ML20235R196

From kanterella
Jump to navigation Jump to search
Forwards Rev 4 of Pipe Support Review Issues List. Any Procedural Control Issues Associated W/Author Original Pipe Support Reviews of Gibbs & Hill Being Processed as Part of Ongoing Design Control Assessments
ML20235R196
Person / Time
Site: Comanche Peak  
Issue date: 09/18/1987
From: Williams N
CYGNA ENERGY SERVICES
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20235R198 List:
References
NUDOCS 8710070825
Download: ML20235R196 (1)


Text

A

't A c M,

g e/ %g V

4 Ve w saeveras 2121 N. Cahtomia Blvd., Suite 390, Walnut Creek, CA 94596' 415'934 5733 September 18, 1987 84056.120 Mr. W. G. Counsil Executive Vice President TU Electric Skyway Tower 400 N. Olive St., L B. 81 Dallas, TX 75201

Subject:

Pipe Support Review Issites [ht - Rev. 4 Comanche Peak Steam Electric Station independent Assessment Program - All &ses Job No. 84056

/

Dear Mr. Counsil:

Enclosed is Revision 4 of the Pipe Support Review Issues List (RIL). All changes are indicated by a revision bar in the right margin.

All technical issues associated with this discipline have been closed.

Any procedural control issues associated with Cygna's original pipe support reviews of Gibbs & Hill are being addressed as part of the ongoing design control assessments.

If you have any questions or require further information, please contact Cygna at your convenience.

Very truly yours, LJ h'r<

l d N. H. Wiiliams i

Project Manager Enclosure NHW:rir cc:

Mr. J. Redding Mr. L Nace Mr. W. Counsil i

Mr. J. Muffett Mr. D. Pigott -

Ms. A. Vietti-Cook i Mr. C. Grimes Mr. E. Siskin Mr. R. Klause 8710070825 070918 1

PDR ADOCK 05000445 f) t l

f s._._

o i

]