MONTHYEARML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20197C3551997-12-31031 December 1997 1RE07 ISI Summary Rept for SG Tubing of STP Electric Generating Station for Unit 1 ML20202D1561997-11-30030 November 1997 1RE07 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 ML20199L7001997-11-12012 November 1997 1REO7 ISI Summary Rept for Repairs & Replacements of STP Electric Generating Station - Unit 1 ML20199L7151997-10-28028 October 1997 1RE07 ISI Summary Rept for Sys Pressure Test (Class 1 & 2) for STP Electric Generating Station, Unit 1 ML20217A5101997-09-0404 September 1997 Supplemental Info to Rev 0,Suppl 2 to ISI Plan for First Insp Interval of STP Electric Generating Station,Unit 1 ML20217A5151997-09-0404 September 1997 Supplemental Info to Rev 0,Suppl 2 to ISI Plan for First Interval of STP Electric Generating Station,Unit 2 ML20148G0871997-05-31031 May 1997 2RE05 ISI Summary Rept for Welds & Component Supports of South Texas Project Electric Generating Station Unit 2 ML20148E7721997-05-19019 May 1997 2RE05 ISI Summary Rept for Repairs & Replacements ML20148E7791997-05-19019 May 1997 2RE05 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20141H1981997-05-0808 May 1997 2RE05 ISI Summary Rept for SG Tubing of STP Electric Generating Station - Unit 2 ML20134B9141996-09-0505 September 1996 1RE06 ISI Summary Rept for Welds,Sg Tubes & Component Supports of STP Electric Generating Station Unit 1 ML20117H5411996-08-29029 August 1996 1RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) STP Generating Electric Generating Station,Unit 1 ML20117H5591996-08-20020 August 1996 1RE06 ISI Summary Rept for Repairs & Replacements STP Generating Station,Unit 1 ML20097B8991996-01-29029 January 1996 2RE04 ISI Summary Rept for Welds,Sg Tubes & Component Supports of STP Electric Generating Station - Unit 2 ML20097A6901996-01-23023 January 1996 2RE04 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) for STP Electric Generating Station,Unit 2 ML20097A3541996-01-23023 January 1996 2RE04 ISI Summary Rept for Repairs & Replacements STP Electric Generating Station,Unit 2 ML20086F9901995-07-0606 July 1995 IRE05 ISI Summary Rept for Welds,Sg Tubes & Component Supports of South Tx Project Electric Generating Station Unit 1 ML20086G9451995-06-29029 June 1995 1RE05 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20085N7831995-06-19019 June 1995 1RE05 Inservice Insp Summary Rept for Repairs & Replacements for South Texas Project Electric Generating Station,Unit 1 ML20073J3941994-09-30030 September 1994 Rept of Summer 1993 & Mar 1994 Testing of SG Tubes of STP Electric Generating Station - Unit 1 ML20072Q7961994-08-24024 August 1994 2RE03 ISI Summary Rept for Welds,Sg Tubing & Component Supports of STP Electric Generation Station Unit 2 ML20072P1991994-08-24024 August 1994 2RE03 Inservice Insp Summary Rept for Sys Pressure Tests at STP Electric Generating Station,Unit 2 ML20072P1391994-08-24024 August 1994 2REO3 Inservice Insp Summary Rept for Repairs & Replacements,Stp Electric Generating Station,Unit 2 ML20056C3431993-05-13013 May 1993 Addendum 1 to 1RE04 Inservice Insp Summary Rept for Repairs & Replacements (Class 1 & 2) at South Texas Project Electric Generating Station,Unit 1 ML20095A9411992-04-0909 April 1992 2RE02 Inservice Insp Summary Rept for Repairs & Replacements,Addendum-1 South Texas Project Electric Generating Station,Unit 2 ML20090L7701992-03-13013 March 1992 2RE02 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station Unit 2 ST-HL-AE-4035, 2RE02 ISI Summary Rept for Repairs & Replacements at South Texas Project Electric Generating Station Unit 21992-03-13013 March 1992 2RE02 ISI Summary Rept for Repairs & Replacements at South Texas Project Electric Generating Station Unit 2 ML20090M5491992-03-12012 March 1992 2RE02 ISI Summary Rept for Welds,Sg Tubing & Component Supports at South Tx Project Electric Generating Station, Unit 2 ML20082A8601991-06-30030 June 1991 1RE03 Inservice Insp Summary Rept for Welds,Steam Generator Tubing & Component Supports of South Texas Project Electric Generating Station Unit 1 ML20076B4891991-06-21021 June 1991 1RE03 Inservice Insp Summary Rept for Repairs & Replacement at South Texas Project Electric Generating Station Unit 1 ML20079D3681991-06-21021 