ML20196D454

From kanterella
Jump to navigation Jump to search
Forwards Rev 4 of Mechanical Review Issues List (Ril). Rev Includes Review Issue 10 Re Component Cooling Water Sys Butterfly Valve at Outlet of Residual Heat Removal Hx.Rev of Ril Reflects Info That Cygna Gained Prior to Dec 1987
ML20196D454
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/09/1988
From: Williams N
CYGNA ENERGY SERVICES
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20196D457 List:
References
84056.124, NUDOCS 8802170146
Download: ML20196D454 (2)


Text

(

() Y 0

g J)h)beht r a d

$nS[ces 415/934-5733 2121 N. California Blvd., Suite 390. Walnut Creek. CA 94596 February 9,1988 84056.124 Mr. W. G. Counsil Executive Vice President TU Electric Skyway Tower 400 North Olive Street, LB 81 Dallas, TX 75201

Subject:

Mechanical Review Issues List - Revision 4 Comanche Peak Steam Electric Station

\\

Independent Assessment Program - All Phases j

Job No. 84056

Dear hir. Counsil:

j Please find enclosed Revision 4 of the hiechanical Review Issues List (RIL).

All j

changes from Revision 3 are indicated by a revision bar in the right margin. Included in this revision is a new Review Issue No.10, which deals with the component cooling water system butterfly valve at the outlet of the residual heat removal heat exchanger.

This revision of the RIL reflects information that Cygna gained prior to and during their December,1987 review.

Of the ten hiechanical Review Issues, two remain open as of the December,1987 review date.

These are, Issue Nos.1 and 4.

hicchanical Review Issue No. I was further reviewed at Stone and Webster Engineering Company's Boston office the week of February 1,1988. hiechanical Review Issue No. 4 was reviewed at the Comanche Peak site during the week of January 25, 1988. Information from these two reviews will be analyzed and the results included in Revision 5 of this RIL If you have any questions or require further information, please contact Cygna at your convemence.

Very truly yours, flu O!

YCl N. H. Williams Project hianager Enclosure

!$[ 00N f

th I

Bostm Chicago Houston Parsippany Toledo Walnut Creek

evKr Mr. W.G. Counsil February 9,1988 Page 2 cc-Mrs. J. Ellis Mr. T. Jenkins Mr. D. Pigott _. _

Mr. J. Redding Mr. C Grimes Ms. A. Vietti-CookI Mr. L Nace Mr. E. Siskin Mr. J. Muffett Mr. S. Stamm I

1 O

s TV IT?s O 4 A C/s T 'T'T) 114

_ _ _. _ _. _ _ _ _ _ _ _ _. _ _