Category:PRESERVICE & INSERVICE INSPECTION & TEST REPTS
MONTHYEARML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20197C3551997-12-31031 December 1997 1RE07 ISI Summary Rept for SG Tubing of STP Electric Generating Station for Unit 1 ML20202D1561997-11-30030 November 1997 1RE07 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 ML20199L7001997-11-12012 November 1997 1REO7 ISI Summary Rept for Repairs & Replacements of STP Electric Generating Station - Unit 1 ML20199L7151997-10-28028 October 1997 1RE07 ISI Summary Rept for Sys Pressure Test (Class 1 & 2) for STP Electric Generating Station, Unit 1 ML20217A5101997-09-0404 September 1997 Supplemental Info to Rev 0,Suppl 2 to ISI Plan for First Insp Interval of STP Electric Generating Station,Unit 1 ML20217A5151997-09-0404 September 1997 Supplemental Info to Rev 0,Suppl 2 to ISI Plan for First Interval of STP Electric Generating Station,Unit 2 ML20148G0871997-05-31031 May 1997 2RE05 ISI Summary Rept for Welds & Component Supports of South Texas Project Electric Generating Station Unit 2 ML20148E7721997-05-19019 May 1997 2RE05 ISI Summary Rept for Repairs & Replacements ML20148E7791997-05-19019 May 1997 2RE05 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20141H1981997-05-0808 May 1997 2RE05 ISI Summary Rept for SG Tubing of STP Electric Generating Station - Unit 2 ML20134B9141996-09-0505 September 1996 1RE06 ISI Summary Rept for Welds,Sg Tubes & Component Supports of STP Electric Generating Station Unit 1 ML20117H5411996-08-29029 August 1996 1RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) STP Generating Electric Generating Station,Unit 1 ML20117H5591996-08-20020 August 1996 1RE06 ISI Summary Rept for Repairs & Replacements STP Generating Station,Unit 1 ML20097B8991996-01-29029 January 1996 2RE04 ISI Summary Rept for Welds,Sg Tubes & Component Supports of STP Electric Generating Station - Unit 2 ML20097A6901996-01-23023 January 1996 2RE04 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) for STP Electric Generating Station,Unit 2 ML20097A3541996-01-23023 January 1996 2RE04 ISI Summary Rept for Repairs & Replacements STP Electric Generating Station,Unit 2 ML20086F9901995-07-0606 July 1995 IRE05 ISI Summary Rept for Welds,Sg Tubes & Component Supports of South Tx Project Electric Generating Station Unit 1 ML20086G9451995-06-29029 June 1995 1RE05 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20085N7831995-06-19019 June 1995 1RE05 Inservice Insp Summary Rept for Repairs & Replacements for South Texas Project Electric Generating Station,Unit 1 ML20073J3941994-09-30030 September 1994 Rept of Summer 1993 & Mar 1994 Testing of SG Tubes of STP Electric Generating Station - Unit 1 ML20072Q7961994-08-24024 August 1994 2RE03 ISI Summary Rept for Welds,Sg Tubing & Component Supports of STP Electric Generation Station Unit 2 ML20072P1991994-08-24024 August 1994 2RE03 Inservice Insp Summary Rept for Sys Pressure Tests at STP Electric Generating Station,Unit 2 ML20072P1391994-08-24024 August 1994 2REO3 Inservice Insp Summary Rept for Repairs & Replacements,Stp Electric Generating Station,Unit 2 ML20056C3431993-05-13013 May 1993 Addendum 1 to 1RE04 Inservice Insp Summary Rept for Repairs & Replacements (Class 1 & 2) at South Texas Project Electric Generating Station,Unit 1 ML20095A9411992-04-0909 April 1992 2RE02 Inservice Insp Summary Rept for Repairs & Replacements,Addendum-1 South Texas Project Electric Generating Station,Unit 2 ML20090L7701992-03-13013 March 1992 2RE02 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station Unit 2 ST-HL-AE-4035, 2RE02 ISI Summary Rept for Repairs & Replacements at South Texas Project Electric Generating Station Unit 21992-03-13013 March 1992 2RE02 ISI Summary Rept for Repairs & Replacements at South Texas Project Electric Generating Station Unit 2 ML20090M5491992-03-12012 March 1992 2RE02 ISI Summary Rept for Welds,Sg Tubing & Component Supports at South Tx Project Electric Generating Station, Unit 2 ML20082A8601991-06-30030 June 1991 1RE03 Inservice Insp Summary Rept for Welds,Steam Generator Tubing & Component Supports of South Texas Project Electric Generating