e o  !

o QT s 4

2 l<

STP 1REO8 Inservice Inspection Summary Report for  ;

Welds and Component Supports ofthe South Texas Project Electric Generating Station - Unit 1 Operator: South Texas Project Nuclear Operating Company Address: P. O. Box 289 Wadsworth, Texas 77483 Commercial Operation: August 25,1988 Issue Date: May 1999

{$07 S$$$ oEI>he

]f4

{ 1RE08 INSERVICE INSPECTION

SUMMARY

REPORT FOR WELDS AND COMPONENT SUPPORTS ofthe SOUTII TEXAS PROJECT ELECTRIC GENERATING STATION UNIT NO. I USNRC DOCKET NO.: 50-498 OPERATING LICENSE NO.: NPF-76 COMMERCIAL OPERATION DATE: August 25,1988

s. ,

Prepared by: O' M ~me 7/8[N r Date C. Yo ISInfngineer- Welds & Component Supports Reviewed by: b 7!7 9 T i f

J. .- .f t . ! r ,- Dste '1 Stauber Consu :lting Engineer - Secfion XI Section . .g .a :

Approved by: L4 cmMM /' ' ' 7!7!79 C. A. Murry Dat-Supenrisor- Section XI Section

~

,,~. ,

IRE 08 Inservice Inspection Summary Report for Welds and Component Supports p TABLE OF CONTENTS 1

Pace INTRODUCTION 1 Scope of Summary Report 1 Figure 1 2 WELDS 3 Scope of Examinations 3 Summary of Examinations 4 Examination Methods 4 Examination Results and Corrective Actions 4 Additional and Successive Examinations 5 i Certification ofInspections 5 o

U COMPONENT SUPPORTS 6 Scope of Examinations 6 Summary of Examinations 6 Examination Methods 6 Examination Results and Corrective Actions 7 Additional and Successive Examinations 7 l I

l Certification ofInspections 7 APPENDIX A Welds Listing APPENDIX B Component Supports Listing APPENDIX C ISI Limitations APPENDIX D NIS-1 Forms: Owner's Report for Inservice Inspection g h*

I 1RE08 Inservice Inspection Summary Report for

! Welds and Component Supports l O I V INTRODUCTION This Summary Report describes South Texas Project Nuclear Operating Company's (STPNOC) inservice inspection (ISI) of selected Class 1,2, and 3 components of the South Texas Project Electric Generating Station, Unit 1 (STPEGS-1) performed prior to and during the eighth

refueling outage (1RE08) of STPEGS-1. The STPEGS ISI program for welds and component l supports is scheduled in accordance with Program B of the American Society of Mechanical Engineers (ASME)Section XI Code " Inservice Inspection of Nuclear Power Plant Components".
The first ten year inspection interval of STPEGS-1 began August 25,1988. Because STPEGS-1 I was out of service continuously for 13 months, the inspection inten al was extended for an equivalent period in accordance with IWA-2400(c) of ASME Section XI. The inspection inten'aiis also extended an additional 12 months as allowed by DVA-2400(c). This extends l thefirst inspection interval to September 24, 2000. The ISl summarized herein is for the second )

ISI of the third inspection period of STPEGS-1. The third inspection period began April 25, {

1996 and extends to September 24,2000. Figure 1 of this Section depicts the first ten year interval and Periods 1 through 3 for STPEGS-1. The percentages completion of examinations I

performed through IRE 07 for STPEGS-1 welds and component supports are also summarized in Figure 1.

The STPEGS-1 ISI program for the first inspection interval is described in the Ten Year ISI Plan previously filed with the Nuclear Regulatory Commission (NRC) and the State of Texas. The p STPEGS-1 ISI program was developed and is being implemented in accordance with

( 10CFR50.55a, the 1983 Edition of Section XI Code with the Summer 1983 Addenda, and other

)

regulatory and Code bases as specified in the Ten Year ISI Plan. This Summary Report satisfies the reporting requirements ofIWA-6000 of the Section XI Code for welds and component suppons.

Scope ofSummary Report This Summary Report describes the ISI examinations performed prior to and during the IRE 08 refueling outage on Class 1 and 2 welds (Section 2) and Class 1,2, and 3 component supports (Section 3). Each of these sections describes the scope of examinations performed; examination results, and corrective actions (if needed). The appendices of this report provide a listing of the weld examinations (Appendix A), listing of component suppora examinations (Appendix B), ISI limitations (Appendix C) and copies of the NIS-1 Forms: O u ner's Report for Inservice Inspection (Appendix D).

l l

O o I l

i l 1

2 El j. .M #E #

$h 3

'.3 @

O ,

l e _

m....

i =,

g

$l, ee s=

_a g YY W 2 l .,

5dpV=

_I 2  ::

p ti .l. Wj i i ad]g og e fs  ;

_]

a li 3 I 7T -

88 lsg B J.s s l

Au -i

,?t

  • Eb - . es w _1 #Y #p%g2 z 1 yf G 1 ms ic _

ce IS g g J ..

w y 5 5 *'

ao -

a a ==

e" N z 22 6 e

~

l 9 88 W*gN;;:,Tp

~

.U " $P i  ! @@ Bh Bi sa

= -

@d p y1

~

h LO $ i g"E g 2 -1

- S a xd g g

>a ts es

_I m 'b YY $4 E A 2 2 bd rn li

~

i

,y, g .

.- 1

-1 [- 4c i 3 i L ga ac

.- o

! Ek h

_1= yi ll w E

,i s e sl- l n l

. [>

i

~8 E d!$ -'

5E8 tu

lRE08 Inservice Inspection Summary Report for Welds and Component Supports O wstos This section of the Summary Report documents the examinations performed by STPNOC NDE Group and contractor nondestructive examination (NDE) personnel in accordance with the following documents:

(1) First 10-Year Long-Term Inservice Examination Plan for the South Texas Project Electric Generating Station, Unit 1 (LTP),

(2) Examination Plan for the 1999 - 1RE08 Inservice Inspection of Welds and Component Supports at the South Texas Project Electric Generating Station, Unit 1, (including any changes made during the performance of the examinations)

The Long-Term Plan (LTP) provides a detailed description of the rules for exemption, selection, allocation, and scheduling of Class 1 and 2 welds and examination areas for ISI.

Scope ofExaminations NDE was performed on selected Class 1 and Class 2 components and examination areas as contained in the Examination Plan. Any deviations or changes were documented as Examination O Plan Changes to the Examination Plan. A complete listing of the components and examination areas and other pertinent information is contained in Appendix A. Class 1 and Class 2 weld identification figures referenced in the Tables of Appendix A are contained in the LTP.

Reactor Vessel (RV) examinations (excluding the RV Closure Head) were performed with both manual and automated NDE methods by WesDyne Intemational personnel and equipment. This included all RV sheti welds and nozzle welds, nozzle to safe-end welds, adjacent safe-end to pipe / fitting welds, and nozzle inner radii. A manual examination of the flange to shell weld was j conducted from the seal surface to obtain maximum coverage. Remote visual examinations were also conducted on the RV intemals and the RV interior surfaces.

Manual UT examinations were conducted by STPNOC NDE Group and contractor NDE personnel on the RV flange threads and flange bushings (Roto-Lok inserts). The UT examinations on the flange bushings were performed as described in Relief Request RR-ENG-23 in lieu of the Section XI required visual examination.

The spare RCP motor and flywheel were installed on RCP 1 A during 1RE084 Baseline magnetic particle and ultrasonic examinations were performed on the replacement flywheel prior to the outage. These examinations are also summarized in this report.

O 3

IRE 08 Inservice Inspection Summary Report for Welds and Component Supports (3

V The examinations completed during 1RE08 and previous refueling outages constitute the following percentages of completion for Class 1 and Class 2 components during the first inspection interval:

Cumulative (1st Intervan Class 1 (IWB) 98 %

Class 2 (IWC) 96 %

Summary ofExaminations Examination Methods The following examination methods were conducted:

VT Examinations VT-1: Visual examination conducted to determine the condition of the part, component, or surface examined, including such conditions as cracks, wear, corrosion, erosion, or j physical damage on the surfaces of the part or component.

VT-2: Visual examination conducted to locate evidence ofleakage from pressure retaining components, or abnormal leakage.

hs)

  1. VT-3: Visual examination conducted to determine the general mechanical and structural conditions of components.

PT Examinations PT: Liquid penetrant examination conducted to detect surface defects.

MT Examinations MT: Magnetic particle examination conducted to detect surface defects.

UT dxaminations UT: Ultrasonic examination conducted to detect the presence of discontinuities Broughout the volume of weld and base material.

Examination Results and Corrective Actions Examination area coverage was provided, to the extent practical, in accordance with the requirements of ASME Section XI and Code Case N-408. In those cases where physical conditions of the component restricted examination of the required area, the amount of coverage achieved was assessed. Appendix C,ISI Examination Limitations, contains a detailed account of examination limitations encountered during IRE 08 weld examinations for limitations that were

,q 10% or greater.

V 4

l

l 1RE08 Inservice Inspection Summary Report for Welds and Component Supports 1

All UT indications determined to be recordable, regardless of signal amplitude, were investigated i

to determine the nature of the reflector. Indications determined to be other than geometry were evaluated to ASME Section XI criteria.

Additional and Successive Examinations If examinations reveal indications that exceed allowable indication standards, additional examinations are required as prescribed in IWB-2430 and IWC-2430. No additional examinations of Class I or Class 2 components (IWB/IWC-2430) were required during this outage.

Successive examinations are required if flaw indications are evaluated in accordance with IWB-3122.4 and the component qualifies as acceptable for continued service. No successive examinations (IWB-2420 or IWC-2420) will be scheduled as a result of examinations performed during this outage.

i Certification ofInspections ASME Section XI NIS-1 forms, " Owner's Report for Inservice Inspections", have been prepared to certify the STPEGS-1 weld ISI examinations described in this section of the Summary Report.

The STPEGS-1 weld ISI examinations have been certified by our ANil, Arkwright Mutual

'VQ Insurance Company, on the NIS-1 forms included in Appendix D.

4 i

O l

l 5

L

1RE08 Inservice Inspection Summary Report for Welds and Component Supports n

U COMPONENT SUPPORTS Introduction R

This Section of the Summarf eport documents the examinations of component supports performed by STPNOC NDE Group and contractor NDE personnel in accordance with the following documents:

(1) STPNOC (HL&P) Specification SUO35JS0003: Inservice Inspection Examination of Component Supports of South Texas Project Electric Generating Station, Unit 1, First Inspection Interval (2) Examination Plan for the 1999 - IRE 08 Inservi~e Inspection of Welds and Component Supports at the South Texas Project Electric Generating Station, Unit 1, including changes made during the outage (Examination Plan).

The Specification provides a detailed description of the rules for exemption and selection of Class 1,2, and 3 component supports for ISI. The IRE 08 Examination Plan is an individual Examination Plan for implementing ISI component support examinations as designated in the Specification. Any deviations or changes were documented as Examination Plan Changes to the Examination Plan, p.

O Scope ofExaminations A complete listing of component supports examined during 1RE08 is contained in Appendix B.

The examinations completed during 1RE08 and previous refueling, outages constitute the following percentages of completion for Class 1,2, and 3 component supports:

Cumulative j (1st Interval)

Class 1 (IWF) 100 %

Class 2 (IWF) 109 %

Class 3 (IWF) 100 %

Summary ofExaminations Examination Methods The following visual examination methc,ds were conducted for the ISI of component supports: 1 VT-3: Visual examination conducted to determine the general mechanical and stmetural conditions of components.

O VT-4: Visual examination conducted to determine conditions related to the operability of components or devices.

4 s

l i

1RE08 Inservice Inspection Summary Report for Welds and Component Supports '

O' Examination Results and Corrective Actions  !

1 The visual examinations performed on component supports during 1RE08 detected one(l) relevant condition. A spring hanger on a Class 3 Component Cooling piping had a cold load setting which was out of tolerance. Engineering evaluation CREE 99-5790-2 concluded the support to be operable and functional in each case and no additional or successive examinations are required. The hanger settings were reset and reexamined with satisfactory results.

Additional and Successive Examinations a The results of the visual examinations of component supports performed during 1RE08 did not require that any additional examinations (IWF-2430) be performed or any successive i examinations (IWF-2420) be scheduled.

Certification ofInspectionsSection XI NIS-1 forms, " Owner's Report for Inservice Inspections", have been prepared to certify the STPEGS-1 component support ISI examinations described in this section of the Summary Report. The STPEGS-1 component support ISI examinations have been certified by our ANil, Arkwright Mutual Insurance Company, on the NIS-1 forms included in Appendix D.

