MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 ML22300A1032022-11-0101 November 2022 Integrated Inspection Report 05000382/2022003 IR 05000382/20224022022-10-24024 October 2022 NRC Security Inspection Report 05000382 2022402 IR 05000382/20220122022-09-16016 September 2022 Digital Instrumentation and Control Modification Inspection Report 05000382/2022012 IR 05000382/20224032022-09-14014 September 2022 NRC Security Inspection Report 05000382 2022403 IR 05000382/20220902022-09-12012 September 2022 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter, NRC Insp Rprt 05000382/2022090 IR 05000382/20220102022-08-24024 August 2022 Biennial Problem Identification and Resolution Inspection Report 05000382/2022010 ML22229A0662022-08-17017 August 2022 Security Baseline Inspection Report 05000382/2022403 ML22217A1112022-08-0909 August 2022 Integrated Inspection Report 05000382/2022002 IR 05000382/20220112022-07-14014 July 2022 License Renewal Phase 1 Inspection Report 05000382/2022011 IR 05000382/20224012022-06-16016 June 2022 Security Baseline Inspection Report 05000382/2022401 IR 05000382/20225012022-06-11011 June 2022 Emergency Preparedness Inspection Report 05000382/2022501 and Preliminary White Finding IR 05000382/20220012022-05-17017 May 2022 Reissue IR 05000382/2022001 ML22124A3062022-05-0808 May 2022 Integrated Inspection Report 05000382/2022001 IR 05000382/20223012022-03-28028 March 2022 NRC Examination Report 05000382/2022301 IR 05000382/20210142022-03-0909 March 2022 Digital Instrumentation and Control Modification Inspection Report 05000382/2021014 IR 05000382/20210062022-03-0202 March 2022 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2021006) IR 05000382/20210042022-02-0808 February 2022 Integrated Inspection Report 05000382/2021004 and Exercise of Enforcement Discretion ML22011A0992022-01-14014 January 2022 IR 2021012 EOI CO3 IR 05000382/20210102021-12-0909 December 2021 Triennial Fire Protection Inspection Report 05000382/2021010 IR 05000382/20214022021-12-0303 December 2021 Security Baseline Inspection Report 05000382/2021402 IR 05000382/20210112021-11-18018 November 2021 Digital Instrumentation and Control Inspection Report 05000382/2021011 IR 05000382/20210032021-11-11011 November 2021 Electrical Station, Unit 3 - Integrated Inspection Report 05000382/2021003 IR 05000382/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Waterford Steam Electric Station - Unit 3, (Report 05000382/2021005) IR 05000382/20210022021-08-0505 August 2021 Integrated Inspection Report 05000382/2021002 IR 05000382/20210902021-05-18018 May 2021 Notice of Violation; NRC Inspection Report 05000382/2021090 and NRC Investigation Report 4-2017-033 IR 05000382/20210012021-05-10010 May 2021 Integrated Inspection Report 05000382/2021001 IR 05000382/20214042021-05-0707 May 2021 Follow-Up on Traditional Enforcement Inspection (IP 92702)(PUBLIC) - NRC Security Inspection Report 05000382/2021404 IR 05000382/20214012021-04-27027 April 2021 Security Baseline Inspection Report 05000382/2021401 IR 05000382/20214202021-04-0505 April 2021 Security Baseline Inspection Report 05000382/2021420 Cover Letter (Public) IR 05000382/20214032021-03-0808 March 2021 Material Control and Accounting Program, NRC Inspection Report 05000382/2021403 Cover Letter(Public) 2024-01-31
[Table view] Category:Inspection Report Correspondence
