' SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV. l

  • NO. 1 Chapter 1.0 9

l OPERATIONS QUALITY ASSURANCE PLAN PAGE 1 OF 6 ORGANIZATION EFFECTIVE DATE 2-1-98 1.0 PURPOSE 1

1.1 The purpose of this chapter is to describe the organizational structure as related to quality assurance and to establish the responsibilities of organizations for the South Texas Project Electric Generating Station (STP).

2.0 SCOPE l

5 {

2.1 STP Nuclear Operating Company (STPNOC) , as licensee, M has the Quality responsibility for design, engineering, D procurement, fabrication, modification, maintenance, lE.

repair, in-service inspection, refueling, testing, and 9 operation of the STP. 2@

2.2 The requirements of this chupter are applicable for structures, systems, and camponents designated as

" Full", " Targeted", or " Basic".

3.0 DEFINITIONS 3.1 None -

4.0 REFERENCES

4.1 None 5.0 RESPONSIBILITIES e.s m

o' 5.1 The STPNOC is comprised of Generation, Engineering & d l Technical Services, Business Services, and Safety and T Quality Concerns Program. The senior management of l(

these groups report to the President and Chief 9 Executive Officer.

2$

)

l 5.1.1 The President and Chief Executive Officer has {

overall responsibility for the implementation i of the Operations Quality Assurance Program l i and approving the Operations Quality l Assurance Plan (OQAP) and revisions therato.

I i

9907270244 990721 PDR ADOCK 05000498 P PDR L

' SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

NO.

Chapter 1.0 9 OPERATIONS QUALITY ASSURANCE PLAN PAGE 2 OF 6 ORGANIZATION EFFECTIVE DATE 2 1-98 5.1.2 The Vice President, Generation is responsible  !

for implementing quality program requirements applicable to staffing STP with qualified gj personnel and acquiring and coordinating the o assistance of internal and external 4 organizations for the following functions  %

including: plant management, operations support, outage and installation, and metrology & radiological laboratories. The senior management of these functions report to the Vice President, Generation.

5.1.2.1 The Plant Manager has prime l responsibility for the safe 1 operations of the units. The plant 1 staff, under the direction of the qp Plant Management, develop detailed o procedures and instructions for ,

testing, operation, modification, 95 and maintenance of the STP.

5.1.3 The Vice President, Engineering & Technical Services (E&TS) is responsible for implementing quality program requirements applicable to the following functions:

design engineering and control, systems engineering, fuels & analysis, engineering support, quality & licensing, operating experience, risk management & industry relations, plant protection, and training e functions. The senior management of these 77 functions report to the Vice President, E&TS.

9.

m The Vice President, E&TS is responsible for 5) the development, maintenance, and independent g verification of implementation of the STP Ouality Program; making periodic reports on its effectiveness; review of selected documents which control activities within its scope; and preparation, control, and approval of the OQAP and revisions thereto.

' SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

NO, Chapter 1.0 9 OPERATIONS QUALITY ASSURANCE PLAN PAGE 3 OF 6 ORGANIZATION EFFECTIVE DATE 2-1-98 The Vice President, E&TS is responsible for implementing quality program requirements if-gi applicable to corrective action, licensing, o and independent oversight activities, and administration of the Nuclear Safety Review

$f 9

Board (NSRB). 4E The Vice President, E&TS has the authority to identify, initiate, recommend, or provide d solutions to quality-related problems and verify the implementation and effectiveness lg ee -

of the solutions. This position has the independence to conduct Quality activities @ -

without undue pressure of cost or schedule, d5 5.1.3.1 The NSRB administrative 1y reports to the senior management of the $k Risk Management & Industry C Relations function. The NSRB M functionally reports directly to O and advises the President and Chief d$

Executive Officer.

5.1.3.2 The senior management of the 4 Quality & Licensing function is responsible for independent g

4 oversight activities, including ,

audits, independent assessments, g%

evaluations, surveillances, s-performance monitoring, inspections y and independent oversight of NDE examinations. 2E' 5.1.3.3 The senior management of the Quality & Licensing function, at a his discretion, reports directly to is the President and Chief Executive -

Officer. During performance of hh independent oversight of activities sc relating to Licensing, the T ' l management of the Plant Support C; function, at his discretion, may 9 report to the President and Chief 26 Executive Officer.

l 1

i

' SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

NO.

Chapter 1.0 9 OPERATIONS QUALITY ASSURANCE PLAN PAGE 4 OF 6 ORGANIZATION EFFECTIVE DATE 2-1-98 5.1.3.4 The senior management of the Quality & Licensing function has the authority to stop work for cause. This authority has been ifo granted by the Fresident and Chief g{

Executive Officer. The Quality o organization, including the W' inspection staff, is based upon the $

anticipated Quality involvement in -

operations, modification, and 3h maintenance activities.

5.1.3.5 The senior management of the Risk Management & Industry Relations function is responsible for activities related to the ih Comprehensive Risk Management o ,

Program, including oversight of $; j Probabilistic Safety Assessment 9 l activities. The senior management [g 1

of the Risk Management & Industry Relations function also serves as the Graded Quality Assurance Expert Panel chairperson.

5.1.4 The Vice President, Business Services is responsible for implementing quality program d requirements applicable to the following l5 functions: human resources, planning & O' '

controls, projects & programs, contracts & 1 steam generator replacement, information Rf systems, emergency response and 0 ,

i communications, records management services g and administration, and purchasing and material management for STP. T.he senior 3-O l

management of these functions report to the 4 Vice President, Business Services.  %:

5.1.5 The Vice President and Special Assistant to the President and Chief Executive Officer is }a responsible for implementing quality program s' requirements applicable to this position, g,..

m 5.1.6 The Director, Safety Quality Concerns Program E' (SQP) , is responsible for implementing U j$

quality program requirements applicable to the SQP. '

35

.  : \

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

NO.

