Issue date | Title | Topic | |
---|---|---|---|
ML20217K944 | 15 October 1999 | SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) | Nondestructive Examination |
ML20217K915 | 15 October 1999 | SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) | Nondestructive Examination Incorporated by reference |
NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With | |
ML20217D053 | 30 September 1999 | Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr | |
ML20217D048 | 30 September 1999 | Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr | |
ML20211P841 | 9 September 1999 | Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 | Incorporated by reference |
ML20211P781 | 9 September 1999 | SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 | Incorporated by reference |
ML20211Q673 | 9 September 1999 | Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 | Boric Acid Hydrostatic VT-2 Incorporated by reference |
NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With | |
ML20212E519 | 31 August 1999 | Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment | |
ML20211F453 | 24 August 1999 | Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period | Non-Destructive Examination Incorporated by reference |
ML20211F511 | 23 August 1999 | Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 | Nondestructive Examination VT-2 Incorporated by reference |
ML20210C941 | 31 July 1999 | Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 | |
ML20210R363 | 31 July 1999 | Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With | |
ML20210D916 | 23 July 1999 | Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency | Enforcement Discretion Probabilistic Risk Assessment Incorporated by reference Foreign Material Exclusion Large early release frequency |
ML20210D482 | 21 July 1999 | 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 | |
ML20210D449 | 21 July 1999 | Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review | |
NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With | 15 July 1999 | LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With | |
ML20207H636 | 8 July 1999 | Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively | Nondestructive Examination VT-2 Incorporated by reference |
ML20216D748 | 7 July 1999 | 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 | Nondestructive Examination VT-2 Liquid penetrant |
NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with | 30 June 1999 | Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with | |
NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With | 28 June 1999 | LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With | |
ML20196G582 | 23 June 1999 | LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program | Stolen |
ML20195J687 | 17 June 1999 | Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval | Incorporated by reference |
ML20196A239 | 15 June 1999 | Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months | Nondestructive Examination Fire Protection Program |
NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with | 31 May 1999 | Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with | |
ML20206U541 | 18 May 1999 | Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept | |
ML20206A772 | 30 April 1999 | STP Electric Generating Station Unit 1 Cycle 9 Colr | |
NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with | |
ML20205H032 | 31 March 1999 | Change QA-040 to Rev 13 of Operations QA Plan | Nondestructive Examination |
NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with | |
ML20205A378 | 22 March 1999 | STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 | |
ML20204B271 | 15 March 1999 | Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 | Incorporated by reference |
ML20207M923 | 12 March 1999 | Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results | |
NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With | 28 February 1999 | Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With | |
ML20207D110 | 24 February 1999 | Change QA-039 to Rev 13 of Operations QA Plan, for STP | |
ML20203H836 | 17 February 1999 | Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant | VT-2 |
ML20202H962 | 3 February 1999 | SER Accepting Change to EALs Used in Classification of Emergency Conditions | |
ML20202E847 | 31 January 1999 | 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 | |
ML20216G201 | 31 January 1999 | City Public Svc of San Antonio Annual Rept 1998-1999 | |
ML20199G596 | 31 January 1999 | Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 | Nondestructive Examination B.5.b Mitigating Strategies |
ML20199K771 | 21 January 1999 | Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping | VT-2 |
ML20199G816 | 19 January 1999 | SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology | Safe Shutdown Fire Barrier |
ML20199H498 | 11 January 1999 | 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 | Nondestructive Examination VT-2 Liquid penetrant |
ML20206Q375 | 4 January 1999 | 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) | VT-2 |
ML20206Q372 | 4 January 1999 | 2RE06 ISI Summary Rept for Repairs & Replacements | |
ML20216G217 | 31 December 1998 | Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl | |
NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With | 31 December 1998 | Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With | |
ML20216G152 | 31 December 1998 | Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K | |
ML20198M343 | 28 December 1998 | SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 |