ML051920042
ML051920042 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 04/12/2004 |
From: | Nuclear Management Co |
To: | Office of Nuclear Reactor Regulation |
References | |
FOIA/PA-2004-0282 | |
Download: ML051920042 (16) | |
Text
NMC, Comrmitted to NuCICar ExcellCnC _
TEMMCELCEU POW BERCH* UIR21 Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Monday April 12, 2004 Start Time: 0600 / (S) NSB Cafeteria Attendees: Shift Outage Directors (SOD)
Shift Outage Managers (SOM)
Operations Coordinators (SOC)
Maintenance Coordinators (MOC)
Engineer Coordinators (EOM)
Major Project Coordinators (MPC)
Rad Protection Manager (RPM)
Agenda: 1. Safety Issue Discussion (SOD)
- 3. Plant Status / Operations Coordinato Turnover (SOC) V7'
- 4. Shutdown Safety Assessment (SOC)
- 5. Maintenance Coordinator Turnover (MOC) - Po i4 64LJ - c'2- I
- 6. Engineering CoordinatorTurnover (EOC) / /;i7 Y h /'4hJ IiY'L
- 7. Schedule Review (SOM)- V S. Shift Goals (SOM)- V
- 9. Management Expectations /
- 10. ACEMAN Assessment (SOM) 11.' Final Comments (SOD)
Items Included in Daily Package:
- Site Communications
- Safety Snippet
- Outage Alara Report Daily Outage Status Report
- Shutdown Safety Assessment
- Outage Schedule
- Operating Unit Schedule
- Medium/High Risk Activities Information Inthef record war de0eId inaccordance with tke Freedom of Information Act, e eqmntio V 4 '94q FOlSt7 y e 1
Site Communication Priorities: Cbf4 , .
- TheSafe0perationofUnit2 eltI
- Exiting the Yellow Paths onUnit I - 7 Communication Improvement Initiatives A Due to the recent problems encountered with outage activities, ALL outage activities have been stopped. Changes are being made to improve communication and turnovers and to focus our efforts on achieving all green shutdown safety assessment parameters. Effective 4/11/2004 at 1800 the following expectations are in effect:
Outage Briefing Schedule (held in the NSB Cafeteria):
Day Shift Night Shift Activity 0600 -0645 and 1800 -1845 OCC turnover **
0645 -0730 and 1845 - 1930 Communicate OCC turnover to work force 0730- 0800 and 1930 - 2000 Verify OCC turnover information I__IIcommunicated to the crew 0800- 0900 and 2000 - 2100 Supervisors conduct job specific briefs with their workforce
- Outage Briefing Schedule Notes:
- The following personnel are required to attend the OCC turnover meeting:
Upcoming shift supervisory personnel, General Supervisors, temporary supervisors, managers, and other personnel performing in a supervisory capacity for outage activities.
- Attendance will be taken at the OCC turnover meeting.
It is recognized that this will result in longer durations for the outage. Since the safest place to be is on schedule, the outage schedule is being revised to include these meetings.
- Very few exceptions will be made to the briefing schedule requirement. The OCC will control all exceptions.
Additional Changes:
- Just in Time Training (JITT) shall be developed and presented for each upcoming significant task such as IB RCP motor lift, Reactor Head Lift, etc.
- A responsible Manager will be assigned to selected work activities as directed by the OCC. These managers will monitor the job from pre-job briefing through to completion.
- Management activities not related to the safe operation of Unit 2 and safety exiting Unit I yellow paths will be reviewed on 4/12/2004 and suspended as necessary.
- Initially, non-power block work may be approved through the OCC.
These changes are being implemented immediately. Please provide feedback to your supervisor on ways to improve this process.
2
ConzmItted to Nuclear ExccllnceA tLJDUSflEY O GERCH UIR2B Ntri Point Beach Nuclear Plant UIR28 Refueling Outage
.Safety Topic for week of April 11-17th : -
Theme for the week This week's theme is Housekeeping. What does housekeeping have to do with safety?
Lotsl A clean and orderly workplace is essential to avoid falls, fires and many other kinds of accidents and injuries.
Daily Safety Snippets Sunday "Outage rubble can lead to trouble" On April 21, 2001 the Point Beach dedared an Unusual Event due to a small fire In the Unit I containment building during a refueling outage. The fire was in a bag of rags on the manway platform of the Alpha steam generator In Unit
- 1. The fire brigade was summoned and put out the fire within about 20 minutes.
Monday "When you clean up hazards, you scrub out accidents" Why is good housekeeping Important? Just think about it. A clean workplace has less fire hazards, fewer safety hazards and lust plain looks better. A clean workplace promotes pride Inyour lob.
