ML20217A515
| ML20217A515 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 09/04/1997 |
| From: | Beverly R, Jordan T, Murry C HOUSTON LIGHTING & POWER CO. |
| To: | |
| Shared Package | |
| ML20217A508 | List: |
| References | |
| NUDOCS 9709190208 | |
| Download: ML20217A515 (3) | |
Text
- _ _ - - _ - - -
s e
SOUTH TEXAS PRCUECT ELECTRIC GENERATING STATION INSERVICE INSPECTION PLAN FOR THE FIRST INSPECTION INTERVAL ofthe SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - UNIT 2 REVi3 ION 0, SUPPLEMENT 2 P.O. Box 289 Wadsworth, Texas 77483 Owner:
Houston Lighting and Power Company City Public Semce Board of San Antonio Central Power and Light Company City of Austin Address:
P.C Box 1700 Houston, Texas 77251 Commercial Operation:
JUNE 19,1989 Issue Date:
AUGUST 25,1997 DR DO 05 00 98 G
)
INSERVICE INSPECTION PLAN FOR THE FIRST INSPECTION INTERVAL ofthe SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - UNIT 2 REVISION 0, SUPPLEMENT 2 USNRC DOCKET NO.: 50-499 OPERATING LICENSE NO.: NPF-80 COMMERCIAL OPERATION DATE: JUNE 19,1989 4
3 1
Prepared by:
M /> M
$!8d!' 7 in R. L.'Beverly date '
ISI Engineer Nh7 Reviewed by:
M~
C.A. Murry Date Supervisor-Section XI Section Approved by:
- 1/LAN-T/
47
,// [ i.J. Jordan bale Maraget - Systems Engineering Department 4
~ a - ~
g South Texas Project Electric Generating Station Unit 2 Docket No. STN 50-499
" Revision 0. Sunnlement 2. to ISI Plan for First Incnection Interval" Supplement 2, to the ISI Plan for the First Inspection interval, adds the following Section XI Code Cases to Section 2.1.5 of the Plan:
N-401-1
" Eddy Current Examination"
- N-408 2
" Alternate Rules for Examiaation of Class 2 Piping" N-416-1
" Alternative Pressure T est Requirement for Welded Repairs or Installation of Replacement items by Welding, Class 1,2, and 3"
- N-427
" Code Cases in inspection Plans" N-429-1
" Alternate Rules for Ultrasonic Instrument Calibration" N 461
" Alternative Rules for Piping Calibration Block Thickness" N-481
" Alternate Examination Requirements for Cast Austenitic Pump Casings" N-546
" Alternative Requirements for Qualification of VT-2 Examination Personnel" 5
-W