide it.. Tr. 24-27.
Ites 10: Not received as of 8/6/84; Mr. Horin advised that maybe this was page out of AWS sent with 6/20/84 letter from Applicants; supplied to NRC Staff, per Mr. Mizuno, attached to a letter; Applicants are to supply date of the letter. In Applicants' 8/4/84 letter (received by CASE 8/7/84), Applicants' stated that this information was described in
' their "most recent" letter to the NRC Staff; the date of the letter was not included.
Ret Applicants' statement that these conditions are not present in tubular members used at CPSES and that they do not apply to the relatively small tubular members used in pipe supports at CPSES, want documentation that statement is correct.
(The question that these conditions do not apply to pipe supports at CPSES is also a Staff question.) Applicants will respond. See full discussion at Tr. 24-30.
- 4. Friction Forces -- CASE filed Answer 8/6/84 From 6/6/84 Conference Call Transcript (unless otherwise indicated, the items referred to are from Applicants' Statement of Material Facts as to Which There Is No, Genuine Issue):
Ites 1: Received 6/29/84. Want documentation showing what Gibbs &
Hill and Westinghouse do in regard to friction forces in the design of pipe supports and soment restraints. Applicants will check and advise.
Tr. 36-37.
Ites 6: As of 7/29/84, CASE was still showing as not received. Mr.
Horin stated that the G4H Spec. MS-46A attached to the Motion is the documentation for this. Documentation that ITT Grinnell uses a factor 4
s i
of safety of 5 to 1 for pipe supports. Applicants stated that ITT Grinnell had also committed to this in Gibbs & Hill Specification 2323-MS-46A.
Mark Walsh stated that it was his recollection that Jack Doyle had a docuesnt in his deposition / testimony which indicated a factor of safety of 4; he is to supply Applicants with information on that, and
~they will respond to the question. Applicants stated that they are
" confident that we've always used a factor of safety of five to one."
Tr. 45-46. Advised Mr. Morin was actually in PSE Manual,Section XII (not sure from my notes, but might have erroneously told him Section IVII), pages 12-15 of 364. In any event, CASE answered Motion 8/6/84.
(None of the calculations which were provided were vendor certified; CASE wanted to see the vendor certified calculations for those supports.' Applicants responded that these particular supports were five supports that had less than 1/16" moyeesat and they had no calculation of friction loads in the design of those supports; so they supplied an additional calculation to show the effect of including the friction load in these supports that have the movement less than 1/16";
so these wouldn't be vendor certified calculations; they were additional calculations.
(CASE still wanted to see the calculations as comparison (for example, the welds and other items that were considered); would like to see how this compares with the actual calculations that exist now.
Applicants stated that the reason this is not vendor certified is that this support no longer looks like this. "What we analysed was the support as it' existed on the drawing that was in Jack's exhibits. And so this support, as it looks there now . . . does not exist now. So there wouldn't have been any vendor certified cales for it and we had to generate a set of celes for that particular condition."
(CASE wanted to have a statement of why there was a change made.
Applicants argued that the reason for their making a change on that pipe support is irrelevant to the point that they're trying to make about friction forces because the support does not even exist any longer, and that even if they changed it, friction is not certainly the reason for the change and here they are addressing friction only. Tr. l 46-54.) '
Table 1: Received 6/21/84 (itee #3). Re: Support CT-1-004-011-532R,
,one of the five supports on which the Applicants provided calculations (the first one that's listed on Table 1), page 4 of 4: Want to see the referenced analysis. Applicants agreed to provide it. Want clarifications on these interactises and the basis for them. TR. 55-57 5
g un . i
- 5. Section Property Values From 6/6/84 Conference Call Transcript (unless otherwise indicated, the items referred to are from Applicants' Statement of Material Facts as ,
to Which There Is No Genuine Issue):
(*) Item 2, 4th and 5th sentences (as clarified; i.e., that this referred to PSDG, pipe support design group, which was actually the forerunner organisation to PSE at CPSES): Mr. Horin stated 7/29/84 that there was not anything more than was was in the Affidavit attached to Applicants' Motion for Summary Disposition.
Want to see the design criteria for the PSDG group and the FSE group (the group making field changes to the pipe supports; same group Cary Brown was involved in). Applicants responded that "I think we're into an area here that that group was not responsible for, that designe*d the support. They simply were the group who made the field changes, documented those changes and forwarded that information to the original design organisation for approval. As such, they were not required to have the same criteria that was the responsibility of the design organization to assure that that change met the requirements." CASE still requested the information. Tr. 60-61.