Tuesday "Improper storing can be more than annoying" What are those yellow cabinets for? Remember to properly store all flammable chemicals in fire cabinets. These should be in properly labeled containers and the storage capacity of the cabinet should never be exceeded.
Wednesday "Avoid a fatal scene; Keep your job site clean" A building contractor died when he was trapped in the burning basement of a house under construction. Another worker was using an oxyacetylene cutting torch to cut I-beams over the basement of the house. Stray sparks set fire to some sawdust and scrap wood used as packing material. The worker escaped and sounded the alarm, however the contractor lumped into the basement, In a fatal attempt to put the fire out.
Thursday "Ashes to ashes, dust to dust; A clean workplace is a must" At the PI a couple of years ago during a refueling outage on unit 1,welding sparks ignited a small fire In some rags in containment An alert fire watch was able to put out the fire Immediately but the fire was preventable with some very basic housekeeping practices.
Friday "D~on't be a slob; Clean up after each job" After going through the snippets for this week makes you feel as if you have Just gotten a lecture from your mother about keeping your room tidy, that's okay. Mom was right! Housekeeping Is everyone's job and working together will not only ensure a dean workspace, It will also help to ensure a safe one.
Saturday "Clean up and care will speed up repair" It Is a good practice to assign one coworker as the 'housekeeping conscious on each job. This person is responsible not to dean up after you but to remind everybody on the job to clean up after themselves. This helps to minimize the gradual buildup of clutter as the job progresses.
Y Point Beach Nuclear Plant Outage 1R28 Path Picture DAY 8 IN A1 Meets Supporting Operational Excellence Outaae I _- ip-Radiation Performance
- ----- -- __-- I I r%-_16 IA--#
LJUVOI5 IIVIUVL ~ C--4.
V..
I. e* gAM IThis indicator measures cumulative dose radiation exposure and [Day 8-April 11 Actual = 0.259 total number of personnel-contamination events (PCE's > 5000 Cumulative = 22.634 cpm) during refueling outages. The dose indicator is measured in Cumulative Forecast = 28.148 Rem and individual PCE events.
Meets: <=75 Rem Actual Cum.
Exceeds: <=71 Rem Dose: 22.634 Rem Meets: <=18 Exceeds: <= 12 Actual PCE's: 5 1- - S S O i Stu Thomas I Personnel Contamination Events Cummulative Dose Exposure 20 w I I
18 16
,,:-- -- 1
- 6-E Io -- Actual it 14
- I ---- Actual 0 i 12 z
.Forecast U.E i 10 0 U
-GGoal i ft -- Goal a0 40 la 8 +/-'2 0 ZI 6 0 2 9
z "i - 0 20 4
B r ....
2 0
,~
0 2 4 6 8 10121416182022242628303234 0 2 4 6 8 10 12 14 16 18 20 22 24 26
Nuce Comnmulfed ID Nuclear Excellence Outage Status Report Plant: Point Beach Unit I Day: Monday Today's Date/ Time: 4112/04 I 1500 Outage Duration: Day 9 of 28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0 First Aid cases 0 Significant near misses _ 0 Total for this outage 0 Summary:
Radiological Dose outage to date 22.634 Projected to date 28.148 Outage Goal S75 R Difference -5.514 Number of PCEs 5 Summary:
Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0 Summary:
Plant Status Mode: El Hot Standby (Mode 3) El Hot Shutdown (fode 4) E] Cold Shutdown (Mode 5) Refueling Shutdown (Mode 6)
RCS: Temperature: 100 Pressure: Vented to Atmosphere RV Level: 69%
Time to Boil: 45 Minutes Shutdown Safety Assessment Reactivity: Green Core Cooling: Yellow Power Availability: Green Containment: Green Inventory: Yellow Spent Fuel Pool Cooling: N/A Protected Equipment:
Malor Activities Completed In Last 24 s Critical Path and Near Critical Path Activities (Next 24 Hours)
