ML20059K791

From kanterella
Revision as of 06:17, 25 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Corrected Monthly Performance Rept for Braidwood Nuclear Generating Station for Sept 1993,revising Attachment I.F
ML20059K791
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/09/1993
From: Kofron K
COMMONWEALTH EDISON CO.
To:
NRC, NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059K796 List:
References
BW-93-0283, BW-93-283, NUDOCS 9311160196
Download: ML20059K791 (1)


Text

.

C2mm:nw=lth Edis n

- Braidwood Nuclear Power Station Ze Route #1, Box 64 V' Braceville, Illinois 60407 Telephone 815/458-2801 I

November 9, 1993 BW/93-0283 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk r

Reference:

(a) Letter BW/93-0260 dated October 8, 1993  :

Dear Sir:

Enclosed for your information is a corrected Monthly Performance Report covering the Braidwood Nuclear Generating  ;

Station for the period September 1 through September 30, 1993.

l Information in Attachment I.F, Licensee Event Reports -

Unit 1, of the original report transmitted in reference (a) was incorrect.

/

l Kofro i

Station Manager i Braidwood Station KLK/TP/da

Attachments -

cc: J. B. Martin, NRC, Region III  ;

R. R. Assa, U.S.N.R.C.

Ill. Dept. of Nuclear Safety HRC Resident Inspector, Braidwood .

INPO Records Center j

, D. L. Farrar, Nuc Reg Serv Mgr l l D. M. Saccomando, Nuc Lic Admin I i D. R. Eggett, Nuc Eng Dept l S. M. Berg, Site V.P., Braidwood Nuc Fuel Services, PWR Plant Support Results Eng Group, Sys Eng, Braidwood Nuc Group, Sys Eng, Braidwood l

l I

9311160196 931109 PDR ADDCK 05000456 pi r; {

j R PDR tj