ML20199H498

From kanterella
Jump to navigation Jump to search
2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2
ML20199H498
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 01/11/1999
From: Beverly R, Murry C
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20199H479 List:
References
NUDOCS 9901250220
Download: ML20199H498 (100)


Text

f+aa%,

o, ,

a i STp 2REO6 Inservice Inspection -

Summary Report for Welds and Component Supports of the South Texas Project Electric Generating Station - Unit 2 Operator: South Texas Project Nuclear Operating Company Address: P. O. Box 289 Wadsworth, Texas 77483 Commercial Operation: June 19,1989 Issue Date:_ .Innuary 1999 cm23.

{7>Stagggggggo

l

,9 per%

G

.f s

3 2 i STA 2REO6 Inservice Inspection Summary Report for O Welds and Component Supports ofthe l South Texas Project Electric Generating Station - Unit 2 Operator: South Texas Project Nuclear Operating Company Address: P. O. Box 289 Wadsworth, Texas 77483 Commercial Operation: June 19.1989 Issue Date: Jant'ary 1999

'iV'

~. . ... _ _ _. _ _ _ . _ _ _ _ _ ._ _

O 2REo6 INSERv1CE INSeECTION SUuuARv REeORr .

FOR WELDS AND COMPONENT SUPPORTS ofthe SOUTII TEXAS PROJECT ELECTRIC GENERATING STATION UNIT NO. 2 USNRC DOCKET NO.: 50-499 OPERATING LICENSE NO.: NPF-80 COMMERCIAL OPERATION DATE: June 19,1989

(

Prepared by: .N . m., 1, /62 - 30, ff I /

R. L Beverly / Date ISI Engineer - Welds &/ Component Supports Re;ew d 9 M C. A. Murry Date Supervisor- Section XI Section I

' (~} TABLE OF CONTENTS v

1.0 2RE06

SUMMARY

REPORT Eage j 1

1.1 Introduction 1-1 1.2 Scope of Summary Report 1-1

' 2.0 WELD EXAMINATIONS 2.1 Introduction 2-1 l

2.2 Scope of Examinations 2-1 2.3 Personnel, Procedures, and Equipment 2-3 2.3.1 Personnel Qualifications 2-3 2.3.2 Examination Procedures 2-3 2.3.3 Equipment 2-3 2.3.4 Materials 2-3 2.3.5 Calibration Blocks 24 2.4 Summary of Examinations 2-4 2.4.1 Examination Methods 2-4 l 2.4.2 Augmented Examinations 2-4 2.4.3 Data Comparison 2-5 2.4.4 Additional and Successive Examinatians 2-5 L 2.5 Examination Results and Corrective Actions 2-5 l

2.6 Certification ofInspections 2-5 l

' Appendix 2-A Summary of Examinations i

. Appendix 2-B STPNOC Procedures Appendix 2-C ISI Examination Limitations Appendix 2-D Owner's Report for Inservice Inspections - NIS-1 Forms l-I a

e J

O

TABLE OF CONTENTS (cont'd) l I

3.0 COMPONENT SUPPORT EXAMINATIONS 3.1 Introduction 3-1 3.2 Scope of Examinations 3-1 3.3 Personnel and Procedures 3-3 3.3.1 Personnel Qualifications 3-3 3.3.2 Examination Procedure 3-3 3.4 Summary of Examinations 3-3 3.4.1 Examination Results and Corrective Actions 3-3 3.4.2 Additional and Successive Examinations 3-3 3.5 Cenification ofInspections 3-3 Appendix 3-A Summary of Examinations Appendix 3-B Owner's Report for Inservice Inspections - NIS-1 Forms O

1.0 2RE06

SUMMARY

REPORT 1.1 Introduction This Summary Report describes South Texas Project Nuclear Operating Company's (STPNOC) inservice inspection (ISI) of selected Class 1,2, and 3 components of the South Texas Project Electric Generating Station, Unit 2 (STPEGS-2) performed prior to and during the sixth refueling outage (2RE06) of STPEGS-2 during the time period between the breaker closure for the fifth refueling outage (2RE05 - February 25,1997) to the breaker closure for the sixth refueling outage (2RE06 - October 24,1998). The STPEGS ISI program for welds and component supports is scheduled in accordance with Program B of the American Society of Mechanical Engineers (ASME)Section XI Code " Inservice Inspection of Nuclear Power Plant Components". The first ten year inspection interval of STPEGS-2 began June 19,1989.

Because STPEGS-2 was out of service continuously for 16 months, the inspection interval was extended for an equivalent period in accordance with IWA-2400(c) of ASME Section XI. This extended the inspection interval to October 18,2000. The third inspection period began October 19,1997 and extends to October 18,2000. The inspections performed for this summary repon were conducted during the third inspection period. The ISI summarized herein constitutes the sixth ISI performed during the first ten year inspection interval and the first ISI of the third inspection period of STPEGS-2. Figure 1 of this Section depicts the first ten year interval and Periods 1 through 3 for STPEGS-2. The percentages completion of examinations performed through 2RE06 for STPEGS-2 welds and component suppons are also summarized in Figure 1.

,O l

The STPEGS-2 ISI program for the first inspection interval is described in the Ten Year ISI Plan I previously filed with the Nuclear Regulatory Commission (NRC) and the State of Texas. The STPEGS-2 ISI program was developed and is being implemented in accordance with l

10CFR50.55a, the 1983 Edition of Section XI Code with the Summer 1983 Addenda, and other l regulatory and Code bases as specified in the Ten Year ISI Plan. This Summary Repon satisfies the reporting requirements ofIWA-6000 of the Section XI Code for welds and component  ;

l supports.

l 1.2 Scope of Summary Report This Summary Report describes the ISI examinations performed up through breaker closure for 2RE06 on welds (Section 2) and component supports (Section 3). Each of these sections l describes the scope of examinations performed; describes the personnel, procedures, and equipment utilized for the examinations; provides a summary of the examinations, examination results, and corrective actions; and includes copies of the examination certification (NIS-1) forms.

The ISI examinations performed on Class 1 and 2 welds and other examination areas (e.g., l bolting) are described in Section 2 of this Summary Report. These examinations were performed in accordance with Subsections IWB and IWC of Section XI and other bases as specified in the Ten Year ISI Plan. The ISI examinations performed on Class 1,2, and 3 component supports and Class 3 integral attachments are described in Section 3. These examh:atiens were performed in p accordance with Subsection IWF (Class 1,2, and 3 supports) and Subsection IWD (Class 3 i integral attachments) of Section XI and other bases as specified in the Ten Year ISI Plan.

1-1

ISI WELDS AND COMPONENT SUPPORTS PROGRAMS FIRST 10-YEAR INSPECTION INTERVAL CALENDAR UNIT 2 is *4 tv *s t, es to 97 19 wit

  • ve an a Year to so to ao t, 9: is 92 1, 93

wlwl= I wIwi e. Ivlwie. Iwlmlu Ivlwle. Ivlwle. Iwiwl=w.Iwiwl= 4vlwle. M wiwl= ~1vlwl= Iwiw rrarons ermon s

Period '~

ni

,o crainn t E M Mi Outsge #

1 e 2

1. E'I 3 i l' ' i l i 1 i - I' I d I ' l- I ' l-' i ' l's I ' . _e 1 7 to to so 10 to CO- Commetrist Operation EDI End oflawrval XO. Estended estage f>ese Febrvory 3.1993 to May 30,1994 Neee: Some percentage templeties dets,for setsgee prior se 2RE04,have been eersweed to decoment eety these essmiestions performeed for sedine XI credit.

PERIOD 1 Minimun 16 % PERIOD 2 Minimun 50 % PERIOD 3 Minirpun 100 %

PERIOD 1 Maximum 34 % PERIOD 2 Maximum 67 % PERIOD 3 Mailmum 100 %

';"' 6 7 Com ta Ine*=ews oi*are PERIOD 1  % PERIOD 2 .% PERIOD 3 s -- s -- *

SUMMARY

Camp. . SUMM ARY - Comp. (in Prwgress) Counp. Camp, Camp, Welds Program 2, % Welds Program es s Welds Program 17 . m2 .

Comp.Spts Program 25 % Supports Program 64 , Supports Progral 34 5 ,7 s l

l 1

1 FIGURE 1 0 9 - _-

e

l l

2.0 WELD EXAMINATIONS l

i 2.1 Introduction ISI of STPEGS-2 Class 1 and 2 welds and components within the Welds Examination Program was performed between September 18,1998 and October 23,1998. These examinations i

constitute the sixth ISI (the first ISI of the third period) of the first inspection interval for the Welds Examination Program for STPEGS-2. i This section of the Summary Report documents the examinations performed by STPNOC Quality nondestructive examination personnel (Q-NDE) and contractor NDE personnel in accordance with the following documents:

(1) "First 10-Year Long-Term Inservice Examination Plan for the South Texas Project Electric Generating Station, Unit 2" (LTP),

(2) " Examination Plan for the 1998 - 2RE06 Inservice Inspection of Welds and Component Supports at the South Texas Project Electric Generating Station, Unit 2",

including changes made during the outage (Outage Plan).

The Long-Term Plan (LTP) provides a detailed description of the rules for exemption, selection,  !

allocation, and scheduling of Class 1 and 2 welds and examination areas for ISI. The 1998-2RE06 Examination Plan is an individual Outage Plan for implementing ISI weld examinations as scheduled in the LTP. The Outage Plan references the applicable NDE procedures used for the examinations.

2.2 Scope of Examinations NDE was performed on a total of one hundred and fifty six (156) selected Class 1 and Class 2 components and examination areas as contained in the Outage Plan. Any deviations or changes were documented as Examination Plan Changes to the Outage Plan. Additionally, four (4) reactor coolant pump (RCP) casings were examined for leakage during plant startup from the 2RE06 outage. Therefore, a total of one hundred and sixty (160) Class 1 and Class 2 components and examination areas were examined prior to or during 2RE06. Selection of these components i and examination areas was based on the LTP allocation and scheduling requirements for the sixth l

refueling outage.  ;

1 l l Class 1 A total of seventy two (72) examinations were performed on the following Class 1 components  !

and examination areas. Fifty five (55) of these components or examination areas were examined l for Section XI credit. Additionally, baseline examinations were performed on nine (9) l components, RG 1.26 examinations were performed on four (4) RCP flywheels, and four (4) RCP O casings were examined for leakage in accordance with Code Case N-481.

2-1

Vessels

(

Reactor Vessel Steam Generator 2C BPES Reactor Coolant System Chemical and Volume Control System Safety Injection System hunp3 Reactor Coolant Pumps Reactor Coolant Pump Flywheels

.Yab'es Reactor Coolant System Clas32 A total of eighty eight (88) examinations were performed on the following Class 2 component welds and examination areas. Forty eight (48) of these component welds or examination areas were examined for ASME Section XI credit. Sixteen (16) of the examinations were performed on Class 2 piping longitudinal welds, located adjacent to selected circumferential welds.

Additionally, twenty four (24) of these welds were examined under the Augmented ISI-BEZ program.

g SPES Containment Spray System Feedwater System Main Steam System Residual Heat Removal System Safety Injection System h!mp3 Containment Spray Pump l Residual Heat Remova! Pump High Head Safety Injection Pump Low Head Safety Injection Pump A complete list of the components and examination areas is contained in Appendix 2-A. Class 1 and Class 2 weld identification figures for the above components and examination areas are contained in the LTP. These examinations constitute the following percentages of completion for Class 1 and Class 2 components during the first inspection interval:

9 2-2

rr )

(O Cumulative 2RE06 (1st Interval)

Class I (IWB) 13'7o 80 %

Class 2 (IWC) 23 % 85 %

2.3 Personnel, Procedures, and Equipment 2.3.1 Personnel Qualifications Component welds and other examination areas were nondestructively examined by STPNOC Q-NDE and contractor NDE personnel. Q-NDE personnel were :ertified in accordance with ASME Section XI (IWA-2300) and STPNOC Nondestructive Examination Procedure OPQP05-ZA-0001 (Rev.1)," Qualification and Certification of Nondestructive Examination Personnel".

Contractor NDE personnel were certified in accordance with ASME Section XI (IWA-2300) and their employer's written practice, which was approved by STPNOC. In addition, Level II examiners performing ultrasonic examinations on austenitic piping welds have been qualified by Electric Power Research Institute in detection of intergranular stress corrosion cracking.

2.3.2 Examination Procedures (n'") NDE activities were performed using visual (VT), liquid penetrant (PT), magnetic particle (MT),

and ultrasonic (UT) techniques in accordance with STPNOC Q-NDE procedures. The NDE procedures were written to conform to the requirements of the applicable sections of the ASME Code. A list of applicable NDE procedures is provided in Appendix 2-B.

2.3.3 Equipment l

Various equipment was used during the ISI to perform the examinations of the selected component welds and examination areas. Major equipment consisted of the following:

Krautkramer Branson ultrasonic instruments Ultrasonic transducers AC electromagnetic yokes MT calibration block Pyrometers / Thermometers 2.3.4 Materials J

l NDE materials utilized during 2RE06 weld examinations included penetrant and magnetic particle i materials, and ultrasonic couplant. All materials contacting an austenitic examination surface were tested and certified to be within acceptable sulfur and halogen limits specified in the STPNOC Expendable Material Control Program.

,m 2-3 l

l

O 2.3.5 Calibration Blocks Pipe and vessel calibration blocks were utilized to calibrate the UT instruments prior to examination of the selected welds. Applicable calibration blocks are noted in the Examination Sununary Tables (Appendix 2-A). Drawings for calibration blocks are included in the LTP.

2.4 Summary of Examinations 2.4.1 Examination Methods The following examination methods were conducted in accordance with STPNOC Q-NDE procedures:

VT Examinations VT-1 examinations were performed on RPV washers, S/G manway bolting, piping flange bolting, and valve bolting.

VT-3 examinations were performed on valve interiors.

PT Examinations PT examinations were performed on RPV studs, piping welds and lugs, and pump casing welds.

g MT Examinations MT examinations were performed on RPV studs and nuts, RCP flywheels, and piping welds and lugs.

UT Examinations j UT examinations were performed on Class I and 2 components, including RPV studs and

! nuts, RCP flywheels, and piping welds and lugs. Various techniques were used to perform the UT examinations, depending on classification, material type, and weld thickness.

( 2.4.2 Augmented Examinations l In addition to the ISI requirements of Section XI for Class 1 piping and ASME Code Case N-408 for Class 2 piping, the following augmented ISI program was implemented during this outage:

1 i Augmented ISI- Break Exclusion Zone l

Augmented ISI -IEB 79-17 Augmented ISI - Code Case N-481 1

The first two augmented programs listed above are described in the LTP. The augmented ISI O

examinations for Code Case N-481 are the supplemental visual examinations of the RCP casings, 2-4

'O V welds, and interiors required by this Case. The affected examination areas are noted in the

" Remarks" column of the Examination Summary Tables.

2.4.3 Data Comparison In accordance with IWB-3121 of Section XI, the examination results were compared with the l recorded NDE results of the Preservice Inspection (PSI) and any prior ISI examinations.

If flaws were recorded in the selected component weld or examination area during previous examinations and dispositioned as acceptable, these flaws were verified during this ISI. All such flaws were observed and verified during this ISI.

2.4.4 Additional and Successive Examinations If examinations reveal indications that exceed allowable indication standards, additional examinations are required as prescribed in IWB-2430 and IWC-2430. No additional examinations l of Class I components (IWB-2430) or Class 2 components (IWC-2430) were required during this l outage.

Successive examinations are required if flaw indications are evaluated in accordance with IWB-3122A and the component qualifies as acceptable for continued service. No successive

, g examinations of Class I components (IWB-2420) or Class 2 components (IWC-2420) will be Q scheduled as a result of examinations performed during this outage.

2.5 Examination Results and Corrective Actions Examination area coverage was provided, to the extent practical,in accordance with the requirements of ASME Section XI and Code Case N-408. In those cases where physical conditions of the component restricted examination of the required area, the amount of coverage achieved was assessed. Appendix 2-C, ISI Examination Limitations, contains a detailed account of examination limitations (UT, Irr, and MT) encountered during 2RE06 weld examinations for limitations that were 10% or greater.

All UT indications determined to be recordable, regardless of signal amplitude, were investigated to determine the nature of the reflector. Indications determined to be other than geometry were evaluated to ASME Section XI criteria.

2.6 Cenification ofInspections ASME Section XI NIS-1 forms," Owner's Repon for Inservice Inspections", have been prepared l to cenify the STPEGS-2 weld ISI examinations described in this section of the Summary Report.

The STPEGS-2 weld ISI examinations have been certified by our ANII, Arkwright Mutual Insurance Company, on the NIS-1 forms included in Appendix 2-D.

,f3 iU l

2-5

.- . . . - . - . - . - - - . . . . . . . . ~ . . . . ~ . . . - - - - . . - . - . _ . - . . ~ - . - . . _

t i

l i

1 l

l 1

1 l

APPENDIX 2-A f

SUMMARY

OF EXAMINATIONS 1

l EXAMINATION RESULTS LEGEND A Augmented ISI Examination B Baseline Examination C Examination ~ for Section XI Scheduling Credit L Piping Longitudinal Weld Examination W RCP Flywheel Examination 1

-i y l l

)

i i

l^ ,

4 l:

IL . - ~ - - . - . . - _

DATE: 12/29/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 FAGE: 1 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 WELDS j FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 1 CLABW STATUS CQ4PONENTS gv/ 1 l

PEAT"rOR PRESSURE VESSEL N O ATIE O G T j SEC. XI R E H I

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIDCK**

CLOSURE HEAD BOLTING (FIO NO A-RPV-3A,B) 005303 3B B-G-1 MT ZA-0019 R0 C - - PERFORMED UT ON THE THREADED AREA OF THE CIDSURE NUT B6.10 UT UTI-011 R1 C - - NUT IN LIEU OF MT IN THIS AREA IN ACCORDANCE WITH RR-ENG-012.

    • CS-46R** j i

005306 6B B-G-1 MT ZA-0019 R0 C - . PERFORMED UT ON THE THREADED AREA OF THE CLOSURE NUT B6.10 UT UTI-011 R1 C - - NUT IN LIEU OF MT IN THIS AREA IN ACCORDANCE WITH RR-ENG-012.

    • CS-46R** ,

005309 9B B-G-1 MT ZA-0019 R0 C - . PERFORMED UT ON THE THREADED AREA OF THE CLOSURE NUT B6.10 UT UTI-011 R1 C - - NUT IN LIEU OF MT IN THIS AREA IN A

j ACCORDANCE WITH RR-ENG-012.

( **CS-46R**

l 005312 12D B-G-1 MT ZA-0019 R0 C - - PERFORMED UT ON THE THREADED AREA OF THE CLOSURE NUT B6.10 UT UTI-011 R1 C - - NUT IN LIEU OF MT IN THIS AREA IN ACCORDANCE WITH RR-ENG-012.

    • CS-46R**

005315 15B B-G-1 MT ZA-0019 RD C . - PERFORVID UT ON THE THREADED AREA OF THE CICSURE NUT B6.10 UT UTI-011 R1 C - - NUT IN LIEU OF MT IN THIS AREA IN ACCORDANCE WITH RR-ENG-012.

    • CS-46R**

005318 16B B-G-1 MT ZA-0019 R0 C - . PERFORMED UT ON THE THREADED AREA OF THE CIDSURE NUT B6.10 UT UTI-011 R1 C - - NUT IN LIEU OF MT IN THIS AREA IN ACCORDANCE WITH RR-ENG-012.

    • CS-46R**

005121 21B B-G-1 MT ZA-0019 R0 C - - PERFORMED UT ON THE THREADED AREA OF THE CLOSURE NUT B6.10 UT UTI-011 R1 C - - NUT IN LIEU OF MT IN THIS AREA IN f ACCORDANCE WITH RR-ENG-012.

