MONTHYEARML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20197C3551997-12-31031 December 1997 1RE07 ISI Summary Rept for SG Tubing of STP Electric Generating Station for Unit 1 ML20202D1561997-11-30030 November 1997 1RE07 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 ML20199L7001997-11-12012 November 1997 1REO7 ISI Summary Rept for Repairs & Replacements of STP Electric Generating Station - Unit 1 ML20199L7151997-10-28028 October 1997 1RE07 ISI Summary Rept for Sys Pressure Test (Class 1 & 2) for STP Electric Generating Station, Unit 1 ML20217A5101997-09-0404 September 1997 Supplemental Info to Rev 0,Suppl 2 to ISI Plan for First Insp Interval of STP Electric Generating Station,Unit 1 ML20217A5151997-09-0404 September 1997 Supplemental Info to Rev 0,Suppl 2 to ISI Plan for First Interval of STP Electric Generating Station,Unit 2 ML20148G0871997-05-31031 May 1997 2RE05 ISI Summary Rept for Welds & Component Supports of South Texas Project Electric Generating Station Unit 2 ML20148E7721997-05-19019 May 1997 2RE05 ISI Summary Rept for Repairs & Replacements ML20148E7791997-05-19019 May 1997 2RE05 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20141H1981997-05-0808 May 1997 2RE05 ISI Summary Rept for SG Tubing of STP Electric Generating Station - Unit 2 ML20134B9141996-09-0505 September 1996 1RE06 ISI Summary Rept for Welds,Sg Tubes & Component Supports of STP Electric Generating Station Unit 1 ML20117H5411996-08-29029 August 1996 1RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) STP Generating Electric Generating Station,Unit 1 ML20117H5591996-08-20020 August 1996 1RE06 ISI Summary Rept for Repairs & Replacements STP Generating Station,Unit 1 ML20097B8991996-01-29029 January 1996 2RE04 ISI Summary Rept for Welds,Sg Tubes & Component Supports of STP Electric Generating Station - Unit 2 ML20097A6901996-01-23023 January 1996 2RE04 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) for STP Electric Generating Station,Unit 2 ML20097A3541996-01-23023 January 1996 2RE04 ISI Summary Rept for Repairs & Replacements STP Electric Generating Station,Unit 2 ML20086F9901995-07-0606 July 1995 IRE05 ISI Summary Rept for Welds,Sg Tubes & Component Supports of South Tx Project Electric Generating Station Unit 1 ML20086G9451995-06-29029 June 1995 1RE05 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20085N7831995-06-19019 June 1995 1RE05 Inservice Insp Summary Rept for Repairs & Replacements for South Texas Project Electric Generating Station,Unit 1 ML20073J3941994-09-30030 September 1994 Rept of Summer 1993 & Mar 1994 Testing of SG Tubes of STP Electric Generating Station - Unit 1 ML20072Q7961994-08-24024 August 1994 2RE03 ISI Summary Rept for Welds,Sg Tubing & Component Supports of STP Electric Generation Station Unit 2 ML20072P1991994-08-24024 August 1994 2RE03 Inservice Insp Summary Rept for Sys Pressure Tests at STP Electric Generating Station,Unit 2 ML20072P1391994-08-24024 August 1994 2REO3 Inservice Insp Summary Rept for Repairs & Replacements,Stp Electric Generating Station,Unit 2 ML20056C3431993-05-13013 May 1993 Addendum 1 to 1RE04 Inservice Insp Summary Rept for Repairs & Replacements (Class 1 & 2) at South Texas Project Electric Generating Station,Unit 1 ML20095A9411992-04-0909 April 1992 2RE02 Inservice Insp Summary Rept for Repairs & Replacements,Addendum-1 South Texas Project Electric Generating Station,Unit 2 ML20090L7701992-03-13013 March 1992 2RE02 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station Unit 2 ST-HL-AE-4035, 2RE02 ISI Summary Rept for Repairs & Replacements at South Texas Project Electric Generating Station Unit 21992-03-13013 March 1992 2RE02 ISI Summary Rept for Repairs & Replacements at South Texas Project Electric Generating Station Unit 2 ML20090M5491992-03-12012 March 1992 2RE02 ISI Summary Rept for Welds,Sg Tubing & Component Supports at South Tx Project Electric Generating Station, Unit 2 ML20082A8601991-06-30030 June 1991 1RE03 Inservice Insp Summary Rept for Welds,Steam Generator Tubing & Component Supports of South Texas Project Electric Generating Station Unit 1 ML20076B4891991-06-21021 June 1991 1RE03 Inservice Insp Summary Rept for Repairs & Replacement at South Texas Project Electric Generating Station Unit 1 ML20079D3681991-06-21021 June 1991 