2RE04 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) for STP Electric Generating Station,Unit 2
ML20097A690
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 01/23/1996
From: Kent A, Lashley M, Pathak A
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20097A677 List:
References
NUDOCS 9602060129
Download: ML20097A690 (8)


Text

_.

4 COVER SHEET l

2RE04 INSERVICE INSPECTION

SUMMARY

REPORT FOR SYSTEM PRESSURE TESTS

( CLASS 1 AND 2 )

1 j

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 2 i

P.O. BOX 289 WADSWORTH, TEXAS 77483 USNRC DOCKET NO: 50-499 4

OPERATING LICENSE NO: NPF-80 i

COMMERCIAL OPERATION DATE: JUNE 19,1989 l

Prepared by:

Ma /G4

/ /r-94 A.T. Pahak, Consulting Engineer Reviewed by:

/

/O

[" 2,1-9h M. Sll'dgpfeV,"

ising Engineer bf0&

O Approved by:

A. P. Kent, Manager - Reliabilty Engineering Division 9602060129 960130 PDR ADOCK 05000499 G

PDR

SCOPE 2RE04 SYSTEM PRESSURE TESTS The examinations summarized in this report were performed in accordance with the 1983 Edition through Summer 1983 Addenda of the ASME Code Section XI which is applicable to the South Texas Project Electric Generating Station Unit 2.

This report covers selected ASME Code Class 1 and 2 systems and components. Examinations and tests required by the Code are scheduled in accordance with " Inspection Program B" as defined in IWB-2412 and IWC-2412 for ASME Code Class 1 and 2 systems / components respectively. All ASME code Class 1 components were examined as prescribed by table IWB-2500-1, Examination Category B-P which established the examination frequency at each refueling outage. The ASME Code Class 2 systems / components were selected on a prorated basis. This selection process will continue until all ASME Code Class 2 systems / components are examined in accordance with Table IWC-2500-1, Examination Category C-H for ASME Code Class 2 systems / components. This examination category establishes the frequency at each inspection period. These pressure tests are performed in the second period of examination. The remaining second period examinations are anticipated to be completed by the end of the second inspection period time frame.

The System Leakage Test (IWA-5200(a)] conducted on i

Class 1 systems / components in accordance with Examination Category B-P, also satisfied the system pressure test required by IWA-5214(e) subsequent to the disassembly and reassembly of mechanical joints in ASME Code Class 1 components.

c-

FORM NI>1 CWNER'S REPORT FOR IN;ERVICE INSPECTIONS Ptg31 of 3 As required by the Prsvi;lInc cf the ASME Cod 3 Rules 1.

Owner Houston Ughting & Power Comoany Electric Tower. P.O. Box 1700. Houston. TX 77001 (Name and Address of Owner) 2.

Plant South Texas Project Electric Generatino Station P.O. Box 289. Wadsworth. TX 77481,.

(Name and Address of Owner) 3.

Plant Unit 2

4. Ownct Certificate of Authorization (if required)

N/A 5.

Commercial Service Date 06/19/89

6. National Board Number for Unit N/A 7.

Components inspected ASME CODE CLASS 1 PIPING AND COMPONENTS Manufacturer g

Component or Manufacturer or installer Province Appurtenwice or Installer Serial No.

No.

j i

REACTOR VESSEL COMBUSTION ENGINEERING /

11073 WA 22190 1R102NRV201 A WESTINGHOUSE (M) j WESTINGHOUSE (M) 2131 N/A W18091 2NS S

WESTINGHOUSE (M) 2132 N/A W18692 R 2NSG2 B WESTINGHOUSE (M) 2133 N/A W18693 R

NS C

WESTINGHOUSE (M) 2134 N/A W18694

,s R

NSG2 D WESTINGHOUSE (M) 2141 N/A W18590 R 2NP 0A ESMMWSE (M) 1-115E580@1 WA 28 R132NPP201A ESMMWSE @)

2-115E580@1 WA 29 R1 2NPP201B ESMMWSE @)

3415E580@1 WA 30 R1 2NPP201C WESTINGHOUSE (M) 4-115E580G01 N/A 31 R1 2NPP201D EBASCO (1)

N/A N/A N/A I

G VARIOUS N/A N/A N/A ES Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet. and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

NtM.CLt.2RE03

^ - ".