MONTHYEARIR 05000382/20184042018-07-17017 July 2018 NRC Security Inspection Report 05000382/2018404 IR 05000382/20154022016-03-0202 March 2016 Non-Public Security Inspection Plan for Waterford Steam Electric Station, Unit 3 (NRC Physical Security Inspection Report Number 05000382/2015402) ML15119A1142015-04-30030 April 2015 FOF Inspection Report Cover Letter IR 05000382/20152012015-04-30030 April 2015 Waterford FOF Inspection Report Cover Letter ML1106301232011-03-0404 March 2011 Notification of Inspection (NRC Inspection Report 05000382-11-003) and Request for Information IR 05000382/20105012011-01-10010 January 2011 IR 05000382-10-501, on 12/31/10, Waterford Steam Electric Station, Unit 3 - NRC Annual Emergency Preparedness IR 05000382/20094012010-03-26026 March 2010 IR 05000382-09-401, on 12/31/2009 & 01/01/2009, Waterford Steam Electric Station, Unit 3 - NRC Physical Security Annual ML0809406242008-04-0303 April 2008 IR 05000382-08-003, from May 5 to May 16, 2008, for Waterford 3 - Notification of Inspection and Request for Information IR 05000382/20075012008-02-21021 February 2008 IR 05000382-07-501, on 12/31/2007, for Waterford, Unit 3, Emergency Preparedness Annual IR 05000382/20070042007-11-0909 November 2007 IR 05000382-07-004; 07/08/2007 - 10/07/2007; Waterford Steam Electric Station, Unit 3 ML0711701232007-05-0404 May 2007 IR 05000382-07-201, on 03/02/2007, Waterford Steam Electric Generating Station Security Baseline Inspection, Cover Letter ML0704502512007-02-13013 February 2007 IR 05000382-06-005, on 10/08/2006-12/31/2006, Waterford Steam Electric Station, Unit 3, Postmaintenance Testing; Refueling and Other Outage Activities, Emergency Plan Biennial Program Inspection IR 05000382/20060112006-09-20020 September 2006 3 IR 05000382/2006011 IR 05000382/20060062006-07-19019 July 2006 IR 05000382 06-006; on 06/19 - 22/2006; Waterford Steam Electric Station, Unit 3, Security Baseline Inspection; Equipment, Performance, Testing and Maintenance - Letter Only IR 05000382/20030122004-06-24024 June 2004 IR 05000382-03-012, Waterford 3, No Report to Be Issued IR 05000382/20023022002-09-0606 September 2002 IR 05000382-02-302, on 7/31-8/6/2002, Entergy Operations, Inc., Waterford Steam Electric Station, Unit 3, Initial Retake Examination of an Applicant for a Reactor Operator License. No Violations Noted IR 05000382/20010092002-04-25025 April 2002 IR 05000382/2001-009; on 12/30/01-03/30/02; Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3; Integrated Resident & Regional Report; Maintenance Risk Assessments and Emergent Work Evaluation; Permanent Plant Modifications 2018-07-17
[Table view] Category:Letter
MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22332A5292022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000382/2023301 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 2024-01-31
[Table view] |
Text
ber 6, 2002
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - INITIAL RETAKE EXAMINATION REPORT 50-382/02-302
Dear Mr. Venable:
On August 6, 2002, the NRC completed an initial retake examination at the Waterford Steam Electric Station, Unit 3. The enclosed report presents the results of this examination.
The examination included the evaluation of one applicant for a reactor operator license. We determined that the applicant failed the retake examination and did not satisfy the requirements of 10 CFR Part 55.
In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter and your response will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Anthony T. Gody, Chief Operations Branch Division of Reactor Safety Docket No.: 50-382 License No.: NPF-38
Entergy Operations, Inc. -2-
Enclosure:
NRC Inspection Report No.
50-382/02-301
REGION IV==
Docket No.: 50-382 License No.: NPF-38 Report No.: 50-382/02-302 Licensee: Entergy Operations, Inc.
