ML20217A510

From kanterella
Jump to navigation Jump to search
Supplemental Info to Rev 0,Suppl 2 to ISI Plan for First Insp Interval of STP Electric Generating Station,Unit 1
ML20217A510
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 09/04/1997
From: Beverly R, Jordan T, Murry C
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20217A508 List:
References
NUDOCS 9709190204
Download: ML20217A510 (3)


Text

.

l 1 ' .

l f

l l

l SOUTli TEXAS PROJECT ELECTRIC GENERATING STATION 1

i l INSERVICE INSPECTION PLAN FOR TIIE FIRST INSPECTION INTERVAL l

ofthe i

SOUTH TEXAS PROJECT l ELECTRIC GENERATING STATION - UNIT I i REVISION 0, SUPPLEMENT 2 l P.O. Box 289 j Wadsworth, Texas 77483 l

Owner: 11ouston Lighting and Power Company i City Public Service Board of San Antonio Central Power and Light Company

City of Austin Address
P.O. Box 1700 llouston, Texas 77251 4

j Commercial Operation: August 25,1988 l Issue Date: AUGUST 25,1997 4

i 97o9190204 970911 ADOCK 0500 0 gDR

INSERVICE INSPECTION PLAN FOR Tile FIRST INSPECTION INTERVAL ofthe SOUTII TEXAS PROJECT ELECTRIC GENERATING STATION - UNIT 1 REVISION 0, SUPPIsEMENT 2 USNRC DOCKET NO.: 50-498 OPERATING LICENSE NO.: NPF-76 COMMERCIAL OPERATION DATE: AUGUST 25,1988 Prepared by:

Au]Al '

/Ad' 8 !20!7 7'

' ' k. L. Beverl. I / Date ISI Engineer J A

~

Reviewed by: 0% 'i 7A $ 7 C.A. Murry ' Date Supen'isor - Section XI Section Approved by: 1 Mw //97

'/ [* '

f anager - Systems Engineering Department T.J. Jordan 'liate s

South Texas Project Electric Generating Station

. Unit 1 Docket No STN $0-498 "Reyision 0. Supplement 2. to ISI Plan for First inspection Interval" Supplement 2, to the ISI Plan for the First inspection interval, adds the following Section XI Code Cases to Section 2.1.5 of the Plan:

N-401-1 " Eddy Current Examination" N-408-2 " Alternate Rules for Examination of Class 2 Piping" N-4161 " Alternative Pressure Test Requirement for Welded Repairs or installation of Replacement items by Welding, Class 1,2, and 3" N-427 " Code Cases in Inspection Plans" N 4291 " Alternate Rules for Ultrasonic Instrument Calibration" N-461 " Alternative Rules for Piping Calibration Block Thickness" N 481 "Alterna'e Examination Requirements for Cast Austenitic Pump Casings" N 546 " Alternative Requirements for Qualification of VT 2 Examination Personnel"

- .J