Forwards Evaluation of Boston Edison Co Emergency Preparedness Plan for Pilgrim,In Response to 840120 Request for Evaluation of Potential Traffic Bottlenecks That Could Impede Evacuation.Problem Identified in NUREG-0022
ML20090K593
Person / Time
Site: Pilgrim
Issue date: 05/15/1984
From: Krimm R
Federal Emergency Management Agency
To: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML16341C148 List:
References
RTR-NUREG-0022, RTR-NUREG-22 NUDOCS 8405240267
Download: ML20090K593 (1)


Text

g

[ E (> Federal Emergency Management Agency

  • f Washington, D.C. 20472 g- y/3 MAY l51984 MEMORANDUM FOR: Edward L. Jordan Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission ,

FROM: a Assistant Associate Director l Office of Natural and Technological Hazards Programs

SUBJECT:

Response to January 20, 1984, Request for Assistance on Evacuation Time Estimates for Pilgrim Nuclear Power Station This is in response to the January 20, 1984, Nuclear Regulatory Commission (NRC) request for assistance from the Federal Emergency Management Agency (FEMA) in evaluating certain potential traffic bottlenecks that could impede evacuation of the population at risk in the vicinity of the Pilgrim Nuclear Generating Station. The bottlenecks, located at the intersections of Route 128 and the Sagamore Bridge with Route 3, adversely impact the evacuation time and were previously identified in the May 1981 NUREG-0022 (Appendix B) of the Safety Evaluation Report for Pilgrim Unit #2. This unit has since been cancelled by the Boston Edison Company but the same problems still exist for Pilgrim Unit #1.

As the attached report from FEMA Region I indicates, the traffic management issues cited in your January 20, 1984, memorandum have been resolved by the Commonwealth of Massachusetts. The Massachusetts State Police now have a plan for the Sagamore / Buzzards Bay area, and procedures have been established for emergency management of traffic at the intersection of Route 128 and Route 3 and on the Cape Cod side of Sagamore Bridge. If you have any questions about the attached report, please contact Robert S.

Wilkerson, Chief, Technological Hazards Division, Room 506, 500 C Street S.W., Washington, D.C. 20472.

s Attachment As Stated 84052402g7 0 3 PDR ADOC PDR F