June 1991 1RE03 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project,Unit 1, Including Period from Second Refueling Outage 900621 to Completion of Third Refueling Outage 910404 ML20070J9001991-03-0505 March 1991 2RE01 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project,Unit 2, Including Period from Commercial Operation (890619) to Completion of First Refueling Outage (901211) ML20070K3271991-03-0505 March 1991 2RE01 Inservice Insp Summary Rept for Repairs & Replacements, Covering Period from Commercial Operation (890619) to Completion of First Refueling Outage (901211) ML20070M6101991-03-0404 March 1991 2RE01 Inservice Insp Summary Rept for Welds,Steam Generator Tubing & Component Supports of South Texas Project Unit 2 ML20065D3361990-09-30030 September 1990 1RE02 Inservice Insp Summary Rept for Welds & Component Supports of South Texas Project Electric Generating Station Unit 1 ST-HL-AE-3563, 1RE02 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station,Unit 11990-09-0808 September 1990 1RE02 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station,Unit 1 ML20065D9531990-09-0707 September 1990 1RE02 Inservice Insp Summary Rept for Repairs & Replacement at South Texas Project Electric Generating Station Unit 1 ML20005G7051990-01-31031 January 1990 1RE01 Inservice Insp Summary Rept for Welds,Steam Generator Tubing & Component Supports of South Texas Project Electric Generating Station Unit 1. ML20006A7391990-01-0909 January 1990 1RE01 Inservice Insp Summary Rept for Repairs & Replacements at South Texas Project Electric Generating Station,Unit 1. ML20006A7571990-01-0909 January 1990 1REO1 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station,Unit 1. ML20245L8061989-08-31031 August 1989 Amended Preservice Insp Summary Rept for Class 1,Class 2 & Class 3 Component Supports at South Texas Project Electric Generating Station Unit 2 ML20245A4361989-06-12012 June 1989 Inservice Insp Exam of Component Supports of South Texas Project Electric Generating Station - Unit 2 First Insp Interval ML20245A4811989-05-31031 May 1989 Vols 1 & 2 to First 10-yr Interval Long-Term Inservice Exam Plan for South Texas Project Electric Generating Station, Unit 2, Final Plan with Appendices ML20196B9591988-12-31031 December 1988 Preservice Insp (PSI) Summary Rept for Class 1,Class 2 & Class 3 Component Supports at South Texas Project Electric Generating Station Unit 2. Rept Reviews Bases for PSI Program & Describes Scope of PSI Exams 1999-07-07
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
-
1 l
l COVER SHEET 2RE06 INSERVICE INSPECTION
SUMMARY
REPORT j FOR SYSTEM PRESSURE TESTS l I
(CLASS 1 AND 2) l SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 2 P. O. BOX 289 WADSWORTH, TEXAS 77483 USNRC DOCKET NO: 50-499 OPERATING LICENSE NO: NPF-80 )
, 1 l
COMMERCIAL OPERATION DATE: JUNE 19,1989 TRACKED BY CR# 98-14015-2 Prepared by: 'r D.W. Ech ngineer Reviewed by:__ % e
~
l j C.A. Murry, Supervising Engineer ;
i 1
9901140178 990104 PDR ADOCK 05000499 i l G PDR _
J. .
l-SCOPE f
2RE06 SYSTEM PRESSURE TESTS The examinations summarized in this report were performed in accordance with the 1983 Edition through Summer 1983 Addenda of the ASME Code,Section XI which is applicable to the South Texas Project. Unit 2. This report covers selected ASME Code Class 1 and 2 Systems / Components. Examinations and tests required by the Code are scheduled in accordance with " Inspection Program B" as defined in IWB-2412 and IWC-2412 for ASME Code Class 1 and 2 Systems / Components. All ASME Code Class I components were examined as prescribed by Table IWB-2500-1, Examination Category B-P that established the examination frequency at each refueling outage. The ASME Code Class 2 Systems / Components were selected on a l prorated basis. This prorated selection process will continue until all ASME Code Class 2 Systems / Components are examined in accordance with Table IWC-250(bl, Examination Category C-H. This examination category for ASME Code Class 2 Systems / Components l
established the examination frequency at each inspection period. The remaining third period examinations are anticipated to be completedu 'y the end (10/18/2000) of the third inspection period and the first 10-year Inspection Interval.
