Forwards Communications Repts Associated W/Cable Tray Audits,Per Communication Repts Transmittal 33 for Independent Assessment Program - All Phases.List of Encl Communication Repts Provided on Attachment 1
ML20236M313
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/09/1987
From: Williams N
CYGNA ENERGY SERVICES
To: Ellis J
Citizens Association for Sound Energy
References
84056.126, NUDOCS 8711130086
Download: ML20236M313 (49)


Text

>

7 s

A9 g

k g

j --

o p ci,;; w.w.

' -. a -

savges '

2121 N CaMornia Blvd. Suite 390. Walnut Cree ( CA 94596 *

-415/934 5733 November 9,1987 84056.126 1

' Mrs. Juanita Ellis '

. President, CASE 1426 S. Polk Dallas, TX 75224

.t

Subject:

Communications Report Transmittal No. 33 independent Assessment Program - All Phases.

Comanche Peak Steam Electric Station TU Electric Job No.'84056

Dear Mrs. Ellis:

u l

Enclosed please find communications reports associated with the cable tray audits. A

l l

list of the enclosed communications reports appears in Attachment 1.

l-l If you have any questions or desire to discuss.any of these documents, please do not '

hesitate to call.

i Very truly yours, j

t J

Yb

}

I N. H. Williams j

Project Manager j

(

o NHW/amh 1

Attachrnents cc-Mr. J. Redding (TU Electric) 1 l

Mr. W. Counsil (TU Electric)

Mr. J. Muffett (TU Electric)

Mr. L Nace (TU Electric) j Mr. G. Ashley (Impell) i l

Mr. D. Pigott (Orrick, Herrington & Sutcliffe)

.j Mr. C. Grimes (USNRC) i mms."A; Vietti. Cook (USNRC) o q

l Mr. R. Alexandru (Ebasco) 1 i

8711130086 871109 PDR ADOCK 05000445 l _

A PDR i

G San Francisco Boston Chicago. Pbrsippany

'I I

\\TUE\\84056\\LTR.126 4

' J. - t g..

2

'^.

j Mrs. Juanita Ellis November 9,1987

Page 2

' ATTACHMENT 1-LIST OF ENCLOSED COMMUNICATIONS REPORT TIME DATE' 04/04/87 11:15 a.m.

04/22/87 1G0 p.m.

04/27/87,

8:30 a.m.

04/27/87 8:40 a.m.

04/27/87 2:15 p.m -

04/27/87

. 4:45 gm.

04/28/87

' 9:45 a.m..

04/28/87

' 1100 a.m.

04/28/87

' 3d0 p.m.

04/29/87 1:30 p.m.

1 04/29/87 400 p.m.-

04/30/87

- 11:30 a.m.

05/01/87 11:20 a.m.-

05/12/87

. 9:00 a.m.

05/13/87 1000 a.m.

05/13/87 12d5 p.m.

06/22/87 9:00 a.m.

06/22/87 1190 a.m.

06/25/87 1030 a.m.

09/22/87 1100 a.m.

09/24/87 500 p.m.~

09/25/87 8:45 a.m.

. \\TUE\\84056\\LTR.126

.i

Communications Al *j t Rsport i

.[

- lll11111llll!!!I11ll1111i111ll e-T ' :==-"

~ ~ ~T -

Company:

l elecon X Conference Report Project-

-Job No.,

)

TU Electric cate:

CPSES IAP Phase 4 04/04/87 subject Ebasco Cable Tray Audit 11:15 a.m.

Place Ebasco (NY)

]

of l

Participants:

P. Harrison Ebasco l'

John Russ Cygna l

Required item Comments Action By Cygna requested a copy of the AISC Detailing Manual for use during the audit. Ebasco provided the following:

1.

AISC " Structural Steel Detailing", 2nd edition.

2.

AISC " Detailing For Steel Construction".

)

l TUE/040487-A. CON

)

j]

Page of SignedG fAj'),

Td 11]))IJN D 1

1 f

- SEh ATTA'CN5'D DISTRIBUTION SHEET.

oistriouuon:

1020 Os a l

DISTRIBUTION LIST Mr. J. Redding Mr. L Nace Mr. W. Counsil Mr. D. Pigott l

. Ms. A. ViettiCook Mr. C Grimes 1

Mr. R. Alexandru Mr. J. Muffett Ms. N. Williams Mr. J. Russ Mr. W. Horstman Mr. K. Parikh Ms. D. Leong Mr. G. Ashley i

Project File l

l

r i

lt Communications g6 M L

A Report

'N lllll1111ll11111llll!!i1111111 Company:

CES Telee n Conference Report -

j

.l Project-Job No cate:

J CPSES IAP Phase 4 04/22/87 smect Cygna Position on Review Issues 1:30 p.m.

' Walnut Creek

Participants:

Of gg gg g i

Associates 1

John Russ Cygna Required f

1 item Comments Action By 1

Mr. Wu called Cygna to determine the status of.several issues in the Cygna RIL Mr. Wu stated that he was doing an audit of Impell Corporation's ' ffices in Walnut Creek for TU Electric. He' J

o specifically asked what Cygna's position was on Hilti expansion 1

anchors installed in diamond cored holes. I replied that the status i

was shown in RIL 3J.

Additionally, I noted that in the public meeting of 4/21/87, Stone & Webster was also involved with the evaluation of the problem in conjunction with Impell's effort. Mr.

