1RE03 Inservice Insp Summary Rept for Welds,Steam Generator Tubing & Component Supports of South Texas Project Electric Generating Station Unit 1
ML20082A860
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 06/30/1991
From: Beverly R, Haning J, Younger J
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20082A841 List:
References
NUDOCS 9107120050
Download: ML20082A860 (127)


Text

_ _ _ _ _ _ .. _ ._.. _ _._. . _ _ __.__ _ . _ _ _. _ _ _ _ __ _ _ _ . _ _ _ _ _ . _ _ _ .

O SOUTH TEXAS PRf ECT ELECTRIO GENEF.1NG l

STAT 10t 1RE03 INSERVICE INSPECTION

SUMMARY

REPORT FOR WELDS, STEAM GENERATOR TUBING, AND COMPONENT SUPPORTS of the SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - UNIT 1 P.O. Box 289 Wadsworth, Texas 77483 l

l Owner: Houston Lighting and Power Company l City Public Service Board of Son Antonio Centrol Power and Light Company City of Austin Address: P.O. Box 1700 Houston, Texas 77001 Commercial O Operation: AUGUST 25,1988 Issue Date: JUNE i991 s m w oB16A 710712coso930793,g g

DR ADock orooo4 l

- -. - - - - - _ _- - - _ _ - __- _ __. ] ]LR-

IRE 03 INSERVICE INSPECTION

SUMMARY

REPORT c O FOR WELDS, STEAM GENERATOR TUBING, AND 4

COMPONENT SUPPORTS l of flie SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION 3 l

UNIT NO.1 USNRC DOCKET No.: 50 498 OPERATING LICENSE NO.: NPF 76

(]

V COMMERCIAL OPERATION DATE: AUGUST 25,1988 Prepared by: N 0 i ww- 4 '7-9/

J/C. Yv/nger / Date ISI Engineer Welds & Component Supports Prepared by: 6- PI.$ M vcv2 J.!..N4JW S "

( 40-9/

J. L IIaning Date ISI Engineer Steam Generator Tubing Reviewed by: M X. M_ 6 20 9/

R. L Beverly Date Supervising . gineer ISI Group Approved by: *W4 Gd2 /9i n

R. R. Ilernande/

h Manager . Design Engineering Department

/ Dafe U

TABLE OF CONTINIS 1.0 1RE03

SUMMARY

REPORT Pilgt 1.1 Introduction 11 1.2 Scope of Summary Report 1-1 2.0 WELD EXAMINATIONS 2.1 Introduction 2-1 2.2 Scope of Examinations 2-1 2.3 Personnel, Procedures, and Equipment 2-2 2.3.1 Personnel Qualifications 22 2.3.2 7.xamination Procedures 23 2.3.2 dquipment 2-3 2.3.4 Materials 2-4 2.3.5 Calibration Blocks 2-4 2.4 Summary of Examinations 2-4 2.4.1 Examination Methods 2-4 2.4.2 Augmented Examinations 2-5 2.4.3 Data Comparison 2-5 2.4.4 Additional and Successive Examinations 25 2.5 Examination Results and Corrective Actions 2-6 2.6 Certification of Inspections 2-6 Appendix 2-A Summary of Examinations 2-7 Appendix 2 B Personnel / Equipment / Materials 2 27 Appendix 2-C Procedures 2-34 Appendix 2-D ISI Examination Limitations 2-38 Appendix 2 E Owner's Report for Inservice Inspections - NIS 1 Form 2-48 O i d

TABLE OF CONTEN'IS (cont'd) 3.0 STEAM GENERATOR TUBING EXAMINATIONS 3.1 Introduction 31 3.2 Scope of Examinations 31 3.3 Personnel, Procedures, and Equipment 32 3.3.1 Personnel Qualifications 32 3.3.2 Examination and Analysis Procedures 32 3.3.3 Equipment 33 3.3.4 Calibration Standards 33 3.4 Summary of Examinations 3-4 3.4.1 Technical Specification Exam: nations 34 3.4.2 Augmenting Examinations 34 (s 3.5 Examination Results ana Corrective Actions 35

(

3.6 Certification of Inspections 3-7 Appendix 3 A Changes to the ISI Outage Plan 38 Appendix 3 B List of Examination and Data Analysis Personnel 3-12 Appendix 3 C Flaws with Tube Wall Thickness Reduction 3-14 Appendix 3 D Dings and Dents 3 16 Appendix 3-E Owner's Report for Inservice Inspections - NIS 1 Form 3-18 O v l

TABLE OF CONTENTS (cont'd) l O)

L l

4.0 COMPONENT SUPPORT EXAMINATIONS 4.1 Introduction 41 4.2 Scope of Examinations 41 4.3 Personnel and Procedures 42 4.3.1 Personnel Qualifications 42 4.3.2 Examination Procedure 42 4.4 Summary of Examinations 43 4.4.1 Piping und Equipment Supports 43 4.4.2 Additional and Successive Examinations 43 4.5 Examination Results and Corrective Actions 43 4.6 Certification of Inspections 4-4 V

Appendix 4 A Summary of Examinations 4-5 Appendix 4 B Personnel 4 34 Appendix 4-C Owner's Report for Inservice Inspections - NIS 1 Forms 4-36 l

l 1

l O l kl jjj

l i

l 1.0 1RE03

SUMMARY

REPORT 1.1 Introduction  ;

This Summary Report describes Houston Lighting & Power Company's (ILtP) insenice inspection (ISI) of selected Class 1,2, and 3 components of the South Texas Project Electric Generating Station, Unit 1 (STPEGS-1) performed from December 10,1990 to completion of the third refueling outage (1RE03) on April 4,1991. The ISI summarized herein constitutes the third ISI performed during the first inspection period of the first inspection interval of STPEGS 1. The STPEGS ISI program for welds and component supports is scheduled in accordance with Program B of the American Society of Mcchanical Engineers (ASME)Section XI Code " Inservice Inspection of Nuclear Power Plant Components". The STPEGS ISI Program for steam generator tubing is scheduled in accordance with STPEGS Technical Specification 3/4.4.5. The first ten year inspection interval of STPEGS 1 extends to August 25, 1998. The first inspection period, which is of three years duration beginning with commercial operation (August 25, 1988), extends to August 25, 1991. The ISI examinations performed up through 1RE03 satisfy the Section XI Code completion requirements for STPEGS 1 welds and component supports for the first inspection period.

The STPEGS 1 ISI program for the first inspection interval is described in the Ten Year ISI Plan previously filed with the Nuclear Regulatory Commission (NRC) and the State of Texas. The STPEGS 1 ISI program was developed and is being implemented in accordance with 10CFR50.55a, the 1983 Edition of Section XI Code with the Summer 1983 Addenda, and other regulatory and Code bases as specified in the Ten Year ISI Plan.

This Summary Report satisfies the reporting requirements of IWA-6000 of the Section XI Code for welds, steam generator tubing, and component supports and those of Technical Sp:cification 4.4.5.5 (b) with regard to steam generator tubing inspection.

1.2 Scope of Summary Report This Summary Report describes the ISI examinations performed up through 1RE03 on welds (Section 2), steam generator tubing (Section 3), and component supports (Section 4).

Each of these sections describes the scope of examinations performed; describes the personnel, procedures, and equipment utilized for the examinations; provides a summary of the examinations, examination results, and corrective actions; and includes copies of the examination certification (NIS-1) forms.

The ISI examinations perfrm 4 on Class I and 2 welds and other examination areas (e.g.,

bolting) are described in Seu.an 2 of this Summary Report. These examinations were l

performed in accordance with Subsections IWB and IWC of Section XI and other bases as specified in the Ten Year ISI Plan. ISI examinations performed on steam generator I

tubing are described in Section 3. These examinations were performed in accordance with 11 L

l ___ __ _ _ ___ __ _ _ _-_ _

r O Subsection lWI3 (Examination Category B 0), STPEGS Technical Specifications 4.4.5, and other bases as specified in the Ten Year ISI Plan. The ISI examinations performed on Class I,2, and 3 component supports and Class 3 integral attachments are described in Section 4. These examinations were performed in accordance with Subsection IWF (Class 1,2, and 3 supports) and Subsection IWD (Class 3 integral attachments) on Section XI and other bases as specified in the Ten Year ISI Plan.

O O l2

2.0 WEl.D EXAhilNATIONS 2.1 Introduction ISI of STPEGS 1 Class 1 and 2 welds and components within the Welds Examination Program was performed between January 18 and March 1,1991. These examinations constitute the third ISI and completion of the first inspection period of the first inspection interval for the Welds Examination Program for STPEGS 1.

This section of the Summary Report documents the examinations performed by Southwest Research Institute (SwRI) and HL&P Ouality Control (OC) nondestructive examination (NDE) personnel in accordance with the following documents:

(1) "First 10 Year Long Term inservice Examination Plan for the South Texas Project Electric Generating Station, Unit 1" (LTP),

(2) " Examination Plan for the 1991 IRE 03 Inservice inspection at the South Texas Project Electric Generating Station, Unit 1" including changes made during the outage (Outage Plan).

The Long Term Plan (LTP) provides a detailed description of the rules for exemption, '

selection, allocation, and scheduling of Class 1 and 2 welds and examination areas for ISI.

O The 1991 Examination Plan is an individual Outage Plan for implementing ISI weld examinations as scheduled in the LTP The Outage Plan references the applicable operating procedures (OP) and NDE procedures used for the examinations.

2.2 . Scope of Examinations NDE was performed on a total of seventy-six (76) selected Class 1 and Class 2 components and examination areas as contained in the Outage Plan. Any deviations or changes were documented as Examination Plan Changes to the Outage Plan. Selection of these components and examination areas was based on tiie LTP allocation and scheduling requirements for the third refueling outage.

L These examinations constitute approximately thirty-one (31) percent of the total number of components and examination areas required to be examined during the first inspection interval.

! 21 l

Class 1 A total of forty three (43) examinations were performed on the following Class 1 components and examination areas:

Vessels Reactor Pressure Vessel Pressurizer Steam Generator 1D(Primary Side)

$dt1g Reactor Coolant System Pumps Reactor Coolant Pumps  :

flass2 A total of thirty three (33) examinations were performed on the following Class 2 components and examination areas:

O V

MdDE Auxiliary Feedwater System Feedwater System Residual Heat Removal System Safety injection System A complete list of the components and examination areas is contained in Appendix 2 A.

Class 1 and Class 2 weld identification figures for the above components and examination areas are contained in the LTP.

2.3 Personnel, Procedures, and Equipment 2.3.1 Personnel Qualifications The examination personnel have been trained and qualified in accordance with Section XI.

In addition, Level 11 examiners performing ultrasonic examinations on austenitic piping welds have been qualified by Electric Power Research Inst!tute in detection of inte.rgranular stress corrosion cracking. A list of all personnel who performed examinations during 1RE03 is contained in Appendix 2 B l

lO l

2-2 l

i 2.3.2 Examination Procedures NDE activities were performed using visual (VT), liquid penetrant (PT), magnetic particle (MT), and ultrasonic (UT) techniques. SwRI personnel performed all UT examinations except for carbon steel piping and the Reactor Coolant Pump (RCP) flywheels in accordance with SwRI NDE procedures approved by HLtP. IIL&P OC NDE personnel performed all MT, PT, and VT examinations and UT examinations on carbon steel piping ar'd RCP flywheels in accordance with ILtP OC NDE procedures.

The NDE procedures were written to conform to the requirements of the applicable sections of the ASME Code. Any deviations from ASME Code requirements are noted within the procedure. Some of the swr 1 procedures were amended for specific examination purposes with interim change notices (ICN). A list of the applicable NDE procedures is provided in Appendix 2 C.

swr 1 OP's were utilized to provide guidelines and controls for performance of on site activities. This included procedures for weld joint indentification marking, indication recording, UT linearity measurements, and use of customer notification forms (CNF). A list of the applicable OP's is provided in Appendix 2 C.

2.3.3 Equipment O

verie#s enei P cot -es esce deri"8 tae isi te verterm 18e exemimetiees ef the seieeted component welds and examination areas. Major equipment consisted of the following:

4 Sonic FTS Mark I ultrasonic in:truments TektronN Oscilloscope Ultrasonic transducers AC electromagnetic yokes MT calibration block Pyrometers Black light meters Paint thickness gauge A list of all major equipment used during the IRE 03 ISI is contained in Appendix 2 B.

O 23

2.3.4 Materials NDE materials utilized during 1RE03 weld examinations included penetrant and magnetic particle materials, ultrasonic couplant, and marking pencils. All materials contacting an I austenitic examination surface were tested and certified to be within acceptable sulfur and halogen limits specined in the STPEGS Expendable Material Control Program. A list of these material and traceability numbers is included in Appendix 2-B.

2.3.5 Calibration Blocks Pipe and vessel calibration blocks were utilized to calibrate the UT instruments prior to examination of the selected welds. Applicable calibration blocks are noted in the Examination Summary Tables (Appendix 2 A). Drawings for all calibration blocks are included in the LTP.

2.4 S'immary of Examinations 2.4.1 Examination Methods The following examination methods were conducted in accordance with IIL&P approved swr 1 NDE procedures and/or HL&P OC NDE procedures:

VT Examinntions VT-1 examinations were performed on RCP Seal Housing bolting.

PT Examinations PT examinations were performed on Pressurizer nozzle safe end, Pressurizer support brackets, and Class 1 and 2 piping welds.

MT Examinations MT examinations were performed on the RPV closure head, Class 2 pipe lugs and l Class 2 piping welds.

l O 24 i

..,-.,y iy - - <y,, , - - ,-- - , - -- y r---.,- y--w, - , . , . yw,,, , - . . - ,,,, - w--.--,,-%.w.-,.-..ym .~.y, p. --r-,-

l UT Examinations UT examinations were performed on Class 1 and 2 components, including vessels, austenitic piping, ferritic piping, and RCP flywheels. Various techniques were used to perform the UT examinations, depending on classification, material type, and weld thickness.

I 2.4.2 Augmented Examinations In addition to the ISI requirements of Section XI for Class 1 piping and ASME Code Case N 408 for Class 2 piping, the following augmented ISI program was implemented during this outage:

Augmented ISI NRCB 88-08 Augmented ISI Break Exclusion Zone These augmented programs are described in the LTP and the affected examination areas are noted in the " Remarks" column of the Examination Summary Tables.

2.4.3 Data Comparison In accordance with IWB 3121 of Section XI, the examination results were compared with pd the recorded NDE results of the preservice inspection (PSI). There were no prior inservice examinations on the areas examined during this outage.

If flaws were recorded in the selected component weld or examination area during previous examinations and dispositioned as acceptable, these flaws were verified during this ISI. All such flaws were observed and verified during this ISI.

2.4.4 Additional and Successive Examinations If examinations reveal indications that exceed allowable indications standards, additional examinations are required as prescribed in IWB 2430 and IWC-2430. No additional examinations (IWB 2430 or IWC-2430) were required during this outage.

Successive examinations are required if flaw indications are evaluated in accordance with IWB 3122.4 and the component qualifies as acceptable for continued service. No successive examinations (IWB 2420 or IWC-2420) will be scheduled as a result of examinations performed during this outage.

.i 25

2.5 Examination Results and Corrective Actions Examination area coverage was provided, to the extent practical, in accordance with the requirements of ASME Section XI and Code Case N-408. In those cases where physical conditions of the component restricted examination of the required area, the amount of coverage achieved was assessed. Appendix 2 D, ISI Examination Limitations, contains a detailed account of all examination limitations (UT, PT, and MT) encountered during 1RE03 weld examinations.

All UT indications determined to be recordable, regardless of signal amplitude, were investigated by SwRI to determine the nature of the reflector.

No reportable indications were detected by volumetric (UT), surface (PT and MT), or visual (VT) examinations.

2.6 Certification of Inspections ASME Section XI NIS 1 forms, " Owner's Report for Inservice Inspections", have been prepared to certify the STPEGS 1 weld ISI examinations described in this section of the Summary Report. The STPEGS-1 weld ISI examinations have been certified by our ANil, O Factory Mutual Systems, on the NIS 1 forms included in Appendix 2 E.

1 i

l l

O 2-6

, _ _ . _ . , _ . , . . _ _ _ _ _ . . . . ~ . _ - -

a_A J ..h4.mba me a4 x,.a. da-_s.._4 e. _.dA_ei-w A me e- A14m_Aeah .4.Am_m m4_-_.m.J.,Ad#m.mJ e- a 4 M 4,4hpm3 4m a e A h.4.h m 4h4p.&.A.4MC4_ _J-_42e,Amn a u l

l I

i O

A B

APPENDIX 2-A O

SUMMARY

OF EXAMINATIONS O 27

. _ __ ....__ . _ _ .__ __ .__,..__ _ .. _.. _ __ _ __._ _ _ _ _ _ ____ ~ _

Daft 06/19/91 $0UTH ftXAS PROJECT ELECitlC GluttAtlNG $1All0N UN!i 1 Pacts 1 REVltitwa 0 IN$ttvlCE INSPictl0N staeunt fitst INittVAL, Fit $f PEtt00, TMikD OUTAGE (1991) ,

class 1 CCMPLtitD COMP 0NEWil figigt.f.at$SURt 411[L N 0  ;

ASME O O 1

$tc. XI R E N

$lsentf (KAMlWA110N AttA CATCY EXAM t 0 t t[ MARKS

- NLNH R 3DENilFICAfl0N litM NO Mt1N00 PROCEDUtt C M R "CALIBRA110N BLOCK" CIRcuMrtRENil AL Vis&tt W(pt (F10 NO A RPV 1)  !

000100 RPv1'101 121 BA U11.5 $1P UT13 R0,CO X *

  • tRAMiut0 50% (281 INCHt$) 0F THE WILD FLANot TO UPPER $NELL 81.30 UT5 ICN1 & 2 X - - LtNGTH FROM STLD ft0LE 910 $100 Holt 28.

Uf9 K * *

"CSCL 39/C$CL*45**

CIRCUM 7tRIN11st closUnt HEAD w Lep (Flo NO A PPV 1) 000600 RPV1'101*101 8A Mt NDFP 7.1 R2 M *

  • EXAMlWr0 33% (182 INcNis) 0F THE VtLD CLOSURE HEAD TORUS TO FLANGE 81.40 U10W s1P UT150 R0,C0 x * - LINGTH FROM ETUD HOLE 9 70 Stud HOLE 22.

U145 ICN1 & 2 X * - LIMitt0 EXAM ON THE FLANGE $101 DUE 10 ,

a

UT45T X Uf60 K - - "C$CL

  • 39'*

p Uf601 X - - .

V ,

000700 RPv1 103 101 DA U10W stP U1150 to,C0 M

  • EXAMlWED 50% (229 INCHis) 0F THE WILD CLOSUtt HEAD DOME 10 CLOSURE 81.21 Uf45 Icht & 2 X . LtNGTH FROM ETUD HOLE 910 $100 Holt 28.

HEAD 10RUS. U1451 X -

  • LIMlit0 UT DUE 10 PROXIMiff 0F U160 - X - INSULATION $UPPORT R]NG AND LIFilNG LUG. ,

UT60T X - - "CSCL

  • 90"

~

l MERIDIONAL CLOSURE HEAD WELOS (F(p10 A RPV 3) ,

002100 RPV1'101 104A- 8A U10W stP UT150 RO,C0 x *

  • U145 ICN1 & 2 X *
  • i.

CLOSURE HEAD MERIDIONAL WELD- $1.22 UT45T X * -

l AT 0 DEG -

l UT60 x * -

U160T X - - "CSCL

  • 90/CSCL *38" 002200 RPV1 101*104B 0A U10W $18-UT150 R0,CO X - -

ICN1 & 2 X -

  • CLOSURE HEAD MERIDIONAL WELD 31.22 . .UT45 UT45T X - -

, AT 90 DEG x - -

U160 U160f X * - "CSCL*90/CSCL *38" O

2-8 .

DAlti 06/19/91 SOU1h itKAS PROJtci ELECTRIC GlutRA11NG sfA110N UNIT 1 PAGtt 2 Rivill0N .0 lkstRVict th5Pict10N stas 4 ART FIR $1 luff RvAL, flR$f Pitf(0, TRIRD CU1 AGE (1991)

CLAll 1 COMPLtit0 COMPONENTS 2MM.M a 0 ASME O O i SEC. Il R E N

$UMMART EkAMih4fl0N AktA CAfGY EKAN t 0 t REMARKS F,M6t P lDENTIFICAfl0N litM ho Mt1NLD PROCEDURE C M R " Call 6RA110N BLOCK" gglut to SH!tt AWD thett to uDirtt WLDS (FIC WO AaPRI il 010500 PRZ*1 N1 00- U10W $1P U149 R1,C0 X *

  • SURQt WCZZLt $3.110 U145 stP UTil R0,C0 X *
  • U145T ICN1 I *
  • U160 X *
  • U1601 X * * "CSCL
  • 56" N0ZZLt 11110f RADlut stCTION (fl0 NO A*PRI il 011100 PRZ*1*N1*lR BD UT28 SfP U111 RD,CO I * *

$ URGE N0!!LE R3.120 U133 (CN1 X + +

aCsCL.42a 50ZZLt.10 SAf t tND,jND $Af t tND 10 WQM WLDS (f!G N0 A PRf 1) 011700 Pk!*1*N1 $t Saf PT NDEP 6.2 R3 X *

  • tlMitt0 UT FROM THE $ Aft (ND $101 DUE TO SVRGE WO!!LE 85.40 UT45 $1P U152 RD,C0 X -* -PROKIMITY Of INSULAll0N SUPMai LUGS.

UT451 ICN1 X *

  • LIMiff0 U1 FR(M THE WOZZLt $10E DUE 10 WOZZtt CONil0VRAfl0N.

e<gg.72'*

- lNTEGRAL AffACHMtWTS (FIG WO A*PRI 1) 012400 .PRZ*1 1A B*H Pi NDEP 6.2 R3 X *

  • WO PT DN TOP Of THE BRACKti DU! TO j $UPPOR1 BRACKli 58.20 PROXIMlYi 0F SUPPORT FRAME.

i l.

012410--PRI'1*1B- 8*N PT NDEP 6.2 R3--- -X *

  • No PT ON fop OF THE BRACKET DUE TO l

l' SUPFORT BRACKti 88.20 PROXIMiff 0F $UPPORT FRAME.

