2RE05 ISI Summary Rept for Welds & Component Supports of South Texas Project Electric Generating Station Unit 2
ML20148G087
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 05/31/1997
From: Beverly R, Murry C
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20148G078 List:
References
NUDOCS 9706050155
Download: ML20148G087 (102)


Text

. _ . . _ _ . . . . . _ _ . _._ _ _ _ _ _ . _ _ _ . . . _ _ _ _ _ _ _ . _ . _ . _ . _ _ _ _ _ _ _

M l

l 1

l SOUTH TEXAS PROJECT l

ELECTRIC GENERATING STATION l \

l 2RE05 INSERVICE INSPECTION

SUMMARY

REPORT FOR WELDS AND COMPONENT SUPPORTS 1 l

i i

l ofthe SOUTII TEXAS PROJECT ELECTRIC GENERATING STATION - UNIT 2 l P.O. Box 289 Wadsworth, Texas 77483 Owner: Houston Lighting and Power Company i City Public Service Board of San Antonio Central Power and Light Company City of Austin Address: P.O. Box 1700 Houston, Texas 77001 I

Commercial Operation
JUNE 19,1989 Issue Date: MAY 1997 4

9706050155 970522 i PDR ADOCK 05000499 l G PDR

i P '

i g s

! SOUE TEXAS PROJECT

! ELECTRIC GENERATING j STATION

! 2RE05 INSERVICE INSPECTION

SUMMARY

REPORT l FOR WELDS AND COMPONENT SUPPORTS O ofthe SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - UNIT 2 P.O. Box 289 Wadsworth, Texas 77483 Owner: Houston Lighting and Power Company City Public Service Board of San Antonio Central Power and Light Company City of Austin Address: P.O. Box 1700 Houston, Texas 77001 Commercial Operation: JUNE 19,1989 Issue Date: MAY 1997

_ _ _ =. ._ _ .. . . - - _ -

/ 2RE05 INSERVICE INSPECTION

SUMMARY

REPORT FOR WELDS AND COMPONENT SUPPORTS ofthe SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT NO. 2 l

1 l

USNRC DOCKET NO.: 50-499 )

l OPERATING LICENSE NO.: NPF-80 COMMERCIAL OPERATION DATE: June 19,1989 d%

Prepared by: YllBeverly ' I M_ I'#@~k Date ISI Engineer- Weld Component Supports Reviewed by: b /'I7M C. A. Murry

/'

Date I//7!Y7 Supervisor- Section XI Section O

TABLE OF CONTENTS -

O 1.0 2RE05

SUMMARY

REPORT P_ age 1.1 Introduction 1-1 1.2 Scope of Summary Report 1-1 2.0 WELD EXAMINATIONS 2.1 Introduction 2-1 2.2 Scope of Examinations 2-1 2.3 Personnel, Procedures, and Equipment 2-3 2.3.1 Personnel Qualifications 2-3 2.3.2 Examination Procedures 2-3 2.3.3 Equipment ' 2-3 2.3.4 Materials '

2-3 2.3.5 Calibration Blocks 2-3 2.4 Summary of Examinations 2-4 2.4.1 Examination Methods 2-4 2.4.2 Augmented Examinations 2-4 2.4.3 Data Comparison _

2-4 2.4.4 Additional and Successive Examinations 2-5 2.5 Examination Results and Corrective Actions 2-5 2.6 Certification ofInspections 2-6 Appendix 2-A Summary of Examinations Appendix 2-B Personnel Appendix 2-C HL&P Procedures Appendix 2-D ISI Examination Limitations ,

Appendix 2-E Owner's Report forInservice i Inspections - NIS-1 Forms l

O l

l I

l TABLF, OF CONTENTS (cont'd)

O 3.0 COMPONENT SUPPORT EXAMINATIONS 3.1 Introduction - 3-1  !

3.2 Scope of Examinations 3-1 l

3.3 Personnel and Procedures 3-3 3.3.1 Personnel Qualifications 3-3  !

3.3.2 Examination Procedure 3-3 3.4 Summary of Examinations 3-3 i 3.4.1 Examination Results and Corrective Actions 3-3 '

I 3.4.2 Additional and Successive Examinations 3-3 3.5 Certification ofInspections 3-3 Appendix 3-A Sununary of Examinations -

Appendix 3-B Personnel i Appendix 3-C Owner's Report for Inservice Inspections - NIS-1 Forms I

i O i

l l l

llD

l.0 2RE05

SUMMARY

REPORT 1

l

\._)'

1.1 Introduction This Summary Report describes Houston Lighting & Power Company's (HL&P) inservice )

inspection (ISI) of selected Class 1,2, and 3 components of the South Texas Project Electric Generating Station, Unit 2 (STPEGS-2) performed prior to and during the fifth refueling outage (2RE05) of STPEGS-2 during the time period between October 4,1996 and Febmary 18,1997. 1 The STPEGS ISI program for welds and component supports is scheduled in accordance with ,

Program B of the American Society of Mechanical Engineers (ASME)Section XI Code

" Inservice Inspection of Nuclear Power Plant Components". The first ten year inspection interval of STPEGS-2 began June 19,1989. Because STPEGS-2 was out of service continuously for 16  ;

months, the inspection interval was extended for an equivalent period in accordance with IWA-2400(c) of ASME Section XI. This extended the inspection interval to October 18,2000. The  ;

second inspection period began June 19,1992 and extends to October 18,1997. The ISI )

summarized herein constitutes the fifth ISI performed during the first ten year inspection interval j and the third ISI of the second inspection period of STPEGS-2. Figure 1 of this Section depicts the first ten year interval and Periods 1 through 3 for STPEGS-2. The percentages completion of i examinations performed through 2RE05 for STPEGS-2 welds and component supports are also  ;

summarized in Figure 1. '

O The STPEGS-2 ISI program for the first inspection interval is described in the Ten Year ISI Plan j d previously filed with the Nuclear Regulatory Commission (NRC) and the State of Texas. The STPEGS-2 ISI program was developed and is being implemented in accordance with j

10CFR50.55a, the 1983 Edition of Section XI Code with the Summer 1983 Addenda, and other  !

regulatory and Code bases as specified in the Ten Year ISI Plan. This Summary Repon satisfies ,

l the reporting requirements of IWA-6000 of the Section XI Code for welds and component suppons.

1.2 Scope of Summary Report This Summary Report describes the ISI examinations performed up through 2RE05 on welds (Section 2) and component supports (Section 3). Each of these sections describes the scope of examinations performed; describes the personnel, procedures, and equipment utilized for the  ;

examinations; provides a summary of the examinations, examination results, and corrective l actions; and includes copies of the examination certification (NIS-1) forms. The ISI examinations  !

performed on Class 1 and 2 welds and other examination areas (e.g., bolting) are described in l Section 2 of this Summary Report. These examinations were performed in accordance with Subsections PNB and IWC of Section XI and other bases as specified in the Ten Year ISI Plan.

The ISI examinations performed on Class 1,2, and 3 component supports and Class 3 integral attachments are described in Section 3. These examinations were performed in accordance with Subsection IWF (Class 1,2, and 3 supports) and Subsection IWD (Class 3 integral attachments) of Section XI and other bases as specified in the Ten Year ISI Plan.

i n

1s V) l I

l-1 l

(J ) I

' (q.)'

ISI WELDS AND COMPONENT SUPPORTS PROGRAMS FIRST 10-YEAR INSPECTION INTERVAL CALENDAR UNIT 2 Year i, ii, i, se 39 ,i te ,2 is ,3 is ,s i, ,s to ,s is ,7 no se se e, se es

= vlwl= ==i wi wt w l vl a-I ns ==l = l =-l = ==l v l wt w ==l=lwina ==l w l wl w ==l v l wi m ==l v l wl = ==l = l s-l = ==l v l wl w ==l = I m

Period to PFRi@ I PERIOD 2 PERf0D 3 eru

--E -

NEEEEEE,EEg ME MEEEEEEEE -

o.. ~

y y y e .- y m - - HTr9 s v to so xo xo xo co .comemw o,meen EOI- End ofImeervei

10. Estended outage from February 3,1993 to May 30,1994 Neeer Some remetste esepleties data, ter outages prior to 2RE04, have been eerreceed to decommet emp y these esamim.n ns pertermed rer secae xs erant.

PERIOD 1 Minimun 16 % PERIOD 2 Miniman 50 %

7 PERIOD 1 Maximum 34 % PERIOD 2 Maximum 67 %

10 le % oene. 3 4 s com PERIOD 1  % PERIOD 2  %.  % -%  ;%

SUMMARY

ceanp. '(In Progitss) ' comf - cacep. Casup. ~ camp.

Welds Program 2,  % Welds Program n% u% ns as

  • Comp. Spts Program 2s % Supports Program is % is % is s 64 s i

FIGURE 1

1

()

7" 2.0 WELD EXAMINATIONS 2.1 Introduction ISI of STPEGS-2 Class 1 and 2 welds and components within the Welds Examination Program was performed between October 4,1996 and February 18,1997. These examinations constitute the fifth ISI (the third ISI of the second period) of the first inspection interval for the Welds Examination Program for STPEGS-2.

This section of the Summary Repon documents the examinations performed by HL&P Quality Control (QC) and contractor nondestructive examination (NDE) personnel in accordance with the following documents:

(1) "First 10-Year Long-Term Inservice Examination Plan for the South Texas Project Electric Generating Station, Unit 2"(LTP),

(2) " Examination Plan for the 1997 - 2RE05 Inservice Inspection of Welds and '

Component Supports at the South Texas Project Electric Generating Station, Unit 2",

including changes made during the outage (Outage Plan).

The Long-Term Plan (LTP) provides a detailed description of the rules for exemption, selection, p allocation, and scheduling of Class 1 and 2 welds and examination areas for ISI. The 1997- l V 2RE05 Examination Plan is an individual Outage Plan for implementing ISI weld examinations as scheduled in the LTP. The Outage Plan references the applicable NDE procedures used for the examinations.

2.2 Scope of Examinations NDE was performed on a total of one hundred forty two (142) selected Class 1 and Class 2 components and examination areas as contained in the Outage Plan. Any deviations or changes were documented as Examination Plan Changes to the Outage Plan. Selection of these components and examination areas was based on the LTP allocation and scheduling requirements for the fifth refueling outage. Two (2) small bore piping welds in the SI system were baseline examined after an adjacent valve was replaced during a maintenance train outage in October, 1996. These examinations are summarized in this repon.

Class 1 A total of fifty five (55) examinations were performed on the following Class I components and examination areas. Forty one (41) of these components / areas were examined for Section XI credit. Additionally, baseline examinations were performed on seven (7) components, sample expansion examinations were performed on three (3) components, and RG 1.26 examinations were performed on four (4) RCP flywheels.

r~s

()

2-1

1 O

V Vessels Reactor Vessel Pressurizer Steam Generator Piping Reactor Coolant System l Chemical and Volume Control System l Residual Heat Removal System Safety Injection System Epinp.s Reactor Coolant Pump Flywheels  !

Valves Reactor Coolant System Class 2 A total of eighty seven (87) examinations were performed on the following Class 2 component welds and examination areas. Twenty seven (27) of these component welds / areas were l

~h examined for ASME Section XI credit. Thirteen (13) of the examinations were performed on (V Class 2 piping longitudinal welds, located adjacent to selected circumferential welds.

Additionally, forty five (45) of these welds were examined under the Augmented ISI-BEZ l program and two (2) welds were baseline examined after a valve was replaced.

Vessels RHR Heat Exchanger 2A

. EipipJ Auxiliary Feedwater System Main Steam System Safety Injection System A complete list of the components and examination areas is contained in Appendix 2-A. Class 1 and Class 2 weld identification figures for the above components and examination areas are contained in the LTP. These examinations constitute the following percentages of completion for Class 1 and Class 2 components during the first hspection interval:

Cumulative 2RE05 (1st Interval)

Class 1 (IWB) 10 % 67 %

Class 2 (IWC) 13 % 62 %

Q b

2-2

I 7q 2.3 Personnel, Procedures, and Equipment U l 2.3.1 Personnel Qualifications ,

l Component welds and other examination areas were nondestructively examined by HL&P QC and contractor NDE personnel. HL&P NDE personnel were certified in accordance with ASME Section XI (IWA-2300) and HL&P Nondestructive Examination Procedure OPQP05-ZA-0001 (Rev.1)," Qualification and Certification of Nondestmetive Examination Personnel". Contractor l NDE personnel were certified in accordance with ASME Section XI(IWA-2300) and their employer's written practice, which was approved by HL&P. In addition, Level II examiners performing ultrasonic examinations on austenitic piping welds have been qualified by Electric Power Research Institute in detection ofintergranular stress corrosion cracking. A list of all personnel who performed examinations during 2RE05 and their NDE certification level for each applicable examination technique is contained in Appendix 2-B.

2.3.2 Examination Procedures NDE activities were performed using visual (VT), liquid penetrant (PT), magnetic particle (MT),

and ultrasonic (UT) techniques in accordance with HL&P QC NDE procedures. The NDE procedures were written to conform to the requirements of the applicable sections of the ASME Code. A list of applicable NDE procedures is provided in Appendix 2-C.

2.3.3 Equipment Various equipment was used during the ISI to perform the examinations of the selected l component welds and examination areas. Major equipment consisted of the following:

Krautkramer Branson ultrasonic instruments Ultrasonic transducers  ;

AC electromagnetic yokes l MT calibration block Pyrometers / Thermometers 2.3.4 Materials NDE materials utilized during 2RE05 weld examinations included penetrant and magnetic particle materials, and ultrasonic couplant. All materials contacting an austenitic examination surface were tested and certified to be within acceptable sulfur and halogen limits specified in the STPEGS Expendable Material Control Program.

2.3.5 Calibration Blocks Pipe and vessel calibration blocks were utilized to calibrate the UT instruments prior to examination of the selected welds. Applicable calibration blocks are noted in the Examination Summary Tables (Appendix 2-A). Drawings for calibration blocks are included in the LTP.

2-3

1 l

l 2.4 Summary of Examinations f3 b 2.4.1 Examination Methods The following examination methods were conducted in accordance with HL&P QC NDE procedures:

i VT Examinations i VT-1 examinations were performed on manway bolting, flange bolting, and valve bolting.

VT-3 examinations were performed on RPV interior and valve internal surfaces.

PT Examinations l PT examinations were performed on Pressurizer nozzle welds, piping welds, and integrally welded attachments.

i i

MT Examinations '

MT examinations were performed on piping welds and piping lugs.

UT Examit:4 ens UT examinuivs were performed on Class 1 and 2 components, including vessel and  !

piping welds and RCP flywheels. Various techniques were used to perform the UT  !

examinations, depending on classification, material type, and weld thickness.

2.4.2 Augmented Examinations In addition to the ISI requirements of Section XI for Class 1 piping and ASME Code Case N-408 for Class 2 piping, the following augmented ISI program was implemented during this outage:

Augmented ISI- Break Exclusion Zone j These augmented programs are described in the LTP and the affected examination areas are noted i in the " Remarks" column of the Examination Summary Tables. j 2.4.3 Data Comparison 4 i In accordance with IWB-3121 of Section XI, the examination results were compared with the recorded NDE results of the Preservice Inspection (PSI). There were no prior inservice examinations on the areas examined during this outage.

If flaws were recorded in the selected component weld or examination area during previous examinations and dispositioned as acceptable, these flaws were verified during this ISI. All such flaws were observed and verified during this ISI.

2-4

n 2.4.4 Additional and Successive Examinations i%~)i If examinations reveal indications that exceed allowable indication standards, additional examinations are required as pascribed in IWB-2430 and IWC-2430. Additional examinations were required during 2RE05 due to the detection of boric acid residues on a Class 1, CV system bolted piping flange connection (see Summary No. 155405 in Appendix 2A). Three (3) additional CV system bolted piping flange connections were examined . One (1) of these additional examinations revealed evidence of boric acid residue. None of the examinations revealed evidence of bolting degradation. The leaks were not active and no repairs or rework was required. No further sample expansion was required. No additional examinations of Class 2 components (IWC-2430) were required during this outage.

Successive examinations are required if flaw indications are evaluated in accordance with IWB-3122.4 and the component qualifies as acceptable for continued service. No successive examinations (IWB-2420 or IWC-2420) will be scheduled as a result of examinations performed during this outage.

2.5 Examination Results and Corrective Actions Examination area coverage was providsd, to the extent practical,in accordance with the requirements of ASME Section XI and Code Case N-408. In those cases where physical conditions of the component restricted examination of the required area, the amount of coverage t'N achieved was assessed. Examination limitations of applicable Section XI examinations are U documented in the Remarks column of Appendix 2-A. Additionally, Appendix 2-D,ISI Examination Limitations, contains a detailed account of examination limitations (UT, PT, and MT) encountered during 2RE05 weld examinations for limitations that were 10% or greater.