Released Work to Complete Stud Detensioning Schedule: Activities Required to Exit Yellow Risk Conditions Detension Reactor Vessel Head Studs 1) B RCP Motor Move
- 2) ORT 15 Fuel Transfer System Checkout
- 3) Reactor Vessel Head Stud Removal
- 4) Reactor Vessel Head Lift Significant Outstanding Issues Date Issue Due Responsibility 4/03/04 Repair Blowdown Tank Leakage 4/15/04 Scott Manthei 4/04/04 0P2A Charging Pump Troubleshooting 4/12/04 Clay Hill 4/07/04 N40 Source Range Contingency Temp Mod Approval 4/12104 Mel Pedersen 4/08/04 K2B Instrument Air Compressor Solenoid Replacement - Update to OCC 4/12/04 Gary Sherwood 4/08/04 Incorporate Lessons Learned from 1ST Reduced Inventory Orange Path 4/18/04 Dave Dyzak 4/08/04 B RCP Motor Oil Sludge 4/12/04 Jim McGough 4/11/04 B RCP Motor Lift Concerns 4/12/04 Dan Laing Containment Crane Checkout (Use Outage Contingency Plan) 4/11/04 Priority Special Projects Contracts/Resources - Coordination of Continued Support I) SG Eddy Current and sludge T. Klesperl/H. Erdman
- 2) Main Turbine & Generator Work D. Hofstra /T. Ruiz
- 3) Rx Vessel Under Head Inspection R. Brown
- 4) Hx Hydro Lance & Eddy Current P. Holzman
- 5) Maintenance Support (i.e., AIMS)
Pag I of 2
Committed to Nuclear Excellence O
~ Outage Status Report Upcoming Malor Milestones Scheduled Actual Scheduled Actual Date Time Date Time l Date Time Date Time Cooldown 200° 4/03/04 2100 4/03/04 2230 lHeatup >2000 4125/04 0900 Head Lift 4/09/04 0900 Initial 4/28/04 1100 Refueled /14/04 0300 On-Line 4/30/04 0100 Pagg2 of 2
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: I DATE: April 12, 2004 TIME: 143(0 KEY SAFETY FUNCTIONS:
REACTIVITY: GREEN CORE COOLING: 11 I- 1.1.0WR POWER AVAILABLE: GREEN INVENTORY: YELLOW CONTAINMENT: GREEN SFP COOLING: NA PROTECTED EQUIPMENT:
L-co MENTS:
Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency RCS Time to Boil is 45 minutes RCS is at 69% Reactor Vessel Level Hol Leg V'ent Path is the Pressurizer Nlanivay PB F-1A2 Rerterences: NP 10.3 6 Rotiucj,n IIf~l)/VVO Pagei Or 9 NF I U.2 3
after 12APR04 0800 after 12APR04 0800 I U1R28 WORKING SCHEDULE I U I RESI WOI O EQID DESCRIPTION RD ES EF 13AP I CE46CO01BR CE4 ICP-10.029 PRE JOB BRIEF FOR I 12APR04 12APR04 46C001 BRPR !J01I BRIEf FOR SEAL TAE CAFFC LD SEAL TABLE SCAFFOLE 12:00- 12:59 ESEAL TABL _RATI(7NS FOR REFUE OPz 1 T-0719-R WCC - 0010719 Z-024A I FH Z-24A RP-1A OPS 1 12APR04 12APR04 9.R1 FH Z. P-lA OPS REVo-1 REVO-1 12:00 12:59 I FH Z-24A kOPS )EV0-1 0010719 1 T-6510-H WCC 0016510 Z-013 IZZ-13TBLEMREVO-1 2 12APR04 12APR04 .1-Il Z Z-. EM REVO.1 12:00 13:59 _ 1 ZZ-13 'ML EM REV0.10016510 1 IC1O.29CBR IC 76 0300890 ICP-10.029 PRE JOB BRIEF FOR 1 12APR04 12APR04 0.ICBRPRE J01u BRIEF )OR THIMBLE Vl RAWA HIMBLE WITHDRAWAL 13:00' 13:59 *SEAL TA ILEC IPERATIONS FOR REF1 IG0300 390 RWP: Seal MaInlehance 1 Z13BRIEF EM 0311802 Z-013 PRE JOB BRIEF TO 1 12APR04 12APR04 IS EFPREJ uEF TO REPAIR POLAI ILNE REPAIR POLAR CRANE 13:00 13:59 *0311802 1 CE46CO15SI CE4 - ICP-10.029 BUILD SCAFFOLD FOR 2 12APR04 12APR04 46C00158U11 AFFOLD FOR SEAL TA (ICP.1 1.029) 1/
SEAL TABLE 13:00 14:59 _SEAL1 OPERATIONS FOR RE -ING (ICP-10.029) 1 0156-030 OPS - 01-56 ADD WATER TO 2 12APR04 12APR04 6-030ADD W. tER TO TRANSFER CANAL CART MOTION TRANSFER CANAL FOR 13:00 14:59 CART MOTION 1 EM0311802 EM 76 0311802 Z-013 TROUBLESHOOTER & 4 12APR04 12APR04 0311 TROI 1aLE HOOTER & REPAIR P4 tCRAN REPAIR POLAR CRANE 14:00 17:59 CON rAINMENT CRANE0311 1 IC10.29C IC 76 0300890 ICP-10.029 ICP 10.29 THIMBLE 3 12APR04 12APR04 I0.2LgCP 10. 1IMBLEi WITHDRAWALl WITHDRAWAL 15:00- 17:59 SEA~ *TABLU OPERATIONS I IEFUEI .ING RWP: eaIl.1 able Maintenance t ..
