U1R28 OCC Interactive Turnover
ML051950432
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/14/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051950432 (24)


Text

- .

committed to NuclearonamIrIJEYDF W O TuR .R 2 8.

Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Friday, May 14, 2004 Start Time: 1800 NSB Cafeteria BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)

Operations Coordinators (SOC)

Maintenance Coordinators (MOC)

Engineer / Projects Coordinators (EOM)

Rad Protection Manager (RPM)

Site Safety Coordinator (SSC)

Shutdown Safety Assessor (SSA)

Site Management (SSM)

General Supervisors First Une Supervisors Agenda

1. Safety Issue Discussion (SSC)
2. Radiation Protection (RPM)
3. Operations Coordinator Turnover (SOC)
4. Shutdown Safety Assessment (SSA)
5. Maintenance Coordinator Turnover (MOC)
6. Engineering Coordinator Turnover (EOM)
7. Major Projects Update (EOM)
8. Schedule Review (SOM)
9. Management Expectations (SSM)
10. ACEMAN Assessment Results (SOM)
11. Shift Goals (SOM)

Items Included In Daily Package:

- Site Communication

- Safety Snippet

- Outage Alara Report

- Outage Status Report

- Shutdown Safety Assessment

- Defined Critical Path

- Work Activity Risk Assignment

- Outage Schedule _l_.__ ,

liformairn f mrocrd was deeed _

hI = brwaWithfte Freedom of Irforma0on AXQX 1

NCdN MI Commitned to NcleCIar Esies Pire. - Ir ramw uam

  • Ulmn
  • Point Beach Nuclear Plant U1R28 Refueling Outage
fSafetyToPlc 0fr week of May 9

Theme for the week This week's theme covers Emergency Situations. Be It weather, fire or a medical emergency. are we ready to respond to those unexpected situations?

I;>~t~2~< ,,i v Jee... -S<'Da11

.3@>8sq SAfetvSnippets -:, *. . .:..

Sunday

'You would be shocked if you found your emelyency egress path blocked" Material is beginning to come out of containment as a lot of work Iswrapping up. Don't pile up tools and equipment In the walkway even for short periods of time. Always keep the egress paths open for use.

Monday

'If strong winds start to blow, do you know where to go?'

Do you know the proper location to go Inthe event of a tornado warning if you are In the trailers, turbine hall or PAB? NP1.921 covers the site's various shelter areas. Plan ahead and take the time now to review the NP with your group.

Tuesday Wake sure to cleanup or a fire may start during heat up.

OEI 5310 Indian Point 3 - An oil vapor extractor for the main boiler feed pump failed. The tag out used to repair the extractor resulted In an Increased leakage of oil from the pump bearings onto lagging. A special log was created to monitor the leakage, but no plan existed for dealing with the safety hazards.

Maintenance repaired the extractor, returning It to service. The next day a portion of oil soaked lagging on a main boiler feed pump caught fire and was quickly extinguished by an alert watchstander.

Wednesday "rake heed - Don't block emelyency'equipment you may need."

Last week on the 66ft of containment, the NFIC noticed we blocked access to 2 fire extinguishers mounted on the stairwell handrail. A scaffold was built In the area that made access questionable. We then added a number of bags of Insulation It made access Impossible. Just a question - Why Is the NRC finding this Instead of us? .

Thursday "What number do you call if your co-worker takes a serious fall?"

What Is the plant's emergency number? 2911. This number is only to be used for emergency situations.

Two weeks ago a work group was having trouble getting through to operations to communicate a change In equipment status. Rather than waiting, the Individual Involved decided to contact the control room via the emergency number. Needless to say this was not an appropriate use of 2911.

Friday, WMake sure your fire watch is alert to keep someone from getting hurt" OE12607- LaSalle - A worker using an acetylene torch for cutting through a structural member that was behind a metal wall panel. Wall Insulation behind the member began to bum. The alert fire watch extinguished the fire within one minute of it beginning and no significant damage occurred.

Saturday "Debris buildup may result In an unplanned heat up" OE14899 River Bend Station - A small fire occurred under the exhaust piping on a diesel generator during testing. The fire was observed during routine checks of the generator and the control room was Immediately notified. The control room unloaded the generator while the operator extinguished the fire. The cause was insulation debris that accumulated around the hot piping over time.

2

Path Point Beach Nuclear Plant Outage 1R28 Picture DAY 40 Path Meets Supporting Operational Excellence Outaqe Radiation. Performance I - . .

hr%=Qgn't IAnuat Izve-ari S.

  • gA
  • This. indicator measures cumulative dose radiation exposure and Day 40 - May 13 .

Actual = 0.146 total number of personnel-contamination events. (PCE's > 5000 Cumulative = 54.869 cpm) during refueling outages. The dose indicator is measured in. Cumulative Forecast = 54.974 Rem and individual PCE events.

Daily PCE goal reforecast on 4/23. Daily dose reforecast on 5/8/04.

Meets: <=75 Rem Actual Cum. Reactor Head Repair Dose for May 13th is 0.854 vs. goal of 0.663.

Exceeds: <=71 Rem Dose: 54.869 Rem RV Head Total Dose Is 9.026.

Meets: <=18 Exceeds: <=12 Actual PCE's: . .9 S - S ** ~

  • 0I co Stu Thomas I Personnel Contamination Events Cummulative Dose Exposure 20 18 I 16

. 14 E

C 0 D 12 . Forecast w

a 10 0 0

0 ~Goal 28 0)

E0

.2 6 E

0 2

0 0 2 4 6 810121416182022242628303234363840424446485052 0 2 4 6 8 101214161 2422623032436384042444648 2

C*mM 1 Cotrnmifted to Nuclear Excellenc Ia Outage Status Report Plant: Point Beach Unit I Day: Friday Today's Date / Time: 5/14/04 1600 Outage Duration: Day 41 Of Refueling Outage Number U1R28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0 First Aid cases 0 Near misses 0 Total for this outage I Summary:

Radiological Dose to date 54.869 Projected to date *54.974 Outage Goal 575 R Difference -.105

  • Reforecast on 5/8 Number of PCEs 9 Summary: Reactor Head Repair Dose for May 13 ais 0.854 vs. goal of 0.663. RV Head Total Dose is 9.026.

Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0 Summary:

Plant Status Mode: QHot Standby (Mode 3) - a Hot Shutdown (Mode 4) 0 Cold Shutdown (Mode 5) 0 Refueling Shutdown (Mode 6)

RCS: Temperature: 81 Pressure: Vented to Atmosphere RV Level: Rod Latch Height Time to Boll: 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> Shutdown Safety Assessment Protected Equl ment:

Major Activities Completed in Last 24 Hours Critical Path and Near Critical Path Activities (Next 24 Hours)

  • Move Upper Internals Lift Rig (to 66' LDA)
  • Continue Reactor Vessel Head Penetration #26 Repair
  • P Perform Repair Welding of Nozzle
  • lXI I Transformer Breakers and Recover 480V Bus Alignment

. Fill and Vent Containment Spray . Containment Spray Restoration

  • Coordinate UT Inspections Penetration #32 and #33
  • De-energize IX03 for Breaker Maintenance Significant Outstanding Issues Date Issue Due Responsibility 5/03/04 Reactor Vessel Head Repair Penetration #26 5116/04 John Walsh 5/13/04 IP-lA RCP Motor Oil 5/14/04 Dan Laing 5/14/04 T-26 Steam Generator B lowdown Tank 5114/04 Scott Manthei

_ Upcoming Mtl or Milestones Scleduled Actual Scheduled Actual Date Time Date Time Date Time Date Time Cooldown <00° 4/03/04 2100 4/03/04 2230 RCS Fill & Vent 4/23/04 1500 Head Lift 4/09/04 0900 4/21/04 1550 Heatup >2000 4/25/04 0900 Refueled 4/14/04 0300 5/02/04 1848 Reactor Critical 4/28/04 0800 RV Headset 4118/04 1900 On-Line 4/30/04 0100 4

Point Bcach Nuclcar Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST ip OUTAGE SAFETY ASSESSMENT UNIT: I DATE: MIay 14, 2004 TIME: 1400 KEY SAFETY FUNCTIONS:

REACTIVITY: GREEN CORE COOLING: GREEN POWER AVAILABLE: GREEN INVENTORY: GREEN CONTAINMENT: YELLOW SFP COOLING: NA UJ-PROTECTED EOUIPMENT:

COMMENTS:

RCS Time to Boil is 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Using NP 10.3.6 Time To Boil curves.

Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF- 1562 Rfrerences NP 10.3.6 Revision2 1W01i02 5 Pag c5of9 NP 10.2.1

____ _ _Defined Critical Path

_ .MAY -

U ID DESCRIPTION OD RD Cal U SYS I * -

EQD TF 14 15

_416.8.,10112,14.16.18.20,2210,2,4.6.8.lOIl2.14.16e18.20I2210,2.4.6.8.10112.14.16,18,20, 16 1 CE1600R027 48 HOUR COOLDOWN OF 48 1341 1 1 RC I R.1 I0 16002jI HOUR COOLDOWN OF REPAIRED AREA REPAIRED AREA . 0213476- 15MAY04 21:5913MAY04 22:00A Ft*

e iT II I CE1600R029 FINAL NDE OF REACTOR .12 12 1 1 RC R-1 .00 CEI600RO29NAL NDE OF REACTOR HEAD REPAIR AR HEAD REPAIR AREA 0213476- 16MAY04 09:5915MAY04 22:001 1 CEI600R049 P REMOVE NOZZLE 2 2 l1 1.l RC. R-1 0 CEI600R049P REMOVE NOZZLE EXTENSIO EXTENSION 0213476- 16MAY04 11:5916MAY04 10:00U I CEI600R050 P CHAMFER GRIND 4 4 1 1 RC R-1 0 CE06001R05O 26 - CHAMFER GRINr 0213476- 16MAY04 15:5916MAY04 12:00 _

1 CE1600R055 PREP TO INSTALL THERMAL 5 5 1 1 RC R-1 0 CEI60OR055PREP TO INSTALLTHERMAL SLEEVE AT P2(

SLEEVE AT P-26 0213476- 16MAY04 20:5916MAY04 16:00 _

Run Dat 14MAY04 13:511 LT-16 DEFINED CRICAL PATH Shoot 1 of 1 O Primavera Systems, Inc. FL-16 DEFINED CRICAL PATH SET

Run Date 14MAY04 13:531 Work Activity Risk Assignment I Sheet I of.1 U ACT WO GRP HPE EQUIPMENT ActIvIty Cal DUR START FINISH MAY ID

_ ST RISK Description ID I CE1600R027 76 CE8 DR-Y ML-Y R-1 48 HOUR COOLDOWN OF 1 34 13MAY04 15MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M REPAIRED AREA 22 OOA 21 59 021 76 - 128CE F1 CE1600R028 76 CEO DR-Y ML-Y R-1 PRELIMINARY NDE OF 1 4 14MAY04 14MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M REPAIRED AREA (UT/PT) 10 OOA 15:59 213476 - 128CE 1 CEI600RO19 76 CE8 DR-Y ML-Y R-1 P PERFORM WELD ON 1 4 14MAY04 14MAY04 REACTOR VESSEL AND'ASSEMBLY ORT3-Y R-M SLEEVE SAMPLE 11:00A 15:59 213475 - 128CE

_ CE1600R029 76 CEO DR-Y MLY R-1 FINAL NDE OF REACTOR 1 12 15MAY04 16MAY04 EREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M HEAD REPAIR AREA 22:00' 09:59 0213476 - 128CE 1 CE1600R049 76 CE8 DR-Y ML-Y R-1 P REMOVE NOZZLE 1 2 16MAY04 16MAY04 IREACTOR VESSEL AND ASSEMBLY ORT3Y R-M EXTENSION 10:00 11:59 0213476 - 128CE I CEI60OR050 76 CEO DR-Y ML-Y R-1 P CHAMFER GRIND 1 4 16MAY04 16MAY04 IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M 12:00 15:59 0213476 - 128CE 1 CE1600R055 76 CEO DR-Y ML.Y R-1 PREP TO INSTALL THERMAL 1 5 16MAY04 16MAY04 EREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M SLEEVE AT P-26 16:00 20:59 0213476- 128CE l 111 - - - - - - ___ _ _ _ ____1111 0 EM0407642A 76 EM DR-N ML-N 852-DB75-001 REMOVE B52-DB75-001 I I 115MAY04 15MAY04 0480 VOLT DB-75 SWITCHGEAR BREAKER ORT3-N R-M FROM 2B52-40C 15:00 15:59 0407642 - 128EM (V

-Eu3 SOP BOZ OPS 1--

DR-N ML-N B-01 SUPPLY 18-01 FROM 1A-01 1 3 14MAY04 14MAY04 0 ORT3-N R-M IAW 1-SOP-480-001 16:00 18 59 1280P 1 SOP-B03A OPS DR-N ML-N 8-03 PREPARATION TO SUPPLY 1 8 15MAY04 15MAY04 El ORT3-N R-M 1B-03 FROM 1B-04 15:00- 22:59 1280P 1 SOP B03C OPS DR-N ML-N B-03 SUPPLY 18-03 FROM 1B-04 1 1 15MAY04 15MAY04 ORT3-N R-M IAW 1-SOP-480-001 23:00 23:59 1280P 1 SOP-B03D _ OPS DR-N ML-N B-03 RESTORE IB-03 TO IA-05 1 2 16MAY04 16MAY04 0 ORT3-N R-M IAW 1-SOP-480-001 01:00 02:59 1280P

- _ NMC/WE LT-8t HUMAN ERROR RISK BARCHART

~~ - - =D~AMW PBNP U1 Refueling 28 Outage FL HUMANERRORPOTENTIAL C PrImavera Systems, Inc.

after 14MAY04 12:00 l U1R28 WORKING SCHEDULE after 14MAY04 12:00 I I I . I I I if U ID IRES EQID DESCRIPTION RISK MAY WO RD I EF MF 1d 14 Sat 2Sun 16 ST 11O2*1416120 A1l 2 4* 6* 8SP1E12.14R16.18,20.221S0. 2 4. 6E*8.1002.14.1 I I AP0303688 APR 76 A-01 CAUBRATE IA-01 60 11MAY04 21MAY04 DR-N ML-N 222 _P36 ALM=IA0BNNTE SE REAS I NON-TECH SPEC 08:00A 08:59 ORT3-N R-N _ I RELAYS 2 1 AP0215122 APR 76 A52-04 P-1A UNDERFRECL REIAYFUNCTIONAL 6 16AAAY04 12-00 17MAY04 08:59 DR-N ML-N ORT3-N R-N 0

AP02 ~12 2 P.IAUNDE TEST 021 5122§N~

ET 3!

3 0 L1510OS-3 APS F52-151 UNE 151 OUT OF 31- 14MAY04 15MAY04 DR-N ML-N 0 L.5IbOS-3tUNE 1 OUT OF SERVICE hECOD TIME SEWCE(SECOND 07.OOA 18:59 ORT3-N R-N TIME) 4 0 ATC151-3 APS F52-151 ATC WORK AT NORTH WF-14M-AYD4 15MAY04 DR-N ML-N 0 ATCf51-3ATC"K AT NORTH A NS STAI1 3N APPLETON SUB STA11ON 16:59 ORT3-N R-N

_ _ I a U L1015b"3 Arb F52-151 bVI ILMINU UNh Thi IN 2 1 MAYU4 I MAYC4 UK-N ML-N L151SI-3SWITC HING UNE 151 IN 17:00 1 18:59 ORT3-N R-N U

6 01 BM0300063 BMS 76 VNSBGCX INSPECT AND MAINTAINI 2.

SBCCAIR 14MAY04 I 14MAY04 10.00A 13:59 DR-N ML-N ORT3-N R-N 745 Ig00053 INSPECT AND MAINTAIN SJCC AIR

~MVNSBCC S1S MULTI AND/OR tpN-NUMBERED EQ JIPMENT0300063I 7 o i LEU-3l1TTZ CE 76 Z-065A Z-45A INSTALL HEAT TRACE - MR 03-044 43 10MAY04 l 21MAY04 07.00A 14:59 U

128 CE011j77'2Z45 I

IM~STALL HEATTRAC~. MR 03-044 I - I 4I

. I - . ---- . - I -- I -- . ---. I - -- . .. .-- . . . .- . , , .

a U'I  %.U.3 Iuar %It: (0 ZZ65t £-0.A INb I ALL MK 51 1 10MAY04 1 24MAY04 120 crj~ jZ5A7- *?~mmL MR 03.044 03-044 07.00A 14:59 1

__ ,-4 - -

7R I - -- . --- ---- . - . - --- - .

. s^^^avrvA E em RU n I cF.sn7n11RR rR U-105 oDCrnaT n a so^Vr.^

IS9vuJL E I I-AV1PTLP* j 1o I*JISJ~ INTERCONNECTING 070OA 14:59 CE3 I'OIBBPREC )AT INTERCONNEC TING BUSWORK D 105 (SPARE)

BUSWORK D-105 M125V DC TATFON BAT1ERYC 307011 1

-10 I 0 CE0306041I CEI 76 INTAKE CRI INSPECT CRIB. INSTALL 12 05APR04 15MAY04 DR-Y ML.Y 251 kEOINMt INSPEct CMIB, INSTALL Bt 0YS ANO FISH BUOYS AND FISH 1000A 13:59 ORT3-Y R-N - A1 11 I 1 CE44CGATR TCE3 76 INSUL-MS REM INSUL FOR FAC 63 1 04APR04 18MAY04 DR-Y ML-Y 460 CE45:GATR REM ItSUL FOR FAC PROC. CTMT44 FT GE ARMEA .

PROG -CTMT44 FT GEN ARFA I l 16:00A l 14:59 ORT3-Y R-N El~UI -I - T

-~I &

j l w 12- l CE26TGATI n I _I _

I CE3.

I _

IST-SISI REINSULATE-FAC PROG-TRB HALL 26 FT GEN AREA 10 28APR04 14MAY04 0900A 1 21:59 DR-Y ML-Y ORT3-YRR-N 95 ATE . FAC PROG. rRB HALL 26 FT GE NAREA ISECONDARY INS RVICE INSPECTION 0303638 13 1 CE30000TI CE3 76 TG-01-T ENCAPSULATE 10 01MAY04 14MAY04 DR-Y ML-Y INSULATION ON HP 12 00A 21:59 ORT3-Y R-N l161 0E31 ~nENCMP LI.ATE INSULATIO1 ON HP TURBINE Cl )VER I _______ _______ TURBINE COVER _ _ __ __ _

IHIGH PRESSURE rURBINE0302153 4A I1'ro1, I-.. *F 101 Il; MrIl" aULP.