O O

7

. O APPENDIX A WELDS LISTING EXAMINATION RESULTS LEGEND B Baseline Examination C Examination for Section XI Scheduling Credit D Examination Deferrable to End ofInterval W -RCP Flywheel Examination l

1 i

O

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGEs 1 REVISIONS 1 INSERVICE INSPECTION SUMARY FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

-( CIASS .1 CBWD STATUS COMPONENTS REAC1DR PRESSURE VESSEL N O ASME O O T SEC. XI R E H SUDetARY EXAMINATION AREA CATGY EXAM E O E REMARKS WUMBER IDENTIFICATION ITEM NO M2THOD PROCEDURE C M R *

  • CALIBRATION BIDCK8
  • CIRCLBIFERENTIAL VESSEL WELDS (FIO NO A RPV-1.2) 0~0101 RPV1-101-121(B) B-A(D) UT WESDYNE D - - EXAMINED 1004 OF WELD LENGTH FROM THE FLANGE TO UPPER SHELL B1,30 1771 013 R1 SEAL SURFACE. PERFORMED BY WESDYNE PERSONNEL WITH STPNOC PROCEDURE.
    • CSCL-43**

l 000102 RPV1 101-121(C) B-A(D) M-UT WESDYNE D - . EXAMINE 1004 OF WELD LENGTH FROM VESSEL FLANGE TO UPPER SHELL Bl.30 TGX-ISI-254 WALL.

l

    • CSCL-39/CSCL-38**

I CIRCUMFEREFTIAL VESSEL WELDS (FIO NO A-RPV-1) 100200 RPV1 103-121 B- A (D) M-UT WESDYNE D - -

UPPER SHELL TO INTERMEDIATE ' Bl.11 WX-ISI 'A54 SHELL "CSCL-3 8 8

  • 000300 RPV1-101 -111 B A(D) M-UT WESDYNE . . D THREE INDICATIONS RECORDED AND EVALUATED INTERMEDIATE SHELL TO IDWER Bl.11 TGX ISI-254 'IU BE ACCEPTABLE PER IWB-3510.1 (REF. CR SHELL 99-5294-1).
  • CSCL- 3 8 "

000400 RPV1-101-141 B A(D) M.UT WESDYNE . - D THREE INDICATIONS RECORDED AND EVALUATED IDWER SHELL 'IV BOTTOM HEAD Bl.11 TGX-ISI-254 TO BE ACCEPTABLE PER IWB 3510.1 (REF. CR TORUS 99-5294-1). J

  • CSCL-37/CSCL- 3 8" 000$00 RPV1-102 -151 B-A(D) M-bT WESDYNE . - D THREE INDICATIONS RECORDED AND EVALUATED BOTTOM HEAD %RUS TO BOTTOM Bl.21 'ICX*ISI 254 TO BE ACCEPTABLE PER IWD-3510,1 (REF, CR HEAD DOME 99-5294-1).
    • CSCL-37/CSCL-38**

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 SAGE: 2 REVISION: 1 INSERVICE INSPECTION

SUMMARY

(] FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

(' PEACTOR PPESFUPE VESSEL CLASS 1 CBWD STATUS COMPONENTS N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATUY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION B14CK**

IDNGITUDINAL VERSFL WELDS (FIG NO A-RPV-1) 000800 RPV1-101-122A B-A(D) M-tTT WESDYNE D - - LIMITED EXAMINATION COVERAGE (RR ENG-21).

LONGITUDINAL WELD ON THE UPPER Bl.12 TGX-ISI-254 SHELL

" CSCL- 2 9/CSCL- 3 8 *

  • 00b900 RPV1-101-122B B-A(D) M-UT WESDYNE D . -

IONUITUDINAL WELD ON THE UPPER Bl.12 TGX-ISI-254 EHELL

    • CSCL-39/CSCL-38**

)01000 RPV1-101-122C B-A(D) M-UT WESDYNE D - -

\ '

%./ IDNGITUDINAL WELD ON THE UPPER Bl.12 TGX-ISI-254 I SHELL ,

    • CSCL-39/CSCL 38** .

I 001100 APV1-101-124A B-A(D) M ITT WESDYNE - - D ONE INDICATION RECORDED AND EVALUATED TO LONGITUDINAL WELD ON THE Bl.12 7CX-ISI-254 BE ACCEPTABLE PER IWB-3510.1 (REF. CR INTERMED SHELL 99-5294-2).

l t 1

    • CSCL 38** l 001200 RPV1-101-124B B-A(D) M-tff WESDYNE - - D TWO INDICATIONS RECORDED AND EVALUATED LONGITUDINAL WELD ON THE Bl.12 TGX-ISI-254 TO BE ACCEPTABLE PER IWB-3510.1 (REF. CR INTERMED SHELL 99-5294-2). ONE GEOMETRIC INDICATION ON THE OUTSIDE SURFACE.
    • CSCL-38**

001300 PPV1-101-124C B-A(D) M-1TT WESDYNE - - D ONE INDICATION RECORDED AND EVALUATED TO LONGITUDINAL WELD ON THE B1.12 TGX-ISI-254 BF. ACCEPTABLE PER IWB-3510.1 (REF. CR INTERMED SHELL 99-5294 2).

f] *

  • CSCL- 3 8 "

\

J

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PACE: 3

REVISION
1 INSERVICE INSPECTION StD9tARY FIRST INTERVAL. THIRD PERIOD, THIRD OUTAGE (99RF)

![^ CLASS 1 CBWD STATUS COMPONENTS REAC'IOR PRESSURE VESSEL N O I ADME O O T SEC. XI R E H StBetARY EXAMINATION AREA a CAT 3Y EXAM E O E REMARKS l NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK ** I i ....... .............................. ....... .......... ............... . . . ........................................

i IDNGT7UDINAL VESSEL WELDS (FIO NO A-RPV-1)

I r

l 001400 RPV1-101-142A B-AID) M-UT WESDYNE D . -

EDNGITUDINAL WELD ON THE IDWER Bl.12 TGX ISI 254 SHELL

    • CSCL-38**

I 001500 RPV1 101 1429 B-A(D) M-UT WESDYNE - - D TWO INDICATIONS RECORDED AND EVALUATED IDNGITUDINAL WELD ON THE IDWER Bl.12 TGX-ISI-254 TO BE ACCEPTABLE PER INB-3510.1 (REF. CR SHELL 99-5294-2).

    • CSCL-38**

l 301600 RPV1-101-142C B-A(D) M-11T WESDYNE D - -

IDNGITUDINAL WELD ON THE IDWER Bl.12 702-181-254 SHELL

    • CSCL-388*

MERIDIONAL BOTIOM HEAD WELDS (FIG NO A-RPV 1) 001700 RPV1 101-154A B-A(D) M-UT WESDYNE - - D ONE INDICATION RECORDED AND EVALUATED TO BOTTOM HEAD MERIDIONAL WELD AT Bl.22 TGX-ISI-254 BE ACCEPTABLE FER IWB-3510.1 (REF. CR 0 DEG 99-5294-3).

    • CSCL-37/CSCL-38**

001800. RPV1 101 1548 B-A(D) .M-tTT WESDYNE D - -

BOTTOM HEAD MERIDIONAL WELD AT B1.22 TGX-ISI-254 90 DEG j l

    • CSCL-37/CSCL 38**

001900 RPV1-101-154C B-A(D) M-UT WESDYNE D - -

BOT 70M HEAD MERIDIONAL WELD AT B1.22 TGX-ISI-254 I 180 DEG

    • CSCL-37/CSCL-38** l I

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION IJNIT 1 PAGE: 4 REVISION: 1 INSERVICE INSPECTION

SUMMARY

FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF) g / CIASS 1 CBWD STATUS COMPONENTS REACMR PRESSURE VESSEL N O ASME O G T SEC. XI R E H SUPetARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

MERIDIONAL BOTMM HEAD WELDS (FIG NO A-RPV-1) 002000 RPV1-101-154D B-A(D) M-UT WESDYNE - . D ONE INDICAT!DN RECORDED AND EVALUATED M DOTIOM HEAD MERIDIONAL WELD AT Bl.22 TGX-ISI-254 BE ACCEPTABLE PER IWB-3510.1 (REF CR 27 0 DEO 99-5294-3).

    • CSCL-37/CSCL-38**

NOZZIE TO SMELL AND SHELL M NOZZLE WELDS (FIO NO A-RPV-1) 002300 RPV1-107-121A B-D M-UT WESDYNE C - -

ISOP A OUTLET NOZZLE AT 22 DEG B3.90 TGX-ISI.254

    • CSCL-39/CSCL-53/CSCL-38**

\

\ /

% ./ 002100 RPV1-105-121A B-D M-UT WEEDYNE C - -

LOOP A INLET NOZZLE AT 67 DEG B3.90 TGX-ISI-254

  • CSCL-3 9/CSCL- 53/CSCL-3 8 *
  • 002700 RPV1-105-121B BD M UT WESDYNE C - -

140P B INLET NOZZLE AT 113 DEG B3.90 MX-ISI-254

  • CSCL- 3 9/CSCL- 53 /CSCL-38" 002800 RPV1-107-121B B-D M-UT WESDYNE C - -

IDOP B O'JTLET NOZZLE AT 158 B3.90 TCX-ISI-254 DEG l

    • CSCL-39/CSCL-53/CSCL-38**

c 002900 RPV1-107-121C B-D M-UT WESDYNE C - -

1DOP C OUTLET NOZZLE AT 202 B3.90 TGX-ISI-254 DEG

  • CSCL- 3 9/CSCL- 53 /CSCL- 3 8"

\

O(<%

DATE:- 04/28/99 SOUTH TEXAS PROJECT ELECTRIC OENERATING STATION UNIT 1 PAGE: 5

' REVISION: 1 INSERVICE INSPECTION SUP94ARY

' . N FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF) l CIASS 1 CBND STATUS COMPONENTS REACMR PRESSURE VESSEL N O ASME O O T SEC. XI. R E H SupORRY EXAMINATION AREA- CAMY EXAM E O E REMARKS NUMBER. IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCKu NOZZLE TO SHELL AND SHELL TO NOZZLE NELDS (FIG NO A-RPV-1)

-003000 RPV1-105 121C B-D M UT NESDYNE C - -

LOOP C INLET NOZZLE AT 247 DEG B3.90 TCX-ISI-254

    • CSCL-39/CSCL-53/CSCL-38**

003100 RPV1-105 121D B-D M-UT NESDYNE C - -

IDOP D INLET NOZZLE AT 293 DEG B3.90 TCX.ISI-254

    • CSCL-39/CSCL-53/CSCL-38" 003200 RPV1-107-121D B-D M-UT NESDYNE C . -

IDOP D OUTLET NOZZLE AT 338 B3.90 'ICX.ISI-254 DEG

    • CSCL 39/CSCL-53/CSCL-38" NOZZLE INSIDE RADIUS set"fION (FIO NO A-RPV-2) 003300 RPV1-NIAIR B-D M-ITF NESDYNE C - -

LOOP A OUTLET NOZZLE AT 22 DEG B3.100 TCX-ISI.254 eeMy.44 e 003400 RPV1-N2 AIR B-D M-UT NESDYNE C - -

IDOP A INLET NOZZLE AT 67 DEG B3.100 TGX-ISI-254 eeMg.44ee 003500 RPV1-N2BIR B-D M-tTF NESDYNE C - -

140P B INLET NOZZLE AT 113 DEG B3.100 TCX-ISI-254 l

l eeMU-44** i 1

1 I

i.

l

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GCNERATING STATION UNIT 1 PAGE: 6 REVISION: 1 INSERVICE INSPECTION

SUMMARY

[ FIRST INTERVAL, THIRD PERIOD, THIRD OtfrAGE (99RF)

(j CLASS 1 CBWD STATUS COMPONENTS REAC"!OR PRESSUPE VESSEL N O ASME O O T SEC. XI R E H StDNARY EXAMINATION AREA CAMY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

NOZZLE INSIDE RADIUS SEC"* ION (FIO NO A-PPV-2) 003600 RPV1-N1BIR B-D M-UT WESDYNE C . .

IDOP B OUTLET NOZZLE AT 158 B3.100 MX-ISI-2 54 DEG

    • MU-44**

003700 RPV1-N1CIR B-D M-UT WESDYNE - - C ONE SUBSURFACE FLAN RECORDED FOR 1DOP C OUTLET NOZZLE AT 202 B3.100 TGX-ISI-254 INFORMATION ONLY. ACCEPTABLE PER DEG IWB-3512.1 (REF. CR 99-5294-6).

    • MU-44**

03800 RPVI-N2CIR B-D M-UT WESDYNE C - -

IDOP C INLET NOZZLE AT 247 DEG B3.100 TGX ISI-254 e.Mg.44ee 003900 RPV1 N2DIR B-D M-irr WESDYNE C - -

IDOP D INLET NOZZLE AT 293 DEG B3.100 TGX-ISI 254 l

l *enu.44ee 1

004000 RPV1-N1DIR B+D M-UT WESDYNE C -

IDOP D OtfrLET NOZZLE AT 338 B3.100 TGX-!SI-254 DEG e.gg.44..