1 EM0215236A EM 76 0215236 Z-024B1 Z-024B1 PERFORM 4 12APR04 12APR04 CHECKOUT 15:00' 18:59 0215236 491, 2ERFORM CHECKOUT II H15236_ INTAINMENT FUEL UPE R 1 O-RT-015A OPS 77 0215962 O-RT.015 FUEL XFR SYSTEM 10 12APR04 13APR04 tT-O15AFUEL KFR SYSTEM CHECK OUT CHECK OUT 15:00 00:59 15962 _ - FUEL MANI TOR/FI IEL TRANSFER ;Ysi RWP:( ~6rta nment beneral Area Mali nce I PM-BRIEF1 ADM ADMIN OCC INTERACTIVE 2 12APR04 12APR04 PM-BRIEF1 INTER"CTIVE TURNOY nd FOL LOWUP TURNOVER and 18:00 19:59 FOLLOWUP 1.2 1 IC1o.29C-J IC 76 0300890 ICP-10.029 THIMBLE WITHDRAWAL 1 12APR04 I 12APR04 ICI .JTHIMBLE WITHDRA nTT JIrTT 21:00 21:59 cSItAL TABLE OPEF )NS FO l REFUELING RWPr Seal Table Mali enaice I . I I I . .1 Run Date 12APR04 12:41 LT-51 PRIORITY PUBLICATION-ES I Sheet 1 of 3 C Primavera Systems, Inc. _ FL-51 Activities to Fill Cavity I
after 12APR04 0800 l U1R28 WORKING SCHEDULE I after 12APR04 0800 U ID RESP ST WO I EQID I DESCRIPTION IRDI ES I EF APR 13
_ ST 012 4118
. ,20. 221 0 .2 .4 1 6 1 8 .1p 121Z.14. 16 118 120, 221 0.2. 4 I EZMRCP-K1 EM 76 0215205 P-001B-M JIT INFO SHARING FOR 2 12APR04 12APR04 EZM (jj!1.yFO SHARING Ft f1B Mc TOR UFT P.1B MOTOR LIFT 21:00 22:59 215 q5REACTOR COOq PUMP MAOTOR RWP: RCP Seal MaIntl 1 EZMRCP-K2 EM 76 0215205 P-0011B-M P-11B PRE-JOB BRIEF 2 12APR04 13APR04 E+/-MI CPp4C2P.18 PRE-JOB FORl OTOR MOVE FOR MOTOR MOVE 23:00 00:59 `1520!REACTOR q ANT PI IMP MOTOR RWP: RCP Seal mnance 1 OP0215233 OPS 76 0215233 Z-016 PERFORM 2 12APR04 13APR04 bP( 2 1 5 2 3 EFORM MANI kTOR FMT MANIPULATOR PMT 23:00 00:59 21 523XREACTOR Y MAN IPULATOR 1 T-0711-H WCC 0010711 Z-024A 1 RC Z-24A RMP-9096 I 13APR04 13APR04 T.071141 1 RC Z-24A .9096 HM REVO-1 MM REVO-1 01:00 01:59 001t711E1 RC Z.24 pP-9094 ; MM REVO-1 1 T-8379-H WCC 0018379 Z-024A 1 FH Z-24A RP.1A OPS 2 13APR04 13APR04 T-83794 1f FH Z-24A I 1kOPS 1EV1-1 REVI11 01:00 02:59 0018379_1 FH Z* RP-1A I )PS REV1-1 1 EZMRCP-K EM 76 0215205 P-001B-M P1B MOVE MOTOR 6 13APR04 13APR04 EZMRtP4(PIB MOVE 1 )R FRC iMPUMP TO ST)
FROM PUMP TO STAND 01:00 06:59 021520!_ :ACTOI *COOLANT PUP )TOR RWP: RCP 8 Aainten ince 1 AM-BRIEF2 ADM OCC INTERACTIVE 2 13APR04 13APR04 AM-BRIEF2 INTER kCTIVE TURNOV nd FOLLOWUP TURNOVER and 06:00- 07:59 FOLLOWUP 1 MM-8480C4 MM1 76 0214134 R1 IPTE BRIEF PRIOR TO I 13APR04 13APR04 MM.84 IPTE B IIEF PRIOR TO I rUD REMOVAL RV STUD REMOVAL 08:00- 08:59 I02 1 MM-8480C3 MMI 76 0214134 R-1 REMOVE STUDS/ 8 13APR04 13APR04 r.3 REM DVE STUDS I ClI STUD >HOLES MM-CLOSE STUD HOLES 09:00 16:59 1W .OR VEPSEL AND ASSE
~~Rl 1 PM-BRIEF2 ADM OCC INTERACTIVE 2 13APR04 13APR04 PM-BRIEF2 INTERACTIVE TURNOV TURNOVER and 18:00- 19:59 FOLLOWUP I MM-8480RA MMI 76 0214134 R-1 JIT INFO SHARING. 1 13APR04 13APR04 4TINFO SHARING, IN MM."