- 6. Caps -- CASE filed Answer 8/13/84 without receiving the requested information **
From 6/6/84 Conference Call Transcript (unless otherwise indicated, the items referred to are from Applicants' Statement of Material Facts as to Which There Is No Genuine Issue):
, Item 1: Discussion as to whether or not the code allows Applicants to 4
choose either a bearing or a friction connection as long as it is
, properly designed. Tr. 70-74.
Mark Walsh to provide portion of code which prohibits using bearing type connections. Is implicit in the code; will be argued in CASE's answer to Applicants' Motion for Summary Disposition.
Item 2: Received 7/16/84 Documentation (original and n11 revisions of procedures or whatever other documentation exists) showing that QC inspectors inspect the whole tube steel base plates prior to inserting the bolt. Tr. 74-
- 76.
Item 3: CASE was showing (apparently erroneously) as seill open as of 7/29/84 Mr. Horin stated that this was supplied as item 2 of Applicants' 6/28/84 letter. l Documentation showing why a linear distribution would be allowed ;
to come up with these maximum bolt hole values. Tr. 76-78. l
- I 6
z.
Iten 10: CASE was still showing open (apparently erroneously) as of 77fF/E Mr. Morin advised that this was Ites 4 of Applicants' 6/28/84 letter.
Applicants are to check on whether or not at Comanche Peak they (including, in particular NPSI) utilise the snubbers,and take into account the dead band, and by so doing, they decrease the stiffness of the snubber. Tr. 85-87.
- Ites los CASE is to supply information to NRC Staff (Applicants are already aware of it). Applicants did not release CASE from their admonition not to use this information until the 7/26/84 conference call. This will be included in CASE's fillag about the use of information obtained in rate hearings, regarding ANI reports and records.
Applicants clarified that for Classes 2 and 3, the piping analysis is only done with one set of generic stiffnesses, and that they use actual stiffnesses for Class 1.
- CASE asked: "When a pipe support that was classifled as class two is reclassified as class one, is its stiffness also considered?"
Applicants stated that they were not aware of any such reclassifications. CASE was asked to identify any such instances however, we were unable to do so at that ties because Applicants still had not given us their release to do so. -(It should be noted, however that Aeolicants were aware of such instances at least since CASE's 6/30/54 letter under subject of Docuasats Obtained by CASE in Rate Mesrinas Which Are Also Relevant and Material for Operatina License Nearinas, as well as our 6/30/84 Request to Applicants for Admissions. to which were attached a summary of each ANI Report and Record as wel;. as a cosv of each such document.) The Staff asked that we supply thee with the information when we could. Tr. 88-91.
7.. Upper 1.ateral Restraint - had just received lots of information at ties of last conference call on 6/11/84: did not ask questions at that ties or in later telephone conference call. We are still reviewing the thousands of pages of documents already received regarding this Motion, as well as the information contained in the transcript of Staff /
Applicant asetings in Bethesda.
- 8. Safety Factors From 6/11/84 Conference Call Transcript (unless otherwise indicated, the items referred to are from Applicants' Stateasnt of Material Facts as to Which There is No Genuine Issue):
- Iten 1: CASE requested a copy of all the references which were uti:,ised and listed in affidavit. Tr. pages 6-8. Have received most, encept for Items 37, and 40 through 44. Received 7/2/84: 1-12, 14-15, l 17, 19-21, 23-30, 33, 36, 38 picked up 7/20/84: 13, 16, 35, 39: picked '
up 8/1/84: 18, 22, 31, 34 picked up 8/6/84: 32. '
7
I' i
9.. Generic Stiffnesses From 6/6/84 Conference Call Transcript (unless otherwise indicated, the items referred to are from Appli, cants' Statement of Material Facts as
~to Which There Is No Genuine Issue):
Ites 2: Received. Applicants are to supply a listing of the plants that were surveyed and by each company. Tr. 93-95.
Ites 4: Received 6/21/34 (items #1 and #2). Documentation that shows that U-bolts and catalog items were factored into the actual stiffness calculations; i.e., calculations on all 60 supports where the actual stiffnesses have been calculated. Applicants explained that this would be quite a chore; CASE explained why we did not want just a saeple chosen by Applicants or chosen by CASE from a list. It was agreed that Applicants would supply toples of just the drawings of the 60 supports, along with the calculations for the drawing which Applicants consider to be most complex; if CASE does not agree that the one set of calculations provided by Applicants is the most complex, Applicants agreed to supply CASE with calculations for the one which CASE believes is most complex. Tr. 102-111.