A visual examination (VT-1) of a small bore bolted pipe flange in the Class 1, CV system (see Summary No. 155405) revealed boric acid residue. The ISI sample was expanded to three (3) additional bolted pipe flanges in the CV system. Boric acid residue was found on one (1) of the expansion locations. No bolting degradation was detected on any of the flange bolts. The leakage was not active and no repair or rework was required. No further sample expansion was required.

A liquid penetrant examination of a 16 inch branch connection weld in the Class 1. Main Loop piping (see Summary No.101150) verified that a small linear surface indication in the weld metal had not grown since it was documented during the PSI examinations. The linear indication remains acceptable in accordance with IWB-3514 acceptance standards.

A UT examination of a 4 inch pipe to valve weld in the Class 1, CV system (see Summary No.

150240) verified a Code-allowable planar reflector in the weld volume near the OD surface has not grown. This indication was documented during PSI examinations and continues to remain acceptable.

O 2-5

- . - -. . . . . . . . .- . . - - . ~ - . . - - . . - . . . - . . . - - . - - - - -

All UT indications determined to be recordable, regardless of signal amplitude, were investigated to determine the nature of the reflector. Indications determined to be other than geometry were evaluated to ASME Section XI criteria.

2.6 Certification ofInspections ASME Section XI NIS-1 forms, " Owner's Report for Inservice Inspections", have been prepared l to certify the STPEGS-2 weld ISI examinations described in this section of the Summary Report.

The STPEGS-2 weld ISI examinations have been certified by our ANII, Arkwright Mutual

- Insurance Company, on the NIS-1 forms included in Appendix 2-E.

l i

!O i

l 2-6 /

. - _ . - - . _ _ . . . _ - __ _-__ . __.. . _ ._ _ _ _ . ._.__.. ~..__ ___ _.._. .. _

7 O

l 4

l APPENDIX 2-A

SUMMARY

OF EXAMINATIONS EXAMINATION RESULTS LEGEND A Augmented ISI Examination l

B Baseline Examination O C E

Exranination for Section XI Scheduling Credit Expanded Examination L Piping Longitudinal Weld Examination W RCP Flywheel Examination 1

)

i ,

l l

l I

i

i DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 1 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (WELDS) l FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF) '

~

/]

1 g REACTOR PRESSURE VESSEL CLASS 1 CIABWE STATUS COMPONENTS I

N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • VESSEL INTERIOR (FIO NO A-RPV-1. 2) i 006200 VESSEL INTERIOR B-N-1 RVT3 ZA.0024 R1 C - . USING A REMOTE VIDEO CAMERA, EXAMINED B13.10 THE SPACE ABOVE AND BELOW THE REACTOR CORE THAT IS MADE ACCESSIBLE POR EXAMINATION BY REMCP'AL OF COMPONENTS.

1

\

i i

m

/

t s

\v,

, . - _. _ .-. - - - - .-_ .. . _ _ _ . . --a.. . . _ . . . _ _ _ -

DATE: 05/19/97 SOUTH TEXAG PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 2 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF)

C' CLASS 1 CLABWE STATUS COMPONENTS PRESSURIZER N O ASME O G T SEC, KI R E H SUlHARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

NOZZLE '!O SAFE-END AND SAFE-END TO NOZZLE WELDS (FIG NO A-PRZ-1) 011700 PR2-2-N1-SE B-F PT ZA-0012 R2 C - -

a SURGE NOZZLE B5.40 17T UTI-001 R3 C - .

UT UTI-005 R3 C . -

    • CSCL-71/SS.72**

011800 PRE-2-N2-SE B-F PT ZA-0012 R2 C . .

SPRAY NOZZLE B5.40 ITT UTI-001 R3 C - -

+

UT UTI-005 R3 C - . I

! **CSCL-l9/SS-70**

1 INTEGPAL ATTACHMENTS (FIO NO A-PRZ-1) j 012460 PER-2-4A,4B B-H PT ZA-0012 R2 C - -

SUPPORT BRACKET B8.20 o

D s

it l

1 9

d i

p

-( )

i l

l 1

, ~ - , - . . - - . . _ . - . . . - _ . - . . - . .. . - - .

l l

l

! DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 3 l

l " REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (NELDS) l FIRST INTERVAL, SECOND PERIOD, THIRD OWAGE (97RF) l l

/m STEAM CENERATOR 2C (PRIMARY SIDE)

CLASS 1 CLABWE STAnfS COMPONENTS ]

l l

i N O '

ME O G T I SEC XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS ,

NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK ** l l NOZZLE TO VESSEL IhWER HEAD WELDS (FIO NO A-SG-1) l 017200 SG-2C.IN B-D UT UTI.004 R3 C . -

INLET NOZZLE TO CHANNEL HEAD B3,130 W LTI.017 R2 C . -

CAP

    • CSCL-89'*

017300 SG-2C-ON B-D UT UTI.004 R3 C . -

CHANNEL HEAD CAP TO OUTLET B3.130 UT UTI.017 R2 C - -

NOZZLE "CSCL- 8 9'

  • NOZZLE INSIDE PADIUS SECTION frIO NO A-SG-1) 017400 SG-2C-IN.IR B-D UT UTI-016 R1 C - -

. INLET NOZZLE INSIDE RADIUS B3.140 ,

J SECTION {

    • CSCL-41** l l

]

017500 SG-2C-ON-IR B-D UT UTI-016 R1 C - -

OUTLET NOZZLE INSIDE RADIUS B3,140 SECTION )

I

  • CSCL-41"  !

1 l

1 i

1 1

1 i

l 1

3 J

DATE: C5/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 4 INSERVICE INSPECTION PLAN . 2RE05 (WELDS) t REVISION: 0 s FIRST INTERVAL, SECOND PERIOD., THIRD OUTAGE (97RF) i CLASS 1 CLABWE STATUS COMPONENTS I

STEAM CENERATOR 2D fPRTM,\PY SIDE)

(~d N O ASME O G T SEC. XI R E H SD94ARY EX. AMINATION Af.EA CATGY EXAM E O E REMARKS I

NUMBER IDENTIFICATION - ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK'*

MANWAY BOLTIN1 (FIG MO A-SG-2) 018900 SG-2D.OMB B-0.? VT-1 EA.0024 RI B - . PERFORMED BASELINE VISUAL EXAMINATION ON OUTLET MANWAY BOLTING B7.30 REPLACEMENT BOLT NO. 9 ONLY, PRIOR TO INSTALLATION.

r e

I l

l l

l l 4 l

l 2

i k

1,, O w

L i

_ _ . . . _ . . . _ . , _ ._ m .. . __ - -

l l

!- . I l

DATE: 05/19/97 SOUTE TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 5 .

REVISION: O INSERVICE INSPECTION PLAN - 2RE05 (WELDS) j FIRST INTERVAL, SECOND PERIOD, THIRD O(TIAGE (97RF) l CLASS 1 CLABWE STATUS COMPONENTS t PEACTOR COOLANT SYSTEM l

\ l N O ,

i ASME O G T f SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS 1

f IrJMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION Bl4CK** l 31-PC-2202-NSS - LOOP 2 (FIG NO A-RC-2) l 300260 9 B-J PT ZA-0012 R2 C - .

ELBOW TO REACTOR COOLANT PUMP B9.11 UT 17f1-018 R1 - C -

1

    • CSS-80**

I 31-PC-2302-NSS - LOOP 3 (FIG NO A-PC-3) 1 100360 1 B-F PT ZA-0012 R2 C - - l SG CUTLET NOZZLE TO ELBOW B5.130 tTf VII-018 R1 C - - j UT UTI-005 R3 C - -

    • CS-78/SS-79/ CSS-80**

100410 6 B-J PT ZA-0012 R2 C - - l 3,1N. BRANCH CONNECTION B9.32 i

r\ l 100440 9 B-J PT ZA-0012 R2 C - - j ELBOW TO REACTOR COOLAfff PUMP B9.11 UT UTI-018 R1 - C -

    • CSS-80**

l 31-PC-24 02-NSS - LOOP 4 (FIO NO A-PC-4) l l

100580 5 B-J PT ZA-0012 R2 C - -

3-IN. BRANCH CONNECTION B9.32 100420 9 B-J PT ZA-0012 R2 C - -

ELBOW TO REACTOR COOLANT PUMP B9.11 UT trf1-018 R1 - C -

29-PC-2301-NSS - LOOP 3 (FIG NO A-RC-3) 101040 5 B-F PT EA-0012 R2 C - -

ELBOW TO SO INLET NOZZLE B5.130 UT UTI-018 Al C - -

UT UTI-004 R3 C - -

ITT ITTI-005 R3 C - -

    • CS-78/SS-79/ CSS-80**

i

m

_ _ _ _ . . . . . _ _ _ __ ._ m ,m._ .. ._ -.. _ __. . _ _ __

DATE 05/19/97 SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 2 PAGE: 6 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF)

/' CLASS 1 CLABWE STATUS COKPONENTS

/ REA(" TOR COOLAN7 SYSTEM ASME O G T SEC. XI R E H S'Jf4ARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDElff1FICATION ITEM NO METHOD PROCEDURE C M R " CALIBRATION BLOCK **

79-PC-24 01-NS9 - LOOP 4 (FIO NO A-RC- Q 101150 2 B-J PT ZA-0012 R2 - - C THE 3/16 INCH LONG LINEAR INDICATION 16 1N BRANCH CONNECTION B9.31 UT LTTI.018 R1 C - . DETECTED BY A LIQUID PENETRANT SURFACE UT UTI.030 R0 C - - EXAMINATION DURING PSI WAS VERIFIED BY A 1 PT EXAMINATION DURING 2RE05. NO INCREASE IN LENGTH WAS DETECTED. THE J INDICATION REMAINS ACCEPTABLE BASED ON I SECTION XI ACCEPTANCE CRITERIA AND THE INDICATION WAS LEFT IN PLACE. l l

l 27.5-RC-2303-NSS - LOOP 3 (FIG NO A-DC-3) 101590 3 B-J PT ZA-0012 R2 C - - '

12-IN BRANCH CONNECTION B9,31 UT 1772 018 R1 C . .

l

  • CCSS.17/ CSS. 8 0" l

l

$ 27.5-RC-24 03-NSS - LOOP 4 (FIO NO A-RC-4) 101745 4 B.J PT ZA 0012 R2 C - .

4 IN. BRANCH CONNECTION B9.31 UT UTI.030 R0 C - -

    • SS-77**

16 -P C- 2412 -NSS (FIO NO A RC-5) 101860 1 B-J PT ZA-0012 R2 C - -

SAFE END TO BENT PIPE B9.11 ITT UTI.001 R3 . C -

"SS.16 *

  • 101880 2 B-J PT ZA-0012 R2 C - -

BENT PIPE TO ELBOW B9.11 UT UTI.001 R3 - C -

" SS .16 "

V, \

t b

DATE: 05/1S/97 SOWH TEXAS PRa7ECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 7 i REVISION: 0 INSERVICE INSPk:CTION PLAN - 2RE05 (WELDS) l FIRST INTERVAL, SECOND PERIOD, THIRD O WAGE (97RF) I t

[N CLASS 1 CLABWE STATUS COMPONENTS t REACTOR COOLANT SYSTEM

\

N O ASME O G T SEC. XI R E H SUP94ARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

16-PC-2412-NSS (F10 NO A-RC-5) 1 101890 3 B-J PT ZA-0012 R2 C - .

ELBOW TO PIPE B9.11 W WI-001 R3 - C -

    • SS-16**

i 101900 4 B-J PT ZA.0012 R2 C - - I PIPE TO ELBOW B9.11 W UTI.001 R3 . C . I i

"SS- 16 *

  • I 12-RC-2312-BB1 (FIO NO A-RC-8) l ZA-0012 R2 102930 8 B-J PT C - -

PIPE TO PIPE B9.11 177 UTI.001 R3 - C -

1 1

    • SS-21**

t J V i 102960 11 B-J PT ZA-0012 R2 C . .

PIPE TO VALVE B9.11 UT WI-001 R3 . C -

UT UTI-005 R3 - C -

    • SS-21**

12-RC-2322-BB1 (FIO NO A-PC-11) 103060 1 B-J PT ZA-0012 R2 C . -

VALVE TO PIPE B9.11 UT UTI.001 R3 - C -

17r 1771-005 R3 - C .

  • *SS-21" 103090 4 BJ PT ZA-0012 R2 C - -

PIPE TO BRANCH CONNECTION B9.11 UT UTI.001 R3 - C -

UT 1771-005 R3 - C .

    • SS.21**

r 0%

i

%-./

. . _ . _ _ ___ .m.. ., ._._m . ~ . _ . _ _ _ . _ . . _ . _ - . . . _ . , . - . . _ . . . . 4 m_..

DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GE FJATING STATION UNIT 2 PAGE: 8 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (NELDS)

! FIRST INTERVAL, SECOND PERIOD, THIRD OITTAGE (97RF)

I CLASS 1 CLABWE STATUS COMPONENTS l PEACTON COOLANT SYSTEM )

N O l ME O G T SEC XI R E H SIMfARY EXAMINATION AREA CATGY EXAM E O E REMARKS i

NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

109600 1 B.J PT ZA.0012 R2 C . .

REDUCING TEE TO BENT PIPE 89.40 109630 2 B-J PT ZA-0012 R2 C . .

BENT PIPE TO VALVE B9.40

(

I i

i l

l l

l 1

i l i i  !

t 4

l l

DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 9 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF) j

( 4 CHEMICAL AND VOLtME CONTROL SYSTEM CLASS 1 CLABWE STA11JS COMPONENTS N O ASME O G T SEC. XI R E H SIMOJtY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBEE IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

4 -CV- 2118 - BB 1 (FIG NO A-CV-2) 150220 1 B-J PT ZA-0012 R2 C - -

VALVE TO PIPE B9.11 UT UTI-005 R3 C - -

l

..SS.7..

150240 2 B-J PT ZA-0012 R2 C - - A PLANAR REFLECTOR LOCATED WITHIN THE PIPE TO VALVE B9.11 UT 071-005 R3 - - C WELD VOLUME NEAR THE OUTSIDE SURFACE OF THE WELD WAS DETECTED BY AN ULTRASONIC EXAMINATION DURING PSI AND VERIFIED BY 1TT EXAMINATION DURING 2RE05. THE I REFLECTOR HAS NOT CHANGED IN SIZE AND REMAINS Ar'CEPTABLE BASED ON SECTION XI ACCEPTANCE CRITERIA. )

I 2-CV-2121-BP1 (FIO NO A-CV-3)  !

r f\ 151100 3 B-J PT ZA-0012 R2 C - -

BENT PIPE TO VALVE B9.21 2-CV-2124-PP1 (FIO NO A-CV-5) 152320 5 B-J PT ZA-0012 R2 C - -

VALVE TO PIPE B9.21 152400 9 B-J PT ZA-0012 R2 C - -

REDUCING TEE TO REDUCER B9.21 2(1.5)-CV-2122 PP1 (FIG NO A-CV-4) 154905 4FB B-G-2 VT-1 ZA-0024 R1 . . E SAMPLE EXPANSION PER IWB-2430. - SEE FLANGE BOLTING B7.50

SUMMARY

NO. 155405. MINOR BORON RESIDUE NOTED. LEAK IS NOT ACTIVE. NO BOLTING DEGRADATION. SEE CR 97-2667. NO INSPECTION CREDIT TAKEN BECAUSE WELD WAS EXAMINED PREVIOUSLY IN PERIOD 1. NO FURTHER SAMPLE EXPANSION REQUIRED.

O

DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 2 PAGE: 10 l REVISION: 0 INSERVICE INSPECTION PIAN . 2RE05 (WELDS) l FIRST INTERVAL, SECOND PERIOD, THIRD OITTAGE (97RF)

/% CLASS 1 CLABWE STAWS COMPONENTS

( \ CHEMICAL AND VOLINE CONTROL SYSTEM N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS I NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION B14CK**

2(1.5)-CV-2124-BB1 (FIG NO A-CV-5) 155400 2 B-J PT ZA-0012 R2 C - -

BENT PIPE TO FLANGE B9.21 155405 2FB B-G-2 VT-1 ZA-0024 R1 - - C BORON BUILDUP AT FLANGE CONNECTION. SEE FLANGE BOLTING B7.50 CR 97-2667. SAMPLE EXPANSION TO SN 154905, 155925, AND 156445. BOLTING WAS REEXAMINED AFTER BORIC ACID RESIDUE WAS REMOVED BY DECON AND NO BOLTING DEGRADATION WAS OBSERVED.