INSTALLING CAVITY 20:00' 20:59 021 EREACTOR VESSEL A SEAL RING I MM-8480RB MMI 76 0214134 R-1 IPTE BRIEF PRIOR TO I 13APR04 13APR04 8BPTEBRIEF PRIOR T(
MMq INSTALLING CAV1IY 21:00 21:59 34MRqACTOR VESSEl SEAL RING 1 MM-54B0R1 I MM1 76 0214134 R-1 INSTALL CAVITY SEAL 4 13APR04 14APR04 -.
M .I S 3QR1INSTALL CAVITY RING 22:00 01:59 413_REACTO Run Date 12APR04 12:41l LT-51 PRIORITY PUBLICATION-ES Sheet 2 of 3 0 Primavera Systems, Inc. I FL-51 Activities to Fill Cavity I
afte 12AR040800afte 12PR04080 after 12APRO4 0800 after 12APRO4 0800 I U1R28 WORKING SCHEDULE U ID RESP WO WO EOID DESCRIPTION RD ES EF 2 R ST ._ 12_14_16_ 20 221a _ZaL 2 i 8 1 i-214 _ 2Q1220.L2.+/- 4-1 RP1D-005 OPS O-RP-OOID ESTABLISH RP 1D 4 14APR04 14APR04 RP1 00SESTABUS INITIAL CONDITONS 01:00 04:59 . .. ' _
1 MM-8480RC MMI 76 0214134 R.1 JIT INFO SHARING. I 14APR04 14APR04 ,..MM40R~ INFO SANDBOX & TOP HAT 02:00 02:59 :.1413.REACI COVER I MM-848ORD MMI 76 0214134 R-1 IPTE BRIEF PRIOR TO 14APR04 14APR04 , M"-8480RdPTEB SANDBOX & TOP HAT 03:00 03:59 02141 3REA COVER 1 MM-8480R2 MM1 76 0214134 R-1 CHECK SANDBOX & I 14APR04 14APR04 MM4480 H TOP HAT COVER BOLT 04:00 04:59 0214tRI TORQUE I RPID-010 OPS O-RP-001D FILL LOWER CAVITY 10 14APR04 14APR04 RP1D0101FI 05:00 14:59 4 R'if l /los- fit puN-n.-
Run Date 12APR04 12:41 LT.51 PRIORITY PUBLICATION-ES Shoet 3 of 3 o PNmavera Systems. Inc. I FL-51 Activities to Fill Cavity
after 12APR04 12:00 WORKWEEK SCHEDULE thru 14APR04 0500 U ID RESP Tl WO I EQID DESCRIPTION RD) ES I EF RISK Resm1 APR Y ST ID 16. 1112.14,16,18,20,2210, 2.4. 6. 841002,14,16,18.20.221 0, 2, A. A.