1RE03 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project,Unit 1, Including Period from Second Refueling Outage 900621 to Completion of Third Refueling Outage 910404 ML20070J9001991-03-0505 March 1991 2RE01 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project,Unit 2, Including Period from Commercial Operation (890619) to Completion of First Refueling Outage (901211) ML20070K3271991-03-0505 March 1991 2RE01 Inservice Insp Summary Rept for Repairs & Replacements, Covering Period from Commercial Operation (890619) to Completion of First Refueling Outage (901211) ML20070M6101991-03-0404 March 1991 2RE01 Inservice Insp Summary Rept for Welds,Steam Generator Tubing & Component Supports of South Texas Project Unit 2 ML20065D3361990-09-30030 September 1990 1RE02 Inservice Insp Summary Rept for Welds & Component Supports of South Texas Project Electric Generating Station Unit 1 ST-HL-AE-3563, 1RE02 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station,Unit 11990-09-0808 September 1990 1RE02 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station,Unit 1 ML20065D9531990-09-0707 September 1990 1RE02 Inservice Insp Summary Rept for Repairs & Replacement at South Texas Project Electric Generating Station Unit 1 ML20005G7051990-01-31031 January 1990 1RE01 Inservice Insp Summary Rept for Welds,Steam Generator Tubing & Component Supports of South Texas Project Electric Generating Station Unit 1. ML20006A7391990-01-0909 January 1990 1RE01 Inservice Insp Summary Rept for Repairs & Replacements at South Texas Project Electric Generating Station,Unit 1. ML20006A7571990-01-0909 January 1990 1REO1 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station,Unit 1. ML20245L8061989-08-31031 August 1989 Amended Preservice Insp Summary Rept for Class 1,Class 2 & Class 3 Component Supports at South Texas Project Electric Generating Station Unit 2 ML20245A4361989-06-12012 June 1989 Inservice Insp Exam of Component Supports of South Texas Project Electric Generating Station - Unit 2 First Insp Interval ML20245A4811989-05-31031 May 1989 Vols 1 & 2 to First 10-yr Interval Long-Term Inservice Exam Plan for South Texas Project Electric Generating Station, Unit 2, Final Plan with Appendices ML20196B9591988-12-31031 December 1988 Preservice Insp (PSI) Summary Rept for Class 1,Class 2 & Class 3 Component Supports at South Texas Project Electric Generating Station Unit 2. Rept Reviews Bases for PSI Program & Describes Scope of PSI Exams 1999-07-07
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
. . . . . .. .- . - _ _ .. - .--
l.
COVER SHEET 1RE06 INSERVICE INSPECTION
SUMMARY
REPORT FOR SYSTEM PRESSURE TESTS >
( CLASS 1 AND 2 ) ;
j SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 1
! P. O. BOX 289
- WADSWORTH, TEXAS 77483 USNRC DOCKET NO
- 50-498 OPERATING LICENSE NO: NPF-76 COMMERCIAL OPERATION DATE: AUGUST 25, 1988 b f~
/
B. J. 5H!of't,' Consulting Engineer y: .
'W. R. Harris. ' Supervising Engineer y; [d/ f M 5.'Tashley,' i - Reliability Engineering Division J
v609090318 960829 8 DR ADOCK 0500
i i- -
SCOPE 1
5 1RE06 SYSTEM PRESSURE TESTS 1
! The examinations summarized in this report were performed in j accordance with the 1983. Edition through Summer 1983 Addenda of j the ASME Code,.Section XI which is applicable to the South Texas
- Project Electric Generating ~ Station, Unit 1. This report covers I
selected ASME Code Class 1 and 2 Systems / Components. Examinations and tests required by the Code are scheduled in accordance with
" Inspection Program B" as defined in IWB-2412 and'IWC-2412 for ASME Code Class 1 and 2 Systems / Components. All ASME Code Class 1 components were examined as prescribed by Table IWB-2500-1, Examination Category B-P which established the examination frequency at each refueling outage. The ASME Code Class 2 Systems / Components were selected'on a' prorated basis. This prorated selection process will continue until all ASME Code Class 2-Systems / Components are examined in accordance with Table-2500-1, Examination Category C-H. This examination category for ASME Code Class 2-Systems / Components established the examination frequency at each. inspection period. The remaining third period examinations are anticipated to be completed by the end (9-24-99) of the third inspection period.