- ear-.

t - r^U-

- -... A A I -

ULNMIMTU% alMVTI.M

-.- I n vl LRI-T ML-T mE2

- I . I Ivc; I I I' 2b/

rOfmlENSU ATE - FAC PROG- WURE HALL 261FT 5 VERHD PROG -TURB HALL 26 20'00A 19-.59 OR13-Y R-N _ _

FT OVERHD mu I - 9!9 I-15 1 l CE44CGATI A CE3 76 INSUL-MS REINSULATE-FAC 35 l 12MAY04 I15MAY04 l DR-YML-Y o0qEg4,GATIRE1NSL.ATE- FAC PROGC CMT44 FT GEN AtEA 10AREA nPROG - CTMT44 Fr GT 17;00A 22.59 l ORT3-Y R-N I

- I I INSULATION048:174 I I I 10Iu I vcj II INb I PLL INbULA I [UN I SW-2861 Z 1SMAYU4 1 14MAYU4 20.MA 20~.59 UK-Y ML-Y ORT3-Y R-N 1331 ~EJSI2 "TINSfAJ~Iw4. INLAioNm 1S~ 2861 IU -MISC EOUIPM4ENT I EPAIRISERVICE046006 I.I 3. .. I __ .I L L I a I I.I Run Date 14MAY04 13:32l LT-03 STANDARD PUBLICATION Sheet 1 of 17 0 Primavera Systems, Inc. I FL-03 Execution Publication Set

after 14MAY04 12:00 l

-I U1R28 WORKING SCHEDULE after 14MAY04 12:00 ID RESPI WO EQID DESCRIMTiON RD ES l IEF RISK MF MAY PrI IA . I5 ST . _ . _

12.14.1 1.2.4.6. 1Q. 2.A. I A.4.161 17 _

CE44POHTI CE3J 70 76 INSUL-MS REINSULATE FAC 1Z 14MAY04 15MAY04 I DR-Y ML-Y 1 PROG - PAB44 FT 18:00 05:59 l ORT3-Y R-N C'4PO1* PR 1 -A 44 FT OVEJI hEAD OVERHEAD 04 O9 74 ISiLAIO CE26TOHSR CE4 77 IST-SISI REM SCAFF - FAC PROG 23 01MAY04 15MAY04 l DR-YML-Y 276 ONSro1RREM S*AF - FAC PROG .fURB HALL 26 FT VERHD 181, - TURB HALL 20 FT 0900A 14:59 . ORT3-Y R-N OVERHO

  • SECONDOVRYINSERVICEINSIECTiON030363 19 I CE08TOHSR CE4 77 IST-SISI REMOVE SCAFF -FAC 32 05MAY04 18MAY04 DR-Y ML-Y 159 PROG -TURB HALL 8 FT 10:OOA 11:59 ORT3-Y R-N :E0I1TOHSRREMO SCAFF- FAC PRi - TURB HALL S8 OVERHD

_ _ ~OVERHD_

2 T CE214035SR CE4 82 CW REMOVE SCAFFOLDING 16 13MAY04 17MAY04 DR-Y ML-Y 175

'E21ISSR RM SAFLIG NASH FLOAT Vj LES FOR NASH FLOAT 08 O0A 11:59 ORT3-Y R-N

_____ ____VALVES 21 1 P1402-SI CE4 l7 Z-022 Z-02Z-BUILD 23 14MAY04 15MAY04 DR-Y ML-Y 0 21C.I--UDCFOD~ OINTERNALSUFr RIG.l SCAFFOLDING FOR 1 0A 10.59 ORT3-Y R-N INTERNALS UFT RIG ER-1 REACTOR' VSSEL INTERNALS RiG030 RFiNG 22 l CE215202SR CE4 76 P-001A-M REMOVE SCAFFOLDING 4 15MAY04 15MAY04 DR-Y ML-Y 178 FOR P-IA-M 05:00 08:59 ORT3-Y R-N CE21522SRRE SCAFFOLDING FDR P-1A.M 0215202 REACTOR COOL* T PUMP MOTOR 23 1 CE44POHSR CE4 77 IST-SISI REMOVE SCAFF FOR 4 15MAY04 15MAY04 DR-Y ML-Y 142 FAC PROG - PAB 44 FT 07:00 10.59 ORT3-Y R-N CE44POHSRRE OVE SCAFF FOR CPROG - PAB 44 F OVERHEAD

_ _ OVERHEAD 0303636 SECONDARY IN ER1iCE INSPECTl IN 2 1 CE933444SR CE4 76 W-001C2-A REMOVE SCAFFOLDING 5 15MAY04 15MAY04 DR-Y ML-Y 165 FORW-1C2-A 17:00 21:59 ORT3-YR-N IE933444SRREMO SCAFFOLDING ORW-1C2-A 9933444 CONTAINMENT COOLING FAN DIS 25 l1 CE44CGASR CE4 77 IST-SISI REMOVE SCAFFOLDING 4 15MAY04 16MAY04 DR-Y ML-Y 160 FOR FAC PROG 23:00 02.59 ORT3-Y R-N CE44C REMOVE S OLING FOR F 0303 6SECOND RY INSERVICE 2 1 CE66CW1SR CE5 77 P - R OSCAFFOL RMAY04 101MAY04 19 DR- ML-Y 48 CE6S 01SR REMOVE GF

.TFORBRCPMOTOR 02:00l 11:59 ORT3-Y R-N l . . .l l . }REACTOR DAMPER PEM 1 18:591141 27 1 CE0407589C CE5 76 T-02P T-026-BD TANKPIPINGE/l 104 07MAY04 15MAY04 DR-Y ML-Y 1 lEA758CT- 3D TANK PIPING I I MNGMENT PLATE REPAIR EINPINGMENTPLATE 07.00A 15:59 ORT3-Y R-N BBLWpWN TANKU040758 281 1 CE9929774 CE5 { n z INSTALTCO U TD 27 10MAY04 19MAY04 DR-Y ML-Y 16 IIN5T MOD PLATFORMS OPLATFORMS RElR t0:00A t4:59 ORT3-Y R-N 29 l1 lCE0305397 CE5 l82 W-W01C1 W-1C2-A, iRE-WELD l15 l14MAY04 0115MAY04 l E 53 7 W-1C24 RE-WELDDAMPE PLENUM DAMPER PLENLIM 12:00* 16:59 lE , _ CONT INMENT ACCIDED RECIRCULATI 30 llCE0408110 CE5 PIPING EB- MS-2085 ELBOW - I10 l16MAY04 116MAYD4 lDR-Y ML-Y l 0 CE0408110 208ELBOW

. REMOVE STANCHION l l07.{W 16:59 lORT3-YR-Nl 0408110 31 j1 jCE0407589B C5l76 T-026 CLOSEOUT BD TANK l20 l16MAY04 I18MAY04 lDR-Y ML-Y a FOLLOWINGiREPAIRS l 08: 0959 ORT3-YRN CE0407589B E 040757 I,&I ._a II i Well. . .,,. 1.R.I

32. 0 CE0210988 CE6 77 SEC SECSUPPORTMR 1168805APR04 I 14JUN04 1 DR-N ML-N 3 99411 B 0700A 11:59 ORT3-NR-N -E 10 9gSECSU RTMR 99-011

" I U %UQIULYo I Ico (a tt;, I99-0 MRL, 1f JIMltI VW 114JUNqU4I Um-N ML-N J E ALLNEW EQUIP 99-011OE EQUIP MR 99-011-E I . 08:00A 11:59 ORT3-N R-N 09 SEC, 9 IN

_ ji m

,_ _ _I . I . r I Run Date 14MAY04 13:321 LT-03 STANDARD PUBLICATION Sheet 2 of 17 a Primavera Systems, Inc. I FL-03 Execution Publication Set I

after 14MAY04 12:00 U1R28 WORKING SCHEDULE after14MA Y04 12:00 U ID RESP WO E_ DESCRIPTON ES I EF FR RSK I

__. ST . S 1012,14.16.1a,,210* 2

  • 4
  • 6
  • 8.1* 21t 4,1.8122 0. 2 4. . 12 t4 E - f S;4rl.:Csi;1;

_-E

.34 0 CE0210990 CE6 76 SEC SEC REM ABANDONED 171 03MAY04 14JUN04 DR-N ML-N 0 1S 0 gEC RE ABANDONED P MR99.01 EQUIP MR 99011'F 0800A 14:59 ORT3-N R-N I 35 1 CE1600R027 CE8 76 R-1 48 HOUR COOLDOWN 34 13MAY04 15MAY04 DR-Y ML-Y _ CI6 R0274 8 COODOWNOF EPAIRED AREA OF REPAIRED AREA 22.00A 21:59 ORT3-Y R-M IREACTOR VESSE AND ASSEMB 36 1 CEI600R028 CE8 76 R-t PREUMINARY NDE OF 4 14MAY04 14MAY04 DR-Y ML Y 30 E16 R02sPR EL NDEOF ARED AREA (UTF1 REPAIRED AREA (UT/PT) 10 OOA 15:59 ORT3-Y R-M REACT VESSEL AND AS EMBLY0213478 37 1 CE1600R019 CE8 76 R-1 P-26 -PERFORMWELD 4 14MAY04 14MAY04 DR-Y ML-Y 53 r RC19P-2. RMWELD ON SLEEVE SAMPLE ON SLEEVE SAMPLE 1100A 15:59 ORT3-Y R-M REACT4 RVESSEL AND i iEMELY0213475 38 1 CE1600R029 CE8 76 R-1 FINAL NDE OF REACTOR 12 15MAY04 16MAY04 DR-Y ML-Y 0 CE160OR0 FINAL NDE OF RE HCTOR EAD HEAD REPAIR AREA 2200 09:59 ORT3-Y R-M 021341 IREACTOR 39 1 CEI600R049 CE8 76 R-1 P REMOVE NOZZLE 2 16MAY04 16MAY04 DR-Y ML-Y 0 CEI600R0 gP-26-REMOV 9