Facility: Waterford Steam Electric Station, Unit 3 Location: Hwy. 18 Killona, Louisiana Dates: July 31- August 6, 2002 Inspectors: Thomas O. McKernon, Chief Examiner, Operations Branch Approved By: Anthony T. Gody, Chief, Operations Branch Division of Reactor Safety
-2-SUMMARY OF FINDINGS IR 05000382/02-302, on 7/31-8/6/2002, Entergy Operations, Inc., Waterford Steam Electric Station, Unit 3, initial retake examination of an applicant for a reactor operator license.
An NRC chief examiner evaluated the competency of one applicant for a reactor operator license at the Waterford Steam Electric Station, Unit 3. The applicant was administered a written retake examination that the facility developed using the guidance of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors," Revision 8, Supplement 1.
The written retake examination was administered to the applicant on July 31, 2002, by facility proctors in accordance with instructions provided by the chief examiner.
Cross-cutting Issues: Human Performance
- No findings of significance were identified.
Report Details 4. OTHER ACTIVITIES 4OA4 Initial License Examinations
.1 Operator Knowledge and Performance a. Examination Scope On July 31, 2002, the licensee proctored the administration of a written retake examination to one applicant. The licensee staff graded the written examination, analyzed the results, and presented their analysis to the NRC on August 6, 2002.
The NRC granted a waiver to the applicant for the operating portion of the examination since the applicant had previously passed this portion during the initial operator license examination administered on January 21-24, 2002.
b. Findings The applicant scored 79.8 per cent and failed the retake written examination. The text of the examination questions may be accessed in the ADAMS system using the accession number as noted in the attachment.
The licensee conducted a performance analysis for the written examination with emphasis on three questions. The licensee concluded that there were no commonalities in the knowledge deficiencies. The licensee did not formally recommend any questions be modified or deleted from the written examination. However, the licensee stated that three questions would be modified in their examination bank. The chief examiner reviewed the technical basis for these questions as well as other questions missed by the applicant and regraded the examination. Question No. 39 was deleted from the examination since insufficient information was provided for the applicant to correctly answer the question. Questions Nos. 43 and 45 were revised to accept an additional answer choice, answer A. The chief examiner also reviewed all the other missed questions by the applicant and determined that the other questions were technically accurate and satisfactory as written.
No findings of significance were identified.
.2 Initial Licensing Examination Development The licensee developed the written retake examination in accordance with NUREG-1021, Revision 8, Supplement 1, using facility training and operations staff on the security agreement.
-2-
.2.1 Examination Outline and Examination Package a. Examination Scope The facility licensee submitted the written retake examination outlines on April 8, 2002.
The chief examiner reviewed the submittal against the requirements of NUREG-1021, Revision 8, Supplement 1, and provided comments to the licensee. The licensee revised the examination outlines and the chief examiner approved the initial examination outline and advised the licensee to proceed with the written retake examination development. The facility licensee submitted the draft written retake examination package on July 2, 2002. The chief examiner reviewed the draft submittal against the requirements of NUREG-1021, Revision 8, Supplement 1, and provided comments to the licensee on July 11, 2002. The licensee satisfactorily completed comment resolution on July 15, 2002. The licensee submitted letter W3F1-2002-0075 on August 6, 2002, which contained the examination analysis. The licensee letter may be accessed in the ADAMS system using the accession number, as noted in the attachment.
b. Findings The chief examiner determined that the written retake examination initially submitted by the licensee was within the range of acceptability expected for a proposed examination.
No findings of significance were identified.
40A5 Management Meetings
.1 Exit Meeting Summary The chief examiner presented the examination results to Mr. R. Fletcher, Operations Training Supervisor during a telephone conversation on August 12, 2002. The licensee acknowledged the findings presented.
The licensee did not identify as proprietary any information or materials examined during the examination.
ATTACHMENT PARTIAL LIST OF PERSONS CONTACTED Licensee R. Fletcher, Operations Training Supervisor NRC T. Farnholtz, Senior Resident Inspector ADAMS DOCUMENTS REFERENCED Accession No.:
ML022310316 Final Reference Exam ML022480431 Licensees Post Examination Analysis