Chap;e; 1.0 9 OPERATIONS QUALITY ASSURANCE PLAN PAGE 5 OF 6 ORGANIZATION EFFECTIVE D,O E 2-1-9'.

6.0 REOUIREMENTS 6.1 The fundamental responsibility for inplementing quality program requirements is assigned to all personnel performing activities affecting the safe and reliable operation of the STP. These personnel and their management are responsible for implementing through approved procedures and other work documents, the quality assurance program controls described in the OQAP.

6.2 Attachment 1 depicts the organizational structure of the STP as it relates to the implementation of the Operations Quality Assurance Plan. The structure reflects the reporting alignment for key functions. h9 Line organizational details and responsibilities are further described in STP UFSAR Chapter 13.1. g 7.0 DOCUMENTATION 7.1 None 8.0 ATTACHMEN'I l do T

8.1 Attachment 1 - STPNOC Organization 0 E.

o o

1

- 1

.  : l SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV,

  • NO.

Chapter 1.0 g OPERATIONS QUAllTY ASSURANCE PLAN PAGE 6 OF G ORGANIZATION EFFECTIVE DATE 2-1 98 ATTACHMENT 1 J l

STPNOC ORGANIZATION 4

r- U"E I

I i j i i [

T.:.T~ ,W,.~ l ~= ~~

. - - . "W.".  %

! M l D

. _ . _ i , _ = .

5 l m '

Demon 6,===g omes. _ == man.n aus. - men d ,

i g

__ j _ _ . -

g l

  • W .j n,"d md _.

4' M

M*n ' --

. . , _ .-._ 4

. _ . _ _ =.

1 y_ n' *-

T

. u mummm 4

.SOUT.H TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV, N O.

OPERATIONS QUALITY ASSURANCE PLAN INDEPENDENT TECHNICAL REVIEW PAGE 1 OF 3 EFFECTIVE DATE 07/05/99 1.O PURPOSE 1.1 The purpose of this <:hapter is to describe the requirements and responsibilities for independent technical review for the South Texas Project Electric Generating Station (STPEGS).

2.0 SCOPE 2.1 This chapter describes the independent technical review activities within the scope of the Operations Quality Assurance Plan (OQAP).

3.0 DEFINITIONS 3.1 None 4.O REFERENCES 50 4.1 OQAP Chapter 1.0, Organization 4.2 OQAP Chapter 2.0, Program Description 4.3 OQAP Chapter 4.0, Qualification, Training, and Certification of Personnel 4.4 OQAP Chapter 13.0, Deficiency Control 4.5 OQAP Chapter 14.0, R':ords Control 4.6 OQ4P Chapter 15.0, Qualj Oversight Activities 5.0 RESPONSIBILITIES c) 5.1 The Vice President, Engineering & Technical Services is responsible for implementing quality program requirements

)

including independent technical review.

g 5.2 The senior management of the Quality & Licensing function w is responsible for independent oversight activities performed to accomplish the independent technical 3 -

reviews. E l 6.0 REOUIREMENTS 6.1 Independent oversight activities, as described in Reference 4.6, shall be performed in accordance with implementing procedures to ensure the completion of independent technical reviews, s

T e ,

kat EIA CMlZMt 4

. SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUM!ER REV.

NO.

OPERATIONS QUALITY ASSURANCE PLAN INDEPENDENT TECHNICAL REVIEW PAGE 2 OF 3 l

EFFECTIVE DATE 07/05/99 6.2 Independent technical reviews shall be used to observe and verify that activities are performed correctly and that human errors are reduced as much as practical.

6.3 Independent technical reviews shall include, but not be limited to, the following activities:

6.3.1 Unit-operating characteristics 6.3.2 Nuclear Regulatory Commission issuances 6.3.3 Industry advisories 6.3.4 Licensee Event Reports 6.3.5 Other sources of unit design and operating experience information, including units of similar design, which may indicate areas for improving unit safety.

6.3.6 Plant operations 6.3.7 Maintenance activities 3o 6.3.8 Equipment modifications k 6.4 As determined by Quality management, several personnel I performing independent technical reviews will be required )

to have a degree in engineering or related science and at least 3 years of professional level experience in the nuclear field.

6.5 Personnel performing independent technical reviews should be indepencent of performance function, signoff function, and the plant management chain while performing this oversight activity.

1 6.6 The results of independent technical reviews will be periodically transmitted to appropriate line and senior <

management, the Nuclear Safety Review Board, and the President and Chief E::ecutive Officer for review and/or action and advise management on the overall quality and safety of operations.

G.7 Conditions adverse to quality and recommendations I identified during the performance of independent I technical reviews shall meet the requirements of I Reference 4.4

u m unnun SOUTJi TEXAS PROJECT ELECTRIC GENERATING STATION NUM!.ER REV.

NO.

OPERATIONS QUALITY ASSURANCE PLAN INDEPENDENT TECHNICAL REVIEW PAGE 3 OF 3 EFFECTIVE DATE 07105/99 7.O DOCUMENTATION 7.1 Procedures which are generated as required by this chapter shall identify the records which are required to implement and document those activities. The records shall be controlled in accordance with Reference 4.5.

gg 8.0 ATTACHMENTS k

8.1 None I