EXTENSION 10:00 11:59 ORT3-Y R-M 02134 8EREACTOR 40 1 CE1600R050 CE8 76 R-1 P CHAMFER GRIND 4 16MAY04 16MAY04 DR-Y ML-Y 0 CE660 50 . CA 12:00 15:59 ORT3-Y R-M 021 3476REA 41 1 CE1600R055 CE8 76 R-1 PREP TO INSTALL 5 16MAY04 16MAY04 DR-Y ML-Y 0 E1600ROSSPRE THERMAL SLEEVE AT 18:00 20 59 ORT3-Y RM 0213476 Ah'1641WA --*_s_

42 1 CH0300361 CH 77 CHEM-SAMt RCSCLTSR3.452 11 10MAY04 15MAY04 333 H0 36jRCSCL T1R3A.52 05:00A 11:59 MISC CHEMIS RY SAMPLING 0300 361 43 1 CH0300374 CH 77 CHEM-SAMPL RCS DO TSR 3.4.5.1 11 10MAY04 15MAY04 333 HO D 3 74RCS TSR 3A4.5.1 05:OOA 11:59 _MISC U CHEMIS RY SAMPLING 0300 374 44 1 CH10300404 CH 77 CHEM-SAMPL RCS BORON SR 39.1.1 11 10MAY04 15MAY04 333 RCS BRON B SR 3.9.1.1 05.00A 11:59 _ _ _MISC CHEMIS RYSAMPUNG030 U .04 45 1 CAMP-113BC CH CAMP-113 CAMP-113N2SPARGE 3 15MAY04 15MAY04 DR-N ML-N 0 CAMP-1139CC A 113 N2SPARGE SAMPLE B I AND SAMPLE B STEAM 18:00 20m59 ORT3-N R-N NITROGEN MIKING STEAM GEN 48 1 CAMP-113AC CH CAMP-113 CAMP-113 N2 SPARGE 3 16MAY04 16MAY04 DR-Y ML-Y 0 CAMP.113AC P113 N2 SPARC AND SAMPLE A STEAM 06:00 08:59 ORT3-N R-N NITROGEN MItl 47 1 CH0331362 CH 77 CHEM-SAMPL RCS CL TSR 3.4.52 72 16MAY04 22MAY04 256 CH03D3620Rs CL TSR 34.52 06 00 11:59 MIC CHEMISTRY SAM DLING0300362 48 1 CH0300375 CH 77 CHEM-SAMPL RCS DO TSR 34.5.1 72 16MAY04 22MAY04 256 CH030037 RCS DO TSR 3.4.5.1 0600 11:59 MIc CHEMISTRY SAM. ILNG030035 49 1 CH0300405 CH 77 CHEM-SAMPI RCS BORON SR 3.9.1. 72 16MAY04 22MAY04 256 CH030045RCS BORORSR 3.9.

600C 1159 MIQC CHEMISTRY SAM UNG0300405 5 0 EE0208969 EEP l 77 G001 THERMALVECTOR DAT 4 16MAY04 16MAY04 206 EE0208969 COLLECTION 08:00 11:59 0208969 EMERGEN Run Date 14MAY04 13:321 LT-03 STANDARD PUBLICATION Sheet 3 of 17 C Primaver SWems. Inc. FL-03 Execution Publication Set I

after 14MAY04 12:00 U1R28 WORKING SCHEDULE after 14MAY04 12:00 lU ID lRESPl WO EQtD DESCRIpTnON RD ES I1BEF I RISK MF 0, SM 1 ST _ ._1  :.1,.6_ La 1 16 EM0215241,IEM 41/1E02,RMP 9308.1DSII 76 14 06MAY04,17MAY04.OR-N2ML-N110 51 1 EM0215241 EM 76 4111E02 RMP 9308. DS-11 14 06MAY4 17MAY04 OR-N ML-N 10I EM il5241 RMP 93#8, OS-l BREAKER IINTEANCE _

BREAKER 19:00A 00.59 ORT3-N R-N I h MAINTENANCE - I- Irni -

i

- I ffiilii171117fl 4-4--- 4--4 -- 4-0z 1 tMUZlzb4b EM 76 W-003B-M 1W-36-M REPLACE 60 09MAY04 1 21MAY04 I DR-N ML-N 0 4 MOTOR BEARINGS 09.OOA 08:59 ORT3-N R-N EMO126451W-3 REPLACE MOTORJBEARINGS mi I

g i . ,

= . 1 53 1 EM0216170 EM 76 FIRE-BARRI PERFORM RMP 58 FIRE 8 09MAY04 15MAY04 DR-N ML-Y 68 BARRIER 21.O0A 01:59 ORT3-N R-N - I: 16170 PERFO 1M RMP 58 FIRE BA IRIER SURVELLAN I _FIRE BARS ERS IN CONTAINMN 'NT0216170

______ _SURVE1LLANCE 54 1 EM0215202 EM 76 P-001A-M P.1A-M PERFORM OL 17 12MAY04 15MAY04 DR-N ML-N 0M CHANGEJFLUSH 0O.0QA 04:59 ORT3-N R-N I: 15202 P-1AM 'ERFORM OIL CHAI iGEIFLUSH I REAC DOR COOLANT PUM ' MOTOR 0215202 55 0 EM040763BC EM 76 Z-014 TROUBLESHOOTIREPAIS 6 12MAY04 14MAY04 273 MC TB CRANE (SMALL 12.00A 23:59 . 07 S3SCTROUl ILESHOOTIREPAIR TB CRANE (SMALL I TURBINE BLD0 'OVERHEAD CRAN :0407638

___________________HO OK) _ _ _ _ _

56 0 EM0405897D EM 76 D-106 D-06PERFORMO48 9 12MAY04 14MAY04 0 'ERFORM 48 HOLR FLOAT CHARGE

_ HOUR FLOAT CHARGE 21:00A 20.59 C 05897 II 125V DC STATION I 3ATrERY0405S97 57 0 EM0304878 EM 76 B52-DB50-0 BREAKER 3 13MAY04 14MAY04 DR-N ML-N 1 04 87 8BREAKI -t MAINTENANCE I 8504X01( 524B)

T MAINTENANCE D

~~(B52-413)_

.50-001 00O0A 14:59 ORT3-N R-N

_ _ _ li W480VOLT DB-50 SWITCHGEA P BREAKER0304871 5 EM0215228 EM 76 W-003B W-31-M INSPECT AND MAINTAIN FAN AND MOTOR 5 14MAY04 07.O0A 14MAY04 16:59 DR-N ML-N ORT3-N R-N 160 M

,I tsn8W-3B-M INSPECT AND MAP TAIN FAN AND MOI OR

_CONT UNMENT CONTROL ROD DRIVE SHROL DFAN0215228 59 1 EM0216539 EM 76 TG-01-VARM REMOVE TEMPORARY 2 14MAY04 14MAY04 DR-N ML-N 0 1 16539REMOV TEMPORARY MF ERING T-MOD 02-0! 2 METERING T-MOD 12Z00 13:59 ORT3-N R-N A - EM276 M 7 5-800 02-02 -____ *ITG-01 TUI BINE GENERATOR OUTPUT VARMETE t0216539 60 ° EM0207564 EM 76 B52-DB504 1X-11 TO 11 INSP 4 14MAY04 14MAY04 DR-N ML-N 0 I 1B-01 INSP INERT A LATCH(DB50-48)

INERTIA 12:00 15:59 ORT3-N R-N M I:07564tX-I1 TI

__________ ~LATCH(DBSO-4B)_ _ _ _ _

=480 VOL T DB-50 SWVICHGE AR BREAKER02075 61 1 EM0216169 EM 77 COM TESTALLGAI-TRONICS 4 14MAY04 14MAY04 DR-N ML-Y 198E 1200" 15:59 ORT3-N R-N 16169TESTAI L GAI-TRONICS

_COM S'!STEM MULTI AND/C R NON-NUMBER EQUIPMENTO2161 9 62 0 EM0304828 EM 77 P-OD0AIB-M INSPECT SPARE RCP 4 14MAY04 14MAY04 743 EM RCP MOTC 64828 INSPEC SPARE iRI MOTOR 1200" 15:59

_SPARE _2P-1AIB REACTOR COOLANT PUMP Ml3TOR0304828 63 0 EM0215134 EM 77 COM GA)-TRONICS TEST 15 14MAY04 15MAY04 DR-N ML-N 732 M NICS TEST 1Z:00 02:59 ORT3-N R-N 115 1 3 4GA~I-T OCoM SYS TEM MULTI AND/Ol lNON-NUMBERED I DUIPMENT021!