I j

^ *

  • CS- 4 6R" I \

,U

SOtTTH TEXAS PROJECT CLECTRIC GENERATING STATION UNIT 2 FAGE: 2 DATE: 12/29/98 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 WELDS FIRST IliTERVAL. THIRD PERIOD. FIRST O W AGE (98RF)

CLASS 1 CLABW STATUS COMPUNENTS PEACTOR PRFSSURE VESSEL N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REFARKS ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

NUMBER IDENTIFICATION CLOSUDE HEAD BOLTING (FIG NO A-PPV-3A.9) 005324 24B B-G-1 MT ZA-0019 R0 C - - PERFORMED UT ON THE THREADED AREA OF THE CICSURE NUT B6.10 ITT UTI-011 R1 C - - NW IN LIEU OF MT IN THIS AREA IN ACCORDANCE WITH RR-ENG-012.

    • CS-46R**

005327 27B B-G-1 MT ZA-0019 R0 C - - PERFORMED UT ON THE THREADED AREA OF THE CICSURE NW B6.10 ITI UTI-011 R1 C - - NUT IN LIEU OF MT IN THIS AREA IN ACCORDANCE WITH RR-ENG-012.

, **CS-46R**

005330 30B B-G-1 MT ZA-0019 R0 C - - PERFORMED ITT ON THE THREADED AREA OF THE CLOSURE NUT B6.10 UT UTI-011 R1 C - - NUT IN LIEU OF MT IN THIS ATJA IN ACCORDANCE WITH RR-ENG-012.

    • CS-46R**

005333 33B B-G-1 MT ZA-0019 RD C - - PERFORMED UT ON THE THREADED AREA OF THE CLOSURE NUT B6.10 UT UTI-011 R1 C - - NUT IN LIEU OF MT IN THIS AREA IN ACCORDANCE WITH RR-ENG-012.

  • *CS-4 6R" 005336 36B B-G-1 MT ZA-0019 R0 C - - PERFORMED UT ON THE THREADED AREA OF THE CLOSURE NUT B6.10 UT UTI-011 R1 C - - NUT IN LIEU OF Mr IN THIS AREA IN ACCORDANCE WITH RR-ENG-012.

" CS -4 6R*

  • 005403 3B B-G-1 PT ZA-0014 R1 C - - j CLOSURE STUD B6.30 MT ZA-0019 R0 C - - l UT UTI-015 R2 C - - l 17T ITTI-010 R1 C - - 1 I
  • CS- 4 5A/CS-4 5B" i l

1 005406 6B B-G-1 PT ZA-0014 R1 C - -

CLOSURE STUD B6.30 MT ZA-0019 R0 C - -

UT L7TI-015 R2 C - -

UT 17T1-010 R1 C - -

    • CS-45A/CS-45B**

I

l l

l DATE: 12/29/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 3 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 WELDS A FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RP)

/

)-

CLASS 1 CLABW STATUS COMPONENTS FIEACTOR PRESSUPE VESTEL N O l ASME O G T l

i SEC. XI R E H l

SUMMARY

EKAMINATION ARIA CATUY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

i CLOSURE HEAD BOLTING (FIO NO A-PPV-3 A 9) l

\

l 005409 98 B-G-1 PT ZA-0014 R1 C . .

CLOSURE STUD B6.30 MT ZA-0019 R0 C - '.

UT UTI.015 R2 C ~ -

UT UTI-010 R1 C - -
    • CS-45A/CS-45B**

l 005412 12B B-G-1 PT ZA-0014 El C - -

CLOSURE STUD B6.30 MT ZA-0019 R0 C . -

UT UTI-015 R2 C - -

UT UTI-010 R1 C - -

    • CS-45A/CS-45B**

15415 15B B-G-1 PT ZA-0014 R1 C - -

I (A l

CLOSURE STUD B6.30 MT ZA-0019 R0 C - -

l UT UTI-015 R2 C - -

UT UTI-010 R1 C - -

    • CS 45A/CS-45B**

005418 ISB B-G-1 PT ZA-0014 R1 C - -

CICSURE STUD B6.30 MT ZA-0019 R0 C - -

UT UTI-015 R2 C - -

UT UTI-010 R1 C - -

  • CS -4 5A/CS-4 5B*
  • 005421 21B B-G-1 PT ZA-0014 R1 C - -

CLOSURE STUD B6.30 MT ZA-0019 RO C - -

UT UTI-015 R2 C - -

UT UTI-010 R1 C . -

    • CS-45A/CS-45B**

I i

j 005424 24B B-G-1 PT ZA-0014 R1 C - -

CI4SURE STUD B6.30 MT ZA-0019 R0 C - -

UT UTI-015 R2 C - -

UT UTI-010 R1 C - -

    • CS-45A/CS-45B**

l

}

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 4 DATE: 12/29/98 REVISION: 0 INSERVICE INSFECTION PLAN . 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 1 CLABW STATUS COMPONENTS REACTOR PPESSUPE VESSEL N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM !!O METHOD PROCEDURE C M R ** CALIBRATION BLOCK +*

CLOSURE HEAD BOLT!NO fFIO NO A-PPV-3A B) 005427 27B B-G-1 PT ZA-0014 R1 C . .

CLOSURE ETUD B6.30 MT ZA-0019 RD C - -

UT UTI.015 R2 C - -

UT UTI-010 R1 C - -

    • CS-45A/CS-45B**

005430 30B B-G-1 PT ZA-0014 R1 C - -

CLOSURE STUD B6.30 MT ZA-0019 R0 C - -

UT UTI-015 R2 C - -

UT UTI-010 R1 C - -

    • CS-45A/CS-45B**

'05433 33B B-G-1 PT ZA-0014 R1 C - -

CLOSURE STUD B6.30 MT ZA-0019 R0 C . -

UT UTI-015 R2 C - .

Ur ITTI-010 R1 C - -

    • CS-45A/CS-458**

005436 36B B-G-1 PT ZA-0014 R1 C - -

CLOSURE STUD B6.30 MT ZA-0019 R0 C - -

UT UTI-015 R2 C - -

UT UTI-010 R1 C - -

  • CS -4 5 A/CS - 4 5 B *
  • 005603 3b B-G-1 VT-1 ZA-0024 R2 C - -

CLOSURE WASHER B6,50 005606 68 B-G-1 VT-1 ZA-0024 R2 C - -

CLOSURE NASHER B6.50 005609 9B B-G-1 VT-1 ZA-0024 R2 C - -

CLOSURE WASHER B6.50 5

DATE: 12/29/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 5 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST Ot7FAGE (98RP)

CLASS 1 CLABW STATUS COMPONENTS PEACTOR PRESSURE VESSEL

.I N O ASME O G T SEC, XI R E H SUPNARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

CLOSURE READ BOLTING ( FIG NO A-R PV *3 A . B) 005612 128 B-G VT-1 ZA-0024 R2 C - .

C145URE WASHER B6.50 005615 158 B-G-1 VT-1 ZA-0024 R2 C - .

CLOSURE WASHER B6.50 005618 18B B-G-1 VT-1 ZA-0024 R2 C . -

CLOSURE WASHER B6.50 J5621 21B' B-G-1 VT-1 ZA-0024 R2 C . .

C14SURE WASHER B6.50 005624 24B B-G-1 VT.1 ZA-0024 R2 C . -

CLOSURE WASHER B6.50 005627 27B B-G-1 VT-1 ZA-0024 R2 C . .

C14SURE WASHER B6.50 005630 30B B-G-1 VT-1 ZA-0024 R2 C - .

CLOSURE WASHER B6.50 t

i-005633 33B B-0-1 VT-1 2A-0024 R2 C . .

l CLOSURE WASHER B6.50 i-a t

I i

i i

e

SOtTTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 6 DATE: 12/29/98 REVISION: 0 INSERVICE INSPEC"IION PLAN . 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 1 CLABW STATUS COMPONE!(TS

(

FEAC" TOR PRFS9tmP VESSEL N O ASME O O T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARFJ ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

NUMBER IDEtrrIFICATION CLOSimE HEAD POLTIN'3 (FIG NO A-PPV.3A.B) 005636 368 B-G-1 VT.1 ZA-0024 R2 C . .

CLOSURE WASHER B6.50 O

1 0;

I l

i l

DATE: 12/29/98 SOtTTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 7 REVISION: 0 INSERVICE INSPEC"f1ON PLAN . 2RE06 WELDS l n - l

/ FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF) l CLASS 1 CLABW STATUS COMPONENTS x

STEAM GENERATOR 2C (PRIMARY SIDE)

N O ASME O C T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS 1

N'JMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK ** l MANWAY BOLTING (FIG NO A-SG-1) 017800 SG-2C-IMB D-G-2 VT-1 ZA-0024 R2 C . - EXAMINED BOLT NOS. 1 THROUGH 16.

INLET MANWAY BOLTING B7.30 i l

l

)

017900 SG-2C-OMB B-G-2 VF-1 ZA-0024 R2 C - - EXAMINED BOLT NOS. 1 THROUGH 16.

OUTLET MANWAY BOLTING B7,30 O

s

)

i I

I SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 8 DATE: 12/29/98 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST OWAGE (98RF) f CLASS 1 CLABW STATUS COMPONENTS PEAC' TP COO! ANT SYSTEM N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R " CALIBRATION BLOCK **

6-PC-2003-BB1 (FIG NO A-PC-13) 103740 10 B-J PT ZA-0012 R2 C - - MANDATORY ISI-HS-UP.

PIPE TO ELBOW B9.11 UT UTI-001 R3 . C -

    • SS-8**

103750 11 B-J PT ZA-0012 R2 C . - MANDATORY ISI-HS-UF.

ELBOW TO PIPE B9.11 UT UTI-001 R3 - C -

"SS- 8 *

  • 103754 11A B-J PT ZA-0012 R2 C - - MANDATORY ISI-HS-UF. WELD ADDED PER PIPE TO TEE B9.21 UT UTI-001 R3 - C - MOD.91-020.
    • SS-8**

103756 11B B-J PT ZA-0012 R2 C - - MANDATORY ISI-HS-UF. WELD ADDED PER TEE TO PIPE B9.11 UT (TTI-001 R3 - C - MOD.91-020.

"SS- 8 *

  • 103760 12 B-J PT ZA-0012 R2 C - . MANDATORY ISI-HS-UF.

PIPE TO ELBOW B9.11 UT (TTI-001 R3 - C .

"SS- 8 "

103770 13 B-J PT ZA-0012 R2 C - - MANDATORY ISI-HS-UF.

ELBOW TO PIPE B9.11 UT UTI-001 R3 C - -

" SS- 8 *

  • 103780 14 B-J PT ZA-0012 R2 C - - MANDATORY ISI-TE/HS-UP.

PIPE TO SAFE END B9.11 UT UTI-001 R3 - C -

UI UTI-005 R3 - C -

'SS - 8 *

  • DATE: 12/29/98 SOUTH TEXAS PROJECT ELEC"TRIC GENERATING STATION UN!1' 2 IAGE: 9 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 WELDS

/' FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF) i CLASS 1 CLABW STATUS COMPONENTS PEA 0"f0R COOTANT SYSTEM N O ASME O G T SEC. XI R E H

SUMMARY

3:XAMINATION AR.EA CAIUY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

6-RC-2004-NSS (FIG NO A-RC-6) 103950 7FB B-G-2 VT.1 ZA-0024 R2 B . . PERFORMED BASELINE VISUAL EXAMINATION ON FLANGE BOLTING B7.50 FLANGE BOLTING THAT WAS REPLACED AS A RESULT OF THE INSTALLATION OF VALVE NO.

PSV 3452 IN ACCORDANCE WITH PM: 98000515 (WAN: 135365).

6-PC-2009-NSS (FIG NO A-PC-6) 104130 9FB B-G-2 VT 1 ZA.0024 R2 B . . PERFORMED BASELINE VISUAL EXAMINATION ON FLANGE BOLTING B7.50 FLANGE BOLTING THAT WAS REPLACED AS A RESULT OF THE INSTALLATION OF VALVE NO.

PSV.3451 IN ACCORDANCE WITH PM: 98000513 (WAN: 135363).

(

6-RC-2012-NSS (FIG NO A-PC-6) 104330 11FB B-G-2 YT-1 ZA-0024 R2 B . - PERFORMED BASELINE VISUAL EXAMINATION ON FLANGE BOLTING B7.50 FLANGE BOLTING THAT WAS REPLACED AS A RESULT OF THE INSTALLATION OF VALVE NO.

PSV-3450 IN ACCORDANCE WITH PM: 98000512 WAN: 135362).

2.5-RC-2003-RB1 (FIG NO A-PC-13) 107900 1 B-J PT ZA-0012 R2 C - . MANDATORY ISI-HS-UF. WELD ADDED PER TEE TO PIPE B9.21 MOr. 91 020.

2+RC-2121-PB1 (FIO NO A-PC-16) 208400 1 B-J PT ZA-0012 R2 C . . MANDATORY IS!-HS-UP.

BRANCH CONNECTION TO PIPE B9.40 0

1 SOUTH TEXAS PROJECT ELECTRIC GENERATI24G STATION UNIT 2 PAGE: 10 DATE: 12/29/C8 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

/ CLASS 1 CLABW STATUS COMPONENTS FEACTOR CYJOLANT SYSTEM N O ASME O O T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

2-RC-2121-BB1 (FIG NO A-PC-16) 108430 6 B-J PT ZA-0012 R2 C - . MANDATORY ISI-HS UF.

PIPE TO VALVE B9.40 2-RC-2419-PPI (FIG NO A-PC-19) 110200 1 B-J PT ZA-0012 R2 C . - MANDATORY ISI-HS-UF.

BRANCH CONNECTION TO PIPE B9.40 110230 4 B-J PT ZA-0012 R2 C - - MANDATORY ISI-HS-UF.

PIPE TO TEE B9.21 0

110240 5 B-J PT ZA-0012 R2 C - - MANDATORY ISI.HS-UF.

TEE TO PIPE B9.21 110250 6 B-J PT ZA-0012 R2 C . - MANDATORY ISI-HS-UF.

PIPE TO VALVE B9. 4 0 0

._ . . . . _ . . . _ .. . . _ . - ...m. __ -. .._.. _ _ . _ _ . . _ . _ _ . . _ .

DATE: 12/29/S8 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 11 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 WELDS N FIRST INTERVAL. THIRD PERIOD, FIRST OUTAGE (98RF)

I CLASS 1 CLABW STATUS COMPONENTS i' CHEMICAL AND VOLUME CONTROL SYSTEM N O ASME O G T l SEC. XI R E H SUPNARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R " CALIBRATION BLOCK *

  • l 2fl.5).CV-2126-BB1 (FIO NO A-CV-5) 155920 2 B.J PT 2A-0012 R2 C . . MANDATORY ISI-TE.

BENT PIPE TO FLANGE B9.21 l 155925 .2FB B-G-2 VT.1 ZA.0024 R2 C - .

FLANGE BOLTING B7.50  ;

i l

i N

l l.

l l

l l

t l

i i

l

,D 1

l l , -.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE 12 DATE: 12/20/98 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

{ CLASS 1 CLABW STATUS COMPONENTS SAFETY INJECTION SYSTEM N O ASME O G T SEC, XI R E H CATGY EXAM E O E REMARr3

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

6-SI-2309-PBI (PIO NO A-SI-5) 232760 1 B-J PT ZA-0012 R2 C . - MANDATORY ISI-HS-UF.

VALVE TO PIPE B9.11 UT UTI-001 R3 - C -

LT UTI.005 R3 - C .

..ss.9..

9' 1

O 1

i

l t

DATE: 12/29/98 SOUni TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 FAGE: 13 l REVISION: 0 INSERVICE INSPECTION PLAN 2RE06 WELDS I

FIRST INTERVAL, THIRD PERIOD, FIRST OUIAGE (98RF) l /.es k CLASS 1 CLABW STAn7S COMPONENTS PEAC"POR COOLAvr PUMP 2A N O ASME O G T SEC. XI R E H SUh84ARY EXAMINATION AREA CATGY EXAM E O E REMARXS NUMBER- IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

r PUMP CASING (FIG NO A-RCP-1) 260141 RCP.2A.PC h.481 VT-2 DPSP15-RC-0001 A - - PERFORMED VT.2 VISUAL EXAMINATION OF t

PUMP CASING .. PUMP CASING POR LEAKAGE AS REQUIRED BY CODE CASE N-481.

FLYWHEEL (FIG NO A-RCP-3) 260170 RCP-2A.FW RG UT UTI.003 R2 W . . EXAMINED BORE, KEYWAYS, AND BOLT HOLES FLYWHEEL 1.14 IN PLACE.

    • CS-76**

[h d

i l

b i

e

SOtiTH TEXAS PROJECT ELECTRIC GENERATING STATIO2 UNIT 2 PAGE: 14 DATER 12/29/90 REVISION: 0 INSERVICE INSPECTION PLAN 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST OtJTAGE (98RF) j CLASS 1 CLABW STARIS COMPONENTS PEACTOR COOLANT PtHP 2B N O ASME O G T SEC XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS ]

NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIOCK*
  • PUMP CASTNG (FIO NO A-RCP-1) .

360241 RCP.2B-PC N-481 VT-2 OPSP15-RC-0001 A . - PERFORMED VT-2 VISUAL EXAMINATION OF PUMP CASING .. PLHP CASING FOR LEAKAGE AS RE7JIRED BY CODE CASE N-481.

FLYWHEEL (FIO NO A-PCP-2) 360270 RCP-2B-FW RG UT UTI.003 R2 W - - EXAMINED BORE, KEYWAYS, AND BOLT HOLES FLYWHEEL 1.14 IN PLACE.

    • CS-76**

O O

DATE: 12/29/98 SOtTTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE 15 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 WELDS

  • FIRST INTERVAL, THIRD PERIOD, FIRST OUTAOE (98RF)

CLASS 1 CLABW STATUS COMPONENTS PEACTOR COOLANT PUMP 2C .

r N O ASME O G T SEC. XI R E H 3 SIM4A "Y EXAMINATION AREA CATGY EXAM E O E P.EMARKS  !

l NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

I PUMP CASING (FIO NO A-RCP-1) 260341 'RCP.2C.PC N-481 VT.2 CPSP15-RC-0001 A . . PERPORMED VT-2 VISUAL EXAMINATION OF PUMP CASING .. PUMP CASING FOR LEAKAGE AS REQUIRED BY CODE CASE N-481.

FLYWHEEL (FIG NO A-rCP.3) 260370 RCP.2C.FW RG UT UTI-003 R2 W . . EXAMINED BORE, KEYWAYS, AND BOLT HOLES FLYWHEEL 1.14 IN PLACE.

    • CS.76** <

l l

/

-/

I i.

1 1

i l

i i

l i

l s

DATER 12/29/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE4 16 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 1 CLABW STATUS COMPONENTS REAC" POP COOLANT PUMP 2D N O ASME O G T I

l SEC. XI R E H SUfe4ARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMDER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK'*

PUMP CASING (FIG NO A-RCP-1) i 360441 RCP-2D-PC N-481 VT-2 CPSP15-RC-001 A . - PERFORMED VT-2 VISUAL EXAMINATION OF PUMP CASING .- PUMP CASING FOR LEAKAGE AS REQUIRED BY CODE CASE N-481.

FLYWHEEL (FIG NO A-RCP-2) 260470 RCP-2D-FW RG ffr EA-0018 R2 W - - RCP MOTOR & FLYWHEEL ID (REM. FROM RCP FLYWHEEL 1.14 UT UTI.003 R2 - W - 1D 9 1RE07) WAS INST. ON RCP 2D e 2RE06.

PERFORMED MT EXAM OF ALL ACCESSIBLE FLYWHEEL SURFACES AND UT EXAM OF THE BORE, KEYWAYS, BOLTHOLES, AND BASE MATERIAL IN FHB PRIOR TO OUTAGE. SEE CR NO. 98-2279.