2 '1. 5) -CV-2126 BB1 (FIG NO A-CV-5) 155925 2F8 B-G-2 VT-1 ZA-0024 R1 2 - - SAMPLE EXPANSION PER IWB-2430 - SEE FLANGE BOLTING B7.50 SIM1ARY NO. 155405. NO INSPECTION CREDIT TAKEN BECAUSE THIS WELD IS SCHEDULED FOR O

g ISI EXAMINATION IN PERIOD 3.

SAMPLE EXPANSION IS REQUIRED.

NO FURTHER 2 (1. 51 -CV-212 8 -BB1 (FIO NO A-CV-6) 156445 2FB B-G-2 VT-1 EA-0024 R1 E . . SAMPLE EXPANSION PER IWB.2430 . SEE FLANGE BOLTING B7.50

SUMMARY

NO. 155405. NO INSPECTION CREDIT TAKEN BECAUSE THIS WELD WAS EXAMINED PREVIOUSLY IN PERIOD 1. NO FURTHER SAMPLE EXPANSION IS REQUIRED.

l 1

i 1

DATE: 05/19/97 SOtTTH TEXAS PROJECT ELECTRIC GENERATING STATION 11 NIT 2 PAGE: 11 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF)

[ CLASS 1 CIABWE STATUS COMPONENTS PESIDUAL HEAT REMOVAL SYSTEM N O ASME O G T SEC, XI R E H SUP94ARY EXAMINATION AREA CATCY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

12-RH-2101-BB1 (FIG NO A-RH-1) 200000 1 B-J PT ZA-0012 R2 C . -

VALVE TO PIPE B9.11 UT IJTI-001 R3 - C -

UT UTI-005 R3 . C .

    • SS-21/SS-20**

200140 8 BJ PT ZA-0012 R2 C - -

. PIPE TO ELBOW B9.11 ITT ITTI-001 R3 - C -

eess.21**

200160 9 B-J PT ZA-0012 R2 C - .

ELBOW TO PIPE B9.11 UT UTI-001 R3 . C .

eess.21**

\

B-J

,N/f200200 11 PIPE TO PIPE B9.11 PT UT ZA-0012 R2 ITTI.001 R3 C - -

- C -

177 UTI-005 R3 - C - i

    • SS-21/SS-20**

l 1

1 l

1 I

U[\.

J

. __. _ _ _ _ . _ . . m~ , _ . . _ .- _. __ _ ._ _ _ _ _ _ _ _ _ _ _ _ _ . . __

DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 12 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF)

[% SAFFTY INJECTION SYSTEM CLASS 1 CLABWE STATUS COMPONENTS N O ASME O G T SEC. XI R E H SUPHARY EXAMINATION AREA CATGY ' EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

12-SI-2315-BB1 (FIG NO A-SI-2) 1 230660 7 B-J PT ZA-0012 R2 C - - TWO INDICATIONS OF ROOT GEOMETRY WERE PIPE TO ELBOW B9.11 W UTI-001 R3 . C - DETECTED FROM OPPOSITE SIDES OF THE WELD j NEAR THE SAME 'W* I4 CATION THAT WERE NOT ~I PREVIOUSLY RECORDED.

. sS.21**

230700 9 B-J PT ZA-0012 R2 C - -

PIPP TO VALVE B9.11 W WI.001 R3 - C .

UT UTI-005 R3 - C -

"SS - 21 *

  • l 1

i l

l l

l 1

l i

i I

f~~'

k r

i I

I l

DATE: 05/19/97 SOtTrH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGEt 13 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF)

CLASS 1 CLABWE STATUS COMPONENTS

( PEA" TOR COOLANT PUMP 2A N O l ASME O G T SEC. XI R E H SIM4ARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK ** ,

i FLYWHEEL (FIO NO A-PCP-3) 260170 RCP-2A-FW RG UT UTI-003 R1 W - - EXAMINED BORE, KEYWAYS, AND BOLT HOLES FLYWHEEL 1.14 IN PLACE.

    • CS-76**

i A  !

(j  !

l 1

/ $

. _. _ _ _ . - . _ ___ _ _. _ . ...m.__m___ _. .

dam 05/19/97 SOUTH TEXAS PRCATECT ELECTRIC CENE2ATING STATION UNIT 2 PAGE: 14 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF)

A CLASS 1 CLABWE STATUS COMPONENTS

, g' \

REACTOR COOLANT PUMP 2B N O M8 0 0 7 SEC. XI R E H SUM 4ARY EXAMINATION AREA CATGY EXAM E O E REMARKS t

, NUMBER IDENTIFICATION  % TEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

d d

FLYWHEEL (FIG NO A-pCP.2}

260270 RCP-28-FW RG UT UTI-003 R1 W . . EXAMINED BORE. KEYWAYS, AND BOLT HOLES FLYWHEEL 1,g4 IN PLACE.

    • CS-76**

11 (O'

, i a

4

)

e 4

)

i

F F

DATE: 05/19/97 SOUDI TEXAS PROJECT ELECTRIC OENERATING STATION UNIT 2 FAGE: 15 REVISION: 0 . INSERVICE INSPECTION PLAN . 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF)

CIASS I CLABWE STATUS COMPONENTS 4 PEACTOP COOLANT PUMP 2C Nd N O ASME O O T SEC. XI R E H

SUMMARY

E4 AMINATION AREA CATGY EXAM E O E REMARKS j NUMBER IDENTIFICATION ITEM NO METHCD PROCEDURE C M R ** CALIBRATION BLOCK **

FLYWEEL (FIG NO A-PCP-3) t 260370 RCP-2C-FW RG UT UTI-003 RI W . - EXAMINED BORE, KEYWAYS, AND BOLT HOLES FLYWHEEL 1.14 IN PIACE,

    • CS-76**

y-l s

v/

I 1

i I

I t

7_

i DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 16 REVISION: 0 INSERVICE INSPECT 10tf PLAN . 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIOD, THIRD OITTAGE (97RF)

'N CLASS 1 CLABWE STATUS COMPONENTS REACTOM COOIANT PIMP 2D N O i j ME O G T l SEC. XI R E H l

StM4ARY EXAMINATION AREA CATGY EXAM E O E REMAEKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK ** (

I FLYWHEEL (FIG NO A-RCP-2) l 260470 RCP-2D-FM RG UT UTI-003 R1 W - . EXAMINED BORE, KEYWAYS, AND BOLT HOLES )

FLYWHEEL 1.14 IN PLACE. 1 i

i

. cS 76.. ]l l

1 1

I i

I i

I (A

.g

\ -

1 4

4 l

t i

I s

i I

DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 17

REVISION
0 INSERVICE INSPECTION PLAN - 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF)

[N CLASS 1 CLABWE STA711S COMPONENTS I 1%EEE N

N O ASME O G T SEC. XI R E H SIMMARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFIC'LTION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

VALVE OROUP 1 261100 PSV 3452-VB ON 6.RC-2004 B-G-2 VT.1 EA-0024 R1 B . . PERFORMED BASELINE EXAMINATION ON VALVE FIO. NO. A-RC-6 B7.70 BOLTING ON REPLACEMENT VALVE INSTALLED PER WCD NO. RC-2-345646, 263120 PSV 3452-VIS ON 6-RC-2004 B-M-2 VT 3 EA-0024 R1 B . . PERFORMED BASELINE VISUAL EXAMINATION ON FIO. NO. A-RC-6 B12.50 INTERIOR OF REPLACEMENT VALVE INSTALLED PER WCD NO. RC-2-345646. EXAMINED ALL INTERNAL PRESSUkE BOUNDARY SURFACES TO THE EXTENT POSSIBLE.

262160 PSV 3451-VB ON 6-RC-2009 B-G-2 VT-1 EA-0024 R1 B - - PERFORMED BASELINE EXAMINATION ON VALVE FIO. NO. A-RC-6 B7.70 BOLTING ON REPLACEMENT VALVE INSTALLED PER WCD NO. RC-2-345645.

2f1180 PSV 3451.VIS ON 6-RC-2009 B-M-2 VT-3 EA-0024 R1 B - . PERFORMED BASELINE VISUAL EXAMINATION ON FIG. NO. A-RC-6 v } B12.50 INTERIOR OF REPLACEMENT VALVE INSTALLED PER WCD NO. RC-2-345645. EXAMINED ALL INTERNAL PRESSURE BOUNDARY SURFACES TO THE EXTENT POSSIBLE.

261200 PSV 3450-VB ON 6-RC-2012 B-G-2 VT.1 EA-0024 R1 B - . PERFORMED BASELINE EXAMINATION ON VALVE FIG. NO. A-RC-6 B7.70 BOLTING ON REPLACEMENT VALVE INSTALLED PER WCD NO. RC-2 345644, 261220 PSV 3450* VIE ON 6-RC-2012 B-M-2 VT-3 EA-0024 R1 B - . PERFORMED BASELINE VISUAL EXAMINATION ON FIO. NO. A-RC-6 B12.50 INTERIOR OF REPLACEMENT VALVE INSTALLED PER WCD NO.RC-2 345644. EXAMINED ALL INTERNAL PRESSURE BOUNDARY SURFACES TO THE EXTENT POSSIBLE.

\

1 2

l l

DATE: 05/19/97 SOtTTH TEXAS PROJECT ELECTRIC CENERATING STATION IJNIT 2 PAGE: 18 I REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (WELDS) j FIRST INTERVAL, SECOND PERIOD, THIRD OtTTAGE (97RF)

CLASS 2 CLABWE STATUS COMPONENTS

{ PESIDUAL FEAT REMOVAL HEAT EXCHANGER 2A

\ N O -J ME O G T l SEC. XI R E H i SUPNARY EXAMINATION AREA CA'IUY EXAM E O E REMARKS l

NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK +* j l

l CIPCtMPEPFNTIAL WELDS (FIO NO B-RHX-1) 305450 RHAHRS-2A-S2 C-A UT 0t1 032 RO - C -

SHELL TO FLANGE CI.10

    • SS-65**

NOZZLE TO SHELL WELDS (FIO NO B-RHX-1) 305500 RHAHRS-2A-NA C-B PT ZA-0012 R2 C - -

NOZZLE TO SHELL C2.21 UT UTI-032 R0 . C -

l l

    • SS-65/SS-66** j l

i 305550 RHAHRS-2A-NB C-b PT ZA-0012 R2 C . .  !

l NOZ2LE TO SHELL C2.21 UT UTI.032 RO - C -

I i

,g **SS-65/SS-66**

I

( i I

l l

l l

I t

i l-i 1

l5

\

DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 2 PAGE 19 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF)

A CLASS 2 CLABWE STATUS COMPONENTS

/ \

AUXILIAPY FEEDWATER SYSTEM N O ASME O O T SEC. XI R E H SIP 9tARY EXAMINATION AREA CATGY EKAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK" 8-AF-2008-CA2(C1 (FIO NO B-AF-3) 351740 12 C-F-2 MT ZA-0018 R2 C . .

ELBOW TO PIPE C5.51 UT UTI-002 R3 . C .

" CS - 2 *

PIPE LUGS C3.20 1- AF-2010-GA2 fC1 (FIO NO B-AF-5) 353330 18FL1-18PL8 C-C MT ZA-0018 R2 C . .

PIPE LUGS C3.20 A

/ 25PL1-25PL8 C-C MT ZA-0018 R2 C . -

)353470 PIPE LUGS C3.20 1

353520 28 C-F-2 MT EA-0018 R2 C - .

PIPE TO REDUCER C5.51 UT UTI-002 R3 - C -

l

  • *CS-2 "

9-AF-2010-GA2fG] (FYG NO B-AF-6) 354040 2 C-F-2 MT EA-0018 R2 C . .

PIPE TO REDUCER- C5.51 UT UTI-002 R3 - C -

6-AF-2010-GA2 (FIO NO B-AF-6. 6) 359660 2 C-F-2 PrT ZA-0018 R2 C - -

PIPE TO ELBOW C5.51 UT UTI-002 R3 - C -

"CS- 1*

  • s

\

- .. . - ._ - - _ _ _ _ . -, . . - ~.. - _ - .

- DATE: 05/19/97 COffTH TEXAS PROJECT ELECTRIC OENERATING STATION UNIT 2 FAGEt 20 '

REVISION: 0 IFSERVICE INSPECTION PLAN . 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF) j#] CLASS 2 CLABWE STATUS COMPONENTS

'N TEETiWATER SYSTEM N O ASME O O T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS

,j NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK'*

t 18-FW-2018-GA2 (FIG NO B-FW-7 ___8) 502720 4 BE3 HT ZA.0018 R2 A . - AUGMENTED ISI/BEZ.

g PIPE TO PIPE C5.51 UT UTI-002 R3 A . .

    • CS-3**

4 E

/%

i

(

l I

DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 21 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIDD, THIRD OUTAGE (97RF)

,q CLASS 2 CLABWE STATUS COMPONENTS f )MAINSTEAMSYSTEM

'd N O ,

ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NC METHOD PROCEDURE C M R **CALIBRATIC"6 BLOCK ** j

....... .............................. ....... .......... ............. . . . . ........................................ j

,30-MS-7003-GA2 (FIG NO D-MS-5. Q 555'/60 14LUI C-F 2-L MT ZA-0018 R2 L - - EXAMINED 2.5T AT THE INTERSECTING LONGITUDINAL WELD C5.52 UT UTI-002 R3 L - - CIRCUMFERENTIAL WELD.

" CS - 5 *

  • 1 555780 14LUO C-F-2-L MT ZA 0018 R2 L - - EXAMINED 2.5T AT THE INTERSECTING I4tlGITUDINAL WELD C5.52 UT UTI-002 R3 L - - CIRCUMFERENTIAL WELD.

l 1

    • CS-5**

555800 34 C-F-2 MT ZA-0018 R2 C - -

E% CW TO PIPE C5.51 tTT UTI-002 R3 C - *

" CS - 5 "

, 555820 14LD C-F-2-L MT ZA-0018 R2 L - - EXAMINED 2.5T AT THE INTERSECTING

\ -

LONGITUDINAL WELD C5.52 UT (frI-002 R3 L - - CIRCUMFERENTIAL WELD.

    • CS-5**

l 556400 23 BEZ MT ZA-0018 R2 A - . AUGMENTED ISI/BEZ.

PIPE TO PENETRATION C5.51 (7T ITTI-002 R3 A - -

..CS-5**

b56460 24 BEZ MT ZA-0018 R2 A - - AUGMENTED ISI/BEZ.

PIPE TO PIPE C5.51 UT UTI-002 R3 . A .

    • CS 5**

556480 24LD BEZI4NG MT ZA-0018 R2 A . - AUGMENTED ISI/BEZ. EXAMINED 1004 OF THE 14NGITUDINAL WELD C5.52 UT UTI-002 R3 A - - WELD LENGTH

  • CS- 3 3"  !

i i

1 l

I v

I DATE: 05/19/97 SOUnt TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 22 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (WELDS) ,

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF) l

% CLASS 2 CLABWE STATUS COMPONENTS MAIN STEAM SYSTEM l N O ASME O O T SEC. XI R E H SU>t1ARY EXAMT .ATION AREA CA70Y EXAM E O E REMARKS 1 1

NUMBER IDEETIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK ** ]

30-MS-2003-GA2 (FIG NO B-MS-5, 61 556500 25LU BEZLONG MT ZA-0018 R2 A - - AUGMENTED ISI/BEZ. EXAMINED 100% OF THE LONGITUDINAL WELD C5.52 (TT UTI-002 R3 A - - WELD LENGTH.

    • CS-33**

4 556520 25 BEZ MT ZA-0018 R2 A - - AUGMENTED ISI/BEZ.

PIPE TO PIPE C5.51 UT UTI-002 R3 A - -

"CS - 3 3 *

  • 556540 2514 BEZLONG >fr ZA-0018 R2 A - - AUGMENTED ISI/BEZ. EXAMINED 100% OF THE LONGITUDINAL WELD C5.52 UT UTI-002 R3 A . . WELD LENGTH.

l l

  • *CS- 3 5 "

1 A I

~[ h556542 26LU BEZLONG MT ZA-0018 R2 A - - AUGMENTED ISI/BEZ. EXAMINED 100% OF THE

/ LONGITUDINAL WELD C5.52 UT ITTI-002 R3 A - - WELD LENGTH.

..CS.35..

556544 26 BEZ >ff ZA-0018 R2 A - - AUGMENTED ISI/BEZ.