64 0 EM9925005 EM 76 A52-DHVR-3 3000-1 1X02-1AOI CELL I 14MAY04 14MAY04 DR-N ML-N 339 K02-1A01 CELL SW TCH INSPECTION SWITCH INSPECTION 13:00 13:59 ORT3-N R-N 25S053000-1 I

.14.16 KV/301 )AMP VACUUM BR iAKER9925005 65 0 EM0301792A EM 76 A52-DHVR-3 BKR MAINT. PORTION AT 4 14MAY04 14MAY04 DR-N ML-N ,E a AINT. PORTION AT .UBIcE (A2-01) D00-01 CUBICLE (A52-01) 13:00 16:59 ORT3-N R-N 0 1 792ABKR IV

_ _ _ _3000-01 M4.16 K /0 AMP VACUU ABREAKER030791 66 1 EM0312035A EM 76 P-028B-M I 0P-28-M PERFORM 4 14MAY04 14MAY04 DR-Y ML-Y 0 EO M PERFORM JiTiF POS1 1MCE * -

12Q3I^P 28 TEST POST MCE TEST 14:00 17:59 ORT3-N R-N IMGENERATOR FE-DPUMP MOTOR0 12035 67 1 EM0306911 EM 76 TG-01-VARM 1TG-1-VARM READS 8 14MAY04 14MAY04 DR-N ML-N 136 -M HIGH 'REPLACE 14:00 21:59 ORT3-N R-N 06911 ITG.1-V kRM READS HIGH tEPLACE METER'

________ _______M ETER'_ _ _ _

1ITG4-1 TURBINE ;ENERATOR OUTP TVARMETER0306 11 E8 1 EM0216166 EM 76 E-01 CHECK EXCITER 2 14MAY04 14MAY04 DR-N ML.N 742 MO GROUND DETECTION 15:00 16:59 ORT3,N R-N 16166CHECK -XCITER GROUNDI )ETECTION 166ETG-01 TURBINE GENERAl OR EXCITER vv I . olwvvrvv vw 69 cgn u 09IZunwMAS FM 7R I I -n 0!AAA I MflOAAf FROM CONDENSATE CAI~l C F *.MAAV-18:00' 19:59 t

U E 80 305 10 9 DRA1 VOL SAMPLE FRO 'ACONDENSATE P PUMP 0305109MC DNDENSATE PUMP MOTOR AY.413:2J - Seet4 of1 Run Date 14MAY04 13:321 LT-03 STANDARD PUBLICATION Sheet4of 17 C Primavera Systems, Inc. I FL-03 Execution Publication Set 7

after 14MAY04 12:00 U1R28 WORKING SCHEDULE after 14MAY04 12:00 lU I IRESPl WO IEI DESCRrnON RDIEFES _MK 1 MAY IIST ___11120E22i M1012.14,16,1S820F2210 24 6 0, 2f 4l 6. 8,1002.141 70 U I EM0305111.

it J, a I I #U.l [1I .~~~~~~A IA^

Lmuim 11 Lm A

75 I'-025"- .t DR~AW OIL SAMPI+/-- 2 I 14MAY04 --

.O .CONDENSATEPUMP.--

14MAY4 EM0305111 0 SAPL R~AWOIL SAMPLE I OM CONDENSATE PUMP FROM CONDENSATE Ptlup 20:00 21:59 03051111 ECONDENSATE Pt 6P MOTOR 71 0 EM0405897E EM 76 D-106 OBTAIN RMP 9046-1 3 14MAY04 14MAY04 c DATAFORD-106 21:00 EM045897E OBTAIN RMP 9046- DATA FORD-106 23:59 0405897 125V DC STAI ON BATTERY 72 2 EM0305113 EM 76 P-030AM DRAW OIL SAMPLE 2 14MAY04 14MAY04 0 EM030511 3DRAW OIL SAMPI FROM CRCULAT NG FROM CIRCULATING 22.00 23:59 030511 3ECIRCULATnNG NATER PUMP MOT  :)R 73 2 EM0305115 EM 76 P-030B-M DRAW OIL SAMPLE 2 15MAY04 15MAY04 733 FROM CIRCULATING 00:00 01:59 EM03( 15gsDRAW OIL SA IPLE FROM ClRCUt ATING 03o 11ISECIRCULAT IG WATER PUMP IVOTOR 74 0 EM0210718 EM 76 W-085-M MCE ANALYZE MOTOR 4 15MAY04 15MAY04 DR-Y ML-Y c (2B52-3213Cr2B-32) 04:00 07:59 ORT3-N R-N EM0210718MCEAl ULYZE MOTOR (2B! 2-3213CrIB-32) 0210718F M8BATTERY AND I VERTER ROOM VE qT FAN MOTOR 75 1 EM0215199B EM 76 P-001A-M P-01A FINAL PMT PER 10 15MAY04 15MAY04 DR-N ML-N C 9002-12 06:00 15:59 ORT3-N R-N EM0215199B1P-M A FINAL PMT PER! 002-12 0215199 REACT( R COOLANT PUMP MOTOR 76 0 EM0407642A EM 76 B52-DB75-0 REMOVE B52-0875-001 1 15MAY04 15MAY04 DR-N ML-N c 352-4075-001 FRO] 12B52-4C FROM 2B52-40C 15:00 15:59 ORT3-N R-M EN 1407 6 42AREMOVE 04076423480 VOI B-75 SWITCHGE AR BREAKER 77 1 EAMRCP-B1 EM 76 P-001A-M REPLACE A RCP 2 15MAY04 15MAY04 DR-Y ML-Y 257 FLOOR PANEL 16:00 17:59 ORT3-N R-N I AMRCP4B1 REPLAC E A RCP FLOOR I ANEL 021519SEREA' 'TOR COOLANT PI8UP MOTOR 78 1 EM0215205 EM 76 P-001B-M INSPECT AND MAINTAIN 10 15MAY04 16MAY04 c REACTORCOOLANT 16:00 01:59 M02152"SlNSPEC AND MANTrAIN RI ACTOR COOLAI 0215205 REACTOR OOLANT PUMP 79 1 EM0215203 EM 87 P-0011A-M P-001A-M-2NDMCE 3 15MAY04 15MAY04 DR-Y ML-Y 0 TEST (IA52-01A-01) 17:00 19.59 ORT3-N R-N EM0215203 P001 -M -2ND MCE TES (1A5241411A-01 0215203DS EACTOR COOLANT PUMP MOTOR 801I0 EM0407642 EM 76 B52-0B75-0 B52-DB75-001 RESET I AMPTECTOR ]17.001 5I 15MAY04 I215MAY04 21:59 DR-N ML-N ORT3-N R-N 1

EM040764252-DI 75-001 RESET AMI TECTOR 0407642 1480 VOLT DB-75 v WITCHGE:AR B 81 0 EM0304874A EM 76 A52-DHVR-1 IP-OA PM BKR TESTING 4 15MAY04 15MAY04 DR-Y ML-Y 112 EM03OW84AII '-OIA PM BKRTES~ 1NG AT CUBIL AT CUBICLE 20:00 23:59 ORT3-N R-N

____ _ _1200-31(A52-04) _ 03048741 in4.16 KV/1200A UIPVACUUM BR 82 1 EM0400050 EM 76 852-16B 1B52-168 PERFORM BKR 16MAY04 16MAY04 DR-N ML-N 0 SWAP INU1R28 00:00 00:59 ORT3-N R-N EM04U 050 1952-161 PER FORMU BKR SWA 040 O50§FEEDTO 1B D3FROM IX-13 83 1 EM0400107 EM 76 A52-58 1A52-58 PERFORM BKR 1 16MAY04 16MAY04 DR-N ML-N 0 SWAP IN U1R28 00:00 00:59 ORT3-N R-N EM04U 11071A52-8 PERF IRM BKR SW 040 107EPWRTO IX. 3 STATION SER 84 0 EM0304880 EM 76 852-DB75-0 BREAKER 24 16MAY04 17MAY04 DR-N ML-N 0 MAINTENANCE 01:00' 00:59 ORT3-N R-N EM0 04880BREAKER M UNTENANCE B

__ __ _B52-D875-M3 04880~

85 1 EM9937213 EM 76 Z-022 Z REPLACE CUT 10 16MAY04 16MAY04 DR-N ML-N 10 LIGHT WIRING 05:00 14:59 ORT3-N R-N EM9937213Z022 REPLACE CUT 9937213= R-1R DO I1~v~uc I I v%14 1U.v tM to WAU11 L.P.L AZNU iI r-.2izAm~I RELAY PER IRMP o I TMALI4 06C00 IlDMiTU'4 11:59 UK-N-ML-N ORT3-N R-N U

EM0215248 CAL A.ND TEST 6=21A

%flf7 0215246M tIA-01 BUS 87 10 EM0406353I EM 75 1 D05 I INSPECT CELL FORI 1 16MAY04 16MAYD4 I0

_ ELECTROLYTE _ 07.w 07:59 EM04063531N PECT CELLS 25V DC STA

.. . cuns$7o I Ik -s uu

... A . -.. 4o-alWvItA . 4iA I IeF oV II tMUxlD Mm /I VVW]L.Z-M LuUJLcAPrt 1W-lCZ z ThMATUM I IbMATUK U MOTOR BEARINGS 07:00 I 08:59 EM0215222LU IRICATE 1WI 0215222* CONTAINMENT n -I-ILI.L I I I___ I I...... S Run Date 14MAY04 13:32w LT-03 STANDARD PUBLICATION Sheet 5 of 17 0 Prlmavera Systems, Inc. 3 FL03 Execution Publication Set S

after 14MAY04 12:00 U1R28 WORKING SCHEDULE after 14MAY04 12:00 HT---

  • U ID RESPl WO EQID DESCRIPON RD ES I EF SK MF MAY

_S_ sir_ I I Fil2.124.161,120,2210o.2.4.6,.