FJZZLE TO SAFE-END AND SAFE-END TO NOZZLE WELDS (FIO NO A-RPV-2) 004500 RPV1-NIASE BF M-UT WESDYNE C - - RR-ENG-22 1DOP A OUTLET NOZZLE AT 22 DEG B5.10 TGX-ISI-754

    • CSCL-48/ CSS-80/MU-44**
  1. h

DATE: 04/28/99 Sci /TH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 7 REVISION: 1 INSERVICE INSPECTION

SUMMARY

j^ FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF) l CLASS 1 CBWD STATUS COMPONENTS REAC" TOR PRESSURE VESSE!,

N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION B14CK**

N0ZZLE TO SAFE-END AND SAFE-END *O NOZZLE WFLDS (FIO NO A RPV-2) 004600 RPV1-N2ASE B-F M-UT WESDYNE C - . RR-ENG-22 140P A INLET NOZZLE AT 67 DEO B5.10 TGX-ISI-254

    • CSCL-48/ CSS-80/MU 44**

004700 RPV1-N2BSE B-F M-lTT WESDYNE C - . RR-ENG-22 140P Bi INLET NOZZLE AT 113 DEG B5.10 TGX-ISI-254

    • CSCL-48/ CSS-80/MU-44**

004800 RPV1 N1BSE B-F M-UT WESDYNE C * - RR-ENG-22 140P B OLTTLET NOZZLE AT 158 B5.10 TGX-ISI-254 DEG v

    • CSCL-48/ CSS 80/MU-44**

l 1

004900 RPV1 NICSE B-F M-UT WESDYNE C - - RR-ENG-22 140P C OUTLET NOZZLE AT 202 B5.10 TGX ISI 254 i DEG

  • CSCL- 4 8 / CSS - 8 0/MU- 4 4 "

005000 RPV1-N2CSE B-F M-UT WESDYNE C . - RR-ENG-22 140P C INLET NOZZLE AT 247 DEG B5.10 TGX-ISI-254

    • CSCL-48/ CSS-80/MU-44**

005100 RPV1 N2DSE B-F M UT WESDYNE C . - RR-ENG-22 140P D INLET NOZZLE AT 293 DEG B5.10 TGX-ISI-254

    • CSCL-48/ CSS-80/MU-44**  !

i i

i 005200 RPVI-N1DSE B-F M UT WESDYNE C . . RR-ENG-22 C} ISOP D OUTLET NOZZLE AT 338 B5.10 TGX-ISI 254 j

%) DEG

)

l l

l

\

l **CSCL-48/ CSS-80/MU-44** l l

l

DATES 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 8 REVISION: 1 INSERVICE INSPECTION SO94ARY FIRST IITTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

CLASS 1 CBWD STATUS COMPONENTS PEACTOR PRES 8URE VESSEL N O ASME O G T SEC. XI R E N Sm04ARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • CIASURE HEAD BOLTING (FIO NO A-PPV-2. 3A) 005501 1 B-G-1(D) UT UTI-051 R1 D . -

FIANGE THREADS B6.4 0

    • CS-47**

005502 2 B -G- 1 (D) UT UTI-051 R1 D - .

F1ANGE THREADS B6.40

    • CS-47**

005503 3 B-G-1(D) UT UTI-051 R1 D - -

FLANGE THREADS B6.40 s ..CS.42..

005504 4 B-G-1(D) UT ITTI-051 R1 D - -

FLANGE THREADS B6.40 l 1

    • CS-47**

005505 5 B G-1(D) UT ITTI-051 R1 D - -

FIANGE THREADS B6.40 e*CS-47**

005506 6 B-G-1(D) UT UTI-051 R1 D - -

FIANGE THREADS B6.40

    • CS-47**

005507 7 B-G-1 (D) 1TI UTI-051 R1 D - - i F1ANGE THREADS B6.40 p **CS 47**

U 1

DATE: 04/28/99 SOWH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 1 PAGE: 9 REVISION: 1 INSERVICE INSPECTION

SUMMARY

FIRST INTERVAL. THIRD PERIOD, THIRD OUTAGE (99RF)

!O) CLASS 1 CBWD STATUS COMPONENTS REAt"!9R PRESSURE VESSEL N O ASME O O T SEC. XI R E H SUPMARY EKAMINATION AREA CATOY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK'*

CLOSURE HEAD BOLTING (FIG NO A-RPV-2, 3A) 005508 8 B-0-1(D) (Tr UTI 051 R1 D - -

FLANGE THREADS B6.40

    • CS-47**

005509 9 B-0-1(D) ITT UTI-051 R1 D - -

FLANCE THREADS B6.40

    • CS-47**

005510 10 B-G 1(D) UT UTI-051 R1 D - -

FLANGE THREADS B6.40

    • CS-47**

005511 11 B-0-1(D) UT UTI-051 R1 D - -

FLANGE THREADS B6.40

    • CS-47**

005312 12 B 0-1(D) UT UTI-051 R1 D - -

FLANCE THREADS B6.40

    • CS-47**

i l

! 005513 13 B-0-1(D) UT UTI-051 R1 D - -

FLANGE THREADS B6.40

(

i

    • CS-47**

005514 14 B-0-1(D) UT LTTI-051 R1 D - -

FLANGE THREADS B6.40 eeCS-47**

\

DATE: 04/28/99 SOWH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 10 REVISION: 1 INSERVICE INSPECTION

SUMMARY

FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

[*N

{

V f CLASS 1 CBWD STATUS COMPONENTS REACTOR PPESSURE VESSEL N O ASME O G T SEC. II R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK'*

CLOSURE HEAD BOLTING (FIG NO A-RPV-2, 3A) 005515 15 B-0-1(D) UT UTI-051 R1 D - -

FLANGE THREADS B6.40 '

    • CS-47**

005516 16 B-0-1(D) ITT UTI-051 R1 D . -

FLANGE THREADS B6.40

    • CS-47**

003517 17 B-G-1(D) UT UTI-051 R1 D - -

FLANGE THREADS B6.40

    • CS-47**

005518 18 B-O-1(D) UT UTI-051 R1 D - .

FLANGE THREADS B6.40 005519 19 B-G-1(D) UT UTI-051 R1 D - -

FLANGE THREADS B6.40

..cs.47.e 005520 20 B-G 1(D) UT UTI-051 R1 D . -

FLANGE THREADS B6.40

    • CS-47**

005521 21 B-G-1(D) UT UTI-051 R1 D - -

FLANGE THREADS B6.40

    • CS-47'*

k

l

\

DATES 04/28/99 SOUTH TEXL PRaIECT ELECTRIC CENERATING STATION UNIT 1 PAGE: 11 i REVISION: 1 INSERVICE INSPECTION

SUMMARY

/ FIRST INTERVAL, THIRD PERIOD, THIRD OtfrAGE (99RF)

CLASS 1 CBWD STATUS COMPONENTS REACTOR PRESSURE VESSEL N O ASME O G T SEC. XI R E H SUP91ARY EXAMINATION AREA CATOY EXAM E O E REMARKS NUMBER IDENTI'.' CATION ITEM iG METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • CLOSURE HEAD DOLTING (FIO NO A-RPV-2, 3A) 003522 22 B-G-1(D) 17F UTI.051 R1 D - .

FLANGE THREADS B6.40

    • CS-47**

005523 23 B-0-1(D) UT UTI-051 R1 D . -

FLANGE THREADS B6.40

    • CS-47'*

005524 24 B-0-1(D) UT UTI-051 R1 D - -

FLANGE THREADS B6.40 t }

    • CS-47**

005525 25 B-G-1(D) UT UTI-051 R1 D - -

1 FLANGE THREADS B6.40

    • CS-47**

005526 26 B-0 1(D) UT UTI-051 R1 D - .

FLANGE THREADS B6.40

    • CS-47**

005527 27 B-0-1(D) UT UTI-051 R1 D - -

FLANGE THREADS B6.40 i I

    • CS-47**

UTI-051 R1 I 005528 28 B-0-1(D) UT D - -

FLANGE THREADS B6.40 I

..cs. v..

t)

DATE: 04/28/99 SotTTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGEs 12 REVISION: 1 INSERVICE INSPECTION

SUMMARY

O FIRST IITTERVAL, THIRD PERIOD, THIRD OLTTAGE (99RF)

CLASS 1 CBWD STAWS COMPONENTS RFACTOR PRESSURE VESSEL N O ASME O O T SEC. XI R E H SUPHARY EXAMINATION AREA CAMY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION B1OCK**

C!DSimE HEAD BOLTIN3 (FIG NO A-RPV-2. 3A) 005529 29 B-0-1(D) UT 071-051 R1 D . .

FIANGE THREADS B6.40

    • CS-47**

005530 30 B-0-1(D) ITT UTI-051 R1 D - .

FIANGE THREADS B6.40

    • cs.47ee 003531 31 B-0-1(D) (TT UTI-051 R1 D - .

FLANGE THREADS B6.40

    • CS-47**

003532 32 B 0-1(D) tTT UTI.051 R1 D . -

FLANGE THREADS B6.40

    • CS-47**

005533 33 B-G-1(D) UT UTI- 951 R1 D - .

FLANGE THREADS B6.40

    • CS-47**

005534 34 B-O-1(D) UT ITTI-051 R1 D - -

FLANGE THREADS B6.40

    • CS-47**

005535 35 B-G 1(D) UT ITTI-051 R1 D - .

FLANGE THREADS B6.40

    • CS-47**

U

I DATE: 04/28/99 SOWH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 13 REVISION: 1 INSERVICE INSPECTION

SUMMARY

FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

CLASS 1 CBWD STATUS COMPONENTS v

REAC"!VR PRESSURE VESSEL N O ASME O O T SEC. XI R E H SUPMARY EXAMINATION AREA CATGY EXAM E O E PJD4 ARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIhCK**

CIDSUPE HEAD BOLTING (FIG NO A-RPV-2. 3A) 005536 36 B-G-1(D) UT UTI-051 R1 D - -

FLANGE THREADS B6.40

    • CS-47**

005701 1 B-C-1(D) UT UTI.052 R1 D . . RR-ENG-23 FLANGE BUSHING B6.50

    • CS-100**

005702 2 B-G-1(D) LTI UTI.052 R1 D - . RR ENG-23 FLANGE BUSHING B6.50

%- **CS-100**

005703 3 B-0-1(D) UT UTI.052 R1 D . . RR-ENG-23 FLANGE BUSHING B6.50

    • CS-100**

005704 4 B-G-1(D) UT 17t!-052 R1 D . . RR-ENG-23 FLANGE BUSHING B6.50

    • CS-100**

005705 5 B-G-1(D) UT UTI-052 R1 D . . RR-ENG-23 FLANGE BUSHING B6.50

    • CS-100**

005706 6 B-C-1(D) 177 UTI-052 R1 D . - RR-ENG-23 FI.ANGE BUSHING B6.50

    • CS-100**

\

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENTRATING STATION UNIT 1 PAGE: 14 REVISION: 1 INSERVICE INSPECTION

SUMMARY

[ FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

( CLASS 1 CBWD STATUS COMPONENTS REA N R PRES $URE VERSEL N O ASME O O T SEC. XI R E H SUPMARY EXAMINATION AREA CATG'r EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

CLOSURE HEAD BOLTING (FIG NO A-RPV-2, 3A) 003707 7 B-G 1(D) ITT UTI-052 R1 D . - RR-ENG-23 FIANGE BUSHING B6.50

    • CS-100**

005708 8 B-0-1(D) UT WI-052 R1 1, - -

RR-ENG-23 FLANGE BUSHING BC.50

V *

  • CS - 10 0 '

005710 10 B-G-1(D) UT UTI-052 R1 D . - RR-ENG-23 FLANGE BUSHING B6.50

    • CS-100**

005711 11 B-G-1(D) UT UTI-052 R1 0 - - RR-ENG-23 FIANGE BUSHING B6.50

    • CS-100**

005712 12 B-G-1(D) W UTI 052 R1 D . - RR-ENG 23 FLANGE BUSHING B6.50

  • CS - 10 0" 005713 13 B-G-1(D) UT UTI 052 R1 D . - RR ENG-23 FIANGE BUSHING B6.50

[ **CS-100**

k

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 15 REVISION: 1 INSERVICE INSPECTION

SUMMARY

O,' FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF) ig CLASS 1 CBWD STATUS COMPONENTS REACTOR PPESSURE VESSEL N O ASME O G T SEC. XI R E H SG WARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

CIDSUPR MEAD BOLTING (FIG NO A-PPV-2, 3A) 005714 14 B-G-1(D) 171' UTI-052 R1 D . . RR-ENG-23 FLANGE BUSHING B6.50

    • CS-100**

005715 15 B-G 1(D) UT UTI-052 R1 D - . RR ENG-23 FLANGE BUSHING B6.50

    • CS-100**

005716 16 B-G-1 (D) UT UTI-052 R1 D . . RR-ENG-23

, FLANGE BUSHING B6.50

    • CS-100**

l 005717 17 B-G-1(D) UT UTI-052 R1 D - . RR ENG-23 FLANGE BUSHING B6.50

    • CS-100**

005718 18 B-G-1(D) UT UTI.052 R1 D . . RR-ENG-23 FLANGE BUSHING B6.50

    • CS-100**

1 005719 19 B-G-1(D) UT UTI-052 R1 D - - RR ENG-23 FLANGE BUSHING B6.50

    • CS-100**

005720 20 B-G-1(D) UT UTI-052 R1 D - - RR-ENG-23 FLANGE BUSHING B6.50

    • CS-100**

\

f f

l DATES 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 16 REVISION: 1 INSERVICE INSPECTION

SUMMARY

/ FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

CIASS 1 CBWD STATUS COMPONENTS PEACTOR PRESSURE VESSEL N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION ARF.A CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK 6*

CLOSURE HEAD BOLTING (FIG NO A-RPV-2, 3A) 005721 21 B-G-1(D) UT UTI.052 R1 D . - RR-ENG-23 FLANGE BUSHING B6.50

    • CS-100**

005722 22 B-G-1(D) UT UTI-052 R1 D . - RR-ENG-23 FLANGE BUSHING B6 50

    • CS-100**

005723 23 B-G 1(D) LTT UTI-052 R1 D - . RR-ENG-23 g FLANCE BUSHING B6.50 i tI I b' **CS-100**

005724 24 B-G-1(D) UT UTI-052 R1 D . - RR-ENG-23 FLANGE BUSHING B6.50

    • CS-100**

005725 25 B 1 (D) UT ITTI-052 R1 D . - RR-ENG-23 FLANGE BUSHING B6.50

    • CS-100**

, 005726 26 B-G-1(D) UT UTI-052 R1 D . - RR-ENG-23 l

B6.50 FLANCE BUSHING l

    • CS-100**

I i

005727 27 B-G-1(D) UT UTI.052 R1 D . . RR-ENG-23 FLANGE BUSHING B6.50

[ **CS-100**

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 1 PAGE 17 REVISION: 1 INSERVICE INSPECTION