PIPE TO PIPE C5.51 UT UTI-002 R3 A . -

"CS- 3 5 *

  • 556546 26LD BEZIONG MT ZA-0018 R2 * - . AUGMENTED ISI/BEZ. EXAMINED 100% OF THE IDNGITUDINAL WELD C5.52 UT UTI-002 R3 a - - WELD LENGTH.
    • CS-35**

556548 27LU BEZLONG MT ZA-0018 R2 A - . AUGMENTED ISI/BEZ. EXAMINED 100% OF THE LONGITUDINAL WELD C5.52 UT UTI.002 R3 A - - WELD LENGTH.

    • CS-35**

(

i  !

j n >

I r 4 1 DATES 05/19/97 EOWH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 23 .

REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIOD, THIRD OtfrAGE (97RF) ,

CLASS 2 CLABWE STATUS COMPONENTS k MATM STEAM SYSTEM

(' {

N O ASME O G T ,

SEC. XI R E H $

LIM %RY EXAMINATION AREA CATGY EXAM E O E F.EMARKS NUMBF2 IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK ** i

....... .............................. ....... .......... .. ............ . . . ........................................ 4 30-MS 2003-GA2 (FIG NO B-MS-5, 61 556550 27 BEZ MT ZA-0018 R2 A - - AUGMENTED ISI/BEZ. j

, PIPE TO PIPE C5.51 trr UTI.002 R3 A - - '

" CS - 3 5 "

I' 556552 27LD BEZLONG M' ZA-0018 R2 A . . AIXNENTED ISI/ BEE. EXAMINED 100% OF THE IDNGITUDINAL WELD C5.52 UT UTI-002 R3 A - - WELD LENCTH. ,

"CS- 3 5" i

5565E0 28LU BEZIDNG MT ZA-0018 R2 A - - AUGMENTED ISI/BEZ, EXAMINED 100% OF THE .

LONGITUDINAL WELD C5.52 ITT UTI-002 R3 A - . WELD LENGTW.

6

    • CS-35**

s

$56580 28 BEZ MT ZA-0018 R2 A - - AUGMENTED ISI/BEZ,

(%/

PIPE TO VALVE C5.51 ITT UTI-002 R3 A . .

.*CS-5**

$56600 29 C-r-2 MT ZA-0018 R2 C - .

VALVE TO PIPE C5.51 tTI UTI-002 R3 - C -

i I

. . CS - 5" l l

556620 29LD BEZIDNQ MT ZA-0010 R2 A . . AUGMENTED ISI/BEZ. EXAMINED 100% OF THE LONGITUDINAL WELD C5.52 UT UTI-002 R3 A - - WELD LENGTH.

. .CS. u . .

556630 29PL1-29PL8 C-C MT ZA-0018 R2 C - -

PIPE 1.UGS C3.20 s

s t.

DATE 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UN!T 2 PAGE: 24 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (WELDS)

FIRET INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF) j CN CLASS 2 CLABWE STATUS COMPONENTS k )MAINSTEAMSYFTEM L/

N O ASME O O T SEC. XI R E N SIM4ARY EXAMINATION AREA CATGY EXAM E O E REMARFJi N'J MBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R " CALIBRATION BIOCK" 30-MS-2003-GA2 (FIO NO B MS 5, 6) 556640 30LU BEZLONG MT ZA-0018 R2 A - . AUGMENTED ISI/BEZ. EXAMINED 100% OF THE LONGITUDINAL WELD C5.52 UT tJTI-002 R3 A - . WELD LENGTH.

"CS - 3 4 *

  • 556660 30 BEZ MT ZA-0018 R2 A - . AUGMENTED ISI/BEZ.

PIPE TO PIPE C5.51 UT ITTI-002 R3 A - .

    • CS-33**

556680 30LD BEZLONG MT EA-0018 R2 A . . AUGMENTED ISI/DEZ. EXAMINED 100% OF THE IONGITUDINAL WELD C5.52 UT UTI-002 R3 A . . WELD LENGTH.

.

  • CS - 3 4 "

f%

( f556700 31LU BEZLONG MT ZA-0018 R2 A . - AUGMENTED ISI/BEZ. EXAMINED 100% OF THE V IONGI'!UDINAL WELD C5.52 tTT ITTI-002 R3 - A - WELD LENGTH.

    • CS-34**

556720 31 BEZ MT ZA-0018 R2 A . . AUGMENTED ISI/BEZ.

PIPE TO PIPE C5.51 UT UTI.002 R3 . A -

    • CS-5**

30-MS-2004-GA2 (FIG NO B-MS-7 6) 557340 4LUI C-F-2 L MI ZA-0018 R2 L . . EXAMINED 2.5T AT THE INTERSECTING LONGITUDINAL WELD C5.52 UT UTI.002 R3 L - - CIRCUMFERENTIAL WELD.

    • CS-5**

E57360 4LUO C-F-2-L MT ZA-0018 R2 L . . EXAMINED 2.5T AT THE INTERSECTING LONGITUDINAL WELD C5.52 UT UTI-002 R3 L - - CIRCUMFERENTIAL WELD.

l l

/~N

\ \ ,w M

_ _ _ m - _ . _

! I I

i i

DATES 05/19/97 COUTH TEKAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 25 I REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (WELDS) l FIRST INTERVAL, SECfJFD PERIOD, THIRD OffrAGE (97RF) l  % CLASS 2 CLABWE STATUS COMPONENTS MAIN STEAM SYSTEM N O ASME O G T l SEC. XI R E H l

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK" l

30-MS-2004-GA2 (FIG NO B-MS-7, 8) f 557380 4 C F-2 MT ZA-0018 R2 0 . .

ELBOW TO PIPE C5.51 UT UTI.002 R3 C . .

    • CS.5** j i

l l

557400 4LD C-F 2 L MT ZA-0018 R2 L . . EXAMINED 2.5T AT THE INTERSECTING j IONGITUDINAL WELD C5.52 UT ITTI.002 R3 L .. CIRCUMFEREfff1AL WELD. l

    • CS-5**

'558700 22 BEZ MT ZA-0018 R2 A . - AUGMENTED ISI/BEZ.

PIFE TO PENETRATION C5.51 UT ITTI.002 R3 A . . .

I e s CS. s" \

f 558760 23 BEZ MT ZA-0018 R2 A . . AUGMEh*TED ISI/BEZ.

PIPE TO PIPE C5.51 UT I?rI-002 R3 - A .

l l

558780 23LD BEZLONG MT ZA 0018 R2 A . . AUGMENTED ISI/BEZ. EXAMINED 100% OF THE LONGITUDINAL NELD C5.52 UT UTI.002 R3 A . . WELD LENGTH.

e*CS 33** l 558800 24LU BEZLONG MT ZA-0018 R2 A - . AUGMENTED ISI/BEZ, EXAMINED 1004 OF THE LONGITUDINAL HELD C5.52 UT IJTI-002 R3 A . . WELD LENGTH.

"CS- 3 3 *

  • S58820 24 BEZ MT ZA.0018 R2 A . . AUGMENTED I$1/PFZ.

PIPE TO PIPE C5.51 UT UTI-002 R3 A . -

l l "CS.3 3 *

  • i .s i

l

. . . - . . _ _ _ _ _. _ . . - . . .m _ . .__

DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENEPATING STATION UNIT 2 PAGE: 26 4 REVISION: 0 INSERVICE INSPECTION PIAN . 2RE05 (WELDS) 4 FIRST INTERVAL SECOND PERIOD, THIRD OUTAGE (97RF)

A CIASS 2 CLABWE STATUS COMPONENTS

' MAIN FTEAM SYSTD4

( N O i l

ASME O G T l SEC. XI R E H '

I SIM4ARY EXAMINATION AREA CATGY EXAM E O E REMARXS ]

NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCE**  !

l

....... .............................. ....... .......... ............... . . . ........................................ 1 l

30-MS-2004-GA2 (FIG NO B-MS-L 8) )

), 558840 24LD BEZLONG MT ZA-0018 R2 A . . AUGMENTED ISI/BEZ. EXAMINED 10'Jt OF THE IDNCITUDINAL WELD C5.52 UT UTI.002 R3 A . . WELD LENGTH.

4

" CS.35" i

558842 25LU BEZLONG MT ZA-0018 R2 A . . AUGMENTED ISI/BEZ. EXAM 1a'O 200% OF THE  !

IONGITUDINAL WELD C5.52 UT ITTI.002 R3 A - . WELD LENGTH.  !

l

    • CS.35**

I 558844 25 DEZ MT ZA.0018 R2 A . . AUGMENTED ISI/BEZ. I i

PIPE TO PIPE C5.51 ITT UTI-002 R3 A . .

  • cs. 3 5" I

i g

$58846 25LD BEZLONG MT EA-0018 R2 A . . AtGMENTED ISI/BEZ. EXAMINED 100% OF THE IONGITUDINAL WELD ,C5.52 UT UTI.002 R3 A . . WELD LENGTH.

..eS.35..

l 1

558848 26LU BEZLONG MT ZA-0018 R2 A . . AUGMENTED ISI/BEZ. EXAMINED 100% OF THE IDNGIWDINAL WELD C5.52 UT UTI-002 R3 A . . WELD LENGTH.

i

    • CS-35**  !

558850 26 BEZ MT ZA-0018 R2 A . - AIT M ED ISI/BEZ.

PIPE TO PIPE C5.51 UT UTI.002 R3 A . .

"CS. 3 5 *

  • 558852 26LD BEZLONG MT EA-0018 R2 A . . AUGMENTED ISI/BEZ. EXAMINED 2004 OF THE LONGITUDINAL WELD C5.52 ITT UTI-002 R3 A . . WELD LENGTH.
    • CS.35**

(

DATE: 05/19/97 SOWH TE%AS PROJECT ELECTRIC GENERATING STATICC! UNIT 2 PAGE: 27 REVISION: 0 INSERVICS INSPECTION PIAN . 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUIAGE (97RF)

g. CLASS 2 CLABWE STARIS COMPONENTS

{ i MAIN STEAM FYSTEM t

,Ql N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS MUNDI R IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK'*

30-MA-2004-GA2 (FIO NO B-MS-7 81 558860 27LU BEZLONG MT ZA-0018 R2 A . - AUGMENTED ISI/BEZ. EXAMINED 100% OF THE LONGITUDINAL WELD C5.52 UT UTI-002 R3 A . . WELD LENGTH.

..es.35**

558880 27 C-F-2 MT ZA-0038 R2 C - -

PIPE TO VALVE C5.51 Ifr 17FI-002 H3 - C .

    • CS-5**

$58900 28 BEZ MT ZA-0018 R2 A . . AUGMENTED ISI/BEZ.

VALVE TO PIPE C5.51 W ITTI-002 R3 A - .

    • CS-5**

n

[ j558920 28LD BEZLONG MT ZA 0018 R2 A - . AUGMENTED ISI/BEZ. EXAMINED 1004 OF THE

\ ,/ LONGITUDINAL WELD C5.52 LTT UTI-002 R3 A - . WELD LENGTH.

    • CS-34**

558925 28PL1-28PL8 C-C MT ZA-0018 R2 C . .

PIPE LUGS C3.20 55b940 29LU BEZLONG MT ZA-0018 R2 A . - AUGMENTED ISI/BEZ. EXAMINED 1004 OF THE IDNGITUDINAL WELD C5.52 ITT tTTI.002 R3 A . . WELD LENGTH.

    • CS-34**

558960 29 BEZ MT ZA-0018 R2 A . . AUGMENTED ISI/BEZ.

PIPE TO PIPE C5.51 UT LTTI-002 R3 A - -

    • CS-33**

.O

/ 5

\ /

m/

f_ I DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 FAGE: 28 !

l REVISION: C INSERVICE INSPECTION PLAN

  • 2RE05 (WELDS) .

FIRST INTERVAL, SECOND PERIOD, THIRD OtfrAGE (97RF) g CLASS 2 CI.ABWE STATUS COMPONENTS ,

MAfW ffTEAM SYSTEM i

ASME O Q T SEC. XI R R H I SUP94ARY EXAMINATION AREA CATOY EXAM E O E REMARKS $

i NLNBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

....... .............................. ....... .......... ............... . . . ........................................ i 30-MS-2004-GA2 (PfC NO B-MS *P. 8) 558980 29LD BEZIONG Pft EA-0018 R2 A . . AUGMENTED ISI/BEZ. EXAMINED 1004 OF THE '

IDNGITUDINAL WELD C5.52 ITT UTI-002 R3 A . . WELD LENGTH.

    • CS.34**

559000 30LU BEZIONG MT EA-0018 R2 A . . AUGMENTED ISI/BEZ. EXAMINED 200% OF THE IDNGITUDINAL WELD C5.52 UT UTI.002 R3 A . - WELD LENGTH.

l

    • CS.34**

559020 30 BE2 MT ZA-0018 R2 A . . AUGMENTED ISI/BEZ.

PIPE TO PIPE C5.51 ITT 17t1 002 R3 . A .

    • CS-$**

6 16-MS-2004-GA2 (FIG NO B-MS-8) 551080 1 BEZ MT ZA-0018 R2 A . . AUGMENTED ISI/BEZ.

EXTRUSION TO PIPE C5.51 UT UTI-002 R3 A . .

e.cs.15**

561100 2 BEE MT EA-0018 R2 A . - AUGMENTED ISI/ BEE.

PIPE TO WELD CAP C5.51 11T 1771-002 R3 . 'A .

    • CS-15**

6-MS-2004-GA2(A) (PTG NO B-MS-8) 567900 1 BEZ MT EA 0018 R2 A . . AUGMDTTED ISI/BEZ. .

EXTRUSION TO FLANGE C5.51 tri UTI-002 R3 A . .

    • CS-75**  ;

i l

1 1

j i (G f

t DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 2 PAGE: 29 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (NELDS)

FIRST INTERV7L, SECOND PERIOD, THIRD Ot1TAGE (97RF)

, CIASS 2 CLABNE STATUS COMPONENTS

( jeAIN STEAM SYSTEM N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER JDENTIFICATION ITEM NO METHOD PROCEDURE C M R " CALIBRATION BIOCK" 6-MS-2004-OA2fB) (FIO NO B-MS-8) 568000 1 BEE MT EA-0018 R2 A . . AUtr4ENTED ISI/ BEE, EXTRUSION '!?, FLANOE C5.51 UT UTI.002 R3 A . .

ll

    • CS-75**

i 4

. O l

1 i

i l

l i

4

(%

v)

.ar _t

. - - -~. _ - . . ~ -. _ - . . . - ..

l DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 30 REVISIOWs D INSERVICE INSPECTION PLAN - 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF)

CIASS 2 CLABWE STA1VS COMPONENTS f

SAFETY INJEC" TION SYSTEM (V N O 1 MM O G T SEC. XI R E H i

SUPNARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK'* i l

24-SI-2101-UR2 (FIG NO B SI-1, 2) l j 699990 ILU C-F-1-L PT ZA-0012 R2 L - - EXAMINED 2.57 AT THE INTERSECTING

! 14NGITUDINAL WELD C5.12 UT UTI.012 R2 L - - CIRCUMFERENTIAL WELD.

i

    • SS.32ee i

l 700000 1 C-F.1 PT ZA-0012 R2 C - -

NOZZLE TO PIPE C5.11 UT UTI-012 R2 - C -

..SS.32 e 700020 ILD 't-F-1-L PT EA-0012 R2 L - - EXAMINED 2.57 AT THE INTERSECTING f LONGITUDINAL WELD C5.12 ITT UTI-012 R2 - L - CIRCUMFERENTIAL WELD. i seSS.33u 700040 2LU C-F.1-L PT EA-0012 R2 L - - EXAMINED 2.5T AT THE INTERSECTING 1DNGITUDINAL WELD C5.12 UT ITTI-012 R2 L - - CIRCUMPERElrTIAL WELD. NO ITT BASELINE ITT ITTI.004 R3 L - - PRIOR TO 2RE05.

"$S - 3 2 "

l I I

' 700060 2 C-F-1 PT EA-0012 R2 C . - NO UT BASELINE PRIOR TO 2RE05. I PIPE TO ELBOW C5.11 LTT ITTI-012 R2 - C - INTERMITTEN'! ROOT GEOMETRY DETECTED WITH j LTT UTI-004 R3 C - + 45 DEGREE SEARCH UNIT. I I

    • SS-32** i l l 700080 2LDI C-F-1-L PT ZA-0012 R2 L - - EXAMINED 2.5T AT THE INTERSECTING l

14NGITUDINAL WELD C5.12 ITT ITTI-012 R2 L - - CIRCUMFERENTIAL WELD. NO UT BASELINE UT UTI-004 R3 L - - PRIOR TO 2RE05, j "SS- 3 2 "

700100 2LDO C-F-1-5 (T EA-0012 R2 L - - EXAMINED 2.57 AT THE INTERSECTING LONGITtIDINAL WELD C5.12 ITT UTI.012 R2 L - - CIRCUMFERENTIAL WELD. NO UT BASELINE UT ITTI.004 R3 L - - PRIOR TO 2RE05.