Wu asked for a specific description of Cv:na's concern. I noted that the manufacturer's catalog called for the use of carbide i

tipped rotary hammer drills for assurance that the expansion anchors would meet the listed allowables. The use of a diamond 1

coring bit would result in a gre,ater variability' of the ultimate capacity of the anchor. I further added that the material to this effect had been provided to Impell in the audit held at the CPSES site.

Mr. Wu also asked what Cygna's position was on the twist buckling of angle sections. I told him that Cygna was presently evaluating the responses of both Impell and Ebasco.

TUE\\042287-A.TEL

9"**'

U I

kjh (h

'l 1

Distribution:

SE d 'A*ITACHED DISTRIBUTION SHEET.

1020 01a

r 1

I DISTRIBUTION LIST Mr. J. Redding Mr. L Nace Mr. W. Counsil '

Mr. D. Pipott Ms. A.:VmttiCook Mr. C Grimes Mr. R. Alexandru Mr. J. Muffett Ms. N. Williams Mr. J. Russ Mr. W. Horstman Mr. K. Parikh Ms. D. Leong Mr. G. Ashley Project File

}

1 I

i i

u - -

L

y l

Communications i

4 A (,n a Report llllllllllllllllllllllllllllll f

Company:

CES Teiecon.

conference Report -

Job No.

Project e

TU Enig CPSES IAP Phase 4

. o,ie 04/27/87.

i l

Cable Tray Support Design Review 8GO a.m.

I'**

subject:

Place

I Statistical Analysis of Bolt Holes / Edge Distances Ebasco (NY)

Participants.

P Hmim Ebasco i

D. Leong, J. Russ Cygna 1

)

Required 1

Item Comments -

Action By Cygna requested and received Ebasco Calculation Volume I, Book 22, " Statistical Analysis of Bolt Holes / Edge Distances in Cable Tray Hangera" for review at Ebasco's office.

I i

i 6

i I

i t,

l TUE\\042787-E. CON

^

hf)h,fj 1

1 Distribution: SEE-ATTACHED DISTRIBUTION SHEET.

l

'j im oi.

g

/

.I i

3, G[

y

. m

==w.

~--

U DISTRIBUTION LIST Mr. J. Redding Mr. L Nace Mr. W. Counsil

'i Mr. D. Pigott l

' Ms. Ar ViettKaA i

Mr. C Grimes Mr. R. Alexandru i

Mr. J. Muffett Ms. N. Williams Mr. J. Russ Mr. W. Horstman Mr. K Parikh i

Ms. D. Leong Mr. G. Ashley Project File

-l l

a

.i

)

t

(.

Busussp Communications

[TC@ ra Report 111ll1111111111111111111111lll

.y Company; Teiec n x conference Report ES TU Electric, CPSES IAP PHASE 4

" ' 84056-Date:

CPSES IAP Phase 4

~

04/27/87 sumect:

COMBS Program 8:40 a.m.

Place:

Ebasco, NY -

Participants:

of P. Harrison Ebasco D. Leong, J. Russ Cygna Required item Comments Action By Cygna requested and received for review the following:

.1. User's manual and engineering instruction for composite channel sections using " COMBS" computer program for Comanche Peak Steam Electric Station No. 1 and No. 2, Revision 1.

2. Description of analytical approach & verification.of computer program " COMBS', Revision 2.

TUE\\042787-A. CON s

f/ )f4 J/,I _

1 1

SEE AfTACHED DISTRIBUYON SHEET.

~

Distribution:

ihmoi.

e b

. DISTRIBUTION LIST Mr. J. Redding Mr. L Nace Mr. W. Counsil Mr. D. Pigott Ms.*VmttiOmk Mr. C Grimes -

. Mr. R. Alexandru -

Mr. J. Muffett i

Ms. N. Williams Mr. J. Russ Mr. W. Horstman Mr. K. Parikh Ms. D.Imng Mr. G. Ashley Project File 1.

'l r

l.,

l-

i E

. Communications -

mays 4 15% A Rep ~ ort llillllllllillllilllilllfilll! '

.j h ' Conference Report Company:

1

Telecon Project
,

Job No.

TU Electric 84056 CPSES IAP Phase 4 '

cate:

4/27/87 Subject Time:

1 Cable Tray Support Design Review 2:15 p.m.-

Ebasco ' Audit Piace:

Ebasco (NY) ima Participants.

' of P. Harrison Ebasco K. Parikh, W. Horstman Cygna -

i Required-i ttem Comments Action By 1

'i Cygna requested and received, for' use during the audit, copies of the cable tray span length drawings and the associated cross-3 reference index. This index can be used to locate the appropriate span length drawing for an individual support.

TUd\\042787 B. CON signed.

}

Page-of -

oistrieut,on:

SEE AfTACHED DISTRDMION SHEET.

im oi.,

i i;

i l

Q.'

t

' DISTRIBUTION LIST i

Mr. J. Redding Mr. L Nace Mr, W. Counsil.

Mr. D. Pigott L

. Mr AVietti<mok Mr. C Grimes.

Mr. R. Alexandru Mr. J. Muffett L

Ms. N.-Williams l

Mr. J. Russ

,1 Mr. W. Horstman l

Mr. K. Parikh Ms. D. I.cong Mr. G. Ashley i

Project File-4 1

9 l

l 1

i i

l i

i I

4 l

l l

.J i

)

k

'1 Communicatioris t9 td ; i Repod

~

1111llll113111111111ll11lll11

" " * ' ~

Company:

Teiec n

. conference neport CES Project.