l l
l l
l l
l a
i f
l l
l , .:.. . ',-_ _ _ - _ - - . _ . . _ - .. _ _ . _ .. _ _ _
l Page 1 of 3 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules i
f
- 1. Owner STP Nuclear OperatintComoany. P. O. Box 289. Wadsworth . TX 77483
- 2. Plant South Texas Proiect Electric Generatine Station P.O. Box 289. Wadsworth. TX 77483 1
! 3. Plant Unit 2 4. Owner Certificate of Authorization (if required) N/A
! 5. Com:nercial Service Date 06/19/89 6. National Board Number for Unit N/A
- 7. Components Inspected ASME CODE CLASS 1 PIPING AND COMPONENTS Component or Manufacturer Manufacturer or State or National l Appurtenance or Installer Installer Serial Province Board No.
No. No.
REACTOR VESSEL COMBUSTION ENGR / 12173 N/A 22391 1R102NRV201 A WESTINGHOUSE (M)
STM. GENERATOR 2A WESTINGHOUSE (M) 2151 N/A 29 1R122NSG201 A l STM. GENERATOR 2B WESTINGHOUSE (M) 2152 N/A 30 1R122NSG201B STM. GENERATOR 2C WESTINGHOUSE (M) 2153 N/A 31 1R122NSG201C STM. GENERATOR 2D WESTINGHOUSE (M) 2154 N/A 32 IR122NSG20lD
]
j PRESSURIZER 2A WESTINGHOUSE (M) 2161 N/A N/A
- 1R112NPZ201 A RC PUMP 2A WESTINGHOUSE (M) 1-Il5E580G02 N/A 46 1R132NPP201 A RC PUMP 2B WESTINGHOUSE (M) 2-Il5E580G02 N/A 47 1R132NPP201B RC PUMP 2C WESTINGHOUSE (M) 3-il5E580G02 N/A 48 1R132NPP201C RC PUMP 2D WESTINGHOUSE (M) 4-ll5E580G02 N/A 49 1R132NPP201D CLASS 1 PIPING EBASCO (I) VARIOUS N/A N/A CLASS 1 VALVES VARIOUS VARIOUS N/A N/A f Note: Supplemental sheets in the form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in. , (2)
- Information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form i
f l
i i
Pege 2 of 3 FORM NIS 1 (Back)
- 8. Examination Dates 32/_2M2 to 10/24//98 9. Inspection Interval from 08/25/88 to 09/24/99
- 10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval. Refer to Supplemental Sheet Page 3 of 3.
- 11. Abstract of conditions Noted No relevant conditions affecting pressure retaining boundaries were noted.
- 12. Abstract of Corrective Measures Recommended and Taken Refer to Supplemental Sheet Page 3 of 3.
We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code,Section XI.
Certificate of Authorization No. (if cpplicable) N/A Expiration Date N/A Date I E f(4 19 N Signed STP Nuclear Operatine Co. By % wL Owner C.A. Mu Ty Reliability Engineering Supervisor CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by Arkwricht Mutual Insurance Co. of Waltham. MASS. have inspected the components described in this Owner's Report during the period '7-!J- 4A to /d- /4-W' and state that to the best of my knowledge and belief, the 0,vner has performed examinationsand taken corrective measures described in this Owner's report in accordance with the inspection plan and as required by the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or porperty damage or a loss of any kind arising from or connected wi this inspection.
1
- - h Commissions TX-826 m B. R. Russell, Inspector's Signature National Board, State, Province, and Endorsemen, Date 'E W 19 9 J' I
- _- . . _. - _. . - - - - . _ . - _ . - . =- _ _ . ~ . - . . - . - . - - . . _ .