I l.

l 29 ,

y

Daft 06/19/91 SOUTH 1[ub PROJECT titCitit OtWikAtlWQ 51A110N UNll 1 PAGtt 3 g try! LION: 0 lusttVICE INSPicitoW staoual t flR$1 INilRVAL, FlR$1 Pikl(D,1Nik0 OU1 AGE (1991)

CLAll 1 COMPLti!D COMPONEN18 M ENERATOR iD (PALMAR 1 110tl N 0 ASMt 0 0 1

$tc. XI k E N SumeAtt (KAMINA110W AttA CA101 t1AM E O E ttMARES t*.sett t IDtWilflCA110W litM NO Mt1HCC PROCED0tt C M k "CAllDRA110N DLOCK" ggil[t 10 VttstL town H[3D WIDS (Flo NO A to fi 018200 SG 10 IN 00 U1DW $1P U149 kt,CO X . . LIMi1[D U1 ta0M THE HEAD $105 DUt 10 INLt1 N022LE 10 CHANNEL HEAD 83.130 U145 81P U115 RO,CO x. -

Pa0KIM1110F WLD st) AND VIBRA 110N U1451 ICN1 x . . $tNs0R INsituMENTA110W Box.

CAP U160 X -

  • U1601 N * * **CSCL 36" 018300 SG 10 0N 00 U1DW $1P U149 R1,CO X . . U10L PERFORMED 10 VfRIFT PRESERVICE CNANNEL HEAD CAP 10 OUTLt1 83.130 U10L . M
  • LAMINAll0N. LIMittD Ut fROM 1HE HEAD N0ZILE U145 $1P U115 R0,C0 - X .

SIDE DUt to PtoxlM1110F WLD $t1 AND U1451 ICN1 * . . VitaA110N stNton int 1RUMENTA110N BOX.

U160 M . . **CSCL.36" U1601 X + .

g012LE INilDE R ADIUt StC110N (FIC WO A $0 21 018400 $G IDalN !R BD U128 $1P U111 R0,C0 X . .

- INLt1 NO2!LE INllDE R@lV$ $3.140 ICN1

$tcil0N "CSCL 41" 01C500 $010 0W Ik - BD U128 51P U111 RO,CO X . -

001(*1 NCZ2LE IN51DE RADlus 83.140 ICN1-SECil0N "CSCL.41" O

2 10

-sh-m.munis sinmi -

M

DATE: 06/19/91 $CUTH TEXAS PROJECT ELECTRIC GhiRA11NQ $1Afl0N UNif 1 PAGE: 4 REVltt0W: 0 INSERVICE INSPECfloN suMMAtt FIRST INTERVAL, FIR $f PERl00, TNIRD OlffAGE (19911 CLAtt 1 COMPLETED COMPONEN18 RfACTOR COOL ANT 1@

u 0 ASME O O f SEC.-XI REN C,MMARY EKAMIN4fl0N AREA CAIGY EKAM E O E REMAttt NUMelt IDENilFICAfl0N ffLM NO MEIN 00 PROCEDURE C N R "CAllBRAtl0N BLOCK" 31 Ac 1102 ktf

  • LOOP 1 (flG NO A tt 1) 100000 1 3F Pt MDEP 6.2 R3 X *
  • LIMifED UT FROM fut EttrW !!DE DUE TO SC OUILET N0ZZLt 10 Ett0W B5.130 U145 stP UT54 R0,CO + X
  • fnE NtLD CONFIGURAfloW AND STARCH UNIT

-Vt4%f ICN 1,2, & 3 X *

  • Sitt. LIMitt0 UT FROM THE N0ZILE $1DE UT60 LTP Uf31 R0,00 - X - DUE 10 THE N0ZZLE CONFlouRAT10N.

U1451 ICN1 X * * "CS 16/$$*79/C$$ 80" 100040 $ BJ Pt NDEP 6.2 R3 X *

  • 3 IN. BRANCH CONNECTl0N 99.32 100080 9 8J PT NDEP 6.2 R3 X *
  • X -

WELD DUE TO THE UCLD CONFIGURAtl0N AND

( U14*', ICN14 2 X + + $12E OF THE $EARCH UNIT.

"CS$ 80"

, 31 RC i?02 N$5 LOOP 2 (FIG NO A Rfa?)

100260 9 BJ PT C P 6.2 R3 X -

  • LIMi1ED UT FROM BOTH SIDE $ AND ON THE Ett0W TO REACTOR COOLANT PUMP 99.11 UT45 STF UT54 R0 C0 - X -

WELD DUE TO THE W LD CONFIGURAll0N AND U1451 ICN) & 2 X *

  • s!!E OF THE SEARCH UNIT.

"CES80" 31 RC 1402 NS$ LOOP 4 (F10 NO A RC 41 100540 1 8F PT NDEP 6.2 R3 X ** LIMITED UT FROM THE Ela0W SIDE DUE TO SG DUTLET N022LE TO ELBOW 95.130 UT45 $1 UT54 R0,C0 - X -

THE WELD CONFIGURATION AND SEARCH UWli.

Ui ICdi, 2, & 3 X * * $1!E. - LIMiiED UT FROM THE N0ZZLE $10E UT60 STP UT31 a0,CO

  • X
  • DUE TO THE N022LE CONFlGLEAfloN.

UT451 ICN1 & 2 X * * "CS 78/ts 79/ css 80" 29-RC 1101 Nst LOOP 1 (F10_NO A RC 1) 100740- 3 BJ PT WDEP 6.2 R3 X * . LIMiiED UT FROM THE BRANCH CONNECTION 12 IN. BRANCH CohNECiloN 09.31- UT24 stP UT53 RD,C0 X * - (BC) SIDE DUE TO THE IC CONFIGURA110N.

UT45 ICN1 X -

  • N.s UT45T STP UT54 R0,C0 X - -

ICN1, 2, & 3 "CC5$ 18/ss 82" 2 11

. ~..._._.___.___.m.m__.___-. _ .. _.._ __ _.__ _ _ _..,__..__._._ - . _ . . .

Daft: 06/19/91 30UIN ftXA8 PROJECT (LECTRIC DENERAtlNG stall 0N UNIT 1 PACE: 5 Rivill0N: 0 IN$tRVict 1N$PECfl0N StD#4ARY flRsf INittvAL, flR$f PERIOD, THIRD OUTAGE (1991)

CLA$$ 1 COMPLtitD CCmPohENTS l gf ACf0R COOLANT ffsif3 N O ,

ASME O O f SEC. XI R t H SUW4 ART EXAMINAfl0N AttA- CAfGY f.XAM f 0 E RLMARKS NUMett IDtNT!flCAtl0N llEM NO MtfM00 PROCEDURE C M R **CAllBRAi!Cu St0Ct" 29 Re 1101 N*,8

  • LOOP 1 (F10 NO A RC 1A 100760 5 0f PT NDEP 6.2 R3 X *
  • LIM 11ED UT f ROM THE ELSW $1DE DUE 10 ,

ILDOW 10 SG INLtf N022Lt B5.130 U145 $1P UT54 R0,CO = X

  • THf WID CONFIGURAfl0W AND $tARCH UNif UT451 ICN1,2 & 3 X - * $12E. LIMitto UT FROM THE N0!ZLt $1DE UT60 STP Uf31 R0 C0 - X - DUE 10 THE N022LE CONil0VRAfl0W.

U145T ICN1 & 2 X * *

"CS 78/3$*79/C$$ 80**

29 RC 1401 Nil

  • LOOP 4 (FIG NO A rcd 1 101170 4 BT P1 NDEP 6.2 R3 X *
  • LIM 11ED UT FROM INE ELBOW SIDE DUE 10 ELBOW 10 $C INLtf N022LE B5.130 U145 51P U154 R0,CO
  • X
  • THE WLD CONFIGURAfl0N AND $tARCN UNii Uf45T ICN1,2, 8 3 X *
  • SIZE. LIMITED UT FROM THE NO22Lt $1DE Uf60 stP Uf31 R0,CO = X
  • DUE 10 THE NO22LE CONFIGURATION.

U145T ' ICN1 & 2 X * * "Cl 78/S$*79/Cl$ 80" 16 RC 1412 W11 (FIG NO A RC 5)

- 101860 .1-- 8J- of NDEP 6.2 R3 X * *

-$ Aft (WD TO stNT PIPE

- 99.11 0145 STP UT52 R0,C0 + X

  • UT451 ICN1 X *
  • eess.16**

101890 4 6J PT- NDEP 6.2 R3 X *

  • EL50W TO PIPE 89.11 - 0145 tiP 0152 R0,C0
  • X
  • r

'UT45T ICN1 X * *

  • * $$
  • 16" 101900 -'5--- BJ PT NDir 6.2 R3 X - *
  • P!PE TO (LBOW 09.11- Ut45 51P U152 R0,C0-
  • X -

U145T ICN1 X *

  • eegs.16**

101910 6 sJ PT NDEP 6.2 R3 X *

  • Elt0W 10 P!PE 89.11 UT45 STP UT52 R0.C0 X ICN1 -
  • UT45T X eegg.16**

l l

l 2-12

!__ ._ . . _ , . _ , . , _ _ . . ~ .. _ . , _

._. .m_m___ _ ._ _ . _.m._. _

DATE 06/19/91 SOUTN TEK45 PROJECT ELECTRIC GENERATING $fATION UNIT 1 PAGE: 6 REVISION: 0 INSERVICE INSPECTION $UIMARY FIRTT INTERVAL, FIRST PERito, THIkD OUTAGE (1991)

CLAS$ 1 COMPLETED COM*0NENTS REACTOR COOLANT SYSTL5 N O ASME D G T

$EC. XI REN

$UpMARY EKAMINAfl0N AREA CATCT EKAM E O E REMARKS ,

NUMBER IDEWilflCAfl0N ITEM No METHC0 PROCEDURE C M R **CAllBRATION BLOCK **

4 RC 1123 BBi (PIC NO A RCa14) ,

104990 4 BJ PT NDEP 6.2 R3 X . .-

B9.11 *

  • Ett0W TO PlPE UT45 STP UT31 R0.C0 X U145T ICN1 & 2 X *
  • e.gg.yee 105040 9 B*J PT NOEP 6.2 R3 X *
  • PlPE TO PlPE 89.11 UT45 STP UT31 R0,CD X - -

UT45T ICN1 & 2 X - *

  • egg.p.

105060 11 BJ PT NDEP 6.2 R3 X * *

' ELBOW TO PIPE $9.11 UT45 $1P UT?1 R0,C0 X *

  • g UT45' ICN1 & 2 X * -

segg.7e.

4 RC 1126 sei (FIC No A RC 11) 105255 1 NRCs UT45 STP UT128 RO C1 X *

  • AUGMENTED ISI'* NRC8 88 08.

VALVE 10 PIPE 88 08 UT457 . X *

  • UT60 - X
  • e gg.7 e 105265 2 NRCB UT45 STP UT128 R0,C1 X *

P!PE TO ELS0W 88 08 UT45T X -

  • UT60
  • X
  • eegg.pe

, 105275D3 NRCs UT45 STP UT128 R0,C1 X . - AUGMENTED 151 NRCB 88 08, i"

' ELBOW TO PIPE - 88 08 UT451 X *

  • UT60
  • X *
- ..ss.pe l

4 Pt 1525 BB1 (FIC No A PC-11) 105615 1 NRCB UT45 STP-UT128 R0,C1 X *

  • AUGMENTED 151 NRC8 88 03.' ,

VALVE TO PIPE 88 08 UT45T X *

  • l WM.
  • X *
    • S$*7**

g y

_ _ _. - _._ _ , _ _. _. _ .._ ~ ... _ _ _ _._ _ _ __ _ _. _ _ _ . _ . _ . _ _- ___.___ _ . . _ _ . .

DA1El 06/19/91 S001N ItKAS PROJECT ELECitlC OtutkA11NG $1Afl0N UN11 1 PAGE: 7 0 IN$tRVICE INSPECittal suMSRY fik$f INittVAL, flR$1 Pitt0D, THIRD OUTAGE (1991)

OhtvlSION: CLASS 1 COMPLtitD COMPONEN1$

M6 E C00LANT SYSTEM N 0 AtME O G T StC. XI R E N SUM ARY EXANINA110N AttA CATGY EISN t 0 t RfMARKS NLMSit IDtWilflC4.flM litN NO MCTHOD PROCEDURE C N k **CAllDRA110N BLOCK"

....... .............................. ....... .......... ............... . . . ........................................ -)

l 4.RC 1323 ast (Fro No A We 112 105623 2 NRCS U145 STP UT128 RO C1 X .

  • AUGMENitD 151
  • NRC8 88 08.

PIPE 10 EL60W 88+08 01451 X * *

=

U160

  • X
    • $$ 7** ,

M M QQ hpB1 (FIG NO A RC 1 107965 1 NRCB U10L $1P U149 ti,CO X *

  • AUGMEWitD ll!
  • NRC8 88 08. EAstLINE UT VALVE TO Pi;? 88 08 - UT45 sip UT128 k0,C) X - - EXANINAfl0N.

UT451 X - - U160 -X + + e+gs.95++ 107975 2 NRCB U10L sfP U149 R1,CO X - - AucMENTED 181

  • NR:B 88 08. 8AltLINE UT -

P!PE 10 REDUCER 88 08 U145 $1P U1128 R0,C1 X - - E UNINAll0N. UT45T X - -

                                                                                                                            - U160                              -    X
  • egg.95ee 2+RC 1220 BBi (fl0 NO A RC+17) 109000 1 B.J PT NDEP 6.2 R3' X - -

DAANCH CONNECTION 10 39.40 SENT PIPE ' V P

                --2 RC.1419 Bt1 (FIG No A RC 19) a   =

110300 1 B*J PT NDEP 6.2 R3 X TEE 10 SENT PIPE 09.21 y l l l t l1 L 2 14 1' 3-c,t' *- T---d*v+tw-'ry*Me-9--e-'+w't g- 'tirm-+N'?tp r.We g W M g

  • a- eg-w ^-tve7d deM r+ g '4~P' th'e'-**r T T'

DATE: 06/19/91 SOUTH TEKAS PROJECT CLECTRIC CEhERATING STs. TION UNIT i PAGEt B w REVISION: 0 INSERVICE INSF'ECTION SUNKARY FlkST INTERVAL, f!RST PERICD, THIRD CUTAGE (1H1) CLASS 1 CCHPLETED COMPONENTS PEACTOR COOLAWT PtMP A N O Amt 0 G T SEC. XI R E H

SUMMARY

EKAMINAfl0N AREA CATGY EXAM E D E REMARKS LtMBER IDENTIFICATION ITEM NO METHCD PROCEDURE C M R ** CALIBRATION BLOCK ** P W BOLTING (FIG WO A RCP 1) 260130 RCP 101A SNB tC2 VT 1 NDEP 9.3 R1 X * - EKAMINED BOLT WOS 1 THkOUu., . SEAL HOUSING BOLTS B7.60 FLYVMEEL (FIG WO A RCP 2) 260170 RCP 101A FW RG UTO U71 003 R0 X - - EKAMINED BCr.!, KEYWAYS, AND BOLT HOLES FLYWHEEL 1.14 IN PLACE. escs.ysu l l 2 15

! DATE: 06/19/91 south TERA $ PROJECT ELECTRIC GENERAflWG ST Afl0N UNIT 1 PACE: 9 REVISION: 0 ik$ERVICE IN$PECT.ON RMMARY FIFLT INTERVAL, Fir $1 PERIOD, THIRD OUTAGE (1991) i j CLASS 1 COMPLETED COMPONENTS RfACTOR COOLAWT PtMP 8 W 0 ASME D G T SEC. XI R E N

SUMMARY

EKAMikATION AREA CAIGY EuM E O E REMARKS WUMBER IDENTIFICAfl04 ITEM NO MET MCD PROCEDURE C M R ** CALIBRATION BLOCK'* FLYWwtEl (FIG NO A RCP 2) 260270 RCP 1018 FW RG UTO UT1 003 R0 X - - ERAM1 SED BORE, KEYWAYS, AND BOLT HOLE $ FLYWHEEL 1.14 IN PLACE.

                                                                                                                                          **CS 76**

1 1 2 16

DATE: 06/19/91 SOUTH IEFAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PACE: 10 REVill0N: 0 INSERVICE INSPECTION $UMMARY F KST INTERVAL, FIR $f PERIOD, THIRD OUTAGE (1991) CLA$$ 1 COMPLETED COMPONENTS REACTOR COOLANT PUMP C N O ASHE D G T SEC. XI R E N

SUMMARY

EKAMINAfl0N AREA CATGY EKAM E D E REMARKS EUMBER IDENilFICAtlON ITEM No METHOD PROCEDURE C M R **CALIBRAll0N BLOCK'* FLYWHEEL (FIC WG A RCP 3) 260370 RCP 101C FW RG UTO UTI-003 R0 x - - EKAMINED BORE, KEYWAYS, AND BOLT HOLES FLYVMEEL 1.14 IN PLACE.

                                                                                                                  **CS 76**

2 17

DATE: 06/19/91 SOUTH TEXA5 PROJECT ELECTRIC GENERATING STATION UNIT i PAGE: 11 REVill0N: 0 INSERVICE IN$PECTION

SUMMARY

flRST INTERVAL, flR$1 PEkl00, THIRD DJTAGE (1901) CLASS 1 COMPLETED C04PONENTS PEACTOR COOLANT PUMA D N O ASME D G T SEC. El R E N

SUMMARY

EXAMINAfl0N AREA CATGY EXAM E D E REMARKS NUMBER IDENTIFICATION ITEM N0 METHOD PROCEDURE C M R "CALIBRAil0N BLOCK" FLYWHEfL (FIG No A PCP 21 260470 RCP 1010 FW RG UTO UTI 003 R0 X - - EKAMINED BORE, KEYWAYS, AND BOLT HOL!$ FLYWHEEL 1.14 IN PLACE.

                                                                                                                                                                  "Cs 76" 2-18

l l

DATE: 06/19/91 SOUTH TEKAS PROJECT ELECTRIC GENEllATING STATION UNIT 1 PAGE: 12 .'1 REVISION: 0 INSERVICE INSPECTION

SUMMARY

l[ \ FIRST INTERVAL, FIRST PERIOD, THIRD OUTAGE (1991) CLASS ? COMPLETED COMPONENTS

              . AUXILIARY FEEDWATER SYSTEM N         O ASME                                     D G T SEC. XI                                  R E N SU MARY EXAMINATION AREA                 CATGY    EXAM                            E 0 E REMARLS NUMBER-IDENTIFICATION                    ITEM Wo METHOD        PROCEDURE          C M R **CAllBRAfl0N SLOCK**

8 AF 1006-GA2[C] (FIG N0 B AF 1)

330020 2' CF2 MT NDEP 7.1 R2 x- -

PIPE TO EL80W C5.51-- U145 071 002 RD - x-eecs.2.. 350350 18PL1 18PL8 CC MT NDEP 7.1 R2 x *

  • PIPE LUGS C3.20 350430' 22PL1 22PL8 C*C . MT NCEP 7.1 R2 x-PIPE LUGS C3.20 O

t . 8 AF 1006 G42[G1 (FfG WO B.AF-2)

              '351020I2                                  CF2 - MT              WDEP 7.1 R2        x-        -

PIPE TO REDUCER C5.51 U145 UTI 002 R0 - x - l

                                                                                                              ** C S - 2"

( 8 AF 1008 GA2f31 (FIG NO B-AF 4) 352440 1 C-F-2 MT NDEP 7.1 R2 x- - ! REDUCER 70 PIPE- C5.51 UT45 UTI 002 R0 X - - 1 l **CS 2** l 6-AF 1008 GA2 (FIC NO S AF 3.4) t I 359000 1 CF2 MT - NDEP 7.1 R2 x- - REDUCER TO PIPE t5.51 UT45 UTI 002 RO x-

                                                                                                              **CS-1**

l 2 3

DATE: 06/19/91 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 13 REVISION: 0 INSERVICE INSPECil0N SUMMART FIRST INTERVAL, FIRST PERIOD, THIRD OUTACE (1991) CLASS 2 COMPLETED COMPONENTS AUXILI ARY FEEDWATER SYSTE'4 N O ASME C C T SEC. XI R E N

SUMMARY

EKAMINATION AREA CATGY EKAM E 0 E REMARKS WUMBER IDENTIFICATION ITEM NO METHCD PROCEDURE C M R ** CAL 18RAfl0N BLOCK ** 6 AF 1006 CA2 (FIG NO B AF 3.4) 359120 7 CF2 MT NOEP 7.1 R2 X - a PENETRATION 10 P!PE C5.51 UT45 UTI 002 RO - X - eecs.1u 4 2-20

          .. . ~ . .-                                    . ~.             . . _       .~ - - - ~              ,,                .       - - - - - . - - - _ . ~ . ~ . ~ . .

1

                 =DATEi--06/19/91'

_ SOUTH TEXAS PROJECT ELECTRIC GENERATING STAfl0N UNIT 1 PAGE: REVISION: -0 INSERVICE INSPECTION

SUMMARY

    ~ FN -                                                        _ FIRST INTERVAL, FIRST PERIOD, THIRD CUTAGE (1991)

L - CLASS 2 COMPLETED COMPONENTS FEEDWATER SYSTEM N 0-ASME O G T SEC. XI R E N (SummART EXAMINATION AREA CATGf EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PR WEDURE C M R . ** CALIBRATION BLOCK" 18 FW 1012 GA2 (FIG NO B FW 1.2) 500080 5 CF2 MT WDEP 7.1 R2 X - - AUGMENTF.D ll! BEZ. PENETRATION TO P!PE C5.51 UT45 UTI 002 R0 X - -

                                                                                                                              ** CS - 3 "

18 FW 1032 AA2 (FIG NO B FW 71 505340 1 CF2 MT WDEP 7.1 R2 X -

  • AUGMENTED 151 BEZ.
                          -ELBOW TO PIPE                           C5.51        UT45             UTI 002 R0      X   - -

i "CS 4** 505350 1PL1 LPL8 CC MT NDEP 7.1 R2 X - PIPE LUGS C3.20

                                                                                                                              **CS 33" 503360 2                                          CF2          MT               NDEP 7.1 R2     X   - --

AUGMENTED !$1

  • BEZ.

P!PE TO PIPE C5.51 UT45 UTI 002 R0 X - +

                                                                                                                              "CS-4" 505380 3'                                         C-F 2        MT               NDEP 7.1 R2-    X   - - AUGMENTED ISI                   BEZ.

P!PE TO PIPE C5.51 UT45 UTI 002 R0 X - -

                                                                                                                              **CS 4" 4505400 ~4                                          C-F 2        MT               WDEP 7.1 R2     X        -

AUGMENTED ISI BEZ.