Ites 5: CASE was showing open as of 7/26/84. On 7/29/84, Mrs. Ellis advised Mr. Morin that following further discussions with Mr. Walsh, it appeared that this had'been received on 6/29/843 it had been shown in Applicants' letter as being for Cape and this ites was therefore still shown as being open.
Docuesntation, including the tests of snubbers under a LOCA type condition, for Applicants' statement: " Tests conducted on snubbers with the sees rating as the two for which the calculated loads exceeded manufacturers' rated loads, specific scientific rated at 1,500 pounds for normal load set, have shown that the snubber will perfore its intended function of loads, which are considerably higher than rated."
Applicants agreed to provide the tests, which were done by Lucius pitkin Laboratory at the behest of Dr. Iotti, for a different project than Comanche Peak. Tr. 111-118, 120.
Ites 6: (See discussion at Tr. 120-128.) CASE was to review the transcript and got back with Applicants if we had further questions; believe we have enough information to discuss in Answer.
Dr. Iotti: "Are you asking whether it was considered at the pin, at.those joints?" Walsh: "What was done there?" Iotti: "I guess it depends on support to support, but I assume that it would have probably been--John, correct me again--the soment would probably be relieved at
. those joints than would be considered thin. And then I fail to see what the effect of the moesnt of inertis would be." Walsh: " Exactly, if that's how it was modeled. If it was modeled continous over the support, it does have an impact." E111st "I think what he wants to know is how is it handled by the applicant, is that right?" Walsh:
"Right ." Tr. 128. Finneran: "I would say it does not have an tapact 8
i on stiffness calculation, deflection calculations. It's still a pin
[ joint whether it's continuous through the joint or not, isn't it?"
f .Walsh: "No." E111st "I think what he's wanting to know is how it was I handled by ,the applicants in their analysis, right?" Walsh: "Yes.
That will be one of the items. If you're going to bring in a sample calculation, show one with the tube steel aseber with three Richmond inserts underneath it, as existed in any of those calculations. That would be one of thee I'd be interested in looking at." Tr. 128-129.
Misunot.". . . Th* staff will be asking a few questions on the last point that Mark was talking about at the Friday aseting. So I would suggest, Mark, that when you get the transcript, review what we ask and what the applicants respond, and then see if you have some additional questions on that."
- 10. U-Bolts Actina As Two-Way Restraints From 6/11/84 Conference Call Transcript (unless otherwise indicated, the items referred to are from Applicants' Statoesnt of Material Facts as to Which There Is No Genuine Issue):
Ites 1: Not received as of 7/29/848 on 7/29/84, Mr. Morin advised Mrs.
Ellis that there is no such documentation. See also discussion in I following ites.
CASE requested the criteria that would say which U-bolts need to be cinched up and which ones need not be cinched upt documentation that l there was an original intention that some of the U-bolts should be cinched up and sons of thee shouldn't. Tr. 8-16.
Ites 1: Answer not received until 8/7/,848 on 7/29/84, Mr. Horin stated that he would check further. In 8/4/84 letter (received by CASE on 8/7/84), Applicants advised that Dr. Iotti's answer in the 6/11/84 conference call was all that we would be receiving.
Asked for documentation showing why NPSI had allowables for both directions. (Siellar to question in ites above.) Tr. 16-21. (See further discussion through p. 23.)
Ites 3: Received 6/21/84 (Itee #5). Requested results of the testing and documentation that shows what stiffness Gibbs & Hill actually used for the systees that they evaluated. Tr. 27-28.
Ites 6: Received 6/21/84 (Itee #5). Requested documentation showing that the manufacturer's allowable values referenced in or applicable to itse 6 is consistent with that used by an NPSI design in 1982 Applicants were to clarify. Tr. 29-31.
9
' .e
- 11. Richmond Inserts - Had just received at time of 6/6/84 and 6/11/84 conference calls; discovery not requested during those calls.
- Applicants agreed to supply some documents in.8/6/84 Applicants / Staff /
~
CASE telephone conference call. ~
Reasinina Motions for Summary Disposition
- Discovery not requested on remaining Motior.s through 8/5/84.
Applicants agreed to supply some documents in 8/6/84 Applicants / Staff / ',
CASE telephone conference call (not included in this summary).
b
- QA for Desian By mutual agreement, to keep from tying up everyone's
- time on non-technical matters during the 8/6/84 Applicants / Staff / CASE L
telephone conference call, CASE is to file request for documents in writing. Had hoped to have in the mail by the middle of last week, but due to press of other more urgent matters (and the fact that there was I
- a lot to cover), have been unable to do so yet. Should be able to get '
l it into the.anil by the middle of'this week.
t e
O b
e '
l :
i l
9 h
10 l
-