SUMMARY

% FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

( CLASS 1 CBWD STATUS COMPONENTS REAC1DR PRESSURE VESSEL N O ,

ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E RE.% RKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

CLOSURE HEAD BOLTING (FIG NO A-RPV-2, 3A) 005728 28 B-G-1(D) UT ITTI.052 R1 D - . RR-ENG-23 FLANGE BUSHING B6.50 I

    • CS-100**

005729 29 S-G 1(D) UT UTI.052 R1 D - - RR-ENG-23 F1ANGE BUSHING B6.50

    • CS 100**

005730 30 B-G-1(D) UT UTI-052 R1 D . RR-ENG-23 r FLANGE BUSHING B6.50 I f l

(% **CS-100**

l 005731 31 B-G-1(D) UT UTI-052 R1 D . - RR-ENG 23 FLANGE BUSHING B6.50

    • CS-100**

005732 32 B-G-1(D) UT UTI-052 R1 D - - RR-ENG-23 FLANGE BUSHING B6.50

    • CS-100**

005733 33 B-G- 1 (D) UT UTI-052 R1 D . . RR-ENG-23 FLANGE BUSHING B6.50

    • CS-100**

005734 34 B-G- 1 (D) UT UTI-052 R1 D - - RR-ENG-21 FLANGE BUSHING B6.50

    • CS-100**

t

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 18 REVISION, 1 INSERVICE INSPECTION

SUMMARY

FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

]

( CLASS 1 CBWD STATUS COMPONENTS PEACTOR PRESRUDE VESSEL N O ASME O G T SEC. XI' R E H

SUMMARY

EXAMINATION AREA CA'It3Y EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

CIOSURE HEAD BOi, TING (FIG NO A-RPV-2. 3A) 005735 35 B-G-1(D) UT UTI-052 R1 D - . RR-ENG-23 i

FIANGE BUSHING B6.50 l l

    • CS-100**

005736 36 B-0-1(D) UT UTI-052 R1 D - - RR-ENG-23 FIANGE BUSHING B6.50 l

    • CS-100**

VESSEL INTERIOR (FIO NO A-RPV-1)

F 106200 VESSEL INTERIOR B-N-1 VT-3 WESDYNE C - - FIVE TIEWRAPS 1DCATED IN BOTTOM HEAD B13.10 TGX-ISI-88 AREA. TIEWRAPS WERE REMOVED (CR 99-6134).

006400 VESSEL INTERIOR ATTACHMENTS B-N-2 (D) VT-3 WESDYNE D . - INCLUDES SIX CORE SUPPORT LUGS.

BEYOND BELTLINE REGION B13.60 TGX ISI-88 l

l l

VESSEL CORE SUPPORT STRUC"rURE (FIG NO A-PPV-5) l 006502 ITEM NO. 1 B-N-3(D) VT-3 WESDYNE D - . THERMOCOUPLE CLAMPS.

! UPPER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 l

l 006504 ITEM NO. 2 B-N-3(D) VT-3 WESDYNE D - - CONDt'IT SWAGIOCK FITTINGS, BANDINGS, AND UPPER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 TAB IDCKS.

006506 ITEM NO. 3 B-N-3(D) VT-3 WESDYNE D - - CLAMPS ON MOUNTING BRACKETS.

UFPER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 I l

O .

i

" un l

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 1 PAGE: 19 REVISION: 1 INSERVICE INSPECTION

SUMMARY

FIRST INTERVAL THIRD PERIOD, THIRD O WAGE (99RF)

CLASS 1 CBWD STATUS COMPONENTG REAC"f0R PRESSURE VESSEL N O ASME O C T SEC. XI R E H

SUMMARY

EXAMINATION AREA CA7GY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

VESSEL CORE SUPPORT STPUCWPE (FIG NO A-PPV-5) 006308 ITEM NO. 4 B-N-3(D) VT-3 WESDYNE D - - CONDUIT CLAMP WELDS.

UPPER CORE SUPPORT ASSEMBLY B13,70 TGX-ISI-88 006510 ITEM NO. 5 B-N- 3 (D) VT-3 WESDYNE D - - UPPER SUPPORT COLUMN NW 'IO EXTENSION UPPER CORE SUDPORT ASSEMBLY B13.70 TGX-ISI-88 WELDS.

006512 ITEM NO. 6 B-N 3(D) VT-3 WESDYNE D - - CONDUIT SUPPORT BRACKET WELDS.

UPPER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88

)

006514 ITEM NO. 7 B-N-3(D) VT-3 WESDYNE D . . HOLD-DOWN SPRING INTERFACE SURFACE.

UPPER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 006516 ITEM NO. 8 B-N 3(D) VT-3 WESDYNE D - - WELDS ON SUPPORT COLUMN IDWER NOZZLES.

UPPER CORE SUPPORT ASSEMBLY B13 "3 TGX-ISI-88 i

l 006518 ITEM No. 9 B-N- 3 (D) VT-3 WESDYNE D . - UPPER CORE PLACE INSERTS.

[ UPPER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 i

006520 ITEM NO. 10 B N 3(D) VT-3 WEEDYNE D - - THERMOCOUPLE COLUMN AND GUIDE TUBE UPPER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 IDCKING DEVICES.

006522 ITEM NO. 11 B-N-3(D) VT-3 WESDYNE D . . SUPPORT COLUMN AND CORE INSERT SCREW UPPER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 1DCKING DEVICE.

[

(

i I

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 20 REVISION: 1 INSERVICE INSPECTION

SUMMARY

g FIRWT INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

CLASS 1 CBWD STATUS COMPONENTS l

REACMR PRESSUPE VESSEL N O ASME O O T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

VESSEL CORE SUPPORT STRUC"NRE (FIO NO A RPV-5) 006523 ITEM NO. 12 B-N-3 (D) VT-3 WESDYNE D - - UPPER SUPPORT SKIRT M PLATE GIRTH UPPER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 WELD.

006524 ITEM NO. 13 B-N-3(D) VT-3 WESDYNE D - - UPPER SUPPORT SKIRT TO FLANGE GIRTH UPPER CORE SUPPORT ASSEMBLY B13.70 TCX-ISI-88 WELD.

006526 ITEM NO. 14 B N-3 (D) VT-3 WESDYNE D - - GUIDE TUBE WELDS.

UPPER CORE SUPPORT ASSEMBLY B13.70 TGX-If 88

! A 006528 ITEM NO. 15 B-N-3(D) VT-3 WESDYNE D . - UPPER CORE PLATE IDCKING DEVICES.

UPPER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 006530 ITEM NO. 16 B-N-3 (D) VT-3 WESDYNE D - - LIFTING ROD IDCK WELDS.

UPPER CORE SUPPORT ASSEMBLY B13.70 WX-ISI 88 l

l l

006532 ITEM NO. 17 B-N-3 (D) VT-3 WESDYNE D - - UPPER BARREL TO FLANGE GIRTH WELD.  ;

IDWER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 006534 ITEM NO. 18 B-N-3(D) VT-3 WESDYNE D - - UPPER BARREL 'IV IDWER BARREL GIRTH WELD.

IDWER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 l

l 006536 ITEM NO. 19 B-N-3(D) VT-3 WESDYNE D - - IDWER BARREL TO CORE SUPPORT WELD.

IDWER CORE SUPPORT ASSEMBLY B13.70 TGX-IS!-88 a

l l

l t

f L

i DATE: 04/28/99 SOtTTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 21 REVISION: 1 INSERVICE INSPECTION

SUMMARY

[h FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF) k CIASS 1 CBWD STATJS COMPONENTS REAt"rOR PRESSURE VESSEL N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBFR IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLA W VESSEL CORE SUPPORT FTRUCTURE (FIO NO A-RPV-5) l 006538 ITEM NO. 20 B-N-3(D) VT-3 WESDYNE D - - UPPER CORE PLATE ALIGNING PIN WELDS AND IDWER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 BEARING SURFACES. SURFACE CONDITIONS NOTED ON 'IVP OF CORE BARREL FLANGE.

THESE CONDITIONS HAVE BEEN PREVIOUSLY )

DISPOSITIONED (REF. RFA 91-0153/SPR l

910019).

006540 ITEM NO. 21 B-N-3(D) VT-3 WESDYNE D - - OUTLET NOZZLE INTERFACE SURFACE IDWER CORE SUPIORT ASSEMBLY B13.70 TGX-ISI-88 CONDITIONS.

I l 006542 ITEM NO. 22 b-N-3(D) VT-3 WESDYNE D - - NEUTRON SHIELD PANEL DOWEL PIN COVER I , IDWER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-8B PALTE WELDS.

k 1

\

006544 ITEM NO. 23 B-N-3(D) VT-3 WESDYNE D - - NEUTRON SHIELD PANEL SCREW IDCKING IDWER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 DEVICES.

l 006546 ITEM No. 24 B-N-3(D) VT-3 WLSDYNE D - . INTERFACE SURFACES AT THE SPACER PADS 1

l LDWER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 AIDNG TOP AND BOTTOM ENDS OF THE NEUTRON i

PANELS.

l 006548 ITEM NO. 25 B-N-3(D) VT-3 WESDYN2 D - - BAFFLE ASSEMBLY SCREW IOCKING LOWER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI 88 ARRANGEMENTS AT THE TWO TOP AND BOTTOM ELEVATIONS.

006550 ITEM NO. 26 B-N-3(D) VT-3 WESDYNE D - - FUEL PIN TO CORE SUPPORT LOCKING IDWER CORE SUPPORT ASSEMBLY B13.70 TGX-181-88 DEVICES.

006552 ITEM NO. 27 B-N-3(D) VT-3 WESDYNE D . - SEC ARY CORE SUPPORT HOUSING 'IV EASE LOWER CORE SUPPORT ASSEMBLY B13.70 TCX-ISI 88 PLATE WELD.

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 2?

REVISION: 1 INSERVICE INSPECTION

SUMMARY

[h FIRST INTERVAL, THIRD PERIOD, THIRD OtfrAGE (99RF)

CLASS 1 CBWD STATUS COMPONENTS REAf"f0R PPESSURE VESSEL N O ASME O G T SEC. XI R E H SthMARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

VESSEL COPE SUPPORT STRUCTUPE (FIG NO A-PPV-5) 006554 ITEM NO. 28 B-N-3(D) VT-3 WESDYNE D - - IDCKING DEVICES AND CONTACT OF THE IDWER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 BOTTOM INSTRUMENTATI(W GUIDE COLUMNS WHERE ATTACHED E THE CORE SUPPORT AND TIE PLATES.

006556 ITEM NO. 29 B-N-3(D) VT-3 WESDYNE D - - LOCKING DEVICES OF THE SECONDARY CORE IDWER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 SUPPORT COLUMNS WHERE ATTACHED TO THE CORE SUPPORT AND TIE PLATES.

00G558 ITEM NO. 30 B-N-3(D) VT-3 WESDYNE D - - RADIAL SUPPORT KEY WELDS.

IDWER CORE SUPPORT ASSEMBLY 'B13.70 TCX-ISI-88 U[h 006560 ITr.M NO. 31 B-N-3(D) VT.3 WESDYNE D . . RADIAL SUFPORT KEY IDCKING ARRANGEMENTS IDWER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 AND BEARING SURFACES.

006562 ITEM NO. 32 B-N- 3 (D) VT-3 WESDYNE D . - HEAD AND VESSEL ALIGNING PINS SCREW IDWER CORE SUPPORT ASSEMBLY B13.70 TGX-ISI-88 IDCKING DEVICES AND BEARING SURFACES.

006564 ITEM No. 33 B N-3 (D) VT-3 WESDYNE D . - IRRADIATION SPECIMEN GUIDE SCREW IDCKING IDWER CORE SUPPORT ASSEMBLY B13.70 'ICX-ISI-88 DEVICES AND DOWEL PINS.

l i

I i

V i

I

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 23 REVISION: 1 INSERVICE INSPECTION

SUMMARY

FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

(p) CLASS 1 CBWD STATUS COMPONENTS REACTOR COOIANT SYSTEM N O ASME O G T SEC. XI R E H SUB9tARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BI4CK**

29 RC-1101-NSS - th0P 1 (FIO NO A-RC-1) 100720 1 B-J M-UT WESDYNE C . . MANDATORY ISI - TE. RR-ENG 22.

SAFE END '!V PIPE B9.11 TriX-ISI .2 54

    • CSS-80/MU-44/CSCL-48**

29-RC-1701-NSS - IN)P 2 (FIG NO A-RC-2) 100860 1 B-J M-UT WESDYNE C . . MANDATORY ISI - TE. RR-ENG-22.

SAFE END TO PIPE B9.11 TGX-ISI-254

    • CSS-80/MU-44/CSCL-48**

r\ 29-RC-1301-NSS .11)OP 3 (FIO NO A-RC-3)

[

\

101000 1 B-J M-UT WESDYNE C . - MANDATORY ISI - TE. RR-ENG-22.