    • CS-76, CSCL-43**

i O

l

, _ ~ . . ._- - _ - . ._ -

i i

l L

j DATE: 12/29/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 17 l REVISION: 0 INSERVICE INSPEC"IION PLAN . 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

{sm ,

% CLASS 1 CLABW STATUS COMPONENTS vxtVe N O ASME O G T SEC, XI R E H SUM 4ARY EXAMINATION AREA CATGY EXAM E O E REMARKS l NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIOCK**

I ....... .............................. ....... .......... ............... . . . ........................................

l I

VALVE CR7JP 1 261100 PSV 3452-VB ON 6-RC-2004 B-G-2 VT.1 ZA-0024 R2 B . . PERFORMED BASELINE VISUAL EXAMINATION ON FIG. NO. A-RC.6 B7.70 VALVE BOLTING ON REPLACEMENT VALVE INSTALLED PER PM: 98000515 (WAN:

135365).

l 261120 PSV 3452-VIS ON 6-RC-2004 B-M-2 VT-3 ZA-0024 R2 B - . PERFORMED BASELINE VISUAL EXAMINATION ON j FIG. NO, A-RC-6 B12.50 INTERIOR OF REPLACEMENT VALVE INSTALLED PER PM: 98000515 (WAN: 135365). )

EXAMINED ALL INTERNAL PRESSURE BOUNDARY SURFACES TO THE EXTENT PRACTICAL. J I

t l-l 261160 PSV 3451-VB ON 6-RC-2009 B-G-2 VT.1 ZA-0024 R2 8 - - PERFORMED BASELINE VISUAL EXAMINATION ON FIG. NO. A-RC-6 B7.70 VALVE BOLTING ON REPLACEMENT VALVE i INSTALLED PER PM: 98000513 (WAN:

l 135363),

I 261180 PSV 3451-VIS ON 6-RC-2009 B-M-2 VT-3 ZA-0024 R2 B . - PERFORMED BACELINE VISUAL EXAMINATION ON l

FIG. NO. A-RC 6 B12.50 INTERIOR OF REPLACEMENT VALVE INSTALLED I PER PM: 98000513 (WANs 135363).

I EXAMINED ALL INTERNAL PRESSURE BOUNDARY t

SURFACES TO THE EXTENT PRACTICAL.

l 261200 PSV 3450-VB ON 6 RC-2012 B-G-2 VT-1 ZA-0024 R2 B - - PERFORMED BASELINE VISUAL EXAMINATION ON FIG. NO. A-RC-6 B7.70 VALVE BOLTING ON REPLACEMENT VALVE INSTALLED PER PM: 98000512 (WAN:

135362).

261220 PSV 3450-VIS ON 6-RC-2012- B M-2 VT-3 ZA-0024 R2 B - - PERFORMED BASELINE VISUAL EXAMINATION ON FIG. NO. A-RC- 6 B12.50 INTERIOR OF REPIACEMENT VALVE INSTALLED I. PER PM: 98000512 (WAN: 135362).

I l EXAMINED ALL INTERNAL PRESSURE BOUNDARY l-

! SURFACES TO THE EXTENT PRACTICAL.

q t

-*s

DOTE: 12/29/08 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 16 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 WELDS FIRST INTERVAL, THIRD PERIOC, FIRST OUTAGE (98RF)

(, CLASS 2 CLABW STATUS COMPONENTS CCNPAINMENT SPRAY SYSTEM N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROC':: DURE C M R ** CALIBRATION BLOCK **

12-CS-2301-UB2 (FIG NO B-CS-4) 403830 10LU C-F-1-L PT ZA-0012 R2 L - - EXAMINED 2.57 AT THE INTERSECTING LONGITUDINAL WELD C5.12 UT UTI-012 R2 L - - CIRCUMFEREITTIAL WELD.

    • ss.12..

402840 10 C-F-1 PT ZA-0012 R2 C - -

PIPE TO FLANGE C5.11 ITT ITII-012 R2 C - -

    • SS-12**

8-CS-2302-PB2 (FIG NO B-CS-6)

'5470 17LU C-F-1-L PT ZA-0012 R2 L - - AUGMENTED ISI-IEB 79-17. EXAMINED 2.

IDNGITUDINAL WELD -. UT UTI-012 R2 - L - AT THE INTERSECTING CIRCUMFERENTIAL WELD.

    • SS-87**

415480 17 C-F-1 PT ZA-0012 R2 C - - AUGMENTED ISI-IEB 79-17.

PIPE TO VALVE .- ITI ITTI-012 R2 C - -

. ss 87**

415510 19LU C-F-1-L PT ZA-0012 R2 L - - AUGMENTED ISI-IEB 79-17. EXAMINED 2.5T LONGITUDINAL WELD -- UT ITTI-012 R2 L - . AT THE INTERSECTING CIRCUMFERENTIAL WELD.

    • SS-87**

415520 19 C-F-1 PT ZA-0012 R2 C - - AUGMENTED ISI-IEB 79-17.

PIPE TO ELBOW --

ITT UTI-012 R2 - C .

    • SS-87**

415530 19LD C-F-1-L PT ZA-0012 R2 L - - AUGMENTED ISI-IEB 79-17. EXAMINED 2.5T LONGITUDINAL WELD --

UT UTI-012 R2 L - - AT THE INTERSECTING CIRCUMFEREtTIIAL WELD.

    • SS-87**

-.. - . .- ._ . . ,. .. . . - - _ . . . _ . - . ~ . . . - . . ~ . _ _ , - - _ . . ,

.DATE: 12/29/f8 SOWH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 19 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 WELDS

[D

' FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 2 CLABW STATUS COMPONENTS CONTATNMENT SPRAY SYSTEM N O ASME O G T SEC. XI R E H SID94ARY EXN41 NATION AREA CATGY EXAM E O E REMARKS ITEM NO METHOD I NUMBER IDENTIFICATION PROCEDURE C M R **CALIBEATION BLOCK **

6-CS-2303-PB2 (FIO NO B-CS-4) 424360 12LU C-F-1-L PT ZA-0012 R2 L . . AUGMENTED ISI-IEB 79-17. EXAMINED 2.$T LONGITUDINAL WELD .. UT 17TI.012 R2 L . . AT THE INTERSECTING CIRCUMFERENTIAL l WELD.

l **SS-8s** ,

424370 12 C-F-1 PT ZA-0012 R2 C . - AUGMENTED ISI-IEB 79-17. l I

l PIPE TO VALVE -- ITT UTI-012 R2 C . -

l l **SS-85**

1 f% \

l J 1

l l

l l

l t

l l

l

\

i

PAGE: 20 DATE: 12/29/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST OITTAGE (98RF)

CLASS 2 CLABN STATUS COMPONENTS FFEDWATER SYSTEM N O ASME O G T SEC. XI R E H CATCTY EXAM E O E REMARKS EUMMARY EXAMINATION AREA ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BLOCK' NUMBER IDENTIFICATION 18-FW 2016-GA2 (FIG NO B-FW-5, 6)

BEZ KT ZA-001B R2 A - - AUGMENTED ISI BEZ.

501700 1 VALVE TO PIPE C5.51 UT UTI-002 R3 . A -

501720 2 C-F-2 MT ZA-0018 R2 C . -

PIPE TO VALVE C5.51 UT UTI-002 R3 C . .

    • CS-3**

$01740 3 BEZ MT ZA-0018 R2 A . . AUGMENTED ISI-BEZ.

VALVE TO PIPE C5.51 UT UTI-002 R3 A - .

    • CS-3**

501760 4 BEZ MT ZA-0018 R2 A - - AUGMENTED ISI-BEZ.

PIPE TO PIPE C5.51 UT UTI-002 R3 A . -

    • CS-3**

501780 5 BEZ KT ZA-0018 R2 A - - AUGMENTED ISI-BEZ.

PENETRATION TO PIPE C5.51 UT UTI.002 R3 A . .

    • CS-3**

501860 9 C-F.2 MT ZA-0018 R2 C . - ALTERNATE SELECTION TO S/N 501900 (HIGH ELBOW TO PIPE C5.51 UT UTI-002 R3 C - . RAD. AREA). NO BASELINE EXAMINATION WAS UT VTI-004 R3 C - . PERFORMED DURING PSI. PERFORMED UT BASELINE EXAM INCLUDING 0-DEGREE LAMINATION AND WELD VOLUME EXAM.

" CS - 3 *

  • IP-FW-2019-GA2 (FIG NO B-FW-7 8) 2660 1 BEZ MT ZA-0018 R2 A - - AUGMENTED ISI-BEZ.

VALVE TO PIPE C5.51 UT UTI-002 R3 A -

    • CS-3**

1 1

- .. - ._. - .. - _. . _ - . . . - - . ._....__c .-- . _ ~ .- . . . _. .-

DATE: 12/29/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 21 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 WELDS

[ FIRST INTERVAL, THIRD PERIOD, FIRST OVTAGE (98kF) ,

(

P CLASS 2 CLABW STAWS COMPONENTS  !

FEEDWATFR SYSTEM t i

N O ASME O G T SEC. XI R E H SUPE 1ARY EXAMINATION AREA CATOY EXAM E O E REMARKS ,

NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R " CALIBRATION BLOCK **

18-PW-2018-GA2 (FTO NO B-FW-7. 8) 502680 2 BEZ KT ZA-0018 R2 A . - AUGMENTED ISI-BEZ.

PIPE TO VALVE C5.51 UT UTI.002 R3 A . .

" CS - 3 "

i l

i 502740 5 BEZ MT ZA-0018 R2 A . - AUGMENTED ISI-BEZ.

PENETRATION TO PIPE C5.51 UT 17TI.002 R3 A . .

" CS - 3 "

19-FW-2031-AA2 (FIG NO P-FW-5) 94780 1 BEZ MT ZA-0018 R2 A - . AUGMENTED ISI-BEZ.

ELBOW TO PIPE C5.51 UT 17TI-002 R3 . A .

"CS- 4 "

504790 1PL1-IPL8 C-C Kr ZA-0018 R2 C . .

PIPE LUGS C3.20

    • cs.33*.

504795 2PL9-1PL10 BEZLUG UT UTI-031 R1 . A - AUGMENTED ISI-BEZ.

PIPE LUGS --

"CS- 2/CS- 3 3 "

504800 2 BEZ MT ZA-0018 R2 A . . AUGMENTED ISI-BEZ.

PIPE TO PIPE C5.51 17T 17tI-002 R3 - A -

"CS-4 *

  • 504820 3 BEZ MT ZA-0018 R2 A - . AUGMENTED ISI-BEZ.

PIPE TO PIPE C5.51 UT UTI-002 R3 A - -

\

    • CS-4"

DATE: 12/29/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 22 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 2 CLABW STATUS COMPONENTS FFFDWATER SYSTFM N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

39-FW-203I.AA2 (FTG NO B-FW *,)

504830 4 BEZ MT ZA-0018 R2 A - . AUOMENTED ISI-BEZ.

PIPE TO PIFE C5,51 UT UTI-002 R3 A . .

    • CS-4**

504840 5 BEZ MT ZA-0018 R2 A . . AUGMENTED ISI-BEZ.

PIPE TO VALVE C5,51 UT UTI.002 R3 . A -

    • CS-4**

18-FW-2032-AA2 (FIG NO B-FW.7)

B

~ %350 1PL1-1PL8 C-C MT ZA-0018 R2 C . -

PIPE LUGS C3,20 26-FW-2016-GA2 (FIG NO P-FW-6) 507080 4 C-F.2 MT ZA-0018 R2 C . .

PIPE TO NOZZLE C5.51 UT ITTI-002 R3 C - .

    • CS-I5**

1 O

- - - . . , . _ . ~ , . _ - _ - - . . . . . .~ , , . - _ , _ - - .

DATEi 12/29/98 Solmt TEXAS PRCUECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 23 REVISION: 0 INSERVICE INSPECTION FLAN . 2RE06 WELDS

/ FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 2 CLABW STATUS COMPONENTS

. MAIN STEAM SYSTEM N O ASME O G T SEC. XI R E H StD94ARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R " CALIBRATION BLOCK" 30-MS-2003-CA2 (FIG NO B-MS-5. 6) 556690 30PL1-30PL2 BEZLUG UT UTI-031 R1 - A - AUGMENTED ISI BEZ.

PIPE LUGS -.

  • *CS-2/CS- 3 4 "

16-MS-2003-GA2 (FIG NO B-MS-6) 560560 1 BEZ MT ZA-0018 R2 A . - AUGMENTED ISI-BEZ.

EXTRUSION TO PIPE C5.51 UT UTI-002 R3 A - .

"CS- 15* *

'40580 2 BEZ MT ZA-0018 R2 A . . AUGMENTED ISI-BEZ.

PIPE TO WELD CAP C5.51 L*r 177I.002 R3 A . .

"CS- 15 *

  • R-MS-2104-GA2 fFIG NO B-MS-10) 564540 4 C-F-2 MT ZA-0018 R2 C - .

PIPE TO VALVE C5.51 UT UTI-002 R3 . C .

    • CS-2**

6-MS-2003-GA2(A) (FIG NO P-MS-61 567400 1 BEZ MT ZA-0018 R2 A . . AUGMENTED ISI-BEZ.

EXTRUSION TO FIANGE C5.51 UT ITTI-002 R3 A - -

    • CS-75**

6-MS-2003-GA2(B) (FIG NO B-M M 567500 1 BEZ MT ZA-0018 R2 A - . AUGMENTED ISI-BEZ.

EXTRUSION TO FLANGE C5,51 UT UTI-002 R3 A - .

N

  • CS- 75"

r DATE: 12/29/08 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 24 REVISION: 0 INSERVICE INSPECTION PLAN 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF) f CLASS 2 CLABW STATUS COMPONENTS

' MAIN STFAM SYSTEM N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARFS NUMBER IDENTIFICATION ITEM NO METIIOD PROCEDURE C M R " CALIBRATION BLOCK **

6 -MS-2003.GA2 (C) (FIG NO B-MS-6) 567600 1 BEZ MT ZA.0018 R2 A - . AUGMENTED ISI.BEZ.

EXTRUSION TO FLANGE C5.51 ITT UTI-002 R3 A . .

    • CS 75**

6 -MS-2 003 -GA2 (D) (FIG MO B-MS-6) 567700 1 BEZ MT ZA-0018 R2 A . - AUGMENTED ISI-BEZ.

EXTRUSION TO FLANGE C5.51 ITT ITTI.002 R3 A . -

" CS - 7 5 *

  • 6 -MS-2 00 3-GA2 (E) (FIG NO B-MS-6) 567800 1 BEZ MT ZA-0018 R2 A . - AUGMENTED ISI-BEZ.

EXTRUSION TO FLANGE C5.51 UT UTI-002 R3 A . -

    • CS-75**

f-MS-2004-GA2fC) (FIG NO B-MS-6) 568100 1 BEZ MT ZA-0018 R2 A - . AUGMENTED ISI-BEZ.

EXTRUSION TO FLANGE C5.51 UT ITTI-002 R3 A . -

" CS - 7 5 "

6-MS-2 004 -GA2 f D1 (FIG NO B-MS-8) 568300 I BEZ MT ZA-0018 R2 A - . AUGMENTED ISI-BEZ.

EXTRUSION TO FLANGE C5.51 UT UTI.002 R3 A - .

' CS - 7 5 *

  • 6-MS-2004-GA2(E) (FIG NO B-MS-8) 8300 1 BEZ MT ZA-0018 R2 A - - AUGMENTED ISI-DEZ.

EXTRUSION TO FLANCE C5.51 UT UTI-002 R3 A - -

    • CS-75**

- - - _ _ _ _ . . . , . m._ .__ .

l DATEt 12/29/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 25 l ' REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 WELDS I / \ FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 2 CLABW STATUS COMPONENTS RESIDUAL HEAT REMOVAL SYSTEM

! N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

1 l

l 12-RH 2215-KB2 (FIG WO B-PH-9) l i 605700 3LU C-F-1-L PT ZA-0012 R2 L - - EXAMINED 2.57 AT THE INTERSECTING LONGITUDINAL WELD C5.12 UT UTI-012 R2 L - - CIRCUMFERENTIAL WELD.

l l

" SS - 13 *

  • I 605740 3 C.F-1 PT ZA-0012 R2 C - -

ELdOW TO PIPE C5.11 UT UTI-012 R2 - C -

i l

! **SS-11**

t

(

1 r

l 605760 4 C-F-1 PT ZA-0012 R2 C - -

j PIPE TO REDUCER C5.11 UT UTI-012 R2 C - - 4 l / I

\'

r e egs.g 3 u l

l

[ 605780 4LD C-F-1-L PT ZA-0012 R2 L - - EXAMINED 2.5T AT THE INTERSECTING

[ LONGITUDINAL WELD C5.12 UT UTI-012 R2 L - - CIRCUMFERENTIAL WELD.

"SS - 13 "

l 12-PH-2302-FB2 (FIG NO P-PH-4) 606680 11LU C-F-1-L PT ZA-0012 R2 L - - EXAMINED 2.5T AT THE INTERSECTING LONGITUDINAL WELD C5.12 UT UTI-012 R2 L - - CIRCUMFERENTIAL WELD.

e ess.13n i

606760 11 C-F-1 PT ZA-0012 R2 C - -

ELBOW TO PIPE C5.11 UT UTI-012 R2 - C -

eess.13n i

606780 12 C-F-1 PT ZA-0012 R2 C - -

/ PIPE TO ELBOW C5.11 UT UTI-012 R2 - C -

eess.13n l.. _ _ ,

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION LHIT 2 FAGE: 26 DATE: 12/29/98 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF) f CLASS 2 CLABW STATUS COMPONENTS PESIDUAL HEAT PEMOVAL SYSTEM N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

12-RH-2302-rB2 (FIG NO B-RH-4) .

606000 12LD C-F.1-L PT ZA-0012 R2 L - . EXAMINED 2.5T AT THE INTERSECTING IDNGITUDINAL WELD C5.12 UT UTI-012 R2 L . - CIRCUMFERENTIAL WELD.

    • SS-13**

606840 13LU C-F-1-L PT ZA-0012 R2 L - . EXAMINED 2.5T AT THE INTERSECTING IONGITUDINAL WELD C5.12 UT L'II.012 R2 L - . CIRCUMFERENTIAL WELD.

    • SS.13**

606880 13 C-F-1 PT ZA-0012 R2 C . -

ELBOW TO PIPE C5.11 UT UTI-012 R2 - C .

    • SS-13**

606900 14 C-F 1 PT ZA-0012 R2 C - -

PIPE TO REDUCER C5.11 UT UTI-012 R2 C - -

    • SS-13**

606920 14LD C-F-1-L PT ZA-0012 R2 L . - EXAMINED 2.57 AT THE INTERSECIING LONGITUDINAL WELD C5.12 UT UTI-0* 2 R2 L - - CIRCUMFERENTIAL WELD.

    • ss_13**

12.PH-2303-rP2 (FIG NO B4H-10) 607620 4 C-F-1 PT ZA-0012 R2 C - -

PIPE TO NOZZLS C5.11 UT UTI-012 R2 C - -

" SS - 13 "

8-PH-2210-FB2 (FIG NO B-FM-3) 1660 7 C-F-1 PT ZA-0012 R2 C . -

PIPE TO VALVE CS.11 UT UTI-001 R3 - C -

    • SS-10**

?

DATES 12/29/98 SOWH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 27 REVISIONS 0 INSERVICE INSPECTION PLAN , 2RE06 WELDS

, [ ,-~~ FIRST IlfrERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

/ CLASS 2 CLABN STATUS COMPONENTS l ' PESIDtTAL HEAT PEMOVAL FYSTEM i

l N O j MM 0 0 T l

l SEC. XI R E H SIM%RY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

]

6 PH.2211.BB2 (FIG NO B PH.3) l l 622200 2 C.F.1 PT ZA 0012 R2 C . -

I PIPE TO ELBON C5.11 UT UTI.001 R3 . C .

i l

    • SS.11** l i

l I

i 8-RH-2307-PB2 (FIG NO P-RH 14)

! 62B160 2 C.F 1 PT ZA-0012 R2 C - .