2 BM0300118 BMS 77 RE-PC 46.1 VERIFY RTO AS 1 13APR04 13APR04 BM0300118VERIF ' RTO AS CALCULATED BY PPCS CALCULATED BY PPCS 01:00 01:59 ' 03001114CAL RIMETRIC
_ Pr_-p roved tech spec Restart CL not req'd 1S - ,n;1[ 0 I-1 - t ;,i g 0 CE0210986 CE6 77 SEC SEC SUPPORT MR 123 05APR04 03MAY04 DR-N ML-N 926 2 2E 6EC SUPPORT MR 99-011*B 99-011B 0 7:00A 14:59 ORT3-N R-L_ _
O CE0210989 CE6 M 76 SEC SEC. INSTALL NEW 123 05APR04 03MAY04 DR-N ML-N 926 E21 EC, INS'ALL NEW EQUIP M 99-01_E EOUIPMR99-011E1 07:OOA 14:59 ORT3-N R-Li 2 CH0300510 CH 77 M-SAMP RCS DO TSR 3.4.5.1 65 11APR04 17APR04 DR-N ML-N CS DO tSR 3.4.5.1 05:OOA 16:59 ORT3-N R-L re-appro tech spiC ST - Restart CL nc reqd 2 CH0300497 CH _ 77 CHEM-SAMPl RCS CL TSR 3.4.5.2 65 11APR04 17APR04 DR-N ML-N CS CL TSR 3.4.5.2 07:OOA 15:59 ORT3-N R-L________
re-app tech spec ST - Restart CL n reqd CH0300194 CH l 77 CEM-SAMPI BAST BORON TSR 35 12APR04 16APR04 DR-N ML-NLAST BORON TSR 3.5.12 3.5.1.2 07:OOA 14:59 ORT3-N R-L M Pre-app I tech spec ST - Restart Cl not reqd 2 CH0300523 CH P 77 CHEM-SAMPI SGBDFO GAMMA SCAN 35 1MI-N CH0 07:OOA 14:59 ORT3-N R-L MEMO______
Pm-app ved tecI spec ST - Restart C rnot reqd 2 CH0300549 CH 77 CHEM-SAMPI RE-229 ISOTOPIC 35 12APRO4 16APR04 DR-N MI-N CH E-_9 I OTOPIC 07:OOA 14:59 ORT3-N R-L Pro-appr tec spec ST - Restart Cl. not reqd 1 CH0300413 CH p 77 CHEM-SAMPL RCS FL TSR 3.4.5.3 8 12APR04 12APR04 DR-N ML-N CH030041 CS FL>SR 3A.5.3 12:00' 19:59 ORT3-N R-L 030041 MISC CHEMIS RY SAMPLING
_ __ _ _ _ __ _* l_ re-apprbved tech spec ST - Festart CL not reqd 1 CH0300357 CH P 77 CHEM-SAMP RCS CL TSR 3.4.5.2 60 12APRO04 17APR04 DR-N ML-N CH03003 C R 3.4.2 12:00' 11:59 ORT3-N R-L 003' raprvdtech spec ST.- estart CL not raqd I CH0300400 Cl-IP 77 CHM-SAMPL RCS BORON SR 3.9.1.1 60 12APR04 17APR04 DR-N MI-N C004 SD NS ...
12:00 11i:59 ORT3-N R-L 004 re-approved tech spec ST - oestart CL not req'd 2 CH0300563 CH - 77 CHEM-SAMPi RCS GROSS ACTIVllY 6 13APR04 13APR04 DR-N ML-N
- CH03005 CS GROSS ACTMTY SR 3.04.1 6.01 SR 3.04.16.01 05:00- 10:59 ORT3-N R-L , 030056 MISC CH4MISTRY SAMPLING
_ _ __ _ _ , re-approved tech sppc ST - Restart CL nrgt req'd Run Date 12APR04 13:291 LT-52 WORKWEEK ACTIVITIES DURING U1R28 Shoet I of 4 O Primavera Systems, Inc. I FL-52 Workweek Activities during U1 R28 I
after 12APR04 12:00 WORKWEEK SCHEDULE thru 14APR04 0500 U ID RESPlT WO EQID DESCRIPTION RD ES EF RISK Reuc APR
_ Y ST _I . .6. 8 .10il2.14.16,18.20,2210, 2, 4. 6. 8 .10112,14.16).18.20.Z2 0, 2. 4. 6 .
0 EM0305201 EM P 76 125V STATION TECH SPEC 3 13APR04 13APR04 DR-N ML-N 42044 E 0 3 0 5 2 01 STATION TECH SPEC BATTERIE SWEE BATTERIES WEEKLY 10:00' 12:59 ORT3-N R-M 0305201125V SYSTEM MULTI AND, OR NC Pre-approved tech spec ST - Res art CL O EM0309069 EM P 76 D-105 WEEKLY STATION 3 13APR04 13APR04 DR-N ML-N 420,442 EM0309069WEEKL'¢ STATION BATTERy INSPE BATTERY INSPECTION 12:00 14:59 ORT3-N R-M 030906ll124V DC STATION BAT ERY
__ ____.Pre-apprpved tech spec ST - estart O EM0309133 EM P 76 D-106 WEEKLY STATION 3 13APR04 13APR04 DR-Y ML-Y 20.44 EM0309133WEEKLY STATION BAT ERY I BATTERY INSPECTION 15:00 17:59 ORT3-N R-M 030913l125V DC STATION BATI Pre-approved tech spec ;T- Re O FG0309950 FG3 P aK 77 SERVICE
-x~ll~FLAMMABLE STORAGE 24 14APR04 15APR04
']:J
-_DR-Y ML-Y 453 FG030995 M CABINET INSPECTION 05:00 1659 ORT3-Y R-L F030995 OUTSIDE PA 0 IC0300670 lIC1 P 77 Z-107H REPLACE MEMBRANE 1 13APR04 13APR04 DR-Y ML-Y 330 C0300670 PLACE MBRAN 04:00' 04:59 ORT3-Y R-L 030067 ORTABLE EXPLOSIVES DETECTOR l~~~~~~ llll
- 1006 03 -e-approved tech spec ST PORTBEEXPLOSIVE S- Restart CL not eq d DETECTORCLAN
_ IC0213607 lIC1 :Pl 77 lZ-107H EXPLOSIVE DETECTORl 1 l13APR04 l13APR04 lDR-Y ML-Y l330 *IC02' 3607EXPLOSIVE DMTCTOR CLEANING CLEANING 08:00l 08:59 ORT3-Y R-L 02 3607IPORTABLE EXIPLOSIVES DETEC OR
_ Pre-approved teth spec ST- Restart L not O ICSECMX1 ICI 77 SEC SECURITY MUX 1 13APR04 13APR04 DR-YML-Y 310 ICSE MXISECURITY MUX CABINETS MONTH Y PM CABINETS MONTHLY 08:00 08:59 ORT3-Y R-L
- 2 IC2.3BRUN IC5 E1EE 76 ICP-02.003 RPLOGICTEST-TRAIN U
2 13APR04 13APR04 DR-NML-N 330. IC2.3 RUNRP LOGIC TEST-TRAIN B (4WK)
B (4WK) 08:00' 09:59 ORT3-N R-M 321.
