MONTHYEARML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20197C3551997-12-31031 December 1997 1RE07 ISI Summary Rept for SG Tubing of STP Electric Generating Station for Unit 1 ML20202D1561997-11-30030 November 1997 1RE07 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 ML20199L7001997-11-12012 November 1997 1REO7 ISI Summary Rept for Repairs & Replacements of STP Electric Generating Station - Unit 1 ML20199L7151997-10-28028 October 1997 1RE07 ISI Summary Rept for Sys Pressure Test (Class 1 & 2) for STP Electric Generating Station, Unit 1 ML20217A5101997-09-0404 September 1997 Supplemental Info to Rev 0,Suppl 2 to ISI Plan for First Insp Interval of STP Electric Generating Station,Unit 1 ML20217A5151997-09-0404 September 1997 Supplemental Info to Rev 0,Suppl 2 to ISI Plan for First Interval of STP Electric Generating Station,Unit 2 ML20148G0871997-05-31031 May 1997 2RE05 ISI Summary Rept for Welds & Component Supports of South Texas Project Electric Generating Station Unit 2 ML20148E7721997-05-19019 May 1997 2RE05 ISI Summary Rept for Repairs & Replacements ML20148E7791997-05-19019 May 1997 2RE05 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20141H1981997-05-0808 May 1997 2RE05 ISI Summary Rept for SG Tubing of STP Electric Generating Station - Unit 2 ML20134B9141996-09-0505 September 1996 1RE06 ISI Summary Rept for Welds,Sg Tubes & Component Supports of STP Electric Generating Station Unit 1 ML20117H5411996-08-29029 August 1996 1RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) STP Generating Electric Generating Station,Unit 1 ML20117H5591996-08-20020 August 1996 1RE06 ISI Summary Rept for Repairs & Replacements STP Generating Station,Unit 1 ML20097B8991996-01-29029 January 1996 2RE04 ISI Summary Rept for Welds,Sg Tubes & Component Supports of STP Electric Generating Station - Unit 2 ML20097A6901996-01-23023 January 1996 2RE04 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) for STP Electric Generating Station,Unit 2 ML20097A3541996-01-23023 January 1996 2RE04 ISI Summary Rept for Repairs & Replacements STP Electric Generating Station,Unit 2 ML20086F9901995-07-0606 July 1995 IRE05 ISI Summary Rept for Welds,Sg Tubes & Component Supports of South Tx Project Electric Generating Station Unit 1 ML20086G9451995-06-29029 June 1995 1RE05 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20085N7831995-06-19019 June 1995 1RE05 Inservice Insp Summary Rept for Repairs & Replacements for South Texas Project Electric Generating Station,Unit 1 ML20073J3941994-09-30030 September 1994 Rept of Summer 1993 & Mar 1994 Testing of SG Tubes of STP Electric Generating Station - Unit 1 ML20072Q7961994-08-24024 August 1994 2RE03 ISI Summary Rept for Welds,Sg Tubing & Component Supports of STP Electric Generation Station Unit 2 ML20072P1991994-08-24024 August 1994 2RE03 Inservice Insp Summary Rept for Sys Pressure Tests at STP Electric Generating Station,Unit 2 ML20072P1391994-08-24024 August 1994 2REO3 Inservice Insp Summary Rept for Repairs & Replacements,Stp Electric Generating Station,Unit 2 ML20056C3431993-05-13013 May 1993 Addendum 1 to 1RE04 Inservice Insp Summary Rept for Repairs & Replacements (Class 1 & 2) at South Texas Project Electric Generating Station,Unit 1 ML20095A9411992-04-0909 April 1992 2RE02 Inservice Insp Summary Rept for Repairs & Replacements,Addendum-1 South Texas Project Electric Generating Station,Unit 2 ML20090L7701992-03-13013 March 1992 2RE02 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station Unit 2 ST-HL-AE-4035, 2RE02 ISI Summary Rept for Repairs & Replacements at South Texas Project Electric Generating Station Unit 21992-03-13013 March 1992 2RE02 ISI Summary Rept for Repairs & Replacements at South Texas Project Electric Generating Station Unit 2 ML20090M5491992-03-12012 March 1992 2RE02 ISI Summary Rept for Welds,Sg Tubing & Component Supports at South Tx Project Electric Generating Station, Unit 2 ML20082A8601991-06-30030 June 1991 1RE03 Inservice Insp Summary Rept for Welds,Steam Generator Tubing & Component Supports of South Texas Project