PIPE TO VALVE C5.11 UT UTI.001 R3 - C -

Ifr UTI.005 R3 - C -

"SS-10, SS- 11*

  • l n) l E

i 1

1 l

, 1 I

1 i

l l

l t

i l

[

i 1

! 1 1

o 4

SOWH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 IAGE: 28 DATE: 12/30/98 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD FIRST OUTAGE (98RF)

SAFFTY INJTCTION SYSTEM N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARFJi ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

NUMBER IDENTIFICATION 24-SI-2101-UB2 (FIG NO B-SI-1, 2) 700450 6PL1-8PL8 C-C PT ZA-0012 R2 C . .

PIPE LUGS C3.20 20-St-2101-UB2 (FIG NO B-SI-2) 703240 ILU C-F-1-L PT EA-0012 R2 L - - EXAMINED 2.5T AT TIIE INTERSECTING LONGITUDINAL WELD C5.12 UT UTI-012 R2 L - - CIRCUMFERENTIAL WELD.

eess.31..

702280 1 C-F-1 PT ZA-0012 R2 C . -

REDUCER TO PIPE C5.11 UT UTI-012 R2 - C -

    • SS-31**

703300 ILD C-F-1-L PT ZA-0012 R2 L - - EXAMINED 2.5T AT THE INTERSECTING IONCITUDINAL WELD C5.12 ITT UTI-012 R2 L - - CIRCUMFERENTIAL WELD.

eess.31..

16-JI-2301-UB2 (FIG NO B-51-5) 707680 9 C-F-1 PT EA-0012 R2 C - -

12-IN. BRANCH CONNECTION C5.41 707950 12PL1-12FL8 C-C PT ZA-0012 R2 C - -

PIPE LUGS C3.20 12-ST-2301-UP2 (FIG NO P-SI-5) 724720 BLU C-F-1-L PT ZA-0012 R2 L - - LASELINE SURF ACE EXAMINATION. EKAM'D LONGITUDINAL WELD C5,12 UT UTI-012 R2 L - - 2.5T AT THE INTERSECTIN3 CIRC. WELD UT UTI.004 R3 L - BASELINE UT EKAM WAS FERFORMED e PSI.

PERFORMED BASELINE UT EXAM INCL. 0-DEG.

LAMINATMN AND WELD VOL. EXAM.

    • SS-12**

DATE: 12/29/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 29 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 WELDS

/' FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

Q SAFETY TNJECTION SYSTEM CLASS 2 CLABW STATUS COMPONENTS N O ASME O G T I EEC. XI R E H SUl+1ARY EXAMINATION AREA CAMY EXAM E O E REMARKS ,

NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R " CALIBRATION BLOCK" 12-FI-2101 -UB2 (FIG NO B-SI-5) 114740 $ C F.1 PT EA-0012 R2 C - - BASELINE SURFACE EXAMINATION. NO PIPE TO FLANGE C5.11 UT UTI.012 R2 C . - BASELINE UT EXAM WAS PERFORMED DURING ITT UTI-004 R3 C - - PSI. PERFORMED BASELINE (TT EXAM INCLUDING 0-DEGREE LAMINATION AND WELD VOLUME EXAM.

l eess.12ee 114300 10LU C-F-1-L PT ZA-0012 R2 L . - EXAMINED 2.5T AT THE INTERSECTING LONGITUDINAL WELD C5.12 UT UTI-012 R2 L - - CIRCUMFERENTIAL WELD. l

    • SS-12** 4 74820 10 C-F-1 PT ZA-0012 R2 C - -

PIPE TO FLANGE C5.11 UT UTI-012 R2 . C .

"SS-12" 10-SI-2301-UB2 (FIG NO B-SI-5) j 719960- 9 C-F-1 PT ZA-0012 R2 C - . BASELINE SURFACE EXAMINATION. AUGMENTED j I".ANGE TO PIPE .. UT UTI-012 R2 C - - ISI - IEB 79-17. NO BASELINE UT EXAM UT UTI-004 R3 C . . NAS PERFORMED DURING PSI. PERFORPED BASELINE UT EXAM INCLUDING 0-DFGREE LAMINATION AND WELD VOLUME EXAM.

    • SS-B7**

719980 SLD C-F-1-L PT ZA-0012 R2 L - - BASELINE SURFACE EXAMINATION. AUGMENTED LONGITUDINAL WELD .. ITT UTI.012 R2 L - - ISI - IEB 79-IL EXAMINED 2.5T AT THE UT 17T1-004 R3 L . - INTERSECTING CIRC WE1 NO BASELINE UT EXAM WAS PERFORMED DURING PSI.

f PERFORMED BASELINE UT EXAM INCLUDING 0-DEGREE LAMINATION AND WELD VOLUME EXAM.

, **SS-B7**

1 4 9 k

i

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 30 DATE:' 12/29/98 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 2 CLABW STATUS COMPONEFTS SAFETY INJECTION SYSTEM N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS ITEM NO METHOL PROCEDURE C M R ** CALIBRATION BLOCK **

NUMBER IDENTIFICATION 6-SI-2306-DB2 (FIO NO B-SI-19)

C-F-1 PT ZA-0012 R2 C - -

743040, 32 PIPE TO TEE C5.11 ITT UTI-005 R3 - C -

  • **SS-23**

743060 33 C-F-1 PT ZA-0012 R2 C - -

TEE TO PIPS C5.11 tTT ITTI-005 R3 - C -

. 55 23**

'743080 34 C-F.1 PT ZA-0012 R2 C - .

PIPE TO ELBOW C5.11 ITT UTI-005 R3 - C -

    • SS-23**

6-SI-2325-DB2 (FIG NO B-SI-19) 7c4200 1 C-F-1 PT ZA-0012 R2 C - -

TEE TO PIPE C5.11 UT UTI-005 R3 . C -

    • SS-23**

~74 424 0 3 C-F-1 IT ZA-0012 R2 C - - BASELINE SURFACE EXAMINATION. NO PIPE TO FLBOW C5.11 UT UT1-005 R3 C - - BASELINE ITT EXAM WAS PERFORMED DURIN3 UT ITTI-004 R3 C - - PSI. PERFORMED BASELINE UT EXAM INCLIDING 0-DEGREE LAMINATION AND WELD VOLUME EXAM.

..SS.23..

744400 11 C-F-1 PT ZA-0012 R2 C - -

PIPE TO VALVE C5.11 UT UTI 001 R3 - C -

ITT UTI-005 R3 - C -

    • SS-6 SS-9'*

O

- . . . . . . . _ . .- . - ~ . _ _ . , . . _

l l

DATE: 12/29/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 FAOE 31 l l

REVISION: 0 - INSERVICE INSPECTION PLAN - 2RE06 WELDS  ;

g FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 2 CIABW STATUS COMPONENTS N.s/RAFETY TNJECTION SYSTEM N O )

l ASME O O T  !

I SEC. XI R E H

SUMMARY

EKAMINATION AREA CATOY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BIOCK*
  • 6-SI-2326-BB2 (FIO NO B-SI-191 744980 5 C-F-1 PT EA-0012 R2 C . -

EIBOW TO PIPE C5.11 UT UTI-001 R3 . C .

l eess. pee 745000 7 C-F-1 PT ZA-0012 R2 C - -

PIPE TO VALVE C5.11 UT WI-001 R3 - C -

UT UTI-005 R3 . C -

    • SS-8, SS-9**

2-SI-2306-DB2 (FIO NO B-SI-201

'[ 46920 15 C-F.1 PT ZA 0012 R2 C - -

REDUCER TO PIPE C5.21 UT MI-012 R2 C = -

eesS.22**

746950 20 C-F-1 PT ZA-0012 R2 C . . j PIPE TO VALVE C5 30 l

2-SI-2339-DB2 (PIG NO B-SI-23) 747180 19 CF1 PT ZA-0012 R2 C - .

ELBOW TO PIPE C5.30 l

l 747190 '20 C-F-1 PT ZA-0012 R2 C = . l PIPE TO VALVE C5.30 i

l 1

l 4(m/ I I

i i

DATE: 12/29/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 32 REVISION: 0 INSERVICE INSPEC"f20N PLAN - 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF) k CLASS 2 CLABW STATUS COMPOhTNTS CONTAINMI'NT FPRAY PtNPS N C' ASME D G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATCY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R "CALIERATION BLOCK' PLMP 2 A (FIG NO B-CSP-1) 750120 CIAPCS-2A-PCW1 C-G PT ZA-0012 R2 C . .

FLANGE TO UPPER CASE CF.10 750140 CIAPCS-2A-PCWS C-G PT ZA-0012 R2 C . - EXAMINED THE ACCESSIBLE LENGTH OF THIS LOWER CASE SEAM WELD C6.10 WELD DOWN TO THE NEOPRENE SEAL.

O O

- . . . . - - .. - . .- . - . . , . . . - . . . .. .- . -.~

l LATE: 12/29/98 SOtTTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 33 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 2 CLABW STATUS COMPONENTS

' #ESIDUAL HEAT PEMOVAL PtNPS N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMDER IDENTIFICATION ITEM NO METHOD PROCEDURE C M.R ** CALIBRATION BLOCK **

PtNP 2 A (FIG NO B-PHRP-Il 750600 RHARHS-2A-IWAI C-C PT ZA-0012 R2 C - -

INTEGRALLY WELDED ATTACHMENT C3.30 750605 RHARHS-2A-IWA2 C-C PT ZA.0012 R2 C . -

INTEGRALLY WELDED ATTACHMENT C3.30 750610 RHARHS-2A-IWA3 C-C PT ZA-0012 R2 C . .

- INTEGRALLY WELDED ATTACHMENT C3.30 t

i l

(

V) e i

l

i l

DATE: 12/29/08 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 34 REVISION: O INSERVICE INSPECTION PLAN - 2RE06 WELDS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

I CLASS 2 CLABW STATUS COMPONENTS HTCH HEAD SAFETY TNJFCTION PtFPS i

N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMDER IDENTIFI STION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCF**

PtNP 2A (FIO NO B.HHSIP-1) 751020 SIAPHH-2A-PCW1 C.G PT ZA.0012 K2 C . .

FIA%E TO UPPER CASE C6.10 751040 SIAPHH-2A.PCV5 C-G PT ZA-0012 R2 C . . EXAMINED THE ACCESSIBLE LENGTH OF THIS LOWER CASE SEAM WELD C6.10 WELD DOWN TO THE NEOPRENE SEAL.

O O

- . _ -- .. . _ - _ . ~ . . - - _ _ _ . n__ - -- ~. . . .

j l

DATE: '12/29/98- SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 35 REVISION: 0' INSERVICE INSPECTION PLAN - 2RE06 WELDS

/m'j FIRST INTERVAL, THIRD PERIOD, FIRST CUTAGE (98RF)

] CIASS 2 CLABW STATUS COMPONENTS IhN FEAD SAFETY 7NJECTION PUMPS I

N O ASME O O T l SEC. XI R E H l l

I SUWIARY EXAMINATION AREA CATGY EXAM E O E REMARKS 1 NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R " CALIBRATION BLOCKu l ....... .............................. ....... .......... ............... . . . ........................................

l PUMP 2 A (FIG NO B-LHSIP-1) 751320 SIAPLH-2A.PCWI C-G PT ZA-0012 R2 C - -

FLANGE TO UPPER CASE , C6.10 ]

1 i 1 l

751340 SIAPLH-2A-PCW5 C-G PT ZA-0012 R2 C - . EXAMINED THE ACCESSIBLE LENGTH OF THIS LOWER CASE SEAM WELD C6.10 WELD DOWN TO THE NEOPRENE SEAL. j l

1 3

l i

i I

I i

I l

i l

t L

-- ----,--,---,-----,,----,----v----------,--------------v,,-,-- - - - -- ----,-- - - - - -- - - - - - --,----- - - , - ----,

O

^"""*"'" ~"

O STPNOC PROCEDURES O

(0 y/_ APPENDIX 2-B STPNOC PROCEDURES Procedure No. Re_L Title OPQP05-ZA-0001 1 Qualification and Certification of Nondestructive Examination Personnel i

1 OPQP05-ZA-0004 1 General Ultrasonic Examination OPQP05-ZA-0009 0 Recording Data from Direct Visual, Liquid Penetrant, and Magnetic Particle Examinations 0FQP05-ZA-0012 2 Color Contrast Solvent Removable Liquid Penetrant Examination for ASME XI PSI /ISI J OPQP05-ZA-0014 1 Fluorescent Water-Washable Liquid Penetrant Examination of Roto-Lok Studs l

(q) OPQP05-ZA-0018 2 Dry Powder Magnetic Panicle Examination for ASME XI PSI /ISI  ;

1 OPQP05-ZA-0019 0 Wet Fluorescent Magnetic Particle Examination for ASME Section XI PSI / ISI OPQP05-ZA-0023 1 Visual Examination of Component Supports for ASME XI Inservice Inspection OPQP05-ZA-0024 2 ASME XI Examination for VT-1 and VT-3 UTI-001 3 Manual Ultrasonic Examination of Austenitic and Dissimilar Metal Pressure Piping Welds Using Refracted Longitudinal Technique UTI-002 3 Manual Ultrasonic Examination of Ferritic Pressure Piping Welds UTI-003 2 Manual Ultrasonic Examination of Reactor Coolant Pump Flywheels From the Access Holes .

t0 v

2-B- 1

( APPENDIX 2-B STPNOC PROCEDURES Procedure No. Egy, Title UTI-004 3 Manual Ultrasonic Examination Using Longitudinal Wave Straight-Beam Technique UTI-005 3 Manual Ultrasonic Examination of Austenitic Pressure Piping Welds UTI-006 1 Manual Ultrasonic Indication Sizing UTI-010 1 Manual Ultrasonic Examination of the Center-Drilled Hole Surface in Pressure Retaining Studs Greater Than 2 Inches in Diameter UTI-011 1 Manual Ultrasonic Examination of Reactor Vessel Closure Head Round Nuts UTI-012 2 Manual Ultrasonic Examination of Thin Wall Piping Welds UTI-015 2 Manual Ultrasonic Examination of Reactor Pressure Vessel Closure Head Studs UTI-031 1 Manual Ultrasonic Examination of Pressure Piping Support Attachments 1

l O

2-B-2

e- - 4 i

O APPENDIX 2-C ISI EXAMINATION LIMITATIONS O

APPENDIX 2-C ISI EXAMINATION LIMITATIONS Table of Contents STPEGS-2 Summary ofInservice Examination Limitations Cass 1 Components None Class 2 Components ASME Category C-C Feedwater' System Residual Heat Removal System ASME Category C-F-1 Containment Spray Sys em ASME Category C-G Containment Spray System Safety Injection System 2-C-1

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 2

(

SUMMARY

OF INSERVICE EXAMINATION LIMITATIONS The following tables provide details on the limitations which were encountered during the ISI examinations at the South Texas Project Electric Generating Station, Unit 2 (STPEGS-2). Each table of this summary provides the following information as described:

Column 1 - Class / Category / Item No./ Examination Requirement Identifies the ASME Section XI Code Class, Category, Item Number; and Examination Require-ment (volumetric or surface) for the specific examination area listed in Column 2. This information is derived from Tables IWB-2500-1 and IWC-2500-1 of the 1983 Edition of ASME Section XI (with Addenda through Summer 1983), and Tables 1 and 2 of Code Case N-408.

Column 2 - Line No./ Subassembly Weld Identification Weld ID Figure Weld Configuration .

Examination Method Provides information for each examination area by line number (piping) or subassembly number (vessel), unique weld identification number, weld ID Ogure reference, weld configuration (pipe-to-tee, head-to-shell, etc.), and examination method (UT, UT/PT, or UT/MT).

Colttmd - Exam Type Lists the Methods of Examinations used for each area by specific angles for UT (0,45,45T,60, 60T) and surface technique (MT or PT), if required.

Column 4 -  % Coverage The extent of coverage for each exam type is expressed in percentages based on the examination volume / area required in Section XI. Depending on method, the percentage coverage may be represented in more than one way.

Surface methods are the simplest and are expressed as a percentage of the required surface area receiving no coverage and the remaining balance from 100% as the total coverage.

Ultrasonic coverage is first expressed for each exam type as a percentage of the volume receiving no coverage, angle-beam coverage in one direction only, and angle-beam coverage in two directions. These percentages are then used to compute the effective coverage for that exam type.

In the case of 0 degree, the effective coverage is equal to the balance of 100% minus the percentage receiving no coverage. The effective coverage for angle beam is calculated from the following formula:

O 2-C-2

- . . . .. - . . . - . . - . - - . -. .- -. _ - .- - - - - ...- ~. .

. c = a + 2*b (effective coverage formula, angle beam) l 2

where a = one direction only percentage b = two direction percentage Examples:

(1) none 1 dir 2dir 1 0% 0% 100 %

c = 0 + 2*100 = 100% effective coverage 2

(2) none 1dir 2dir  ;

0% 100 % 0 %

1 c = 100 + 2*0 = 50% effective coverage  ;

2 '

(3) none 1dir 2 dir 50 % 50% 0%

c = 50 + 2*0 = 25% effective coverage 2

The total UT coverage is then expressed as the average of the effective coverage percentages for each UT exam type. Each UT exam type is considered as equal weight in the calculation of the average.

Column 5 - ' Limitation A description of the type oflimitation and primary reason for why the coverage was limited is provided in this section.

I i

O 2-C-3

t ASME SECTION XI CODE COVERAGE LIMITATIONS i

1 i

1998 2RE06ISI SOUTH TEXAS PROJECT falCTRIC GENERATING STATION UNIT 2 ASME CATFGORYf C l l

SYSTLM I:EDW ATLR-P!PE LUGS (CLASS 2)

g. .LJNE NOJSUBAShtLMBLY;  ; f- . ,

r l CLASS.WYLD 1 IDENI1FICATION ;;. ,l' ..T 4COVERACE -

4m4 CATGY! -WELD ID F500RE4 , , ,g <

, g, ,

! TEM NO. . WELD CONFIGURATION i._ EXAM'. . . . .

I DIR 2. EFF.. .,e i EXM ROT- .EXAMIN ATION ME11tOD - TYPE' NONE ONLY DIN - COV. TOTAL LIMITA110N 2 18-lW-2031- MT 46.0 . . 54 0 LIM 11LD MT DUL TO COMPONINT C-C IPL1-IPL8 CONFIGURATION.

C3.20 IN5 SURF PIPE LUGS MT sN790 SYSTEM. l'EEDW ATER. PIPE LUGS (CLASS 2) 7 . LINE NOJSUBASSEMBLY. , , . -

9. . ,

<  ; , >- o CLASS L. .WELDIDENT1FICATION <

% COVERACE -

CATGY[ .WELDIDFIGURE E ' ' .

ITEM NO.1 WELD CONFICURATION ( EXAM .' . .

I DIR 2< . EFF. ( s , ,, ,'

EXM ROT \. EXAMINATION METHOD s TYPE' NONE ONLY Df R :' COV. TOTAL i  : LIMITATION 2 18-l'W 2032- MT dito - - 54 0 LIMll ED MI DUI.10 COMPONLNT CC IPL1-IPL8 CONrlGURATION C3 20 ILIV 7 SURI PIPL LUGS MT sostso SYS11.M Rt.SIDUAL HEAT REMOVAL PUMP LUGS (CLASS 2)

. LINE NOJSUBASSEMBLY v  ?