The System Leakage Test [IWA-5211(a)] conducted on Class 1 Systems / Components in accordance with Examination Category B-P also satisfied the pressure tests required by IWA-5214(e) subsequent to the disassembly and reassembly of mechanical jointe in ASME Code Class 1 Systems / Components. j l
I l
i
-. ,_ . . - - , - . . . -. - - - . . . . - , , . . - ,. .n
T Page I of 3 FORM NIS-1 OWNERPS REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules l
6 1.' Owner Houston Lichtinc & Power Company Electric Tower. P. O. Box 1700. Houston . TX 77001
- 2. Plant South Texas Project Electric Genciptine Station P.O. Box 289. Wadsworth. TX 77483 .
- 3. Plant Unit 1 4. Owner Certificate of Authorization (if required) N/A I
- 5. Commercial Service Date 08/25/88 6. National Board Number for Unit N/A !
.i
- 7. . Components inspected ASME CODE CLASS 1 PIPING AND COMPONENTS Component or Manufacturer Manufacturer or State or National Appurtenance or Installer Installer Serial Province Board No.
i No. No.
! REACTOR VESSEL COMBUSTION ENGR / 11073 N/A 22190 IR10lNRV101 A WESTINGHOUSE (M)
STM. GENERATOR 1A WESTINGHOUSE (M) 2131 N/A W18691 1R121NSG10!A STM.GENERATORIB. WESTINGHOUSE (M) 2132 N/A W18692 1R 121NSG101B STM.GENERATORIC WESTINGHOUSE (M) 2133 N/A W18693 I R121NSG101C
- l. STM. GENERATOR 1D WESTINGHOUSE (M) 2134 N/A Wl8694 l 1R121NSG101D PRESSURIZER 1 A WESTINGHOUSE (M) 2141 N/A W18590 IR!!1NPZ101 A ,
RC PUMP I A WESTINGHOUSE (M) 1-il5E580G01 N/A 28 1R131NPP101 A RC PUMP IB WESTINGHOUSE (M) 2-Il5E580G01 N/A 29 1R131NPP101B RC PUMP IC WESTINGHOUSE (M) 3-ll5E580G01 N/A 30 1R131NPP101C RC PUMP 1D WESTINGHOUSE (M) 4-115E580G01 N/A 31 1R131NPP101D CLASS 1 PIPING EBASCO (I) N/A N/A CLASS 1 VALVES VARIOUS N/A N/A N/A 1
l l
4 i
4 1
! Note: Supplemental rhects in the form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in.,(2) l information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the l number of sheets is recorded at the top of this form.
4
}
4 A- , . , . . ,, .,. -.
. . 1 Page 20f 3 i
i FORM NIS-1 (Hack) fl. Examination Dates 06/22/95 to 07/24/96 9. Inspection Interval from 08/25/88 to 09/24/99 1
l
- 10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for ,
i current interval. Refer to Supplemen'. I P' eet Page 3 of 3.
I 1. Abstract of conditions Noted No relevant conditions affecting pressure retaining boundaries were noted. )
- 12. Abstract of Corrective Measures Recommended and Taken j 4
Refer to Supplemental Sheet Page 3 of 3. 1 I We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to i the rules of the ASME Code,Section XI. i Certificate of Authorization No. (if applicable) N/A Expiration Dat N/A j Date M 20 19 95 Signed Houston Lichtinc & Power Co. By Owner [ TJ Jordan ystems Engineering Manager 4
i ..