Electric Generating Station Unit 1 ML20076B4891991-06-21021 June 1991 1RE03 Inservice Insp Summary Rept for Repairs & Replacement at South Texas Project Electric Generating Station Unit 1 ML20079D3681991-06-21021 June 1991 1RE03 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project,Unit 1, Including Period from Second Refueling Outage 900621 to Completion of Third Refueling Outage 910404 ML20070J9001991-03-0505 March 1991 2RE01 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project,Unit 2, Including Period from Commercial Operation (890619) to Completion of First Refueling Outage (901211) ML20070K3271991-03-0505 March 1991 2RE01 Inservice Insp Summary Rept for Repairs & Replacements, Covering Period from Commercial Operation (890619) to Completion of First Refueling Outage (901211) ML20070M6101991-03-0404 March 1991 2RE01 Inservice Insp Summary Rept for Welds,Steam Generator Tubing & Component Supports of South Texas Project Unit 2 ML20065D3361990-09-30030 September 1990 1RE02 Inservice Insp Summary Rept for Welds & Component Supports of South Texas Project Electric Generating Station Unit 1 ST-HL-AE-3563, 1RE02 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station,Unit 11990-09-0808 September 1990 1RE02 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station,Unit 1 ML20065D9531990-09-0707 September 1990 1RE02 Inservice Insp Summary Rept for Repairs & Replacement at South Texas Project Electric Generating Station Unit 1 ML20005G7051990-01-31031 January 1990 1RE01 Inservice Insp Summary Rept for Welds,Steam Generator Tubing & Component Supports of South Texas Project Electric Generating Station Unit 1. ML20006A7391990-01-0909 January 1990 1RE01 Inservice Insp Summary Rept for Repairs & Replacements at South Texas Project Electric Generating Station,Unit 1. ML20006A7571990-01-0909 January 1990 1REO1 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station,Unit 1. ML20245L8061989-08-31031 August 1989 Amended Preservice Insp Summary Rept for Class 1,Class 2 & Class 3 Component Supports at South Texas Project Electric Generating Station Unit 2 ML20245A4361989-06-12012 June 1989 Inservice Insp Exam of Component Supports of South Texas Project Electric Generating Station - Unit 2 First Insp Interval ML20245A4811989-05-31031 May 1989 Vols 1 & 2 to First 10-yr Interval Long-Term Inservice Exam Plan for South Texas Project Electric Generating Station, Unit 2, Final Plan with Appendices ML20196B9591988-12-31031 December 1988 Preservice Insp (PSI) Summary Rept for Class 1,Class 2 & Class 3 Component Supports at South Texas Project Electric Generating Station Unit 2. Rept Reviews Bases for PSI Program & Describes Scope of PSI Exams 1999-07-07
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
-- ..
COVER SIIEET 1RE07 INSERVICE INSPECTION
SUMMARY
REPORT FOR REPAIRS AND REPLACEMENTS SOUTil TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 1 P.O. BOX 289 WADSWORTil, TEXAS 77483 USNRC DOCKET NO: 50-498 OPERATING LICENSE NO: NPF-76 COMMERCIAL OPERATION DATE: AUGUST 23,1988 TRACKED BY CR# 97-17559
/6'-3e'27 Prepared by:
D. W. I cJap. , Engineer Reviewed by: M~k e f' !! f11.$ 7 C.A. Murry, Supervising Engineer i
Ph 0 0 98 0 PDR
SCOPE 1RE07 REPAIRS AND REPLACEMENTS The inspections and records summarized in this report were performed in accordance with the 1983 Edition through Summer 1983 Addenda of the ASME Code,Section XI which is applicable to the South Texas Project Electric Generation Station, Unit 1. This report covers ASME Code Class 1 and 2 Pressure Retaining Components and their Supports where repair or replacement was performed between the end of the sixth refueling outage until the end of the seventh refueling outage just completed. The submittal of this report is required by Section XI in accordance with paragraph IWA-6230 for ASME Code Class I and 2 Pressure Retaining Components and their Supports.
l
l 50UTil TEXAS PROJECT UNIT I ASME SECTION XI IRE 07 INSERVICE INSPECTION SUM 31ARY REPORT FOR REPAIRS AND REPLACEMENTS (CLASS I AND 2)
MFG. SERI AL NO. NUN DESCRIPTION OF COMP.