F2RM NIS-1 ("ack)

Ppge 2'of 3 8.

Examination Dates 05/31/94 to 11/15/95

9. Inspection Interval from 06/19/89 to 10/19/2000,
10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval. Refer to Supplemental Sheet Page 3 of 3.
11. Abstract of Conditions Noted No relevant conditions affecting pressure retaining boundaries were noted.
12. Abr*ract of Corrective Measures Recommended and Taken Refer to Supplemental Sheet Page 3 of 3.

We certify that the statements made in this report are correct and the examinations an corrective measures taken conform to the rules of the ASME Code,Section XI.

l Certificate of Authorization No. (if applicable)

N/A Expiration Date N/A Date If I7 19 % Signed Houston Llahting & Power Co.

By

/

Owner g 'ms.J. Jordan T

Syste Engineering Manager CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Teram and ernployed by Arkwrlaht MutualInsurance Co. of _

Norwood. MASS.

have inspected the components described in this Owner's Report during the period A/d-M to F /'7-46

. and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

p By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concoming the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the inspector nor his empfeyer shall be liable in any manner for any personal injury or property dama or a loss of any kind arising from or connected with this inspection.

t//f/%.

~

4W h

___ Commissions TX-826 B.R. Russell, inspector's Signature National Board, State Province, and Endorsements

/

19 b Date

[

t NI$1.CW.2RCO3

SUPPLEMENTAL F:IR P;ge 3 cf 3 ASME CODE CLASS 1 PIPIN3 AND C2MPONENTS 1.

Owner _ Houston Lighting & Power Comoany Electric Tower. P.O. Box 1700. Houston. TX 77001 (Name and Address of Owner) 2.

Plant South Texas Proiect Electric Generatina Station P.O. Box 289. Wadsworth. TX 77483 (Name and Address of Owner) 3.

Plant Unit 2

4. Owner Certificate of Authorization (if required)

N/A 5.

Commercial Service Date 06/19/89

6. National Board Number for Unit N/A 10.

ABSTRACT OF EXAMINATIONS A System Leakage Test as prescribed by IWA 5211 (a) for all ASME Code Class 1 Pressure Retalning Components was conducted in accordance with Table IWB-2500-1, Examination Category B-P, item Nos. B15.10, B15.20, B15.30, B15.40, B15.50 B15.60 and 815.70.

The Pressure Test and VT 2 visual examinations were conducted in accordance with Piant Surveillance Pressure Test Procedure, OPSP15-RC-0001, Reactor Coolant System Leakage Pressure Test (Rev. 2) at the condusion of the fourth refueling outage. ASME Code Class 1 piping and valves are specifically identified in the above referenced procedure, in addition, the above System Leakage Test also satisfied the requirement for a System Pressure Test subsequent to the disassembly and reassembly of mechanical joints in ASME Code Class 1 components as prescribed by IWA-5214 (e).

Also, System Pressure Terts subsequent to the disassembly and reassembly of mechanical joints in ASME Code Class 1 components as prescribed by IWA-5214 (e) were conducted in accordance with OPGP03 ZE-0027, ASME Section XI Post-Maintenance Pressure Test (Rev. 9) for individual work items performed outside the scope of the fourth refueling outage.

12.

ABSTRACT OF CORRECTIVE MEASURES RECOMMENDED AND TAKEN The Visual Examinations (VT-2) performed during these Pressure Tests found minor leakage at mechanical joints such as valve stems and flanged connections. These leaks were evaluated and determined acceptable for continued system operation. Appropriate corrective action was initiated to correct these leaks.

NISt CLt2REO3

4 FORM NIS-1 OWNER'S REPORT FCR INSERVICE INSPECTIONS Piga 1 of 3 As requir:d by the Provisions of the ASME Code Rults l

l 1.