Job No.

TU Electrical 84056 CPSES IAP Phase 4 o.te:

04/27/87

Subject:

Time-Cable Tray Support Design Review 4:45 p.m.

I Ebasco Audit piaee.

Ebasco (NY)

Participants:

of P. Harrison Ebasco K. Parikh, W. Horstman Cygna l

-l 1

Required item Comments Action By I

Cygna indicated that tneir copy of Ebasco's General Instruction for Cable Tray Hanger Analysis, Revision 4, was missing Sheet 36.

Ebasco said that this may be due to two pages sticking together in the photocopier and provided a copy of the missing page.

TUE\\042787 D. CON j

i Signed. Q Page

.1 1

of l

1

/ /!

/

/M SEs 'AYfA6TED^Di$iRIBUTf0N SHEET.

oistneution-

,o m,.

q

,(

=

i<

DISTRIBUTION LIST i

Mr. J. Redding

' Mr. L Nace.

Mr. W.' Counsil Mr. D. Pigott Ms. A.'VwttiCook

. 1 Mr. C Grimes Mr. R. Alexandru Mr. J. Muffett Ms. N. Williams Mr. J. Russ

. j Mr. W. Horstman i

Mr. K. Parikh Ms. D. Leong Mr. G. Ashley Project File i

i

1 1

= " - "= E Communications i

_( %'=fa Report Tm 9

lilllllilllllililllllilli!!lli l

1

]

Company:

Telee n conference neport ES Proact TU Electric 84056 CPSES IAP Phase 4 oate.

04/28/87 i

Subject Time:

Cable Tray Support Design Review 9:45 a.m.

Place:

Ebasco (NY) j Participants-of P. Harrison Ebasco J. Christudias Ebasco K. Parikh, J. Russ Cygna Required

)

Item Comments Action By 1

1 1.

Support CTH-17%1:

j C gna asked for Ebasco Vol. III to review the values of st ffness in STRUDL input at Joint 26.

l Since Vol. III was in Lyndhurst, Ebasco agreed to photocopy j

relevant pages and telecopy to N.Y. for Cygna review.

)

1 l

i TUE\\042887-E. CON Signed h*

}j '

Page of k It12sl]

5 SEE hT}'AdNED DISTRIBUTION SHEET.

Distribution-icro oi.

(,

4 1

s 4

.q DISTRIBUTION LIST Mr. J.' Redding Mr. L Nace Mr. W. Counsil Mr. D. Pigott.

Ms XViettiCook Mr. C. Grimes J

Mr. R. 'Alexandru Mr. J. Muffett Ms. N. Williams Mr. J. Russ Mr. W. Horstman Mr. K. Parikh -

3 Ms. D.' Leong Mr. G. Ashley -

Project File q

q l

u

.i j

I

~ i

I j

1

-Communications-i

(

t41% ia Report ll11ll11111ll11111111111lll!!!

Company:

Telecon

'X

- Conference Report Project:

Job No.

TU Electric 84056 CPSES IAP Phase 4 Date:

04/28/87 Sutiect.

Tirne:

i Ebasco Cable Tray Audit - Document Request 1100 a.m.

Place:

Ehnwa NY 1

Participants.

of P. Harrison Ehasco l

J. Rum Cygna Required Item Comments Action By Cygna requested the following items for use during the audit.

1. Calculations and output for the following cable tray supports:

J a.

CTH 1-7063 j

b.

CTH-1-7064 1

2. The ESML analysis for se above referenced supports.

4 l

3. The grouping codes for the above-referenced supports (group U1B2-301).

1 1

Ebasco provided Item 3 for Cygna's review.

Items 1 and 2 will l

be provided later.

TUE\\042887-B. CON l

Signed;

[

Page of SE$

'ii CHED DISTRIBUT3N SHEET.

D'5ib" ":

1020 01a

R c,

4

<1 DISTRIBUTION LIST'

' Mr. J. Redding Mr. L Nace Mr. W. Counsil

. Mr. D. Pipott -

Ms. A. VattiCook 4

4 3-Mr. C Grimes I

Mr. R. Alexandru -

Mr. J. Muffett j

Ms. N. Williams

-J Mr. J. Russ :

j Mr. W. Horstman l

' Mr. K. Parikh -

Ms. D. Leong Mr. G. Ashley Project File I

1

'i Communications g' rA t4 N Report s

j.

lll!!!i11!!1111ll1111lll11ll11

'l Company:

Telecon Conference Report j

1 Project:

Job No.

TU Electric 84056 oate:

CPSES IAP Phase 4 04/28/87 J

1

Subject:

Time:

j Cable Tray Support Design Review 3:10 p.m.

Place:

Ebasco Audit-Oversize Bolt Hole Study Ebasco (NY) 1

Participants:

of P. Harrison Ebasco j

D. Leong, J. Russ Cygna j

d Required item Comments Action By l

Ebasco provided the position paper " Effects of Bolt Hole Oversize in CTH System Adequacy" for Cygna's review at Ebasco's office.

This document will be submitted to TU Electric next week for distribution. Ebasco stated that the position paper was written in lieu of generating Calculation Book 26, which they originally had stated would be used to justify their position on oversized twlt holes.

Cygna asked Ebasco what the difference was between ; position l

paper and a Calculation Book.

Ebasco stated that the position paper was a summary of previous work performed in calculations, but that new calculations would not be performed.