CLASS .WELDIDENTIFICATION ' ~ % COVFR ACE M M[.ib CA10Y ; . WELD ID FIGURE f , , . $ ,

., [ ' ,

IDIR ITEM NO. ' MT.LD CONF 1CURATION EXAM', 2'-- EIT. , .

r,XM ROT - EX AMIN ATION MFTHOD '- TYPE ~ NONE ONLY DfR . (XW. TOTAL LIMITAT10N : #

2 kHR PUMP 2A li 17 . 83 LIMI'lLD li DUL TO COMPONLNT C-C RHARHS-2A-IWAl CONFIGURATION C3 30 B RHRP-l SURF INT!.G WELDED ATTACH li 7s0600 SYSTEM RESIDUAL HEAT REMOV AL PUMP LUGS (CLASS 2)

-LINENOJSUBASSEMBLY -

CLASS WELDIDENTIFICATION V ' '

% COVERACE '

CATGY '2 ,WELDID FIGURE 7' ..

W, , -p [

ITEM NO' . WELD CONF 1CURATION' ? EXAM. 1 DIR 2 , EIT. -

CXM ROT . EX AMINATION Mt'THob TYPE- NONE ONLY DIR - COV. TOTAL -

LIMrrATION '

2 RHR PUMP 2A li 17 - - 83 LIMITLD li DUE 1O COCMPONENT CC RHARHS-2A-IWA2 CONFIGURATION C330 B RHRP-l SURF INTI.G WILDED ATTACH.

IT wms O

2-C-4

p ASME SECTION XI CODE COVERAGE LIMITATIONS k

1998 2RE06ISI SOUTH TLXAS PROJECT ELICTRIC GENERATING STATION, UNIT 2 AS%fE CATEGORY C.C SYSTEM. RLSIDUAL HEAT REMOVAL PUMP LUGS (CLASS 2) i I

} # i.% p' .% .l.INE N N Y;. . , , . jj , .y, ; _3%.. ,.

,, f y :. 4

- ;y t?g;;yg gg,, gy cggg .: -WEIA N110N J ' #f4 ~':'t00VERAGE1'd' <

'Y? <"% i CAIGY( .nm -*

r.'s ; . a J U , - , %i l

.A ],,. @$7. % 7N * + ,' '

t ITEM NO. = IWBABFIGUREj7G.k[!

4WEla(XIIWIGURATION ERAMf f 8 IMR 3 '~y , EFF, ,

k, 2*1 EXM ROT . EXAMINATION hW11tOD TYPE' NOME ONLY DER s (DV. 1TFIAL LIMITA110N ! '

2 RHR PUMP 2A PT 17 - -

83 LIMITLD IT DUL10 COMPONLNT CC RHARHS-2A-IWA3 CON}lGURATION.

C3 20 B-RHRP.1 SURF INTEG WELDED ATTACH YT 791610 M%f E CATEGORY C.F 1 SYSTEM CONTAINMENT SPRAY (CLASS 2) ,

1 LINE.NOAU8 ASSEMBLY; p- 4 c. . ,,...m,. s sa, s

...[

CLASS 7 W11DIllEN!1FICATRON > 3  % COVERAGE j# ., 5 <

CATUYf.. . WELD ID FIGURE 2 ...!' N ,,. C. , , c '.U Y'f [

M j '^ ' , . M[$ . n , , . 'a 7 ITEM NO,l . WELD (XINFIGURATION EXAM 7 ,[ t DIR 2; , EFF. ./"

EXM ROT . EXAMINATION ME1150D TYPE

  • NONE ONI,Y DBR - (.VV, TOTAL I '-
  • LIMITATION '

2 6-CS-230k 45 0 0 100 100 LIMITLD U145T ON VALVL SIDE DUE C-F- 1 12 45T 22 0 78 78 TO VALVf CONFIGURATION

- B-CS-4 89 IO SURF /VOL PIPE TO VALVE I"T/UT 42 n10 iT 0 100 AS%f E CATEGORY C-G SYSTEM: CONTAINMENT SPRAY PUMP 2A

%. . LINE NOAUBA!iSEMBLhp..  ; ,

, . _ . . , _ , . , , , ,.a e <

CLASSE

' % COVERAGE ' ^

d,.m 'E .,,M

.WEEE IDENTIFICATION ch l. - i CA1UYC -WELD ID FIGURE "*V V $ 4 y. ~g , '

- IS' <* '

  • @;j f; 't fil!M NO. . WELD 00NFIGURA110N'- EXAMr. .

1 DIR 2E EFF. t . '

af. '

EXM ROT $ EXAMIN ATION METHOD TYPPO ' NONE ONLY DIR " COV. T(FIAL LIMrFA110Ni ' -

2 CS PUMP 2A fi 39 5 - 60.5 LIMITLD Ff DUE1OiLOOR OBSTRUCrlONS C-G CIAPCS-2A-PCWI AT THREE LOCATIONS ALONG WELD.

C610 B-CSP 1 SURF FLANGE TO UPPER CASE li 750120 SYSTEM. LOW HLAD SAfTTY INJECTION PUMP 2A

. J, . . -LINE NOAUBASSEMBLY, . ,, _,

_.c . A g. ym ,

CLASS.I " .WEIA RIElfl1FICATIONi 5' ^?

.% COVERAGE' N *

  • i ~M '

.WELDIDFIGUREil l"M Ei '. . y i CA1UY L -

m- .. e . i E r. ? , '.~ g% .,

11D6 NO.i , WELD CONFIGURATION s ' EXAM / .-

I DIR 2i EIT. ,

4 S {f Q ] LigrJATION 5 ELM RGrr . ET AMINA110N METHOD TYPE- NONE ONIX DfR ' COY. 1TyrAL U 2 LJtSI PUMP 2A FT 26 8 - - 73 : LIMITLIWT DUt 10 FluuR OBSTRUCIf0NS C-G SIAPLH-2A-PCW1 ATTHREELOCAllONS ALI)NGWELD C610 BUIS!P-1

, SURF f1ANGE TO UPPER CASE 1sl120 b

2-C-5

,. , . = - ~ ' -,a.- -- .g__ - s .m-,--AA---. A & ._m_m,n+a.a .-on.a A,- . -,,-. -+na 4.-s. , a .,_n.aan.ame,. m.m.-m- sam--- 1-wa.s-.,m..amawa.,am -,ae ._u-1 l

l 4

APPENDIX 2-D OWNER'S REPORT FOR INSERVICE INSPECTIONS NIS 1 FORMS l l

l l

i l

t i

1998 ISI- 2RE06 - Welds (Class 1) Page 1 of 2 1' \

FORM NIS-1 OWNER'S REPORT INSERVICE INSPECTIONS  ;

l As required by the Provisions of the ASME Code Rules i U 1. Owner South Texas Project Nuclear Operating Comoanv*: P.O. Box 289: Wadsworrh. Texas 77483 (Name and Address of Owner)

2. Plant South Texas Proiect Electric Generating Station: P.O. Bpx 289: Wadsworth. Texas 77483 (Name and Address of Plant)
3. Plant Unit 2 4. Owner and Certificate of Authorization (if required) N.A.
5. Commercial Service Date 06/19/89 6. National Board Number for Unit N.A.
7. Components inspected ASME Code Class 1 (IWB) Items - Welds Program 1 I

Component or Manufacturer or Manufacturer or State or National  !

Appurtenance Installer Installer Serial No. Province No. Board No. l Reactor Pressure Combustion l Vessel Engineering / >

Westinghouse (M) 12173 N. A. 22391 I l Steam Generator j 2C Westinghouse (M) 2153 N. A. 31 l Class 1 Piping Ebasco (I) N. A. N. A. N. A.

Reactor Coolant 1080- I Pump 2A Westinghouse (M) 1163E26G01-14 N. A. 46 I Reactor Coolant 1081- l Pump 2B Westinghouse (M) 1163E26G01-14 N. A. 47 l Reactor Coolant 1082- l

\ Pumr 2C Westinghouse (M) 1163E26G01-14 N. A. 48 l Reactor Coolant 1083-Pump 2D Westinghouse (M) 1163E26G01-14 N.A. 49 Class 1 Valves Ebasco (I) N. A. N. A. N. A.

  • South Texas Project Nuclear Operating Company JTPNOC)is the licensed operator of the South Tex - ject Electric Generating Station STPNOC bydXbh Date/A$Jlo g_Arkwright Mutual by - ._ . as Date N'N R.L.Beverl Insurance Co. B.R.Rmell.ANII 2-D-1

1998 ISI- 2RE06 - Welds (Class I) Page 2 of 2 FORM NIS-1 (Back)

8. Examination Dates 09/21/98 to 10/23/98 9. Inspection Interval from 06/19/89 to 10/18/00
10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval. (ASME Code Class 1 (IWB) Items - Welds Program)

See Section 2.2 of the 2RE06 Summary Report for list of examinations performed. The examinations performed this outage constitute 13% of the required examinations for the current interval. The cumulative percentage completed for the intervalis 80%.

I1. Abstract of Conditions Noted.

None.

12. Abstract of Co:Tective Measures Recommended and Taken.

None.

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of ASME Code,Section XI.

Certificate of Authorization No.(if applicable) N.A. Expiration Date N.A.

Date /A '30 19f8 Signed South Texas Project Nuclear Operatine Company t_

Owner By R.$f'Beverly L

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by Arkwricht Mutual Insurange Co. of Waltham.

Mass have inspected the components described in this Owner's Report during the period 09/21/98 to J0/23/98, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASMECode,Section XI.

By signing this cenificate neither the Inspector nor his employer makes any warranty, express or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

_2 h Commissions Tex 826 Inspector's Signature National Board, State Province, and Endorsements B. R. Russell Date /'4-19_@f 9

2-D-2

1998 ISI- 2RE06 - Welds (Class 2) Page 1 of 2 FORM NIS 1 OWNER'S REPORT INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

> \

1. Owner South Texas Proiect Nuclear Operating Company *: P.O. Box 289: Wadsworth. Texas 77483 (Name and Address of Owner)
2. Plant , South Texas Proiect Electric Generating Station: P.O. Box 289: Wadsworth. Texas 77483 ,

(Name and Address of Plant) t j 3. Plant Unit 2 4. Owner and Certificate of Authorization (if required) N.A.

5. Commercial Service Date 06/19/89 6. National Board Number for Unit N.A.
7. Components Inspected ASME Code Class 2 (IWC)Il-ms - Welds Progrc.m

! Component or Manufacturer or Manufacturer or State or National Appurtenance Installer Installer Serial No. Province No. Board No.

Class 2 Piping Ebasco (I) N. A. N. A. N. A.

Residual Heat Removal Pump 2A Pacific Pumps (M) 51734 N. A. 363 High Head Safety Injection Pump 2A Pacific Pumps (M) 51698 N. A. 400 Low Head Safety injection Pump 2A Pacific Pumps (M) 51704 N. A. 460 Containment Spray Pump 2A Pacific Pumps (M) 51710 N.A. 454

' t

%/

l l

l l

. l t 1 l

l l

  • South Texas Project Nuclear Operating Company (STPNOC)is the licensed operator of the South Te oject Electric Generating Station j p

S7PNOC by khod Date /.130 7dArkwright Mutual by _ udu Date b R!L.Beverly Insurance Co. B.R. Russell,ANIl j

2-D-3 1

1998 ISI- 2RE06 - W: Ids (Class 2) Page 2 of 2 FORM NIS 1 (Back)

8. Examination Dates 09/18/98 to 10/13/98 9. Inspection Interval from 06/19/89 to 10/18/00 l
10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval. (ASME Code Class 2 (IWC) Items Welds Program)

See Section 2.2 of the 2RE06 Summary Report for list of examinations performed. The examinations performed this outage constitute 23% of the required examinations for the current interval. The cumulative percentage completed for the interval is 85%.

I1. Abstract of Conditions Noted.

None.

12. Abstract of Corrective Measures Recommended and Taken.

None.

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of ASME Code,Section XI.

Certificate of Authorization No.(if applicable) N.A. Expiration Date N.A.

Date _/_j42 197f_ Signed South Texas Project Nuclear Operatine Company #d.u /,

Owner By R.(lBeverly L

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by Arkwricht Mutual Insurance Co. of Waltham.

Mgss._ have inspected the components described in this Owner's Report during the period 09/18/98 to 10/13/98.

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, express or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

sllU Commissions Tex 826 Inspector's Signature National Board, State, Province, and Endorsements B. R. Russell Date /-6-19N O

2-D-4

i

] 3.0 COMPONENT SUPPORT EXAMINATIONS

(~J

\.

3.1 Introduction ISI of Class 1,2, and 3 component supports and Class 3 integral attachments of STPEGS-2 was performed between December 1,1997 and October 17,1998. These examinations constitute the sixth ISI (the first ISI of the third period) of the first inspection interval for the Component Supports Examination Program for STPEGS-2. j 1

This Section of the Summary Report documents the examinations of component suppons performed by STPNOC Q-NDE and contractor NDE personnel in accordance with the following  ;

l documents: )

(1) STPNOC Specification SUO36]S0004," Inservice Inspection Examination of Component Supports of South Texas Project Electric Generating Station, Unit 2, First Inspection Interval",

)

(2) " Examination Plan for the 1998 - 2RE06 Inservice Inspection of Welds and Component Supports at the South Texas Project Electric Generating Station, Unit 2 ", including changes made during the outage (Outage Plan).  !

l The STPNOC Specification provides a detailed description of the rules for exemption and selection of Class 1,2, and 3 component supports for ISI. The 1998 Examination Plan is an

(]v individual Outage Plan for implementing ISI component support examinations as designated in the STPNOC Specification.

3.2 Scope of Examinations I

A total of two hundred and ten (210) component suppons were visually examined during 2RE06.

Cla.mj Twenty seven (27) Class ! piping supports and one (1) Class 1 equipment support were examined in the following systems:

Piping Equipment Chemical & Volume Control (CV) 5 0 Reactor Coolant (RC) 14 1 Residual Heat Removal (RH) 6 0 Safety Injection (SI) 2 0 l

i l

U 3-1 i

Class 2 Seventy one (71) Class 2 piping supports and four (4) Class 2 equipment support were examined in the following systems:

Eiping Equipment Auxiliary Feedwater (AF) 8 0 Containment Spray (CS) 7 1 Feedwater (FW) 3 0 Main Steam (MS) 4 0 Residual Heat Removal (RH) 16 1 Safety Injection (SI) 33 2 Clas13 Ninety (90) Class 3 piping supports and seventeen (17) Class 3 equipment supports were examined in the following systems:

Eiping Equipment Auxiliary Feedwater(AF) 17 0 Chemical & Volume Control (CV) 0 1 Component Cooling (CC) 59 3 Diesel Generator Aux. Skid (DG) 0 1 Diesel Generator Jacket Water (JW) 0 3 Diesel Generator Lube Oil (LU) 0 6 Diesel Starting Air (SD) 0 1 Essential Cooling Water (EW) 13 2 Reactor Make-Up Water (RM) 1 0 A complete list of component supports examined during 2RE06 is contained in Appendix 3-A.

These examinations constitute the following percentages of completion for Class 1,2, and 3 component supports:

Cumulative 2RE06 (1st Interval)

Class 1 (IWF) 33 % 92 %

Class 2 (IWF) 34 % 97 %

Class 3 (IWF) 35 % 99 %

O 3-2

. ~ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _

l i

'v 3.3 Personnel and Procedures 3.3.1 Personnel Qualifications l 1

h Component supports were visually examined (VT-3 and VT-4) by STPNOC Q-NDE and ,

contractor NDE personnel. STPNOC NDE personnel were certified in accordance with ASME  :

Section XI (IWA-2300) and STPNOC Nondestructive Examination Procedure OPQP05-ZA-0001 (Rev.1)," Qualification and Certification of Nondestructive Examination Personnel". Contractor NDE personnel were cenified in accordance with ASME Section XI (IWA-2300) and their l employer's written practice, which was approved by STPNOC.

l  :

1 3.3.2 Examination Procedure Visual (VT-3 and VT-4) examinations of component supports were performed in accordance with OPQP05-ZA-0023 (Rev.1), " Visual Examination of Component Supports for ASME XI Inservice l Inspection".

l 3.4 Summary of Examinations One hundred and eighty eight (188)' piping supports and twenty two (22) equipment supports were examined prior to or during 2RE06 as shown in Appendix 3-A. p O 3.4.1 Examination Results and Corrective Actions The visual examinations performed on component supports during 2RE06 did not reveal any  ;

relevant conditions. Therefore, no corrective actions were required. .

3.4.2 Add'itional and Successive Examinations The results of the visual examinations of component supports performed during 2RE06 did not require that any additional examinations (IWF-2430) be performed or any successive

! examinations (IWF-2420) be scheduled.

l 3.5 Cenification ofInspections l

Section XI NIS-1 forms, " Owner's Report for Inservice Inspections", have been prepared to cenify the STPEGS-2 component support ISI examinations described in this section of the Summary Report. The STPEGS-2 component support ISI examinations have been certified by our ANII, Arkwright Mutual Insurance Company, on the NIS-1 forms included in Appendix 3-B.

tO i

3-3

- - - . - - . ~ . . . . - - . - - . _ . . . _ . - . . - - - . . _ - . .

APPENDIX 3 A

SUMMARY

OF EXAMINATIONS EXAMINATION RESULTS LEGEND C Examination for Section XI Scheduling Credit i

I i

1

[ ..

{ :-

I s

)

1.-

i-i.

1 DATE: 12/30/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 1 REVISION: 0 INSERVICE INSFECTION PLAN . 2RE06 SUPPORTS

/' FIRST INTERVAI% THIRD PERIOD, FIRST OUTAGE (98RF)

) CLASS 1 SECTION XI COMPLETE COMPONENTS CHEMICAL &VOLtHE CONTPOL 1 N O ASME O G T SEC XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDUliE C M R *

  • CALIBRATION BLOCK" 4.CV-2001-BB1-B .

100000 CV-2001.HL5001 PIPING-1 VT-3 ZA-0023 R1 C . . EXAMINED WHEN FILLED.

SH V . VT-4 ZA-0023 R1 C . .

2 -CV- 2121 - BB 1 - B 1 A1 200500 CV-2121-HS5005 PIPING.1 VT-3 ZA-0023 R1 C - .

GUIDE .

2-CV-2128-BB1-B-Al f% *01400 CV 2128-HS5001 PIPING-1 VT.3 ZA-0023 R1 C - -

%- gg .

2-CV-2128-BB1-BA2 101500 CV-2128-HS5003 PIPING-1 VT.3 ZA.0023 R1 C . -

U-BOLT -

2-CV-2141-BB1-A-Al 101600 CV-2141 HS5003 PIPING-1 VT.3 ZA-0023 R1 C - . EXAMINED WHEN FILLED.

SH-V -

VT-4 ZA-0023 R1 C . .

/O f

Nj

DATE: 12/30/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STRTION UNIT 2 PAGE: 2 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 1 SECTION XI COMPLETE COMPONENTS PFACTOR COO! ANT 1 N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION ARFA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

12-PC-2112-PB1-C 103400 RC-2112-HL5001 PIPING-1 VT-3 ZA-0023 El C - -

RR -

12-RC-2125-BB1-B 103700 RC-2125-HL5003 PIPING-1 VT-3 ZA-0023 R1 C -

R2 -

12-RC-2125-PB1-D

'04000 RC-2125-HL5007 PIPING-1 VT-3 ZA-0023 R1 C - - EXAMINED WHEN FILLED.