                          - P!PE TO VALVE                          C5.51        UT45-            UTI 002 A0      X   - -
                                                                                                                              **CS 4" 4

a. ( 2-21

                  ~           .                 - --     , -       _    .               ~.        .            ..            - ~. . _ . ~. -- -.. . - - - . . _

DATEJ 06/19/91 SOU1H TEKAS PROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 15 0 INSERVICE INSPECTION SUMMART

       '/'~ -. REVISIDN -                                      FIRST INTERVAL, FIRST PERIDD, THJAD OUTAGE (1991)

CLASS 2 CCetPLETED COMPONENTS _g[HpuAt NEAT REMOVAL STSTEM N 0 ASME O G T SEC. XI R E N

               - SUMMART EKAMINATION AREA                      CATGT    EXAM                            E O E RE4 ARKS NUMOER IDENTIFICAT!DN                      ITEM NO METH3D         PROCEDURE         C M R           **CAllBRAll0N BLOCK **

14 RM 1102 KB2 (FfG NO 8 RH 11 600000 1LU C.F 1 PT NDEP 6.2 R3 X * - EKAMINED 2.5T AT THE INTERSECTING CIRC. LONGITUDINAL WELD C5.12 UT45 STP UT31 R0,C0 X - - WELD. UT45T ICN1 X - - e gg.29ee 600040 1- C.F 1 PT NDEP 6.2 R3 X - - REDUCER To PIPE C5.11 U145 STP UT31 R0,C0 X - - UT45T ICN1 X - -

                                                                                                                        **SS 29

600060 1LD_ C F*1 PT . NDEP 6.2 R3 X - - EXAMlWED 2.5T AT THE INTERSECTING CIRC. C5.12

                           . LONGITUDINAL WELD                          UT45          STP UT31 RO,C0    X    - -        WELD.

Uf45T ICN1. X - - eegs.29**

                           '12 RH-1102 KB2 (FIC K0 B RN 1)
                            ~

i 601600- 1 C F-1 PT' NDEP 6.2 R3 X - - *

  • UT60 REFRACTED SHEAR USED FOR VALVE TO PlPE C5.11 UT45 STP UT52 R0,C0 - X . toDITIONAL COVERAGE.

UT45T ICN1 X - - UT60* STP UT31 R0,C0 -X . ICN1 & 2 **$5 20**

               - 601840 3                                      C F+1    PT            NDEP 6.2 R3       X    - -

PIPE TO ELBOW C5.11 UT45 STP UT35 RO,CO A - - UT45T X - - eegg.13

  • 601860 3LD CF1 PT kDEP 6.2 R3 X - -

EXAMINED 2.5T AT'THE INTERSECTING CIRC.

                            ' LONGITUDINAL WELC                C5.12    UT45          STP UT35 RO,CO    X    - -

WELD. UT45T X - -

                                                                                                                        **SS 13**

l i j'. l 2 22 i l' 7

  • q y- 4 .r- + w '-, w-

DATE: 06/19/91 SOUTH TEXAt PROJECT ELECTRIC GENERATING $1AT10N UNIT 1 PACE: 16 RFYttl0Nt 0 INSERVICE INSPEC110N $UMMARY FIRST INTERVAL, FIR $1 PERIOD, TPIRD OUTAGE (1991) s CLASS 2 COMPLETED COMPONEN1$ PEllDUAL NEAT REMOVAL SYSTEM N O ASME O G T SEC. XI R E M suMMART EXAMINATION AREA CAIGT EXAM E O E REMARK $ NUMBER IDENilFICATION ITEM NO METHOD PROCEDURE C M R **CAllBRA110N BLOCK'* 12 RH 1103 KB2 (FIC No 8 RM-6) 602720 1LU CF1 PT NDEP 6.2 R3 X - - EXAMINED 2.5T AT THE INTERSECTING CIRC. LONGITUDINAL UELD C5.12 U145 51P UT35 R0,C0 k - - UELD. U145T X - *

                                                                                                                                                                 **SS 13**

602760 1 CF4 PT NDEP 6.2 R3 X - - REDUCER TO PlPE C5.11 UT45 STP-U135 RO,CO X - -

  • U145T X - -
                                                                                                                                                                  **ss 13" 12 RM 1104 KC2 (Fl_G_NO B-RH 7)

O 1603400 1 CF1 PT NDEP 6.2 R3 X - - BASELINE EXAMINATION.

  \-                             NO22LE TO PIPE                       C5.11     UTOL         STP UT49 R1,CO               X            - -

UT45 $1P-UT35 R0,C0 X - - UT45T X

                                                                                                                                                                   " S5 13 "

603540 4 CF1 PT NDEP 6.2 R3 X - - PIPE TO REDUCER C5.11 UT45 $1P-UT35 R0,C0 X - - UT45T X - -

                                                                                                                                                                    **gs.13..

603560 4LD C-F 1 PT NDEP 6.2 R3 X - - EXAMINED 2.5T AT THE INTERSECTING CIRC. LONGifubthAL WELD C5.12 U145 51P-UT35 R0,CO X - - UttD. UT45T X - - eegg.13" 8 RH 1106 FU2 (FlG No B RH 7) 611960 13 CF1 PT NDEP 6.2 R3 X - - PIPE TO VALVE C5.11 UT45 STP U152 R0,CO - X - UT45T ICN1 X * *

                                                                                                                                                                       . gg.j ju

( x 2-23

DATE: 06/19/91 SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 1 PAGE: 17 REVISION: 0 INSERVICE INSPECTION

SUMMARY

~ G PESIDUAL HEAT P6MOVAL SYSTEM FIRST INTERVAL, FIRST PERICO, THIRD OUTAGE (1991) class 2 COMPLETED COMPONENTS

 **                                                                                   N         O ASME                                    O G T SEC. XI                                 R E N

SUMMARY

EXAMINATION AREA CATGY EKAM E O E REMARKS WWBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R "CALIBRAfl0N BLOCK ** 8-RM 1107 BB2 (Fic No B-RH 7) 612460 1 C F-1 PT NDEP 6.2 R3 X - - VALVE TO PIPE C5.11 UT45 STP-UT52 R0,C0 - X - UT45T ICN1 X e.gs.11** 8 RH 1314-892 (FIG No B RM 14) 631000 1 CF1 PT WDEP 6.2 R3 X - - VALVE TO PIPE C5.11 UT45 STP-UT52 R0,CO - X - UT45T ICN1 X - -

                                                                                                     **SS-11**

O G 2-24

DATE: 06/19/91 SOUTM TEKAS PROJECT ELECTRIC CENERAllWG STATION UNIT 1 PAGE: 18 REVISION: 0 INSERVICE INSF'ECTION

SUMMARY

FIRST INTERVAL, FIRST PERIOD, THIRD OUTAGE (1991) O\ M Y INJECTION $1 GiB CLASS 2 COMPLETED COMPOWENTS N 0 ASME O C T SEC. XI R E H

SUMMARY

EXAMlWATION AREA CATGY EXAM E O E REKARKS NUMBER IDENTIFICAT10N ITEM WO METHOD PROCEDURE C M R **CALIBRAfl0N BLOCK ** 6 51-11D6 DB2 (FIC NO B SI 12,13.14) 732020 2 C F-1 PT WDEP 6.2 R3 X - - PIPE TO FLANCE C5.11 UT45 STP-UT31 RO,CD X - - X *

  • UT45T ICN1
                                                                                                             . ss.23**

732040 3 C-F 1 PT kDEP 6.2 R3 X - - FLANGE 10 ELBOW C5.11 in45 STP-UT31 RO,CD X - - UT451 ItW1 X - -

                                                                                                              . ss.23**

732060 4 CF1 PT NDEP 6.2 R3 X - - 'UT60 PERFORMED TO ASSIST IN EVALUATION ELBOW 70 PIPE C5.11 UT45 STP-UT31 R0,C0 - X - 0F UT45 INDICATION. Ow/ UT45T UT60* ICN1 X X -

                                                                                                                **SS 23**

732080 5 C F-1 PT EDEP 6.2 R3 X - - PIPE TO ELBOW C5.11 UT45 STP UT31 R0,CO - X - UT45T ICN1 X - -

                                                                                                                 **SS 23**
   ~732100 6                                  C-F 1     PT            WDEP 6.2 R3          X        -
  • ELBOW TO PIPE C5.11 UT45 STP UT31 R0,CO X - -

UT45T ICN1 X - - eess.23** 6 51-1107-882 (FIG NO B SI 14) 733820 1 CF1 PT NDEP 6.2 R3 X - - VALVE TO PIPE C5.11 UT45 STP-UT52 R0,C0 - X - X - - UT45T ICN1 eess.g** s 2-25

                                                                                                                     . . _ . ~ . . - - . . .          . . . - .       .. ,

I DATE: 06/19/91 SOUTH TEXAS PROACT ELECTRIC GENERATING STATION UNIT 1 PACE: 19

   .       REVISION:'      0-                                      INSERVICE INSPECTa0W SUMMART
   -!  4'-                                           FIRST INTERVAL, FIRST PERIOD, THIRD OUTAGE (1991)

CLA$$ 2 COMPLETED COMPONENTS-RAFETT INJECTION SYSTEM

                                                   ~

N 0 ASME D G T SEC. XI R E N SUIMARY EXAMlNAfl0N AREA CATGY EXAM E 0E REMARKS NUM8ER IDENTIFICAfl0N ITEM NO METHOD PROCEDURE C M R **CAllDRAfl0N BLOCK ** 6 31 1107 382 (FIC N0 B-SI 141 733840 2 CF1 PT WDEP 6.2 R3 X - - PIPE TO ELBOW' C5.11 : UT45 s'P-UT52 R0,CO - X - UT45T ICN1 X -

                                                                                                                          **ss.9**

733860.3 C F 1. PT NDEP 6.2 R3 X - -

                 -ELBOW TO PIPE                      C5.11      UT45         STP UT52 RO,C0             -    X   -

UT45T ICN1 X - - . **ss.9** 6 $1 1109 002 (FIG N0 g $1 141-O T34620 8- C F-1 PT NDEP 6.2 R3 X - - PIPE TO ELBOW C5.11 . UT45 $1P UT52 RO,C0 - - X - UT45T ICN1 X - -

                                                                                                                          **$s 9**

734640 9 .C F-1 PT NDEP 6.2 R3 x.-

  • _ ELBOW TO PIPE- C5.11 . UT45 STP UT52 R0,C0 - X-
                                                             -UT45T          ICN1                       X    - -
                                                                                                                         - e* gs.9 * -

734660.10 CF1 ' PT NDEP 6.2 R3 X -

PIPE TO VALVE C5.11 UT45 $1P-UT52 R0,C0 X-UT45T ICN1 -X * -
                                                                                                                          **gs.9e*-

4 - f O 2 26

O APPENDIX 2-B PERSONNEUEOUIPMENT/ MATERIALS O O 2-27

i APPENDIX 7-B f] X./ PERSONNEL OUALIFICATIONS Y ) Name Company trr MT p_I yy Anderson, A. R. SwRI I" *" "* *" SwRI *" "* *" Delgado, J. R. II _* Roberds, B. A. _ SwRI II * "* *** "* Garcia, D. G. SSI II * *" *" *" Clark, A. D. SSI I '" "* *" Hanes, J. L. SSI I "* *" *" Rusca, R. SSI I '" "* *"

           ' Pennanen, A. R.                    NES             III*             III     III         II Graham, J. T.                     HL&P-                            II      II           -

Hubbard, S. K. HL&P III- III III III

           - Silva, P.                          HL&P                             II      II           -

Spiess, L D. HL&P II

  • II II -

Suhler, C. D. HL&P II

  • II II II Comnany SwRI - Southwest Research Institute SSI - Sonic Systems International, Inc.

__NES - Nuclear Energy Services

           - HI.AP_ - Houston _ Lighting & Power Company l-i.

I l: l:

                    - IGSCC Qualified by EPRI
                    - Level I Trainee
                    - This NDE method not performed by these personnel n

l-( 2-28

                                                                        *-e,

q APPENDIX 2-B U SwRI MATERIAL AND EQUIPMENT MATERIAL Certification Typ_c Date Berol Prismacolor Black Pencils #935, Log #2989 26 Feb 90

       -Berol Prismacolor White Pencils #938, Log #2998                        26 Feb 90 Sonotrace 40, Batch #8979, Log #2857 -                                 02 Mar 89 Sonotrace 40, Batch #9087, Log #3000                                   15 Feb 90                          ,

Sonotrace 40, Batch #9091, Log #3023 02 Aug 90 EOUIPMENT-Calibration Brand- Serial No. Date Pyrometer, Amprobe, Fastemp 078 15 Oct 90 Pyrometer, Amprobe, Fastemp 082 - 15 Oct 90 Pyrometer, Amprobe, Fastemp 140 15 Oct 90-Pyrometer, Amprobe, Fastemp 159 15 Oct 90 4 4 7 2-29

                                                               ,e-u,a-          --     ,-               n

[) 'bl APPENDIX 2-11 SwRI MAT 11 RIAL AND EQUIPMENT, cont'd EOUI'. fiNI Odibration Brand Serial No. Date Sonic FTS MK I 00608E 03 Jan 91 Sonic FTS MK I 01110E 03 Oct 90 Sonic FTS MK I 01117E 30 Oct 90 Sonic FTS MK 1 Oll22E 09 Oct 90 Sonic FFS MK I 04325E 09 Oct 90 Sonic FTS MK I 04330E 16 Oct 90 Sonic FTS MK I 04333E 10 Oct 90 Sonic FTS MK 1 06907E 10 Dec 90 Sonic FIS MK I 06909E 20 Nov 90 Sonic FTS MK I 774716 02 Oct 90 Sonic FFS MK I 780419 16 Jan 91 Tectronix Oscilloscope 2335 B010338 07 Dec 90

                                                                                 'l l

'd 2-30

l-APPENDIX 2 B SwRI MATERIAL AND EQUIPMENT, cont'd TRANSDUCERS IlHEL4 Serial No. Aerotech B09696 Aerotech B24665 Aerotech B27405 Aerotech D05923 Aerotech E15545 Aerotech E15546 Aerotech E16905 Aerotech E29801 Aerotech K18433 Aerotech K30086 Aerotech 015565 , SwRI 199 SwRI 1160 O SwRI SwRI 1586 1845 SwRI 1848 SwRI 1973 swr 1 2216 SwRI 2521 SwRI 2784 SwRI 2831 SwRI 2832 SwRI 2928 swr 1 3387 SwRI 3389 SwRI 3438 SwRI 3439 SwRI 3672 SwRI 3674 SwRI 3676 SwRI 3677 SwRI 3679 SwRI 3835 2-31

  ,.       -~ -        . - . - - -               .- ~                    . .    .   - . - -     - . - .-.

q: P APPENDIX 2-B. ] A

                                        ' HL&P MATERIAL AND EQUIPMENT hiATERIAL TxPs PT Cleaner SKC-NF/ZC 78, Magnaflux, Batch 88A004
             . PT Cleaner SKC NF/ZC 7B, Magnaflux, Batch 88D020 PT Cleaner SKC-NF/ZC-7B, Magnaflux, Batch 88F079 PT Penetrant SKL-HF/S, Magnaflux, Batch 88A027 PT Developer SKD-NF/ZP-9B, Magnaflux, Batch 88E035 MT Powder, Gray No.1
            ' MT Powder, Red No. 8A -

Sonotrace 40, Batch No. 9091 EOUIPMENT-Cahtration Hignd . Serial No. Due Date Thermometer 100-00520-26 05-03 91 Thermometer 100-00520 38 05-02-91 w): ( Thermometer 100-00520 49 06-01 91

Thermometer 100 00520-69 :03 19 91
             -Thermometer                                  100-00520-74         06-29 91 Thermometer                                100-00520-75         06-29-91 Thermocouple                               100-00534-18         03-19 91-Thermocouple -                             100-00534 28-        07-17 91 Thermocouple                               100-00534-33         04-11 91 Thermocouple.                             -100-00534-38       .06-04 91
            . Thermocouple                                 100-00534-56'        04 11                  MT Yoke, ElectroSpect ES-X                 6                      N/A MT- Yoke, Magnaflux, Y-6 --                Y6-012                 N/A MT Y_oke, Magnaflux, Y-6                  - Y6-03                 N/A
               .MT Yoke, Magnaflux;Y-6                     Y6-06 =                N/A                     :

Krautkramer Branson, USD-10 100-01303 01 .03/13/91 Sonic FTS MK I 100-01256-01 01/07/92 Sonic FTS MK I 100-01278-01 12/18/91 0 2-32

i ( APPENDIX 2-H _( ILtP MATERIAL AND EQUIPMENT, cont'd TRANSDUCERS Brand Serial No. Aerotech B03307 Aerotech B07336 Aerotech B07337 Aerotech H31814 Aerotech L16908 Aerotech L17920 Oi v

  '                             2-33
  ,,.a. se c;we. i.4._a .p.u.sw- A.d.e.a...w4 a--I'.dJ. w. a. .__A. , An. 2 .e4 -e    E     -a..       4_sa. .h -A@    4a-4          .=.-* =A - * . -'d At a e... A-    - m.

O f APPENDIX 2-C PROCEDURES O . s 2-34

APPENDIX 2-C g SwRI OPERA 1TNG PROCEDURES E Erocedure No, Title SwRI NDE3/0/0 Recording Indications During Ultrasonic Examinations ICN No. 2 SwRI-NDE5/0/1 Ultrasonic Linearity Measurements SwRI-NDE6/0/0 Use of Customer Netification Forms SwRl-NDE7/0/0 Weld Joint Identification Marking i J 1

 \           O l

l 1 1 l 1 i l l I l l 9 2-35

{ APPENDIX 2-C SwRI NDT PROCEDURES Procedure No. . Title STP-UT11/0/0 Manual Ultrasonic Examination of Vessel-To-Nozzle Inner Radius ICN No.1 Sections STP-UT13/0/0 Manual Ultrasonic Examination of the Reactor Pressure Vessel ICN Nos.1 & 2 Flange to Upper Shell Weld STP-UT15/0/0 Manual Ultrasonic Examination of Pressure Vessel Welds (Greater ICN No. I than 2 to 12 Inches in Thickness) STP-UT31/0/0 Manual Ultrasonic Examination of Austenitic Pressure Piping Welds ICN Nos.1 & 2 STP-UT35/0/0 Manual Ultrasonic Examination of Austenitic Thin Wall Piping Welds ICN No.1 STP-UT49/1/0 Manual Ultrasonic Examination Using longitudinal Wave Straight-Beam Techniques

  - STP-UT52/0/0              Manual Ultrasonic Examination of Similar and Dissimilar Metal Welds ICN No.1                  in Austenitic Piping Systems STP-UT53/0/0              Manual Ultrasonic Examination of Austenitic Branch Connectica Welds ICN No.1                  from the Branch Connection Taper STP-UT54/0/0              Manual Ultrasonic Examination of Pressure Piping Welds of High ICN Nos.1,2 & 3           Attenuation Materials STP-UT128/0/1             Manual Ultrasonic Examination of Austenitic Pressure Piping Welds for Thermal Fatigue Cracking STP-UT150/0/0             Manual Ultrasonic Examination of Reactor Pressure ICN Nos.1 & 2             Vessel Welds in Accordance with Regulatory Guide 1.150.

A V 2-36 I

        ~V                                               -APPENDIX 2-C J

HL&P PROCEDURES

                  ' Procedure No.                                            Title NDEP 4.0 Rev.-2        Ultrascnic Examination NDEP 6.2 Rev. 3-     ' Color Contrast Solvent Removable Liquid Penetrant Examination of        '

ASME XI PSI /ISI

             ,      NDEP 7.1 Rev. 2        Dry Powder Magnetic Part!cle Examination for ASME XI PSI /ISI f        NDEP 9.3 Rev.1         ASME XI Examiniotion for VT-1 and VT-3
                   - UTI-002 .Rev.O        Manual Ultrasonic Examination of Ferritic Pressure Piping Welds UTI 003   Rev. 0      . Manual Ultrasonic Examination of of Reactor Coolant Pump Flywheels from the Access Holes UTI 004 Rev. O         Manual Ultrasonic Examination Us ng Longitudinal Wave Straight-O                                       8ee- Tee *=ia e UTI 006: Rev. O .      Manual Ultrasonic Indication Sizing
       .t .,

1 l

                                                                                                                .1 L

4 h 2-37 i y 1-

O APPENDIX 2-D O isi ex^ utu^rios tiairxi>oss O 2-38

APPENDIX 2-D ISI EXAMINATION LIMITATIONS Table of Contents Pace STPEGS-1 Summary of Inservice Examination Limitation 2-40 Class 1 Componejlti ASME Categog B-A 2-43 Reactor Pressure Vessel ASME Category B D 2 44 Steam Generator ASME Category B-F 2-45 Pressurizer Piping Reactor Coolant System ASME Category B H 2-46 Pressurizer O ASME Categon B-J 2-47 Piping Reactor Coolant System O 2-39

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 1

SUMMARY

OF INSERVICE EXAMINATION LIMITATIONS The following tables provide details on the limitations which were encountered during the inservice examinations (ISI) at the South Texas Project Electric Generating Station (STP), Unit 1. Each table of this summary provides the following information as described: folumn 1 - Class / Category / Item No./ Examination Requirement Identifies the ASME Section XI Code Class, Category, item Number, and Examination Requirement (volumetric or surface) for the specific examination area listed in Column 2. This information is derived from Tables IWB-2500-1 and IWC-2500-1 of the 1983 Edition of ASME Section XI (with Addenda through Summer 1983), and Tables 1 and 2 of Code Case N-408. Columql - Line No./ Subassembly Weld Identification Weld ID Figure Weld Configuration Examination Method Provides information for each examination area by line number (piping) or subassembly number (vessel), unique weld identification number, SwRI weld ID figure reference, weld configur ? ion (pipe-to-tee, head to-shell, etc.), and examination method (UT, UT/PT, or UTiM1; Column 3- - Exam Type - Lists the Methods of Examinations used for each area by specific angles for.UT (0,45, 45T,60,60T) and surface technique (MT or PT), if required. Column 4 -

                    % Coverage The extent of coverage for each exam type is expressed in percentages based on the examination volume / area required in Section XI. Depending on method, the percentage coverage may be represented in more than one way.

