SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

NO. >

Table of Contents 13 OPERATIONS QUALITY ASSURANCE PLAN TABLE OF CONTENTS EFFECTIVE DATE 0241-98 i

Chapter Title Effective Effective Change Number Chapter Revision Notice Revision Date No.

Definitions 7 2-1-98 QA-032 1.0 Organization 9 2-1-98 QA-032 QA-034 QA-035 QA-037 QA-038 QA-039 2.0 Program Description 11 2-1-98 QA-032 QA-033 QA-034 QA-037 ,

QA-038  ;

1 3.0 Conduct of Plant Operations 7 2-1-98 4.0 Qualification, Training, and 6 2-1-98 Certification of Personnel 5.0 Maintenance, Installation of 5 2-1-98 Modifications, and Related Activities 6.0 Design and Modification Control 7 2-1-98

- 7.0 Procurement 7 2-1-98 QA-034 l QA-037 i QA-038 8.0 Control and Issuance of 6 2-1-98 Documents 9.0 Control of Material 6 2-1-98 10.0 Inspection 7 2-1-98 QA-037 11.0 Test Control 6 2-1-98 4

12.0 Instrument and Calibration 6 2-1-98 Control-9903090207 PDR 990224 7 P ADOCK 05000498f PDR _

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

NO.

Table of Contents 13 OPERATIONS QUALITY ASSURANCE PLAN

^ *

  • TABLE OF CONTENTS EFFECTIVE DATE 02-01-98 Chapter Title Effective Effective Change Number Chapter Revision Notice Revision Date No.

13.0 Control Of Conditicns Adverse 8 2-1-98 QA-032 to Quality QA-033 QA-034 QA-037 QA-038 14.0 Records Control 5 2-1-98 15.0 Quality Oversight 7 2-1-98 QA-034 Activities QA-037 QA-038 16.0 Reserved for Future Use 17.0 ASME Code Section XI - 5 12-30-94 QA-034 Repairs and Replacements QA-036 QA-037 18.0 ASME Code Section XI - 6 01-01-97 QA-034 I Inservice Inspection and QA-036 Testing QA-037 I

l l

i f

e 4

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

NO.

Chapter 1.0 9 OPERATIONS QUALITY ASSURANCE PLAN  ? AGE 1 OF 6 ORGANIZATION EFFECTIVE DATE 2-1-98

  • 1.O PURPOSE 1.1 The purpose of this chapter is to describe the organizational structure as related to quality assurance and to establish the responsibilities of organizations for the South Texas Project Electric Generating Station (STP).

2.0 SCOPE A ,

2.1 STP Nuclear Operating Company (STPNOC) , as licensee, Q has the Quality responsibility for design, engineering, y procurement, fabrication, modification, maintenance, g repair, in-service inspection, refueling, testing, and operation of the STP.

2.2 The requirements of this chapter are applicable for structures, systems, and components designated as

" Full", " Targeted", or "Lasic".

l 3.0 DEFINITIONS .

3.1 None 1 i

4.O REFERENCES l

4.1 None 5.0 RESPONSIBILITIES

{

5.1 The STPNOC is comprised of Nuclear Generation, Nuclear t' Engineering & Technical Services, Business Services, @

and Nuclear Safety and Quality Concerns Program. The y l

heads of these groups report to the President and Chief Executive. Officer.

g g

, 5.1.1 The President and Chief Executive Officer has ov2rall responsibility for the implementation of the Operations Quality Assurance Program and approving the Operations Quality Assurance Plan (OQAP) and revisions thereto.

1 i

l l

m

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION iiUMBER REV.

NO.

Chapter 1.0 9 OPERATIO?)S QUALITY ASSURANCE PLAN PAGE 2 OF 6 ORGANIZATION EFFECTIVE DATE 2-1-98 5.1.2 The Vice President, Nuclear Generation is responsible for implementing quality program requirements applicable to staffing E7P with qualified personnel and acquiring and coordinating the assistance of internal and external organizations for the testing, operation, modification, maintenance, and radiological monitoring functions of STP. 1 5.1.2.1 The Plant Manager, Unit 1; Plant  ;

Manager, Unit 2; Assistant to the V% i Vice President; Manager, Generation $  !

Support; Manager, Outage and 1 Installation; and Manager, 2 {

Metrology & Radiological Laboratory {

report to the Vice President, i Nuclear Generation.

5.1.2.2 The Plant Managers have prime  !

responsibility for the safe  !

operations of their respective {

units. The plant staff, under the i

direction of the Plant Managers,  !

' develop detailed procedures and instructions for testing, operation, modification, and maintenance of the STP.

5.1.3 The Vice President, Nuclear Engineering &

Technical Services (NE&TS) is responsible for l implementing quality program requirements applicable to the design engineering and control, systems engineering, nuclear fuels design, acquisition and management, and engineering support functions. g m

The Vice President, NE&TS is responsible for Q the development, maintenance, and independent T verification of implementation of the STP 'T Quality Program; making periodic reports on its effectiveness; review of selected documents which control activities within its scope; and preparation, control, and approval of the OQAP and revisions thereto.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

NO.