SH-V - VT-4 ZA-0023 R1 C - -

{-RC-2003 BB1-A 105700 RC-2003-RR07 PIPING-1 VT-3 ZA-0023 R1 C - -

RR -

4-PC-2000-PB1-A 106600 RC-2000-RR01 PIPING-1 VT-3 ZA-0023 R1 C - -

GUIDE - j l

,4 PC-2000-PP1-B l

106700 RC-2000-SH02 PIPING-1 VT-3 ZA-0023 R1 C - - EXAMINED WHEN FILLED, SH-V - VT-4 ZA-0023 R1 C - -

0 l l

DATE: 12/30/98 SOUTH TEXAS PROJECT E'2CTRIC GENERATING STATION UNIT 2 PAGE: 3 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS FIRST INTERVAL, THIRD PTRIOD, FIRST OUTAGE (98RF)

-'\

( CLASS 1 SECTION XI COMPI/frE COMPONENTS PEAC"f0R COOIJNT 1 N O ASME O G T SEC. XI R E H

SUMMARY

Ir:XAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCFDURE C M R ** CALIBRATION BLOCK **

4-RC-2123-BB1-A 106900 RC-2123-RR01 PIPING-1 VT-3 7.A-0023 R1 C . .

RR .

4-RC-2123-BB1-E 107700 RC-2123-RR05 PIPING.1 VT-3 ZA-0023 R1 C - .

RR .

107800 RC-2123-RR06 PIPING-1 VT-3 ZA-0023 R1 C - .

RR i

n .

L

\

4-RC-21p-BB1-F 107900' RC-2123-HL5008 PIPING-1 VT.3 ZA-0023 R1 C . . EXAMINED NHEN FILLED.

SH-V . VT.4 ZA-0023 R1 C . .

4-PC-2123-BB1-H 108400 RC-2123-RR09 PIPING-1 VT-3 ZA-0023 R1 C - -

RR .

108500 RC-2123-RR10 PIPING-1 VT-3 ZA-0023 R1 C . .

RR .

4-PC-2320-PB1J 108700 RC 2320-HII.003 PIP 7NG-1 VT-3 ZA-0023 R1 C . . EXAMINEO NHEN FILLED.

[ SH-V - VT-4 ZA-0023 R1 C - .

Q)

DATE: 12/30/98 SOITrH TEKAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 4 REVISION: 0 INSERVICE INSPECTION PIAN - 2EE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OWAGE (98RF)

CLASS 1 SECTION XI COMPLETE COMPONENTS REACTOR COOIANT 1 N O ASME O O T SEC. XI R E H

SUMMARY

EKAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

.--.... --...---...---...--..-- -.- .- --..... - . - - - - - - - - ~ - - - - - - - . - - - - - - - - - . ---.---------- -------------------------

2-PC-2121-BB1-A-A 110700 RC-2121-HS5002 PIPING-1 VT-3 ZA-0023 R1 C - - EKAMINED WHEN FILLED.

SH-V - VT-4 ZA-0023 R1 C - -

O 1

O i

1

DATE: 12/30/98 SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 2 PAGE: 5 REVISION: 0 INSERVICE INSPECTION PIAN . 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

[

( RESTDUAL HEAT PEMOVAL 1 CIASS 1 SECTION XI COMPLETE COMPONENTS N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

12-PH 2201-BB1-p 112300 RH-2201-RR06 PIPING-1 VT-3 ZA-0023 R1 C . -

  1. R
  • 12-PH-2201-BB1-B 112400 kH-2201-HL5010 PIPING-1 VT-3 ZA-0023 R1 C . . EXAMINED WHEN FILLED.

SH-V - VT-4 ZA-0023 R1 C . -

112500 kH-2201-RR04 PIPING-1 VT-3 ZA-0023 R1 C - -

RR -

O) v

  1. 12-RH-2201-PB1-D 112700 RH.2201-SH01 PIPING-1 VT.3 ZA-0023 R1 C - - EXAMINED WHEN FILLED.

SH-V - VT-4 ZA-0023 R1 C . -

l l

RH-2208-0B1-9 l

113900 RH-2208-HL5001 PIPING-1 VT-3 ZA-0023 R1 C - - j RR .

l 114000 RH-2208-RR01 PIPING-1 VT-3 ZA-0023 R1 C . - l RR .

i V['N

SOtTTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 3 PAGE: 6 DATES 12/30/98 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OtJIAGE (98RF)

CIASS 1 SECTION XI COMPLETE COMPONENTS .

SAFETY INJECTION 1 N O ASME O G T SEC. XI R E E

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

8 4I-22 08 -BB1 -B 115600 SI 2208-HL5001 PIPING-1 VT-3 ZA-0023 R1 C . .

RR -

115700 SI.2208-HL5002 PIPING-1 VT.3 ZA-0023 RI C . . EXAMINED WHEN FILLED.

SH-V - VT-4 ZA-0023 R1 C . .

O i

O'

.. . ,- - a . .. . , . _ , . . - . - . _ . - ~ _ .. . .- - ..

SotTrH TEXAS PROJECT ELECTRIC OENERATING STATION UNIT 2 PAGE: 7 DATE: 12/30/98 REVIft0N: 0 INSERVICE INSPEC"IION PLAN . 2RE06 SUPPORTS

/% FIRST INTERVAL, THIRD PERIOD, FIRST OtTIAGE (98RF)

CLASS 1 SECTION XI COMPLETE COMPONENTS i REACTOR COOLANT 1 ,

N O ME O G T SEC. XI R E H CIM1ARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK ** r r

L 19132NPP201B i 120200 RPCIB EQUIP-1 VT-3 2.A-0023 R1 C - . THE COLUMN SUPPORT IDCATED NEAREST THE

  • RC PUMP COL - STEAM OENERATOR COLUMN SUPPORT ON RCP 2B,

.i I

a l

e O  !

I i

l 1

I g  !

l-

%_J

I DATE: 12/30/98 SOUTH TEXAS POOJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 8 i i

~

REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 2 SECTION XI COMPLETE COMPONENTS AUX 1LIARY FEEDWATFR 2 N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **


~~--------------------------

8-AF-2012-GA2 d 304800 AF-2012-HL5002 PIPING-2 VT-3 ZA-0023 R1 C - -

RR -

B-AF-2012-GA2-D 204900 AP-2012-HL5004 PIPING-2 VT-3 ZA-0023 R1 C - -

RR -

305000 AF-2012-HL5005 PIPING-2 VT-3 ZA-0023 R1 C - -

RR -

O 305100 AF-2012-HL5025 PIPING-2 VT-3 ZA-0023 R1 C - -

RR -

8-AF-2012-GA2-H 306100 AF-2012-HL5011 PIPING-2 VT-3 ZA-0023 R1 C - -

RR -

6-AF-2012-GA2-J 306300 AF-2012-EL5015 PIPING-2 VT-3 ZA-0023 R1 C - - EXAMINED WHEN FILLED.

SH-V - VT-4 ZA-0023 R1 C - -

4-AF-2012-GA2-L 308700 AF-2012-HL5035 PIPING-2 VT-3 ZA-0023 R1 C - - EXAMINED WHEN FILLED.

SH-V -

VT-4 ZA-0023 R1 0 - -

i

m.... . . _ . . - . _ . _ _.

__ .__..m._ _ _ _ . , _ - - - .

l DATE: 12/30/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 9 REVISIONS 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS

/

/* FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF) ,

CLASS 2 SECTION XI COMPLETE COMPONENTS AUXILIARY FEEDWATER 2 N O ME O G T ]

SEC. XI R E H SUP91ARY EXAMINATION AREA CATGY EXAM E O E REMARKS l NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

l 4-AF.2012-GA2-L l l

204800 AF.2012.HL5036 PIPING.2 VT.3 ZA-0023 R1 C . -  !

1 CUIDE .

l i

i 1

k n

]

l i

l

DATES 12/30/96 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 3 PAGE 10 REVISION: 0 INSERVICE INSPECTION PUJf . 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

I CLASS 3 SEC"rICN XI COMPLETE COMPONENTS CONTAINMTNT SPPAY 2 N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK'*

12-CS-2301-UB2-A 213300 CS-2301.HL5002 PIPING-2 VT-3 ZA.0023 R1 C - -

ER

  • 312400 CS.2301.RR02 PIPING-2 VT-3 ZA-0023 R1 C . -

RR .

8-CS-230f-PB2-C 214600 CS-2302-SHO3 PIPING-2 VT-3 ZA 0023 R1 C - . EXAMINED WHEN FILLED.

SH-V . VT-4 ZA-0023 R1 C - .

O 6-CS-2303-PB2-AA 216900 CS-2303-HL5001 PIPING-2 VT-3 ZA-0023 El C - -

RR .

6-CS-2303 PB2-C 217100 CS.2303-HL5004 CIPING-2 VT.3 ZA-0023 R1 C - -

RR -

l l

217200 CS-2303-HL5005 PIPING-2 VT-3 ZA-0023 R1 C . -

RR .

317300 CS-2303-HL5006 PIPING-2 VT-3 ZA-0023 R1 C . .

GUIDE .

O

I r ,

! l

(' PAGEs 11 i DATE: 12/30/98 SOLTTH TEXAS PROJEC"T ELECTRIC OENERATING STATION UNIT 2

! REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 SUPPORTS i FIRST INTERVAL, THIRD PERIOD, FIRST OtTTAGE (98RF)

CLASS 2 COMPLETED COMPONENTS l

i FEED WATER 2

+

l N O I

ASME O a T  !

SEC. XI R E H l '

S'JMMARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

j

....... .............................. ....... .......... ............... I t

i 18-FW-2016-CA2-C i

I 220100 FW-2 016-HL5 012 PIPING-2 VT-3 ZA-0023 R1 C - -

- 1 RR i

1 l I I

I 220200 FW-2016-ML5015 PIPING-2 VT-3 ZA-0023 El J - -

RR -

1 i

18-FW-2016-CA2-K 220700 FW-2016-SH01 PIPING-2 VT-3 ZA-0023 R1 C + - EXAMINED WHEN FILLED.

,a SH-V - VT-4 ZA-0023 R1 C - - {

l I

l l

l l

I I

\.w) l l

l

_ . - . m

DATE: 12/30/98 SOUTH TEXAS PRCATECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 12 REVISION: 0 INSERVICE INSPECTION PLAN 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST GUTCR (98R?i f CLASS 2 SECTION XI COMPLETE COMPONEN78 MAIN STE M 2 N G ASME O G T SEC. XI R E H SUf94ARY EXAMINATION AREA CATGY EXAM E O E REKARKS NLHBER IDE2frIFICATION ITEM NO METHOD PROCEDURE C M R *

  • CALIBRATION BLOCK" 30-MS-2003-GA2-C 335800 MS-2003-HL5008 PIPING-2 VT-3 ZA-0023 R1 C . -

SH.V (2) - VT-4 ZA.0023 R1 C - -

30-MS-2003-GA2-D 226000 MS-2003-HL5006 PIPING-2 VT-3 ZA-0027 R1 C . -

RR -

30-MS-2003-GA2-E 16300 MS-2003-HL5005 PIPING-2 VT-3 ZA-0023 R1 C - -

GUIDE -

8-MS-2104-GA2-D 228800 MS-2104.HL5002 PIPING-2 VT-3 ZA-0023 R1 C - -

SH-V -

VT-4 ZA-0023 R1 C - -

O l

O

,. . - - --, -- ... . - . . . . .-. . , . - . . ~ . -. - . . . . - - - - - . . . _ , - _ .

DATE: 12/30/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 13 REVISION: 0 INSERVICE INSPECTION PIAN . 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OITIAGE (98RF)

- (,) CIASS 2 SECTION XI COMPLETE COMPONENTS RESTDUAL FEAT PEMOVAL 2 r

N O ASME O G T SEC. XI R E H ,

SIM1ARY EXAMINATION AREA CATCY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R " CALIBRATION BLOCK **

12-RH-2102-KB2-A

'229400 RH-2102.SH01 PIPING-2 VT-3 ZA-0023 R1 C . - EXAMINED WHEN FILLED.

SH-V - . VT.4 ZA-0023 R1 C . .

E 12-PH-2304-EP2-A 229800 RH-2104.RR01 PIPING-2 VT-3 ZA-0023 R1 C . .

RR .

8-RH-2103-KB2-A A

'31300 RH-2103-RR09 PIPING-2 VT-3 ZA-0023 R1 C ., -

RR .

8-RH-2103-KB2-E 232400 KH-2103-SH05 PIPING-2 VT-3 ZA-0022 R1 C . . EXAMINED WHEN FILLED.

SH-V . VT-4 ZA.0023 R1 C . -

8-RH-2106-FB2-A 233000' RH-2106-ML5003 PIPING-2 VT-3 ZA-0023 R1 C . .

ANCHOR -

1 233100 RH-2106-SH01 PIPING-2 VT-3 ZA-0023 R1 C . - EXAMINED WHEN FILLED.

SH V . VT-4 ZA-0023 R1 C . -

8-PH-2110-rP2-B t

3800 Rib 2110 HL5004 PIPING-2 VT 3 ZA-0023 R1 C . -

A,cHoR .

t l

DATE: 12/30/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE 14 l

REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 2 SECTION XI COMPLETE COMPONENTS PESIDUAL MEAT FFMOVAL 2 N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CAMY EXAM E O E REMARKS NUMDER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION B'RK**

8-PH-2110-YD2-C i

233000 RH-2110-ML5003 PIPING-2 RVT.3 ZA-0023 R1 C - .

GUIDE -

8-RH-2204.FB2-D 236000 RH-2204-RR07 PIPING-2 VT-3 ZA-0023 R1 C . .

RR -

8-RH-2204-KB2-E

'16100 RH-2204-HL5008 PIPING-2 VT.3 ZA-0023 R1 C - -

RR -

8-PH-2204-KB2-F 336200 RH-2204-ML5009 PIPING-2 VT-3 ZA-0023 R1 C . .

RR -

8-RH-2204-KB2-J 236600 RX-2204-HL5002 PIPING-2 VT-3 ZA-0023 R1 C ~ -

RR .

8-RM-2205-rB2-A 337100 RH-2205-ML5014 PIPING-2 VT-3 ZA-0023 R1 C . -

M .

l 1

l O

l l

l

\

i

l DATE: 12/30/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 15 REVISION: - 0 INSERVICE INSPECTION PLAN - 2RE06 SUPPORTS TIRST INTERVAL. THIRD PERIOD, FIRST OUTAGE (98RF)

, CLASS 2 SECTION XI COMPLETE COMPONENTS PESIDUAL HEAT REMOVAL 2 N O A3ME O G T SEC. XI R E H SIM4ARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

l l

8-RH-22n5-KB2-C 237300 RH-2205-HL5001 PIPING-2 VT-3 ZA-0023 R1 C . -

GUIDE -

8-RN-2205-KB2-DD 237900 RH-2205-HL5006 PIPING-2 VT-3 ZA-0023 R1 C - -

GUIDE .

l l

8-RM-2205-KB2-E A.

l, 'i RH-2205-HL5009 PIPING-2 VT-3 ZA-0023 R1 C . -

( d )'38000GUIDE

. t l

l I i

I l

1 l

i l

II i

i f

l i

l i.

r-i 9

sot 7nt TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 16 DATE: 12/30/98 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OITTAGE (98RF)

CLASS 2 SECTION XI COMPLETE COMPONENTS SAFETY INJECTION 2 N O ASME O G T SEC, XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

NUMBER IDENTIFICATION l

24-SI-2101-UB2-F 344800 'SI-2I01.RR18 PIPING-2 VT.3 ZA.0023 R1 C - -

RR 1

844900 SI-2101-RR19 PIPING-2 VT-3 ZA-0023 R1 C - -

RR 24-SI-2101-t92-HA 245100 SI-2101-HL5016 PIPING-2 VT-3 ZA-0023 R1 C - -

RR

  • O 70-SI-2101-US2-JA 245200 SI-2101-RH21 PIPING-2 VT-3 ZA-0023 R1 C - -

RR

  • 8-SI-2102-PB2-C 254900 SI-2102 SH09 PIPING-2 VT-3 ZA.0023 R1 C - - EXAMINED WHEN FILLED.

SH-V - VT-4 ZA-0023 R1 C - -

9-SI-2105-KB2-B 255400 SI-2105 ML5004 PIPING-2 VT-3 ZA-0023 R1 C - . EXAMINED WHEN FILLED.

SH-V - VT-4 ZA-0023 R1 C - -

8.SI-2105-KB2-L

.7100 SI-2105-RR33 PIPING-2 VT-3 ZA-0023 R1 C - -

RR -

- .. - - - . -- - ~ _ . .- - ... - _- - . . . - _ _ . ~ , - + - . 2 . .

DATE: 12/30/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 P'GE:

A '17 REVISION: 0 INSERVICE INSPECTION PIAN . 2RE06 SUPPORTS (s-D)

FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RP)

CLASS 2 SECTION XI COMPLETE COMPONENTS SAFETY INJECTION 2 N O ASME O G T SEC.'XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURF C M R ** CALIBRATION BIDCK**

8-SI-2105-KB2-M 257200 SI-2105-RR34 PIPING-2 VT-3 ZA-0023 R1 C . -

RR -

'8-SI-2105-KB2-P.

'i 257400 SI-2105-RR36 PIPING-2 VT-3 ZA-0023 R1 C - -

RR -

257500 SI-2105-RR37 P4 PING-2 VT-3 ZA-0023 R1 C - -

RR -

8-SI-2105-KB2-R 257600 SI-2105-RR38 PIPING-2 VT-3 ZA-0023 R1 C - -

GUIDlc -

s t

- 257700 SI-2105-RR40 PIPINO-2 VT-3 ZA-0023 R1 C - - .

RR -

8-SI-2105-KB2-S 257900 SI-2105-RR41 PIPIN3-2 VT-3 ZA-0023 R1 C - -

GUIDE .

!' 8-SI-2105-FB2-T i

258000 SI-2105.SH42 PIPING-2 VT-3 ZA-0023 R1 C - - EXAMINED WHEN FILLED.

x SH-V (2) - VT-4 ZA-0023 R1 C - -

i I'

i

DATE: 12/30/96 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATIO24 UNIT 2 PAGE: 18 REVISION: 0 INSERVICE INSPECTION PIAN - 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FI?G? Ot7tAGE (98RF)

CLASS 2 SECTION XI COMPLETE COMPONENTS SAFETY INJEf'rION 2 N O ASME O O T SEC. XI R E H SIM4ARY EXAMINATION AREA CA'1VY EXAM E O E REMARKS NUMBER IDE!!TIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

6-SI-2106-DB2-D 363900 SI-2106-HL5011 PIPING-2 VT-3 ZA-0023 R1 C . .

RR .

354000 SI.2106-HL5013 PIP 1NG-2 VT.3 ZA-0023 R1 C . .

GUIDE .

6-SI-2106-DB2-E 264100 SI-2106-RH06 PIPING-2 VT-3 ZA-0023 R1 C - .

RR .

O 6-SI-2106-DB2-P 264200 SI-2106.HL5006 PIPING-2 VT-3 ZA-0023 R1 C . -

RR .

264300 SI.2106-RH05 PIPING-2 VT-3 ZA-0023 R1 C . .

RR -

364400 SI-2106-RR04 PIPING-2 VT-3 ZA-0023 R1 C . -

RR .

6-SI-2106-DB2-M 365500 SI-2306-MLG010 PIPING-2 VT-3 ZA-0023 R1 C - -

RR .

O

I DATE: 12/30/98 SOffrH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 19 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS

[q FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 2 SECTION XI COMPLETE COMPONENTS SAFETY INJEC" TION 2 N O ASME O O T SEC. XI R E H SUM 4ARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R **CALIBRJ. TION BLOCK **

6-ST-2106-DB2-M -

255600 SI*2106-RH64 PIPING.2 VT.3 ZA-0023 R1 C . .

RR! .

s 265600 SI-2106.RR67 PIPING-2 VT.3 ZA-0023 R1 C . .

RR .

6-SI-2104.DB2-N 1

266100 SI.2106-RR60 PIPING.2 VT 3 ZA.0023 R1 C . .

g RR -

J 266200 SI-2106-RR61 PIPING-2 VT.3 ZA-0023 R1 C . .