- 99 120REACTOR IROTECTION LOGIC K03.
_ _ __________ KOS Pre-approved te'ch spec ST - Restart L not 2 IC2.5BRUN IC5 S 76 ICP-02.005 SGLOGICTEST-TRAIN 2 13APR04 13APR04 DR-N ML-N 330. G LOGIC T-TRAINB(4WK STAG B (4WK STAGGERED) 10:00' 11:59 ORT3-N R-M 321, I 5BRUN 5GLAFEGUIARDSLOGIC I
K03, Pre-approved tech spec ST - Res rt CL MM0407739 76 G-500
- EA
- .99 M2 2
12A 1 MM040773 500. REPAIR FUEL OIL UAK 03i SAFEGUiARD LOGIC I I _ __
OIL LEAK I__ _
12:00 13:59 l
_ I _
040T7732 rn-approved tech spec ST - I estart CL not reqd Run Date 12APR04 13:29l LT-52 WORKWEEK ACTIViTIES DURING U1R28 Sheet 2 of 4
¢ Primavera Systems, Inc. FL-52 Workweek Activities during U1 R28
thru 14APR04 0500 after 12APR04 after 12APR04 12:00 12:00 thru 14APRO4 0500 WORKWEEK SCHEDULE U ID RESP T WO EQID DESCRIPTION RD ES I EF RISK l APR 12 13
_ ST .ID .6. 8,1002114,16,18,20.22i0, 2.4 6.8 t,1012.14,16,18.20.221 21 4 6 0 OP0215278 OPO 77 O-PC-OS8 BIWEEKLY 1 13APR04 13APR04 DR-N ML-N OP02 5 2 7 8I0WEEKLY OPERATIONtCHECK OF 3AROW OPERATION/CHECK OF 08:00- 08:59 ORT3-N R-L
- 02 527TNCK OF BARON 11HIGH PRESS BR -ATHI
.BARON It _ . _ . Pro-approved te6h spec ST- RestaIr L not
' m I;5l1t1i Lei g ~ i __ _
O OP0215353 OPI 75 O-PC-MIDS OPERATIONS MID 28 09APR04 16APR04 DR-Y ML-Y LY ROUTINE SHIFT WEEKLY 00:WOA 06:59 ORT3-N R-L 535 ERATINS MID SHIFT WE K OI ROUTINE re-appove tech spec ST - Restart CL nc I reqd 2 OP0216093 OP1 F 75 O-PC-009.5 ROTATIONAL 2 14APR04 14APR04 DR-N ML-N K07 OPo2 160g3ROTATI NAL LUBRICATION OF UNIT 00:00- 01:59 ORT3-N R-L . 0216093IROT ,TION 2 SI Pre-app vedt E 0 OP0215431 OP2 76 O-PC-DAYS OPERATIONS DAY 3 06APR04 12APR04 DR-Y ML-Y po PERATiONS DAY SHIFT KLY ROUTINE SHIFT WEEKLY 08:OOA 14:59 ORT3-Y R-L _OF RATIONS DAY SHI WEEKLY ROUTINt0215431 ROUTINE re-approve tech spic ST - Restart CL n reqd 0 OP0215432 OP2 77 O-PC-DAYS OPERATIONS DAY 42 13APR04 18APR04 DR-N ML-N 'P02 s PERATIONS DAY SHIFT WEEKLY OUTI SHIFTWEEKLY 08:00 14:59 ORT3-N R-L 02 ROUTINE Pre-approved tech spec ST - Restart Lnot 0 OP0215547 OP3 fP 87 3-it1 0-PC-SWING OPS SWING SHIFT 14 07APR04 13APR04 DR-Y ML-Y u DP021554
- 1u PSSWI 0 SHIFT WEEKLY OUTINE WEEKLY ROUTINE 16:OOA 22:59 ORT3-Y R-L O90PERATI )NS S lre-approve tech spc ST - Restart CL n req'd 0 OP0215554 OP3 P75 O-PC-029 LOADTEST G-05.G-501 3 12APR04 12APR04 DR-N ML-N OP 15554)tAD TEST G G-16:00W 18:59 ORT3-N R-L 15554_GAS TURBINE, 1UXILIARIES AND LOpD TESTS