1 1

I l

1 TUE\\042887-C. CON

)

N N /.),f// [

S " **

1 1

distribution.

'SEE MtACH$D BISTIUBUT1014 SHEET,

'l 1020 010

.- g i:

mm==n_.

DISTRIBUTION LIST Mr. 2. Redding 1

Mr. L Nace Mr. W. Counsil Mr. D. Pigott Ms.XVietti Cook Mr. C Grimes

' Mr. R. Alexandru Mr. J. Muffett

. Ms. N. Williams Mr. J. Russ Mr. W. Horstman Mr. K. Parikh

. Ms. D. Leong Mr. G. Ashley Project File i

i j

i

1 1

26ffTHE Communications ALW M R3 port lilllllllllilllllllllillllilli N " "" ""

--.i

^~

~

Company:

Teiec n X. conference soport -

ES Project Job No.

TU Electric 84056 1

CPSES IAP Phase 4 o.te:

.j 04/29/87 l

Subject ~

Time:

'l Ebasco Cable Tray Audit 100 p.m.

j Place:

Ebasco (NY)

)

J. Christudias Ebasco W. Horstman, J. Russ Cygna

{;

Required item Comments Action By.

e

Reference:

Communications' Report dated 28 March 1987, 9:45 a.m., " Audit of Cable Tray Hanger Supports", K.

Parikh, J. Russ (Cygna), and J. Christudias and P.

)

Harrison (Ebasco) participating.

Cygna received the document requested in the referenced communications report for use during the audit.

(

l l

I s

TUE\\042987 A. CON i

m ff )g )}y 1

1 oistnbution:

$EE NIT 4CllED DISTRIBUTION SHEET.

1020 0t a

m,

l']

i 1

DISTRIBUTION LIST Mr. J. Redding Mr. L Nace '

Mr. W. Counsil Mr. D. Pigott -

~

Ms.1A. %ettiCook j

Mr. C Grimes 1

Mr. R. Alexandru -

1 Mr. J. Muffett Ms. N. Williams 1

Mr. J. Run H

Mr. W. Horstman Mr. K. Parikh j

Ms. D. I.co 4g i

Mr. G Oley

.l Proy

.de 4

1 i

j i

1 1

i l

a 1

i

^l 1

-l l

l Communications 4 L n' ra Report-4 111111ll11111111lll11111111111 6 conference neport Company:

Teiec n CES Project Job No.

TU Electric 84056 Date.

CPSES IAP Phase 4 04/29/87 8"*'

Cable Tray Support Design Reyiew -

400 p.m.

Place:

Ebasco Audit Ebasco (NY)

Participants:

of J. Christudius, P. Harrison Ebasco S. Harrison TU Electric W. Horstman, J. Russ Cygna Required item Comments Action By

1. K-factors for In-clane Sidesway (Reference Calculation provided on April 29,1987, a.m.)

Ebasco indicated that these calculations addressed only the typical transverse type trapeze support where sidesway was associated with major axis bending of the posts.

For this i

case, major axis buckling will not govern the development of the allowable axial stress.

The only significant effect will be on the allowable axial stress which will affect the allowable bending stress reduction due to combined compression and bending as given in AISC Equation 1.6-la.

Cygna concluded that the k value. used in the study was unconservative but the use of a higher value would increase the interaction by approximately 3% for the transverse frame in the study.

l Cygna stated that their larger concern was on sidesway j

magnification for longitudinal trapeze frames where the major 3

axes of the post were parallel to the cable tray longitudinal j

axis. Cygna will review the longitudinal trapeze frames when i

received.

TUE\\042987-B. CON l

I Signed -

l Page

. of D'$tribut'on:

SEE ATTACHED DISTRIBUTION SHEET, 1020 01 a

]

Communications ALa Report j

i j

lll11llll1111111lllll1111111ll

[ sot *8y item comments During the review, Cygna noted that the support, CTEl-3580, appeared to have used a k-value of 1.0 for both axes of the j

Posts.

i 1

Ebasco stated that this~ was done since the post fell ' into the

' definition of a tension member. Cygna stated that the check for the compreAn requirement. was performed using an allowable compressive stress, Fa, calculated using k = 1.0.

Fa. must be calculated using the actual k, and only then can the tension member definition be checked. - Ebasco and Cygna decided to investigate this issue separately and continue discussion later.

I Ebasco provided Cygna with the.information on loading on longitudinal trapeze supports.

Cygna requested the following supports for review:

481 1268 3360 j

3936 1

3957 5143 5324

)

5629 6064 6348 All the calculations are ESM calculations.

l l

TUE\\042987-B. CON Page of 2

2 1020 01b

4 1

i

(

1 o

DISTRIBUTION LIST Mr. J. Redding -

Mr. L Nace Mr. W. Counsil Mr. D. Pigott l

%s. A. ViettiCook M

. C' Grimes ~ "

Mr. R. Alexandru

'l Mr. J. Muffett Ms. N. Williams Mr. J. Russ Mr. W. Horstman s

Mr. K. Parikh

.j Ms. D. Leong 1

Mr. G. Ashley -

Project File j

j t

I

~

l

'1 l

i

~-----

I.

~!

{.

~

.c.'

Lipsiglga Communications

[TiMTM p lilllilllilllillllllllllllllll Report Company:

Teiec n M

CES conference neport.

Project Job No.