r H414 SatI15l.246 8101212fl4,16.t,10,2 o2.4.6. 8.10022.t4,19 Sun 16 89 0 EM0306039 EM 77 ISFSI BLDG ISFSI SECURIY BLDG 8 16MAY04 16MAY04 696 EM0306039 5 1SECURITY B MAINTENANCE- 07 00 14:59 0306039 ISFSI 90 0 EM0309138 EM 76 D-106 STATION BATTERY INSP 3 16MAY04 16MAY04 0 EM0309138 ATION BA PER RMP 9046-1 08:00' 10:59 0309138 125V DCST 91 0 EM0305248 EM 77 D-502 MONTHLY G-05 4 16MAY04 16MAY04 0 EMO3 MONTLY G STARTING BATTERY 11 00 14:59 0305 46 G- S 92 1 EM0215122 EM 76 A52-04 ASSIST APR DURING 6 16MAY04 17MAY04 DR-N ML-N 0 EM02 1 2 2 ASSIST P-1A RELAY 12:00 08:59 ORT3N RN 021 122 93 0 EMO305252 EM 77 D-503 MONTHLY G-05 BLACK 5 16MAY04 16MAY04 0 E 030 5 25 2 MO START DIESEL 15:00 19:59 0305252 94 1 B52-427CE EMV 76 B-42 BUS STAB PUT I 14MAY04 14MAY04 DR-N ML-N 123 3 2TCEBUS ST)B PMTIRC-59

'1RC-596 _ 12:00 12:59 ORT3-N R-N 480V MOTOF CONTROL CENE PAB SAFEGUARD 0202527 95 1 EM0215240 EMV 76 162-A S-2019 &2020LOSSOf 8 15MAY04 15MAY04 DR-N MLN 0 EMO 1 5 24 0 MS-2019& 0LOSSOFVLT GETEST-1&

VOLTAGE TEST- 13 00 20i59 ORT3-N R-N 0 15240 TDRELAYFOR1M I209ACTUA

- 011--11 -I-I [ - - - --

96 1 NG44CFC1EV EPI 77 IST-SISI ENG EVAL FOR FAC I 29APR04 14MAY04 DR-Y ML-Y 12 NG4 CFClEVENG IALFOR FAC PR*.CTMT 44FTGE ARA PROG-CTMT 44FT GEN _ 0800A 14:59 ORT3-Y R-N SECONDtRY INSERBCE INStECTON 0301897 97 98

° FG03022077 1 FG302863RP FG1 FG1 77 75 MAHOLE PM FS-02852 PUMP ELECTRICAL MANHOLESUMPS PAINT FS-2852 8 14MAY04 8

07.00A 14MAY04 17MAY04 11:59 15MAY04

- 163 FG0, y2077PUMP E £CTRICAL MANHO LE SUMPS' 25 02 FG 02663RPPA r FS-2852 R

I18:00' 01:59 l0302663 _ P-30B CWFI SEAL WATER FLO VtSWhlTCH 99 1 Z22FG030 FG1 77 Z-022 Z-022 INTERNALS UFT 12 15MAY04 16MAY04 DR-Y ML-Y 0 Z22FG03OZ- 22 INTERNALS UFT R STRIP PAIM RIG - STRIP PAINT FOR 17:00 04:59 ORT3-Y R-N 0301913 R-1R CTORVESS 100 1 FG0408118 FG1 76 MISC LEAD ABATEMENT ON 6 16MAY04 16MAY04 DR-Y ML-Y 17 FG0408118 A FLOOR BEAM SOUTH OF 08:00- 13:59 ORT3-Y R-N 0405118 MISC S 101 1 Z22FG035 FG1 77 Z-022 Z.22 INTERNALS LIFT 8 16MAY04 17MAY04 DR-Y ML-Y 0 Z22FG035Z-RIG -PAINTWELDS 17:00 00-59 ORT3-YRN _0301913 102 0 FG0300151 FG2 77 VNEIC INSPECTAND SERVICE 5 12MAY04 14MAY04 DR-Y ML-Y 339 GO 151 INSPE AND SERVICE EIC AC EQUIP EIC HVAC EQUIP 07.00A 16 59 ORT3-Y R-N VN SYSTEM MULTI ANp/OR NONNUMB ED U1PMENT0 0151 103 0 FG0300135 FG2 77 HX-378A SERVICE HX-378ASBCC 10 15MAY04 15MAY04 DR-Y ML-Y 718 I FG0 30 1 35 SE EHX.378ASE CCOMPRM AC UNT COMP RM AC UNIT 07:00' 1659 ORT3-Y R-N 0300135 SBCC ROOM= CONDTIONI FG307011SI FG3 76 D-105 BULDSCAFFOLD FOR 5 10MAY04 14MAY04 3CAFFOLD FOR D-15 REPLACE 0D-105 REPLACEMENT 12:-0A 16:5 125 STATION BA 0307011 Run Date 14MAY04 13:321 LT-03 STANDARD PUBLICATION Sheet 6 of 17 o Primavera Systems, Inc. I FL-03 Execution Publication Set I

after 14MAY04 12:00 U1R28 WORKING SCHEDULE after14MAY04 12:00 U ID RESP WO ECDM DESCRIPTION RD ES I EFP RISK AMF MAY 105 0 IC00311805 IC 7B FS-00230 RE-230 CLEAN FLOW 2 14MAY04 14MAY04 DR-Y ML-Y 295 0 3 11 8 0 5 RE-2 10 CLEAN FLOW S lICHI' SWITCH 1800 19-59 ORT3-Y R-N 0311805EF E-230WASTEWAT REFRUENTMON 'ORINLETFLOWS STOPPED ALARM CLEAR 00-00 00-59 ORT3-Y R-N 0 3851 ETURBINE IN' TRUMENTATION - ISCELLANEOUS 107 1 IC0306626A IC 76 S-06050A 1S-6050A REPLACE 2 15MAY04 15MAY04 DR-Y ML-Y 321 IC0306 2SAIS605tA REP ACE PROBE GAP PROBE GAP 00:00 01:59 OR73-Y R-N 0 a 28ETURB IND ENDENT OVERS ED PROTECON HANNEL 1 108 1 IC5.54A IC 78 ICP-05.054 P59B SOBEUPUMP 3 15MAY04 15MAY04 DR-YML-Y 3X I 5AP9 SOBIUI STARTFU ON START FUNCTION 0000 02:59 ORT3-Y R-N 0 874 SECOND PLANT LOW GE PRESSURE IN UMENTS 109 1 IC5471i ICi 75 ICP-05.047, SECONDARY LEVEL 9 19APR04 15MAY04 DR-Y ML-Y 0 5 SECO Y LEVELCONTR SAND SWIT CONTROLLERS AND I11:00A 09-59 ORT3-Y R-N SECONDARY LEV L CONTROLLERS kND SWITCHES 110 1 IC5.53 IC1 76 ICP-05.053 ICP 5.53 SECONDARY 11 02MAY04 15MAY04 DR-Y ML-Y 58 C5 IP 5.53 SEC )NDARY HIGH PRE URE HIGH PRESSURE 0800A 11:59 ORT3-Y R-N  ! ESECONDARY ILANT HIGH PRESS JRE INSTRUMEI 111 1 IC5.53A IC1 76 ICP-05.053 lCP 5.53 REPLACE 5 10MAY04 14MAY04 DR-Y ML-Y 64C5 ICP 5.53 RE LACE PS-2196 PS-2196 16.00A 16:59 ORT3-Y R-N SECO qDARY PLANT HIGI PRESSURE INSTR MENTS0300873 112 0 IC0407300 IC1 76 FT-03298B REMOVE PAB 5 13MAY04 14MAY04 DR-Y ML-Y 339 C 73 0 0REM PAS ISOKINETIC StACK MONITOR ISOKINETIC STACK 15 00A 16:59 ORT3-Y R-N PABV ENT STACK ISOKN C FLOW TRANS n IER 0407300 113 1 IC5.54B IC1 76 ICP-05.054 LC-2393 CHECK 1 14MAY04 14MAY04 DR-Y ML-Y 93 IC 5 4 BLC2393C HECK FITTINGS HT/ LEAK CHECK FITTINGS TGHT/ LEAK 15:00 15:59 ORT3-Y R-N 03 U74ESECON ARY PLANTLOW WGE PRESSURE I STRUMENTS 114 1 IC5.47A IC1 76 ICP-05.047 VERIFY DRN BOTTLE 2 15MAY04 15MAY04 DR-Y ML-Y 299 IC5.47A IFYDRNB LViL ALARMS LVL ALARMS 08:00 09.59 ORT3-Y R-N 0300857 SECONDARY LEV L CONTROLLERS WD SWITCHES 115 1 IC5.47B IC1 76 ICP-05.047 VERIFY STLG MNFLD 1 15MAY04 15MAY04 DR-Y ML-Y 299 1C5.47S s5TLG MNFK LVIL ALARMS I I LVL ALARMS 09:00 09:59 ORT3-Y R-N 0300867 ECONDARY LE CONTROLLERS WD SWITCHES 118 1 IC5.47C IC1 76 ICP-05.047 VERIFY LO COND HULO I 15MAY04 15MAY04 DR-Y ML-Y 171 IC5.470 LO COND l 'LOLVL ALM LVL ALM 09:00 09-59 ORT3-Y R-N 0300867 SECONDARY LEV L CONTROLLERS D SWITCHES 117 1 IC5.47D I10 76 ICP-05.047 VERIFY GEN LVL ALMS 1 15MAY04 15MAY04 DR-Y ML-Y 319 1C5470 GEN LVL A MS

_ 09.00 09:59 ORT3-Y R-N _ 0300867 SECONDARY I L CONTROLLERS D SWITCHES 118l 2 1}S flfl 1 IC0301009 IC2 75 ICP-04.021 CHEMICALANDVOLUME I

11 10MAYD4 I 15MAY04 DR-YML-Y 0 C03 1009 LANDVOLMECC NTROL SYSTEM CONTROL SYSTEM 18:OOA 04:59 ORT3-Y R-N - CHEMCALANDVOLUME ONTROLSYSTEM 301009 119 1 IC2.22 IC2 76 1ICP-0Z02 POWER RANGE NIS 10 13MAY04 15MAY04 DR-N ML-Y 2 POWER RAN ST4REFUEL (EPISTESiNG TESTiNG (POST4REFUEL 1800A 03:59 ORT3-NR N NPO ER RANGE CHAN ELS SHUTDOWN S RVTEST03069 120 0 IC03W710 IC2 77 HP-07736 CLEAN CONTAMINATION 24 13MAY04 16MAY04 DR-Y ML-Y 273 C03 O7TIOCLEAN NATONM NITOR MNTAC MONITOR 18OOGA 19:59 ORT3-Y R-N l l U 4

121 1 ICPRE-COMP IC2 REI 10.1 MOVE REACTIVITY COMPUTERTO 10 15MAY04 19:00' 16MAY04 04:59 DR-Y ML-Y ORT-YR-N 110 T I ICPRE-COMP VIIYC APITER TOCO COREACT 4 DIGITALR Run Date 14MAY04 13:321 LT-03 STANDARD PUBLICATION. I Sheet 7 of 17 C Primavera Systems, Inc. 1 FL-03 Execution Publication Set l

after 14MAY04 12:00 U1R28 WORKING SCHEDULE after14MAY04 12:00 22 U

1 ID IC0300795C RESP WO IC5 T

76 ECID I&CMISC DESCRIPTION C-158 RELAY MAINTENANCE -

RD

_e.

