April 3, 2008

Kevin T. Walsh, Vice President

of Operations

Waterford 3

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-3093

SUBJECT:

WATERFORD 3 - NOTIFICATION OF INSPECTION (NRC INSPECTION

REPORT 05000382/2008003) AND REQUEST FOR INFORMATION

Dear Mr. Walsh,

From May 5 to May 16, 2008, reactor inspectors from the Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline inservice inspection at

Waterford 3, using NRC Inspection Procedure 71111.08 and Temporary Instruction 2515/172,

Rector Coolant System Dissimilar Metal Butt Welds. Experience has shown that this

inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize

the impact to your onsite resources and to ensure a productive inspection, we have enclosed a

request for documents needed for this inspection. These documents have been divided into two

groups. The first group (Section A of the enclosure) identifies information to be provided prior to

the inspection to ensure that the inspectors are adequately prepared. The second group

(Section B of the enclosure) identifies the information the inspectors will need upon arrival at the

site. It is important that all of these documents are up to date and complete in order to minimize

the number of additional documents requested during the preparation and/or the onsite portions

of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Ron Williams of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact the lead inspector W. Sifre at (817) 860-8193 (wcs@nrc.gov).

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4005

Entergy Operations, Inc

- 2 -

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter

and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Russell L. Bywater, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-382

License: NPF-38

Enclosure:

Inservice Inspection Document Request

cc: w/enclosure

Senior Vice President

Entergy Nuclear Operations

P.O. Box 31995

Jackson, MS 39286-1995

Senior Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Vice President, Operations Support

Entergy Services, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Senior Manager, Nuclear Safety

and Licensing

Entergy Services, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Site Vice President

Waterford Steam Electric Station, Unit 3

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

Entergy Operations, Inc

- 3 -

Director

Nuclear Safety Assurance

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

General Manager, Plant Operations

Waterford 3 SES

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

Manager, Licensing

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-3093

Chairman

Louisiana Public Service Commission

P.O. Box 91154

Baton Rouge, LA 70825-1697

Richard Penrod, Senior Environmental

Scientist, State Liaison Officer

Office of Environmental Services

Northwestern State University

Russsell Hall, Room 201

Natchitoches, LA 71497

Parish President Council

St. Charles Parish

P.O. Box 302

Hahnville, LA 70057

Director, Nuclear Safety & Licensing

Entergy, Operations, Inc.

440 Hamilton Avenue

White Plains, NY 10601

Louisiana Department of Environmental

Quality Radiological Emergency Planning

and Response Division

P.O. Box 4312

Baton Rouge, LA 70821-4312

Entergy Operations, Inc

- 4 -

Louisiana Department of Environmental

Quality

Office of Environmental Compliance

P.O. Box 4312

Baton Rouge, LA 70821-4312

Lisa R. Hammond, Chief

Technological Hazards Branch

National Preparedness Division

FEMA Region VI

800 N. Loop 288

Denton, TX 76209

Entergy Operations, Inc

- 5 -

Electronic distribution by RIV:

Regional Administrator (EEC)

DRP Director (DDC)

DRS Director (RJC1)

DRS Deputy Director (TWP)

Senior Resident Inspector (RVA)

Branch Chief, DRP/E (JAC)

Senior Project Engineer, DRP/E (GDR)

Team Leader, DRP/TSS (CJP)

RITS Coordinator (MSH3)

DRS STA (DAP)

J. Adams, OEDO RIV Coordinator (JTA)

ROPreports

WAT Site Secretary (AHY)

SUNSI Review Completed: _RLB_____

ADAMS: Yes

Initials: _RLB_____

Publicly Available

Non-Sensitive

S:DRS\\REPORTS\\WT 200803 LTR-WCS.doc

ML

SRI:EB1

RI:EB1

C:EB!

WCSifre/lmb

JHNadel

RLBywater

/RA/

/RA/

/RA/

4/2/08

4/2/08

4/3/08

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

- 1 -

Enclosure

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates:

May 5, 2008 - May 16, 2008

Inspection Procedures:

IP 71111.08 Inservice Inspection (ISI) Activities

TI 2515/172 Reactor Coolant Dissimilar Metal Butt Welds

Inspectors:

W. Sifre, Senior Reactor Inspector (Lead Inspector - ISI)

J. Nadel, Reactor Inspector

A.