SAFE END TO PIPE B9.11 TGX-ISI-254

    • CSS-80/MU-44/CSCL-48**

29-PC-14 01-NSS - LOOP 4 (FIO NO A-PC-4) 101140 1 B-J M-UT WESDYNE C - - MANDATORY ISI . TE. RR-ENG-22.

SAFE END TO PIPE B9.11 TGX-ISI-254

    • CSS 80/MU-44/CSCL-48**

27.5-RC-1103-NSS - LOOP 1 (FIO NO A-RC-1) 101330 7 B-J M - tTI' WESDYNE C . . MANDA1VRY ISI - TE. RR-ENG-22.

ELBOW TO SAFE END B9.11 TGX-ISI-254

    • CSS-80/MU-44/CSCL-48**

k

27. 5-RC-1703-NSS - IDOP 2 (FIO NO A-RC-2) 101470 $ B-J M-UT WESDYNE C - - MANDATORY ISI TE. RR-ENG 22.

- ELBOW TO SAFE END B9.11 TGX-ISI-254

    • CSS-80/MU-44/CSCL-48**

1

_l

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1. PAGE: 24 REVISION: 1 INSERVICE INSPECTION

SUMMARY

/% FIRST IFTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

(

/

CLASS 1 CBWD STATUS COMPONENTS REACWR COOIANT SYSTEM N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDudE C M R *

  • CALIBRATION BIDL1(*
  • 27.5-RC-1303-NSS - 1/3OP 3 (FIG NO A-R Q 101620 6 B-J M-UT WESDYNE C . . MANDATORY ISI . TE. RR-ENG-22.

ELBOW TO SAFE END B9.11 T'JX- ISI - 2 54

    • CSS-80/MU-44/CSCL-48**
27. 5-RC-14 03 -NSS - IDOP 4 (FIG NO A-RC-4) 101760 6 B-J M-UT WESDYNE C . . MANDATORY ISI'. TE. RR-ENG-22.

ELBOW TO SAFE END B9.11 TGX-ISI-254

    • CSS-80/MU-44/CSCL-48**

h 6-RC-1003-BB1 (FIG NO A-RC-13) f 103750 11 B-J PT EA-0012 R2 C - - MANDATORY ISI - HS-F. REMOVAL OF PIPE I ELBOW TO PIPE B9.11 UT ITTI.001 R3 - C . HANGER RESTRAINT REQUIRED.

    • SS-8**

6-RC-1004-NSS (FIG NO A-RC-6) 103950 7FB B-G-2 VT.1 ZA-0024 R2 B . - BASELINE PM98000518/WAN135432.

FIANGE BOLTING (N1RCPSV3452) B7.50 l 6-RC-1009-NSS (FIG NO A-RC-6) 104130 9FB B-G-2 VT-1 ZA-0024 R2 B - - BASELINE PM98000517/WAN135431.

FLANGE BOLTING (NIRCPSV3451) B7.50 6-RC-1012-NSS (FIG NO A-RC-6) 104330 11FB B-G-2 VT-1 ZA 0024 R2 B . . BA9ELINE PM98000516/WAN135430.

g FLANGE BOLTING (N1RCPSV3450) B7.50

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 1 PACE: 25 REVISION: 1 INSERVICE INSPECTION

SUMMARY

P FIRST IFTERVAL, THIRD PERIOD, THIRD OtJTAGE (99RF)

CLASS 1 CDWD STAWS COMPONENTS REACTOR COOLANT PUMP 1A N O ASME O O T l SEC. XI R E H

SUMMARY

EXAMINATION AREA CAMY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • M P CASING (FIO NO A-RCP-1) 200141 P.CP-101A-PC N-481 VT-2 CPSP15-RC-0001 C - . VISUAL EXAMINATION FOR LEAKAGE DURI.*U PUMP CASING --

CATEGORY B-P PRESSURE TEST (BY SED).

FLY 16 TEEL (FIO NO A-RCP-2) 260370 RCP-101A-FW RG MT ZA-0018 R2 C - - 10 YEAR RG 1.14 EXAMINATION: MT ON FLYWHEEL 1.14 UT UTI-003 R2 C - - FLYWHEEL SURFACES AND (TT OF BORE KEYWAY, DOLTHOLES, AND BASE METAL. FLYWi! EEL ORIGINALLY FRCM RCP-2D(2RE06).

  • *CS - 76" i

l f'

i

- (a I

i l

i A

! \

'% )

DATE: 04/28/99 SOtfrH TEXAS PROJECT ELECIRIC OENERATING STATION UNIT 1 PAOE 26 REVISION: 1 INSERVICE INSPECTION

SUMMARY

O- FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

/ \

$ J' CIASS 1 CBWD STATUS COMPONENTS

'w/

PEACTOR COOIANT PUMP IB N O ASME O O T ,

SEC. XI R E H

SUMMARY

EXAMINATION AREA CATCY EXAM E O E REMARKS NUMBER IDElrTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

PUMP CASING (FIG NO A-RCP-1)

I 260241 RCP-101B.PC N-481 VT-2 CPSPI4-RC 0001 C - . VISUAL EXAMINATION FOR LEAKAGE DURING i PUMP CASING --

CATEOORY B P PRESSURE TEST (BY SED).

i

)

I 4

i I

f*% l 1

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PACE: 27 REVISION: 1 INSERVICE INSPECTION

SUMMARY

FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

['N

$ CLASS 1 CBWD STATUS COMPONENTS

'#) REACTOR COOIANT PUMP IC N O ASME O O T SEC. XI R E H EUMMARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • PUMP CASING (FIG NO A-RCP-1) 260341 RCP-101C PC N-481 VT-2 CPSP15-RC-0001 C . . VISUAL EXAMINATION FOR LEAKAGE DURING PUMP CASING --

CATEGORY B P PRESSURE TEST (BY SED).

PUMP CASING WELDS (FIG NO A-RCP-1) 260342 RCP-101C-PCW N-481 VT-1 ZA-0024 R2 C - - VT-1 ON EXTERIOR OF THE PUMP CASING WELD PUMP CASING WELD .-

PER ASME CODE CASE N-481.

\

' v) i

/ i

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 28 REVISION: I INSERVICE INSPECTION

SUMMARY

D FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

( PEACTOR COOIANT PUMP ID CLASS 1 CBWD STATUS COMPONENTS N O ASME O O T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATOY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIhCK**

PUMP CASING (FIO NO A-RCP-1) 260441 RCP-101D-PC N-481 VT-2 CPSP15-RC-0001 C - - VISUAL EXAMINATION FOR LEAKAGE DURING PUMP CASING --

CATEGORY B-P PRESSURE TEST (BY SED).

l

(.

i L

l l

i V

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 1 PAGE: 29 REVISION: 1 INSERVICE INSPEC" TION

SUMMARY

^ FIRST INTERVAL, THIRD PERIOD, THIRD OtTTAGE (997.F) f

(%nd f CLASS 1 CBWD STATUS COMPONENTS VAL"E9 N O ASME O G T SEC. XI R E H SUPNARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

VALVE GPOUP 1 261100 PSV 3452-VB ON 6-EL 1004 B-0-2 VT-1 ZA-0024 R2 B - . BASELINE PM 98000518/WAN135432.

FIO NO A-RC-6 B7.70 f

261150 PSV 3452-VIS ON 6 RC-1004 B-H-2 VT-3 2A 0024 R2 B - - BASELINE PM 98000518/WAN135432.

FIO !=0 A-RC-6 B12.50 261200 PSV 3451-VB ON 6-RC-1009 B-0-2 VT-1 ZA-0024 R2 B - - BASELINE PM 98000517/WAN135431. I FIO NO A-RC-6 B7.70 A

g 261250 PSV 3451-VIS ON 6 RC-1009 B-M-2 VT-3 ZA-0024 R2 B - - BASELINE PM 98000517/WAN135431.

l FIO NO A-RC-6 B12.50 l 261300 PSV 3450-VB ON 6-RC-1012 B G-2 VT-1 ZA-0024 R2 B - - BASELINE PM 98000515/WAN135430.

I FIG NO A RC-6 B7.70 l

261350 PSV 3450-VIS ON 6 RC-1012 B-M-2 VT-3 ZA-0024 R2 B - - BASELINE PM 98000515/WAN135430.

i FIG NO A-RC-6 B12.50 l

{

I l

I i

g

DATE: 04/28/99 SOUTH TEXAS PRCUECr ELECTRIC GENERATING STATION UNIT 1 PAGE: 30 REVISION: 1 INSERVICE INSPECTION

SUMMARY

/"% FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

CLASS 2 CBWD STAIVS COMPONENTS CONTAINMENT SPRAY PUMPS N O ASME O G T SEC. XI R E H SUIMARY EXAMINATION AREA CA' ICY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIOCK**

PUMP 1A (FIO NO R-CSP-1) 730133 CIAPCS-1A PCW3 C-G VT-1 ZA-0024 R2 C . - VT 1 BOROSCOPIC EXAM OF WELD PER CR IDWER CASE TO BOTTOM HEAD C6.10 98-10926. RR-ENG-24.

750140 CIAPCS-1A-PCW5 C-0 PT ZA-0012 R2 C - - EXAMINE ACCESSIBLE LENGTH DOWN TO FIDOR IDWER CASE SEAM WELD C6.10 SEAL.

750145 CIAPCS-1A-PCW5 C-O VT-1 ZA-0024 R2 C - . VT-1 BOROSCOPIO EXAM OF WELD PER CR IDWER CASE SEAM WELD C6,10 98-10926, RR-ENG-24.

/"

c

(

(

! ~~

l 1

i i

DATE: 04/28/99 BOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 31 REVISION: 1 INSERVICE INSPECTION

SUMMARY

7  % FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF) a i

\%j / CLASS 2 CBWD STATUS COMPONENTS HION HEAD SAFETY INJECTION PUMPS N O ME O O T l SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARK 3 NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIOCK*
  • PUMP 1 A (FIG NO B-HHSIP-1) 731033 SIAPHH-1A-PCW3 C-C VT-1 ZA-0024 R2 C - - VT-1 BOROSCOPIC EXAM OF WELD PER CR 1 IDWER CASE TO BOTTOM HEAD C6.10 98-10926. RR-ENG-24.

751040 SIAPHH-1A-PCW5 C-C PT ZA-0012 R2 C - - EXAMINE ACCESSIBLE LENGTH DOWN TO FIDOR IDWER CASE SEAM WELD C6.10 SEAL.

731045 SI APlut-1 A- PCWS C-G VT-1 ZA-0024 R2 C - - VF-1 BOROSCOPIC EXAM OF WELD PER CR IDWER CASE SEAM WELD C6.10 98-10926. RR ENG-24.

7.y

> s ,

%/

l I

l l

7.

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 1 PAGE: 32 REVISION: 1 INSERVICE INSPECTION

SUMMARY

'^% FIRST INTERVAL, THIRD PERIOD, THIRD OITTAGE (99RF)

CLASS 2 CBWD STAWS COMPONElfrS

~ IDW HEAD SAFETY INJtCTION PUMPS N O ASME O O T SEC. XI R E H SUPNARY EXAMINATION AREA CATCY EXAM E O E REMARKS NLMBER IDENTIFICATION ITEi; NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

....... .............................. ....... .......... ............... . . . ........................................ j PUMP 1A (FIG NO B-LHSIP-1) 731333 81APLH-1A-PCW3 C-G VT.1 ZA-0024 R2 C . . VT.3 BOROSCOPIC EXAM OF WELD PER CR i IDWLR CASE M BOTTOM HEAD C6.10 98-10926. RR-ENG-24.

131340 SIAPLH-1A PCW5 C-G PT ZA-0012 R2 C . . EXAMINE ACCESSIBLE LENGTH DOWN TO FIDOR IDWER CASE SEAM WELD C6.10 SEAL. .

I l 731345 SIAPLH.1A-PCW5 C-G VT-1 ZA-0024 R2 C . - VT-1 BOROSCOPIC EXAM OF WELD PER CR IDWER CASE SEAM WELD C6.10 ,

98-10926. RR ENG-24.

, , [

I i

b l

l l

I l

l

\

j \

\ )

v l

O APPENDIX B COMPONENT SUPPORTS LISTING k EXAMINATION RESUI,TS I,EGEND C Examination for Section XI Scheduling Credit l

l l

w.)

i I

1 I

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 1 REVISION: 1 INSERVICE INSPECTION

SUMMARY

[ FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF) kJ ]* CLASS 1 COMPLETED COMPONENTS CHEMICAL & VOLUME CONTROL 1 N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDErrIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION block **

2-CV.1121-BB1-B1A1 100600 CV-1121-HS5006 PIPING.1 VT.1 ZA-0023 R1 C * -

RR .

2-CV-1141-BB1-A-Al 101700 CV-1141-HS5003 PIPING-1 VT-3 ZA-0023 R1 C . -

SH-V - VT-4 ZA-0023 R1 C - -

\

c o

I l

i l

1 l

l l

i m

r-DATE: 04/28/99 SOtTIH TEXAS PROJECT ELECTRIC GENERATING STATION (JNIT 1 PAGE: 2 REVISION: 1 INSERVICE INSPECTION SLHMARY

[] FIRST INTERVAL, THIRD PERIOD, THIRD OtJTAGE (99RF)

( PEACTOR COOLANT 1 CLASS 1 COMPLETED COMPONENTS N O ASME O O T SEC. XI R E H SIM4ARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

12-PC 1125-BB1-B 103700 RC-1125-HL5003 PIPING-1 VT-3 EA-e023 R1 C . -

RR -

1

)

l 4 - PC- 100 0 - BB1 - B 1 106400 RC-1000-SH02 PIPING-1 VT 3 ZA-0023 R1 C . .