Surface methods are the simplest and are expressed as a percentage of the required surface area receiving no coverage and the remaining balance from 100% as the total coverage. 2-40

O Ultrasonic coverage is first expressed for each exam type as a percentage of the volume V receiving no coverage, angle beam coverage in one direction only, and angle beam coverage in two directions. These percentages are then used to compute the effective coverage for that exam type. In the case of 0 degree, the effective coverage is equal to the balance of 100% minus the percentage receiving no coverage. The effective coverage for angle beam is calculated from the following formula: c = " +22*b (effective coverage formula, angle beam) where a = one direction only percentage b = two direction percentage Examples: (1) none 1 dir 2 dir 0% 0% 100 % c = 0 + 2 100 = 100% effective coverage , 0 v 1 (2) none 1 dir 2 dir 0% 100 % 0 % c = 100 + = 50% effective coverage 2 (3) none 1 dir 2 dir 50 % 50 % 0% c = 50 + 2*0 = 25% effective coverage The total UT coverage is then expressed as the average of the effective coverage percentages for each UT exam type. Each UT exam type is considered as equal weight in the calculation of the average. [ 2-41

Columnj - Limitation A description of the type of limitation and primary reason for why the coverage was limited is provided in this section. O 2-42

ASME SEcrioN XI CODE COVERAGE I.tMITATIONS C ( 19911RE03 ISI 60VTH TEY At PROJtcT IltITRIC OENIAAitNO STATION, UNIT I LWE CA1NORY h A SYSTIM. P.LACTOR PRES $URE Veit!1 (CLAs! !) LIMet NOl&USAbiEMblY C1.A92

  • WELD IDINTITICATION '5 @ VERAOE CATOY * %T1D ID TlOURE TTPM No. EXAM i D]IR ? -D7, Enl RQT . EX AMIN ATION MtTilOD TYPt NONEOMLY DIR O)V. TUTAL - LIMITATION 4 RPV8 UTO 30 * + 70 IN!1ED UT DUE TO IROXIMITY OF B- A 103 101 UT4$ 3 0 97 97 LD7!NO LUOS AND INSULATION Bl.21 FIOURE No. A+RPV4 UT45T 30 0 70 W $UPPORT lt!NO 005 OP THE Wr1D VOL (Closure llud) tff60 1 0 99 99 1I:NOTil WAS EXAMINPD POR PERIOD 1)

DOME-To-TORUS UT6nT 30 0 70 '70 88 UT I- RPYi

                                                                                               ~

FTT~ 3 . . 3 NtY1iT FROM THE PLANOE $1DE DUti B- A 101 101 UT45 1 0 99 99 PLANOE CONFIOURATION. Of n OP file Bl4 FIOURE No. A RPV 3 UT457 5 0 95 M Wi1D LENGTn? WAS EX AMINED POR YO!)5URP (Cloews Hud) UT60 3 0 97 l'ERJOD 3) TORUS TO rLANOE UT60T $ 0 95 95 M UT/MT MT 0 . + + 100 C ( l 2 43

eg ASME SECTION 2 wuS COVERAGE LIMITATIONE 1991 1RE0.11S1 toVTH TEX AS PROJFCI 11LCTklC OINERATINO ST ATION. UNIT I ARMP CATfOORY b-D 8YSTnt: &TLAM OlWERATOR (CLAS$ 1)

                                                                                                                                                                                ~

LINE nod &V&Ab&hlblY CLAtt - WELD IDEN11PICATION 5 CVVERAOR CATOY WI1D ID flOURE ITDf NO. EXAM i DIR 2 kJ /. EXM kQT EX AMINAT10N METilOD TYPE NONE ONLY DlR COV. TOTAL UMTTATiON i 80-ID UTO I ~ a

  • 99 LIMITLD UT 1 ROM THE HLAD &lD2 DUE B-D IN UT4$ 0 7 93 97 TO PROXIMITY OF WT1D &Ri AN!) VIPRATION B3. 8 X) F100RE NO A-SO-2 UT437 1 0 99 99 SENSOR INSTRUMINTATION DOE VOL UTW D 14 H 93 NO2 ELE-TO-SHI1L UTo07 1 0 99 99 97 UT
                                                                                                                                                            ~

I b-ID US - 1 - - LIMITLD UI FROM $E5YDY b-D ON UT45 0 7 93 97 10 PROXIMfrY OF Wild $kt AND V!bkATlON B3,830 FlOURE NO. A-!G 2 UT4ST I 0 99 99 SENbOR INSTRUMINT ATION iiOX. VOL UTto 0 14 M 93

                                                       $ HELL-T&NOIILE    U160T               1       0          99        99 9s UT
   \

lO l v l 2-44

l l l l ASME SECTION XI CODE COVERAGE LIMrrATIONS 19911RE03 ISI 60VTH TEX AS PkOJECT 11ECTRIC OD4ERATINO $T ATiON, UNTT I b.5Mit CATipORY h-P KYSTEM: PRl3SURIZER (CLAtt 11 UNE NOJ&UBALWMBLY I CLASS - WELD IDENTiflCATlON # ET)VER AOE CATOY WELD ID flOURE TTIM NO, LXAM i DIR 2 EFF,

                        ,EXM     kQT + EX AMIN ATION METHOD                                       TYPE      NONEONLY D.1R. .        COV.         TOTA 1.                                   LIMf7ATION I                               FRZ-1                                    UTO          O     -        100     luu                 LIMt1ED UT l' ROM THE & ale END $1DE DP                              Hi-EE                                    UTelleo      0       ft      79      90                  DUE TD PROXIMITY Of PLkMANENT B3 40                FIOURE NO. A PRI-l                                  UT41!e0T     C        0     100     st0                  INSULATION BUPPORT LUOt. L1hMTED YOf/4URP                                                                                                                      97 UT FROM Tile NOZZLE SIDE DUE 10 NOZZLE-70-& ATE END                                                                                           NOZZLE CONT 10URA'lloN.

UT/PT PT 0 - *

  • 100 SY$ TEM- Rf. ACTOR COOLANT MAIN LDOPS (CLA&51 PIPINO) 9 LINE No./&CBAkstatBLY CLASS
  • WELD IDINTirlCATION 5 COVERAGE CATOY - Wi1D ID TIOVRE -

TTEM NO. EXAM _ i D!R 2 ETP. Elkf PQT + EX AM! NATION METilOD TYPE NONEONLY D!R COV, TOTAt uhtri ATION E!5EkNTY$MthL DUE10

                                                                                                                                                ~~

3

                                                                                                                                             ~
    %                    1                           31 kC-8102                                   U10          0
  • 100

-f ( SP 1 UT4Sleo 26 24 50 62 THE WELD CONFIOURATION AND $EARCH

                        'B3130                 FIOURE NO. A RC 1                                  UT45!e07      8       0      92      92                  UNIT SIZE 11MITED UT TkOM THE NOZZLE YOll&URP                                                                                                                      83  $!DE DUE TO THE NOZZLE CONFlOVR ATION.

NOZZLE-TO-ELBOW , _ _ . __ UT/PT __ PT _0, = 100 1 31-kt-1402 U10 0 - 100 100 LIMITED U1 I kOM lilE ELBOW E1DE DUE TO B-P 1 UT45/60 19 31 50 66 THE WELD CONPIOURATION AND $EAkCH B3 IM FIOURE NO. A RC-4 UT45/e01 Il 0 $1 82 UNIT 512E. LIMITED UT F ROM THE NOZZLE VOL/$URP 83 SIDE DUE TO THE NOZZLE CONflOUk ATION. NOZZLE-TO ELBOW UT/PT PT 0 - - - 100 1 29 kC Il01 DE~ 6

  • 100 100 LIMI1LD UT PROM TYElbOW $1DIYEY B-P 3 Ufe$/to 0 0 100 100 Tile %ILD CONFIOURATION AND $EARCll lL5.130 FIOURE NO. A-RC 8 UT45/e07 43 0 15 l) UNIT stZE LIMITED UT FROM THE NOZZLE YOUSURP 72 SIDE DUE TO THE N0ZZLE CONTIOURATION.

elbow-TO-NOZZLE UT/PT PT 0 - *

  • 100 Y
                                                                                              ~

1 29 RC-1401 hTo 0 7 3Y 'L3IfD UT PROM THE LLbOW $1DL DUEM~ B-P 4 UT45teo 0 30 SO 15 THE WELD CONFIOURATlON AND $EAkCH B5.130 FIGURE NO, A-kC-4 U e45/e0T 22 0 78 78 UNTT $1ZIL LIMITED UT PROM THE NOZZLE YOU$URP $4 SIDE DUE TO THE NOZZLE CONFIOURATION. ELBOW-TO-NOZZLE UT/PT PT 0 . - - 100 2 45

                          -                      . . _ _ _ _        _ _ _ - . _ - -_ _ _ _                                                               - - . . _ . _ - - -  ._._m____._.                          _ . _ _ _ _ _ . _ _

ASME SECTION XI CODE COVERAGE LIMITATIONS O g 1991 1RE03151 SOUTH Tt.XAS PROJECT LUCTRIC OENERATING tTATION, UNTT 1 AtMP CATinORY b-H SYSTEM- PRI35URIZER (CLA&S 11

                                                - UNE NO.I5UBA$$EMBLY CLAta     - WELD IDENitflCATION                                                                            S COVERAGE                                                                             ,

CATOY

  • WELD ID F10VRE  !

ITEM No, EXA1.4 1 DIR 2 Err, EXM RQT = EX AMIN AT10N MET 110D TYP L NONEONLY DIR _ COV. TOTAL __ llMfiATION _ i PRZ-l PT 10 * *

  • 90 NO PT ON TOP OF THE BRACKCIS DVE Th DH IA.18 PROXIMilY OF PF.RMAND4T silPPORT bl.20 Pf0VRE NO, A-PRZ*l FR
  • M L
                                      $URf
                                                       $UPPORT BRACKET 8 PT t

l l l I l 2-46 l l

   .   -. _ ___-_.m_.             ..            _ , _ _ _ .         . _ _ _ _ _ _ _ _ _ _ _ . - .. _ . - _                       _ _ . . _ _ . . . _,___ _ _                      .m _

ASME SECTION XI CODE COVERAGE LIMITATIONS 1991 IRE 03 ISI

               &OUTil Tr.XAS PROJECT 121CTRIC OINERATD40 $T ATION, UNTT l A5MP CATTnOty k-J EYSTIM; RFACTOR COOLANT (CLAts I)

LINE NOJJUBAb5LMBLY CL.\S$ - W1:LD IDINTIPICATION l S(VVERAOE CATOY - WELD ID FIOVRE ITTM NO. EXAM i DfR 2 Err. FXM kQT - EXAMINAT1oM METHOD 1YPE NONE ONLY DIR COV. TOTAL LIhutATION I SthNtId UT45 3 88 T $8 UMTIED UT FROM kJIjiELS AND ON BJ 9 UT451 45 0 I$ il THE %TA D DUE TO STLD CONFIOURATION 89.1i FIOUPE NO. A EC-1 2 AND kiE OF THE $EARCH UNIT. YOU5URP l 11 tow-TO- PUMP l l

                                                                 "           d. . * - - , 3-*                  .

l ll kC 1292 U14) t 64 l) 87 LIMITED UT FROM IOTH &lD14 AND ON_ B-J 9 UT45T 83 0 18 il THE WELD DUE TO WELD CONFlOURATION tit.ll FIOURE 14O. A*RU-2 M AND $1EE OF THE EEARCH UNIT. j v0UsUmr i ELh0W TO PUMP I l UT/PT PT 0 - - - 100 l 1 29-RC-Ilon UT24/45 10 90 0 4$ LIMriLD UT FNOM THE bC &lDE DUL 10 j g B-J 3 BC CONFIOURATION. l 119.3 8 FIOURE NO. A-RC-1 43 ) VOUSURP 12' BRANCH CONNECTION UT/PT PT 0 - - - 100 1 l l t I t l I~ { i O 2-47 l l

O APPENDIX 2-E OWNER'S REPORT FOR INSERVICE INSPECTIONS ' NIS-1 FORMS l 2-48

1991 ISI IRE 03. Welds (Clus 1) Page 1 of 3 PORM Nis.1 OWNER'S REPORT FOR INSERV)G INSPECI10NS As required by the Proviskms of the ASME Code Rules O 1. Owner Houston Lithline & Power Comoany: Electric Tower: P.O. Box 170&. Houston. Texas 77001 (Name and Address of Owner)

2. Plant South Texas Project Electric Ocnerating Station: P.O. Box 2R9. Wadswrth. Texas 77483 (Narne and Address of Plant)
3. Plant Unit 1 4. Owner and Certificate of Authori:.ation (if required) N.A.
5. Commercial Service Date 06/25%8 6. National Board Number for Unit N.A.
7. Components inspected ASME Onde Class 1 (IWB) Items We&ds Program

_ (See Pane 3 of 3 for ident1&stion Numben) Manufacturer Component or Manufacturer or lutaller National Appurtenance or Installer Serial No. Board No, Reactor Pressure Combustion Engineering /

                                    . Ygssel                                          Westinghouse (M)                       11073                                                    22190 Pressurher                                     Westinchouse (M)
                                                                                            ~

2141 W18500 Steam _0enerator ID Westfachouse (M)

                                                                                            ~

2134 W18694 Reactor Coolant , Pumt) 1A Westinghouse (M) 1 115E580 001 28 Class 1 Pleine Ebasco,II) N.A. N.A. O i M Date M/Jk/ Date bd4/ O HL&P by R. L'Beverly // Factory Mutual by B. R. Russell, ANIl e 2 49

 , . --                         . ~         _      _-_ - _ _ __-.. ..~ . -._ .... _ .                                           .._.__ ._ _~ _--__ _._ _ .-.._.~- _--_- _ _ .~.

Page 2 of 3 I 1901 ISI . IRE 03 . Welds (Clan 1) PORM N31 (Baci)

8. Examination Dates - Ol/1R91 to 201N1 9. Inspection Interval from ORPJE to ARPJ98 l 10. Abstract of Examinatter.:. include a list of examinations and a statement concerning status of work D' required for n,nent interval. (ASME CWe Class I (IWB) Items . Wekis Program)

Fe Section 2.4 and Appendia 2 A of 1RH13 Summary Report for list of craminations performa!.

              'Ibe examinations performed this outage constitute 30 pertent of the required examinations for the current laterval.
11. Abstract of Conditions Noted.

No relevant conditions mere noted.

12. Abstract of Corrective Measures Recommended and Taken.

No conective measuns were taken or remmmended. We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of ASME Code, Section XI. Certificate of Authonzation No.(lf applicable) N.A. Expiration Date _RA,. Date b-/.3 19 d?/ Signed Houston Lichtinc & Power Co,_ Dy kdad' Owner R'. 1. Beverly CERTIFICATE OF INSERVICE INSPECI'lON (', 1, the undersigned, holding a valid commission issued by the National Board of Boller and Pressure Vessel Inspectors and the State or Province ofIr3ui and employed by Arkwricht Mutual Insurance Co. of Norwood. Man have inspected the components described in this Owner's Report during the period

           /-/A-4/           to 3 -/ #F/             . and state that to the best of my knowic4ge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code, Section XI.

By signing this certificale neither the Inspector nor his employer makes any warranty, express or implied, concerning the examinations and corrective measures described in this owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or prope y damage or a loss of any k!nd arising from or connected with this inspection. Factory Mutual System s awhs Commissions Tex 326 Inspector's Signature National Board, State, Province, and Endorsements B. R. Russell Date M /d - 19 #7/ () 2-50

1991151 1RE03. Welds (Class 1) Page 3 of 3

                                  $UPPl.LMENT 'IO PORM NIS 1 OWNER'S REPORT POR INJERVICE INSPECrlONS FOR ASME Onde Qass 1 (TWB) Items . Wekts Pror, ram
1. Owner flouston Uchtine A Power Company: Electric Tower: P.O. Box 170m Houston. Texas 77M11 (g (Name and Address of Owner)
2. Plant South Teus ProtectElectric Generatine Station: P.O. Bot 284. Wadsworth. Tens 7748't (Name and Address of Plant)
3. Plant Unit 1 4. Owner and Certificate of Authorization (if required) N.A.
5. Commercial Service Date 082/88 6. National Board Number for Unit N.A.

A5 Mil ASMll COMPONFXT EXAM fATUY [1121. er fTrTF M _ IDi'Km1 CAT 10N No. MImlOD EmARKs DA D1.30 RPV IU'V1101 121 UT Ilange toUpper sheu DA D1.40 RPV RPVI 101101 LTT,MT C3caure llend Torw-to-lhnge DA D1.21 RPV RPV1103101 UT Ckuure }{end Dorne toTorus DA 111.22 RPV RPVI 101104A LTT Cks. Ilead Merid. Weld (ALO) Il A B122 RPV RPVI 101104B LTT Cks. llead Merid. Weld (AL 90) Il-D D3.110 PRZ PRZ1 N1 tTT Surge Nonje.to-$heti D-D B3.120 PRZ PRZ1NIIR LTT Surge Nonle Inner Radius B-F B$.40 PRZ PRZ 1 N15E LTTPT Surge Nonie-to-Safe Fa$ DH B&.20 PRZ PRZ 1 1 A.1B PT Suppon Dreckets BD D3.130 50 501D1N LTT inlet Nonle-to Shell D-D B3.130 50 SG 1 DON LTT Shell-to-Outlet NonJe DD D3.140 50 SG 1D IN !R IIT inlet Nonje tr.ner Radius ll.D B3.140 50 501 DON 1R UT Outlet Nauje Inner Rad us BF D$.130 RC 31 RC 11021 tTT.PT SO Outlet Nonje-to Dtw BJ D9.32 RC 31 RC 1102 $ IT 3-in. Branch Connection DJ 119 11 RC 31 RC-1102-9 LTT.PT Piping Butt Weld DJ D911 5:C 31 RC 1202 9 LTT,PT Piping Dutt Weld DF B5.130 RC 31 RC 14021 LTT,PT SO Outlet Non3e-to-Dtm trr,PT f' s DJ DF B9.31 DS.130 1C RC 29-RC 11013 29 RC 11015 trT,PT 12-in. Dranch Connection Dtw to-50 Inlet Nonic DF B5.130 RC 29 RC-1401-4 UT.PT Dte to-SO Inlet Nonne DJ D9.11 RC 1&RC 1412-1 trT,FT Piping Butt Weld flJ D9.11 RC 16-RC 1412-4 LTT PT Piping I;utt Weld DJ 119 11 RC 1&RC-1412-5 LTT.PT Piping Butt Weld DJ D9.11 RC 1&RC 1412-6 UT,PT Piping Butt Weld D4 D9.11 RC GC 1123-4 UTPT Piping Butt Weld 11J D9.11 RC 4.RC 11219 UT.PT Piping Butt Weld BJ D9.11 RC 4-RC 1123-11 trT,PT Pipirig Butt Weld 11 4 D9.40 RC 2 RC 1220-1 PT 2 in Drsnch Connection DJ D9.21 RC 2 RC 1419-1 PT Piping flutt Weld DO2 D7.60 RC RCN01A-SHB VT1 Seal Housing Dotting

       ,r'       HlAP by                             b M __ Date NI R. L Beverl 91   Factory Mutual by k       wl-B. R. Russell ANil Date le ~ 'O -9/

( 2-51

 ._.m.___.          . .    . _ . _ - . . . _ _ _ . _ . _ .         .

1991 ISI 1RE03 Welds (Oass 2) Page 1 of 3 PORM NLSI OWNER'S REPORT FOR INSERVIG INSPECT 10NS I As required by the Provisions of the ASME Oude Rules l

l. Owner Houston Uthfine & PoweLCompany: Electric Tower: P.O. Box 1701 Housto:1. Texas '77001  !

(Natne and Address of Owner)

2. Plant South Texas Project Electric Generatine Station: P.O. Box 289. Wadsworth. Texas 77483 _

(Name and Address of Plant)

3. Plant Unit 1 ,4. Owner and Certificate of Authorization (if required) NA
5. Commercial Service Date 08/2548 . 6. National Board Number for Unit NA
7. Components Inspected ASME Code Qass 2 (IWC) Items . Welds Program (See Page 3 of 3 for identifkstbn Numbers)

Manufacturer i Component or Manufacturer or Installer National Appurtenance or lastaller Serial No. Board No. Class 2 Pipine Ebasco m ' NA NA O i HL&P by 8 */u_ Date h/S/1/ Factory Mutual by . 10 Date 4"/8Y/ R. I' Bever1 B. R. Russell, ANil 2 52

2. ..__.;_ _ . . _ . . _ . _ _ . _ . _ . . _ _ _ . . . _ . _ _ _ .. _ _.-__.., _ __ _ _ _ _ . . _ .. . - _ _ . ~- _ _ - _

1991 ISI 1RE03 Welds (cau 2) Page 2 of 3 PORM NIS-1 (Back)

8. Examination Dates - 01/21N1 to 02/20 91 9. Inspection Interval from 085%8 to EL'jlSs. l l

(G)

10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for cunent interval. (ASME Code Qass 2 (IWC) Items - WeMs Program) l l

See Section 2.4 and Appendiz 2.A of 1RE03 Summary Report for list of examinations performed. ne enminations performed this outage mnstitute 31 perocat of the required examinations for the cunent latesvat

11. Abstract of Conditions Noted.

No selevant mnditions were noted.

12. Abstract of Corrective Measures Recommended and Taken.

No mrrective measures were takea or recommcaded. We certify that the statements made in this report are mrrect and the examinations and corrective measures taken conform to the rules of ASME Code, Section XI. Cert 10cate of Authortration No.(if applicabic) N.A. Expiration Date N.A. Date d-/3 19 9/ Signed Houston Lichtinc & Power Co. By _ bbs - Owner k.1. Beverly CERTIFICNITI OF INSERVICE INSPECTION /N 1, the undersigned, holding a valid commission hsued by the National Board of Boiler and Pressure h Vessel Inspectors and the State or Province ofInn and employed by Arkwricht Mutual Insurance C4h of NorwtM Maw have impected the components described in this Owner's Report during the period

        /-;1/ #h           to ,,.P .#p '7/         . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code, Section XI.

By signing this certificate neither the inspector not his employer makes any warranty, express or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or pro rty damage or a loss of any kind arising from or connected with this inspection. Factory Mutual System

             .       MA                           Commissions                  Tex 826 Inspector's Signature                               National Board, State, Province, and Endorsements B. R. Runell Date             0        ~~

19 i / pd 2-53

l IW1 ISI . IRE 03. Welds (Class 2) Page 3 of 3 l SUPPIEMPRT'IU FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPl!Ci1ONS 1 FOR ASMI!__Crxic Clau 7 (IWC) Items .-. Wolds Profrarn

1. Owner Houston IJchtinc & Power Company; Flectric Tower: P.O. flot 170a. Houston. Texas 77001 (n) (Nanic and Address of Owner) 1 l
2. Plant South Texas Pro. ject Electric Generatine Station: P_.0, Box 2R9. Wgdsworth. Texas 77483 ,

(Name and Address of Plant) .