, "SS- 32 *

  • I I

4 I

l DATE: 03/1f/97 SOITTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 2 PAGE: 31 REVISl0Ns 0 INSERVICE INSPECTION PLAN . 2RE05 (WELDS)

FIRST IsrTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF)

CIASS 2 CLABWE STATUS COMPONEffTS s.s 1 EAFETY INJECTION SYSTEM l N O MM O C T SEC. XI R E H

SUMMARY

EXAMMATION AREA CATGY EXAM E O E REMARKS NUMDER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R " CALIBRATION B14CK' 24-SI-2101-UB2 (FIO NO D-SI-1, M 701600 27LU C-F-1-L PT ZA 0012 R2 L - - EXAMINED 2.LT AT 1HE INTERSECTING LONGITUDINAL WELD C5.12 17T UTI.012 R2 L . - CIRCUMFERElfrIAL WELD.

    • SS-32** ,

701700 27 C-F-1 PT ZA-0012 R2 C - -

PIPE TO REDUCER Cf.11 UT UTI.012 R2 . C -  ;

eess.32**

701720 27LD C-F.1-L PT ZA-0012 R2 L . - EXAMINED 2.5T AT THE INTERSECTING IONGITUDINAL WELD C5.12 ITT UTI.012 R2 L . . CIRCUMFERENTIAL WWLD.

. ss.32..

I

(

(% ) 6-EI-2206-DB2 (FIG NO B-SI-16)

V 139320 24 C-F-1 PT ZA-0012 R2 C - -

PENETRATION TO PIPE C5.11 UT UTI-012 R2 - C -

"SS-23" i

I 739340 25 C-F-1 PT ZA.0012 R2 C . -

PIPE TO ELBOW C5.11 UT 17TI-012 R2 C - -

1 l

  • *SS.2 3 " )

i I

739360 26 C-F-1 PT ZA-0012 R2 C - -

ELBOW TO PIPE C5.11 UT ITTI.012 R2 C - -

..Ss.23**

i 739380 27 C-F-1 PT ZA-0012 R2 C - -

PIPE TO VALVE C5.11 UT UTI-012 R2 C - -

    • SS 23" p

i

\ l i

I i

I l

l l I

i l

DATE: 05/19/97 SOWH TEXAS PRCJECT ELECTRIC OENERATINO STATION UNIT 2 PAGE: 32 i

REVISION: 0 INSERVICE INSPECTION PIAN . 2RE05 (WELDS)  !

1 FIRST INTERVAL, SECOND PERIOD, THIRD O WAGE (97RF) j (q

4 EAFETY INJFCTION SYSTEM CLASS 2 CLABWE STATUS COMPONENTS N O ASME O O T SEC. XI R E H SUI 94ARY EXAMINATION AREA CATOY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

6-8f-2206-DB2 (FIO NO B-SI-16) l 1

739400 28 C-F-1 PT EA-0012 R2 C - - l VALVE TO PIPE C5.11 UT UTI-012 R2 C - .

..SS.23**

l, 6-ST-2207-BB2 (FIO NO P-SI-16)

  • /40640 4 C-F-1 PT ZA-0012 R2 C - -

PIPE TO ELBOW C5.11 UT UT!-001 R3 - C . l

    • SS-9**

740660 5 C-F-1 PT ZA-0012 R2 C . -

ELBOW TO PIPE C5.11 UT ITTI.001 R3 . C -

I

    • SS-9** '

\

6-ST-7210-BB2 (FIO NO B-SI-17) 741920 2 C-F-1 PT ZA-0012 R2 C . .

PIPE TO VALVE C5.11 UT UTI-001 R3 - C a

    • SS.9ee 2-ST-2335-DB2 (FIO NO B-SI-23) 747180 19 C-F-1 PT ZA-0012 R2 B - - NO EXAMINATION WAS REQUIRED ON THIS WELD ELBOW TO PIPE C5.30 DURINO 2RE05. THIS WELD WAS REPLACED ON 10-4-96 IN ACCORDANCE WITH WCD NO.

SI-340353, WHICH WAS INITIATED TO REPLACE VALVE S10120C. THE BASELINE PT EXAMINATION PERFORMED ON THE NEW WELD ON 10-4 96 WILL BE INCLUDED IN THE 2RE05

SUMMARY

REPORT.

l 1

e V

i l

DATE: 05/17/97 sot /TH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 33 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (WELDS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF) f^- CLASS 2 CLABWE STATUS COMPONENTS i SAFETY INJFCTION SYSTEM

'J N O s ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M A ** CALIBRATION BIOCK**

l I 2-SI-733%-DB2 (FIO NO B-SI-21) 747190 20 C-F-1 PT ZA-0012 R2 B - - NO EXAMINATION WAS REQUIRED ON THIS WELD PIPE TO VALVE C5.30 DURING 2RE05. THIS WELD WAS REPLACED ON ,

I 10-4-96 IN ACCORDANCE WITH WCD NO.

S1 34C353, WHICH WAS INITIATED TO REPLACE VALVE S10120C, THE BASELINE PT EXAMINATION PERFORMED ON THE NEW WELD ON l 10-4 96 WILL BE INCLUDED IN THE 2EE05

SUMMARY

REPORT.

O' C.

.\

i i

l lv t

l l

l 6

l l

1 i

l l

l 1

l l

l APPENDIX 2-B J l l l

PERSONNEL l

l l

1 1

i l

l 1

l 1

l l

3 4

t l

3

_ . .m... . _ . . - - - _

t s

I l

l l i

-(

APPENDIX 2-B FERSONNEL

! Name Company UT MT PT VT l

!~ Blecha,P. SSI II

  • II
  • II II
  • DiValerio, P.' SSI II II II II Garcia, D. SSI II II II
  • Grell, M. SSI- II II II II Hahn, M. SSI II * *
  • Harry, A.J. SSI II
  • II
  • Jackson, T.E. SSI
  • II * *

! Nagel, A. SSI II

  • II
  • Williams, S. SSI II * *
  • Busby, R. HL&P * *
  • II Hubbard, S. K. HL&P III III III III Kieler, K. HL&P * *
  • II Smith, T. HL&P *
  • II
  • Spiess, L. D. HL&P III
  • III
  • lO

, Company  !

l ' SSI - Sonic Systems International, Inc.

l HL&P - Houston Lighting & Power Co.

l l

l l^  ;

l i

I l

  • -This NDE method not performed for ISI by these personnel during this refueling outage. l
i l

l l

2-B-I

i n

i r

i l

i

l 1

4 M

i 4

i 1

4 i

i 1,

l l APPENDIX 2-C i i IIL&P PROCEDURES '

4 k

j i l

I l

I s

a  !

APPENDIX 2-C -

l . HL&P PROCEDURES l Procedure No. Brya Title l

l OPQP05-ZA-0001 1 Qualification and Cenification of Nondestructive Examination Personnel i

OPQP05-ZA-0004 1 General Ultrasonic Examination CPQP05-ZA-0009 0 Recording Data from Direct Visual, Liquid Penetrant, and Magnetic Panicle Examinations ,

l i OPQP05-ZA-0012 2 Color Contrast Solvent Removable Liquid Penetrant Examination for ASME XI PSI /ISI

!- i OPQP05-ZA-0018 2 Dry Powder Magnetic Panicle Examination for ASME XI  ;

PSI /ISI l l

OPQP05-ZA-0023 1 Visual Examination of Component Supports for ASME XI Inservice  !

Inspection l OPQP05-ZA-0024 1 ASME XI Examination for VT-1 and VT-3 l UTI-001 3 Manual Ultrasonic Examination of Austenitic and Dissimilar Metal l Pressure Piping Welds Using Refracted Longitudinal Technique UTI-002 3 Manual Ultrasonic Examination of Ferritic Pressure Piping Welds UTI-003 1 Manual Ultrasonic Examination of Reactor Coolant Pump Flywheels From the Access Holes UTI-004 3 Manual Ultrasonic Examination Using Longitudinal Wave Straight-Beam Technique L UTI-005 3 Manual Ultrasonic Examination of Austenitic Pressure Piping Welds UTI-006 1 Manual Ultrasonic Indication Sizing UTI-007 0 Recording Indications During Ultrasonic Examinations

' UTI-008 -0 Weld Joint Identification Marking i

2-C-1 1

.- . .. - .- . _. .- - -- . - - = - . . - , . . - _ - - . . _ ,

l APPENDIX 2-C HL&P PROCEDURES P_rocedure No. Bry. Title UTI-012 2 Manual Ultrasonic Examination of Thin Wall Piping Welds UTI-016 1 Manual Ultrasonic Examination of Vessel-to-Nozzle Inner Radius Sections UTI-017 2 Manual Ultrasonic Examination of Ferritic Pressure Vessel Welds (Greater Than 2 to 12 Inches in Thickness)

UTI-018 1 Manual Ultrasonic Examination of Centrifugally Cast and Static Cast Stainless Steel Piping Welds UTI-023 0 Transducer Analysis ]

l UTI-030 0 Manual Ultrasonic Examination of Austenitic Branch Connection L Welds fron the Branch Connection Taper O

UTI-032 0 Manual Ultrasonic Examination of Pressure-Retaining Welds in l Thin-Walled Vessels i

l 1

-t t t 4

2-C-2 i

i

l l

l l

l l

l l

l l

l l

APPENDIX 2-D

! \

ISI EXAMINATION LIMITATIONS l

l l

t I

l I

i i

I t

APPENDIX 2-D ISI EXAMINATION LIMITATIONS Table of Contents STPEGS-2 Summary ofInservice Examination Limitations Class 1 Components ASME Category B-D Steam Generator ASME Category B-F l

Pressurizer Reactor Coolant system ASME Category B-J Reactor Coolant System Class 2 Components ASME Category C-B RHR HX 2A ASME Category C-C Main Steam System I

i 1

I i

4 l i

(

l 2-D-I l

l -. -_. .. - _ .

- . - .. - - . - - - - = .- - _ - . .- - . .. . .

)

l l SOUTII TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 2

SUMMARY

OF INSERVICE EXAMINATION LIMITATIONS The following tables provide details on the limitations which were encountered during the ISI examinations at the South Texas Project Electric Generating Station, Unit 2 (STPEGS-2). Each table of this summary provides the following information as described:

Column 1 - Class / Category / Item NoExamination Requirement Identifies the ASME Section XI Code Class, Category, Item Number, and Examination Require-ment (volumetric or surface) for the specific examination area listed in Column 2. This information is derived from Tables IWB-2500-1 and IWC-2500-1 of the 1983 Edition of ASME Section XI l (with Addenda through Summer 1983), and Tables I and 2 of Code Case N-408.

Column 2 -

Line No./ Subassembly Weld Identification Weld ID Figum Weld Configuration Examination Method Provides information for each examination area by line number (piping) or subassembly number (vessel), unique weld identification number, weld ID figure reference, weld configuration (pipe-to-tee, head-to-shell, etc.), and examination method (UT, UT/PT, or UT/MT). j Columtd - Exam Type Lists the Methods of Examinations used for each area by specific angles for UT (0,45,45T,60, 60T) and surface technique (MT or 171'), if required.

Column 4 -  % Coverage The extent of coverage for each exam type is expressed in pementages based on the examination volume / area required in Section XI. Depending on method, the percentage coverage may be represented in more than one way.

Surface methods are the simplest and are expressed as a percentage of the required surface area receiving no coverage and the remaining balance from 100% as the total coverage.

Ultrasonic coverage is first expressed for each exam type as a percentage of the volume receiving no coverage, angle-beam coverage in one direction only, and angle-beam coverage in two directions. These percentages are then used to compute the effective coverage for that exam type.

In the case of 0 degree, the effective coverage is equal to the balance of 100% minus the percentage receiving no coverage. The effective coverage for angle beam is calculated from the following formula:

C

O 2-D-2

i l

1

,-~. c = a + 2*b (effective coverage formula, angle beam)

.I

\v' 2 where a = one direction only percentage I

b = two direction percentage Examples:

(1) none 1 dir 2 dir 0% 0% 100 %

c = 0 + 2* 100 = 100% effective coverage 2

(2) none 1dir 2 dir 0% 100 % 0 %

c =_l00 + 2*0 = 50% effective coverage )

2 i I

(3) none 1dir 2dir 50 % 50 % 0%

n

(~) c = 50 + 2*0 2

= 25% effective coverage  !

]

The total UT coverage is then expressed as the average of the effective coverage percentages for i each UT exam type. Each UT exam type is considered as equal weight in the calculation of the average.

Column 5 - Limitation A description of the type oflimitation and primary reason for why the coverage was limited is provided in this section.

l L.)

1 l 2-D-3 1

ASME SECTION XI CODE COVERAGE LIMITATIONS 1997 2RE05 ISI SolfrH TEXAS PROJECT 121rTRIC OENERATING STATION, UNrr 2 ASME CATIfORY B D SYS11M STEAM OENERATOR (CLASS l) 4 5 / O 2C ) 30 , - 70 AMINATION UMTILD TO W=2.0INCHLS ON Till B.D IN 5 7 93 0 47 NOZZlISIDE DUE TO COMPONENT B3.130 FIGURE NO. A-SO-l 7 93 0 47 1GURATKM VOL ST 30 0 70 70 IN NOZZTO CHANN HEAD CAP 30 0 70 70 0172(x) trr 61 I

l 4 5 / O 2C 30 - - 70 EX AMIN ATION UMITED TO W 2.0 INCHl.S ON THE BD ON 45 7 93 0 47 NOZZ11 SIDE DUE TO CDMPONENT l

B 3.130 F10URE NO. A-SO-l 60 7 93 0 47 CONTIGURATION. 1 VOL 45T 30 0 70 70 CHAN HEAD CAP TO OUT NOZZ 30 0 70 70 i A i

017100 17 61 s

ASMF.CATf.CORY B F j

SYSTEM. PRf35URIZ13t (CLASS I) i pig-2 45 7 73 20 57 UMitLD L745 IROM Tith NOZZLk. SIDE BF NI-SE 45T 0 0 100 100 DUE TO NOZZLE CONTIGURATION.

85 40 11GURE NO. A-PRZ-1 LIMrrED trr45 fROM THE SAFE LhD SIDE YOUSURF l 78 lDUE TO PROXIMrrY OF WELDED LUGS.

NOZZLE TO SAIT END f l 011709 Ifi4'r Pr 0 - - - 100 1 FE2 45 4 57 39 68 UMrt1D UT45 IROM THE SAFEI;ND SIDE B-F N2-SE 45T 0 0 100 100 DUE TO $ AFT END CONFIGURATION.

B5.40 FIGURE NO. A PRZ.I VO!) SURF l 84 l SAIT END TO NOZZ1I l l OllR00 trr47 Pr 0 . . . 100 1

2-D-4

.w ASME SECTION XI CODE COVERAGE LIMITATIONS 1997 2RE05 ISI SOLTTH TEXAS PROJffT iliCTR3C GENERATING STATION, UNTT 2 i

AWMF CATECORY B FICONTD1 SYSTIM REACTOR CDOLANT MAIN LDOPS (CLASS I) l 31 RC-2.102 N55 45 0 30 50 75 NO LXAMINA110N ON 111L l2. BOW 6LDii DUE 10 BF 1 457 0 0 100 800 11EOW CONI 1GURAT10N.

83130 I1GURE NO. A RC 3 VOU$URF 58 NOZZ11 TO II. BOW 1(un60 triFr FT 0 100

[ITEM NO.

NI 4 WEED EKM RQ1S ."^ M i GNhAETMon fr h.([M.M D W8M^$$,,.JW@@EY'N$

NM 3

ONLY DIA 'J' 1 EFFA-1 CDV.

t t $ M IdTAL * @4'W@N,1JMITA110PN**

.f MP79.1 $

1 29 KC 2.101 N$$ 45 40 60 0 30 0 UMrTLD LT145 f kOM h0TH 51DLS AND NO UY45T BF 5 45T 50 0 50 50 rROM THE NOZZ11 SIDE DUE TO TRANSDUCER B5130 11GURE NO. A-RC-3 LFTOFF DUE TO CONT 1GURATION.

YOU$URF 40

/7 ILBOW TO NOZZLE k )

(/ 101040 trTFT FT 0 100 g jfCATTCORYBJ SYS1TM REACTOR COOLAbr7. M AIN LOOPS (CLAS5 I) bjFIJ V. [ O 7".Q y/ Q M:y #yf /!M"MM . f i,L, (

y F "3',* -J y <, , . ,

CLMBU WELD I(1 Jig $(70ANSEMht! k" '*i Ci h

' CDVE LAGE 2 gy : N gs  ?'ff [,n Q k *,?Tf "$g 1

7 triconNs; , .FICA

.wsu/Ly#f11  !! 110p hs.s apr a, a q g.n my  ;$$$pff

. mq=f4' R

cAtur nEM %v wsim.