Station Unit 1 ML20076B4891991-06-21021 June 1991 1RE03 Inservice Insp Summary Rept for Repairs & Replacement at South Texas Project Electric Generating Station Unit 1 ML20079D3681991-06-21021 June 1991 1RE03 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project,Unit 1, Including Period from Second Refueling Outage 900621 to Completion of Third Refueling Outage 910404 ML20070J9001991-03-0505 March 1991 2RE01 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project,Unit 2, Including Period from Commercial Operation (890619) to Completion of First Refueling Outage (901211) ML20070K3271991-03-0505 March 1991 2RE01 Inservice Insp Summary Rept for Repairs & Replacements, Covering Period from Commercial Operation (890619) to Completion of First Refueling Outage (901211) ML20070M6101991-03-0404 March 1991 2RE01 Inservice Insp Summary Rept for Welds,Steam Generator Tubing & Component Supports of South Texas Project Unit 2 ML20065D3361990-09-30030 September 1990 1RE02 Inservice Insp Summary Rept for Welds & Component Supports of South Texas Project Electric Generating Station Unit 1 ST-HL-AE-3563, 1RE02 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station,Unit 11990-09-0808 September 1990 1RE02 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station,Unit 1 ML20065D9531990-09-0707 September 1990 1RE02 Inservice Insp Summary Rept for Repairs & Replacement at South Texas Project Electric Generating Station Unit 1 ML20005G7051990-01-31031 January 1990 1RE01 Inservice Insp Summary Rept for Welds,Steam Generator Tubing & Component Supports of South Texas Project Electric Generating Station Unit 1. ML20006A7391990-01-0909 January 1990 1RE01 Inservice Insp Summary Rept for Repairs & Replacements at South Texas Project Electric Generating Station,Unit 1. ML20006A7571990-01-0909 January 1990 1REO1 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station,Unit 1. ML20245L8061989-08-31031 August 1989 Amended Preservice Insp Summary Rept for Class 1,Class 2 & Class 3 Component Supports at South Texas Project Electric Generating Station Unit 2 ML20245A4361989-06-12012 June 1989 Inservice Insp Exam of Component Supports of South Texas Project Electric Generating Station - Unit 2 First Insp Interval ML20245A4811989-05-31031 May 1989 Vols 1 & 2 to First 10-yr Interval Long-Term Inservice Exam Plan for South Texas Project Electric Generating Station, Unit 2, Final Plan with Appendices ML20196B9591988-12-31031 December 1988 Preservice Insp (PSI) Summary Rept for Class 1,Class 2 & Class 3 Component Supports at South Texas Project Electric Generating Station Unit 2. Rept Reviews Bases for PSI Program & Describes Scope of PSI Exams 1999-07-07
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
_ _ ._ ._ _ __ _ __ - _________--- -
l l
COVER SHEET 2RE01 INSERVICE INSPECrlON
SUMMARY
REPORT FOR SYSTEM PRESSURE TESTS AT Tile SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 2 P. O. Box 289 Wadsworth, Texas 77483 USNRC DOCKET NO.: 50-499 OPERATING LICENSE NO.: NPF 80 COMMERCIAL OPERATION DATE: June 19,1989 Prepared by: p fp / 6 3 - oS-4 /
A. P. Pathak Consulting Engineer - Codes & Standards Reviewed by: 2 3 " O S 9 I S. Timmaraju " Sr. Consulting-Engineer - Codes & Standards Approved by: OC M 3- 6' Cl 1 A. C. McIntyre Manager - Design Engineering Department TAHISTM4A 9103180200 910309 PDR ADOCK 05000499 O PDR
SCOPE 2RE01 SYSTEM PRESSURE TESTS The examinations summarized in this report were performed in accordance with the .1983 Edition throsph Summer 1983 Addenda of the ASME Code,Section XI which is applicable to the South Texas Project Electric Generating Station Unit 2. This report covers selected ASME Code Class 1 and 2 System / Components. Examinations and tests required by the Code are scheduled in accordance with " Inspection Program B" as defined in IWB 2412 and IWC 2412 for ASME Code Class 1 and 2 System / Components. All ASME Code Class 1 Components were examined as prescribed by Table IWB 2500-1, Examination Category B.P which estabMshed the examination frequency at each refueling outage. The ASME Code Class 2 Systems / Components were selected on a random basis.