CPSES IAP Phase 4 o,te:

04/30/87 subject Cable Tray Audit 1130 p.m.

Place:

Document Request Ebasco (NY)

P. Harrison Ebasco W. Horstman Cygna Required j

ltem Comments Action By i

Reference:

Communications Report, dated April 29,1987, " Cable Tray Support Design Review - Ebasco Audit," J.

I Christudias, P. Harrison, et. al participating.

Cygna received for review during the audit all the calculations requested in the referenced communications report except those for support CTH-15143.

TUE\\043087-A. CON Signed.

p Page

. of distribution-SEB ATTACHED ~DISTRIBUTIOKSHEET.

1020 0 t a

' % -3, i

i DISTRIBUTION LIST Mr. J. Redding Mr. L Nace Mr. W. Counsil Mr. D. Pigott Ms." A. ViettiCook Mr. C Grimes

- Mr. R.' Alexandru Mr. J. Muffett Ms. N. Williams

-i Mr. J. Russ Mr. W. Hontman Mr. K. Parikh Ms. D. Leong Mr. G. Ashley Project File

.i -

a l

J 4

-I l

y Communications.

4 L n,i Report y

llll1111lllllll111111111111111 I

l Company:

Teiec n x conference neport i

CES Pr4ect Job No.

TU Electric 84056 CPSES IAP Phase 4

.oate:

3 05/01/87 j

Subject Time.

I Cable Tray Support Design Review 1120 a.m.

]

Ebasco Audit 5:ece l

Ebasco, NY 3

SJ. Chen, P. Harrison Ebasco =

D. Leong. J. Russ Cygna l

l l

l l

Required item Comments.

Action By 1.

Axial Load in Tier Numbers Ebasco provided Cygna with some clarification regarding the material which addresses the lack of axial load in tier members due to application of transverse loads at the post connection.

It was noted that the copy of the material provided to Cygna was missing a reference to Calculation L

Book 2, Vol. I, Subject 10.

The axial load study uses results of Book 2, which provides j

a comparison of NASTRAN and STRUDL analyses to validate the STRUDL modelling techniques.

Axial load in tier members was not originally evaluated in Book 2, but is done in the new study. The new study evaluates the impact of the axial load on tier member stress interactions by considering different levels of acceleration in each of 3 1

directions and their combination.

The results of the study show that the stress interaction l

for the tier member changes by less than 5% (see sheets 6 l

and 9 of the evaluation). IAype and trapeze supports were included in the study.

Ebasco also looked at the axial loads in tier members for i

supports analyzed by RSM methods. They provided Cygna 4

l s

Signed-p Page

. of oistneutix-ssh'AITACHED DIST}ttbUTION SHEET.

l wm,,

Communications-Repod-4Ln i Ni ""~"

ll11111111111111111111ll111111

'~" ~ ]

a Reqwred item Comments Action By with the calculation documenting this review.

The results show the axial force in the tier accounts for about 2% of

-l the total stress interaction.

l 2.

Slenderness Ratios 1

In regard to the interpretation of the AISC_ position letter involving special requirements for members. exceeding a i

slenderness ratio of 200. Ebasco stands by its opinion that

-l the effective. length; factor : (k) can be taken as 1.0 to calculate kl/r and, thus, the axial allowable of the member.

l 3.

Tray Solices at Supoort Locations l

l Cygna asked Ebasco howithey evaluate supports with tray l

l splices located at the support location.

Ebasco agreed to i

l provide the information.

j l

l l

1 I

J 1

i TUE\\050187-C. CON Page of.

SEE ATTACHED DISTRIBUTION SHEET 2

2:

1020 0 t b

n gymys.

I 4

l DISTRIBUTION LIST H

.q Mr. J. Redding Mr. L Nace Mr. W. Counsil Mr. D. Pipott

  • Ms. A,Vatti Cook Mr.' C. Grimes 1

Mr. R. Alexandru l

' Mr. J. Muffett

-l Ms. N. Williams 1

Mr. J. Russ l

Mr. W. Horstman H

Mr. K. Parikh Ms. D. Leong Mr. G. Ashley Project File l

'1 i

l l

l l

l 1

l 1

b 4

.)

i 3

i i

l 1

z l

2

L' Communications L

  • = (

cfa Report lllll lllllllllllllllllllllli 1

Company:

Telee n Conference Report CES-Project:

Job No.

4 TU Electric 84056

.i CPSES IAP Phase 4 cate.

i" 05/12/87-Subject.:

Time-Cable Tray Support Design Review 900 a.m.

Impell Audit Place:

]

Lincolnshire. IL j

Participants:

of G. Ashley Impell W. Horstman Cvena

)

I l

Required

']

Item Comments.

Action By i

Impell provided draf.t copies of the white papers addressing the j

following concerns (see the Communications Report for March 6, 1987) :

1.

System Analysis 176-063-02:

error in input lumped weights; 2.

Support No. CTH-1-1227:

assumed bracing of beam from tray for lateral-torsional buckling; 3.

Load distribution in the ' intermittent fillet welds between base angles and embedded strip plates; 4.

The effects of thermal loads on cable tray supports; i

5.

Support No. CTH 113197:

evaluation of potential for member substitution with an MC6x12.

These papers are for review in Impell's office only.

TUE\\051287-A. CON l

i 1

signed-_ V Page of SEE ATTACHED DISTRIB0 TION SHEET.