SH-V . VT-4 ZA-0023 R1 C - .

4-RC-1121-BB1-D f4 g 407200 RC-112 3 -HL5005 PIPING-1 VT-3 ZA-0023 R1 C . - J k RR -

107300 RC-1123-HL5006 PIPING-1 VT 3 ZA-0023 R1 C - -

RR .

2-RC-1121-BB1- Al- Al 110600 RC-1121-HS5002 PIPING-1 VT-3 ZA-0023 R1 C - -

SH-V - VT-4 ZA-0023 R1 C - -

I k

A j

DATE: 04/28/99 Sot /TH Ta:ZAS PROJECT ELECTRIC OENERATING STATION IJNIT 1 PAGE: 3 REVISION: 1 INSERVICE INSPECTION

SUMMARY

FIRST INTERVAL, THIRD PERIOD, THIRD OLTTAGE (99RF)

(y CLASS 1 COMPLETED COMPONENTS RES!!RTAL HEAT REMOVAL 1 N O ASME O G T SEC. XI R E H StMtARY EXAMINATION AREA CAMY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • 8-RH-!?08-BBI-A l

115000 RX-1200-MLSOO3 PIPING-1 VT-3 EA-0023 R1 C - -

RR -

(%

t, s

l

  • I I

l l

J

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 4 REVISION: 1 INSERVICE INSPECTION

SUMMARY

(N FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF) f CLASS 1 COMPLETED COMPONENTS J

REACTOR COOIANT 1 N O ASME O O T SEC. XI R E H SUlmARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • 1R111NPZ101A 117300 PRU2 EQUIP-1 VT.3 ZA-0023 R1 C . -

RC PRES UPPR .

117400 PRU3 EQUIP.1 VT-3 EA-0023 R1 C - -

RC PRES VPPR -

117500 PRU4 EQUIP-1 VT.3 ZA 0023 R1 C - -

RC PRES UPPR .

t l

l l

r

/

DATES 04/28/99 SOUTH TEXAS PROJEC"f ELECTRIC GENERATING STATION UNIT 1 PAGE: 5 REVISION: 1 INSERVICE INSPECTION

SUMMARY

p FIRST INTERVAL, THIRD PERIOD, THIRD OWAGE (99RF) f, y CLASS 2 COMPLETED COMPONENTS v AUXILIARY FEEDWATER 2 N O ASME O O T SEC. XI R E H

SUMMARY

EXAMINATION AREA CAMY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION B1hCK**

8-AF-1012-GA2 D 203100 AF-1012-F15004 PIPING-2 VT-3 ZA-0023 R1 C - -

RR -

205200 AF-1012-ML5005 P7'ING-2 YT-3 ZA-0023 R1 C - -

RR -

8-AF-1012-GA2 y, 206400 AF-1012 HL5015 PIPING-2 VT-3 ZA-0023 R1 C - -

SH-V - VT-4 ZA-0023 R1 C - -

O) i

\ /

J I

i r~T

\m/

DATEt 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 6 j REVISION: 1 INSERVICE INSPECTION

SUMMARY

A. FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

( \

( CLASS 2 COMPLETED COMPONENTS COMPONENT COOLINO 2 .

N O ASME O O T SEC. XI R E H SUt9%RY EXAMINATION AREA CATUY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BI.DCK*
  • 14-CC-1318-WA2-A 210900 CC.1318-ML5002 PIPING-2 VT-3 ZA-0023 R1 C . -

RR .

N I

I i

i g%

f J

DATE: 04/28/95 SOtfrH TEXAS PRCATECT E12CTRIC GENERATING STATION UNIT 1 PAGE: 7 REVISION: 1 INSERVICE INSPECTION

SUMMARY

( FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

SEC. XI R E H SUlHARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • 6-CS-1303-PB2-C 216400 CS-1303-ML5004 PIPING-2 VT-3 ZA-0023 R1 C . .

RR -

216500 CS-1303-ML5005 PIPING-2 VT-3 ZA-0023 R1 C . -

RR -

O U

PJ

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 8 REVISION: 1 INSERVICE INSPECTION

SUMMARY

FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

) CLASS 2 COMPLETED COMPONENTS FEED WATER 2 N O

+ ASME O O T SEC. XI R E H SW94ARY EXAMINATION AREA CATOY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK" 18 FW-1016-CA2-C 217000 FN-1016-HL5015 PIPING-2 VT-3 ZA-0023 R1 C . .

RR .

s

DATES 04/28/99 SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 1 PACE: 9 REVISION: 1 INSERVICE INSPECTION

SUMMARY

fQ FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99kF)

CLASS 2 COMPLETED COMPONENTS MAIN STEAM 2 N O ASME O G T SEC. XI R E H SUPD.ARY EXAMINATION AREA CATGY EXAM E O E REMARFJ NUMBER IDElff1FICATION ITEM NO METHOD PROCEDURE C M R * *CALIBPJLTION BLOCK *

  • 30-MS-1003-GA2-C 224900 MS-1003-HL5011 PIPING-2 VT-3 ZA-0023 R1 C - .

SH.V . VT 4 ZA.0023 R1 C . .

U O

O

DATE: 04/28/99 SOUTH TEXAS PRCOECT ELECTRIC OENERATING STATION UNIT 1 PACE: 10 REVISION: 1 INSERVICE INSPECTION

SUMMARY

FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

( / CLASS 2 COMPLETED COMPONENTS FESIDOAL HEAT RFMOVAL 2 N O ASME O G T SEC. XI R E H SupptARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • 8-RM-1106-FS2-C 232100 RH-1106-RR03 PIPING-2 VT-3 ZA-0023 R1 C - .

RR .

8 - RH - 1110 - K32 - B 232600 RM-1110-HL5004 PIPING-2 VT 3 ZA-0023 R1 C - -

ANCHOR .

8.RH-1110-KB2-C

?

D '1232700 RH-1110 HL5003 PIPING-2 VT-3 ZA-0023 R1 C . -

(M

\ GUIDE .

8-RH-1111-BB2-A 232800 RH-1111-HL5001 PIPING-2 VT-3 ZA-0023 R1 C - -

RR -

8-PH-1204-Y22-F 235200 RH 1204-RR10 PIPING-2 VT-3 ZA.0023 R1 C - -

RR .

M H-1205-KB2-B l 236000 RH-1205-SHIC PIPING 2 VT-3 ZA-0023 R1 C - - j SH-V (2) -

VT-4 ZA 0023 R1 C -

i U

DATE: 04/28/99 SOtTTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 1 PAGE: 11 REVISION: 1 INSERVICE INSPECTION SUl9tARY FIRST INTERVAL, THIRD PERIOD, THIRD OtTTAGE (99RF)

CLASS 2 COMPLETED COMPONENTS RESTDUAL HEAT REMOVAL 2 N O ASME O O T SEC. XI R E H l

StMtARY EXAMINATION AREA CATGY EXAM E O E REMARKS 1 NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • 8-RH-1205-KB2-E 236800 RN-1205 HL5009 PIPING-2 VT-3 ZA-0023 R1 C - +

GUIDE -

I 4

l 1

1 1

1 4

DATES 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING FTATION UNIT 1 FAGE: 12 REVISION: 1 INSERVICE INSPECTION

SUMMARY

FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

("~

ms /

CLASS 2 COMPLETED COMPONENTS SAFETY fMJECTION 2 N O ASME O O T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

24 - S I- 1101 -tm2 - D 243400 SI-1101-ML5024 PIPING-2 VT-3 ZA-0023 R1 C - -

RR .

2 4 - SI- 1101 -tm2 - F 243200 SI-1101 RR19 PIPING 2 VT-3 ZA-0023 R1 C - -

RR -

8-ST-1102-PB2-C t

153600 SI-1102-SH09 PIPING-2 VT-3 ZA-0023 R1 C - -

SH-V VT-4 ZA-0023 R1 C - -

8-ST-1102 PB2-E 1

l 253800 SI-1102-ML5001 PIPING-2 VT-3 ZA-0023 R1 C - - ,

RR -

8-97-1105-KB2-B 254100 EI-1105-HL5004 PIPING-2 VT-3 ZA-0023 R1 C - -

SH V -

VT-4 ZA-0023 R1 C - -

0-SI-1105 KB2-0 255100 SI-1105-RR26 PIPING 2 VT-3 ZA-0023 R1 C - -

RR -

DATE: 04/28/99 SOLTnt TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PACE: 13 l REVISION: 1 INSERVICE INSPECTION

SUMMARY

[S FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

CIJLSS 2 COMPLETED COMPONENTS SAFFTY INJEC"f!ON 2 N O ASME O G T SEC. XI R E H SUINARY EXAMINATION AREA CA MY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • 8-SI-1105-KB2-J 255400 SI-1105-HL5001 PIPING-2 VT-3 EA-0023 R1 C - .

RR .

f,SI-1106-DB2-L 264000 SI-1106-RR69 PIPING-2 VT-3 EA-0023 R1 C - .

RR .

6 SI-1106-DB2 N N

, I:64600 SI.1106 RR60 PIPING 2 VT-3 EA-0023 RI C - -

RR .

6-SI-1106 DB2-0 255800 SI.1106 RR76 PIPING-2 VT-3 ZA-0023 R1 C - -

RR .

l l

6-SI-1106-DB2-R 266100 S!-1106-SS53 PIPING-2 VT-3 EA-0023 R1 C - -

RR -

2-SI-1119 DB2-C-A 277100 SI-1139-HF5004 PIPING-2 VT-3 EA-0023 R1 C - -

GUIDE -

%s

DATES 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATINO STATION UNIT I PAOEs It REVISION: 1 INSERVICE INSPECTION

SUMMARY

FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

CLASS 2 COMPLETED COMPONENTS PE91 DUAL HEAT REMOVAL 2 N O ASME O O T SEC. XI R E H BIDNARY EXAMINATION AREA CATGY EXAM E O E REMARFS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R " CALIBRATION BIDCK**

2R161NPA101A 282400 RHPIA EQUI P-2 VT.3 ZA-0023 RI C . -

RH PUMP SUPT .

pm 1

1 l

i s

DATE: 04/28/99 SOWH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT I PAGE: 15 REVISION: I INSERVICE INSPECTION

SUMMARY

FIRST INTERVAL, THIRD PERIOD, THIRD OLTTAGE (99RF)

I,

\ CLASS 2 COMPLETED COMPONENTS SAFETY IRTECTION 2 N O ASME O O T SEC. XI R E H SIDMARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK'*

2N171NPA102A 281000 LHIA EQUI P-2 VT.3 1.A-0023 RI C . .

S! IJI PUMP -

l 1

I 1

l x

s.

i l

r DATER 04/28/99 SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION LHIT 1 PACE: 16 REVISION: 1 INSERVICE INSPECTION

SUMMARY

/% FIRST INTERVAL, THIRD PERIOD. THIRD OUTAGE (99RF)

CLASS 3 COMPLETED COMPONENTS AUXILIARY FEEDWATER 3 N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • 12-AF-1054-WA M 300200 AF-1054-HL5003 PIPING-3 VT-3 ZA-0023 R1 C . -

SH-V (2) -

VT-4 ZA 0023 R1 C - .

12 - A F- 1054 -WA3 - F 300300 AF-1054-ML5005 PIPINO-3 VT-3 ZA-0023 R1 C - -

GUIDE -

12-AP-1054-WA3-G

'l00400 j AF-1054-HL5006 PIPING-3 VT-3 ZA-0023 R1 C - -

V oUIDE -

8-AF-1079-WB3-D 303300 AP-1079-HL5002 PIPING-3 VT-3 ZA-0023 R1 C - -

GUIDE -

1.5-AF-1053-GA3-EA03 316900 AF-1051-HF5006 PIPING-3 VT 3 ZA-0023 R1 C - -

GUIDE -

I l

l i

l 1,5-AF-1053-WA3-AA03 l 1

317400 AF-1053-HF5001 PIPING-3 VT-3 ZA-0023 R1 C - -

U-BOLT -

\

%/

l DATE: 04/28/99 SOLTTH TEIAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 17 REVISION: 1 INSERVICE INSPECTION

SUMMARY

Q FIRST INTERVAL, THIRD PERIOD. THIRD OUTAGE (99RF)

CLASS 3 COMPLETED COMPONENTS OWrum re a COOLING 3 i N O ASME O O T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDEFTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION B14CK**

20-CC-1103-WA1-B 326000 CC-1103-HL5011 PIPING-3 VT-3 ZA-0023 R1 C . -

ANCHOR -

I 20-CC-1109-WA3-E 1

326800 CC-1109 RR09 PIPING-3 VT-1 ZA-0023 R1 C - -

GUIDE -

20-CC-1109-WA1-J i

[ \27500 CC-1109-SH01 PIPING-3 VT-3 ZA-0023 R1 C - -

i t

\v/ SH-V (2) - VT-4 ZA-0023 R1 C - -

1 I

20-CC-1110-WA3-E 327600 CC-1110-HL5004 PIPING-3 VT-3 ZA-0023 R1 C - -

RR -

16-CC-1105-WA3-K 334300 CC-1105-SH01 PIPING-3 VT-3 ZA-0023 R1 C - - COLD 14AD SETTING WAS FOUND OUT OF SH-V - VT-4 ZA-0023 R1 C . . TOLERANCE. ENF-99 531 AND CR 99 5790 WERE ISSUED BY NDE EXAMINER. CREE 99-5790-2 CONCLUDED THE SUPPORT WAS STILL OPERABLE. NO ADDITIONAL OR SUCCFJSIVE EXAMS WERE REQUIRED. SPRING HANGER WAS RESET AND REEXAMINED WITH A XEPTABLE RESULTS. SPRING HANGEk IS 16 - CC- 1106 - WAl - C

$ J34500 CC-1106-HL5018 PIPING-3 VT-3 ZA-0023 R1 C * -

v RR -

DATE: 04/28/99 SOtfrX TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 18 REVISION: 1 INSERVICE INSPECTION

SUMMARY

b FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

CLASS 3 COP'PLETED COMPONENTS COMPONENT COOLING 3 N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFIC#. TION ITEM NO METHOD PROC" M C M R *

  • CALIBRATION BIDCK' 16-CC-1106 WA3-0 335300 CC-1106-HL5013 PIPING-3 VT 3 ZA 0023 R1 C - -

RJt .