_ l ll llPte-approved tech spet ST - Restart CL not teqd O OP0215653 OP3 -P 77 O-PC-045.3 PUMP OUT 3 13APR04 13APR04 DR-N ML-N OPO2ts5653PUMP OUT CIRCULA INGOW CIRCULATING WATER 16:00 18:59 ORT3-N R-L
0 OP0308216 OP3 S 77 O-PC-045.1 BLOW DOWN I 13APR04 13APR04 DR-N ML-N 528 OPo3o0821LOWDOWNINSTR E INSTRUMENT AIR 17:00' 17:59 ORT3-N R-L 030821 MPERIODIC L80 OWN SYSTEM .Pre-approved tech sp ec ST 2 0P0303334 OP3 77 TS-ECCS-00 SAFEGUARDS SYSTEM 3 13APR04 13APR04 DR-N ML-N OPO303334SAFEGUARDS SYS VENTING (MONTHLY) 20:00 22:59 ORT3-N R-L 030333_SAFEGULRDS6 Pre-approved tech spe 2
l;-1 PR0300113
~
PREI II I 77 I
I-RESP 6.1 UNIT FLUX MAPPIN ROUTINE I4 13APR04 00:00-13APR04 03:59 DR-N MI-N ORT3-N R-L 1.60 1;;
IPRO300II3UNIT-2 -IFLUX MAPPING - R6UTINE
, 030011IcoRE POWER DISTRIBUTION/NUCLEAR OWE I I Pre-appr wed tech spec ST - Ilestart CL not reqd Run Date 12APR04 13:29l LT-52 WORKWEEK ACTIVITIES DURING U1R28 Shoot 3 of 4 0 Prlmavera Systems, Inc. I FL-52 Workweek Activities during U1 R28 I
thru 14APR04 0500 after 12APR04 12:00 12APR04 12:00 thru 14APR04 0500 I WORKWEEK SCHEDULE I U ID RESPlT WO I EQID DESCRIPTION RDOI13 ES EF RISK ResrCe 12 APR Y ST I ID 16.8.10 14.16 18222 0.2.4. 6. 8 .10I12.14.16,18,20.222I 0
- 2.4.
0 T-8390-H WCC G-500 0 GT G-500 MM REVO-1 2 12APR04 12APR04 T.83904 1 GT G-500 MM REVO-1 (IN 2 04 SOMS FOLDER):
(IN 2004 SOMS 12:00 13:59 001839( .
FOLDER) 0 0 T-8390-R WCC C G-500 0 GT G-500 MM REV0-1 2 12APR04 12APR04 T.835 *.R GT G-500 MM REV0.1 (1 2004 SOMS FOLDtR)
O9LR SOMS (IN 2004 14 00 15:59 001FE 0m Run Date 12APRO4 13291 LT-52 WORKWEEK ACTIVITiES DURING Ut R28 l Shoot 4 of 4 I C Pdmavera Systems, Inc. FL-52 Workweek Activities during Ul R28 I
Run Date 12APR04 13:07J Work Activity Risk Assignment Sheet I of I UI ACT WO GRP HPE EQUIPMENT Activity Cal DUR START FINISH APR i0 ST RISK Description ID _ 6 6 13APR04 13APR04 EREACTOR COOLANT PUMP MOTOR 1
- JEZMRCP-K 776 JEM DR-Y ML-Y ORT3-N R-H P-001B-M lP1P MOVE MOTOR FROM PUMP TO STAND j _
1 01:00 06:59 0215205- 12BEM NMCI WE LT-81 HUMAN ERROR RISK BARCHART O Primavera Systems,. Inc.
II oDnin 114 VLllr u1 I E'IUIUIIy AO OM uUaige I
I FL-81 HUMAN ERROR POTENTIAL
I-- S i4 IT. CFA411t 0/t.,,)
I))t IZVItjkl PRI6.
I. ~ 7, v~--