This random selection process will continue until all ASME Code Class 2 Systems / Components are examined in accordance with Table IWC-2500-1, Examination Category C.H. This examination category for ASME Code Class 2 Systems / Components established the examination frequency at each inspection period. The remaining first period examinations are anticipated to be completed by the end of the second refueling outage which should occur within the first period time frame.
The System Leakage Test (IWA 5211] (a)) conducted on Class 1 Systems / Components in accordance with Examination Category B P also satisfied the system pressure test required by IWA 5214 (e) subsequent to the disassembly and reassembly of mechanical joints in ASME Code Class I components.
l TA)O sT28A
PAGE 1 of 3 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPRCTIONS As required by the Provisions of the ASME Cods Rules
- 1. Owner Ituston Lighting & Power Ccrpany Electric Tcword. O. Box 1700, ikuston, TX 77001._
(Nme and Attrest of O c ;)
Plant South Texas Project Electric Cenerating Statim P. O. Box 289, Vadsworth, TX 77483 2.
I (Nee and Mdress of Plant)
- 3. Plant Unit 2 4. Caner Certificate of Autinrlzatim (if required) N/A
- 6. National Board Rsnher for Unit N/A 4
- 5. Camercial Service Date 06/19/89
- 7. Ccrponents Inspected A94E CODE CIASS 1 FIPDG AND OHolENIS
?.
l Manufacturer 1
or Installer State or National i Cceponent or Manufacturer Serial No. Province No. Board No.
Apturtenance or Installer l
4 FFrlm WSSEL CQiBUSTICH HGINEERDG/
12173 N/A 22391 1R102NRY201A W STDG rr a (M) l SIM GDEBAICR 2151 N/A 29
! 1R122N5G201A WSTDG0USE (M) i SDi. GDEFAlm 2152 N/A 30 j 1R122NSG201B WSrDGOUSE (M)
- SIM GNEFA10R
- 1R122NSG201C MSrDUDUSE (M) 2153 N/A 31 l SIM. GENEFAIM N/A 32
$ 1R122NSG201D WSrDUDm (M) 2154
- PRESSURIZER W SrDG D g (M) 2161 N/A 19 i IR122NPZ201A
- E IUf WSrD O D M (M) 1-ll5E580002 N/A 46 1R132NPP201A l FC Iue N/A 47 l
1R132NPP201B WSrnnrre (M) 2.ll5E580CD2 BC Eue 3-il5E580CO2 N/A 48 i IR132NPP201C WSTDDDEE (M)
RC Iue WSrDODEE (M) 4-115E580002 N/A 49 1R132NPP201D' l
! CIASS 1 PIPDG F2ASCD (I) N/A N/A N/A l .
} CIASS 1 i VALVES VARIGJS N/A N/A N/A i
I i __ .
3 i
1 N7PE: Supplumntal sheets in form of lists, sketches, or drawings rmy be used, provided (1) size is 81/2 in. X 11 in., (2) Information in itam 1 through 6 on thlo report is incitded on -
each sheet, and (3) each sheet is ntriered and the ntrnber of sleets is recorded at t!w top of -
2 this form, i
l I
i f
j- NIS1.CLI.2REOl
__ , _ - ~ . , _ _ , _ , . _ . , . . . . _ _ . , _ . - - _ , , - _., c
PAGE.3 of.3 ,
FORF. HIS-1 (Back) l l
- 8. Dominatico Dates 06/19/89 to 12/11/90 9. Inspection Interval frcra 06/19/89 to 06/19/99_
- 10. Abstract of Dcaninations. Incitde a list of cuninations and a statment concerning status of work '
required for current interval. Refer to Npplemntal Sheet Page 3 of 3.
- 11. Abstract of Conditicns tbted tb relevant conditions affecting pressure retaining bourdaries were noted.
- 12. Abctract of Corrective Wasures Recamerded and Taken Befer to Dgp1 mental Sheet 'Page 3 of 3.