CLASS R or n SYSTEM WORK COMPONENT COMPONENT IDENTITY WORK DATE NO. DOC. DESCRII" TION (TAGTPNS)
Crosby N60491 1124 Replaced valve, new SN# 10-15-97 1 1-97-016 RC 327863 Valve N1RCPSV3450 0007 N6049l-00-0003, and 4 Studs Gr. 660 B Crosby N60491 1125 Replaced valve , new 10-15-97 i 1-97-017 RC 327862 Valve NIRCPSV3451 0008 SN# N60491-00-0004 N1RCPSV3452 Crosby N60491 1126 Replaced valve, new SN# 10 15-97 1 1-97-018 RC 327861 Valve 0009 N60491-00-0005, and 4 studs Ht# EVJ Steam Generator Westinghouse- M0764-1 NA Drill and tap Secondary 10-16-97 l 1-97-022 SG 351936 Inspection Port Covers 2" Covers Astro Nuclear M0764-2 side covers for seal Dynamics Inc. injection IR121NSG101D Westinghouse 2134 W18694 Installed temporary 4-30-97 i 1 97-025 SG 356776 Steam Generator scaling device, drill and tap cover 1R141XRC0001 A Westinghouse W750001 WI4271 Drilled 3/16" hole in 10-16-97 1 1-97-033 RC 348208 Valve upstream side ofdisc Valve IR141XRC0001 B Westinghouse W7500ll W18058 Drilled 3/16" hole in 10-15-97 I l-97-034 RC 325977 upstream side ofdisc 1R121NSG101 A Westinghouse 2131 W18691 Replaced helicoil Pt.# 10-14-97
! 1-97-058 SG 332881 Steam Generator (Primary Side) 4190-30-CN 3.750 Steam Generator iR121NSG101B Westinghouse 2132 W18692 Replaced 5 studs / nuts 10-15-97 1 1-97-059 SG 332882 (Primary Side) new SN#
543,623,636,692,618, 614,610,673,733,65I Steam Generator IR121NSG101 A Westinghouse 2131 W18691 Replaced inspection 10-14-97 I l-97-062 SG 332885 (Secondary Side) covers new IIts 331YNF, R6388, Cont.# MB-62398-M IR121NSG101 B Westinghouse 2132 W18692 Replaced inspection 10-14-97 i 1-97-063 SG 332886 Steam Generator (Secondary Side) cover new IIt# 33IYNF, R6388 ANII: II.R. RUSS ELI. TX-826 Pagel
s SOUTil TEXAS FROJECT UNIT I ASME SECTION XI ,
IRE 07 INSERVICE INSPECTION
SUMMARY
REPORT FOR REPAIRS AND REPLACEMENTS (CLASS 1 AND 2)
CIES R or R SYSTEM WORK COMPONENT COMPONENT MFG. SERIAL NO. NHN DESCRIPTION OF COMP.
NO. DOC- DESCRIPTION IDENTITY WORK DATE (TAGTPNS)
I l-97-064 SG 332887 Steam Generator 1R121NSG1e1C Westinghouse 2133 WI8693 Replaced inspection 10-14-97 (Secondary Side) cover new Ht# 331YNF, R6388 I l-97-065 SG 332888 Steam Generator IR121NSG10lD Westinghouse 2134 W18694 Replaced inspection _10-14-97 (Seconday Side) cover new lit # 331YNF,
' R6388 I l-97-114 SG 355697 Steam Generator 1R121NSG101 A Astro Nuclear SN-M-1263-1 N/A Drilled, tapped holes, 10-14-97 Secondary machined photographic Manway Cover finish on manway cover 2 1 95-057 CV 161367 - Flex Ilose CV-1132-IFil- Metal Bellows 007 n/a Rep!zced flange and 10-27 Assembly BB2 Corp. reducer insett 2 1-95-073 SI 304734 Valve 2N121XS10016C Westinghouse W750003 W12067 Drilled 3/16 hole in 6-17-97 ,
upstream side of disc 2 1-95-074 S1 304732 Valve 2N121X310016A Westinghouse W750001 W12054 Drilled 3/16 hole in 8-7-97 upseeam side ofdisc 2 1-95-075 SI 304733 Valve 2N121XSIO0168 Westinghouse W750002 W12055 Drilled 3/16 hole in 8-7-97 upstream side ofdisc >
2 1-96-025 CC 332387 Valve 2R201TCC0198 JRW Mission Q-5126 N/A Replaced valve, new SN# 10-14-97 90-1328-01(N)-02 2 I-96-072 CV 344923 Valve 2Rl71TCV0243 Borg Wamer 29598 N/A Replaced valve, new SN# 10-15-97 95SD0202,Eibow lit # !