3. Plant Unit 1 4. Owner ar.d Cert lAcate of Authorization (if required) _ N.A.
5. Commercial Service Date 08/25/M 6. National Board Number for Unit N A.

AsMf! ASM!i COMPONINI' P.XAM ff]TE ((1M, or SWil'.M li!!N11 FICA 110N No. ,,,,,, Miml0D RUMAltKS Cf2 C5.51 AF lt AF 10iw,[C] 2 UT,MT Piping flutt Weld C4' C3:0 AF trAF 10mjc) IRPL1 lRPlit MT Pipe 1.ugs C-C C3.20 AF 8-AILl(KE[Cl.22pL] 22PlJt MT Pipe L ugs C F-2 C5.51 AF 8-AF 1006{0j 2 LTrMT Piping flutt Weld Cf-2 C5.51 AF 8-AF 1008[0] 1 UT,MT Piping Dutt Weld Cf-2 C5.51 AF 6-Altloon l UT.MT Piping flutt Weld Cf2 C5.51 AF 6 AF 1008 7 UT,MT Piping flutt Weld Cf2 C5.51 FW 18-IV 1012 5 UT,MT Piping Ilutt Weld CF2 C5.51 l'W 18I V 10321 UT MT Piping Ilutt Weld C-C C3.20 IV 18 IV 1032 IPLl4PUI MT Pipe Lugs Cf2 C5.51 l'W 18-IV-1032 2 UT,MT Piping !!utt Weld Cf2 C5 51 l'W 18fw 1032 3 UT.MT Piping flutt Weld Cf2 C5.51 FW 18 IV 10324 LTT.MT Piping !!utt Weld C-F 1 C5 II,12 Hil 14-Ril 11021, ILU, ILD UT,PT Piping Dutt/long. Welds Cfl C5.ll Ril 12-Ril 11021 LTT.PT Piping Ilutt Weld Cfl C511,12 Ril 12 Ril 1102 3,3LD UT,l"! Piping flutt!Leag. Welds Cf.1 C511,12 Rif 12 Illi-1103-1, ILU tri,PT Pipmg Dutt!1ong. WelJs g- Cfl C5.11 Rif 12 1111 1104 1 UT,PT Piping Itutt Weld t Cfl C5.ll,12 Ril 12 Ril 1104 4,4LD UT,PT Piping Duit!long. Welds CT1 C511 Ril 8 Ril 110&l3 UT,PT Piping !!uti Weld CP1 C511 Rif 8 Ril 1107-1 LTT,PT Piping Butt Weld CT1 C5.11 R}l 8-Ril 13141 UT.PT Piping Butt Weld Cfl C511 SI 6 SI llN> 2 UT,PT Piping fluit Weld Cfl C511 51 6 St.1106 3 UT,PT Piping flutt Weld Cf.I C5.Il 5! 6 51 11064 LTr.PT Piping fluit Weld CT1 C5.11 S1 6 SI Il06 5 tri,PT Piping 11utt Weld C-Itl C5.Il SI 6-51 1106 6 UT,PT Piping Inutt Weld CT1 C5.11 SI 6-51 1107-1 UT,PT Piping Dutt Weld Cfl C5 il SI 6 *'l 1107-2 LTT,PT Piping Ilutt Weld Cfl C5.Il SI >-SI 1107-3 UT,PT Piping flutt Weld Cfl C511 51 6 SI 11(48 UT.PT Piping flutt Weld Cfl C5.11 $1 6 51 1109-9 LTT.PT Piping Dutt Weld Cf.) C5.l t $1 6 51 1109 10 UT,PT Pip ng Ilutt WelJ HL&P b) I W/L Date Cd ~ Factory Mutual by _ hw Date &TdQ O a >' w ve>>> ' i>. a. aesscii. ^">i

l

 ,_      3.0 STEAM GENERATOR TUBE EXAMINATIONS l

3.1 Introduction This section of the summary report addresses the eddy current ISI of selected tubing in S: cam Generators C and D conducted during the 1991 refueling outage of the South Texas Project Electric Generating Station, Unit 1 (1RE03). It is intended to respond to the reporting requirements of I ASME Code Section XI, IWA-6000 and 4.4.5.5 (b) of the STPEGS Technical Specification. The STPEGS Unit 1 plant design contains four (4) steam generators. Each of the steam generators is a raodel E2 recirculating design generator, designed and fabricated by Westinghouse Electric Corporation of Tampa, Florida. Each generator contains 4861 tubes. The tubing is ASTM SB-163 Inconel material having a nominal outer diameter (OD) of 0.75 inches and nominal wall thickness of 0.043 inches. The examination agency for the IRE 03 eddy current examination of steam generator tubes was Westinghouse Electric Corporation. They acquired the first eddy current data on January 27, 1991. The last eddy current data analysis was performed on January 31,1991. 3.2 Scope of Examinations The STPEGS 1 Ten Year ISI Plan, previously filed with the NRC, describes the ISI program for examination of steam generator tubing. Additionally, a supplemental 151 plan (ISI Outage Plan) entitled," 1991 Outage Plan for the Inservice Inspection of Steam Generator Tubing at the South Texas Project Electric Generating Station, Unit 1" was prepared by Houston Lighting & Power Company (HL&P). The ISI Outage Plan identified the steam generator tube areas expected to be examined and the eddy current examination procedures expected to be used during this ISI. Prior to the beginning of the ISI, tubes were selected in accordance with 4.4.5.2 of the STPEGS Technical Specification (NUREG - 1346) and assigned to the first (6%) sample of tubes in each of the two (2) steam generators to be examined. _ These first samples were lis:ed in the ISI Outage Plan. Because the results of the initial examinations identified oy the ISI Outage Plan could have identified a situation where additional examinations of other tube areas or the same tube areas (with different nondestructive examination techniques or methods) would be required or advisable, the ISI Outage Plan established a method for quickly changing the plan scope or other details during the outage. Changes were made by issuing Outage Plan Change 3-1

                                ..                      . -    -                                     s
    . _ _ . _  --     -     -__ - _ _ _ ~      .-      .. -           - -.     ..          -- .   - - - _

l I l n Forms. Three (3) changes were made 'o he ISI Outage Plan during the () outage. Each of the three (3)is included as i opendix 3 A. Tl:e ISI Outage Plan and plan changes are consistent with the requirements of the Ten Year ISI Plan. 3.3 Personnel, Procedures, and Equipment 3.3.1 Personnel Qualifications The Westinghouse personnel who performed eddy current examinations and data analysis were c:rtified in accordance with the requirements of IWA 2300 of ASME Code Section XI and a Westinghcuse certification practice approved by H1AP. In addition, all data analysts were required to have satisfactorily completed (1) specific training in eddy current data analysis and (2) site specific training. The site specific training lecture addressed the specific design and operating history, previous cddy current examination results, and the data acquisition procedure and analysis guideline to be used for the STPEGS Unit I and 2 steam genentors. The site specific training also included hands on review of indications of flaw types which have been experienced at plants of similar design to that of the STPEGS. Successful completion of the site specific course required the passing of a written and practical (hands on) test. The N Westinghouse personnel who performed examinations and data L analysis and their certification levels are listed in Appendix 3 B. l l 3.3.2 Examination and Analysis Procedures For those eddy current examinations which respond to the requirements of the STPEGS Technical Specifications, Westinghouse used the bobbin probe technique in their procedure entitled," Digital Multi Frequency Eddy Current Inspection of Preservice and Inservice Heat Exchanger Tubing"(HIAP Document No. 0120(1)-00172 WNC). l This technique was used in each tube examined to record 550,400, 100, and 10 kHz frequency data using both differential and absolute l bobbin probe coil configurations. The Westinghouse bobbin probe l procedure (0120(1)-00172-WNC) is an alternative to the technique l described in ASME Code Section V, Article 8, I-42, which requires that the probe puil speed not exceed 14 inches per second. Instead, l

                          - a maximum pull speed of 24 inches per second was permitted. At this i                           pull speed the digital signal sampling rate must be raised from the typical 400 samples per second to 800 samples per second. This l                           procedure, using the faster probe pull speed, was demonstrated to the n

satisfaction of the Authorized Nuclear Inservice Inspection (ANII) in V accordance with IWA 2240 of Section XI. 32

The eddy current data analysts worked to HIAP Engineering Instruction El 8.01," Steam Generator Eddy Current Data Analysis Guidelines", Revision 0 including the Analysis Guideline Exception i Forms entitled " Update 2"," Update 3", and " Update 4". The data for l each steam generator tube was analyzed by two (2) Independent analysts in accordance with HIAP Er3 ineering Instruction El 8.02,

                            " Steam Generator Eddy Current Data Control", Revision 1.

Every system calibration and calibration verification has been recorded  ; on a uniquely numbered digital magnetic tape which is stored as a , record. The unique digital tape number is entered on the eddy current data sheet. The date and time of every system calibration and calibration verification has been recorded on a Digital Multi frequency Eddy Current Calibration & Data Analysis I.eg Sheet which is also considered to be a data sheet. The data sheets are also stored as records. They make it possible to locate the calibration data for each tube examination. 3.3.3 Equipment Westinghouse used MlZ-18A eddy current examination it. iruments

   -   s-                   to record the raw data and a Heather system to analyze the data. The s                      MlZ 18A's are manufactured and produced by both Zetec, Inc. and Westinghouce. The Heather system is iaanufactured by Westinghouse.

l Both the MlZ 18A and Heather use digital equipment and software which have a significantly improved dynamic range and signal to-noise ratio as compared to analog systems. The MIZ-18A is capable of being operated at locations remote frorr. the steam generators (e.g., in low radiation areas). Westinghouse used 0.610 inch diameter l magnetic biased bobbin coil probes. However, bobbin probes as small as 0.590 inch diameter were used in a few cases in order to pass the small radiused U bends in Rows 1 and 2. A motorized rotating pancake probe coil (MRPC) was used to characterize one incidence of wear detected at a baffle plate in the preheater of Steam Generator D. ASME Boiler and Pressure Vessel Code, Nuclear Components Code Case N-401," Eddy Current Examination Section XI, Division 1", was used after the digital equipment and the eddy L current tecimique used were demonstrated to the ANIIin accordance with Case N-401. 3.3.4 Calibration Standards The U bend areas of the Row I and 2 tubes in each steam generator have received an in situ heat treatment to improve their resistance to 3-3

I O V stress corrosion cracking. The eddy current calibration standards used were not subjected to that heat treatment. ASME Boiler and Pressure , i Vessel Code, Nuclear Components Code Case N-402," Eddy Current t Calibration Standard Material, Section XI, Division 1" was used after it was demonstrated to the satisfaction of the ANil that calibration standards with and without this heat treatment result in equivalent examinations. Otherwise, the design and material of the eddy curTent calibration standards used meet the requirements of the ASME Code Section XI. . 3.4 Summary of Examinations 3.4.1 Technical Specification Examinations Examinations were conducted of 301 tubes in each of Steam Generators C and D, approximately six (6) percent of the total tubes installed in these two (2) steam generators. The examinations were conducted with the bobbin probe inserted from the hot leg bowl. All of these, tubes were examined over their full length (from tube end to tube end). *he tubes that constitute these groups of 301 tubes consist of the first samples, defined in the ISI Outage Plan, with the following changes: O Steam Row Col. Row-Col. Reason Generator Removed Added D 3 106 4 - 106 Tube 3 - 106 could not be examined full length with-the .610 inch diameter })tobe because of the tight radius U bend. These examinations constitute the portion of the tube examinations conducted which responds to the requirements of the Technical Specification. 3A2 Augmenting Examinations in addiion t to the tube eddy current examinations required by the Technical Specification, several tubes were examined for other reasons. The reasons for performing tube testing not required by the Technical Specification included investigation of possible loose parts, investigation < of the preheater wear phenomenon, inadvertent testing of tubes not listed in the ISI Outage Plan, and the inability to test the full length A of a few tubes originally listed in the plan. Tube areas which were 3-4 w - y- ww fr- g -- -

l examined for reasons other than compliance with Technical O Specifications comprise the augmenting program. In some cases tubes or portions of tubes in the Technical Specification program were also included in the augmenting program. The additional numbers of tubes which were examined over their entire lengths as pr.rt of the auBmenting program only are as follows: Steam Generatgr Smiber Examined 1 C 21 l D 32 The augmenting program included the following numbers of tubes ' which were examined over only a portion of the tube length: Steam Generator Number Exnmined C 1 D 25 , 3.5 Examination Results and Corrective Actions i No flaw indication was detected by the Technical Specification program with a depth equal to _ or greater than 40.perc+mt of the nominal tube wall thickness. No indication of a tube flaw, which was greater than 20%, was y l ' detected by the Technical Specification program. Two (2) tubes contain L indications which were less than 20% in depth. The Technical Specification  ! L - 4.4.5.4 a.3 says that a degraded tube means a tube containing imperfections j greater than or equal to 20% of the nominal wall thickness caused by a service induced damage mechanism. Therefore, there were no defective or degraded tubes detected by the Technical Specification or augmenting

                                       - programs. No corrective actions were performed because of any. flaw, 7                                         detected by the Technical Specification-o: augmenting programs, with a                                                        .

L reduction.cf tube wall thickness. Lists, including the locations and depths, of all flaw indications which are characterized as reductions in the tube wall thickness in both the Technical- - Specification and augmenting programs are included in Appendix 3 C , Lists _of all dents and dings detected in each steam generator by both the k Technical Specification and augmenting programs are included in Appendix 3 D. . The location of the indications were recorded relative to the adjacent tube support and baffle plates and anti vibration bars. The tube support plates 3-5 i

   .. - - , . . . ., . . + , . . . - -                                      ,,,,n . . , m.. . . , - ._r+   ...w,w , . , . - ,e., y,..r e,, ,, w c , e m. , .. . - . -

l and baffle plates were numbered cons:cutively from 011I to 1011 (on the hot i leg) and from 11C to 23C (on the cold leg) starting on the hot leg side, over the U bends, and down the cold leg side of the steam generator. The anti-vibration bars were numbered AV1, AV2, AV3, and AV4 from the hot leg , to the cold leg side, respectively. Indications in the tubesheet area were recorded relative to TEH or TS11 (hot leg) or TEC or 1SC (co:d leg) depending on whether the indications were at the tube end (E) or secondary face (S). In addition, the vertical distances from these landmarks to flaws were recorded. > i The tubes which were removed from service by plugging prior to this 151 are as follows: Steam Tube Generator Number A 14 32 35 77 44 48 Steam Tube Generatt r Number B 12 102 17 22 28 30 32 78 Steam Tube Gratttator Number . C 27 8 29-11 42 101 Steam Tube

                                                       .                 Generator       Number D             44 44 47 52 47 94                                                           ,

48 70 48-80

O l

No tubes.were removed from service by plugging as a result of the eddy 36

current ISI performed during this outage. No corrective actions were performed as a result of dings or dents detected during this ISI. 3,6 Certification of Inspections A Section XI NIS 1 form, " Owner's Report for Inservice Inspections," has been prepared to ceriify the STPEGS Unit 1 ISI examinations described in ' this Summary Report. The STPEGS Unit 1 ISI examinations have been 1 eertified by our ANil, Factory Mutual Systems, on the NIS 1 form included in Appendix 3 E. O  ! l l 4 l 4 37

l O i p APPENDIX 3-A CHANGES TO THE O ISI OUTAGE PIAN O 38

                                                                                                                                                   -d
                                               -.,,m.              .. _ . ,

OUTAGE PIAN CHANGE FORM DJJCRIPTION OF CHANGE (ADDITION OR DELETIONb

1. Replace tube 3-106 with tube 3107 in Steam Generator D.
            /

RfASON FOR CHANGE . 1. Tube 3106 is restricted to a 410 inch diameter probe. ( It was also restricted during the PSI) TECHNICAL BASIS: 1. Tube 3107 is consider to be an equhilent tube for sarnpling purposes. The substitution eliminates the radiation dose which would be acquired to switch to a .580 inch diameter probe. SCITEDUIRB1 PACT:

1. His substitution will reduce the aethity duration.

AUTHORIZATIONS: f Lead Analyst: .A =- J8 a Date /-a s- W CTO Engineer:  % ~ Wuw Date / - 2 A - ff 9 O 39

i t OUTAGE FIAN CHANGE FORM DESCRIPTION OF CHANGE (ADDITION OR DELETIOM: .

         .. Add the full length bobbin co!! addy current examination of tubes in Rows 2434 and Columns 59 and 62 to augment the technkal speci6 cation required scope of sumination in Steam Ocaerator C and D.

i f .

                                                                                                                             .1 REASON FOR CHANGE;
  • 1.

To determine if other indications like the one (1) detected in Steam Generator D tube 35 62 at 18C (the D bame plate) are present in the high no:s Dow rate area, the T slot. O TECHNICAL BASIS:

1. Sirnflar cross Dow velocitles are projected to exist owr this region.
  • i SCHEDULE BfPACT: i
1. 8 Hours.
     . AUTHORIZATIONS:

Lead Analyst: d' Date //b t/f/ CTO Engineer: 4 E h=w Date I- 11 -f/

                                              .h                     0

. D 3 10-

_ .._ _ ~ . _ _.._._ ._ _ ________ _ _ .._.._ __ _ ._ _ - _. . I s OUTAGE PIAN CHANGE FORM ' DESCRWrION OF CHANGE (ADDITION OR DELETIONh

1. Replace tube 3107 with tube 4106 in Steam Generator D.
2. Perform MRPC on the indication in tube 3542 in Steam Generator D at bame plate 21C I

i REASON FOR CHANGE: -

1. Tube 3107 is restricted to a .610 inch diameter probe.
2. The bobbin coil indication in tube 3542 is a DSI.

TECHNICAL BASIS:

                 . 1.       Tube 4106 is consider to be an equhilent tube for sampling purposes. The substitution eliminates the radiation dose which would be acquired to switch to a .590 inch diameter prote.
1. MRPC may clarify the source of the distorted signal.

SCHEDULE Bf PACT:

1. Thh substitution will reduce the actMty duration.
2. 'Ile MRPC of tube 3542 of Steam Generator D will take 44 hours.

AUTHORIZATIONS: Isad Analyst: *--y / .* 3 Date //* 9/ CTO Engineer: M l A- ,. ~ Date /- 2 9- 9/ O o O 3 11 '

l l O APPENDIX SB LIST OF EXAMINAT10N AND DATA ANALYSIS PERSONNEL l l 1 l F l l O 3-12

APPENDIX 3-D LIST OF EXAMINATION AND DATA ANALYSIS PERSONNEL NAME LEVEL Bacco, K. J. 11 Burriss, K. T. I Douglas, D. A. 11 Greene, M. S.  !!A Izzo, J. O. 1 Jones, D. T. 1 O Lve . v. s. Obazenu, D. J.

                                                                                                                                                                      >>^

111 Pierini, G. P. 111 Pushnik, G. I Reed, J. E. IIA Rossi, W. M. 11 Ruscitti, S. F. IIA Sekuras, C. J. I Yost, W. D. IIA Young, J. 1 O 3-13 1

______.._-_...__._....___...__-.._.._____..___.._.___._____-_....._.____.m..

                                                                                                                                            .                     .._.m__. .

l O 1 i 1 APPENDIX 3C FLAWS WITil TUBE Wall THICKNESS REDUCI' ION I l l-l l l O 3-14

APPENDIX 34 FIAWS WITIl TUDE Wall TillCKNESS REDUCTION l 1 Steam Row- Percent Indication Reel Generator Column Depth lect. tion Number D 45 59 12 AV3 + 0.0 4 D 35 62 18 21 C + 0.0 7 (s e l l l lO 3 15

O APPENDIX 3-D DINGS AND DENTS O 3 16

(] V APPENDIX 3-D DINGS AND DENTS Steam Row. Indication Generator Column Location C 3 - 25 17C + 42.65 C 6 - 48 18C + 8.45 C 15 - 52 03H + 17.10 m C 30 - 55 19C + 11.91 Q C C 48 - 56 48 - 56 09H + 34.07 10H + 0.0 C 28 - 59 TSH + 4 42 C 28 - 59 12C + 37.34 C 32 - 62 TSH + 4.69 C 41 - 71 09H + 36.81 C 44 - 71 12C + 35.51 C 45 - 93 11C + 0.0 D 47 - 45 10H + 0.0 D 47 - 46 04H + 36.61 D 47 - 46 04H + 40.02 D 47 - 46 04H + 40.83 (- D 47 - 46 AV2 + 6.69 l D 45 - 56 12C + 33.66 D 35 - 59 09H + 39.88 l- D 37 - 59 08H + 42.60 l D 47 - 59 09H + 36.41 D 47 - 62 09H + 43.85 D 48 - 62 10H + 0.0 D- 48 - 63 19C + 12.89

  . (D V

3-17

__m__ u,a - a a .a AA2 __ .4_p_ _i_ .,.4r, , + , _ _ _ . . .~_m.4%,,,, - ha _m , , n m.. m_ m __,9 _ APPENDIX 3-E OWNER'S REPORT FOR INSERVICE INSPECTIONS NIS-1 FORM 3-18

     - - . -           -                      ~.              -   -    _      -                      ._- -           -  - -

1991 ISI 1RE03. Steam Generator Tubes Page 1 of 2 , PORM NIS-1 OWNEUS REPORT POR INSERVIG INSPECI1ONS

                                      - As required by the Prwisions of the ASME Code Rules C            1. Ormer Houston Limhtine.fk Power CotDpm Electric Tower: P.O. Box 1700: Houston. Texas 77001 (Name and Addre:s of Owner)
2. Plant South Texas Prolect Electric Gen (ratine Station: P.O. Box 289: Wadnerth. Texas 77483 (Name and Address of Plant)
3. Plant Unit 1 4. Owner and Certificate of Authorization (if required) NA
5. Commercial Service Date 8 23-88 6. National Bo.rd Number for Unit N.A.
7. Components laspected ASME Code Qass 1 (TWB) Items . Sacam Ocaerator 'Ibbes Manufacturer Component or Manufacture or Installer National Appurtenance or Installer Serial No. Board No.