We certify that tie statments trale in this report are correct and the exaninaticos and corrective masures taken confonn to the rules of the A}E Code,Section XI.
Certificate of Authorization tb. (if applicable) N/A Expiration Date N/A Date N// ve d I 19 7 ( Signed Ikuston Lighting & Power Co. By b b Owner V D. J. Denver Plant Ehgineerits Rumger CIR1'IFICA1E & IMEWIG I)EMCI'IW I, the urdersigned, halding a valid ccmnission issued by the National Board of Boiler and Pressum Vessel Inspectors ani the State or Province of Texas- ard enployed by Arkwright Hitual Insurance Co. of thrwcd, MASS. have inspected the cc Tpcnents described in this Owner's Feport during the pericd L2 - l C1 -R./ to 8 - 6 J7 / , and state that to tlw test of my knowledge and telief, the ' Owner has perforned exaninaticns and taken corrective treasures descrited in this O.ner's Feport in accortlance with the inspection plan ard as required by the A94E Code,Section XI.
By signing this certificate neitter the Inspector nor his mployer rnakes any warranty, expressed l
or irrplied, concerning the exninations ard corrective treasures descrited in this Cuner's Report.' P\trthentnre, l neither the Inspector nor his mployer shall be liable in any rnanner for any personal injury or property danage or a 1 of any kind arising frcrn or connected with this inspection.
FACIUW KJ14\L SYSID1
/
. uw.W Ccmnissions 'IX-826 National Board, State, Province, ard Erdorsments B. R. Russell, Inspector's Signature Date 3 -~ 6 ' 19 9/
NISI.CLI.2RE01
~ PAGE~3 of 3 i
SUPPLEMENTAL FOR ASME CODE CLASS 1 PIPINO AND COMPONENTS CWner lbuston Lighting & Power Ca:pany Electric Tower, P. O. Box 1700, Nauston, 'IX 77001
, 1.
I (Nme ard Address of CWner)
Plant South Texas Project Electric Generatire Statico P. O. Bax 289, Wadsworth, 'IX 77483 l
2.
! (Nme and Moress of Plant)
- 4. Owner Certificate of Authorization (if required) N/A
- 3. Plant Unit 2-
- 6. National Board !1rnber for thit N/A
- 5. Ca:rmrcial Service Date 06/19/89
- 10. ABSTRACT OF EXAMINATIONS A System Leakage Test as prescribed by IWA-5211(a) for_all ASME. Code Class 1 Pressure Retaining Components was conducted in accordance with Table IWB-2500-1, Examination Category B-P, Item Nos. B15.10, B15.20, B15.30, B15.40, B15.50, B15.60 and B15.70.
The Pressure Test and VT-2 visual examinations were conducted in accordance with Plant Surveillance Pressure Test Procedure, 2 PSP 15-RC-0001 Reactor Coolant System Leakage Pressure Test (Rev. 1) at the conclusion of the first refueling outage. ASME Code Class 1 piping and valves are specifically identified in the above referenced procedure.
In addition, the above System Leakage Test also satisfied the requirement.
for a System Pressure Test subsequent to the-disassembly and reassembly of meenanical joints in ASME Code Class 1 components as prescribed by IVA-5214(e).
Also, System Pressure Tests subsequent to the disassembly and reassembly of mechanical joints in ASME Code Class I components as prescribed by IWA-5214(e) were conducted in accordance with OPGP03-ZE-0027, ASME-Section XI Post-Maintenance Pressure Tests (Rev. 3) for individual work items performed outside the scope of the first refueling outage.
- 12. ABSTRACT OF CORRECTIVE-MLASURES RECOMMENDED AND TAKEN The Visual Examinations (VT-2) performed during these Pressure Tests found only- minor leakage at mechanical joints such as _ valve stems and flanged.
connections. These leaks were evaluated.and determined acceptable for continued system operation. Appropriate corrective action was initiated to correct these leaks.
NISI.CLI.2RE01
- 'PAGE 1 of 4 FORM NIS-1 OWNER'S REPORT.FOR INSERVICE INSPECIION3 As required by the Provisions of ths ASME Cods Rulec.
CWer lhiston Lighting & Power Cmpany Electric Tower, P. O. Ibx 1700, Ikuston, TX 77001, 1.