&vI--24l; 5

ES 13MAY04 0800MA I I EF 14MAY04 18659 RISK OR-MLY MF I

BC 60 IFri 14 ORT3-Y R-NMSCWRACTE0079 C

=AY

-gat 5 YMAINTENAN E0PC-431EX

-,024.- Sun 16-K_310012,14.16,1820,221 0 2. 4. 6,* J§012,14,16,18,20,221 0. 2. 4, 6, 8.10112l14.16l1 123 1 1C0300795B IC5 76 I&C MISC ESF RELAY 27 13MAY04 16MAY04 DR-YML-Y 03 OSYMAXIIfENANC INLOGC CARB MAINTENANCE INLOGIC 08.00A 16 59 ORT3-Y R-N m E MI:

124 1 IC0300795A IC5 *76 I&C MISC REACTOR PROTECTION 27 13MAY04 16MAY04 DR-Y ML- C03.79AREACT PROTECTION L C CAB RELAY MA ITENANCE LGC CAB REL.AY 11-00A 16:59 ORT3-Y R-NM

__ _ MAINTENANCE I _ _ __ _ __ _

125 1 ICTUVIBSUP IC5 76 T-SUPERVIS INSTALLTURBINE 2 14MAY04 14MAY04 DR-Y ML-Y 52 INSTA LTURBINEVIBRA ON SENSORS

_VBRATION SENSORS 06:00A 13:59 ORT3-Y R-N TURFINES JPERVISORY I UMENTATION 0300 51 12 1 IC5.8 IC5 76 ICP-05.008 TURBINE SUPERVISORY 54. 14MAY04 19MAY04 DR-Y ML-Y C C5. NE S RISORY IST CA INST CALS 060OOA 10-59 ORT3-Y R-N RSOYNTC 127 1 IC2.10 IC5 76 ICP-OZO10 NI SR PRE CRITICALTY 2 15MAY04 15MAY04 DR-N ML-N 0 _ IC2.10NI S PRE CRITICALIY ST TEST 18:00 19-.59 ORT3-N R-N 0300806 URCE RANGE NU INSTRU 28 I IC2.9 ICS 76 CP-02.009 ICP z9 INTERMEDIATE 1 15MAY04 1sMAY04 DR-N ML-Y 251 1C9 P2zsINTERMEDtA RANGETES RANGE TEST 20-00 20 59 ORT3-N N- _ 030005 INTERMEDIATE GE NUCLEARSI 1Dff ,-jo I 129 1 1IC0300942 ICV 76

-RM-0320ae-RM-3200 DiAGNOSTIC 4 141MAY04 14MAY04

- DR-Y ML-Y E_ -

0 C 0942R-DIAGNOSTIC CHE K O CHECK 13:00' 16:59 ORT3-N R-N ~ RE-21 /RE-212 MONITOR 3UPPLY OPERATO0302 30 1 IC0303383 ICV 76 SC-00966B SC-9668 POST MTN 4 14MAY04 14MAY04 DR-Y ML-Y 9 030333 SC-9 6B POST MTN DA NOSTIC DIAGNOSTIC _ :00a 21:59 ORT3-N R-N 0303353 PZR IJOUIDSAMF LCONTAINMENT I TION 131 1 1C5A9D ICV 76 ICP-05.049 1CP 5.49 CS-2273 3 15MAY04 15MAY04 DR-Y ML-Y 72 1C5 .4DCP9 CS-2273 HATE BYPASS LIMITS1 f HEATER BYPASS UMtT 06:00 08:59 ORT3-Y R-N 0300869 SECONDARY CONTROL VALVE 132 1 IC0214110 ICV 76 MS-02018 SW MS-2018 POST INSPECTION 7 15MAY04 17.00' 15MAY04 23:59 DR-Y ML-Y ORT3-N R-N 0

0089PA 1 0 0 21 4 1 10 MS20 0214110_

8POSTINSP OTO AV HK-1A SG; NOIAGNOSTIC HECTKNMAIN STEA DIAGNOSTIC ______

7

_HX__ASG HMAIN____

133 1 ICMS2018 ICV 76 MS-02018-0 MS-201 sMSV 15MAY04 15MAY04 DR-Y ML-Y 0 ICMS201S1MS-20 UMSIV DIAGNO DIAGNOSTIC 17.00 23:59 ORT3-N R-N 0300903 HX-1A SG H MAIN S 134 1 MMss24975A MM1 76 HS-1 HS-T1 REBUILD & TEST 5 26APR04 14MAY04 DR-Y ML-Y 0 X S-1. REU LD& TESTSIAMBER (SHOP)

SNUBBER (SHOP) 06-VGA 16:59 ORT3-N R-N XSOMNSTAU WETNIB 297 135 1 MM9933444A MM1 76 W-001C2-A W-1C2-A, INSTALL 2 10MAY04 14MAY04 A, INSTALL DAMPER BRACING DAMPER BRACING 18:00A 19.59 ONTAINMENT COCING FAN DISCHARE2DAMPER99334 138 1 MM0407989 MM1 7B CPP-14B 1CPP-14B ROTATE PIPE 15 14MAY04 15MAY04 DR-Y MLY- 246 M 9 P 3CPP S. ROTATE PIPE E DS DOWN FOR FW ECONCERN IENDS DOWN FOR FME 11VOQA 02.59 ORT3-N R-N UIC PIPE P'ENETRATION - C N4TAINMENT PRESSURETRAN0407 CONCERN 137 ¶ MM0408272 MMI 75 W-003A IW-OO3A REMOVE 8 14MAY04 15MAY04 3 A00mW 3,RMOE RMLUE 1lSEALS FROM LOUVERS 18 0159 3 0408272 CONTA NTCONTROL RO DRIVE SHROUD F. N 138 1 MM9924975B MMI 76 HS-1 HS-1. REINSTALL 6 15MAY04 15MAY04 DR-YML-Y 93 MM9924975BHS-1 REINSTALLSNUBBER AsTVr 1391 i MM4885A MMI 82

____________VT-3__

W-0O1C1 SNUBBER, AS-LFT W 101. FME CLOSE I 06:00 11:59 15MAY0-4 15-MAY04 ORT3-NRlN DR-YML-Y 16MM85AllMCLSOT 9924975 HX-1A SG MADII STEAM LINE WES SNUBBER PCIN 13 MBB M 2lOUT iNsPEcTIoN 17.00 17.59 ORTi-N R-N 1E. .. .l MM-UsSAW-IIFME CLOSE oUT ITSPECTO OUT 100 NSPCTIN 159 RT3NRN0214751coAINMENTACCIDE ITRECIRCULAT Run Date 14MAY04 13:32l LT-03 STANDARD PUBLICATION I Sheet 8of 17

_ Primave Svstems, Inc. FL-03 Execution Publication Set I

after 14MAY04 12:00 UlR28 WORKING SCHEDULE after 14MAY04 12:00

_ U ID RESP WO l EQID DESCRIPTION RD ES EF RISK MF MAY Frf 4 Sat is Stin 16 I STI. I I .1 12.14,16.1a20.2210. 2.4. 68.l82192,14,16.18,2(12210.e2.4,§6 §8.10l2.14.1&1 11.

