Forwards Proposal Describing FEMA Intended Response to NRC 840120 Request for Further Evaluation of Evacuation Time Estimate Re Traffic Mgt Problems.Rept Expected to Be Sent on 840502
ML20083M489
Person / Time
Site: Pilgrim
Issue date: 04/12/1984
From: Krimm R
Federal Emergency Management Agency
To: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8404180161
Download: ML20083M489 (3)


Text

. . ,

s O[

f A

['psgu%} Federal Emergency Management Agency 5

  1. Washington, D.C. 20472 o /

APR I 21984 MEMORANDUM FOR: Edward L. Jordan Director Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement U.S. Nucle Regulatory Commission FROM: c ar . r mm Assistant Associate Director Office of Natural and Technological Hazards Programs

SUBJECT:

Evacuation Time Estimates (ETE) for Pilgrim Nuclear Power Station As indicated in my March 9, 1984, memorandum to you, please find attached a proposal by the Federal Emergency Management Agency (FEMA) describing how FEMA intends to respond to the January 20, 1984, U.S. Nuclear Regulatory Commission (NRC) request for further evaluation of the Pilgrim Nuclear Power Station ETEs. Specifically, this request is in regard to traffic management problems concerned with the timely evacuation of the population at risk in the event of a radiological emergency at the Pilgrim Nuclear Power Station.

FEMA intends to transmit the report to NRC on May 2, 1984. Currently items A and B of the attached proposal have already been completed so that at this time FEMA is ahead of schedule.

Attachment As Stated 8404180161 840412 f PDR ADOCK 05000293

- $ . F. .PDR Id %g

g , h:r Federal Emergency Management Agency f yl

' k */ f o .

Region I J.W. McCormack Post Office and Court House Boston, Massachusetts 02109

[

March 12, 1984 l l

l I

MEMORANDUM FOR: Richard W. Krimm l Assistant Associate Director Office of Natural and Technologic 1 Hazards f

FROM: David M. Sparks ,

Regional Director i l i

SUBJECT:

Pilgrim Nuclear Power Station Evacuation Time Estimates (ETE)

This is in response to your memorandum of March 6,1984 in which you requested that we provide you with a detailed proposal of how we intend to respond to NRC's request of January 20, 1984 for further FEMA review of an issue related to the subject ETE.

We expect to submit a study report on the resolution of this issue by April 16,1984. Attached is a study proposal describing our work program, resources needed for support, and a schedule of when major components of the study will be completed. The work program will be h p zi 4 by FEMA Region I and reviewed by Headquarters and NRC's transportation consultants prior to finalization.

AcccMPLICHGD Attachment

//u

e March 12, 1984 STUDY PROPOSAL FOR RESPONSE TO ISSUES RAISED BY NRC ON THE PILGRIM STATION EVACUATION TIME ESTIMATE Completion Work Program Resources Needed Schedule (A) Assemble data (Region I 4 Staff hours done has in its possession all (FEMA Region I) necessary data to proceed with study).

(B) Review the current traffic 40 Staff hours March 23,1984 management situation in light (FEMA Region I) of the changes in the State Traffic Management Plan, the road network, and the popu-lation since 1981.

(C) Confer with the Massachusetts 16 Staff hours March 29, 1984 State Civil Defense, State (FEMA Region I)

Police and State Dept. of Public Works to review FEMA's findings and make appropriate changes.

(D) Forward a draft report to 8 Staff hours April 6,1984 Thomas Urbanik (consultant to (FEMA Region I)

NRC) and FEMA Headquarters for comments.

(E) Review comments and update 10 Staff hours April 13,1984 report as necessary. (FEMA Region I)

(F) Provide Report to FEMA HQ. FEMA Region I April 16,1984 78 Total Staff i Hours 1 1