EXhi kOTJ .E3AMINATpf 1 sx

^

TM NONE im ONLY DIR1 sFF. .,e.

COV;

  • 1VrAL *N4 T,I h,.i Se:

MrrATIOC Ti I 31-kC 2202-NS$ 45 0 50 50 75 UMffLD U145 0N BOTH 5tDLS AND NO U145T DUE BJ 9 45T 100 0 0 0 TO TRANSDUCIR LIIT OIT DUETO %ILD 89.11 I'KiURE NO. A-RC-2 CONI 1GURATION . {

VOL/JURF 38 II. BOW TO PUMP '

100260 ti/PT PT 0 1(O j l

. .,4 '- ~fLINE M *"" ' Jglf(gijptsp Jhe.c.l@8.g,yj.

3 r-

-f pgh ' ~ ~ ' "' gi, f cc

.y ,;.@g y COggu g  ;. g,4,g(g (d_

j

jQ <

4%n% : Qd af' ' "i j 4tiltSc2 g}

@h 3 ERM EDFC""ifl0W ME1100D s

!TV .' NO EFF?> l Mfik IgIfk 9 41JMf74TIOlb ,- G R ONLY DEE " COY.C

! 31-kC-2302-NSh 45 0 50 50 75 LIMITE.D(T!45 ON bolH blD13 AND NO LTl431 DUL B-J 9 45T HW) 0 0 0 TO TRANSOUCER IJIT OIT DUE TO %ILD j B9 II flGURE NO. A-RC-3 CONTICURATION . .

YOUSURF 38 '

11 BOW TO PUMP t HO440 UTFT PT 0 - HO

[

\v 2-D-5 l

. . _ _. _ _ _ . = _ _ _ . . _ _ . .._m. - _ . . . , , ._

ASME SECTION XI CODE COVERAGE LIMITATIONS V 1997 2RE05ISI SOUD11EXAS PROliff f11CTRIC GENERATING STATION, UNTT 2 e

, A5mE CATICOkY R 1 fCONTD)

$YSTEM. REACTOR OOOLANT . M AIN IDOPS (CLASS I) i SI RC-2402-NSE 45 0 50 50 75 UMITED LTI45 ON B(YI'H &lDL$ AND NO trT45T DUE BJ 9 45T 100 0 0 0 TO TRANSDUERIJFT OFF DUE TO RTID 8918 510URE NO. A 4tC 4 CONilOURATION .

<, VOU50RF l 38 l 12EOW TO PUMP 1 I lor 420 trT&T PT D - - - 100 I 29 kC-2401 N35 24/45 10 90 0 45 DUETO W11D CONHGURATION AND $14E OF ILJ 2 SEARCH UNIT.

I 89.38 FIGURE NO A RC 4 VOUSURF l 45l 16 IN. BRANCH CONNECTION l t

/ 101130 trr/PT M 0 - 100

\

4 27.5-RC 2403 35 15 0 85 85 NO trT IKOM Tile MAIN RUN SIDE DUE TO B-J 4 COMIONENT CDNFIOlRATION.

89.31 IlO0RE NO. A RC 4 VOUSURF l B5 l 4 IN. BRANOlCONNECTION  ! i 101745 TWT W D - - 100 2-D-6

._.-__m-.-. ,_.m,_.m__________ . . _ . _ _ _ ~ . _ . . ~ . . . . . _ . . . _ . - _ . . . _ - _ . _ ~ . . . . _ _ _ .

ASME SECTION XI CODE COVERAGE LIMITATIONS 1997 2RE05 ISI SOUTH TEXAS PROJECT II.ECTRIC GENERATING STATION, UNTT 2 AShBE CATEfMARY C.B SYSTEM: RESIDUAL HEAT REMOVAL HEAT EXCHANGER 2A (CLASS 2) l l

l fJ 2 RHAHRS-2A 45 0 0 100 100 NO LTT45T ON THE WELD DUE TO WEl.D l C-B NA 45T 62 0 38 38 (DNFIGURATION.

t C2.21 HGURE NO. B-RHX-1 l VOI/5URF l 69 l l NOZZlITO SHE11 l I 105500 UTM PT 0 - -

  • 100 I

l '

1 l

l 2 RHAHRS 2A 45 0 0 100 100 uMrrED UT45T ON1HE WELD SIDE DUE TO l C.B NB 45T 62 0 38 3R WELD 00NFIGURAT10N.

I C2.21 FIGURE NO. 5-RHX l

( VOL5URF l 69l

[ NOZZLETO SHELL i f 3ossw Urn lPr l cl l - ll - ll inn l 1 l

j ism CAltLORY C-C SYSTM l

MAIN STEAM SYSTEM (CLAS$ 2 )  !

1 l

l I

I M M5-2tKWGA2 MITED bff COVERAGE DUE TO PIPE LUG l

! <- 28Pu 2N18 URADON.

( .20 110URE NO. B-MS-7.8 ,

URr  :

l l '

PIPE LUGS I I

$$8025 bfT MT 46 - - 54 54 I

l[*

i l '

1 +

1 .[

k 1

2-D-7

(

1 i

(

_ . _ . . _ _ . _ _ . - _ . _ . _ . _ . . _ . . _ . _ _. ..__ . _ . ~ _ .. . __ . . _ _

l i

1 l l l

l l l

l i

l l

l I

l APPENDIX 2-E l OWNER'S REPORT FOR INSERVICE INSPECTIONS l NIS-1 FORMS t

l l

l l

l I

l l

i f

a' l

1997 ISI - 2RE05 - Welds (Class 1) Page 1 of 2 i

FORM NIS.1 OWNER'S REPORT FOR INSERVICE INSPECTIONS  ;

i As required by the Provisions of the ASME Code Rules

1. Owner Houston I ighting & Power Comnany: Electric Tower: P.O. Box 1700: Houston. Texas 71001 (Name and Address of Owner)
2. Plant South Texas Proiect Electric Generating Station: P.O. Box 289: Wadsworth. Texas 77483 (Name and Address of Plant)
3. Plant Unit 2 4. Owner and Certificate of Authorization (if required) N.A.
5. Commercial Service Date 06/19/89 6. National Board Number for Unit ' N.A.
7. Components Inspected ASME Code Class 1 (IWH) Items - Welds Program Manufacturer Component or Manufacturer or Installer National Appurtenance or Installer Serial No. Board No.

Reactor Pressure Combustion Engineering /

_ Vessel WestinghousclM) 12173 ._22391

_ Pressurizer - WestinghousclM) 2161 19

_Steamfenerator_2C WestinghousclM) 2153 31

_Steamfencrator 2D Westinghouse _.(M) 2114 32 ,

... Class LPiping Ebascoll) NJL N.A. )

I Class 1Yalves WestinghouscJI) N.A. ' N.Am__ l O

i l

l l

[

l HL&Pb JA . DateN4 77 Arkwright Mutual by N DateM/ 'Y7

Iki.Beverly Insurance Co. B.R. Russell.ANil 2-E-1

1997151 - 2RE05 Welds (Class 1) Page 2 of 2 FORM NIS-1 (B:ck)

, 8. Examination Dates ._ 1/29/97 to 2/18/97 9. Inspection Interval from 06/19/89 to 10/18/00

10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval. (ASME Code Class I (IWB) Items . Welds Program)

See Section 2.4 and Appendix 2 A of 2RE05 Summary Report for list of examinations performed.

The examinations performed this outage constitute 10% of the required examinations for the current interval. The cumulative percentage completed for the Intervalis 67%.

I1. Abstract of Conditions Noted.

See Section 2.5 of the 2RE05 Summary Report.

12. Abstract of Corrective Measures Recommended and Taken.

None.

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of ASME Code,Section XI.

Certificate of Authorization No.(if applicable) N.A. Expiration Date N.A.

Date AA4'd /4 19Y7 Signed Houston Lighting & Power Co. By hg m/s

/ Owner R. L Beverly CERTIFICATE OF INSERVICE INSPECTION

/-'N

) I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel

, inspectors and the State or Province of Texas and ernployed by Arkwright Mutual Insurance Co. of Norwood.

Mass have inspected the components described in this 0,wner's Report during the period 1/29/97 to 2/18/97 . and state that to the best of my knowledge and belief, the Owner has performed l examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, express or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

, y >>4 s Commissions Tex 826 Inspector's Signature National Board, State, Province, and Endorsements B. R. Russell l.

Date I'N" 19 N .

l i

i O

V 2-E-2

1997 IS! - 2RE05 - Welds (Cliss 2) Page 1 of 2 l t

i FORM NIS.I OWNER'S REPORT FOR INSERVICE INSPECTIONS

! As required by the Provisions of the ASME Code Rules ,

1. Owner Houston 1.ighting & Power Comnany: Electric Tower: P.O. Box 1700: Houston. Texas 77001 l (Name and Address of Owner)
2. Plant South Texas Proiect Electric Generating Station: P.O. Box 289: Wadsworth. Texas 77483 l (Name and Address of Plant) i l
3. Plant Unit 2 4. O. ner and Certificate of Authorization (if required) _ N.A.
5. Commercial Service Date 06/19/89 6. National Board Number for Unit N.A. ]
7. Components Inspected ASME Code Class 2 (IWC) Items . Welds Program Manufacturer Component or Manufacturer or Installer National Appurtenance - or Installer Serial No. Board No.

Resid. Heat Removal

_Heatfachanger_2A loseph_OaLCorpdM1 2312-4D 993  !

I'

_ Class.21iping Ebascall) N.A. N.A.

I 1

l I

i l

HL&P by dwAAL Date 6'If 17 Arkwright Mutual by ._ --Date b~ N"Y7 R.L.Beverly Insurance Co. B.R. Russell,ANII 2-E-3

1997 ISI - 2RE05 - Welds (Clars 2) Page 2 of 2 FORM NIS I (Brck)

~s 8. Examination Dates - 10/4/96 to 2/18/97 9. Inspection Interval from .06/19/82_ to 1DLLBl00_

1 V 10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval. (ASME Code Class 2 (IWC) Items - Welds Program)

See Section 2.4 and Appendix 2-A of 2RE05 Summary Report for list of examinations performed.

Th,is report includes basellne examinations performed on two replacement piping welds prior to the 2RE05 refueling outage. The examinations performed this outage constitute I3% of the required examinations for the current interval. The cumulative percentage completed for the Intervalis 62%.

11. Abstract of Conditions Noted.

None.

12. Abstract of Corrective Measures Recommended and Taken.

None.

~

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of ASME Code,Section XI.

Certificate of Authorization No.(if applicable) N.A. Expiration Date N.A.

Date AIA-4 M 19 47 Signed Houston Lightinc & Power Co. By b I Owner ELBev'erly [

CERTIFICATE OF INSERVICE INSPECTION

.m d

t ) I, the undersigned, holding a val.c ammission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province ofInn and employed by Arkwright Mutual Insurance Co. of Norwood.

Mass _ have inspected the components described in this Owner's Report during the period 10/4/96 to 2/18/97 . and state that to the best of my knowledge and belief, the Owner has performed examinations .

and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as I required by the ASME Code,Section XI. l Ey signing this certificate neither the Inspector nor his employer makes any warranty, express or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss j of any kind arising frorn or connected with this inspection. i i

<m>~ Commissions Tex 826 i Inspector's Signature National Board, State, Province, and Endorsements l B. R. Russell l Date N Y'19 N i

I v

2-E-4

3.0 COMPONENT SUPPORT EXAMINATIONS 3.1 Introduction ISI of Class 1,2, and 3 component supports and Class 3 integral attachments of STPEGS-2 was performed between November 27,1996 and February 11,1997. These examinations constitute the fifth ISI (the third ISI of the second period) of the first inspection interval for the Component ,

Supports Examination Program for STPEGS-2. l This Section of the Summary Report documents the examinations of cornponent supports performed by HL&P QC and contractor NDE personnel in accordance with the following documents:

(1) HL&P Specification 5UO36JS00(M," Inservice Inspection Examination of Component l Supports of South Texas Project Electric Generating Station, Unit 2, First Inspection l Interval",

(2) " Examination Plan for the 1997 - 2RE05 Inservice Inspection of Welds and Component Supports at the South Texas Project Electric Generating Station, Unit 2 ", including changes made during the outage (Outage Plan).

The HL&P Specification provides a detailed description of the rules for exemption and selection g of Class 1,2, and 3 component supports for ISI. The 1997 Examination Plan is an individual  !

Up Outage Plan for implementing ISI component support examinations as designated in the HL&P l Specification.

3.2 Scope of Examinations A total of seventy seven (77) component supports were visually examined during 2RE05.

Class 1 Seven (7) Class 1 piping supports and three (3) Class I equipment support were examined in the following systems:

Eipig EquiplDe_t!

Chemical & Volume Control (CV) 1 0 Reactor Coolant (RC) 4 3 Residual Heat Removal (RH) 1 0 Safety Injection (SI) 1 0 0

3-1

Class 2 Twenty seven (27) Class 2 piping supports and one (1) Class 2 equipment support were examined in the following systems:

Eiplag Equipment Auxiliary Feedwater(AF) 2 0 Containment Spray (CS) 2 0 Feedwater(FW) 1 0 Main Steam (MS) 1 0 Residual Heat Removal (RH) 6 1 Safety Injection (SI) 15 0 l i

Class 3 Thiny four (34) Class 3 piping supports and five (5) Class 3 equipment supports were examined in the following systems:

Piping Equipment Auxiliary Feedwater(AF) 6 0 Component Cooling (CC) 23 1 Diesel Generator Jacket Water (JW) 0 1 p

V Diesel Generator Lube Oil (LU)

Essential Cooling Water (EW) 0 5

2 0

Reactor Make-Up Water 0 .1 A complete list of component supports examined during 2RE05 is contained in Appendix 3-A.

These examinations constitute the following percentages of completion for Class 1,2, and 3 component supports:

Cumulative i 2RE05 (1st Interval)

Class 1 (IWF) 12 % 58 %

Class 2 (IWF) 13 % 64 %  ;

Class 3 (IWF) 13 % 65 %

O 3-2

p)

(, 3.3 Personnel and Procedures 3.3.1 Personnel Qualifications Component supports were visually examined (VT-3 and VT-4) by HL&P QC and contractor NDE personnel. HL&P NDE personnel were certified in accordance with ASME Section XI (IWA-2300) and HL&P Nondestructive Examination Procedure OPQP05-ZA-0001 (Rev.1),

" Qualification and Certification of Nondestructive Examination Personnel". Contractor NDE personnel were certified in accordance with ASME Section XI (IWA-2300) and their employer's written practice, which was approved by HL&P. A listing of the personnel who performed visual examinations of component supports, including their certification level, is included in Appendix 3-B.

3.3.2 Examination Procedure Visral (VT-3 and VT-4) examinations of component supports were performed in accordance with OPQP05-ZA-0023 (Rev.1), " Visual Examination of Component Supports for ASME XI Inservice Inspection".

3.4 Summary of Examinations p>

s Sixty eight (68) piping suppons and nine (9) equipment supports were examined during 2RE05 as shown in Appendix 3-A.

3.4.1 Examination Results and Corrective Actions The visual examinations performed on component supports during 2RE05 did not reveal any relevant conditions. Therefore, no corrective actions were required.

3.4.2 Additional and Successive Examinations The results of the visual examinations of component suppons performed during 2RE05 did not require that any additional examinations (IWF-2430) be perfomled or any successive examinations (IWF-2420) be scheduled.