16-CC-1106-WA3-H 335900 CC-1106-RR14 PIPING 3 VT-3 ZA-0023 R1 C - -

RR .

16-CC-1106-WA3-J f 136400 CC-1106 RR19 PIPING-3 VT.3 ZA-0023 R1 C - -

RR -

16-CC-1109-WA3-D 336900 CC-1109-HL5003 PIPING-3 VT-3 ZA-0023 R1 C - -

RR -

14-CC-1111-WA3-C 344300 CC-1111 SH02 PIPING-3 VT-3 ZA-0023 R1 C - -

RR .

)

14-CC-1120-WA3-B 345300 CC-1120 HL5003 PIPING 3 VT-3 ZA-0023 R1 C - ~

j SH-V -

VT-4 EA-0023 R1 C - -

l l

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 19 REVISION: 1 INSERVICE INSPECTION

SUMMARY

% FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

\ CLASS 3 COMPLETED COMPONENTS COMPONENT N LING 3 N O ASME O O

SEC XI R E H SUtmARY EXAMINATION AREA CAMY EKAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • 14-CC-1120-WA3-C 343500 CC-1120 RR04 PIPING-3 VT.3 ZA-0023 R1 C - -

RR -

10-CC-1114-WA3-C 350600 CC-1114-RR29 PIPING-3 VT-3 EA-0023 R1 C - .

RR -

10-CC-1114-WA3-E

$50900 CC-1114-GU19 PIPING-3 VT-3 ZA-0023 R1 C - -

GUIDE -

l J

1 351000 CC.1134-HL5004 PIPING-3 VT-3 ZA-0023 R1 C - -

RR .

I 1

i l

I i

t 10-CC-1114-WA1-J l

351900 CC-1114-RR10 PIPING-3 VT-3 ZA-0023 R1 C - -

RR -

352000 CC-1114 RR11 PIPING-3 VT-3 ZA-0023 R1 C - -

RR -

l 10-CC-1115-WA3-V 355300 CC-1115 RR16 PIPING 3 VT-3 ZA-0023 R1 C -

I l

I-

\

l  ! ATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 1 PAGE: 20 REVISION: 1 INSERVICE INSPECTION

SUMMARY

[

i.

O FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

CLASS 3 COMPLETED COMPONEffrS COMPONTNT COOLING 3 i

1 N O ASME O G T l

i SEC. XI R E H l i

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • 10-CC-1115-WA1-W 355700 CC-1115-KL5002 PIPING.3 VT-3 ZA-0023 R1 C - -

CUIDE -

10-CC-1116-WA3-C 356500 CC-1116-HL5003 PIPING-3 VT.3 EA-0023 R1 C - -

RR .

I 1

10-CC-1117-WA3-R i s  !

( CC-1117-HL5004 PIPING-3 VT-3 ZA-00.93 R1 C - -

V}l59300RR .

V l

f l

DATE: 04/28/99 SOUTH TEKAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 21 l REVISION: 1 INSERVICE INSPECTION

SUMMARY

FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF) gU"-- CLASS 3 COMPLETED COMPONENTS ESSETTTIAL COOLING WATER 3 N O ASME O O T SEC. XI R E H SUPNARY EXAMINATION AREA CATGY EXAM E O E REMARFJ NUMBER IDDITIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

30-EW-1105-WT3-CC1 381100 EW-1105-E5001 PIPING-3 VT-3 ZA-0023 R1 C - -

RR .

381200 EW-1105-HL5002 PIPING-3 VT-3 ZA-0023 R1 C - -

RR .

6-EW-110'7 WT3-A 409100 EW-1107-HL5005 PIPING-3 VT-3 ZA-0023 R1 C - - l GUIDE .

\

a 409400 EW-1107-HL5004 PIPING-3 VT-3 ZA-0023 R1 C - -

GUIDE .

6-EW-1125-WT3-Al 410100 EW-1125-HL5008 PIPING-3 VT.3 ZA-0023 R1 C - -

GUIDE .

m sd 6-EW-1188-WT3-A l

411100 EW-1188-HL5008 PIPING-3 VT-3 ZA-Of23 R1 C - -

CUIDE -

O'

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC OENERATING STATION UNIT 1 PAGE: 22 REVISION: 1 INSERVICE INSPECTION

SUMMARY

[ FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF) k CIASS 3 COMPLETED COMPONENTS b

CHEMICAL & VOLUME CONTROL 3 N O ASME O O T SEC. XI R E H SUWULRY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • 3R171NPA104A 418900 RCPP1 EQUIP-3 VT.3 ZA.0023 R1 C - -

CV PURF PUMP

  • l 1

I f

r k%)

1 l

{

t C

$j\ 1 I

DATE: 04/28/99 SOUTH TEXA8 PROJEC"f ELECTRIC OENERATINO STATION UNIT 1 PACE: 23 REVISION: 1 INSERVICE INSPECTION

SUMMARY

f FIRST INTERVAL, THIRD PERIOD, THIRD OUTAGE (99RF) k CLASS 3 COMPLETED COMPONENTS DIESEL JACFET WATER 3 N O ASME O O T SCC. XI R E H St9 MARY EXAMINATION AREA CATUY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION B1DCK'*

3o1sIMuroin 421100 JWH2A EQUIP 3 VT-3 ZA 0023 R1 C . .

JW HEATER .

N

DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC OENERATING STATION UNIT 1 PAGE: 24 REVISION: 1 INSERVICE INSPECTION

SUMMARY

FIRST IIRERVAL, THIRD PERIOD, THIRD OUTAGE (99RF) k)

~

DIESEL LUBE OIL 3 CLASS 3 COMPLETED COMPONDrFS N O ASME O O T SEC, XI R E H SUM 4ARY EKAMINATION AREA CA'IT3Y EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • 30151MSA0134 424600 LU1A EQUIP-3 VT-3 ZA-0023 RI C - -

LU PIPE SUPT -

l 425200 LU7A EQUIP.3 VT.3 ZA-0023 R1 C - -

LU PIPE SUPT .

1 4

I I

\

1 i

DATE: 04/28/99 SOLTTH TEXAS PROJECT ELECTRIC GENERATING STATION IJNIT 1 PAGE 25 REVISION: 1 INSERVICE INSPECTION

SUMMARY

} FIRST IlffERVAL, THIRD PERIOD, THIRD OUTAGE (99RF)

(v ) CLASS 3 COMPLETED COMPONENT 8 DIESEL OIL 3 N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CAMY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE C M R *

  • CALIBRATION BIDCK*
  • 30151 6 0137 437000 DOSTIA EQUIP-3 VT-3 ZA-0023 R1 C a -

DO STG TANK .

l l

!s l

l I

l DATE: 04/28/99 SOUTH TEXAS PROJECT ELECTRIC OENERATINO STATION UNIT 1 PAOEs 26 REVISION: 1 INSERVICE INSPECTION

SUMMARY

N FIRST INTERVAL, THIRD PERIOD, THIRD OVTAOE (99RF)

CLASS 3 COMPLETED COMPONENTS ESSENTIAL CXCLINO WATER 3 N O ASME O O T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK" 3R281NSP101A 429100 SCSIA EQUIP-3 VT 3 EA-0023 R1 C - - l EW STRN ASS .

l r

i k

l 1

l l

O V

l l

O J

APPENDIX C O ISI LIMITATIONS e

O

APPENDIX C ISI LIMITATIONS O)

Table of Contents STPEGS-1 Summary ofInservice Examination Limitations ASME Category B-A Reactor Pressure Vessel l

O C-1

APPENDIX C ISI LIMITATIONS (G

( ,)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 1

SUMMARY

OF INSERVICE INSPECTION LIMITATIONS The following tables provide details on the limitations which were encountered during the ISI examinations at the South Texas Project Electric Generating Station, Unit 1 (STPEGS-1). Each table of this summary provides the following information as described:

Column 1 - Class / Category / Item No./ Examination Requirement Identifies the ASME Section XI Code Class, Category, Item Number, and Examination Require-ment (volumetric or surface) for the specific examination area listed in Column 2. This information is derived from Tables IWB-2500-1 and IWC-2500-1 of the 1983 Edition of ASME Section XI (with Addenda through Summer 1983), and Tables 1 and 2 of Code Case N-408.

Column 2 -

Line No./ Subassembly Weld Identification Weld ID Figure Weld Configuration Examination Method Provides information for each examination area by line number (piping) or subassembly number (vessel), unique weld identification number, weld ID figure reference, weld configuration (pipe-to-tee, head-to-shell, etc.), and examination method (UT, UT/PT, or UT/MT).

Column 3 - Exam Type v

Lists the Methods of Examinations used for each area by specific angles for UT (0,45,45T,60, l 60T) and surface technique (MT or PT), if required.  !

Column 4 -  % Coverage The extent of coverage for each exam type is expressed in percentages based on the examination volume / area required in Section XI. Depending on method, the percentage coverage may be represented in more than one way.

Surface methods are the simplest and are expressed as a percentage of the required surface area receiving no coverage and the remaining balance from 100% as the total coverage.

Ultrasonic coverage may be first expressed for each exam type as a percentage of the volume 4 receiving no coverage, angle-beam coverage in one direction, and angle-beam coverage in two directions. These percentages are then used to compute the effective coverage for that exam type.

In the case of 0 degree, the effective coverage is equal to the balance of 100% minus the percentage receiving no coverage.

g U

i C-2 L

L APPENDIX C ISI LIMITATIONS The efTective coverage for angle beam is calculated from the following formula:

c = a + 2*b (effective coverage formula, angle beam) 2 where a = one direction only percentage b = two direction percentage c = effective coverage as a percentage Examples:

(1) none 1 dir 2dir 0% 0% 100 %

c = 0 + 2* 100 = 100% effective coverage 2

(2). none Idir 2dir 0% 100 % 0 %

c = 100 + 2*0 = 50% effective coverage (3) none 1 dir 2dir 50 % 50 % 0%

c = 50 + 2*0 = 25% effective coverage 2

The total UT coverage is then expressed as the average of the effective coverage percentages for each UT exam type. As an attemative to the above method, coverage may be directly listed as the effective coverage. Each UT exam type is considered as equal weight in the calculation of the average.

Column 5 - Limitation  %

A description of the type oflimitation and primary reason for why the coverage was limited is provided in this section.

O C-3

ASME SECTION XI CODE COVERAGE / LIMITATIONS 1999 IRE 08 ISI 5017T11 TEXAS PROJEC.T ELECTRIC GENERATING STATION, UNIT I ASME CATEGORY B A SYSTEM: REACTOR PRESSURE VESSEL L CIRCUMFLRENTIAL WELD WO . . . 64 Lmuted UT due to proxmuty of Core Support Lugs.

RPVI10114I UT43 37 . 67 67 Calibraten of 45 and 60 catended to full-we for 1.11 A-RPV.1 UT45T 39 . 61 61 maximum coverage.

OL Lower Shell to Bottom flead Torus UT60 34 66 66 00 UT(Automated) UT60T 39 . 61 61 UT70 40 . 60 60 UT70T 39 . 61 61

. 62 O

C-4

O t

1

)

1 APPENDIX D O

NIS-1 FORMS OWNER'S REPORT FOR INSERVICE INSPECTIONS l

l l

O

1999 ISI- 1REOS - Welds (Class 1) Page 1 of 2 FORM NIS-1 OWNER'S REPORT INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

( 1. Owner South Texas Project Nuclear Operatine Companv*: P.O. Box 289: Wadsworth. Texas '77483 (Name and Address of Owner)

2. Plant South Texas Proiect Electric Generatine Station: P.O. Box 289: Wadsworth. Texas 77493 (Name and Address ofPlant)
3. PlantUnit 1 4. Owner and Certificate of Authorization (if required) N.A.
5. Commercial Service Date 08/25/88 6. National Board Number for Unit N.A.
7. Components Inspected ASME Code Class 1 (IWB) Items -Welds Program Component or Manufacturer or Manufacturer or State or National Appurtenance Installer Installer SerialNo. Province No. Board No.

Reactor Pressure Combustion Vessel Engineering /

Westinghouse (M) 11073 N. A. 22190 Reactor Coolant 1007 Pump 1 A Westinghouse (M) 1163E26G01/R14 N. A. W1869 Class 1 Piping Ebasco (I) N. A. N. A. N. A.

Class 1 Valves Ebasco (I) N. A. N. A. N. A.