Stam f Westinchouse (M) 2133 W18693 _Qenerator 1C ~ Steam Generator ID WestInchouse (hD 2134 W18694 e j HIAP by t M'W Date 1 9l Factory Mutual by W zc Date 6 1/ R. I'. Beverly / B. R. Russell, ANil 3-19

1991 ISI .1RE03 Steam Generator Tubes Pege 2 of 2 FORM NIS-1 (Back) (~' 8. Examination Dates 1 27-91 to 13191 9. Inspection Interval from . 8 25-88 to 8 25-98 D} 10. Abstract of Examinations. Include a list of craminations and a statement concerning status of work required for current interval. (ASME Cbde Oass 1 (IWB) Items . Steam Generator Tubes) See Section 3.4.1 of the 1RE03 Summary Report.

11. Abstract of Conditions Noted.

See Section 3.5 of the IRB03 Summary Report.

12. Abstract of Corrective Measun:s Recommended and Taken.

See Section 3.5 of tbc 1RE03 Sur:tmary Report. We certify that the statemects made in this report are correct and the examinations and corrective measures taken conform to the rules of ASME Code, Section XI. Certificate of Authorhation No.(if applicabic) N.A. Expiration Date NA Date b /6 ,19 @ Signed Houston Lichtinc & Power Co. By %c Owner R. L Bev fly CER'ITFICA'IE OF INSERVICE INSPECTION f% b I, the undersigned, hciding a valid commission issued by the National Board of Boiler and Pressure VesscJ Inspectors end the S' ate or Province of Texas and employed by Arkwricht Mutual Insurance Co. of Norwood. Mass have inspected the components described in this Owner's Report during the period

           /- # 7- 41         to      / ~ 3 /- 9/     . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accoraance with the inspection plan and as required by the ASME Code, Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, express or implied, concerning the examinations and corrective meeures described in this owner's Repor'. Furthermore, neither the Inspecter nor his employer shall be liable in any manner for any personal injury or pro rty damage or a loss of any kind arising from or connected with this inspection. Factory Mutual System M L/ Commissions Tex 826 Inspector's signature National Board State, Province, and Endorsements B. R. Russell Date b ~ IB - 19 9I 7 l V 3-20

 -  .       -         -                          -    -          .            .   .         ~.

l q 4.0 COMPONENT SUPPORT EXAMINATIONS () 4.1 Introduction ISI of Class 1,2, and 3 component supports and Ch .tegral attachments of STPEGS-I was performed between December 10,1990 and M. 20,1991. These examinations constitute the third ISI and completion of the first inspection period of the first inspection interval for the Component Supports Examination Program for STPEGS 1. This Section of the Summary Report documents the examinations of component supports performed by H12P OC NDE personnel in accordance with the following documents: (1) HL&P Specification SUO35JS003, " Inservice Inspection Examination of Component Supports of South Texas Project Electric Generating Unit 1 First Inspection Interval', (2) " Examination Plan for the 1991 - IRE 03 Inservice Inspection at the South Texas Project Electric Generating Station, Unit 1" including changes made during the outage (Outage Plan). The HL&P Specification provides a detailed description of the rules for exemption and selection of Class 1,2, and 3 component suppons for ISI. The 1991 Examination Plan is O O an individual Outage Plan for implementing ISI component support examinations as designated in the HL&P Specification. 4.2 Scope of Examinations A total of ninety-four (94) component supports were visuu .y examined. These supports, selected from the Component Supports ISI Examination Plan (5UO35JS0003), constitute approximately fifteen (15) percent of the total piping and equipment supports required to be examined during the first inspection interval. When combined with the component supports examined during the first two refueling outages (1RE01 and 1RE02), approximately thirty-three (33) percent of the total piping and equipraent supports to be examined during the first inspection interval have been examined. ClasL1 Nine (9) Class I piping supports and three (3) Class I equipment support were examined in the following systems: Pipine Equipment Chemical & Volume Control (CV) 2 0 ( Reactor Coolant (RC) 5 3 Residual Heat Removal (RH) 1 0 Safety Injection (SI) 1 0 4-1 L i t

  .m         _  ._ _ _ .._ _ _.___. _ _ _ _ _ _                                _ _ _ _ . _ _ _ _ _ _

l

                                                                                                                      \

QM11 O- Thirty five (35) Class 2 piping supports and four (4) Class 2 equipment supports were examined in the following systems: Piping Eouipment Auxiliary Feedwater (AF) 3 0 Chemical & Volume Control (CV) 0 1 Camprnent Cooling (CC) 1 0 Containment Spray (CS) 3 1 Feedwater (FW) 1 0 Main Steam (MS) 2 0 Residual Heat Removal (RH) 7 1 Safety Injection (SI) 18 1 Class 3 Thirty-seven (37) Class 3 piping supports and six (6) Class 3 equipment support were examined in the following sy;;tems. Pjping Equipment Auxiliary Feedwater (AF) 7 1 Component Cooling (CC) 24 1 Diesci Generator Ja:ket Water (JW) 0 1 Diesel Generator Lube Oil (LU) 0 3

Essential Cooling Water (EW) 6 0 O A complete list of component supports examined during 1RE03 is contained in Appendix 4-A.

4.3 Personnel and Procedures 4.3.1 Personnel Oualifications. _ l Component supports were visually examined (VT-3 and VT-4) by HL&P OC NDE L . personnel certified in accordance with ASME Section XI (IWA-2300) and HL&P l- Nondestructive Examination Procedure NDEP 1.0 (Rev. 3),."Oualification and Certification for. Examination Personnel". A listing of the-personnel who performed visual examinations of component supports, including their certification level, is included in Appendix 4-B.

       ; 4.3.2     Examination Procedure L;        Visual (VT-3 and VT-4) examinations of component supports were performed in .

E accordance with NDEP 9.2 (Rev. 0),." Visual Examination of Component Supports for ASME XI. Inservice Inspection". L-l- 4-2

Summary of Examinations 4.4-4.4.1 Piping and Equipment Supports Eighty-one (81) piping supports and thirteen (13) equipment supports were examined just prior to and during 1RE03 as shown in Appendix 4 A. 4.4.2 Additional and Successive Examinations The results of the visual examinations of component supports performed during 1RE03 did not require that any additional examinations (IWF 2430) be performed or any successive examinations (IWF 2420) be scheduled. 4.5 Examination Results and Corrective Actions One (1) hanger was found with a missing cotter pin which was replaced and the support was reexamined with satisfactory results. Three (3) supports were found with slightly dislodged betuing racer. One of these supports also had a loose jam nut. These three (3) supports were reworked and reexamined with satisfactory results. One support was found with the load pin in contact with another piping line. This support was reworked and reexamined with satisfactory results. One support was found with a small arc strike on the sway strut. An engineering evaluation determined the arc strike to be insignificant and was accepted as is. One support was found with two (2) of eight (8) jam nuts missing. A L work request was issued to install the jam nuts when posdole. RFA's were issued for these conditions as noted in Table 4-1 below. All of the above supports were analyzed to substantiate their integrity for its intended service in the as-found condition and determined to be acceptable. However, rework was recommended in some cases as indicated in Table 41. l I l f V- 4-3 l

_ Table 4-1 pb Summary of Component Support Visual Indication Disposition Component ID Condition RFA No. Disposition WR No. RH 1201-HL5004 Missing cotter N.A. Installed cotter RH 67181 pin pir. MS 1003-HI.5006 Dislodged bearing 91-0146 Reworked MS-134374 race High Head S1 Pump Missing jam nuts N.A. Accept-as-is SI 67180 HH1A . until rework g completed CC-1106-RR18 Load pin in contact 91-0147 Reworked CC-116586 with adjacent line CC-1114 RR26 Arc strike N.A. Accept as-is N.A. CC-1120-HL5001 Loose jam nut 91 0144 Reworked CC-116588 ( Dislodged bearing

  '-                          race CC-1120-HL5002           Dislodge bearing     91-0145    Reworked           CC-116587 race 4.6       Certification of Inspections Section XI NIS-1 forms, " Owner's Report for Inservice Inspections", have been prepared to certify the STPEGS-1 component support ISI examinations described in this section of the Summary Report. The STPEGS-1 component support ISI examinations have been certified by our ANII, Factory Mutual Systems, on the NIS-1 forms included in Aopendix 4-C.
 ,Ot U                                                    4-4

O G APPENDIX 4-A

SUMMARY

OF EXAMINATIONS O O 4.s

1 i t = , - - DATE:?-.06/19/91 80UTH TEXAS PROJECT ELECTRIC GENERATING ETAfl0N UNIT 1 PAGE: 1

        ~~ . REVISION:         0                                 INSERVICE INSPECil0N SUIOWtf FIRST INTERVAL, FIRST PERIOD, THIRD OUTAGE (1991)
  ' g.
   ;                                                             CLAt$ 1 COMPLETED COMPOWENTA CHENltAL E V0ttMLCONTROL N       0 ASMI                                  O G T SEC. XI                               R E h
               $UMMARY EXAMINAfl0N AREA               CATGY    EXAM                         E D E REMARKS NUMBER -ICEWilflCAfl0N                 ITEM NO METHOD       PPOCEDURE        C M R **CAllBRAtl0N BLOCK **

cv-1128 BLi B Ai l

000100 CY.1128 MS$001 PIPlWO VT.3 NDEP 9.2 R0 x . -

RR .

                      ,cV.1128 BB1-BA2-000200 CV 1128 NS5003                  PIPING   VT.3        NDEP 9.2 R0      X   - -                                                   +

U BOLT . I-i L I 4-6

                    ,       . . -          . .  . - . . -- .                           - - . .- --             - -.           . . - -          .. -. ~ .- - _ . . _ . ..
                   'DATE:' 06/19/91'                                    SOUTH TEXAS PROJECT ELECTRIC GENERATING STAfl0N UNIT 1                                           PAGE: 2 REVISION :         0                                               INSERYlCE INSPECTION $UMMARY
                                                                         -FIRST INTERVAL, FIR $1 PERIOD, THIRD OUTAGE (1991)
      -_ (

CLAS$ 1 COMPLETED COMPONENTS REACfDILCODL811 W 0 AME 0 G T

                                                                          $EC. XI                                   R E N
             - SumARY EXAMihAfl0N AREA                                    CATGY     EXAM                            E O E REMARKS                                                .s
WUMBER IDENTIFICAfl0N ITEM NO METHOD PROCEDURZ C M R **CALIBRAfl0N BLOCK'*

RC1000agj;A VT*3 NDEP 9.2 R0 - - 000300 'RC 1000 RR01 PIPING X GUIDE

                           'RC 1003 BB1-A 000400 RC 1003 HL5004                                   PIPING VT 3              NDEP 9.2 R0      X   - -

RR

                          - Re 1123 861 F
      .'f %-,

000500. RC 1123 HL5008 PIPING- VT 3 NDEP 9.2 R0 X - - EXAMINED WHEN FILLED. l} SH V - VT 4 X - -

                          ' RC 1123 RS1-H
               . 000600 RC 1123 RR10                                       PIPING VT 3             NDEP 9.2 R0'     X   - -

RR

  • Rc 1125-BB1 D I 000700- kC 1125 ML5007- PIPING VT 3 NDEP.9.2 R0 X - - EXAMINED WHEN FILLED.

SH V '- VT 4 X - - i.. _f - U 4-7 m .--.r w ' m'Jr-- -w r - me e- e m - - , - e -= ---#-'

 ...m.
            . . . ~ .-       .. . . _ . . _ _ . , , _ ~ , _ _ . . _ . . _ , - - _ _ _ ._                    .   .m m _ , . . . _ _-                                            . . . _ . . _,___...__m                  ..

__; DATES.._06/19/91 : SOUTH TEXAS PROJECT ELECTRIC GENERAflhG STATION UNIT 1 PACE: 3 REvill0W .- 0 INSERVICE INSPECTION SLMMARY FIRST INTERVAL, FIRST PERIOD, THIRD OLITAGE (1991)

     ' :q                                                                                  CLASS 1 COMPLETED COMPONENTS
       - V REsfDUAL HEAT REMOVAL W          0 ASME'                                          0 G T SEC. XI                                        R E N

SUMMARY

EXAMINAfl0N AREA CATGY EXAM E O E REMARKS

                   -NUMBER IDEWilFICATION.                                   ITEM NO METHCD          PROCEDURE-             C M R **CAllDRATION BLOCK'* -

RM 1201.BB1 E 000800 ^ pH 1201*HL5004 -PIPING VT*3 NDEP ?.2'R0 -X * - REEXAMINED AFTER MISSING COTTER PIN WAS RR

  • REPLACED WR WRf RM 67181.

V i f; i-.

     -I L

48 l^ - -- , . . . - . . . . - , _ . . - _ _ , , . . . , . , , . , _ . . , - -

DATE: 06/19/91 SOUTH TEKAs PROJECT ELECTRIC GENERATING RTAil0N UNIT 1 FACE: 4 REVISION: 0 INSERVICE INSPECTION StMMARY f} FIRST INTERVAL, FIRST PERIOD, THIRD OUTAGE (1991) ( ,/ CLASS 1 COMPLETED COMPONEt'TS SAFEff INJECTION N 0 ASME O G T SEC. XI R E N StMMARY EXAMINATION AREA CATGT EEAM E O E REMARKS NUMBER IDENTIFICAfl0N ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK ** SI 1208 881 A 001000 St*1218 RROI PIPING VT-3 NDEP 9.2 R0 X - . RR - ( N)) s._. ) 4-9

               .   -         ,              - - . . - ..               - - ~ ~ _ . - - - . ~ . ~ .                . - _ ~ ..             n- -   ,~-_.-a.

J DATE:- 06/19/91' $0UTH TEXAS PROJECT ELECTRIC GENERATI G STAfl0N UNIT 1 PAGE: 5 - REVISION:- -0 INSERVICE INSPECTION Su MART-FIRST INTERVAL, FIRST PERIOD, THIRD OUTAGE (1991) CLASS 1 COMPLETED COMPONENTS

    \   kc a EQUIPMENT SUPPORTSI N         O ASME-                                                 0 G T-SEC. xl                                               R E H
      - SumART EXMINAf!ON AREA                             CATGT.            EXAM                                E O E REKARK$                                           '

NUMBER. IDENTIFICAfl0N ITEM NO METHOD PROCEDURE r R **CALIBRAflUN BLOCK" iR121hSG171C 301100 SGC1C EGulP_ VT 3 WDEP 9.2 R0 a - - STEAM GENERATOR 1C COLUMN SUPPORT

                                                            =

RC $/G COL SGCIC 18 LnCATED CLOSE$T TO RC PUNP 1C. e 001200 SGC2C EQUIP VT 3 NDEP 9.2 R0 X -

  • STEAM GENERATOR 1C
  • COLUMN $UPPORT RC 5/G COL * $GC2C 18 LOCATED IMMEDIATELY CLOCKWISE FROM COLUMN SUPPORT
                  -1R131hPP1018 ~
                                                                                                                   ~

i .: 001300 RPC2B EQUIP :VT-3 NDEP 9.2 R0 x- - REACTOR COOLANT PUMP 18

  • COLUMN SUPP0nf
                                                             --                                                               RPC2B IS LOCATED IMMEDIATELY CLOCKWISE
                 .RC PUMP COL.

FWOM COLUMN SUPPORT CLOSEST 10 STM CEN b; it. U. O l i l' l O 4 10 L, l L .

DATE: D6/19/91 SnUTH TEKA$ PROJECT ELECTRIC GENERAllWG STAfl0N UN11 1 PAGE: 6 REVISION: 0 INSERVICE INSPECTION EUMHARY F;R$i INTERVAL, FIR $1 PERIDD, THIRD DUTAGE (1991) _{"~'N

 ~ v/ AUyltlARY FEEDWATE.3 i                                                                      CLASS 2 COMPLETED COMPONENTS N        0 ASNE                                     0 G T
                                                           $EC. Mi                                  R E N

SUMMARY

ELAMINAllDN AREA CATGY EKAM F 0 E REKARKS WUMBER IDENTIFICAllDN ITEM NO METHOD FtoCf>LRE C M R **CAllBRAflDN BLOCK ** AF 1012 CgZ;g 001400 AF 1012 HL5022 PIPING VT 3 NDEP 9.2 R0 x - - RR

  • AF 1012-GA2 H 001500 AF 1012 ML5011 PIPlWG VT 3 NDEP 9.2 R0 x - -

RR AF 1012-CA2 N , [m1001600 AF 1012 ML5032 PIPING VT 3 WDEP 9.2 R0 x- - EKAMINED WHEN FILLEC. , l

  \j               AH V                                       -       VT 4                          x    - -

l l i h s_ 4-11 i l

DATE: ~ 06/19/91 $3JTN TEXAS PROJECT FLECTRIC CENERATlWG STATION UNIT 1 P AC.E s 7

      'REVill0N       0                                 INSCRylCE INSPECTIch submARY

, g ~g FIRST INTERVAL, FIRST PERICD THIRD OUTAGE (1991)

( ~

CLA$$ 2 COMPLETED COMPOWENit COMPOAENT COOL 1WG N 0 ASME O G T

                                             $EC. XI                                R E N sue ART EXAMINAfl0N AREA               CATGY    EXAM                          E O E REMARK $

NUMlER IDFWi!FICAfl0N ITEM NO METHOD PROCEDURE C M R "CAllBRATION BLOCK" (c.1312.VA2 8 001700 CC.1312 ML5001 PIPING VT.3 WDEP 9.2 R0 X * . EXAMlWED VMEN FILLED.

               $H V                            -

VT.4 X - -

  -s 4-12
         'cATE:-06/19/91                                    $0L11H TEXAS PRO.'LCT ELECTP.lC GEWERAflWG STATICvf UNIT 1                                    PAGE:   8 REVIS10N:           0                                               INSERVILE INSPECTIDW SLHMART
  ,h .                                                         FIRST INTERVAL, FIRST PERIOD, THIRD CUTAGE (1991)

( ,/ CLASS 2 C W LETED COMPONENTS

         $2!GilELEEEAI, N        0 ASME                                       O   G    T SEC. XI                                    R   E    M

SUMMARY

EKAM!hAfl0W AREA CATGY EXAM E O t REMARKS ktMBER IDENTIFICAfl0W ITEM NO MITHOD PROCfDURE C M R **CALIBRATIDW BLOCKa* (S.1301 U62 4 001500 CS 1301 RR02 PIP!WG VT 3 WDEP 9.2 R0 X - - RR . CU 1302 PB2 D 001900 CS 1307 RH04 PIPik3 VT 3 etP 9.2 R0 x - - RR Cs 1301-PBL-1 m i002000 CS 1303 ML5002 PIPING VT 3 WDEP 9.2 RD X - -

   'j RR                                          -

3 7% [ a j 'R.J 4 13 l l

t. ..
                                           ~

DATE: D6/19/91 500TH TEKAS PROJECT ELECTRIC GEMEKATING $1AflDN DNii i PACE: 9 REVillDN: 0 IksERVICE INSPECTION

SUMMARY

(' '}f

      \

FIR $7 IW1ERVAL, FIRST PERIOD, THIRD OUTAGE (19.1) C.A!L 2 COMPLETED COMPONENi$ p mac N O ALME O C 1 SEC. XI R E H

SUMMARY

EXAMihailDH AREA CAIGY EKAM E oE REMARK $ NUMBER IDENilflCA110N ITEM NO METh00 PROCEDURE C M R **CALIBRAilDN BLOCK ** [W;1016 CA? H 002101 FW 1016 NL5005 PIPlWG VT 3 NDEP 9.2 R0 X - - RR -

     /

f , G'1 i t l l l

 -(        I w/

4-14

DATE: 06/19/91 SOUTH TEXAS PPSJECT ELECTkiC GENERATING STATION UNIT 1 PAGE: 10 REVISIDH 0 IN1ERVICE l'SPECTION SUMMART r~'*g FIRST INTERVAL, FIRST PEE 100, TNIRD OtJTAGE (1991) CLASS 2 DDNPLETED COM*DNENTS 5

      '*~ )MAIN S1[6M N      O ASME                                   D G T SEC. XI                                 R E H RUMMART EXAMINATION AREA               CATGT    EXAM                          E O E REKARKS L"JM.BE R IDENTIFICAT!DN               IT(M NO NET H00      PROCEDURE          C M R ** Call 8RATIDN CLDCK**

MJ 1003 CA2 D l 002300 MS 1003 HL5006 PIPING VT*3 NDEP 9.2 a0 x . . REEXAMINED AFTFR THE BEARING LACE IN THE RR . STRUT PADDLE AT THE REAR BRACKET END WAS REWDRKED PER WRf MS 134374 01:1303 CA2 E 002400 MS 1003 HL5003 PIPING VT 3 NDEP 9.2 to X - +

                     $N V I,2)
  • VT*4 X - -
        ~s

< ( I \s-) l l 1 l i

 ~

l l 1 l U 4 15

a. . . - - . .

DATE: 06/19/91 $0UTH TEXAS PROJECT ELECTRIC GENERAfl%G $1ATIC3 t#IT 1 PAGE: 11 REVis10N: 0 INSERVICE INSPECT 10h SLMMMY FIRST INTERVAL, FIRST PEll(D, THIRD OUTAGE (1991)

    ]O

( j d 11P'PI M T RL E R CLA$$ 2 COMPLETED COMFONENTS N o ASME D G T

                                                    $EC. X1                               R E N SUHkARY EXAMINAT!DN AAEA               CATGY    EXAM                         E O E REMARKS NW."?R
                . IDENT]FICAfl0N                 ITEM NO MtTHOD       PROCEDURE        C M R ** CALIBRATION BLOCK **

PH it06 K8? A C02500 RN 11 & WL5003 PIPING VT 3 NDEP 9.2 R0 X - - ANCHOR PK 1204 KB2;G

002K0 RN-1204 RR04 PIPING VT 3 NDEP 9.2 R0 X -

RR - By*1204 V822

002700 RH 1204. ML5009- PIPING VT 3 NDEP 9.2 R0 X - -

A_s # '

id 1

B.!!1.12@.W"A 002500 tH 1205 NL5007 P! PING VT 3 NDEP 9.7 #0 X - - ERAMINED WHEN FILLEO. SH-V - VT-4 X -

  • BE 1205-rt?-D 002900 P1-1205 ItL5011' PIPING VT-3 NCEP 9.2 k0 X -- -

Gulff - 003WO RH 1205 RR04 PIP!NG VT 3 KDEP 9.2 R0 X - - RR i

            '003100 RM 1205 WL5010                  PIPING VT 3          NDEP 9.2 R0      X    - -

EXAMINED WHEN FlLLED. EN'V - VT-4 X - - f m 'f $ G.