D'5"ibution:

1020 01a

D

'l 4

i DISTRIBUTION LIST Mr. J. Redding -

Mr. L Nace Mr. W. Counsil

')

Mr. D. Pigott

%AViettdk" Mr. C Grimes Mr. R. Alexandru-Mr. J. Muffett j

Ms. N. Williams Mr. J. Russ -

Mr. W. Horstman

]

Mr. K. Parikh -

Ms. D. Leong Mr. G. Ashley Project File 4

.g I

1 q

4 1

i i.i'

Communications l

y din a Report lilllllilllllllllllllllHillli Company:

Telecon X Conference Report.

Project:

Job No.

TU Electric 84056 l

CPSES iAP Phase 4 Date:

05/13/87

Subject:

Time:

Cable Tray Support Design Review 1000 a.m.

Impell Audit.

Place:

Lincolnshire. It i

Participants-Of G. Ashley Imnell l

W. Horstman Cygna i

Required -

Item Comments

' Action By Impell provided a draft copy of white paper addressing the following topic (see Communications Report for May 12, 1987) :

i-Compressive axial stress levels in angle sections relative to o

the 1.6 increase in Fa-l This paper is for review at Impell's office only.

l l

l TUE\\051387-B. CON j

.I U[1 3 //

Page of l

Signed.

1 11 1 1 ] A m 1

1 b

SEE ADICH5 DISTRIMTION SHEET.

oistnbution:

l m oo,.

(

l

't

,j

' Q f

t

.(

.)

n. ===~ - -

.'1

^

-)

+

~ DISTRIBUTION LIST i

Mr. J. Redding l

Mr. L Nace Mr. W. Counsil i

Mr. D. Pigott

- Ms. A. ViettiCook Mr. C Grimes Mr. R. Alexandru i

Mr. J. Muffett Ms. N. Williams Mr. J. Russ Mr. W. Horstman Mr. K. Parikh Ms. D. W ng Mr. G. Ashley Project File 1

y I.

a Communications Report A(n i lllllll1lllll111lll1ll1111llll 1

Company:

Telecon X

Conference Report p

Project; Job No.

TU Electric 84056 CPSES IAP Phase 4 o te:

05/13/87 Subject Time:

Cable Tray Support Design Review 12:15 p.m.

Impell Audit Piace Lincolnshire, IL Participants.

of P. Harrison Ebasco W. Horstman Cygna I

Required item Comments Action By Ebasco provided draft copies of the following white papers addressing several of the issues discussed on May 1,1987 :

1.

Determination of the dominant frequency at the pdnt of conduit attachment to a cable tray hanger, i

2.

Responses to questions on specific support analyses :

CTH 11126 CTH-1-481 CTH 1-6089 CTH 1-5324 CTH-16091 i

RSM-1-AUX-20 CTH 1-1888 CTH 1-2980 CTH 1-155 CTH 1-6097 CTH 1-6098 3.

Modelling of braces and unloaded tiers without interior nodal' points.

There papers are for review at Impell's office only.

TUE\\051387-A. CON j

ci

',l 1

f h) j Njy A

1 1

distribution:

' gE$ AffACIiED DISTRIBUlT6N SHEET.

~

1 ioro oi.

1 i

f; j

3

,j DISTRIBUTION LIST

^

Mr. J. Redding Mr. L Nace Mr. W. Counsil

.i Mr. D. Pigott :

Ms. A."VwttiCook

. Mr. C Grimes Mr. R. Alexandru Mr. J. Muffett l

Ms. N. Williams Mr. J. Russ Mr. W. Horstman Mr. K. Parikh Ms. D. Leong Mr. G. Ashley l

Project File

-j I

ia

~

q c

Communications; i

" Report j

4 AL t c s

lll111lllllll1llllll111lll1111

- NS-.

4'

'1

]

Company:

Telecon

,X Conference Report Project.

Job No.

l TU Electric 84056 CPSES I.AP Phase 4 cate.

l 06/22/87 l

Subject.

Time:

1 Cable Tray Support Design Review 9:00 a.m. '

c j

Place:

l Ebasco (N.Y.)-

Participants-of i

P. Harriso.n, F. Hettinger

. Ebasco -

)

l B. Shakibnia, B. At91ay, D. Leong Cygna T

W. Horstman Cygna' I

Required ttem Comments Action By j

Cygna and Ebasco me; te discuss the scope of the audits to be conducted this week in New York.

1.

Multimodal Response Multinlier (MRM) l Ebasco personnel have completed the..

xpanded Lstudy for-the justification of the MRM used. This' expanded study is contained in Section II' of Volume I, Book 15. They have also developed. a screening procedure, SAG.CP28,.which.

provides limitations on the applicability of the current value of 1.25. All supports previously evaluated by the equivalent static method (ESM) will be reviewed in accordance with' O

SAG.CP28 to determine if 1.25 is an ucceptable? MRM.

Those supports not satisfying these criteria !will-be ~

reevaluated using a higher MRM value or by other analysis methods.

l The analysis of the " spaghetti" model for i the MRM-validation is also completed. '

This represents an. actual' installed cable tray system which is analyzed by both ESM l

and response spectrum methods.

A summary report has been prepared which serves'to tie the results of the.old and new MRM studies. together and provides conclusions.

This study is located in Volume I, Book 9 ard incorporates revisions based.on the third party reviews.

~

) il hlAin 1

4 l'

'shd AYI'AC5ED' DISTRIBUTION SHEET, distribution:

1020 01a

...~m 4

g; m-e 4

y q.