. . Chapter 1.0 9

  • OPERATIONS QUALITY ASSURANCE , : <dl PAGE 3 OF 6 ORGANIZATION EFFECTIVE DATE 2-1-98 The Vice President, NE&TS is responsible for ,,

implementing quality program requirements q) ,

applicable to STP corrective action, .

licensing, and Independent Safety Engineering di Group activities, and administration of the Nuclear Safety Review Board (NSRB) .

The Vice President, NE&TS has the authority to identify, initiate, recommend, or provide Ni solutions to quality-related problems and 9 verify the implementation and effectiveness dg of the solutions. This position has the independence to conduct Quality activities  ;

without undue pressure of cost or schedule.

5.1.3.1 The Manager, Design Engineering; Manager, Systems Engineering;  %'

Assistant to the Vice President; E) l Director, Nuclear Fuel and gi l Analysis; Director, Quality & g i Licensing; Manager, Operating e. -

Experience; and Manager, Risk y}

Management & Industry Relations gg 4 i

report to the Vice President, j NE&TS.

5.1.3.2 The NSRB administratively reports ,,

to the Manager, Risk Management & M ,

Industry Relations. The'NSRB functionally reports directly to k

CB i

1 and advises the President and Chief i l Executive Officer. )

l

! 5.1.3.3 The Director, Quality & Licensing is responsible for Independent }

i Safety Engineering Group g activities, audits, independent o assessments, surveillances, c5 performance monitoring, inspections and NDE examinations.

5.1.3.4 The Director, Quality & Licensing, DR at his discretion, reports directly 7-to the President and Chief y Executive Officer. 4g

~

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

NO, Chapter 1.0 9 OPERATIONS QUALITY ASSURANCE PLAN PAGE 4 OF 6 ORGANIZATION EFFECTIVE DATE 2 1-98 5.1.3.5 The Director, Quality & Licensing has the authority to stop work for  %

cause. This authority has been  %

granted.by the President and Chief 9 Executive Officer. The Quality b organization, including the @

inspection staff, is based upon the t anticipated Quality involvement in S6 operations, modification, and maintenance activities.

5.1.3.6 The Manager, Risk Management &

Industry Relations is responsible for activities related to the Comprehensive Risk Management N Program, including oversight of y Probabilistic Safety Assessment activities. The Manager, Risk Eh Management & Industry Relations serves as the Graded Quality Assurance Expert Panel chairperson.

5.1.4 The Vice President, Business Services is responsible for implementing quality program g requirements applicable to human resources, o planning & controls, projects & programs, gf contracts, nuclear training, nuclear o information systens, emergency preparedness 98-and communications, records management

  • services and administration, and nuclear purchasing and material management for STP. ff 5.1.4.1 The Manager, Nuclear Training; Manager, Nuclear Information Systems; Manager, Emergency Preparedness and Communications; Director, Records Management e-Services and Administration; Director, Nuclear Purchasing and $g.

Materials Management; General y Manager, Human Resources; Manager, Nv Planning & Controls; Manager, Plant D Projects & Programs; and Manager, gg Contracts report to the Vice President, Business Services.

F ,

1

^

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

NO.

Chapter 1.0 9 OPERATIONS QUALITY ASSURANCE PLAN pAoE s or e ORGANIZATION EFFECTIVE DATE 2-1-98 1

5.1.5 The Vice President and Special Assistant to the President and Chief Executive Officer is o- i responsible for implementing quality program g requirements applicable to this position. e.

m 5.1.5.1 The Manager, Nuclear Plant

  • Protection reports to the Vice President and Special Assistant to {

2g j the President and Chief Executive Officer.  !

l 5.1.6 The Director, Nuclear Safety Quality Concerns ,,

Program (NSQP), is responsible for wi implementing quality program requirements j

applicable to the NSQP. $h 4

6.0 REOUIREMENTS 6.1 The fundamental responsibility for implementing quality program requirements is assigned to all personnel performing activities affecting the safe and reliable operation of the STP. These personnel and their  ;

j management are responsible for implementing through '

approved procedures and other work documents, the quality assurance program controls described in the l

, OQAP.  !

1 6.2 Attachment 1 depicts the organizational structure of t the STP as it relates to the implementation of the '

Operations Quality Assurance Plan. The structure I reflects the reporting alignment for key positions, l Line organizational details and responsibilities are i further described in STP UFSAR Chapter 13.1. l 7.0 DOCUMENTATION 7.1 None I s- i 8.0 ATTACID4EWIS p m

8.1 Attachment 1 - STPNOC Organization D , sc W% w<  !

?

W2.

o e h

F SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

NO.

. . Chapter 1.0 g OPERATIONS QUALITY ASSURANCE PLAN PAGE 6 OF G ORGANIZATION EFFECTIVE DATE 2-1-98 i ATTACHMENT 1 STPNOC ORGANIZATION ,

1

)

~

(" s.- on" $ j l i M l i i i i ~~

i -Q 1

. gg, f ma ww g l l l l l l D

I I I

. 1 d

EO M7 ,

Y "" M mYa e ese i

M 2

. ~. ._v._., l w 1 i  % i wg= *g* I g_ 9 )

, 4  !

._.=. .

_4

==. = == l

-, 1 70:

W.Ceeems