(Nmm and Atiress of Cher)
Plant South Texas Project Electric Generating Station P. O. Ban 289 Waisworth, TX 77483 2.
(Nem and Aiiress of Plant)
- 3. Plant Unit 2 4. 04er Certificate of Authorization (if required) N/A
- 6. Natimal Boartl 1Araber for thit N/A
- 5. Camercial Service Date 06/19/89'
- 7. Caqunents Inspected A9E CODE CLASS ,2__ PIPIW #4D 0}!IGIENIS Manufacturer Caqunent or Manufacturer or Installer State or National or Installer Serial No. Prtwince No. Boarti No.
Amurtenance RWS*r 2A 110016 N/A 1405 2N122NIF201A PITr. Df3 WINES (M) ,
itSI M 2A 400 2N122NPA201A PMIFIC IUfS (M) 51698- N/A- _
ifGI M 2B PEIFIC IUfS (M) 51699 N/A 401 2N122NPA201B litSI M 2C 2N122NPA201C PMIFIC IUfS (M) 51700 N/A 402
! LISI Ite 2A
- 2N122NPA202A PMIFIC IDFS (M) 51704 N/A 460 ,
11SI M 2B 2N122NPA202B PACIFIC IUfS (H) 51705 N/A 461
! IISI M 2C 2N122NPA202C PACIFIC IUfS (M) -51706 N/A 462
( _
, SI ACC 'IK 2A l
2N122NRC201A RUniWF" FAB. (M) 0042 N/A 361 l SI ACC '1K 2B 2N122NRC201B SCUnMEST FAB.- (M) 0058 N/A 402 i
SI AOC TX 2C 2N122NRC20IC SOUnMEST FAB.- (H) 0059 N/A 403-CS Itf 2A 2N102NPA201A PACIFIC IUfPS (M) 51710 N/A 454
-CS Ite 2B 2N102NPA201B PACIFIC IUfS (M) 51711 N/A 455
, CS Ite 2C l 2N102NPA201C PACIFIC PatPS (M) 51712 N/A 456 i CS ErU3m 2A EBASCO (I) 226 N/A N/A
! _2N102NID201A
- CS ELt.CIOR 2B 2N102NED201B 13ASCO (I) 227A -N/A N/A
{ CS E[XI'ICR 2C 2N102NED201C IBASCO(I) 228 N/A N/A i ?UrE: Supplmental rJeets in form of lists, sketcles, or drawings roay be used, provided (1) size is 81/2 in. X'll In., (2) infomation in itma 1 through 6 cn this report is included on 3-each sheet, and (3) each sNat is nuttered and the nunber of slwets is recorded at the top of this form, i
?
u
)
. NISI.CL2.2RE01 5
, ,- ,,,,-.,y.wi,--v., - - ~ , , , , , . _ . . , , , ,_.,,,.,g.,,,s. ,
.,.,,...,m.y..r ,,___c,.,e~we,,,en+,,,,,,,,,y.m.,, y-r e
PAGE 3 of 4 FORM NIS-1 (Bock)
- 8. Ikudnation Dates 06/19/89 to 12/11/90 9. Inspectico Interval frun 06/19/89 to 06/19/99
- 10. Abstract of Daminat ims. Incitde a list of exaninations aM a statment concerning status of work required for current interval. Refer to 1pplmental Deet Page 4 of 4.
- 11. Abstract of CoMitions }bted
!b relevant corditions affecting pressure retaining tmMaries were noted.
- 12. Aintract of Corrective tbasures Roccramrded ard Taken Enfer to Su;plermntal Sleet Page 4 of 4.
We certify that the statermnts twie in this report are correct aM the exantinaticos and corrective rmasures taken confonn to Ow rules of the A}E Code,Section XI.
Certificate of Autlerir.ation No. (if applicable) N/A Expiration Date N/A Date ((/1q d $' 19 7/ Signed }htston Lighting & Power Co. By o w Owner V D. J. Denver Plant Engineering Rmager OXIIFICATE CF ItGRVIG IlmCTICH I, the undersigned, tolding a valid cannission issued by tie Natimal Boani of Boller aM Pressure Vessel Inspectors and the State or Province of Texas and mployed by Arkwright Hitual Insurance Co. of l
tbrw ud, MASS. have inspected the ccuponents described in this O ner's Report during de period /p -l' ~ $^? to 34-@l , and state that to Om test of rny knculedge and telief, the Owner has perfonmd exaninations and taken corrective rmasures descrited in this CWer's Report in accordance with tie inspection plan and as required by the ASE Ccde,Section XI.