3; j,

.g, 4,

. Communications' desyn, A L e i

~ Report L

L r.

-ll111111111111111I1ll111111111 -

d

1 g

t

.=

. Requred.

j ltem.

Comments Action By ~

The longitudinal. load -distribution procedure (Attachment' YL l

of the' General' Instructions) has':. also been revised to Lbe -

consistenti.with.the new LMRM, study and the-third : party's comments. The evaluation of' tray connectivityL(Attachment Z to the ~ General Instructions) has' also been revised,L based d

on third; party comments and preliminary results from' its

' t4 ' *j implementation. - Ebasco has determined that :it is 'necessary!

to reanalyze all RSM models' considering connectivity since-1.

the initial sampling showed no > definite J trend towards :

conservative results.

g i

Ebasco provided review copies of< the. following documents '

for.use during the_ audit:

y...

l-Volume I, Books 9, 10, 15,.23 SAG.CP28

.q 2.

Cable Tray System Dynamic Testinn-

[

ti A schedule for the audit of the testing' program and results l

was discussed.

This will be conducted at. Impell's. Walnut :

1 Creek office.

Cygna will discuss the. te'st specification.

developed' by Ebasco,: the ANCO test procedure - and test d

report and the correlation ' studies prepared by Impell' and-i Ebasco. A date of June 29 - July 2,'1987 has been proposed for this audit.

.l Ebasco noted that since they now consider connectivity i

between the cable trays and supports their RSM models are:

equivalent to Irnpell's.

They '- may abandonc. their1 test correlation study as being too conservative Land rely solely upon Impell's study as representing a' common position.

3.

Sinnle Annie Design Ebasco has prepared a position paper - discussing their.

i criteria used for determining the allowable' bending stresses l

in single: angles.

This paper has been -transmitted to TU -

c Electric and should - be available; to. Cygna.. This ; paper concludes that Ebasco's current approach is conservative.

(

4.

Tray Clamo Testing and Desian Verification.

[

Cygna. will. revie.w the' test ' reports and the ' ' design i

verification procedure (SAG.CP19).

I s

Page

. of

'SEE ATTACHED DISTRIBUTION SHEETE 2

4 1020.016 -

J x

Communications e

ALn Report i

lillllllllilillilillllilllllli -

Requeed Comments Action By ltem,

Ebasco' indicated that. John Verkos ' will be available to discuss'- the test specification and ' results and 'the development.of the design verification procedure.

5.

Determination of the Dominant Suonort Freauency at a Conduit Attachment Point Cygna has reviewed the position paper provided during the

' iny.19,1987 public meeting and has several comments and questions. This will be discussed via.a. conference call later in the week.

6.

Longitudinal Traneze Sunoorts Cygna will complete the review of the calculation packages which were started during the last audit.-

7.

Load Combination Methods Cygna would like to hold additional discussions with Ebasco regarding the load combination method used in STRUDL Cygna was unable to verify the adequacy.of the method presented during the last audit. '

Ebasco has prepared a sample problem to illustrate the. load combination used. The sample will be provided later in the week.

8.

P-Delta STRWDIs AISC Code Check Cygna will discuss the choice of Cm for equation'1.6-la and the method of implementing this equation.

9 EmLuction in Section Pronerties due to Bolt Holes Cygna will discuss the development of the reduced section properties provided in the General Instructions and compare these to the values given in Impell Project Instruction PI-11.

10.

Partial Penetration Welds Cygna will discuss the applicability of un AWS prequalified I

welding procedure for the partial penetration welds used on i

gusset plates.

i 1

.. j SEE ATTACHED DISTRIBUTION SHEET 3

k Page of 4

ioac om

]

I Communications L

L Mi f. n i Report 1ll111111111111111111111111111 i

i Required j

. Item Comments ~

' Action By l

1 11.

White Papers 1

Cygna has questions on several of the White Papers provided 1

l by Ebasco at the May 19,'1987 public meeting. Cygna would -

also like to review the calculations associated with several-of the White Papers.

12.

Cable Trav Clamo and Fitting Test Program.

i l

Cygna would like to discuss these test procedures and the 1

results.

A review of.the tray and clamp qualification procedures will also be' conducted..

l l

l l

i l

TUE\\062287 B. CON Page of SEE ATTACHED DISTRIBUTION SHEET 4

'4

.E.

7 ls.

t -' h DISTRIBUTION LIST 4

. Mr. J. Redding i

Mr. L Nace Mr. W. Counsil Mr. D. Pigott Ms. A.Vietti-Cook l

Mr. C Grimes

' Mr. R. Alexandru Mr. J. Muffett r

Ms. N. Williams Mr. J. Russ Mr. W. Horstman 1

Mr. K. Parikh Ms. D. Leong j

Mr. G. Ashley Project File q

. 1 i

?.

l 1

-i t

l l

t l

m

J Communications

]

z,.

+

A f.* h r a Report 111111111111ll1111lll11111ll11 i:3E=~1 ~ m u

~r- : 3 y,

4 l

'li Company:

- Telecon X ' Conference Report Project Job No.

TU Electric 84056 l

CPSES IAP Phase 4 cate:

i 06/25/87 J

4 Subract.

Time-I Cable Tray Support Review 1030 a.m.

Ebasco Audit - Meeting Request

. Piace-

.i New York. NY

Participants:

of j

P. Harrison Ebasco 1

J W. Horstman Cvena l

1 Required item Comments Action By l

j L

Cygna scheduled a meeting with Ebasco to discuss the following.

i topics-i 1.