BG, Pipe iIt#
467477,470172 2 1 96-077 CV 341158 Valve 2R171TCV0246 Anderson A3848 N/A Replaced valve new SNH 10-14-97 Greenwood EZ874-1-8, Pipe ilt#
470172, Elbow IIt# OJ 2 1 96-082 CV 341159 Valve 2Rl71TCV0247A Anchor / Darling EZ874-1-2 N/A Replaced valve, new SN# 10-14 07 ,
A3841. Pipe lit # 470172, Elbow lit # OJ 2 1-96-084 CV 344924 Valve 2R171TCV0244 Anderson B3146 N/A Replaced valves, new 10-13-97 2R171TCV0245 Greenwood A3845 SN# EZ874-1-1.EZ874-1-7, Pipe lit # C7366, ,
Elbow lit # BF A Nil: II.R. RUSSELL, TX-826 Page2
SOUTil TEXAS PROJECF UNIT i ASME SECTION Al IRE 07 INSERVICE INSPECTION
SUMMARY
REPOPT FOR REPAIRS AND REPLACEMENTS (CLASS I AND 2) l CLASS R or R . SYSTEM WORK. COMPONENT COMPONENT MFG. SERIAL NO. NBN DESCRIITION OF COMP.
NO. DOC. . DESCRIPTION IDENTITY WORK .DATE j (TAGTPNS)
- 2 1-97-005 - I'W 348360 Valve 2S131TFWO222 Kerotest ZN4-2 N/A Replaced valves, new 10-15-97 2S131TFWO226 YM9-6 SN# 97ZV1012, 97ZV1011, 2 1-97-006 FW 352968 Valve 2S131TFWO467 Anchor / Darling E3326-23-1 N/A Replaced valve discs, 10-15-97 new SN# 241,,208 2 1-97-007 FW 352968 Valve 2S131TFWO468 Anchor / Darling E3326-23-3 N/A Replace valve discs, new 15-97 SN# 240,242 2 1-97-012 MS ~i5699 5 Valve ClMSPV7431 Control 35199-1-3 N/A Skim cut stem seating 10-16-97 Components, surface,cxisting seat ring, Inc.
plug, seating surface on existing plug 2 l-97-019 CV 356990 Valve NICVFCV0202 Ametek 54-89-002 N/A Replaced valve plug, new 10-14-97 SN# M-1243-1 2 1-97-020 CV 356988 Valve N1CVFCV0201 Ametek 54-89-001 379 Replaced valve ple;,, new. 10-14-97 SN# M0930-1 2 1-97-021 F# 316829 Valve 2S131TFWO220 Kerotest YM9-15 N/A Replaced valves. new 10-15-97 2S131TFWO224 ZN1-12 She 97ZV1010, 97ZV1013, Pipe lit #
698814 2 1-97-029 WL 345597 Valve BlWLFV4913 WKM 70-119184 1877 Replaced valve ptug new 10-14-97 lit # OA3557-2. seat 2 1 97-067 CV 345446 Flow Element NICVFE0132 Vickerv-Simms K81067 N/A Replaced flow element, 10-14-97 new lit # 33402 2 1-97-074 CV 316049 Ileat Exchanger SR171NilX102A Joseph Oat 2312-1 A 986 Replaced studs new lite 10-14-97 Corp. 83038, nuts SN# 33120 2 l-97-104 MS 367705 Valve N1MSPSV7430B Dresser BT-2176 N/A Drilled hole in 10-14 compression screw 2 1-97-107 CV 359848 Valve 2R171TCV0014 Kerotest CAB '5-25 N/A Replaced valve, new SN# 10-16-97 ASZ2-1 2 1-97-l10 SI 362207 Valve 2N121TS10120A Anderson A3832 N/A Replaced valve, new SN# 9-3-97 Greenwood EZ874-1-4 4
ANil: II.R. RUSSELL, TX-826 Page3
SOUTil TEXAS PROJECT UNIT I ASME SECTION y.I 1RE07 INSERVICE INSPECTION
SUMMARY
REPORT FOR REPAIRS AND REPLACEMENTS l (CIASS I AND 2) l COMPONENT M FG. SERI AL NO. NBN DESCRIPTION OF COMP.
CLASS R or R SYSTEM WORK COMPONENT IDENTITY WORK DATE NO. DOC. DESCRIPTION (TAGTPNS)
ESI N/A N/A RemovedReinstalled 10-23-97 l 2 l-97-121 RC 355208 Support RC-1212-IIS5002 support and replaced 2 bolts / nuts Ht.# A-307 Gr.A. A-563 Gr.A Southwest Fab N/A N/A RemovedReinstalled 10-15-97 2 1-97-122 CV 344923 Support CV-1112-IIF5006 l pipe strap l
I l
l l
I l
l A NII: II.R. H USSEI.I., TX-826 Page4