ML20082U762

From kanterella
Revision as of 11:58, 19 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amend to License NPF-73,consisting of Change Request 92,adding 2CHS*MOV373,centrifugal Charging/ High Head SI Pump Min Flow Valve to SRs for TS 3.5.2
ML20082U762
Person / Time
Site: Beaver Valley
Issue date: 04/26/1995
From: George Thomas
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082U765 List:
References
NUDOCS 9505050305
Download: ML20082U762 (3)


Text

-

@ @ g 87,r v n.y eo..r si. tion snigningPA 150U-0004 (412) 643-8069 FAX l

v s o Vic'sPr s dent f[cIdr o '[ Division April 26, 1995 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Proposed Operating License Change Request No. 92 Pursuant to 10 CFR 50 90, Duquesne Light Company requests an amendment to the above license in the form of changes to the technical specifications. The proposed amendment will add 2CHS*MOV373, the centrifugal charging /high head safety injection pump minimum flow valve, to the surveillance requirements for Technical Specification 3.5.2. The proposed amendment includes two 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> surveillances and one'31 day surveillance. A footnote to the 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> surveillance of flow indication is also proposed to allow flexibility should the control room indication used for determining flow in the minimum flow line become inoperable. Several editorial changes have also been made to Technical Specification 3.5.2 to make it consistent with the format of the other technical specifications.

The proposed technical specification change is presented in Attachment A. The safety analysis (including the no significant hazards evaluation) is presented in Attachment B. The typed replacement technical specification pages are presented in Attachment C.

The attached change has been reviewed by the Onsite Safety Committee and Offsite Review Committee. The change was detennined to be safe and does not involve a significant hazard consideration as defined in 10 CFR 50.92 based on the sttached safety analysis.

95050%ck PDR h l P

l 4

^ Beaver Valley Power Station, Unit No. 2 1

Proposed Operating License Change Request No. 92 .

Page 2 L

If there are any questions on the attached technical specification change request, f please contact Mr. Nelson R. Tonet, Manager, Nuclear Safety Depanment,

~

(412) 393-5210. j Sincerely,  ;

1 s  !

Geor e S. Thomas  !

Attachment ,

Mr. L. W. Rossbach, Sr. Resident Inspector  !

c:

. . T. T. Manin, NRC Region I Administrator  ;

i Mr. D. S. Brinkman, Sr. Project Manager Mr. W. P. Dornsife, Director BRP/ DER j Mr. R. Maiers (BRP/ DER)  !

i 1

l 1

AFFIDAVIT l I

f COMMONWEALTH OF PENNSYLVANIA)  :

)SS:  ;

COUNTY OF BEAVER

) i

Subject:

Beaver Valley Power Station, Unit No. 2 ,

BV-2 Docket No. 50-412, License No. NPF-73 ,

Proposed Operating License Change Request No. 92 ]

i Before me, the undersigned notary public, in i.nd for the County and l Commonwealth aforesaid, this day personally appeared George S. Thomas, to me known, who being duly sworn according to law, deposes and says that he is Division  !

Vice President, Nuclear Services of the Nuclear Power Division, Duquesne Light l Company, he is duly authorized to execute and file the foregoing submittal on behalf of said Company, and the statements set forth in the submittal are true and correct to the best of his knowledge, information and belief.

I I

'*/f uS l George S. Thomas .

Subscribed and sworn to before me on thiQ hff ay of $4 h !

4)lll '

0}/*t!

prarv Public #

%cY$

E cea%h

~~.w ~ ~

-. - . _ _ - _. . ._, - ,.-