i CERTIFICATE OF INSERVICE INSPECTION i
$ I 1, the undersigned, holding a valid commission issued by the Natic tal Board of Boiler and Pressure Vessel Inspectors i and the State or Province of Texas and employed by Arkwricht Ii tual Insurance Co. of N_orwood. MASS. have inspected the components described in this Owner's Report during ~he period 6-22-6/JiiP214-47Go 3 and state that to the best of my knowledge and belief, the Owner hr. performed examinationsand taken corrective
- measures described in this Owner's report in accordance with the ir,spection plan and as required by the ASME Code,Section XI. '
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning j I
i- the examinations and corrective measures described in this Owner's Report. Furthermoie, neither the Inspector nor his j employer shall be liable in any manner for any personal injury or porperty damage or a loss of any kind arising from or i connected with this inspection. i f I t m # Commissions TX-821._
B. R. Russell, inspector's Signature National Board, State, Province, and Endorsements Date _ j~~J*d - ___ _19fd ._
l l
1
. Page3 of 3 SUPPLEMENTAL PAGE FOR ASME CODE CLASS 1 PIPING AND COMPONENTS
- 1. Owner Houston Lichtinc & Power Company Electric Tower. P. O. Box 1700. Houston . TX 77001
- 2. Plant Equi.).T,s_xas l Poriect Electric Generatine Station P.O. Box 289. Wadsworth. TX 77483
- 3. Plant Unit 1 4. Owner Certificate of Authorization (if required) N/A
- 5. Commercial Service Date 08/25/88 6. National Board Number for Unit N/A
- 10. ABSTRACT OF EXAMINATIONS i
A System Leakage Test as prescribed in IWA-5211(a) for all ASME Code Class 1 Pressure Retaining Conponents was conducted in accordance with Table IWB-2500-1, Examination Category B-P, Item Nos. B15.10, B15.20, B 15.30, l B 15.40, B 15.50, B 15.60, and B 15.70.
The Pressure Test and VT-2 visual examinations were conducted in accordance with Plant Surveillance Pressure Test Procedure, OPSP15.RC-000), Reactor Coolant System Leakage Pressure Test (Rev. 3) at the conclusion of the sixth l
refueling outage. ASME Code Class 1 piping and valves are specifically identified in the above reference procedure. j Also. System Pressure Tests subsequent to all of the disassembly and reassembly of mechanicaljoints in ASME Code Class I components as prescribed by IWA-5214(e) were conducted in accordance with OPGP03-ZE-0027, ASME Section XI Repair, Replacement and Post-Maintenance Pressure Testing (Rev. 9) for individual work items performed during the sixth refueling outage as a result of the performance of the System Leakage Pressure Test described above.
- 12. ABSTRACT OF CORRECTIVE MEASURES RECOMMENDED AND TAKEN The Visual Examinations (VT-2) performed during the Pressure Test found minor leakage at mechanical joints such as valve stems and flanged connections. These leaks were evaluated and determined acceptable for continued operation.
Appropriate corrective action was initiated to correct these leaks.
l l
1 i
l
Page I of 3 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS
, As required by the Provisions of the ASME Code Rules
- 1. Owner Houston Lichtinc & Power Comnany Electric Tower. P. O. Box 1700. Houston . TX 77001
- 2. Plant South Texas Proiect Electric Generatine Station P.O. Box 289. Wadsworth. TX 77483
- 3. Plant Unit i 4. Owner Certificate of Authorization (if required) N/A
- 5. Commercial Service Date 08/25/88 6. National Board Number for Unit N/A
- 7. - Components Inspected ASME CODE CLASS 2 PIPING AND COMPONENTS Component or Manufacturer Manufacturer or State or National Appurtenance or Installer Installer Serial Province Board No.
No. No.