3.5 Certification ofInspectionsSection XI NIS-1 forms, " Owner's Report for Inservice Inspections", have been prepared to certify the STPEGS-2 component suppon ISI examinations described in this section of the Summary Report. The STPEGS-2 component support ISI examinations have been cenified by our ANII, Arkwright Mutual Insurance Company, on the NIS-1 forms included in Appendix 3-C.

m 3-3

i

[ ]

1 4

k j

i 3

4 i

i 4

i i

n l

e

+

4 1

j APPENDIX 3-A f

i

SUMMARY

OF EXAMINATIONS 1

e t

F,XAMINATION RESULTS LEGEND i C Examination for Section XI Scheduling Credit i

I e

,4 1

I d

i i

I l

i j

i e

r _.%. ._ _,, . - - , _ _ , --. _ - . . . - - .- ,c. , , , _ w n ._-_,. , _ . .._, __ y,y,,_ _ __ 7_-_r-,_,.y, y

DATE: 05/19/97 SOUIH TEXAS PROJECT ELECTRIC GENERATINO STATION UNIT 2 PAGEi 1 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (SUPPORTS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF)

CLASS 1 SECTION XI COMPLETE COMPONENTS

[\)jMMICAL&VOLLME CONTROL

( 1 N O ASME O G T SEC. XI R E H SUW.ARY EXAMINATION AREA l CATOY EXAM E O E kEMARKS '

NUMBER IDENTIFICATION ITEM NO METHOD PRCCLDURE C M R ** CALIBRATION BLOCK **

i r

2-CV-2141-BB1-A-Al 10I700 CV-2141-HS5007 pIpIwo.1 VT-3 ZA-0023 R1 C . - EXAMINED WHEN FILLED, VT-4 ZA-0023 R1 C . . l l

1 1

i

)

[ \

N J l 4

I i

I i

f t

\

. . - _ =- . . ~ . . _ . . . - - _ . . . . . .. - -- . _ - . -

l DATES 05/19/$7 SOUTH TEXAS PRM ECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 2 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (SUPPORTS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF) l O g CLASS 1 SECTION XI COMPLETE COMPONENTS REACTOR NOIANT 1 N O ME O G T $

SEC. XI R E N l EUHARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK'*

1 6-PC-2003-BBI-A 105300 RC-2003-HL5004 PIPING-1 VT-3 ZA-0023 R1 C - -

RR .

205400 RC-2003-HL5005 PIPING-1 YT-3 ZA-0023 R1 C - - EXAMINED NHEN F1LLED, SH-V - VT-4 ZA-0023 R1 C - -

105500 RC-2003 HL5007 PIPING-1 VT.3 EA.0023 R1 C . -

RR -

105600 RC-2003-RR06 PIPING-1 VT-3 ZA-0023 R1 C - -

RR -

e I

1 I

i i

i l

1

- . .. u- ~. , .. ~ . . =. - . .. . . - . - . - .. _ . - . = . . . . - _ . ~_. - - - . -

's DATI.s 0$/19/97 SOtTTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 3 REV1? ION: 0 INSERVICE INSPECTION PLAN . 2RE05 (SUPPORTS)

FIRST INTERVAL, SECOND PERIOD, THIRD OtJTAGE (97RF) g CLASS 1 SECTION XI COMPLETE COMPONENTS PESTWAL HEAT REMOVAL 3.

'(

N O ASME D G T i SEC. XI R E H i SIM4ARY EKAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

b 8-PH-2208-BBI-A ,

114600 RH-2208-HL5004 PIPING-1 VT-3 ZA-0023 R1 C . -

RR .

i o

?

i i

v

. .x . - . . . . _ . . . , .- . - . . -_ , .-

b l DATE: 05/19/97 SOtTTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 4 j REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (SUPPORTS)

\

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF) i s-~%

CLASS 1 SECTION XI COMPLETE CCMPONENTS

[ ) i

, _\j SAFETY INJEC" TION 1 .

N O ASMS O G T

, SEC. XI R E H d

SUPHARY EXAMINATION AREA CATGY EXAM E O E REMARKS i FJMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK** i I

1 l

8-SI.2208-BB1-B i 4

115800 SI.2208.HL5003 PIPING-1 VT-3 ZA-0023 R1 C . -

RR .

i I

I

)!

1 i

T l

< \

i 4

d 1

i

(

i 1

d 8

1 V-

DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 5 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (SUPPORTS)

FIRST INTERVA'a , SECOND PERIOD, THIRD OUTAGE (97RF)

CLASS 1 SECTION XI COMPLETE COMPONENTS

( REAC" TOR COOLANT 1 -

N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BloCX**

3 R112NPZ101 A -

11"1000 PRU3 EQUIP.1 VT-3 ZA 0023 R1 C - - AS VIEWED FROM ABOVE, THE TEIRD SUPPORT RC PRES UPPR -

CLOCKWISE FRCN THE SUPPORT NEAREST THE REACTOR VESSEL.

1R132NPP101B 120500 RPR1B EQUIP-1 VT.3 ZA-0023 R1 C . . AS VIEWED FROM ABOVE, THE TIE ROD RC PUMP RODS -

SUPPORT IPNEDIATELY CLOCKWISE FROM THE DISCHARGE NOZZLE ON REACTOR COOLANT PUMP B.

120500 RPR2B EQUIP-1 VT-3 EA.0023 R1 C - - AS VIEWED FROM ABOVE, THE TIE ROD RC PUMP RODS -

SUPPORT IMMEDIATELY CLOCKWISE FROM RPR18.

7%

I b

\v i l

l I

f%

' I t

/

'%d

DATE: 05/19/97 SOUTH TEXAS PRNECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 6 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (SUPPORTS)

FIRST INTERVAL. SECOND PERIOD, THIRD OITTAGE (97RF)

CLASS 2 SECTION XI COMPLETE COMPONENTS

[T.

\ AUXILI ARY FEEDWATER 2 N O ASME O G T SEC. XI R E H St# NARY EXAMINATION AREA CATGY EXAM E O E REHARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCE**

9-AF-2012-CA2-D 205200 AF.2012-HL5026 PIPING-2 VT.3 ZA-0023 R1 C - -

RR .

8-AF-2012-GA2-E 205300 AF.2012-HL5029 PIPING-2 VT-3 ZA-0023 R1 C . .

RR .

E S 4

/  :

\d I l

l O

V

._ _ . . _ _ _ ..m . - _ _ . - .. .___.--..__m.______. _

. . . _ . . _ _ _ _ _ m.,

P DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 7 ,

REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (SUPPORTS)

FIRST INTERVAL, SECOND PERIOD THIRD OUTAGE (97RF)

CLASS 2 SECTION XI COMPLETE COMPONENTS CONTATNMENT SPRAY 2 b N O ASME O G T SEC XI R E H i St> MARY EKAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK ** ,

j,-SS-2303-PB2-A i  :

215700 CS-2303-HL5002 PIPING-2 VT-3 ZA-0023 R1 C . .

RR .

1 9

216800 C5 2303 HL5003 PIPING-2 VT.3 ZA-0023 R1 C . .

RR .

l l

U h

i i

1 F

(

a f

I i

l i

l i

1

)

I l

I i

l

! l i

4 i

1 V

. - ~ - . _ _ _ _ . .. . . _ - - - _ . - - . -_ . _ . _ _

j DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 8 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (SUPPORTS)

FIRST INTERVAL, SECOND PERIOD, THIRD OLTTAGE {97RF)

[^ CLASS 2 SECTION XI COMPLETE COMPONENTS FEED WATER 2 H O ASME O G T CEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK** j

....... .............................. ....... .......... ............... . . . ........................................ l 1

19-FW-2016-CA2-H 220500 FW-2016.HL5005 PIPING-2 VT-3 ZA-0023 RI C - .

RR .

i 1

I i

i l

1 i

I

\.

1 I

I i

,O

[

\

\

i 1

I j DATES 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 9 l REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (SUPPORTS) i FIRST INTERVAL, SECOND PERIOD, THIRD OtTIAGE (97RF) l

\ !

C% \ CLASS 2 SECTION XI COMPLETE COMPONENTS '

I \ / NAIN STEAM 2 I  %,./

j N O l ASME O G T SEC. XI R E H STJMMARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

....... .............................. ....... .......... ............... . . . ........................................ j 30-Ms-2003.cA2.C 225900 MS-2003-HL5011 PIPING-2 VT-3 ZA-0023 R1 C - -

SH-V - VT-4 ZA-0023 R1 C - .

l l

r O \

t l

I i rs

?

. - .. - - - - _ . . - . - - - - = = . .

I I

i l

DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTEIC GENERATING STATION UNIT 2 PAGE: 10 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (SUPPORTS) l FIRST INTERVAL, SECOND PERIOD, THIRD OtTIAGE (97RF) l l/O CLASS 2 SECTION XI COMPLETE COMPONENTS PESIDUAL HEAT PEMOVAL 2 N O ASME O G T SEC. XI R E H SUPNARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BICCK**

l 8-PH-2106-rB2-C )

l I 233300 RH-2106-RR03 PIPING-2 VT.3 ZA-0023 R1 C - -

M .

8-RH-2111-BB2-A I

234000 RH-2111-HL5001 PIPING-2 VT-3 ZA-0023 R1 C - -

RR -

8-RM-2204-KB2-C 235700 RH-2204 HL5004 PIPING-2 VT-3 ZA-0023 R1 C - - l RR -

(w t

s .

235800 RH-2204-RR04 PIPING-2 VT-3 ZA-0023 R1 C . . )

RR -

8-PH-2205-FB2-D 237600 RH-2205-HL5010 PIPING-2 VT-3 ZA-0023 R1 C - . EXAMINED WHDI FILLED, SH-V - VT-4 ZA-0023 R1 C - -

237700 RH-2205-HL5011 PIPING-2 VT-3 ZA-0023 R1 C - -

GUIDE .

i l

I r

1 l

l

DATE: 05/19/97 SOWH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 11 R3*/ISION: 0 INSERVICE INSPECTION PLAN - 2RF.05 (SUPPORTS) l FIRST INTERVAL, SECOND PERIOD, THIRD O WAGE (97RF)

CLASS 2 SECTION XI COMPLETE COMPONENTS s SAFETY INJECTION 2

! \s 1 N O l ASME- O G T SEC. XI R E H SGNARY EXAMINATION AREA CATGY EXAM E O E REMARKS NGGIER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

I

! 24-SI-2101-UB2-E l

244700 SI-2101-SHIC PIPING-2 VT-3 ZA-0023 R1 C - - EXAMINED WHEN FILLED.

SH-V (2) - VT-4 ZA-0023 R1 C - -

8-SI-2102-PD2-D 255000 SI-2102-RH07 PIPING-2 VT-3 ZA-0023 R1 C - -

RR -

0-SI-2102-PB2-E 255100 SI-2102-HL5001 PIPING-2 VT-3 ZA-0023 R1 C - -

RR -

\'

255200 SI-2102-HL5004 PIPING-2 VT-3 ZA-0023 R1 C - -

RR -

8-SI-2105-FB2-G 256400 SI-2105-RR26 PIPING-2 VT-3 ZA-0023 R1 C - -

RR .

8-SI-2105-KB2-H 256500 SI-2105-RR27 PIPING 2 VT-3 ZA-0023 R1 C - -

RR -

256600 SI-2105-RR28 PIPING-2 VT-3 ZA-0023 R1 C - -

RR -

i i \.

I

DATE: 05/19/97 SOUTH TEXAS PRG7ECT ELECTRIC CENERATING STATION UNIT 2 PAGE: 12 -

REVISION: 0 INSERVICE INSPECTION FIAN . 2RE05 (SUPPORTS) )

FIRST INTERVAL, SECOND PERIOD, THIRD Ot/TAGE (97RF) I 1

,f CLASS 2 SECTION XI COMPLETE COMPONENTS

/ l SAFETY INJECTIOff 2 l \,/ N O ASME O O T SEC. II R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK'*

8-SI-2105-KB2-J l 256700 SI-2105-HL5001 PIPING-2 VT-3 ZA-0023 R1 C . -

l RR -

i I

l 256800 SI.2105 RR29 PIPING-2 VT-3 ZA-0023 R1 C - -

RR -

8 SI-2105-KB2-K 256900 SI-2105-RR31 PIPING-2 VT.3 ZA-0023 R1 C . .

RR -

I l

257000 SI-2105-RR32 PIPING-2 VT-3 ZA-0023 R1 C - .

t' 4 RR -

6-SI-2105-rB2-R 257800 SI-2105-SH39 PIPING-2 VT-3 ZA-0023 R1 C - - EXAMINED WHEN FILLED.

SH-V (2) - VT-4 ZA-0023 R1 C . .

I i

6-SI-2106-DB2-M 265700 SI-2106-RR63 PIPING-2 VT-3 ZA-0023 R1 C - -

GUIDE .

6-SI-2106-DB2-0 2?6600 SI-2106-HL5009 PIPING-2 Vf-3 ZA-0023 R1 C - .

GUIDE .

l

~

I

~ - - - - - . -- - ,. -- .- - . . _ .x.. . . .. . -. ..

f a

f

DATE
05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 13 REVIEION: 0 INSERVICE INSPECTION PLAN - 2RE05 (SUPPORTS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF)

CLASS 2 SECTION XI COMPLETE COMPONENTS I I

SAFFTY INJECTION 2 N O k

ASME O C T SEC. XI R E H I SIPNARY EXAMINATION AREA CAMY EXAM E O E REMARKS

, NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BI4CK**

I 1

4 2-SY-2139-DB2-A-Al i

278300 SI-2139-HF5001 PIPING-2 YT-3 ZA-0023 R1 C - -

GUIDE .

e i 4

e 4

r

, b i

i a

J V

U

, .-- n. - - . ~ . . ~ . - - - - - ._. . . . .

( DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGEs 14 i REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (SUPPORTS)

FIRST INTERVAL, SECOND PERIOD, THIRD OLTTAGE (97RF)

,,f" I

CLASS 2 SECTION XI COMPLETE COMPONENTS

( RESIDUAL HEAT PEMOVAL 2 I N O ASME O O T i SEC. XI R E H 1

SUtHARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIOCK**

2R167?fHX101A .

I 283000 RHU1A EQUIP-2 VT-3 ZA.0023 R1 C . - AS VIEWED FROM ABOVE, THE IDNGER UPPER RH HTK SUPT -

SUPPORT ON RHR HEAT EXCHANGER A.

i l

i i

i f" l

\ J J

l

.I i

DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 15 REVISION: O INSERVICE INSPECTION PLAN . 2RE05 (SUPPORTS)

FIRST INTERVAL, SECOND PERIOD, THIRD OffTAGE (97RF)

CLASS 3 SECTION XI COMPLETE COMPONENTS (N I AUX 7LIARY PEEDWAITR 3 N O ME O G T

]

SEC XI R E H StM4ARY EXAMINATION AREA CATGY E1AH E O E RD4 ARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK" 12-AF-2054-WA3-E 300100 AF.2054-HL5002 PIPING-3 VT-3 ZA-0023 R1 C . .

GUIDE .

)

i r

300300 AF-2054-HL5005 P2 PING-3 VT-3 ZA-0023 R1 C - -

GUIDE -

12-AF-2054-WA3-0 300400 AF-2054-HL5006 PIPING-3 VT-3 ZA-0023 R1 C - -

GUIDE .

r

\

12-AF-2054-WA3d 300600 AP.2054-HL5008 PIPING-3 VT-3 ZA-0023 R1 C - - I GUIDE .

1,5-AP-2053-CA3-AA03 j i

316600 AF-2053-HF5001 PIPING 3 VT-3 ZA-0023 R1 C - -

U BOLT .

2.5-AF-2053-GA3-BA03 316700 AF-2053-HF5002 PIPING-3 VT-3 EA-0023 R1 C - -

RR .

N

2 _. _ ._, . . _ . . _ _ - _. __ _ . . . . . _ . ..mm. _., . . _ .

DATE: 03/19/97 SOWH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 16 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (SUPPORTS)

FIRST INTERVAL, SECOND PERIOD, THIRD OtfrAGE (97RF)

(% CLASS 3 SECTION XI COMPLETE COMPONENTS I G arOntnz COOLING 3 N O ASME O G T

} SEC. XI R E H  ;

St# NARY EXAMINATION AREA CATGY EXAM E O E REMARKS {

l NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

24-CC-2101-WA3-R 319800 CC-2101-HL5003 PIPING-3 VT-3 ZA-0023 R1 C - . EXAMINED WHEN FILLED.

SH-V (2) - VT-4 ZA-0023 R1 C . .

i 16-CC-2106-WA3-D 334500 CC-2106-HL5007 PIPING-3 VT-3 ZA-0023 R1 C - -

GUIDE

  • 16-CC-2106-WA3-F

! 234900 CC-2106-HL5004 PIPING-3 VT.3 ZA-0023 D1 C - .

l GUIDE -

- o im \

16-CC-2106-WA3-H 335800 CC-2106-RR16 PIPING-3 VT-3 ZA-0023 R1 C - -

GUIDE -

14-CC-2114-WA3-A 344500 CC-2114-HL5005 PIPING-3 VT.3 ZA-0023 R1 C - .

RR -

14-CC-2120-WA3-B 345200 CC-2120-HL5003 PIPING-3 VT-3 ZA-0023 R1 C - - EXAMINED WHEN FILLED.

SH-V - VT.4 ZA-0023 R1 C - .