Oversized bolt hole study j

l 2.

Additional major axis bending due to transverse tray loads.

A meeting will be held at 11:40 today.

l l

l

.i l

l l

)

1

?

.)

TUE\\062587 A. CON l

signed.

}

eage of S$$ AfrAClIED DISTRIBUTION SHEET.

l Distobut'on 1

1c20ois n

o l

I

's WE '

1 i

DISTRIBUTION LISI

]

Mr. J. Redding Mr. L Nace Mr. W. Counsil l

Mr. D. Pigott j

Ms. A. Vietti. Cook Mr. C Grimes 1

Mr. R. Alexandru Mr. J. Muffett Ms. N. Williams Mr. J. Russ Mr. W. Horstman Mr. K. Parikh Ms. D. Leong Mr. G. Ashley Project File i

l

W Communications

~~

4 WL*h ra Report lilllllllllllillllllllilllllli i

Company:

Teie n x

Conference Report ES Project -

Job No.

TU Electric 84056 CPSES IAP Phase 4 oate:

09/22/87 Cable Tray ' Support Design Review 1100 a.m.

Ebasco Audit -

Piace.

New Yorkc N.Y.

H. Schoppmann Ebasco W. Horstman Cygna l

l l

i 1

l Required l

Comments Action By Item Ebasco provided a copy of letter EB-T-3426, J. Padalino (Ebasco) to l

O. Lowe (TU Electric) dated August 27, 1987 for use during the l

audit.

This letter included responses to several of Cygna's cable-tray support issues as follows:

i 1.

K-factors for Longitudinal Supports 2.

Unsupported Length for Lateral-Torsional Buckling l

3.

Base Metal Damage in Thermolagged Supports 4.

Revised Procedure for Kinematic Condensation This letter was sent to TU Electric for transmittal to Cygra.

However, Cygna has not yet received it.

i l

TUE/092287-A. CON

~

Signed.

Page of -

Distribution: fSEE' AWA'CHED DIsTRIBUTK)N SHEET.

1020 01a

A>

1

-j DISTRIBUTION LIST Mr. J. Redding Mr. L Nace Mr. W. Counsil Mr. D. Pipott

,WWVettiCook

. Mr. C Grimes Mr. R. Alexandru Mr. J. Muffett Ms. N. Williams Mr. J. Rum Mr. W. Horstman Mr. K. Parikh i

Ms. D. Leong Mr. G. Ashley Project File

.i 1

)

1 s

i

a 1

J Communications

)

s L.4 0; t a Report 11lllll1111llllll1111ll1llltl1

j Company

Telecon Conference Report Project.

Job No.

1 TU Electric '

84056 CPSES IAP Phase 4 cate:

i 09/24/87

'~

Subject Time:

Cable Tray Support Design Review 5 00 p.m.

Ebasco Audit Place:

New York, N.Y.

Participants-of H. Scheppmann Ebasco W. Horstman

- Cygna j

l I

i Requirect Item Comments Action By Ebasco provided a copy of " Justification for. Applying Vertical Load I

at Centerline of Channel Web rather than at Bolt Location", dated 1

March 10,1987 for use during the audit. This is in response to the request on September 24,1987 at 200 p.m.

1 l

I

\\

l l

l l

TUE/092487-F. CON l

OfRff hl, [

1 1

' D'5tr* ut'on' SE'E AfrYCHDTSTRIBUTION SHEET.

1020 014

i s-

^<

1 l

DISTRIBUTION LIST Mr. J. Redding Mr. L Nace I

- Mr. W. Counsil Mr. D. Pigott

%*&Vietti Cook Mr. C Grimes Mr. R Alexandru Mr. J. Muffett l

Ms. N. Williams -

Mr. J. Russ Mr. W. Horstman Mr. K. Parikh l

Ms. D. I.cong l

Mr. G. Ashley i

Project File l

l

.)

I i

'j 1

1 1

I l

l s

l l

l

l Communications

=

p=

whfile) Ci Report d

ll111ll1111111111ll111111ll111

@ conference Report Company:

Teiec n CES Project Job No TU Electric 84056 CPSES IAP Phase 4 oate.

9/25/87

Subject:

Time.

Cable Tray Support Design Review 8:45 a.m.

Ebasco Audit piece New York, N.Y.

Participants.

01 SJ. Chen, H. Schoppmann Ebasco W. Horstman Cycna Required item Comments Action By Ebasco provided copies of the following documents for Cygna's review during the audit:

1.

" Additional Clarifications of Ebasco's Cable Tray Henger MRM Study", dated August 19,1987.

1 2.

Ebasco Procedure SAG.CP28, Revision 3, dated August 19, 1987.

TUE/092587-E. CON r

n Signed 1

Page o;

- -, - w D'$tneut,on-SEE ATTACHED DISTRIBUTION SHEET.

1020 01a

v l-

.]

)-

3 DISTRIBUTION LIST Mr. J. Redding -

- Mr. L Nace Mr. W. Counsil Mr. D. Pigott "Ms.*Av ViettM'cok Mr. C Grimes Mr. R. Alexandru Mr. J. Muffett Ms. N. Williams Mr. J. Russ i

Mr. W. Horstman Mr. K. Parikh i

Ms. D. Leong Mr. G. Ashley 1

Project File j

l

(

.\\

...