RR -

6-SI 2106-DB2+R

'267400 SI.2106.SS53 PIPING-2 VT.3 ZA-0023 R1 C - .

RR .

6-SI-2106-DB2-T 257700 SI-2106-SH80 PIPING-2 VT.3 ZA-0023 R1 C - .

RR .

6.SI-2107-BB23 267800 SI 2107.SS59 ' PIPING 2 VT.3 ZA-0023 R1 C - .

\ GUIDE .

DATE: 12/30/96 SOITTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 30 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 2 SECTION XI COMPLETE COMPONENTS SAFETY INJEC* TION 2 N O ASME O G T r SEC. XI R E H (LNMARY EXAMINATION AREA CAM 1r EXAM E O E REMARKS tcJMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C H R ** CALIBRATION BLOCK **

6-SI.2109-DB2-B 368000 SI.2109-HL5003 PIPING-2 VT.3 ZA-0023 R1 C .

GUIDE -

358100 SI-2109-HL5005 PIPING-2 VT.3 ZA-0023 R1 C . -

RR .

6-SI-2110-BE2-A 268400 SI-2110-HL5001 PIPING-2 VT-3 ZA-0023 R1 C - .

RR -

2 2SI-2106-DB2-CA1 378000 SI.2106-HF5014 PIPING-2 DVT-3 ZA-0023 R1 C . -

RR -

2-SI-2106-DB2-DA1 376100 SI.2106-HS5001 PIPING-2 VT-3 ZA-0023 R1 C - .

GUIL2 .

9

bht 2s 12/30/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 21 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OITTAGE (98RF)

CLASS 2 SECTION XI COMPLETE COMPONE!frS .

1 '

CONTAINMENT SPRAY 2 N O ASME O O T SEC. XI R E N

SUMMARY

EXAMINATION AREA CAWY EXAM E O E REMARKS

. NUMBER IDENTIFICATION ITEM NO METHOD PROCED*JRE C M R ** CALIBRATION BLOCK **

2NIO2NPA201C 282900 CSIC. EQUIP-2 VT-3 ZA-0023 R1 C . - SINGLE BASE SUPPORT ON CS PUMP 2C.

CS CS PUMP .

i 1

/ .

SOtTTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE 22 LATE: 12/30/98 REVISION: 0 INSERVICE INSPECTION PIJJi . 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 2 SECTION XI COMPLETE C M DONENTS MAL HEAT PD40 VAL 2 N O ASME O G T SEC. XI R E H SID1 MARY EXAMINATION AREA CATGY EXAM E O E REM.\RFJ ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BIOCK**

NUMBER IDENTIFICATION 2P!62NPA201A EQUT?-2 VT-3 ZA-0023 R1 C . - THE BASE SUPPORT STRUCTURE ON RHR PUMP 383900 RHP1A RH PUMP SUPT . 2A.

O O

i DATE: 12/30/98 SOITIH TEXAS PROJECT ELECTRIC GENI:kATI% STATION UNIT 2 PAGE: 23 REVISION: 0' INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS C PIRST INTERVAL, THIRD PERIOD, FIRST OITTAGE (98RP)

CLASS 2 SECTION XI COMPLETE COMPONENTS SAFETY INJECTION 2 N O ASME O G T SEC. XI R E H StM4ARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

2N122NPA201A 284200 HH1A EQUIP 2 VT-3 ZA.0023 R1 C . . SINGLE BASE SUPPORT ON HHSI PUMP 2A.

SI HH PUMP -

2N122NPA202A 284500 LHIA EQUIP-2 VT.3 ZA-0023 R1 C . . SINGLE BASE SUPPORT ON LHSI PUMP 2A.

SI LH PUMP .

\

XJ

\

f DATE: 12/30/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 24 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF) 1 CLASS 3 SECTION XI COMPLETE COMPONENTS AUXILIARY FEFDWATFR 3 N O ASME O C T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REVARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

12-AF-2054-WA3-E 300000 AF.2054-HL5001 PIPING-3 VT.3 ZA.0023 R1 C . -

RR .

300200 AF-2054-HL5003 PIPING-3 VT-3 ZA-0023 R1 C - - EXAMINED WHEN FILLED.

SH-V (2) -

VT-4 ZA-0023 R1 C . .

32-AF-2054-WA3-H .

300500 AF-2054-HL5007 PIPING-3 VT-3 ZA-0023 R1 C . - EXAMINED WHEN FILLED, SH-V (2) -

VT-4 ZA-0023 R1 C . -

O 8-AF-2079-WB3-C 303200 AF-2079-HL5001 PIPING-3 VT-3 ZA-0023 R1 C . -

GUIDE -

0-AF-2079-WB3-D 303300 AF-2079-ML5002 PIPING-3 VT-3 ZA-0023 R1 C . .

GUIDE .

4-AF-2047-GA3-0 312300 AF-2047-ML5004 PIPING.3 VT-3 ZA-0023 R1 C - -

GUIDE .

4 - AF- 2 04'l-GA3 -J

.2500 AF-2047-HL5005 PIPING-3 VT-3 ZA-0023 R1 C - -

GUIDE .

DATE: 12/30/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 25 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 SUPPORTS h; FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF) q CLASS 3 SECTION XI COMPLETE COMPONENTS AUXILIARY FFETWATER 3 N O  !

ASME O G T SEC. XI R E H SUlHARY EXAMINATION AREA CATGY EXAM E O E REMARFJ NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK'*

4-AF-2047-GA3-0 -

313300 AF-2047-ML5014 PIPING-3 VT-3 ZA-0023 R1 C - -

GUIDE -

l 1

313400 AF-2047-RL5015 PIPING-3 VT.3 ZA-0023 R1 C . .

GUIDE .

1 3-AF-2086-GA3-B l 315300 AF-2086-HL5003 PIPING-3 VT-3 ZA-0023 R1 C - -

GUIDE -

/

l L

I 1

3-AF-20t6-GA3-D 315500 AF-2086-HL5004 PIPING-3 VT-3 ZA-0023 R1 C - -

GUIDE -

l 1

3-AF-2086-GA3 E ,

315600 AF-2086-HL5005 PIPIN3-3 VT-3 ZA-0023 R1 C - -

GUIDE .

3-AP-2006-GA3-F 315700 AF-2086-KL5006 PIPING-3 VT-3 ZA-0023 R1 C - -

GUIDE -

1. 5 - AF-2 0 5 3 -GA3 -BA0 3 A

T s .6800 AF-2053-HS5001 PIPING 3 VT-3 ZA-0023 R1 C - -

ANCHOR -

l

DATE: 12/30/90 SOUTH TEXAS PR NECT ELECTRIC GENERATING STATION UNIT 2 FAGE: 26 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF) i CLASS 3 SECTION XI COMPLETE COMPONEh7S AUXII.IAPY FEEIWATFR 3 N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

1.5-AF.2053-GA3-EA03 317300 AF.2053-HF5006 PIPING.3 VT-3 ZA-0023 R1 C . -

GUIDE -

317400 AF-2053-HF5007 PIPING-3 VT-3 ZA-0023 R1 C - .

GUIDE .

1,5-AP-2006-CA3-BA01 319100 AF.2006 HF5005 PIPING-3 VT-3 ZA-0023 R1 C - -

GUIDE .

O I

l

~

O

'DATE: 12/30/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 27 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 3 SECTION XI COMPLETE COMPONENTS

(/ COMPONENT COOLING 3 ,

N O ASME O G T SEC. XI R E H SUt94ARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

20.CC-2103-WA3-B 325600 CC-2103-ML5011 PIPING-3 VT.3 ZA-0023 R1 C . .

ANCHOR -

20-CC-2109-WA3-E 325400 CC-2109-RR09 PIPING-3 VT-3 ZA-0023 R1 C . .

GUIDE -

20.CC-2109-WA3-F

'26500 CC-2109-ML5008 PIPING-3 VT-3 ZA-0023 R1 C . .

N GUIDE -

1 20.CC-2109-WA3-0 326600 CC-2109-HL5009 PIPING-3 VT.3 ZA-0023 R1 C . .

GUIDE -

l 20-CC-2109-WA3-J l I

326900 CC-2109-HL5002 PIPING-3 VT-3 ZA-0023 R1 C * . EXAMINED WHEN FILLED.

SH-V (2) .- VT-4 ZA-0023 R1 C . .

.327000 CC.2109-SH01 PIPING-3 VT-3 ZA-0023 R1 C . - EXAMINED WHEN FILLED.

SH-V (2) . VT-4 ZA-0023 R1 C . .

4 16-CC-2103-WA3-J

'(j)

/

1900 CC-2103-SM12 PIPING-3 VT-3 EA-0023 R1 C . . EXAMINED WHEN FILLED.

SH.V - VT-4 ZA-0023 R1 C . -

l' l

l

DATE: 12/30/98 SOtTTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 28 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

( CLASS 3 SECTION XI COMPLETE COMPONENTS COMPONENT COOLING 3 N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

16-CC-2106-WA3-D 334700 CC-2106.SH07 PIPING.3 VT-3 ZA-0023 R1 C - . EXAMINTD WHEN FILLED.

SH-V (2) . VT.4 ZA-0023 R1 C . .

14-CC-2114-WA3-9 344600 CC-2114 HL5001 PIPING-3 VT-3 ZA-0023 R1 C . .

GUIDE .

14-CC-2120-WA3-B

'45000 CC-2120-HL5001 PIPING-3 VT-3 ZA-0023 R1 C . -

RR .

345100 CC-2120-HL5002 PIPING-3 VT.3 .ZA-0023 R1 C. .

RR -

10-CC-2114-WA3-E 350800 CC-2114-GU19 PIPING-3 VT-3 ZA-0023 R1 C - -

GUIDE .

351000 CC-2114-RR21 PIPING-3 VT-3 ZA-0023 R1 C . -

GUIDE -

10-00-2118-WA3-G 351600 CC-2114-RR16 PIPING-3 VT-3 ZA-0023 R1 C - .

GUIDE -

i

- - - . . .~n. .. . ~ - _ . ,_.__ ,.. _ _ _ _ - ._- . . _ .. _ . . .. . . .

i i

t DATE: ~ 12/30/98 SOUlH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 29 l REVISION: 0 INSERVICE INSPECTION PLAN

  • 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, PIRST OUTAGE (96RF)

[

( CLASS 3 SECTION XI COMPLETE COMPONENTS ,

l COMPONENT COOI.ING 3 N O ASME O G T i SEC. XI R E H SUW.ARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK" I

10-CC-2114-WA3-H l

351700 CC 2114-GU12 PIPING-3 VT-3 ZA-0023 R1 C . .

QUIDE .

1 10-CC-2114-WA3-K 352000 CC+2114-RH07 PIPING-3 VT-3 ZA-0023 R1 C . . SUPPORT LOCATED INSIDE RING DUCT.  ;

RR I

l j

l l

10-CC-2114-WA3-L

[ '52300 CC-2114-RR03 PIPING-3 VT-3 ZA-0023 R1 C . . SUPPORT I4CATED INSIDE RING DUCT.

i RR 10.CC-2114-WA3-M 352400 CC-2114-HL5006 PIPING-3 VT-3 ZA-0023 R1 C - . SUPPORT LOCATED INSIDE RING DUCT.

RR .

l 352500 CC-2114-RR01 PIPING-3 VT-3 ZA-0023 R1 C . . SUPPORT LOCATED INSIDE RING DUCT.

i RR .

I i

1 1

352600 CC-2114-RR02 PIPING-3 VT-3 ZA-0023 R1 C . . SUPPORT LOCATED INSIDE RING DUCT.

RR .

10-CC-2115-WA1-L i- 352700 CC-2115-RR29 PIPING-3 VT*3 ZA-0023 R1 C - - SUPPORT IhCT.TED INSIDE RING DUCT.

t \ RR .

d O

l I

DATE: 12/30/98 SOTJTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 30 REVISIONS 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 3 SECTION XI COMPLETE COMPONENTS COMPONENT COOLING 3 N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E R;FARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDLRE C M R ** CALIBRATION BLOCK **

10-CCQ115-WA3-L 353800 CC-2115-RR30 PIPING-3 VT-3 ZA-0023 R1 C - - Sf7PPORT LOCATED INSIDE RING DUCT.

RR .

353900 CC-2115-RR31 PIPING-3 VT-3 ZA-0023 R1 C - - SUPPORT LOCATED INSIDE RING DUCT.

RR .

353000 CC-2115-RR32 PIPING-3 VT-3 ZA-0023 R1 C . . SUPPORT LOCATED INSIDE RING DUCT.

RR .

10-CC-2115-WA3-M 353100 CC-2115-RR27 PIPING-3 VT.3 ZA-0023 R1 C - - SUPPORT LOCATED INSIDE RING DUC2.

RR .

353200 CC-2115-RR28 PIPING-3 VT-3 ZA-0023 R1 C - - SUPPORT LOCATED INSIDE RING DUCT.

RE .

10-CC-2115-WA3-N 353300 CC-2115-ML5001 PIPING-3 VT-3 ZA-0023 R1 C . . SUPPORT LOCATED INSIDE RING DUCT.

GUIDE -

10-CC-2115-WA3-0 353800 CC-2115-RR19 PIPING-3 VT-3 ZA-0023 R1 C - .

RR -

0 l

l l

l

k l

DATEi 12/30/96 SOUTH TEXAS PRCUECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 31 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

D COMPONENT COOLING 3 CLASS 3 SECTION XI COMPLETE COMPONENTS N O ASME O G T SEC. XI R E H EUMMARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENT'e

  • CATION ITEM NO METHOD PROCEDURE C M R " CALIBRATION BLOCK *
  • 10.CC-2115-WA3-0 353900 CC-2115.RR20 PIPIN3-3 VT-3 ZA-0023 R1 C . .

RR .

354000 CC.2115.RR21 PIPING.3 VT.3 ZA-0023 R1 C - -

RR -

354100 CC 2115-RR22 PIPING-3 VT-3 ZA-0023 R1 C . .

RR .

O 10-CC-2115-WA3-R 354200 CC-2115-RR17 PIPING-3 VT.3 ZA-0023 R1 C - .

RR -

354300 CC-2115-RR16 PIPING-3 VT-3 ZA-0023 R1 C - .

RR .

10-C".2115-WA1-S 354400 CC.2115 RR15 PIPING 3 VT-3 ZA-0023 R1 C - .

RR .

10 - CC- 2115 - W A3 - 7 354500 CC-2115.RR13 PIPING 3 VT-3 ZA-0023 R1 C - -

RR -

7-

/ \

k

F) ATE: 12/30/98 ECUTH TEIAS PROJECT ELECTRIC GENERATIN3 STATION UNIT 3 PAGE: 33 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

! CLASS 3 SECTION XI COMPLETE COMPONENT $

COMPONCNT COOL,ING_3 N O ASME O G T EEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMDER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R " CALIBRATION BLOCK *

  • 10-CC-2115-WA3-T 354600 CC-2115-RR14 PIPING-3 VT-3 ZF.-0023 R1 C - -

RR .

10-CC-2115-WA3-U 354700 CC-2115-RR09 PIPING-3 VT-3 ZA-0023 R1 C - .

RR -

354800 CC-2115-RR10 PIPING-3 VT-3 ZA-0023 R1 C . -

RR -

O 354900 CC-2115-RR12 PIPING-3 VT-3 ZA-0023 R1 C -

RR -

355000 CC-2115.RR16 PIPING-3 VT-3 ZA-0023 R1 C . -

RR -

10-CC-2116-WA3-A 355700 CC-2116.HL5001 PIPING.3 VT-3 ZA-0023 R1 C - -

RR .

1 355800 CC-2116.RR04 PIPING.3 VT-3 ZA-0023 R1 C -

RR .

O

_. ._ _ _ . . . _ _ -- . . _ . . _ . . . _ _ . . - _ . . _ . _ . . . . . . _ - - ...m._, m.,_ _ -.__ ~..m_. _ _ .m._ .._.

l PAGE: 33 i DATE: 12/30/98 SOUTLt TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS

[\ FIRST INTERVAL. THIRD PERIOD, FIRST OUTAGE (98RF) ,i

.(

i '

CLASS 3 SECT *0N XI COMPLETE COMPONENTS

' ~

COnrvn r.n i COOLING } l N O ASME O O T SEC, XI R E H StH4ARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R " CALIBRATION BLOCK **

10-CC-2116-WA3-B .

355900- CC-2116-RR05 PIPING-3 VT-3 ZA-0023 R1 C . .

RR 356000 CC-2116-RR06' PIPING-3 VT.3 ZA-0023 R1 C . .

RR .

356100 CC 2116-RRO*7- PIPING-3 VT-3 ZA-0023 R1 C - .

RR .

I f% 4 i _.

10-CC-2116-WA3-C 356200 CC-2116-HL5003 PIPING-3 VT-3 ZA-0023 R1 C . .

RR -

l 356300 CC-2116-RR09 PIPING-3 VT.3 ZA-0023 R1 C . - .

RR L. 356400 CC 2116-RR10 PIPING-3 VT-3 ZA-0023 R1 C - .

RR .

k i

10-CC-2116-WA3-D 351500 CC-2116 'L5002 d PIPING-3 VT-3 ZA-0023 R1 C .

5 4

DATE: A3/30/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UlfIT 2 PAGE: 34 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF) f CLASS 3 SECTION XI COMPLETE COMPONENTS COMPONENT COOLINO 3 N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS N'JMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION ELOCK**

10-CC-2116-WA3-D 356600 CC-2116-RR11 PIPING-3 VT.3 ZA-0023 R1 C . -

RR -

356700 CC-2116 HL5004 PIPING-3 VT-3 ZA-0023 R1 C . -

RR .

10-CC-211'1-WA3-0 358600 CC-2117-RR08 PIPING-3 VT-3 ZA-0023 R1 C - -

RR .

O 350700 CC-2117-RR09 PIPING-3 VT-3 ZA-0023 R1 C . .

RR .

358800 CC-2117-RR10 PIPING-3 VT-3 ZA-0023 R1 C - -

RR -

358000 CC-2117-RR11 PIPING-3 VT-3 ZA-0023 R1 C . -

RR -

10 - C"- 2117- WA3 - R 359000 CC-2117 HL5004 PIPING-3 VT-3 ZA-0023 R1 C - -

RR -

O l

_. .. . . - . . . . . . . . . _ _ m _ _. . . . _ . m.-_. . _ . . . -- _ . -m _ _ _ .

l DATE: 12/30/98 EOtfrH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGEt 35 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF) g CLASS 3 SECTION XI COMPLETE COMPOhTNTS COMPONENT COOLING 3 N O ,

ASME O O T SEC. XI R E H StM4ARY EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

10-CC 2117-WA3-R PIPING-3 VT-3 ZA-0023 R1 C - .  ;

359100 CC-2117-RR05

. RR -

[

L i

359200 CC-2117.RR06 PIPING-3 VT-3 ZA-0023 R1 C - -

RR -

359300 CC-2117-RR07 PIPING-3 VT-3 ZA-0023 R1 C - -

RR .

r

- O I i C

l 1

l l

,r~'N. .

1 i

- l 1

j l

DATE: 12/30/98 SOLTPH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 36 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 3 SECTION XI COMPLETE COMPONENTS ESSENTIAL COOLIN3 WATER 3 N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMDER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

E EW-2105-WT3-CC1 383300 EW.2105-HL5001 PIPING-3 VT-3 ZA-0023 R1 C - .

RR -

383400 EW-2105.HL5002 PIPING-3 VT-3 ZA-0023 El C - .

RR -

30-EW-2105-WT3-E 383600 EW-2105-HL5005 PIPING-3 VT-3 ZA-0023 R1 C . -

RR .

O, 10-FW-2101-WT3-AC 408500 EW-2107-HL5001 PIPING-3 VT.3 ZA-0023 R1 C - .