                                                                                                                                     ^

l 4-16 l l

DATE: 06/19/91 SQJTM TEXAS PROJECT ELECTklC CENERATING $TAfl0N L! NIT 1 PACEt 12 REVI$10N:- 0 INSERVICE IMSPECTION StMtARY

 ' 7%                                                    flRST INTERVAL, FIRST PfRIOD, THIRC CUTAGE (1991) k    -

CLA$$ 2 COMPLETED COMPONENTS SAFETY IUg. M N O ASME D G T SEC. XI R E N CLNMARY EXAMINAfl0N ARfA CATGY EXAM E O E REMARKS NUMBER IDENTIFICAfl0N ITEM NO NETHCD PROCEDURE C M R **CALIBRAfl0N BLOCK ** 11 1101 UBL,6 00M 00 11 1101 ML5026 PIPING VT 3 WDEP 9.2 R0 X - - RR -

                 $1 1101-UB2 D 003300 $1 1101 HL5025                             PIPING VT 3              NDEP 9.2 R0      X    - -

RR .

                 $I 1101 097;f 003400 SI 1101 ML5005                             PIPING VT 3              NDEP 9.2 RO      N    - -

EXAMINED WHEN FILLED.

  \.             SH V
  • VT 4 X -
  • st 1105 g,2-!!

001500 SI 11L5 RR27 PIPING VT-3 WDEP 9.2 R0 X - - RR 003600 SI 1105 RR28 PIPING VT-3 h0EP 9.2 RO x - - RR

                 $1 1105 K82 t 003700 $1 1105 RR33                               PIPikG     VT-3          NDEP 9.2 RD      X    - -

RR

                 }l-1105-rB2 N bT g~y00380C st-1105 RH35                                 PIPING VT 3              NDEP 9.2 R0      X - -

SLIDE S - 4-17

      ..        ..               , _. . . - . - , . ~ -           . . . . . - . -            - _ - - .                 . ~ . ,       . _     . _ . . . - . . - - . . . . - ,

l i I_DATE:_06/19/91 MUTH TEXAS PROJECT ELECTRIC GENERATING' STATION UNIT 1 PAGEs- 13 REvlsl0W:- 0 INSERVICE INSPECTION SUMMART 4 FIPST INTERVAL, FIRST PER100, THIRD cl/TAGE (1991) CLASS 2 COMPLETED COMPONENTS -

                        ~
          ~ SAFETi 1NJECTION N          0 ASME                                             D G T SEC. XI                                          N E N

SUMMARY

EXAMINATION AREA CA6 3 EXAM E oE REMARKS NUMBER IDEWilFICATION ITEM h*,~ METHOD PROCEDURE C M R ** CALIBRATION BLOCK'* Jt 1105 K82-E 003900 SI 1105 RR37 PIPING VT 3 NDEP 9.2 R0 X - - RR - 11 1125-KB2 R 00400L. $1 1105-RR38 PIPING VT 3 WDEP 9.2 RO X - - GUIDE St 1105-KB2 T

         - 004100' $1 1105*SH42-                           PIPING VT 3                   NDEP 9.2 RO        X   - -            EXAMINED WHEN FILLED.

Oy SH+V (2) _ VT 4 X - - 31 1106 082 D - 004200-St*1106-Nt5011 FIPING VT*3 NDEP 9.2'R0 . X -

                      - R R -.--                           .-                                                 _

l1 s1 1106-DB2-M ! 004300- $1 1106 RR63

                    -                                      PIPlWG VT 3                   NDEP 9.2 R0        X   * -

GUIDE ~- i- 3 i l

                          $1 1106-082-0
- 004400 $1 1106-RR78 PIPING ~ VT-3 WDEP 9.2 R0 X --

i t RR JO 4-18 1;

I DATE: 06/19/91 SOUTH TEXAS PROJECT ELECTRIC GEtELATING STAilDN UNIT 1 PAGE: 14 REvlSIDNt 0 INSERVICE INSPECTIDW

SUMMARY

FIRST INTERVAL, FIRST PERIOD, THIRD OUTAGE (1991)

   /'j                                                        CLASS 2 COMPLETED COMPONENTS

( j SAFETY INJECTION N O ASME O G T SEC. XI R E N

SUMMARY

EKAMINATION AREA CATGY EKA4 E O E REMARKS huMBER IDEhTIFICATION ITEM Wo METHOD PROCEDURE C M R **CAllBRATION BLOCK'* 51 11D9 D82 B 004500' 'St 1109 HL5005 PIPlWG VT-3 WDE- .4 R0 X - - RR *

                   $1 1110 BB2-A 004600 St.1110*HL5001                      PIPING VT 3           kDEP 9.2 R0      M  - .

RR SI ii18 08? E 004700 $1 1118 HL5009 P!FlWC VT 3 WDEP 0.2 RO X - . l( ,_ GUIDE -

                   $1 1139-DB2 8 A1 004800 $1 1139 HF5001                      P]PlWG VT 3           WDEP 9.2 R0      X  - -

GUIDE ! SI 1139 082 C-A t 004900 $1 1139 HF5003 P! PING -VT.3 NDEP 9.2 R0 X . - l' GUIDE - i

 ~

l l v l 4 19 l

DATE: 06/19/91 SOUTH TEKAS FROJECT ELECTRIC GENERATING STATION UNIT 1 PAGE: 15 REVISION: 0 INSERVICE IkSPECTION

SUMMARY

FIRST IN1EtvAL, FitST PERICD, THIRD OUI AGE (1991)

 /m
 \

CLASS 2 COMPLETED CCMPONENTS (, CV EQUIPMENT SUPPORTS N 0 ASME O G T SFC. XI R E H

SUMMARY

EKAMINAil0N AREA CATGY EXAM E O E PEMARKS C1HSER IDENTIFICATION ITEM NO ETH@ PROCEDULU C M R ** CALIBRATION BLOCK'* 2R171NP0102A 005000 PD1 EQUlP VT-3 NDEP 9.2 R0 X - - $1HGLE BASE SUPPORT ON PULSATION CV PULS DMPR

  • DAMPENER 1A.

(.

 \v)
 \~.)\

4 20

m

                                                                                                                                 /

k

                                                                                                                                  /

l & d> e O

                                               ,;e       O 4, v+u                                                                      9 IMAGE EVALUATION                                    AA
                                                            %\O* %)f   W )@       TEST TARGET (MT-3)
                                                                                                                                   <[*f*6's4{fg s\/[O                                                                  q;,

Nx s pg, b' 37 k I.0 E a tE lt t9. m l-l $D hkb (l =1.8 1.25 1.4 i 1.6

                                                                                                =s    i  ==

4 150mm > 4 6 ->

                                        #4                                                                                   e$
                                                                   ,                                                      4V <^o 4>+p{;f,g%g                                           .>,

c f,p

                                                                                                                              .g g,f
                                                                                                                                         //y4s Or y // {                                                      4Q 4   M-M-
  ' - " - - - - - - - - - - + _ _ _ _ _ _ _ _ _ _ _ , , _ _    _

DATE: 06/19/91 SOUTH TEKAS PROJECT ELECitlC GENERAflhG STA110N UNIT 1

  • AGE: 16 REVISION: 0 INSERYlCE INSPECTIDW bu> MART LIR$T INT!RVAL, FIRST PERICO, THIRD OUTAGE (1991)

CLASS 2 COMPLETED COMPONENTS

 'C$    20VIPMENT SUPPORTS

( N O ASME D G T SEC. XI R E H suMMAR) EXAMINATION AREA CATGY EKAM E O E REKARK$ CJMBER IDENTIFICAfl0N ITEM NO METHOD PROCEDUKE C M R **CAllBRAtl0N BLOCK" Zyj01NPA101t 005100 Cs1C EQUIP YT.3 NDEP 9.2 R0 X SINGLE BASE SUPPORT Oh CONTAlhMENT $ FRAY CS C5 PtNP * @ P 1C. 4-21

DATE: 06/19/91 SOUTM TEXA$ PROJECT ELECTRIC GEkt?.Afl%G STAfl0N U3lT 1 PACE 17 REVISION: 0 INSERVICE INSPECTION SU4 MARY FIRST INTERVAL, FIRST PERIOD, THIRD DUTAGE (1991) i n i CLAS$ 2 COMPLETED COMPONENTS [ "es} 1 (_/ RNA EQUIPMENT SUP*0RTS N O ASME D G T i SEC. XI R E N

SUMMARY

EKAMlWAfl0N AREA CATCT EKAM E O E REKARKS WUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M k **CALIBRAflou BLOCK " 2,9161NNYiO14 005200 RNX1A EQUIP VT 3 KDEP 9.2 R0 X - - SINGLE BASE SUPPORT ON RNR HEAT RN HTX SUPT - EXCHANGER 1A. I i i i k~-.) C's b 4 22

     ..___s          . . _ _ _ - . . _          _ . - .        . - - . _ _ _                 _.. _    -               _. . _ - -               ___.___.__.m._                            _ _ _ . _
       ; DATE:.'06/19/91                                  SOUTH TERAS PROJECT ELECTRIC QENERATING STAfl0N UNIT 1                                                              - PAGE: :18 REVibl0N:          0-                                                INSERVICE INSPECTION 

SUMMARY

FIRST_ INTERVAL, FIRST PER100, THIRD OUTAGE (1991). CLASS 2 COMPLETED COMPONENTS ,

        $1
  • EQUIPMENT SUPPORTS N 0 ,

ASME O G T SEC. XI R E N SuletARY EXAMINAfl0N AREA. CATGT EKAM E D E REMARKS NunsER lDENTIFICATION ITEN No METHOD PROCEDURE C M:R **CAllSRATION SLOCK'* 2N121NPA101A 005300 I NH1A EQUIP VT 3 NDEP 9.2 R0 *

  • X $1NGLE SASE SUPPORT ON HIGH HEAD SAFETY St NN PUMP. -

INJECTION PUMP 1A. MIS $1NG JAMNUTS ON 2 0F 8 ANCMOR Sitet. N0 WEVER, THE SASE SUPPORT WILL CONTINUE TO PERFORM ITS INTENDED FUNCTION, i J . 1 L t' i = 4-23

  . . , . - . . - .              =     .-. - - - ~           . - _ _ ,._ - - - - ,- - . _. -                          -- .._ .,.-, -        .    .

DATE: 06/19/91- $0UTH TEXAS PROJECI ELECTRIC QENERATING $TATION UNIT 1 PAGE: 19

     -REVISION '              -0                                       INSERVICE !NSPECTION ELMMART FIR $f INTERVAL, flRST PERIOD, THIRD OUTAGE (1991)
                                                                    - CLAs$ 3 COMPLETED COMPONENTS AUKILIARY fEEDWATER N      ^

ASME : O GT SEC. XI R E N StsmART EXAMINAfl0N AREA CATGY EXAM 'E O E REMARKS

  = NUMBER-IDENTIFICAfl0N-                           ITEM NO METHOD                      PROCEDURE     C M R **CAllDRAT!ON BLOCK **

l AF 1011 GA3-KA

  -00$A00 AF 1011 ML5003                             PIPING VT 3                          NDEP 9.2 R0  X  - -

GUIDE - t I

                    ~'AF 1053 GA3 EA03 005500 AF.1053 NF5007-                          PlPING VT 3                          NDEP 9.2 R0  X  - -

GUIDE - 005600 AF 1053 HF5008 PIPING VT 3 WDEP 9.2 R1 X - - ( . GUIDE - l  ! i i l AF 1054 WA3 H l l- 1 i 005700 AF 1054 HL5007 P! PING VT 3 NDEP 9.2 R0 X - - EXAMINED WHEN FILLED.

                        $H V (2);                      -           VT 4                                X  - -

l l AF 1086 GA3 A

                                                                                                                                                   ~l 005800 iAF 1086 HL5002                          PIPING VT 3                          NDEP 9.2 RD  X  - -

GUIDE-AF 1086-GA3 B

  - 695900 'AF 1086 ML5003                           PIPING VT 3                          NDEP 9.2 R0  X  - -

GUIDE i NDEP 9.2 RD - - 006000?AF 1086 HF5005 P! PING VT+3 X l U-BOLT 1 I l 4-24 1 I l i-l E_ . . _ _

DATE: 06/19/91 SOUTH TEXAS PROJECT ELECTRIC GENERAftkG $1A110N UNIT 1 PAGE: 20 RTV!$10Ni 0 INSERVICE IN$PECil0N SLMMRT FIRST IkiERVAL, FIR $1 PERICD, THIRD OUTAGE (1991) CLA$$ 3 COMPLETED COMPONEWi$ C(84 DON!WT COOL 1WG W 0 ASME O G T SEC. XI R E N

SUMMARY

EKAMINAfl0N AREA CATGT EXAM E O E REMARKS L94BER IDENTIFICAtl0N ITEM NO METH00 PROCEDURE C M R **CALIBRAfloh BLOCK'* CC 1101-WA3 C 006100 CC 1101-HL5004 PIPING VT 3 WDEP 9.2 R0 x - - RR 006200 CC 1101-HL5005 P! PING VT 3 NDEP 9.2 R0 X - - RR CC-1101-VA3 0 006300 CC 1101 ML5002 PIPlWG VT 3 WDEP 9.2 R0 X - - GUIDE \ CC 1103 VA3-H 006400 CC 1103 HL5003 PIPlWG VT 3 NDEP 9.2 R0 x - - RR 006500 CC 1103 ML5002 PIPING VT 3 h0EP 9.2 R0 x - - RR CC 1105 WA3-8 006600 CC 1105 WR16 PIPING VT 3 WDEP 9.2 R0 x - - RR 006700 CC-1105 RR15 P!P!kG VT 3 kDEP 9.2 R0 x - - RR 4-25

SOUTH TEXAS PROJECT ELECTRIC GENERAil%G STATICW LMlf 1 PAGE: 21 DATE: 06/19/91 REVISION: 0 INSERVICE INSPECTION SUMMART f!RST INTERVAL, flRST PERICO, THIRD OUTAGE (1991) CLASS 3 COMPLETED COMPONENTS Ct>9P0hENT C00t!Ng N O ASME O G T SEC. XI R E N SL%1 MARY EXAMINATION AREA CATGT ERAM E D E REMARKS NUMBER IDENTIFICAfl0N ITEM NO METWOO PROCEDURE C M R **CALIBRAfl0N NOCK" CC 1105 WA3 J 006800 CC 1105 RR02 PIPING VT 3 NDEP 9.2 R0 X - - GUIDE CC 1106-WA3d 006900 CC 1106 Ht5L,17 P! PING VT 3 NDEP 9.? R0 x - - GL.'!OE CC 1106-WA3-J 007000 CC 1106-RR17 PIPING VT 3 NDEP 9.2 R0 x - - RR 007100 CC 1106 RR18 PIPING VT 3 NDEP 9.2 R0 M - - REEXAMINED AFTER THE LOAD PIN AT THE RR - REAR BRACKET WAS REWORKED PER WR# CC 116586. CC-1109-WA3 0, 007200 CC 1109 HL5007 PIPING VT-3 NDEP 9.2 RC K - . RR 007300 CC 1109-HL5004 PIPING .3 ' NDEP 9.2 R0 x - - RR CC 1100 WA3 F 007400 CC 1109-ML5008 PIPING VT*3 NDEP 9.2 RO x - - GUIDE 4-26

l 1 i i DATE: 06/19/91 SOUTH TEXAS PROJECT ELECTRIC GENERATING STAfl0N UNIT 1 ~PAGE: 22'

    . ;REvls!ON:/                    0                                               INSERVICE INSPECTION BLMMARY FIRST INTERVAL, FIRST PERIOD, TNikD OUTAGE (1991)

CLAS$'3 COMPLETED COMPONENTS COMPONENT COOLING 1 N 0 l l A9NE O G T j SEC. XI R E H  : SumARY.EXAMINAfl0N AREA CATGT EXAM E O E RCutKS uuMSER-.IDENTlflCATION ITEM NO METHOD PROCEDURE C M R **CAtlBRATION SLOCK** l CC 1109 WA3 J 007500 CC 1109 HL5002 PIP!NG VT 3 NDEP 9.2 R0 X .- EKAMl"50 WHEN FILLED. SH+V (2) - VT 4 X - - CC 1114 WA3 C 007600 CC-1114 AR27 PIPING VT 3 NDEP 9.2 R0 X * - ta w . 007700 BC 1114 RR28 PIPING VT 3 NDED 9.2 R0 X + - AR - a 007800 CC 1114-RR26 PIPING- VT*3 NDEP 9.2 R0 - - X AN ARC STRIKE WAS 06 SERVED in THE MIDD'.E RR - 0F THE SWAY STRUT. .HOWEVER, AN ENGINEERING EVALUATION OF THis CONDITION CONCLLDED THE ARC SilKE WAS INSIGNIFICANT aND WOULD NOT AFFECT THE FUNCT10NALITY OF THE SUPPORT.

                       -CC 111'. WA3 M 007900' CC+1114 RR01.                                      PIPING VT 3                    NDEP 9.2 R0     X    - -
                      - RR                                              -

008000- CC 1114 RR02 PIP!NG VT 3 NCEP 9.2 R0 X - - RR - CC 1115 WA3 0'

        , 008100 CC 1115-RR20                                         P! PING     VT-3               NDEP 9.2 R0      X    - -

..Og RR - 4-27 . :- , .. .-. . a...- -. . - .

DATE: 06/19/91 50UTN TEXAS PROJECT ELECTRIC GENERAflWG ST ATION UNIT i PACE: 23 l REVISIDN: 0 INSERv!CE INSPECTIDN SUMKART FIR $7 'dTERVAL, FIRST PERIOD, THIRD OUTAGE (1991) CLASS 3 CD4PLETED COMPONENTS COMPONENT COOLING N 0 ASME O G T SEC. XI R E N SUMMART EKAMlWATION AREA CATGT EXAM E O E RE44RKS MUMBER IDENT IF I CAf lDN ITEM NO MET HOD PROCEDURE C M R ** CALIBRATION BLOCK'* CC 1115 WA3 0 008200 CC 1115 RR21 PIPING VT 3 NDEP 9.2 R0 X - - RR CC 1120 WA1 B 008300 CC 1120-HL5001 PIPING VT.3 NDEP 9.2 R0 K - - REEKAMINED AFTER THE STRUT BARREL JAM RR . NUT WAS TIGHTENED AND THE BEARING RACE IN THE STRUT PADDLE ON THE CLAMP END WAS REWORKED PER WR8 CC 1165SS. 008400 CC-1120 ML5002 PIPING VT-3 NDEP 9.2 R0 X - - REEXAMlWED AFTER THE BEARING RACES IN RR - BOTH STRUT PADOLES WERE REWORKED PER WE# CC 116587. l 4 28 l l

__ . . - , . . _ . . . _ . . . . - . . ~ _ . _ _ . . _ . _ . . _ _ . . _ . . , - . _ _ _. . _ . . _ . . . .__._m__.

         - DATE: _06/19/91                                    SouTN TFKA$ PROJECT ELECTRIC GENERATING STATION UNIT 1                                               PAGE:      24 REVill0Ns --                       0                                   INSERVICE ItiSPECTIDW 

SUMMARY

FIRST INTERVAL, flRST PERIOD, TNikD OUTAGE (1991) ,

    'g                                                                            CLASS 3 COMPLETED COMPONENTS.

EstEWil AL COOLIWG WATER N U ASME D G T SEC. XI R E N S M RT EKAMlhAfl0N AREA CATGT EXAM E O E REMARKS NUMBER IDENilf! CATION ITEM NO METHOD PROCEDURE C M R **CAlltRATION BLOCK'* EW-1107 WT3 AC i 006500 EW 1107 NL5001 PIPING VT 3 WDEP 9.2 A0 X - - ' RR - 008600 EW 1107 HL5007 PIPitG VT 3 NDEP 9.2 R0 X - - RR = EW 1125 WT3-91 008700 EW 1125-ML5004 -PIPING VT 3 NDEP 9.2 R0 X - - GUIDE f 008800 EW 1125-HL5005 PIPING VT 3 NDEP 9.2 R0 X - - GUIDE-EW 1188 WT3 A. . 008900 EW 1188 ML5001- PIPlWG - VT 3 NDEP 9.2 R0 X . - GUIDE 1 009000'EW 1188 ML5002 _ PIPING VT 3 NCEP.9.2 R0 X- - i. l- GUIDE '- l 4 29 L

     . _ _ _ . . _ . . .           . _ . _ . - . - _ , - . . . ~ _ _ . _ _ _ . _ . _ . _ ~ _ . . _ . . ~ _ . . . _ _ _ _ . ~ . _ _ _ _ _ . .                                                     ~ . . _ _
          . DATE . 06/19/91                                       SOUTH TEXAS PROJECT ELECTRIC QENERATING STAfloW UNif 1                                                                      PACE:  25        l
          - REV!$10N:            0                                                           INSERVICE INSPECTION 

SUMMARY

FIRST INTERVAL, FIRST PERIOD, THIRD OUTAGE (1991)

       ..                                                                                 = CLASS 3 CuMPLETED COMPONENTS
   ' ~

AF'* EQUIPMENT SUPPORT $ N 0 ASME 0 C T SEC. XI R. E N=

SUMMARY

EXAMINATION AREA CATGY- EKAM E O E REMARKS. NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R **CALISAATION BLOCK'* 33141MPA03

                                                                                                                                                ~

009100 AFMIC EWIP VT 3 NDEP 9.2 R0 X **. SINGLE BASE SUPPORT ON AUXILIARY AF MTR PUMP

  • FEEDWATER MOTOR PUMP iC.  !

1

v. .

d i' 4-30 l

 ~

DATE: 06/19/91 $0VTN TEKAS PROJECT ELECTRIC GENERAflWG STAfl0N UNIT 1 FAGE: 26 REVl$10N: 0 IN$tRVICE INSPECTION

SUMMARY

flR$f INTERVAL, f!R$T PERl(0, TMIRD QJTAGE (1991)

 ~    (O
         )

CC EQUlt*ENT SUPPORTS CLAS$ 3 COMPLETED COMPONENTS N O ASME D G T SEC. XI R E N Su> MART EXAMikAfl0N AREA CATGY EXAM E O E REMARKS NUM8ER IDEWilfitAfl0N ITEM NO METHCC PROCEDURE C M R **CAllBRAfl0N BLOCK" 38201NDA101A 009300 CCP1A EQUIP VT 3 NDEP 9.2 R0 X - - SINGLE BASE SUPPORT ON COMPONENT COOLING CC CLG PUMP . WATER PUMP (TRAIN A), i I i f Lj i l l l l l l l r% v 4-31

4 .. m _ _ _ . _ . . _.___ _. _ . . - . _ . _ _ . . .=._m.__m__ .m_ . . _ . . . . . . - . _ _..m .__._ _ _ _ _ _ _ _ _ .