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (ims.certrec.com preferred), in care of W. Sifre, by April 21, 2008, to facilitate the

selection of specific items that will be reviewed during the onsite inspection week. The

inspectors will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection week (section B of this

enclosure). We ask that the specific items selected from the lists be available and ready for

review on the first day of inspection. *Please provide requested documentation electronically if

possible. If requested documents are large and only hard copy formats are available, please

inform the inspector(s), and provide subject documentation during the first day of the onsite

inspection. If you have any questions regarding this information request, please call the

inspector as soon as possible.

A.1

ISI / Welding Programs and Schedule Information

a)

A detailed schedule (including preliminary dates) of:

i)

Nondestructive examinations (NDEs) planned for Class 1 & 2 systems and

containment, performed as part of your ASME Section XI, Risk Informed (if

applicable), and augmented ISI Programs during the upcoming outage.

Provide a status summary of the NDE inspection activities vs. the required

inspection period percentages for this Interval by category per ASME Section XI,

IWX-2400 (Do not provide separately if other documentation requested contains

this information)

ii)

Reactor pressure vessel head (RPVH) examinations planned for the upcoming

outage.

iii)

Examinations planned for Alloy 82/182/600 components that are not included in

the Section XI scope. (If applicable)

iv)

Examinations planned as part of your Boric Acid Corrosion Control Program

(Mode 3 walkdowns, bolted connection walkdowns, etc.)

v)

Welding activities that are scheduled to be completed during the upcoming

outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs))

- 2 -

Enclosure

b)

A copy of ASME Section XI Code Relief Requests and associated NRC Safety

Evaluations applicable to the examinations identified above.

c)

A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, visual

VT-1, VT-2, and VT-3) which have identified relevant conditions on Code Class 1 and 2

systems since the beginning of the last refueling outage. This should include the

previousSection XI pressure test(s) conducted during start up and any evaluations

associated with the results of the pressure tests. Also, include in the list the NDE reports

with recorded indications in the RPVH penetration nozzles which have been accepted

for continued service. The list of NDE reports should include a brief description of the

SSC where the recordable indication was identified.

d)

A list with a brief description (e.g. system, material, pipe size, weld number, and NDE

performed) of the welds in Code Class 1 and 2 systems which have been fabricated due

to component repair/replacement activities since the beginning of the last refueling

outage, or are planned to be fabricated this refueling outage.

e)

If reactor vessel weld examinations required by the ASME Code are scheduled to occur

during the upcoming outage, provide a detailed description of the welds to be examined,

and the extent of the planned examination. Please also provide reference numbers for

applicable procedures that will be used to conduct these examinations.

f)

Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section

XI of the ASME Code that have been identified since the beginning of the last refueling

outage.

g)

A list of any temporary non-code repairs in service (e.g. pinhole leaks).

h)

Please provide copies of the most recent self assessments for the ISI, Welding, and

Alloy 600 Programs.

A.2

Reactor Pressure Vessel Head (RPVH)

a)

Provide the detailed scope of the planned NDE of the reactor vessel head which

identifies the types of NDE methods to be used on each specific part of the vessel head

to fulfill NRC commitments made in response to NRC Bulletin 2002-02 and NRC

Order EA-03-009. Also, include examination scope expansion criteria and planned

expansion sample sizes if relevant indications are identified. (If applicable)

b)

A list of the standards and/or requirements that will be used to evaluate indications

identified during NDE of the reactor vessel head (e.g. the specific industry or procedural

standards which will be used to evaluate potential leakage and/or flaw indications).

A.3

Boric Acid Corrosion Control Program (BACCP)

a)

A copy of the procedures that govern the scope, equipment and implementation of the

inspections required to identify boric acid leakage and the procedures for boric acid

leakage/corrosion evaluation.

- 3 -

Enclosure

b)

Please provide a list of leaks (including code class of the components) that have been

identified since the last refueling outage and associated corrective action documentation.

If during the last cycle, the Unit was shutdown, please provide documentation of

containment walk-down inspections performed as part of the BACCP.

c)

Please provide a copy of the most recent self-assessment performed for the BACCP.