Page 3 of 3 SUPPLEMENTAL PAGE FOR ASME CODE CLASS 1 PIPING AND COMPONENTS
- 1. Owner STP Nuclear Oce_tating Company. P. O. Box 289. Wadsworth . TX 77483
- 2. Plant South Texas Proiect Electric Generatine Station P.O. Box 289. Wadsworth. TX 77483
- 3. Plant Unit 2 4. Owner Certificate of Authorization (if required) N/A
- 5. Commercial Service Date 06/19/89 6. National Board Nurnber for Unit N/A
- 10. ABSTRACT OF EXAMINATIONS A System Leakage Test as prescribed in IWA-5211(a) for all ASME Code Class 1 Pressure Retaining Components was conducted in accordance with Table IWB-2500-1, Examination Category B-P, item Nos. B15.11, B15.21, B15.31, B15.41, B15.51, B 15.61, and B15.71.
The Pressure Test and VT-2 visual examinations were conducted in accordance with Plant Surveillance Pressure Test Procedure, OPSP15-RC-0001, Reactor Coolant System Leakage Pressure Test at the conclusion of the sixth refueling outage. ASME Code Class 1 piping and valves are specifically identified in the above referenced procedure.
- 12. ABSTRACT OF CORRECTIVE MEASURES RECOMMENDED AND TAKEN The Visual Examinations (VT-2) performed during the Pressure Test found no leakage at mechanical joints (i.e. valve stems,11anged connections), piping, or equipment.
)
l l
l I
l ..
(
l i
k l
\,.." I
. . 1 of 4 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS i As required by the Provisions of the ASME Code Rules l l
- 1. Owner STP Nuclear Ooeration Comoany. P.O. Box 289. Wadsworth. TX 77483 (Name and Address of Owner)
- 2. Plant South Texas Proiect Electric Generatina Station P.O. Box 289. Wadsworth. TX 77483 l (Name and Address of Owner)
- 3. Plant Unit 2 4. Owner Certificate of Authorization (if required) N/A
- 5. Commercial Service Date 06/19/89 6. Nationa! Board Number for Unit N/A
- 7. Components Inspected ASME CODE CLASS 2 PIPING AND COMPONENTS l 1
Manufacturer i Component or Manufacturer or Installer State or National l Appurtenance or Installer Serial No. Province No. Board No.
REGEN HX JOSEPH OAT CORP 2380-1B N/A 2052 2R172NHX201A )
i LETDOWN HX JOSEPH OAT CORP 2312-1B N/A 987 i SR172NHX202A EXCESS LETDN HX JOSEPH OAT CORP 2312-3B N/A 989 SR172NHX203A RHR HX 2A JOSEPH OATCORP 2312-4D N/A 993 2R162NHX201A I RHR HX 2B JOSEPH OAT CORP 2312-4E N/A 994 l 2R162NHX201B RHR HX 2C JOSEPH OAT CORP 2312-4F N/A 995 2R162NHX201C RHR PUMP 2A PACIFIC PUMP 51734 N/A 363 2R162NPA201A RHR PUMP 2B PACIFIC PUMP 51735 N/A 364 2R162NPA201B l RHR PUMP 2C PACIFIC PUMP 51736 N/A 365 2R162NPA201C SI ACCUM. 2A WESTINGHOUSE 0058 N/A 402 2N122NRC201A SI ACCUM. ?B WESTINGHOUSE 0(M2 N/A 361 2N122NRC201B l
SI ACCUM.2C WESTINGHOUSE 0059 N/A 403 2N122NRC201C SI RWST BROWN MINNEAPOLIS 1100-16 N/A N/A 2N122NTF201A 4
s t roo7cl2
-._7.._
2 of 4 Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.