ON l

l l

l l

l

,q

  • South Texas Project Nuclear Operating Company (STPNOC)is the licensed operator of the Sou as Project Electric Generating Station

, Date '5MM Arkwright Mutual by A

[ STPNOC by (7 d Date

[J.C.Y/ung(r Insurance Co. B.R. Russell,ANil ,

CL1 WELD-1

i 1999 ISI- IRE 08. Welds (Class 1) Page 2 of 2 FORM NIS-1 (Back) i 1

8. Exanunation Dates 03/17/99 to 04/27/99 9. InspectionIntervalfrom 08/25/88 to 09/24/00 V 10. Abstract of Exanunations. Include a list of exanunations and a statement concerning status of work required for emTent interval. (ASME Code Class 1 (IWB) Items - Welds Program)

See Section Appendix A of the IRE 08 Summary Report for list of examinations performed. The examinations performed this outage constitute a cumulative percentage completed for the interval of 98 % 1

11. AbstractofConditionsNoted.

None.

12. Abstract of Corrective Measures Recommended and Taken.

None.

We certify that the statements made in this report are correct and the exammations and corrective measures taken conform to the rules of ASME Code,Section XI.

l Certificate ofAuthorization No.(if applicable) N.A. Expiration Date N.A.

Date 19$ Signed South Texas Project Nuclear Ooeratine Comnany By / P Owner J[. Younger CERTIFICATE OF INSERVICE INSPECTION O

V I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province ofTexas and employed by Arkwricht Mutual Insurance Co. of Waltham. Mass have inspected the components described in this Owners Report during the period 03/17/99 to 04/77/99, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Ownefs Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his enployer makes any warranty, express or implied, concerning the exammations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a f. ss of any kind arising from or connected with this inspection.

" ' " Commissions Tex 826 Inspectofs Signature National Board, State, Province, and Endorsements

! B. R. Russell Date 743 19 %

o v

CLlWELD-2

1999 ISI- 1RE08 - Welds (Class 2) Page 1 of 2 FORM NIS-1 OWNER'S REPORT INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

,m.,

O 4
1. Owner South Texas Project Nuclear Operatine Comnanv*:I.1LBox 289: Wadsworth. Texas 77483 (Name and Address ofOwrr;r)
2. Plant South Texas Proiect Electric Generatine Station: P.O. Box 289: Wadsworth. Texas 77483 (Name and Address of Plant)
3. Plant Unit 1 4. Owner and Certificate of Authorization (ifrequired) N.A.
5. Commercial Service Date 08/25/88 6. National Board Number for Unit N.A.
7. Components Inspected ASME Code Class 2 (IWC) Items - Welds Program Component or Manufacturer or Manufacturer or State or National Appurtenance Installer Installer Serial No. Province No. Board No.

liigh IIcad Safety injection Pump 1 A Pacific Pumps (M) 51695 N. A. 382 LowIIcad Safety Injection Pump 1 A Pacific Pumps (M) 51701 N. A. 420 Containment Spray Pump 1 A Pacific Pumps (M) 51707 N.A. 441

,s p

  • South Texas Project Nuclear Operating Company (STPNOC)is the bcensed operator of the STexas Project Electric Generating Station

/-[v Date W//92 Arkwright Mutual by Date 7*/

STPNOCby [LC[ounger Insurance Co. B.R. Russell,ANII CL2 WELD-1 v .

1999 ISI- IRE 08 - Wzids (Class 2) Page 2 of 2 FORM NIS-1 (Back)

8. Exanunation Dates 11/30/98 te 12/02/98 9. Inspection Interval from 08/25/88 to 09/24/00
10. Abstract of Exanunations. Include a list of examinations and a statement concerning status of work required for current interval. (ASME Code Class 2 (IWC) Items - Welds Program)

See Appendix A of the IRE 08 Summary Report for list of examinations performed. The examinations performed this outage constitute a cumulative percentage completed for the laterval of 9W.

I1. AbstractofConditionsNoted.

None.

12. Abstract of Corrective Measures Recommended and Taken.

None.

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of ASME Code,Section XI.

Certificate of Authorization No.(if applicable) N.A. Expiration Date N.A.

Date ~7k 19d Signed South Texas Project Nuclear Operatine Comoany By /!de Owner /J Yodhger CERTIFICATE OF INSERVICE INSPECTION

/*

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by Arkwricht Mutual Insurance Co. of Waltham. Mass have inspected the components described in this Ownefs Report during the period 11/30/98 to 12/02/98. and state that to the best of my knowledge and belief, the Owner has performed exammations and taken corrective measures described in this Owners Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, express or implied, concerning the exammations and corrective measures described in this Ownefs Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

JW Commissions Tex 826 Inspectors Signature National Board, State, Province, and Endorsements B. R. Russe?1 Date 7MI' 19h Oa CL2 WELD-2

1999 ISI - IRE 08 - Component Supports (Class 1) Page1of2 FORM NIS-1 OWNER'S REPORT INSERVICE INSPECTIONS As requircJ by the Provisions of the AS31E Code Rules

1. Owner South Texas Project Nuclear Operatine Companv*: P.O. Box 289: Wadsworth. Texas 77483 (Name and Address ofOwner)
2. Plant South Texas Project Electric Generatine Station: P.O. Box 289: Wadsworth. Texas 77483 (Name and Address ofPlant)
3. Plant Unit 1 4. Owner and Certificate of Authorization (ifrequired) N.A.
5. Conunercial Service Date 08/25/88 6. National Board Number for Unit N.A.
7. Components Inspected ASME Code Class 1 - Component Supports Program Component or Manufacturer or Manufacturer or State or National Appurtenance Installer Installer Serial No. Province No. Board No.

Pressurizer Westinghouse (M) 2141 N.A. Wl8590 Class 1 Piping Supports Ebasco (I) N.A. N.A. N.A.

j "\

  • South Texas Project Nuclear Operating Cornpany(STPNOC)is the licensed operator of the Sou as Project Electric Generating Station STPNOC by [/ ate 1/F!M ArkwrightMutualby W Date b'

jd. C. pung(r Insurance Co. B.R. Russell,ANII CL1SPTS-1

I l 1999 ISI - 1RE08 - Component Supports (Class 1) Page 2 of 2 l l FORM NIS-1 (Back)

8. Exammation Dates 03/31/99 to 04/04/99 9. Inspection Interval from 08/25/88 to 09/24/00

(

l_ ( 10. Abstract of Exammations. Include a list of exanunations and a statement concerning status of work required for i i current interval. (ASME Code Class 1 Component Supports - Piping and Equipment) I l See Appendix B of 1RE08 Summary Report for list of examinations performed. The examinations I

performd this outage constitute a cmnulative percentage completed for the interval is 100%.

I 1. Abstract of Conditions Noted.

None.

12. Abstract of Corrective Measures Recommended and Taken.

None.

We certify that the statements made in this report are coTect and the examinations and corrective measures taken conform to the rules ofASME Code,Section XI.

Certificate of Authorization No.(if applicable) N.A. Expiration Date N.A.

Date Ytf 1922. Signed South Texas Proiect Nuclear Operatine Company b Owner By[M . Ydunger CERTIFICATE OF INSERVICE INSPECTION l

/N h 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by Arkwricht Mutual Insurance Co. of Walthant Mass have inspected the components described in this Ownefs Report during the period 03/31/99 to 04/04/99. and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures det.Tibed in this Ownefs Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer rnakes any warranty, express or implied, 4 concerning the exammations and corrective measures described in this Owners Report. Furthermore, neither the I Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any l kind arising from or connected with this inspection.

( . b Commissions Tex 826 Inspectofs Signature National Board, State, Province, and Endorsements B. R. Russell l Date 7-O'19 b CLISPTS-2

1999 ISI - 1RE08 - Component Supports (Class 2) Page 1 of 2 FORM NIS-1 OWNER'S REPORT INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules (m

1. Owner South Texas Project Nuclear Operatine Comoanv*: P.O. Box 289: Wadsworth. Tg_xas 7748)_

(Name and Address ofOwner)

2. Plant South Texas Project Electric Generatine Station: P.O. Box 289: Wadsworth. Texas 77483 (Name and Address of Plant) i 3. PlantUnit 1 4. Owner and Certificate of Authorization (if required) N.A.
5. Commercial Service Date 08/25/88 6. National Board Number for Unit N.A.
7. Components Inspected ASME Code Class 2 - Component Supports Program Component or Manufacturer or Manufacturer or State or National Appurtenance Installer Installer Serial No. Province No. Board No.

ResidualIIcat Removal Pump 1 A Pacific Pumps (M) 51731 N. A. 343 Low head Safety Injection Pump 1 A Pacific Pumps (M) 51701 N. A. 420 Class 2 Piping Supports Ebasco (I) N. A. N. A. N. A.

/

t 4

i STPh b D '

9 ri hiu y -

y[J.C 6unfer Insurance Co. B.R. Russell,ANII CL2SPT-1

i 1999 ISI - IRE 08 - Component Supports (Class 2) Page 2 of 2 FORM NIS-1 (Back) g 8. Exammation Dates 11/25/98 to 04/12/99 9. InspectionIntervalfrom 08/25/88 to 09/24/00

10. Abstract of Examinations. Include a list of exammations and a statement conceming status of work required for current interval. (ASME Code Class 2 Component Supports - Piping and Equipment)

See Appendix B of the IRE 08 Summary Report for list of examinations performed. The examinations performed this outage constitute a cumulative percentage completed for the interval of 100%

11. Abstract ofConditions Noted.

None.

12. Abstract of Corrective Measures Recommended and Taken.

None.

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of ASME Code,Section XI.

Certificate of Authorization No.(if applicable) N.A. Expiration Date N.A.

Date 7k 1921 Signed South Texas Proiect Nuclear Operatine Comnany By Ih(Of .

Owner [J . Yourfger l

CERTIFICATE OF INSERVICE INSPECTION l r*

l( I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by Arkwricht Mutual Insurance Co. of Walthant Mass have inspected the components described in this Owner's Report during the period 11/2,s/96 to 04/12/99. and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Ownefs Report in accordance with the inspection plan and as required by the ASME Code, Section t

XI.

f By signing this certificate neither the Inspector nor his employer makes any warranty, express or implied, conceming the examinations and corrective measures described in this Owners Report. Furthennore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions Tex 826 Inspector's Signature National Board, State, Province, and Endorsements B. R. Russell Date 7"N'19h j l

( l CL2SPT-2

II 1999 ISI- 1RE08 - Cornponent Supports (Class 3) Page1of2 FORM NIS-1 OWNER'S REPORT INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules l'(,m)

l. Owner South Texas Project Nuclear Oneratine Comnanv*: P.O. Box 289: Wadsworth. Texas 77483 (Name and Address ofOwmer)
2. Plant South Texas Project Electric Generatine Station: P.O. Box 289: Wadsworth. Texas 77483 (Name and Address of Plant)
3. Plant Unit 1 4. Owner and Certificate of Authorization (if required) N.A.
5. Commercial Service Date 08/25/88 6. National Board Number for Unit N.A.
7. Components inspected ASME Code Class 3 - Component Supports Program Component or Manufacturer or Manufactmer or State or National Appurtenance Installer Installer Serial No. Province No. Board No.

Reactor Coolant Purification Pump Goulds Pumps, Inc.

1A (M) N2428077 N. A. 366 Diesel Generator Cooper Energy Auxiliary Skid #11 Senices (M) 8L0101 N. A. N. A.

Diesel Fuel Oil Brown - Minneapolis Storage Tank #11 Tank (M) ll53-01 A N. A. N. A.

Essential Cooling Water Self- Zum Industries, Inc.

Cleaning Strainer (M) 7585 N. A. N. A.

Class 3 Piping

[ Supports Ebasco (1) N. A. N. A. N. A.

V l

,,

  • South Texas Project Nuclear Operating Company (STPNOC) is the licensed operator of the Sout le. s Project Electnc Generatmg Station STPNOC by /f[ P Date //I// Arkwright Mutualby w6Date ounger Insurance Co. B.R. Russell,ANIl

/J CL3SPTS-1

I 1999 ISI - 1RE08 - Component Supports (Citss 3) Page 2 of 2 FORM NIS-1 (Back) i

8. Exammation Dates 01/1369 to 04/14/99 9. InspectionIntervalfrom 08/25/88 to 09'24/00 h 10. Abstract of Exanunations. Include a list of examinations and a statement concerning status of work required for current interval. (ASME Code Class 3 Component Supports - Piping and Equipment) )

See Appendix B of the IRE 08 Summary Report fer list of examinations performed. The examinations performed this outage constitute a cumulative percentage completed for the interval of 100%.

I t. Abstract ofConditions Noted.

None.

12. Abstract of Corrective Measures Recommended and Taken.

None.

We certify that the statements made in this report are correct and the exanunations and corrective measures taken conform to the rules ofASME Code,Section XI.

Certificate of Authorization No.(if applicable) N.A. Expiration Date N.A.

Date 7 19 M Signed __ South Texas Project Nuclear Operatine Comnany By / J.

b Owner ouofer l

CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Rx_aj and employed by Arkwricht Mutual Insurance Co. of Waltham. Mass have inspected the components described in this Ownefs Report during the period 01/13/99 to 04/14/99. and state that to the best of my knowledge and belief, the Owner has performed exammations and taken corrective nrasures described in this Owne/s Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, express or implied, concerning the exammations and corrective measures described in this Owne/s Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions Tex 826 Inspectofs Signature National Board, State, Province, and Endorsements l

B. R. Russell Date D 19h D