RWST I A BROWN I100-15 N/A N/A 2N121NTF101 A MINNEAPOLIS (M)
HHSI PUMP I A PACIFIC PUMPS (M) 51695 N/A 382 2N121NPA101 A HHSI PUMP IB PACIFIC PUMPS (M) 51696 N/A 383 2N121NPA101B HHSI PUMP lc PACIFIC PUMPS (M) 51700 N/A 402 2N121NPA101C LHS1 PUMP 1 A PACIFIC PUMPS (M) 51701 N/A 420 2N121NPA102A LHS1 PUMP IB PACIFIC PUMPS (M) 51702 N/A 421 2N121NPA102B LHS1 PUMP IC PACIFIC PUMPS (M) 51703 N/A 422 2N121NPA102C CS PUMP I A PACIFIC PUMPS (M) 51707 N/A 441 2N10lNPA101 A CS PUMP 1B PACIFIC PUMPS (M) 51708 N/A 441 2N10lNPA101B CS PUMP IC PACIFIC PUMPS (M) 51709 N/A 442
_2N101NPA101C SI ACCUM TANK I A SOUTHWEST FAB (M) 0043 N/A 362 2N121NRC101 A SI ACCUM TANK IB SOUTHWEST FAB (M) 0044 N/A 363 i 2N121NRC101B SI ACCUM TANK IC SOUTHWEST FAB (M) 0045 N/A 364 2N121NRC101C ASSOCIATED CLASS 2 EBASCO (1) N/A N/A PIPING ASSOCIATED CLASS 2 VARIOUS N/A N/A N/A VALVES Note: Supplemental sheets in the form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 1 I in.,(2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
, Page 3 of 3
, FORM NIS-I (Hack)
- 8. Examination Dates 06/22/95 to 07/24/96 9. Inspection Interval from 08/25/88 to 09/24/99 1
- 10. Abstract of Examinations Include a list of examinations and a statement concerning status of work required for I current interval. Refer to Supplemental Sheet Page 3 of 3.
l 1
- 11. Abstract of conditions Noted '
I No relevant conditions affecting pressure retaining boundaries were noted,
- 12. Abstract of Corrective Measures Recommended and Taken !
Refer to Supplemental Sheet Page 3 of 3. l l
We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to l the rules of the ASME Code,Section XI.
Certificate of Authorization No. (if applicable) N/A Expiratio ate N/A Date 9 !80 19 N Signed _ Houston Lichtinc & Power Co. By _
/ Owner
/ TJ Jordan Systems Engineering Manager CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by Arkwricht Mutual Insurance Co. of Norwood. M ASS. have inspected the components described in this Owner's Report during the period 6-22-96' to M #-@ ,
and state that to the best of my knowledge and belief, the Owner has performed examinationsand taken corrective measures described in this Owner's report in accordance with the inspection plan and as required by the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, nei'her the Inspector nor his employer shall be liable in any manner for any personal injury or porperty damage or a loss of any kind arising from or connected with this inspection.
_ Commissions TX-826 B. R. Russell, Inspector's Signature National Board, State Province, and Endorsements i
Date__ _ _ _ _ N_~ _19_h__
1 ww
~ ,.
. Page 3 of 3
~ ' SUPPLEMENTAL PAGE FOR ASME CODE CLASS 2 PIPING AND COMPONENTS
- 1. Owner Un91!np Lichtinc & Power Company Electric Tower. P. O. Box 1700. Houston . TX 77001
- 2. Plant South Texas Poriect Electric Generatine Station P.O. Box 289. Wadsworth. TX 77483
- 3. Plant Unit 1 4. Owner Certificate of Authorization (if required) N/A
- 5. Commercial Service Date 08/25/88 6. National Board Number for Unit N/A
- 10. ABSTRACT OF EXAbilNATIONS System Functional and inservice Pressure Tests as prescribed by IWA-5211(b) and (c), respectively, were conducted on selected A SME Code Class 2 pressure retaining components in accordance with Table IWC-2500-1, Examination Category C-H, Item Nos. C7.10, C7.30, C7.50, and C7.70.
The Pressure Tests and VT-2 visual examinations were conducted during the third period of examination in accordance with the following Plant Surveillance Pressure Test Procedures:
OPSP15-CS-0001 Containment Spray System Functional Pressure Test (Rev. 2)
OPSP15-FW-0001 Feedwater System Inservice Pressure Test (Rev.1)
OPSP15-RC-0001 Reactor Coolant System Leakage Pressure Test (Rev. 3)
OPSP15-SI 0001 Safety Injection System Functional Pressure Test (Rev. 0)
ASME Code Class 2 piping and valves are specifically identified in the above referenced procedures. These tests were conducted during the time period of May 17,1996 to July 24,1996.
- 12. ABSTRACT OF CORRECTIVE MEASURES RECOMMENDED AND TAKf;E The Visual Examinations (VT-2) performed during the Pressure Test found minor leakage at mechanicaljoints such as valve stems and flanged connections. These leaks were evaluated and determined accepable for continued operation.
Appropriate corrective action was initiated to correct these leaks.