LHSI PUMP 2A PACIFIC PUMPS 51704 N/A 460 2N122NPA202A HHSI PUMP 2A PACIFIC PUMPS 51698 N/A 400 2N122NPA201A LHSI PUMP 2B PACIFIC PUMPS 51705 N/A 461 2N122NPA202B HHSI PUMP 2B PACIFIC PUMPS 51699 N/A 401 2N122NPA201B LHSI PUMP 2C PACIFIC PUMPS 51706 N/A 462 2N122NPA202C HHSI PUMP 2C PACIFIC PUMPS 51700 N/A 402 2N122NPA201C CS PUMP 2A PACIFIC PUMPS 51710 N/A 454 2N102NPA201A CS PUMP 2B PACIFIC PUMPS 51711 N/A 455 2N102NPA201B CS PUMP 2C PACIFIC PUMPS 51712 N/A 456 2N102NPA201C ASSOC. CLASS 2 EBASCO (I) N/A N/A N/A PIPING ASSOC. CLASS 2 VARIOUS N/A N/A N/A VALVES RCFC COILS AMERICAN AIR FILTER VARIOUS N/A VARIOUS 11 A,12A,11B,12B,11C, AND 12C Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. X 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
l I
l i
1reo7ci2
--v-
l l*
I 3 of 4 FORM NIS-1 (Back)
- 8. Examination Datas . 02/26/97 to 11/02/98 9. Inspection Intervalfrom 08/25/88 to 09/24/99
- 10. Abstract of Examinations. Include a list of examinations and a statement conceming status of work required for l current interval. Refer to Supplemental Sheet Page 4 of 4.
i
- 11. ' Abstract of Conditions Noted No relevant conditions affecting pressure retaining boundaries were noted.
- 12. Abstract of Corrective Measures Recommended and Taken l Refer to Supplemental Sheet Page 4 of 4.
We certify that the statements made in this report are correct and the examinations an corrective measures taken conform to the rules of the ASME Code,Section XI.
Certificate of Authorization No. (if applicable) N/A Expiration Dat N/A Date N bO 19N Signed STP NuclearOoeratino Co. By Owner A (~ u !~
C.A. PAurry l Reliability Engineering Supervisor CFRTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors cnd the State or Province of Texas - and employed by Arkwriaht MutualInsurance CL of Waltham. MASS.
have inspected the components described in this Owners Report during the period 7-3-4 Y to / 2 -N -G P .
End state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the inspection plan and as required by the ASME Code,Section XI.
By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in this Owners Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
FACTORY MUTUAL SYSTEM s __ _
A( - Commissions TX-820 l B.R. Russell, Inspectors Signature National Board, State, Province, and Endorsements l
Date Id -/Y 196 f l
l l
1reo7ct2
~^
(
'. i l
4 of 4 1
SUPPLEMENTAL FOR I ASME CODE CLASS 2 PIPING AND COMPONENTS
- 1. Owner STP Nuclear Ooeratina Comoany. P.O. Box 289 Wadsworth Tx. 77483 (Name and Address of Owner) I
- 2. Plant South Texas Project Electric Generatina Station P.O. Box 289. Wadsworth. TX 77483 (Name and Add.ess of Owner)
- 3. Plant Unit 2 4. Owner Certificate of Authorization (if required) N/A
- 5. Commercial Service Date 06/19/89 6. National Board Number for Unit N/A 1
- 10. ABSTRACT OF EXAMINATIONS System Functional and Inservice Pressure Tests as prescribed by IWA-5211 (b) and (c), respectively, were conducted on selected ASME Code Class 2 pressure retaining components in accordance with Table IWC-2500-1, Examination Category C-H, item Nos. C7.20, C7.40, C7.60 and C7.80.
The Pressure Tests and VT-2 visual examinations were conducted during the third period of examination in accordance with the following Plant Surveillance Pressure Test Procedures:
OPSP15-FW-0001- Feedwater System Inservice Pressure Test OPSP15-SB-0001 - Steam Generator Blowdown System inservice Pressure Test OPSP15-MS-0001 - Main Steam System Inservice Pressure Test OPSP15-RC-0001 - Reactor Coolant System Leakage Pressure Test OPSP15-RH-0001 - Residual Heat Removal System inservice Pressure Test OPSP15-CS-0001 - Containment Spray System Functional Pressure Test OPSP15-SI-0001 - Safety injection System Functional Pressure Test ASME Code Class 2 piping and valves are specifically identified in the above referenced procedures. These test procedures were conducted during the time period of February 26,1997 to November 02,1998.
- 12. ABSTRACT OF CORRECTIVE MEASURES RECOMMENDED AND TAKEN The Visual Examinations (VT-2) performed during these Pressure Tests found only minor leakage at mechanical joints such as valve stems and flanged connections.
These leaks were evaluated and determined acceptable for continued system operation. Appropriate corrective action was initiated to correct these leaks.
l 1reo7ct2
.