RR -

400600 EW-2107-ML5007 PIPING-3 VT-3 ZA-0023 R1 C - -

GUIDE -

400700 EW-2107-HL5008 PIPING-3 VT-3 ZA-0023 R1 C - .

GUIDE -

6-FW-2107-W'3-AA 417400 EM-2107-HLh004 PIPING-3 VT-3 ZA-0023 El C - -

RR .

O

- .. . . ~ . .--- .. -- . - - - - - - . - ~ . . . . . - , -. . _ - . . . . . ~ .

DATE 12/30/98 SOU2H TEXAS PROJECT ELECTRIC CEhERATING STATION UNIT 2 PAGE: 37 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS

[ FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 3 SECTION XI COMPLETE COMPONENTS ESSPNTIAL COOLING WATER 3 N O ASME O G T ,

i SEC. XI R E H '

.I SL494ARY EXAMINATION AREA CATGY EXAM E O E REMARKS

NUMBER. IDENTIFICATION ITEM NO METHOD . PROCEDURE C M R ** CALIBRATION BI4CK**

....... .............................. ....... .......... ......... .... . . . ..... .................................. i 6-EW-2127-WT3-A =

418700 EW-2127-E5001 PIPING.3 VT.3 ZA-0023 R1 C . .

GUIDE .

418600 EW-2127-HL5002 PIPING.3 VT-3 ZA-0023 R1 C . -

GUIDE -

418900 EW.2127-E5 003 PIPING.3 VT.3 ZA.0023 R1 C . .

GUIDE .

I kv' 6-EW-2128-WT3-Al 419100 EW-2128 E5002 PIPING-3 VT.3 ZA.0023 R1 C . .

GUIDE .

6-EW-2128-WT3-B2 419300 EW-2128 -E5001 PIPING-3 VT-3 ZA-0023 R1 C . .

GUIDE .

1 l

1 i

1 6-EW-2188-WT3-C

]

l

.420300 EW.218 8-E5007 PIPING.3 VT-3 ZA 0023 RI C - .

GUIDE -

l

,m l

LATE: 12/30/96 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 38 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

{ CLASS 3 SECTION XI COMPLETE COMPONENTS PEACTOR M.t#E-UP WATEP 3 N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

6-RM-2002-WB3-AB 426800 RM-2002-HL5002 PIPING-3 VT.3 ZA-0023 PI C - -

GUIDE -

O O

. ~ . . - . , . -. ,_ - . .. . .. . . - ~ _ . . . - .- -..._= ,

4 l

.i i

DATE: 12/30/98 SOUTH TEXAS PRCATECT EJCTRIC CENERATING STATION UNIT 2 PAGE: 39 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS i I

[n FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)  ;

CLASS 3 SECTION XI COMPLETE COMPONENTS CHEMICAL & VOLUME CONTROL 3 N O ASME O O T ,

SEC. XI R E H i

SIM kRY EXAMINATION AREA CATGY EXAM E O E REFARKS

' NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION B14CK**

3P172NPA204 A i

428500 RCPP1 EQUIP 3 YT.3- ZA-0023 R1 C - . SINGLE BASE SUPPORT ON RC PURIFICATION RC PUEF PUMP - PUMP, ,

i t

i m

i 6

i r

l I

Cl J

l

LATE: 12/30/98 SotTfH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 40 REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 CUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF) ,

i I CLASS 3 SECTION XI COMPLETE COMPONENTS COMPONENT COOLING 3 J N O I ASME O G T I SEC. XI R E H  !

l

SUMMARY

EXAMINATION AREA CATUY EXAM E O E REMARKS NLMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

3R202NHX20IR l

428800 CCX3A EQUIP-3 Vt.3 ZA-0023 R1 C . . ThE SUPPORT LOCATED AT THE WEST END OF CC CLG HTX . CC HEAT EXCHAFGER 2A. l l

l l

l 4

3P202NTS201A 439800 CCSTI EQUIP-3 VT-3 ZA-0023 R1 C - . THE SUPPORT LOCATED UNDER THE TANK CC SURG TANK - MANHOLE COVER ON THE CC SURGE TANK, 429900 CCST2 EQUIP-3 VT.3 ZA-0023 RI C . - THE REMAINING SUPPORT ON THE CC SURGE CC SURG TANK TANK.

O O

i i

i I

DATE: 12/30/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 41 l REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS ON FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

CLASS 3 SECTION XI COMPLETE COMPONENTS v l i DIESEL OENERATOR 3 N O I ASME O G T i I

SEC. XI R E H i l

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK ** l

........................................ i i

l l 30152MSA0134 43b000 DGSIA EQUIP-3 VT.3 ZA-0023 R1 C . . SINGLE BASE SUPPORT ON DG AUX. SKID NO. I i

DG AUX SKID . 21.

I I

1 1

i l

l i

l i

t l

l

, p i 1

l

/

v e

r l

i l

/

.o

\

kJ

l l

l DATE: 12/30/98 SOUTH TEXAS PROJECT EL::CTRIC GENERATING STATION UNIT 2 PAGE: 42 l REVISION: 0 INSERVICE INSPECTION PLAN - 2RE06 SUPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

' CLASS 3 SECTION XI COMPLETE COMPONENTS DIESEL JACFET WATEP 3 N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CAIUY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK'*

30152MAB0134 430300 JSP1A EQUIP 3 VT-3 ZA-0023 R1 C - . SINGLE BASE SUPPORT FOR JW CIRC. PUMP i JW STBY PUMP . FOR DG 21.

30152MMX0134 431200 JHX1A EQUIP-3 VT-3 ZA-0023 R1 C . . THE SUPPORT IOCATED CLOSEST TO TPE JW HEAT EXCH -

ENGINE ON JW HEAT EXCHANGER FOR DG 21.

431300 JHX2A EQUIP-3 VT-3 ZA-0023 R1 C . - THE REMAINING SUPPORT ON JW HEAT JW HEAT EXCH .

EXCHANGER FOR DO 21.

I I

l r

A O

. -- _ . . .. -- - . - .~ . . - .- -

DATE: 12/30/98 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 43 REVISION: 0 INSERVICE INSPECTION PLAN . 2RE06 SUPPORTS

[ FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF)

/ CLASS 3 SECTION XI COMPLETE COMPONENTS DIESEL LUBE OIL 3 N O ASME O G T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

30152MHT0114, 432700 LUH1A EQUIP.3 VT-3 ZA-0023 R1 C . . THE SUPPORT LOCATED CIDSEST TO THE LU HEATER . JACKET WATER STAND PIPE ON LUBE OIL ,

FILTER NO. 21.

432800 LUH2A EQUIP.3 VT-3 ZA-0023 R1 C . . THE REMAINING SUPPORT ON LUBE OIL HEATER LU HEATER . NO. 21, 30152MSA0134 434500 LU4A EQUIP.3 VT-3 ZA-0023 R1 C . . THE PIPE SUPPORT LOCATED IMMEDIATELY LU PIPE SUh* . DOWNSTREAM OF DI5 LUBE CIL STRAINER D% CLOSEST To THE LUBE OIL CIRC PUMP ON

+

k LUBE OIL FILTER NO. 21.

434600 LUSA EQUIP-3 VT-3 ZA-0023 R1 C . - THE PIPE SUPPORT LOCATED IMMEDIATELY LU PIPE SUPT . DOWNSTREAM OF THE LUBE OIL STRAINER CLOSEST TO THE LUBE OIL HEAT EXCHANGER ON LUBE OIL FILTER NO. 21.

434700 LU6A EQUIP-3 VT.3 ZA.0023 R1 C - - THE PIPE a?JPPORT LOCATED ON THE LUBE OIL j LU PIPE.SUPI . FILTER BYPA7S LINE ON LUBE OIL FILTER l NO. 21. j l

I l

434800 LU7A EQUIP-3 VT 3 ZA.0023 R1 C - . THE PIPE SUPPORT IDCATED ON THE SUCTION I LU PIPE SUPT - TO THE LUBE OIL STANDBY PUMP ON LUBE OIL rIt.TER NO. 21. l l

I 1

l l

r%

\m

SOtfrH TEXAS PROJECT ELECTRIC OENERATING STATION UNIT 3 PAGE: 'f 4 DATE: 12/30/98 REVISION: 0 INSERVICE INSPECTION PIAN . 2RE06 3UPPORTS FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF) r.

CLASS 3 SECTION XI COMPLETE COMPONENTS DIESFL STARTING AIR 3 N O ASME O O T SEC. XI R E H

SUMMARY

EXAMINATION AREA CATGY EXAM E O E RTf' ARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C M R ** CALIBRATION BLOCK **

.....,,. .............................. ....... .......... ............... . . . ........s.................... .........

30152MTS0234 437000 SATIB EQUIP-3 VT.3 ZA.0023 R1 C . - SINGLE BASF SUPPORT ON ETARTING AIR SD STRT AIR . RECEIVER NO. 22.

O O

, _. . .m._ m.. - _ . . _ , m . . 4.m_m._,-.. . . , . ._ . . _ , , . . . . . . . . . ..

i 1-TATE: 12/30/96 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 PAGE: 45 f.tEVISION: $' INSERYICE INSPCC".10A PLAN . 2RE06 SUPPORTS I

FIRST INTERVAL, THIRD PERIOD, FIRST OUTAGE (98RF) f"f g CLASS 3 SECTION XI COMPLETE C"/JoONENTS

\

ESFEttrYAL COOLING WATER 3 l 1

N O i MM O G T SEC. XI R E H )

l Sthe A.tY EXAMINATION AREA CATGY EXAM E O E REMARKS Nt444.4 IDENTIFICATION. ITEM NO METHOD- PROCEDURE C M R ** CALIBRATION BIDCK' l 1

l 3R282NPA202A 4J0400 SWP1A 2001P.3 VT 3 ZA 0023 RI C . . SINGLE BASE SUPPORT ON ECW SCREEN WASH FW SCRN WASH BOOSTER PUMP .

BOOSTER , PUMP NO. 2A. l l

l 1

i i

3R202NSP201A j i

t

)

433700 SCSIA EQUIP-3 VT.3 ZA.0023 RI C . . SINGLE BASE SUPPORT ON ECW SELF CLEANING l l

EW SELF CLEANING STRN . STRAINER NO. 2A. '

)

I m I Ifxj.Y 1 I

t i

I 4

4 E.

A

\ ,.J l'

n..A,#.;-.A4 3 -.6k 1w4.A 4

.S 6 A .

-. n= 4 .x- m.

d lO

.J l

i 3

l I

i APPENDIX 3-B OWNER'S REPORT FOR INSERVICE INSPECTIONS l

NIS-1 FORMS l

l l

O  !

- . -- ~.. - - . . - . . . -

1998 ISI - 2RE06 - Component Supports (Class 1) Page 1 of 2 i

FORM NIS 1 OWNER'S REPORT INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules '

b i

1. Owner South Texas Project Nuclear Operatine Comoanv*: P.O. Box 289: Wadsworth. Texas 77483 (Name and Address of Owner)
2. Plant South Texas Project Electric Generatine Station: P.O. Box 289: Wadsworth. Texas 77483 (Name and Address of Plant)
3. Plant Unit 2 4. Owner and Certificate of Authorization (if required) N.A.
5. Commercial Service Date 06/19/89 6. National Board Number for Unit N.A.
7. Components Inspected ASME Code Class 1 - Component Supports Program Component or Manufacturer or Manufacturer or State or Nationst i Appurtenance Installer Installg Serial No. Province No. Board No.

Reactor Coolant 1081-Pump 2B Westinghouse (M) 1163E26G01-14 N.A. 47 Class 1 Piping Supports Ebasco (I) N.A. N.A. N.A.

l I

1

)

L/

l

  • South Texas Project Nuclear Operating Company (STPNOC)is the licenwd operator of the South Tex- I 'ect Electric Generating Station

,]

STPNOC by N#M - # ,_ Date.1;r Jo 7f Arkwright Mutual by "" Date

/ "W R.{..Beverly Insurance Co. B.R. Russell,ANII 3-B-1

1998 ISI - 2RE06 - Component Supports (Class 1) Page 2 of 2  !

l FORM NIS-1 (Back)

8. Examination Dates 10/07/98 to 10/17/98 9. Inspectio.n Interval from 06/19/89 to 10/18/00
10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required I for current interval. (ASME Code Class 1 Component Supports - Piping and Equipment) l See Section 3.2 of the 2RE06 Summary Report for list of examinations performed. The examinations performed this outage constitute 33% of the required examinations for the current 1 interval. The cumulative percentage completed for the intervalis 92%.

I1. Abstract of Conditions Noted.

None.

12. Abstract of Corrective Measures Recommended and Taken.

None.

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of ASME Code,Section XI.

Certificate of Authorization No.(if applicable) N.A. Expiration Date N.A.

Date /A - Bo 19M Signed South Texas Owner Pro _iect Nuclear Onerating Comp R.L. Deverl CERTIFICATE OF INSERVICE INSPECTION I, the undeaigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by Arkwricht hiutual Insurance Co. of Waltham.

Mass have inspected the components described in this Owner's Report during the period 10/07/98 to 10/17/98.

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, express or implied, concerning the exe.minations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

/'

j  %'N Commissions Tex 826 Inspector's Signature National Board, State, Province, and Endorsements B. R. Russell Date / 19 8_9 O

3-B-2

1998 ISI - 2RE06 - Component Supports (Class 2) Page 1 of 2 FORM NIS 1 OWNER'S REPORT INSERVICE INSPECTIONS

, As required by the Provisions of the ASME Code Rules

(

V) 1. Owner South Texas Project Nus]sar Operatine Companv*: P.O. Box 289: Wadsworth. Texas 77483 i

l (Name and Address of Owner)

2. Plant South Texas Project Electric Generatine Station: P.O. Box 289: Wadsworth. Texas 77483 (Name and Address of Plant) )
3. Plant Unit 2 4. Owner and Certificate of Authorization (if required) N.A.
5. Commercial Service Date 06/19/89 6. National Board Number for Unit N.A.
7. Components Inspected ASME Code Class 2 - Component Supports Program Component or Manufacturer or I Manufacturer or State or National ,

Appurtenance Installer Installer Serial No. Province No. Board No.  !

l Containment .

Spray Pump 2C Pacific Pumps (M) 51712 N. A. 456 )

Residual Heat l Removal Pump 2A Pacific Pumps (M) 51734 N. A. 363 High Head Safety Injection Pump 2A Pacific Pumps (M) 51698 N. A. 400 low head Safety injection Pump 2A Pacific Pumps (M) 51704 N. A. 460 Class 2 Piping Supports Ebasco (I) N. A. N. A. N. A.

C

(

i l

l l

l I

l l

fq

  • South Texas Project Nuclear Operating Company (STPNOC)is the licensed operator o'the South Te as ject Electric Generating Station

(

) Arkwright Mutual by -. # Date /S '87 STPNOC bMfk._

R.L.Beverly Date 12 *M_ InsuranceB.R. Co. Russell,ANII 1

3-B-3  !

1 1998 ISI - 2RE06 - Component Supports (Class 2) Page 2 of 2 FORM NIS 1 (Back)

8. Examination Dates 01/19/98 to 10/15/98 9. Inspection Interval from 06/19/89 to 10/18/00
10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval. (ASME Code Class 2 Component Supports - Piping and Equipment)

See Section 3.2 of the 2RE06 Summary Report for list of examinations performed. The examinations performed this outage constitute 34% of the required examinations for the current interval. The cumulative percentage completed for the intervalis 97%.

11. Abstract of Conditions Noted.

None.

12. Abstract of Corrective Measures Recommended and Taken.

None.

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of ASME Code,Section XI.

Certificate of Authorization No.(if applicable) _ N.A. Expiration Date N.A.

Date d-Jo 1 % Signed South Texas Pro _iect Nuclear Operatine Company By g Owner R. Beverly CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by Arkwricht Mutual Insurance Co. of Waltham.

Man have inspected the components described in this Owner's Report during the period 01/19/98 to 10/15/98.

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, express or implied, concerning the examinations and corrective measures described in this Owner's Report Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

wm Commissions Tex 826 Inspector's Signature National Board, State, Province, and Endorsements B. R. Russell Date /- G- 1919 9

3-B-4

1998 ISI - 2RE06 - Component Supports (Class 3) Page 1 of 2 FORM NIS 1 OWNER'S REPORT INSERVICE INSPECTIONS CN As required by the Provisions of the ASME Code Rules

1. Owner South Texas Project Nuclear Operatine Companv*: P.O. Box 289: Wadsworth. Texas 77483 (Name and Address of Owner)
2. Plant South Texas Project Electric Generatine Station: P.O. Box 289: Wadsworth. Texas 77483 (Name and Address of Plant)
3. Plant Unit 2 4. Owner and Certificate of Authorization (if required) N.A.
5. Commercial Service Date 06/19/89 6. National Board Number for Unit N.A.
7. Components Inspected ASME Code Class 3 - Component Supports Program Component or Manufacturer or Manufacturer or State or National Appurtenance Installer Installer Serial No. Province No. Board No.

Reactor Coolant Purification Pump Goulds Pumps,Inc.

2A (M) N242B079 N. A. 367 Component Cooling Water Struthers Wells Ileat Exch. 2A Corp. (M) 1-76-06-32941-1 N. A. 14542 _

Component Brown -

Cooling Water Minneapolis Tank Surge Tank 2A (M) 464702B N. A. N. A.

Diesel Generator Cooper Energy p Aux. Skid 21 Services (M) 8L0101 N. A. N. A.

Q Diesel Jacket Water Standby Pump 2A Crane Company NDC-001332 N. A. N. A.

Diesel Jacket Water Heat Exchanger 2A Arrerican Standard ~77A20006-01-2 N. A. N. A.

Chromalox Diesel Lube Oil Instruments &

Heater 2A Controls N. A. N. A. N. A.

Diesel Lube Oil Pipe Support 2A Cooper Energy 7195 N. A. N. A.

Diesel Starting Air Cooper Energy Receiver 22 Services (M) 8K0404 N. A. 1049 Essential Cooling Water Screen Wash Booster Hayward Tyler Pump 2A Pump Co. (M) 813301 N. A. 144 Essential Cooling Water Self Cleaning Strainer 2A Zurn Industries Inc. 7588 N. A.

Class 3 Piping Supports Ebasco (I) N. A. N. A. N. A.

  • South Texas Project Nuclear Operating Company (STP" LOC)is the licened operatar of the South Tex > oject Electric Generatmg Station STPNOC bh h4 _ Datepf.?M$ Arkwright Mutual by W" Date bN R. ..Beverly Insurance Co. B.R. Russell,ANil 3-B-5

1998 ISI - 2RE06 - Component Supports (Class 3) Page 2 of 2 I

FORM NIS 1 (B:ck) 1

8. Examination Dates 12/01/97 to 10/13/98 9. Inspection Interval from 06/19/89 to 10/18/00  !
10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval. (ASME Code Class 3 Component Supports - Piping and Equipment)

See Section 3.2 of the 2RE06 Summary Report for list of examinations performed. The examinations performed this outage constitute 35% of the required examinations for the current interval. The cumulative percentage completed for the interval is 99%.

I1. Abstract of Conditions Noted.

None.

12. Abstract of Corrective Measures Recommended and Taken.

None.

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of ASME Code,Section XI.

Certificate of Authorization No.(if applicable) N. A.. Expiration Date N.A.

Date l>7 &) 19% Signed South Texas Project Nuclear Operating Company By8t'h.,,/.9 Owner R. Il Beverly CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure vessel Inspectors and the State or Province ofIexas and employed by Arkwright Mutua.llnsurance Co. of Wajth_am Mass have inspected the components described in this Owner's Report during the period 12/01/97 to 10/13/98.

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, express or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or proputy damage or a loss of any kind arising from or connected with this inspection.

l Commissions Tex 826 Inspector's Signature National Board, State, Province, and Endorsements B. R. Russell Date / 19 3 t

1 3-B-6 1