               - DAT E l'.. ' 06/19191                 SOUTN TEXAS PROJECT ELECTRIC DENERAllNG 51Afl0N UNif 1                                        PAGE:     27-
               ~ REVill0N: -            -0m                                  INSERVICE INSPECil0N 

SUMMARY

FIR $1 IWi[RVALi FIRST PERIOD, THIRO CUTAGE (1991)

          - -                                                                CLAst 3 COMPLETED COMPONENTS
- DG JW
  • E W1PMENT SUPPORTS N 0 ,
                                                        -ASME                                           O G T                                                         ,

SEC. XI R E N 3420ERT ERAMlhAfl0N AREA CATGY EKAM E O E REIGRKS NUMBER IDENTIFICATION ITEM WO METHOD PROCEDURE C M R ** CALIBRATION F, LOCK ** 30151M1AD134 r 009400 JW1A EQUIP vi 3 NDEP 9.2 RO x . . JACKET WATER PIPE SUPPORT (TRAIN A) - JW PIPE SUPT SUPPORT 18 LOCATED DOWNSTREAM OF JACKET WATER STANOBT PLMP DISCHARGE. 1 J 7 r l a

          \

4 32

      .    , , - . - ~ ~ . _             . . . _ . . . -     .
                                                                ..~....-...-..-~~~~...~--.--...~-..~e..-.a                                               .u   .._

lDATE: 06/19/91 SOUTH TEXAS PROJECT ELECTRIC DENERATING STAfl0N UNIT 1 PAGE: 28 REVlll0N: -0 INSERVICE INSPECTION SUMMART FIRST INTERVAL,- FiksT_ PERIOD, THIRD OUTAGE (1991) O CLAS$ 3 C04PLETED COMPONENTS

                - DC LU EQUIPMENT SUPPORTS
                                                                                                        -N       0 AS'tE -                                 0 G 1 SEC. XI                                 R E H SUMMART EXAMINAfl0N AREA                       CATGY     ELAM                          E D E REMARKS NUMSER. IDENTIFICAfl0N                          ITEN NO METHCD       PROCEDURE         C.M R ** CALIBRATION BLOCK **

30151NHr0136 . i j 009500 LHX2A .TQUIP VT 3 NDEP 9.2 R0 X - - LUBE CIL HEAT EXCMANGER (TRAIN A) - LU HEAT EXCH - SUPPORT 18 LOCATED FARTHEST FROM THE ENGINE. l l R151MSA0114 009600 LUF1A EQUIP YT 3 NDEP 9.2 R0 X - - SINGLE SASE SUPPORT ON LUBE Cll FILTER LU FILTER -- * (TRAIN A). I 1

009700 -LU3A EQUIP VT 3 NDEP 9.2 RO X * - LUBE OIL PIPE $UPPORT (TRAIN A)
  • LU PIPE SUPT -

SUPPORT l$ LOCATED UPSTREAM OF THE LUBE Cll STRAINER CLO$tST TO THE LUBE Cll-- CIRC. PUMP. ! l l l ' t I e l l l l' i i 1 4 33 l m+  % y e-.

l I

APPENDIX 4-B PERSONNEL 1

1 i 4 {+ I s 4 l I l 1 r 4-34

i

                                                                    )

1 A APPENDIX 4-B PERSONNEL Name Company Level R. E. Divers HL&P II R. V. Friesen HIAP II J. T. Graham HL&P II J. F. Halley HL&P 11 M. J. Harris HlaP II S. K. Hubbard HL&P III R. P. Krupa HL&P 11 R. L Manvell HL&P II C. A. Murry HL&P II S. R. Shojael HL&P 11 P. Silva HL&P II L D. Spiess ILtP 11 R. S. Stone HL&P I' C. D. Suhler HL&P II J. J. Weaver HL&P II i W. D. Kieler ESI II A. R. Pennanen NES 11 Company HIAP - Houston Lighting & Power Company ESI - Ebasco -Services Inc. NES - Nuclear Energy Services

               - Level I Trainee l
     ,0
                                                - 4 35
    >a-,-,w--- maK. -4A- ?-,4      4  - + - - *J 4- -MA~4 -- A-- L. -e-4e $L     4 n= --lmee s-++>

J O APPENDIX 4-C i OWNER'S REPORT FOR INSERVICE INSPECTIONS NIS-1 ICRMS t 1 4-36 L

1991151 1RE03 Compouent Suppons (Qass 1) Page 1 of 3 FORM NIS-1 OWNER'S REPORT ICR INSERVICE LNSPECTIONS As required by the Prwisions ni the ASME Cbde Rules O

1. Owner Houston Lichtine & Power Comtianv. Electric Tower: P.O. Box 1700: Houston. Texas 77001 (Name and Address of Owner)
2. Plant South Texas ProitS,tJ;ltgric Generstine Station: P.O. Box 7R9. Wadsworth. Texas 77483 (Name and Address of Plant)
3. Plant Unit 1 4. Owner and certificate of Authortration (if required) N.A.
5. Commercial Service Date fM5M 6. National Board Number for Unit N.A.
7. Components inspected ASME (bde Oass 1 Component Supports . Piping and Equipment (See Pag 3 of 3 for Identification Numben)

Manufacturer Component or Manufacturer or Installer National Appurtenance or Installer Serial No. Board No. Class 1

     ~ Pinine Sunnorts               Ebasco t'I)                     KA N.A.

Steatii Ge'n'erator - Generator 1C Westinchoust[M) 2133 W18693 Reactor Coolant Purnp 1B Westinchouse (hQ 2-115E580 G01 29 10 l C/ i i I i l l HL&P by & Date ' d!7/ Factory Mutual by , 4 Date 4 48-9/ B. R. Russell, ANil R.11 Beverly] 4-37

                '1991 ISI 1RE03 Component Suppons (Qass 1)                                                                            Page 2 of 3 PORM NIS-1 (Back)

( 8. Examination Dates 010491 to 03/1181 _ 9. Irr wtlon Interval from 08nN88 to ,,0lL7J98

10. Abstract of Examinations, lachide a list of examinations nd a statement concerning status of work required for current interval. (ASME Code Oass 1 Component Supports . Piplag and Equipment)

See Sarvian 4.4 and Appeedix 4-A of 1RB03 h==ary Report for list of ====lantions performed.

                              'Ibe n=arminations performed this outage constitute 34 percent of the required +===lantious for the current laterval
11. Abstract of Conditions Noted.

A poeconforming condition was acted on one (1) piping sopport RH 1201 HL5004. missing mtter pin. --

12. Abstract of Correctiw: Measures Recommended and Taken.
                              'Ihe couer pin was replaced on support RH 1201 HL5004.

We certify that the statements made in this report are correct and the examinations and corrective measures taken conforrn to the rules of ASME Code, Section XL Certificate of Authorintion No.(if applicable) N.A. Expiration Date NA Date d- / 3 _ 19 9 / Signed Houston Lichting & Power Co By bbd _ Owner Rl1. Beverly[ CERTIFICATE OF INSERVICE INSPECT 10N I, the undersigned, holding a valid commission issued by the National Board of Boil-r and Pressure Vessel laspectors and the State or Province ofIggg and employed by Arkwrlaht Mutual Insurance Co. of Norwood. Mass have inspected the components described in this Owner's Report during the period

                          / 94-4/                  to J-N-6/                . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code, Section XL-
                        . _ _ By signing this certificate neither the inspector nor his employer makes any warranty, express or-implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or pro y damage or a loss of any kind arising from or connected with this inspection. Factory Mutual System -

                                    -   eeC                                Commissions                     Tex 826 Inspector's Signature                                     National Board, State, Province, and Endorsements B. R. Russell Date                4 "/ O " 19 9 /

i LO 4 38

   . . _ -         _ .     .         -_        ~ ~ .                            -.      .

_ . - - .- ~ . - _ . - - - _ - . . . . _ 1991 ISI - 1RE03 Componsat Supports (Class 1) Page 3 of 3 SUPP13IMEM *!D PorJA h3-1 OWNERS REPORT POR INSERVIG INSPECT 10NS FOR ASME Cbde Class 1 Omponent Supports 0 1. Owner Houston Lichtina & Power Comnam: Electric Tower: P.O. Box 170(h Housten. Texas 77001 (Name and Address of Owner)

2. Plant South Texas Prolect Electric Generatine Station: P.O. Box 289 Wadsworth. Te.us 77483 (Name and Addiess of Plant)
       -- 3. Plant Unit 1                                4. Owner and Certificate of Authorti.ation (if required) NA
5. Commercial Service Date Rajg$ _6. National Board Number for Unit NA PIPING SUPPORT MARK NO_. TYPE CV 1128-HS5001 RR CV 1128-HS5003 U BOLT RC 1000-RR.01 OUIDE RC 1003-HL5004 RR RC-1123-H1.5008 . SH V RC-1123 RR10 RR RC 1125 HL5007 SH V
                            - RH 1201 HL5004                                                     RR SI 1208 RR01                                                        RR EOUIPMENT SUPPORT MARK NO. DESCRITTION SOCIC                                                          - 501C COLUhm 1 SOC 2C                                                             SO IC COLUMN 2.

RPC2B RC PUMP 1B COL 2 r i l l l l HL&P by MM//L Date l'/INf/ " Factory Mutual by _ iLe Date 4 -/c3 4 R.'ll Beverly B. R. Russell, ANIl 4-39 g

1991 ISI 1RE03 Component Supports (Class 2) Page 1 of 3 FORM NIS-1 OWNER'S REPORT POR INSERVICE INSPEC'I1ONS As required by the Proviskms of the ASME Code Rules , 1

1. Owner ,Jiouston Lightine & Power Company: Electric Tbwer: P.O. Box 170m Houston. Texas 77001 G (Name and Address of Owner)
2. Plant South Tens Project Electric Genera, tine Station: P.O. Box 2M. Wadsworth. Texas 77483 (Naroe and Address of Plant)
3. Plant Unit 1 4. Owner and Certificate of Authorization (if required), NA
5. Commercial Service Date OR/25SA 6. National Board Number for Unit __N.A.
7. Components inspected ASME Code Class 2 Cbmponent Supports - Piping and Equiptnent (See Page 3 of 3 for Identification Numters)

Manufacturer Coroponent or Manufacturer or Installer National Appurtenance or Installer Serial No. Board No. Class 2 _ Pin!nc Supports ._Ehasco di NA NA Pdisation Jamnener Johnson Controls (M1 M.G438 176 Couthinment Spray

          *umn1C                    Pacific Pumns (M)                51709                            443 MiR Heat Exchancer IA              Jmenh Oat Com (M)

J2312-4A 990 High ifead S1 Pumn IA Pacific Pumns (M) 51695 387

     )
V l

i l l l 4Q HIAP by b4L Date d 3/9/ Factory Mutual by a w A/C. Date 6 -d-9/

 - \,3             R.f.lleverl                                                B. R. Russell. ANII 4-40

1991 ISI .1RE03 Component Supports (Class 2) Page 2 of 3 PORM NIS-1 (Back) _ ,. - 8. Examination Dates 12/1090 to 03r20.91 9. Inspection Interval from ,1U3M. to 08/2398 e i U 10. Abstract of Eaminations, include a list of examinations and a statement concerning status of work required for current interval. (AShE Code Qass 2 Component Supports . Piping and Equipment) See Section 4.4 and Appendiz 4-A of 1RE03 Summary Report for list of mmtnations performed. The mninntions perfonned this outage constitute 34 percent of the nx[uired mminations for the current latervat

11. Abstract of Conditions Noted.

Nonconforming conditions were noted on two G) supports: A) MS.1003-HL5006. dhlodged bearing race; B) HillA - mhsing }amnuts.

12. Abstract of Corrective Measures Recort, mended and Taken.

A) MS-1003-HL5006 - bearing race was rewosked. B) HH1A - a work request was written to install the missing )am nutt. Eva'uation of the support determined that functiondity and operability of the support was not )mpardized. We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of ASME Code, Section XI. Certificate of Authorization No.(if applicable) NA Expiration Date NA Date d- /3 19 9/ _ Signed Houston Lichtinc & Power Co By NMale Owner k. L. Ikvor/f CERTIFICATE OF INSERVICE INSPECTION h V I, the undersigned, holding a valid commission issued by rie National Board of Boller and Pressure Vessel Inspectors and the State or Province ofIs.3.aj and employed by Arkwricht hbatual Insurance Co. of Norwood. Mass have inspected the components described in this Owner's Report during the period

           /A-/o -90             to 3-#c-9 /            . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code, Section XI.

By signing this certificate neither the Insp*ctor nor his employer makes any warranty, express or implied, conceming the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or pro rty damage or a loss of any kind arising from or connected with this inspection. Factory Mutual System wL _ Commissions Tex 826 Inspector's Signature National Board, State. Prtnince, and Endorsements B. R. Russell Date 4 - / 8 - 19 9 / Ov 4-41

1991 ISI 1RE03. Component Supports (Class 2) - Page 3 of 3 SUPPLEMEPR *ID PORM NIS-1 OWNER'S REPORT POR INSERVIG INSPECf10NS POR ASME Code Class 2 Component Supports

 -n-U-
        - 1. Owner Houston Lirhtint & Power Comnam- Bectric Tower: P.O. Box i700 Houston. Texas 77001 (Name and Address of owner)
2. Plant _ South Texas Project Electric Ocneratine Station: P.O. Box 289: Wadsworth. Texas 77483 (Name and Address of Plant) 3 Plant Unit 1 4. Owner and Certiflate of Authorization (if required) N.A.
5. Commercial Service Date 08'15/88 6. National Board Number for Unit N.A.

PIPINO . SUPPORT MARK NO, TYPE AF-1012 H1.5022 RR AF 1012 HL5011 RR AF 1012 ML5032 SH V CC 1312 HL5001 SH V CS 1301 RR02 RR CS 1302 RH04 RR CS-1303 HL5002 RR FW 1016-HL5005 RR MS 1003 HL5006 RR MS-1003 HL5003 SH V (2) RH 1106-HL5003 ANCHOR RH 1204 RR04 RR "E1204 HL5009 RR

  .                           na11205-HL5007                                      SH V D-                           RH 1205 HL5011                                      OUIDE O                            RH-1205 RRN                                         RR RH 1205-HL5010                                      SH.V St 1101 HL5026                                      RR SI 1101 HL5025                                      RR SI 1101 HL5005                                      SH V SI 1105-RR27                                        RR SI 1105.RR28                                        RR SI 1105 RR33                                        RR SI 1105 RH35                                        SLIDE-S SI 1105-RR37                                        RR SI 1105 RR38                                        OUIDE SI 1105 SH42                                        SH-V (2)

SI 1106-HL5011 RR SI 1106 RR63 OUIDE SI 1106-RR78 RR SI-1109-HL5005 - RR SI 1110-HL5001 RR SI 1118-HL5009 OU1DE S11139-HF5001 OUIDE SI 1139 HF5003 OUIDE -

                             - EOUIPMENT SUPPORT MARK NO.                         DESCRIPTION PD1                                                 CV PULS DAMPENER CSIC                                                CS PUMP 1C RHX1A                                             ' RHR HX 1A SUPT HHIA                                                HHSI PUMP 1A HL&P by                    w2s            Dateb//1f9/

Factory Mutual by h- Date 4 db4/ 1 R.'L Beverly B. R. Russell, ANil 4-42

1991 ISI .1RE03 Component Supports (Oass 3) Page 1 of 4 PORM NIS 1 OWNERS REPORT ICR INSERVICE INSPECI1ONS As requiral by the Provisions of the ASME Code Rules O) 't 1. Owner Houston Lichtine & Power Comoann Electric Tower: P,0. Box 1700: riouston. Texas 770(11 (Name and /.ddress of Owner)

2. Plant South Texas Protect Eiectric Generatine Station: P.O. Box 284. Wadsworth. Texas 77483 (Name and Address of Plant)
3. Plant Unit 1 4. Owner and Certificate of Authorization (if required) N.A.
5. Commercial Service Date 082/88 6. National Board Number for Unit NA
7. Components laspected ASME Code Qass 3 O)mponent Supports Piping and Equiptnent (See Pare 3 & 4 of 4 for identiikation Numbers)

Manufacturer Component or Manufacturer or Installer National Appurtenance or Installer Serial No. Board No. Qass 3 Ploine Suonorts Ebasco 01 NA NA AF ~ Bingham. Jolor Pumn 1C Williamette Co (M) 1A136 NB.554 CCW Hayward Pumn 1A 'I\ler PumgCo. (M) 804001 1 DO~ Cooper Energy Aux. Skid NL11 Services (M) 8L0101 NA v

 )   HL&P by        87$rch R. L' Beverly     -

Date 6[/7!9/ Factory Mutual by -'6 B. R. Russell, ANII Date 6-d"// 4 43 N.

1991151 IRE 03 Component S:pports (Class 3) P:ge 2 of 4 l PORM NIS-1 (Back)

 ,eq  8. Examination Dates        12/10?/J     to    03/2091     9. Inspection Interval from 0825Mt to 0805W8

(" )

10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval. (ASME Cbde Oass 3 Cbmponent Supports - Piping and Paulpment)

Soc Section 4.4 and Appendir 4-A of 1RII13 Summary Report for list of c.auninations performed.

               'Itc examinations performed this outage constitute 32 percent of the required examinations for the current Interval.
11. Abstract of Conditions Noted.

Nonconforming conditions were noted on four (4) supports: A) CC 1105 RR18 - bad pin in cx ntact with adjacent piping line; B) OC 1120-IIL5001 - base )un not and dislodged bearing race; C) CC-1120-HL5002 - dislodged bearing race; D) CC 1114-RR26 - are strike.

12. Abstract of Corrective Measures Recommended and Taken.

A) CC 1106-RR18, B) OC-1120.HL5001, and C) OC 1120-HL5002 were reworked. D) CC 1114-RR26 - after an Engineering evaluation, no co:Tective measures were taken or recommended. We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of ASME Code, Section XI. Certificate of Authorization No.(if applicable) N.A. Expiration Date N.A. Date b /3 19 9/ Signed ,,liouston Lichtine & Power Co. By NM&vMf_ Owner ilL.Beveg l CER'nFICNIE OF INSERVICE INSPECDON 1 l (3 (j I, the undersigned, holding a valid commission issued by the National Board of Boller and Pressure i Vessel Inspectors and the State or Province of Texas and employed ty Arkwricht Mutual Insurance Co. of Norwood. Mass have insoccted the components described in this Owner's Report during the period 4-N 'fo to 3 -#C -9/ . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, express or i implied, concerning the examinations and corrective measures described in this Owner's Report. l Furthermore, neither the Inspector nor his employer shall lie liable in any manner for any personal injury or property mage or a loss of any kind arising from or connected wi'.h this inspection. Factory Mutual System m wA- ---- Commissions Tex 826 Inspector's Signature National Board, State, Province, and Endorsements B. R. Russell Date // "'& 19.7/_ v 4-44

1991 ISI - 1P.E03 Compone:t Supports (Qass 3) Page 3 of 4 SUPPLEMENT 'ID PORM NIS-1 OWNER'S REPORT POR INSERVIG INSPECHONS FOR  ! ASME Onde Class 3 Cbmponent Supports (

 )  1. Owner Houston Uchtine & Power Company: Electric Tower: P.O. Box 1700: Houston. Texas 77001 l

i (Name and AdJtess of Owner)

2. Plant South Texas Project Electric Generatine Station: P.O. Box 2R9; Wadsst>rth. Texas 77483 (Name and Address of Plant)
3. Plant Unit 1 4. Owner and Certificate of Authorization (if required) N.A.
5. Corr.nercial Service Date ,08M/88 6. National Board Number for Unit NA PIPINO SUPPORT MARK NO. TYPE AF 1011 HU003 GUIDE AF 1053 HF5007 GUIDE AF-1053-HF5008 GUIDE AF 1054-HL5007 SH.V (2)

AF-1086-HL5002 OUIDE AF-1086-HL5003 GUIDE AF 1086 HF5005 U-BOLT CC-1101 HL50N RR CC-1101 HL5005 RR CC1101 HL5002 GUIDE CC 1103-HL5003 RR CC 1103-ML5002 RR CC-1105-RR16 RR n CC 1105 RR15 RR GUIDE .Q CC 1105-RR')2 CC-1106-HL5007 GUIDE CC-1106-RR17 RR CC 1106-RR18 RR CC 1109-HL5007 RR CC-1109 HL50N RR CC.1109-HL5008 GUIDE CC-1109-HL5002 SH V (2) CC-1114 RR27 RR CC 1114-RR28 RR CG1114-RR26 RR CC-1114-RR01 RR CC-1114 RR02 RR CC-1115-RR20 RR CC-1115-RR21 RR CC-1120-FL5001 RR CC-1120-HL5002 RR EW 1107-HU001 RR EW-1107-HL5007 RR EW-1125-HL5004 GUIDE EW 1125-HL5005 GUIDE EW-1188-HL5001 GUIDE EW 1188-HL5002 GUIDE /~) HL&P by RT~ >M Date hfh Factory Mutual by w-B. R. Russell, ANIl Date (r' lO--6'l R.'l Beverly{ 4-45

y- - -. - - - - - . . . .- - . . . . - - - - - - . - . . -. ._ - -

     'g   1991 !$1 IRE 03. Component Supports (Class 3)                                                     Page 4 of 4 SUPf 2 MENT *IO PORM NIS-1 OWNER'S REPORT POR INSERVICS INSPECT 10KS POR

_ ~ ASME Code Qass 3 Componeet Supports

    't     _1. Ommer Houston Uahtine & Power Comnanv. Electric Tower: P.O. Box 17M. Houston. Texas 77001 (Name and Address of Ommer)
2. Plant South Texas Project Electric Generatine Station: P.O. Box 284. Wadsworth. Texas 77483 Ciame and Address of Plant)
3. Plant Unit -1 4. Onser and Certificate of Authorization (if required) N.A.
5. Commercial Service Date 06!2588 6. National Board Number for Unit N.A.

EOUIPMENT SUPPORT MARK NO. DESCRTFIlON AFMIC. AF MOTOR PUMP CCP1A CCW PUMP DO Auxiliary Sidd No.11 JW1A JW PIPE SUPT LHX2A LU HEAT EXCH LUFIA LU FILTER LU3A LU PIPE SUPT , O . h I L l l HL&P byMbe Dated/'5/4/ Factory Mutual by arm Date S 44/ R. L Beverly B. R. Russell, ANII 4-46