A.4

Steam Generator Tube (SGT) Inspections

a)

A detailed schedule of:

i)

SGT inspection, data analyses, and repair activities for the upcoming outage. (If

occurring)

ii)

SG secondary side inspection activities for the upcoming outage. (If occurring)

b)

Please provide a copy of your SG ISI Inspection Program and Plan. Please include a

copy of the Operational Assessment from last outage and a copy of the following

documents as they become available:

i)

Degradation Assessment

ii)

Condition Monitoring Assessment

c)

If you are planning on modifying your Technical Specifications such that they are

consistent with TSTF-449, please provide copies of your correspondence with the NRC

regarding deviations from the STS.

d)

Copy of SG history documentation given to vendors performing eddy current (ET) testing

of the SGs during the upcoming outage.

e)

Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy Current

Technique Specification Sheets (ETSS). Additionally, please provide a copy of EPRI

Appendix H ETSS Qualification Records.

f)

Identify and quantify any SGT leakage experienced during the previous operating cycle.

Also provide documentation identifying which SG was leaking and corrective actions

completed or planned for this condition (If applicable).

g)

Provide past history of the condition and issues pertaining to the secondary side of the

steam generators (including items such as bat wing issues, loose parts, fouling, top of

tube sheet condition, crud removal amounts, etc.)

h)

Please provide copies of your most recent self assessments of the SG monitoring, loose

parts monitoring, and secondary side water chemistry control programs.

i)

Please also indicate where the primary, secondary, and resolution analyses are

cheduled to take place.

- 4 -

Enclosure

j)

Please provide a summary of the scope of the SGT examinations, including examination

methods such as Bobbin, Rotating Pancake, or Plus Point, and the percentage of tubes

to be examined. *Do not provide these documents separately if already included in other

information requested.

A.5

Metals Reliability (MRP-139) Program Activities

a)

A list of, with verification that, the baseline inspections of all Dissimilar Metal Butt Welds

(DMBWs)have been completed by December 31, 2007.

b)

Verification that baseline inspection of hot leg and cold leg temperature DMBWs have

been included in the inspection program and that the schedules for the baseline

inspections are consistent with the baseline schedules in MRP-139.

c)

A list and schedule (examination dates) of all DMBW examinations planned for the

coming refueling outage. If none are scheduled, then data from previous examinations

should be available for review.

d)

A list and schedule for any welding to be performed on DMBWs in the coming outage. If

no welding will be performed then records of previous welding on DMBWs and post weld

NDE documentation.

e)

A list and schedule of any stress improvement (SI) activities planned for the coming

refueling outage. If none are scheduled then have qualification reports for any SIs

previously performed.

f)

Documentation and description of how the baseline and inservice inspection

specifications in MRP-139 are satisfied at your facility.

A.6

Additional Information Related To All ISI Activities

a)

A list with a brief description of ISI and BACCP related issues (e.g., condition reports)

entered into your corrective action program since the beginning of the last refueling

outage (for the applicable Unit). For example, a list based upon data base searches

using key words related to piping such as: ISI, ASME Code,Section XI, NDE, cracks,

wear, thinning, leakage, rust, corrosion, boric acid, or errors in piping examinations.

b)

Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams

RPVH Exams

Snubbers and Supports

Repair and Replacement Program Manager

Licensing Contact

Site Welding Engineer

Boric Acid Corrosion Control Program

SG Inspection Activities (site lead and vendor contact)

- 5 -

Enclosure

B.

Information To Be Provided Onsite To The Inspector At The Entrance Meeting

(May 5, 2008):

B.1

ISI / Welding Programs and Schedule Information

a)

Updated schedules for ISI/NDE activities, including SGT inspections, planned

welding activities, and schedule showing contingency repair plans, if available.

b)

For ASME Class 1 and 2 welds selected by the inspector from the lists provided from

section A of this enclosure, please provide copies of the following documentation for

each subject weld:

i)

Weld data sheet (traveler)

ii)

Weld configuration and system location

iii)

Applicable Code Edition and Addenda for weldment

iv)

Applicable Code Edition and Addenda for welding procedures

v)

Applicable weld procedures (WPS) used to fabricate the welds

vi)

Copies of procedure qualification records (PQRs) supporting the WPS from

B.1.b.v

vii)

Copies of mechanical test reports identified in the PQRs above

viii)

Copies of the nonconformance reports for the selected welds (if applicable)

ix)

Radiographs of the selected welds and access to equipment to allow viewing

radiographs (if RT was performed)

x)

Copies of the preservice examination records for the selected welds.

xi)

Copies of welder performance qualifications records applicable to the selected

welds, including documentation that welder maintained proficiency in the

applicable welding processes specified in the WPS (At least six months prior to

date subject work)

xii)

Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable.

c)

For the ISI related corrective action issues selected by the inspector from Section A of

this enclosure, provide a copy of the corrective actions and supporting documentation.

d)

For the NDE reports with relevant conditions on Code Class 1 & 2 systems selected by

the inspector from section A above, provide a copy of the examination records, examiner

qualification records, and associated corrective action documents.

e)

A copy of (or ready access to) most current revision of the ISI Program Manual and Plan

for the current Interval.

f)

For the NDEs selected by the inspector from section A of this enclosure, provide copy of

the NDE procedures used to perform the examinations (including calibration and flaw

characterization/sizing procedures). For ultrasonic examination procedures qualified in

accordance with ASME Code,Section XI, Appendix VIII, provide documentation

supporting the procedure qualification (e.g., the EPRI performance demonstration

qualification summary sheets). Also, include documentation of the specific equipment to

be used (e.g., ultrasonic unit, cables, and transducers including serial numbers) and

NDE personnel qualification records.

- 6 -

Enclosure

B.2

Reactor Pressure Vessel Head (RPVH)

a)

Provide the NDE personnel qualification records for the examiners who will perform

examinations of the RPVH.

b)

Provide drawings showing the following: (If a visual examination is planned for the

upcoming refueling outage)

i)

RPVH and CRDM nozzle configurations

ii)

RPVH insulation configuration

The drawings listed above should include fabrication drawings for the nozzle attachment

welds as applicable.

c)

Copy of NDE reports from the last RPVH examination.

d)

Copy of evaluation or calculation demonstrating that the scope of the visual examination

of the upper head will meet the 95% minimum coverage required by NRC Order EA-03-

009 (If a visual examination is planned for the upcoming refueling outage).

e)

Provide a copy of the procedures that will be used to identify the source of any boric acid

deposits identified on the RPVH. If no explicit procedures exist which govern this

activity, provide a description of the process to be followed including personnel

responsibilities and expectations.

f)

Provide a copy of the updated calculation of effective degradation years (EDY) for the

RPVH susceptibility ranking.

g)

Provide copy of the vendor qualification report(s) that demonstrates the detection

capability of the NDE equipment used for the RPVH examinations. Also, identify any

changes in equipment configurations used for the RPVH examinations which differ from

that used in the vendor qualification report(s).

B.3

Boric Acid Corrosion Control Program (BACCP)

a)

Please provide boric acid walk down inspection results, an updated list of boric acid

leaks identified so far this outage, associated corrective action documentation, and

overall status of planned boric acid inspections.

b)

Please provide any engineering evaluations completed for boric acid leaks identified

since the end of the last refueling outage. Please include a status of corrective actions

to repair and/or clean these boric acid leaks. Please specifically which known leaks, if

any, have remained in service or will remain in service as active leaks.

B.4

Steam Generator Tube (SGT) Inspections

a)

Copies of the Examination Technique Specification Sheets (ETSS) and associated

justification for any revisions.

b)

Copy of the guidance to be followed if a loose part or foreign material is identified in the

SGs.

- 7 -

Enclosure

c)

Please provide a copy of the ET procedures used to perform the SGT inspections

(specifically calibration and flaw characterization/sizing procedures, etc.). Also include

documentation for the specific equipment to be used.

d)

Please provide copies of your responses to NRC and industry operating experience

communications such as Generic Letters, Information Notices, etc. (as applicable to

SGT inspections) *Do not provide these documents separately if already included in

other information requested such as the degradation assessment.

e)

List of corrective action documents generated by the vendor and/or site with respect to

SG inspection activities.

B.5

Codes and Standards

a)

Ready access to: (i.e. copies provided to the inspector to use for the duration of the

inspection at the on-site inspection location, or room number and location where

available)

i)

Applicable editions of the ASME Code (Sections V, IX and XI) for the inservice

inspection program and the repair/replacement program.

ii)

EPRI and industry standards referenced in the procedures used to perform the

SGT eddy current examination.

Inspector Contact Information:

W. Sifre

J. Nadel

Senior Reactor Inspector

Reactor Inspector

817-860-8193

817-276-6547

wcs@nrc.gov

jhn@nrc.gov

Mailing Address:

US NRC Region IV

Attn: W. Sifre

611 Ryan Plaza Drive, Suite 400

Arlington, TX 76011