Owner Houston Llahtina & Power Comoany Electric Tower. P.O. Box 1700. Houston. TX 77001 (Name and Address of Owner) 2.

Plant South Texas Project Electric Generatina Station P.O. Box 289. Wadsworth. TX 77483 (Name and Address of Owner) 3.

Plant Unit 2

4. Owner Certificate of Authorization (if required)

N/A l

5.

Commercial Service Date 06/19/89

6. National Board Number for Unit N/A 7.

Components inspected ASME CODE CLASS 2 PIPING AND COMPONENTS Manufacturer Component or Manufacturer or installer State or National Appurtenance or Installer Serial No.

Province No.

Board No.

CLASS 2 PIPING EBASCO N/A N/A N/A CLASS 2 VALVES VARIOUS N/A N/A N/A 4

2 4

i Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provide j (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 ort this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

NIS1.CL2.2RE03

FORM NIS-1 (Back)

Pjg) def 3 8.

Examination Dates 05/31/94 to 11/15/95

9. Inspection Interval from 06/19/82_ to 10/19/2002,
10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval. Refer to Supplemental Sheet Page 3 of 3.
11. Abstract of Conditions Noted No relevant conditions affecting pressure retaining boundaries were noted.
12. Abstract of Corrective Measures Recommended and Taken Refer to Supplemental Sheet Page 3 of 3.

We certify that the statements made in this report are correct and the examinations an corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No. (if applicable)

N/A Expiration Date N/A Date 19 N Signed Houston Liohtino & Power Co.

By h

Owner

' T.J. Jordan ystems Engineering Managor CERTIFIOATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boller and Pressure Vessel Inspectors and the State or Province of Texas and employed by.A@yrioht Mutual Insurance Co. of Norwood. MASS.

have inspected the components described in this Owners Report during the period M-/o-&f to

/- / 7-8G

. and state that to the best of my knowledge and belief, the Owner has perfonned examinations and taken correctivs measures described in this Owners Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, j

concoming the examinations and corrective measures described in this Owners Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of an nd arising from or connected with this inspection.

  • /E O

Commissions TX-826 B.R. Russell, inspectors Signature National Board, State Province, and Endorsements Date 1g NIS1.cl.2.2 RE04

~

SUPPLEMENTAL FOR Pcge 3 cf 3 ASME CaDE CLASS 2 PIPING AND COMPONENTS l

)

1.

Owner Houston Llahtina & Power Conmany Electric Tower. P.O. Box 1700. Houston. TX 77001 (Name and Address of Owner) 2.

Plant South Texas Proiect Electric Generatina Station P.O. Box 289. Wadsworth. TX 77483 (Name and Address of Owner) 3.

Plant Unit 2

4. Owner Certificate of Authorization (if required)

N/A 5.

Commercial Service Date 06/19/89

6. National Board Number for Unit N/A j

10.

ABSTRACT OF EXAMINATIONS System inservice Tests as prescribed by IWA 5211 (c) were conducted on selected ASME Code Class j

2 Pressure Retaining Components in accordance with Table IWC-2500-1, Examination Category C-H, J

ltem Nos. C7.30 and C7.70.

The Pressure Tests and VT 2 visual examinations were conducted during the second period of examination in accordance with the following Plant Surveillance Pressure Test Procedures:

OPSP15-CM-0001 - RCB H, Monitoring Functional Pressure Test, (Rev. 5)

OPSP15 FW-0001 - Feedwater System inservice Pressure Test (Rev. 0)

OPSP15-RC-0001 - Reactor Coolant System Leakage Pressure Test, (Rev.1)

ASME Code Class 2 piping and valves are specifically identified in the above referenced procedures.

These test procedures were conducted during the time period of May 31,1994 to November 15,1995.

12.

ABSTRACT OF CORRECTIVE MEASURES RECOMMENDED AND TAKEN The Visual Examinations (VT 2) performed during these Pressure Tests found only minor leakage at mechanical joints such as valve stems and flanged connections. These leaks were evaluated and determined acceptable for continued system operation. Appropriate corrective action was initiated to

.?

correct these leaks.

i NISI.cL2.2 Pro 3