By signing this certificate neitler the Inspector nor his enployer nukes any varranty, expressed or inplied, concerning the exardnations and corrective rmasures descrited in this Cher's Report. Rirthen: ore ,
neider the Inspector nor his mployer shall to liable in any rener for any persmal injury or property danage or a loss of any kind arising frcrn or connected with this irspectim.
FACImY M7IUAL SYSIDI
'k MAJ^-- Ccntrdssions TX-826 B. R. Russell, Ins;ector's Signature National Ibard, State, Province, and Erdorsments Date 3-6~ 19jf NISI.CL2.2RE01
PAGE 3 of 4 i
SUPPLEMENTAL FOR ASME CODE CLASS 2 PIPING AND COMPONENTS
- 1. Omer limstm Lighting & 1%r Ccrpany Electric Toer, P. O. Box 1700, ikmsten, 'IX 77001 (Nam ard Mdress of Omer)
- 2. Plant Scuth Texas Project Electric Generating Statim P. O. Box 289, Wadworth, TX 77483 (Nam and Address of Plant)
- 3. Plant Unit 2 4. Omer Certificate of Authorizatim (if required) N/A
- 5. Camercial Service Date 06/19/89 6. Natimal Board firser for Unit N/A Manufacturer Ccrponent or Manufacturer or Installer State or Natlanal Appurtenance or Installer Serial tb. Province }b. Board ib.
CLASS 2 PIPDC DASCD (I) N/A N/A N/A CLASS 2 VALVES VARIWS N/A N/A N/A l
l NISA.CL2.2REOl
SUPPLEMENTAL FOR ASME CODE CLASS 2 PIPING AND COMPONENTS CWer Ibiston Lightirg & Pcwr Carpany Electric Tower, P. O. Bax 1700, liuston, 'lX 77001_
(Nxe ard Mdress of Owner)
Plant South Texas Project Electric Generating Staticn P. O. Box 289, Vadsworth, 'IX 77483
, 2.
(Nxe and Mdress of Plant)
- 4. Owner Certificate of Autlerization (if required) N/A
- 3. Plant Unit 2 1
- 6. National Boatti tknber for Unit N/A j 5. Camercial Service Date 06/19/89
- 10. ABSTRACT OF EXAMINATIONS 4
System Fur.ctional Tests as prescribed by IVA-5211(b) and System Inservice Tests as prescribed by IVA-5211(c) were conducted on selected ASME Code Class 2 Pressure Retaining Coniponents in accordance with Table IWC-2500-1, Examination Category C-M, Item Nos. C7.10, C7.30, C7.50, and C7.70.
i The Pressure Tests and VT-2 visual examinations were conducted in accordance with the following Plant Surveillance Pressure Test Procedures:
2 PSP 15-MS-0001 - Main Steam System Inservice Pressure Test (Rev. 1) 2 PSP 15-SI-0001 - Safety Injection System Functional Pressure Test (Rev. 1) 2 PSP 15-CS-0001 - Containment Spray System functional Pressure Test (Rev. 1) 2 PSP 15-FV-0001 - Feedwater System Inservice Pressure Test (Rev. 1) (Inside containment portion only) 2 PSP 15-SB-0001 - Steam Generator Blowdown System Inservice Pressure Test (Rev. 1) 2 PSP 15-RC-0001 - Reactor Coolant System Leakage Pressure Test (Rev. 1) 1 ASME Code Class 2 piping and valves are specifically identified in the above referenced procedures. These test procedures were conducted during the time period of June 19, 1989 to December 11, 1990,
- 12. ABSTRACT OF CORRECTIVE MEASURES RECOMMENDED AND TAKEN The Visual Examinations (VT-2) performed during these Pressure Tests found only minor leakage at mechanical joints such as valve stems and flanged
, connections. These leaks were evaluated and determined acceptable for contir.ued system operation. Appropriate corrective action was initiated to
> correct these leaks.
J NISI.CL2.2RE01
, - , _ . _ _ , _ _ _ _ _