[)h 1

b

DATE: 05/19/97 SOtTTH TEXAS PROJECT ELECTRIC CENERATING STATION tMIT 2 PAGE: 17 REVISION: 0 INSERVICE INSPECTION PIAN - 2RE05 (SUPPORTS)

FIRST INTERVAL, SECOND PERIOD, THIRD OITTAGE (97RF)

CIASS 3 SECTION XI COMPLETE COMPONENTS f,A COMPONE?rr COOLING 3 N O ASME O G T SEC. XI R E H EtDNARY EXAMINATION AREA CAMY EXAM E O 2 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK'*

h 10-CC-2114-WA3-C

{

350200 CC-2114-RR26 PIPING-3 VT-3 EA-0023 R1 C - .

RR .

i l

350300 CC-2114-RR27 PIPING-3 VT-3 ZA-0023 R1 C - - r RR .

l L

350400 CC-2114-RR28 PIPING-3 VT-3 ZA-0023 R1 C - .

RR .

l l b l

350500 CC+2114-RR29 PIPING-3 VT-3 ZA-0023 R1 C - -

RR . 1

, a l

I 10-CC-2114-WA3-D 350600 CC-2114-RR24 PIPING-3 VT-3 ZA-0023 R1 C - -

RR -

l 350700 CC-2114-RR25 PIPING-3 VT 3 ZA-0023 R1 C - -

RR .

10 -CC- 2114 -WA3 - E 350900 CC-2114-HL5004 PIPING-3 VT-3 ZA-0023 R1 C . -

RR . i t

l n

1 l 4

N l

,- 4 -  %

._ - . _ - . .. < . _ .-. -. . . - . . . - . - . ~ . _ ~ . , _-_ . ._ .--_

d DATE: 05/19/97 SOITTil TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 2 PAGEt 18 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (SUPPORTS) i FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF) i CLASS 3 SECTION XI COMPLETE COMPONENTS l COMPOffENT COOLING 3

' ' N O ASME O G T

! SEC. XI R E H SUPNARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

10-CC-2114-WA3-E a

351100 CC-2114-RR23 PIPING-3 VT-3 ZA-0023 R1 C - .

4 RR -

i l

4

)

10-CC-2114 - W A3 - F I

1 351200 CC-2114-HL5002 PIPING-3 VT-3 ZA-0023 R1 C - . l t RR .  !

I-351300 CC-2114-RR18 PIPING-3 VT-3 ZA-0023 R1 C - .

RR .

I i

10-cc-2114-M3-G 351400 CC-2114-RR14 PIPING-3 VT-3 ZA-0023 R1 L' . .

1 l

RR .

1 l

351500 CC.2114-RR15 PIPING-3 VT-3 ZA-0023 R1 C - -  !

RR -

10-CC-2114-WA1-J 351800 CC-2114-RR10 PIPING-3 VT-3 ZA-0023 R1 C - .

RR .

j i

351900 CC-2114.RR11 PIPING-3 VT-3 EA-0023 R1 C . .

RA .

i I

i I

i w

. . .~ .. . . .--. . . - . . . - . - - . . . ..

DATE: 03/19/97 00ffTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 19 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (SUPPORTS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF)

] COmrvne.ni COCE!NG 3 CLASS 3 SECTION XI COMPLETE COMPONENTS N O ASME O G T SEC. XI R E H SUPNARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

j 10 -CC- 2114 -WA3 - K 352100 CC-2114-RR08 PIPING-3 YT-3 ZA-0023 R1 C . -

RR .

d 352200 CC-2114-RR09 PIPING-3 VT-3 ZA-0023 R1 C - -

l

. xR . 1 1

l 10-CC-2115-WA3-X 355600 CC-2115 RR01 PIPING-3 VT-3 ZA-0023 R1 C . -

, GUIDE -

I 1

4-(J t

.. ~ , . - . ~ . .

l l

DATE: 05/19/97 SOtTTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PACE: 20 l REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (SUPPORTS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF) ,

CLASS 3 SECTION XI COMPLETE COMPONENTS )

, t t

i ESSENTIAL COOLING WATER.3 sj i N O i ASME O G T SEC. XI R E H SUPNARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

1 30-EW-2105-WT3-A  !

380100 EW-2105-HL5004 PIPING-3 VT-3 ZA-0023 R1 C . .

RR .

6-EW-2125-WT3-B1 .

418300 EW-2125 HL5005 PIPING-3 VT-3 ZA-0023 R1 C - -

GUIDE -

418400 EW-2125-HL5009 PIPING-3 VT-3 ZA-0023 R1 C . -

GUIDE -

l g 418500 EW-2125-HL5010 PIPING-3 VT-3 ZA-0023 R1 C - -

CUIDE .

6-EW-2125-WT3-BA l 418600 EW-2125-HL5004 PIPING-3 VT-3 ZA-0023 R1 C - -

GUIDE .

i 4

l l

f

I i

DATE: 05/19/97 SOtTTH TEXAS PROJECT ELECTRIC GENERATINO STATION UNIT 2 PAGE: 21 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE05 (SUPPORTS) I FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF) f"* CLASS 3 SECTION XI COMPLETE COMPONENTS I t COMPONENT COOLING 3 d N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS FJMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

3R202NHX201A 428600 CCX1A EQUIP.3 VT.3 ZA.0023 R1 C . . THE SUPPORT LOCATED AT THE EAST END OF CC Cid HTX .

CCW HEAT EXCHANGER A.

I 1

i 9

O l

\

\

,C

i DATE: 03/19/97 GOUTH TEXAS FROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 22 !

REVISION: ' 0 INSERVICE INSPECTION PLAN - 2RE05 (SUPPORTS)

FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF) f CIASS 3 SECTION XI COMPLETE COMPONENTS E ] !DIESFL JAcrET WATER 3 N O A.SME O O T 6EC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E RFFARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M,R ** CALIBRATION DLOCK**

30152MSA0134 432100 JW1A EQUIP-3 VT 3 ZA 0023 R1 C - . THE PIPE SUPPORT I4CATED DOWNSTREAM OF JW PIPE SUPT -

JACKET WATER STANDBY PUMP DISCHARGE.

I l

1 1

1 1

j

(%

lm

\

~

\

)

i DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 23 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (SUPPORTS)

FIRST INTERVAL, SECOND PERIOD, THIRD OtTIAGE (97RF) 1

  • [N\ CLASS 3 SECTION XI COMPLETE COMPONENTS I,s g / DIFSEL LUPE OIL 3 N O ASME O G T SEC. XI R E H SID94ARY EXAMINATION AREA CATGY EXAM E O 8 REMARKS i NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

30152MPU0134 l

1 433900 LCP1A EQUIP-3 VT-3 ZA-0023 R1 C - - BASE SUPPORT ;W INBE OIL CIRC. PLHP A. i LU CIRC PUMP .

3OI52MSA0134 ,

j 434900 LUFIA EQUIP-3 VT-3 ZA-0023 RI C - - SINGLE BASE SUPPORT ON LUBE OIL FILTER LU FILTER .

A.

l

\

v) l l

i i

/

( )

v i

l

DATE: 05/19/97 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 24 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE05 (SUPPORTS)

~

i FIRST INTERVAL, SECOND PERIOD, THIRD OUTAGE (97RF)

'rA CIASS 3 SECTION XI COMPLETE COMPONENTS 6

REA2'OR MARE-UP NATER 1 1 \

N O 4

ASME O G T SEC. XI R E H SU MARY EKAMINATION AREA CATGY EXAM E O E REMARKS

, NUMBER IDZNTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK" 1

I 3R272NTP101A 1 439000 '..MS?1 EQUIP.3 VT-3 EA 0023 R1 C . . SINGLE BASE SUPPORT ON REACTOR MAKE-UP 5

RC ME.UP TWK -

NATER STORAGE TANK.

i t

4 I

i 1

r

+

0 i

4 N

lO d

i 1,

+

(a8

1 4

t i

i

.i j

f I

f i

i i

i i

4 i

i 1

1-1 i

l ,

APPENDIX 3-B 1

PERSONNEL i

I t

4 l

l 1

}

.i d

I J

14 4

t 1

i b

J d.

1 a

i 4

i i

4 l

f N

4 4

0 r -, - - - -

i APPENDIX 3-B iO i PERSONNEL Hame Comoany level i

' Graham, J. SSI II Suhler, C. HL&P II l

L 1

1 i

(

O O

3-B-1

s

! l l

i I I e  ;

i i

APPENDIX 3 C OWNER'S REPORT FOR INSERVICE INSPECTIONS NIS-1 FORMS O

,.. . __. _ _ _ _ m..... _. _. _ _ _ .. _. __ _ . _ .. _ __ _ _ _ - . . . . _ . . _ _ _ . , _ _ .

1997 ISI 2RE05 - Compon
nt Supports (Class 1) Page 1 of 2 FORM NIS I OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules j 1

i I

1. Owner Houston I.ichtino & Power Comoany: Electric Tower: P.O. Box 1700: Houston. Texas 77001
(Name and Address of Owner) l

! 2. Plant South Texas Proiect Electric Generating Station: P.O. Box 289: Wadsworth. Texas 77483

). (Name and Address of Plant)  ;

1 4

3. Plant Unit 2 4. Owner and Certificate of Authorization (if required) N.A.

r- ,

5. Commercial Service Date 06/19/89 6. National Board Number for Unit N.A. J 1
7. Components Inspected ASME Code Class I Component Supports Program

! Manufacturer l ', Component or Manufacturer or Installer National

! Appurtenance or Installer Serial No. Board No.

_ Pressurizer Westinghause_OJ) 2161 19 Reactor Coolant

,. _ Pump 2B Westinghouse (I) 1081d163E26G01: 14 M.A-Class 1

__ Piping _ Supports Ebascoll) XA. N.A i

'1

)

i

- \

l l

1 l

1 1

e w,

HL&P byb mLj DateI'li'if Arkwright Mutual by -

m : 2 W ate N N @

'R.L.Beverly Insurance Co. B.R. Russell,ANIl 3-C-1 i

1997 ISI - 2RE05 - ComponInt Supports (Class 1) Page 2 of 2 FORM NIS 1 (Back)

8. Examination Dates 2/9/97 to 2/10/97 9. Inspection Interval from 06/19/89 to 10/18/00 t

\ 10. Abstract of Examinations. Include a list of examinations and a statement cone.,rning status of work required for current interval. (ASME Code Class 1 Compontnt Supports Piping and Equipment)

See Section 3.4 and Appendix 3 A of 2RE05 Summary Report fc. list of examinations performed.

The examinations performed this outage constitute 12% of the required examinations for the current interval. The cumulative percentage completed for the interval is 58%.

I1. Abstract of Conditions Noted. [

None.

I

12. Abstract of Corrective Measures Recommended and Taken.  !

None.

We certify that the statements made in this repon are correct and the examinations and corrective measures taken conform to the rules of ASME Code,Section XI.

Certificate of Authorization No.(if applicable) N.A. Expiration Date N.A.

Date MAj l'1 1997 Signed Houston Iighting & Power Co. By N#OM _

Owner R.L.BIcVeriy

[

CERTIFICATE OF INSERVICE INSPECTION b I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by Arkwricht Mutual Insurance Cg, of Norwood.

Mass _ have inspected the components described in this Owner's Report during the period 2/9/97 to 2/10/97 . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, express or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind a ' g from or connected with this inspection.

' M Commissions Tex 826 Inspector's Signature National Board, State. Province, and Endorsements i B. R. Russell Date 6 /N 19 Y7 O

3-C-2

- . . - - . - . . . - - . . . - . - . - _ - - - - . . . . - ~ . . - - _ - - . .

1997 ISI - 2RE05 - Component Supports (Class 2) P:ge 1 of 2 .

i FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS d

As required by the Provisions of the ASME Code Rules b

Q l. Owner Houston Iightirig & Power comoany: Electric Tower: P.O. Box 1700: Houston. Texas 77001 (Name and Address of Owner)

2. Plant South Texas Project Electric Generating Station: P.O. Box 289: Wadsworth. Texas 77483 l (Name and Address of Plant) l s
3. Plant Unit 2 4. Owner and Certificate of Authorization (if required) N.A.

]

5. Commercial Service Date 06/19/89 6. National Board Number for Unit N.A. I
7. Components Inspected ASME Code Class 2. Component Supports Program i

Manufacturer 1 Component or Manufacturer or Installer National Appurtenance or Installer Serial No. Board No.

RHR Heat

, _ Exchanger 2A JoseplLOaLCorp. (M) _.2112-AD 993 Class 2

_ Piping. Supports Ehasco_(IL NA NA i

.i l~

>/ )

,k HL&P by M Date b /917 Arkwright Mutual by -<W Date I'O' 87 RL'.Beverly Insurance Co. B.R.Rus' sell.ANIl 3-C-3

1997 ISI - 2RE05 - Component Supports (Class 2) Ptge 2 of 2 FORM NIS 1 (Bick)

8. - Examination Dates 11/27/96 to 2/11/97 9. Inspection Interval from 06/19/89 to 10/18/00 i
10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval. (ASME Code Class 2 Component Supports Piping and Equipment)

See Section 3.4 and Appendix 3.A of 2RE05 Summary Report for list of examinations performed.

The examinations performed this outage constitute 13% of the required examinations for the current interval. The cumulative percentage completed for the Interval is 64%.

11. Abstract of Conditions Noted.

None.

12. Abstract of Corrective Measures Recommended and Taken.

None.

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of ASME Code,Section XI.

Certificate of Authorization No.(if applicable) N.A. Expiration Date _ N.A.

Date NAC 14 196.~f Signed Houston Iighting & Power Co. By R/d 2.tA

(

Owner R.lTeve'rly CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by Arkwright Mutual Insurance Co. of Norwood.

Mass have inspected the components described in this Owner's Report during the period 11/27/96 to 2/11/97 . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code. Sectio 2 XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, express or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind ' sing from or connected with this inspection.

MM Commissions Tex 826 Inspector's Signature National Board, State, Province, and Endorsements B. R. Russell Date M N -19 @

b d

3-C-4

. . . . . . -- .~. . . .. . . - . . ,. - -- - _ . _ . . -. . ..-

1997 ISI - 2RE05 Component Supports (Class 3) Page I of 2  :

i FORM NIS 1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules i

t 1. Owner Houston I.ichtina & Power Comoany: Electric Tower: P.O. Box 1700: Houston. Texas 77001

,V (Name and Address of Owner)

2. Plant South Texas Proicct Electric Generating Station: P.O. Box 289: Wadsworth. Texas 77483 (Name and Address of Plant)  ;
3. Plant Unit 2 4. Owner and Certificate of Authorization (if required) N.A.
5. Commercial Service Date 06/19/89 6. National Board Number for Unit N.A.
7. Components Inspected ASME Code Class 3 Component Supports Program Manufacturer 4

Component or Manufacturer or Installer National

Appurtenance or Installer Serial No. Board No.

Comp. Cooling Water

, _ Heat.Excit2A Ebasco(I) N.A. ,

NA i l Jacket Water {

NA

_Pipelupport Ebasco(I NA l Lube Oil l

. _. Circ.Eump Ebascn(I) N.A. N.A.___ 1 l

_LubcEil_ Filter Ebasco(I) NA N.A.___ 1 Reactor Coolant

_ Makeup Tank Ebasco(I) NA N.A.

Class 3

! _ Piping Supports EbascD(I) NA NA__ l

~

l l

i l

l i -

t i

i i

i HL&P by O/Mr _ Date /* 19 41 Arkwright Mutual by Date R.LMverly

  • Insurance Co. B.R. Russell,ANII 3-C-5 e

1997 ISI - 2RE05 - Component Supports (CIIss 3) Pige 2 of 2 FORM NIS 1 (Beck) 8, Examination Dates 11/27/96 to 2/9/97 9. Inspection Interval from 06/19/89 to 10/18/00

10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval. (ASME Code Class 3 Component Supports . Piping and Equipment)

See Section 3.4 and Appendiz 3 A of 2RE05 Summary Report for list of examinations performed.

The examinations performed this outage constitute 13% of the required examinations for the current interval. The cumulative percentage completed for the interval is 65%.

I 1. Abstract of Conditions Noted.

None.

12. Abstract of Corrective Measures Recommended and Taken.

None.

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of ASME Code,Section XI.

Certificate of Authorization No.(if applicable) N.A. Expiration Date N.A.

Date MAV M 19.(./ Signed Houston Iighting & Power Co. By df du[_

Owner RL.B/verly CERTIFICATE OF INSERVICE INSPECTION Q I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by Arkwright Mutual Insurance Co. of Norwood.

Mass have inspected the components described in this Owner's Report during the period 11/27/96 to 2/9/97 - and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, express or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

t 4- Commissions Tex 826 InspTctor's Signature National Board, State Province, and Endorsements B. R. Russell Date N/f- 19 87 ,

P d

3-C-6