t^111^171 aP^Z1ISI

1,1112 S;114.1r1tril S _1
1 140 1 MM0408030 MMi1 75 W-003B 1W-0038, REMOVE 8 15MAY04 16MAYD4 65 MM04080301W 03B, REMOVES FROML SEALS FROM LOUVERS 18:00' 01:59 0408030W UCONTAINI NT CONTROL 141 1 MM-8856A1 MM1 82 HX-01sA HX-015A - PERFORM SW 8 16MAY04 16MAY04 DR-Y ML-Y 0 MM488sBA1 HX SAP.ERFORM LEAK CHECK & INSTALL 06:00- 11:59 ORT3-N R-N 0214055 W-1A1 ACC 142 1 MM0215948 MM1 77 O-RF-5102 RF-5102ZMOVEZ-23B 6 16MAY04 16MAY04 DR-Y ML-Y 145 MM0215948 0.2, MOVEZ-23 LATCH TOOL OUT OF 06:00' 11:59 ORT3-N R-N 0215941 REMOVEZ 143 1 MM-8856A MM1 82 W-001A1 N-1A1, FME CLOSEOU 16MAY04 16MAY04 DR-Y ML-Y I MM-8 5W1A1 FM INSPECTION (AFTER SW 1kOO 1259 ORT3-N R-N 021 I67ECONTAI 144 1 MM-8857A1 MM1 82 HX-015B HX -158 PERFORM SW 6 16MAY04 17MAY04 DR-Y ML-Y 0 M AlHX 158 P LEAK CHECK & INSTALL 12:00 06:59 ORT3-N R-N 02 145 1 MM0304995 MM2 76 P-028B P-028B -OVERHAUL 1 30APR04 14MAY04 DR-Y ML.Y 3 M (04 gg5P-025B OVERHAUL MAIN PUMP MAIN FEED PUMP _ 1500A 12.59 ORT3-N R-N STEAM GEN RATOR FEED PUM 0304995 146 1 MM0407390 MM2 76 P-028B 1P-28B INSPECT SPEED 15 01MAY04 15MAY04 DR-Y ML-Y 0 M 1'7gO1P-28B NSPECTSPEEDIN REASER INCREASER 09.00A 15:59 ORT3-N R-N STEAE M ENERATOR FEED PUMP0407390 147 1 MM9919654 MM2 77 P.028B IP-28B STOP OL 4 06MAY04 14MAY04 DR-Y ML-Y 1 1 9 e#41P-28B TOP OL LEAKANS rALL BAFFLE LEAKANSTALL BAFFLE _ 050A 15 59 ORT3-N R-N STEAM ENERATOR FEED 9UMP9919654 C 148 0 MM0305788 MM2 76 W 131 INSPECT AND MAINTAIN 4 14MAY04 14MAY04 0 UM 0 5786 INSPEC rAND MAINTAIN VI NTILATION FAN VENTILATION FAN 11.0A 15 59 HX-202 SB 5TH FLOOR VE MLATION FAN (A 3)0305786 149 1 MM0306052 MM2 76 CS-2297 INSPECT & MAINTAIN 3 14MAY04 14MAY04 DR-Y ML-Y 0 UM 002tINSPE r& MAINTAIN IP-21 BSEALWATERPt 1P-28B SEAL WATER 1300 15:59 ORT3-N R-N 1P-288 GFP SEAL WATER NNTMD LEAKOFF P ESSURE C003060 2 150 1 MM0306053 MM2 76 CS-02298 INSPECT & MAINTAIN 3 14MAY04 14MAY04 DR-Y ML-Y 11 MM 0 6 05 3 1NSPE & MAINTAIN 1P-2 8 SEAL WATER PC I1P-28B SEALWATER 13:00' 15:59 ORT3-N R-N M1P-28B GFP SEALWATER NTMD LEAKOFF P ESSURE CO03060 3 151 0 MM0201676 MM2 76 HX-258 INSPECT AND CLEAN 4 14MAY04 14MAY04 0 M 02 0 1 67 6 IN AND CLEAN R FACUNIT HVAC UNIT 18:00 21:59 0201676 TELEPHONE EQU PMENT RM AC UN 152 0 MM0201638 MM2 76 W-085 LUBRICATE FAN 4 15MAY04 15MAY04 DR-Y ML-Y 0 M0201638 LU8RIC %TEFAN BEARING BEARINGS 04:00 07:59 ORT3-N R-N 0201638 P BATTERY AND I VRER ROOM VE FAN 153 0 MM0201626 MM2 76 W-017 LUBRICATE, INSPECT 2 15MAY04 15MAY04 DR-Y ML-Y 0 MM0201626LUBI tlCATE, INSPECT D MAINTAIN FAN IAND MAINTAIN FAN 06:00' 07:59 ORT3-N R-N 0201626K INE BLDG OFFI AIR CONDITONI G FAN 154 0 MM0405942 MM2 77 LA6335 IA-6335 TEST BY5/21D4 8 15MAY04 15MAY04 330 MM04059421 5 TEST BY Y121 (SPARE)

(SPARE) 07:00' 14:59 0I4059.42 T-162 X VER STEAM DUMP ACCUMULAT 155 0 MM0201642 MM2 76 W-088 LUBRICATE FAN 4 15MAY04 15MAY04 DR-Y ML-Y 0 MM0201 LUBRICATE FAN EARINGS BEARINGS 10:00 13:59 OPR3-N R-N 0201 _ PAB BA RYAND INVERTER OOM VENT FA 156 1 MM0301116 MM2 77 P-028A DRAW OIL SAMPLE FOR 2 15MAY04 15MAY04 DR-Y ML-Y 0 MM0301116 WOIL SAMPLE OR ANALYSIS ANALYSIS 20:00' 21:59 ORT3-N R-N 0301116 STEAM GENERA OR FEED PUMP 157 1 MM0301117 MM2 77 PM0288 DRAW OIL SAMPLE FOR 2 15MAY04 15MAY04 DR-Y ML-Y 324 MM03011 RAWOIL SA E FOR ANALYSI ANALYSIS 22.00' 23:59 ORT3-N R-N 03011 *STEAM GENE ATOR FEED PU Run Date 14MAY04 13:32l LT-03 STANDARD PUBLICATION I Sheet 9 of 17 CPrimavera Systems, Inc. FL-03 Execution Publication Set I

after 14MAY04 12:00 U1R28 WORKING SCHEDULE l after 14MAY04 12:00 U ID RESP wC) EM DESCRIPTION RD ES EF RISK MF FM 14 ASt 15

  • S T _ S T2,1j 2_ 6_ O12,14,16.18.2(22I0.2 4 626 8j10lij111 1 158 2 MM03011961 tMM2 7lELCT PENE 1NSECAND MAITAI 4 16MAY04 169MAY04 lM_! MM316I PECT A_

03 AND 058. 0700' 10:59 I 31161 UI2L 15 M241 MVN6M-21 S-21-PECTV& 29 03MAY04 15MAYD4I DR-YML-Y 0 M j~jMS-2010 - OPEN &INSPtVALVE -RMP93 INSPECT VALVE- 22:00A 16:59 ORT3-N R-N _-X1A ;G HEADER MAIN TEAM STOP CO 1Q 160 1 NG44CFCI ND NDE 77

-1 IST-SISI

-z ; X-2 _ -_ IE_' -_

NDEFORFACPROG* 4 26APR04 14MAY04 DR-Y ML-Y 71 _CFCINDNDE IORFACPROG-C .NTAINMENT44FT ,ENAREA CONTAINMENT 44 FT 08.00A 15:59 ORT3-Y R-N SECON RY INSERVICE*N 3PECTION 0301397 161 1 EP0301909 NDE 77 Ul-CONTAIN VISUAL INSPECTION OF 5 30APR04 14MAYD4 DR-Y ML-Y 70 P0 9 0 9VAL NSPECTION OF CT 1T UNER PLATE CTMT LINER PLATE 0800A 18:59 ORT3-Y R-N UNIT' CONTAINMENT03 1909 162 1 ND0407589B NDE 76 T-026 T-026 - NDE I 8 12MAY04 16MAY04 DR-Y ML-Y 2 y5 8T.026 NDE I RADIOGRAP 4Y OF PIPING RADIOGRAPHY OF 19:00A 02:59 ORT3-Y R-N _- LOWDC IN TANK04076 163 1 P1402NDE NDE 77 Z-022 Z-022-INTERNALSLIFT 12 16MAY04 16MAY04 DR-Y ML-Y 0 P1402NDEZ022 INTERNA LIF

_ RIGNOEEXAM 05:00 16:59 ORT3-YR-N I 0301913 R-164 1 ND0408110 NDE PIPING EB- MS-2085 ELBOW- 2 16MAY04 16MAY04 DR-YML-Y 692 0NW4'OuM INSPECT EXPOSED 17:00 18:59 ORT3-Y R-N 0403110 165 0 OP0301254 OPo 77 l0o4P0h.1 PERFORM l 1 07MAY04 14MAY04 DR-NML-N 746 P 12 5 4 PERFOI AMAINTENANCE NTHESCBA MAINTENANCE ONTHE 0700A 12.59 ORT3-NRNR PERIODICM ONTENANCE OFTH SCBA0301254 166 0 1 OP0301248 I P0I 77 0-PC-O BNWEEKLY I 14MAY04 14MAY04 219 12P 24 BIBWE YOPERAT1ONH -CKOFBARONU I OPERATIONICHECK OF 12 00 1ZS9 CK OF BARC 111 HIGH PRESS BR ATHING AIR 0M3o1248 167 0 OP0301283 OPO 77 -P0075.8 AOP1IA FAN 4 14MAY04 15MAY04 216 P0 1 2 83AOP10, FAN SURVEILLAN E SURVEILLANCE 1Z00 0859 _0 IOA FAN SUR UACE0301283 168 0 OP0301240 OPO 77 O-PC-021A WEEKLY 5 14MAY04 15MAY04 215 p0 12 4 0 WEE)P. MISCELLANEOUS ATAREADINGS MISCELLANEOUS DATA 1200 09:59 WEEKLY MISCEU ANEOUS DATA RE. DINGS0301240 169 0 OP0215335 OPO 77 0-PC-7.4 DRY PIPE SYSTEM 8 14MAY04 15MAY04 212 1 53 35 DRY SYSTEM CHECK CHECK I 1Z-00 1Z59 FPS VALVE TRI -TESTIALARM T RAUTODRY4P 170 0l OP0301293 OPi 76 0-PC-MIDS OPERATIONS MID SHIFT 42 1 14MAY04 20MAY04 lE-. -- .3 175 po. 1293OPERA IONSMDSHIFT WEKLYROUTINE

- : I WEEKLY ROUTINE 0000A 06.59 . -

171 21 OP0301590 OPI 77 TS-RE-004 FLUX DIFFERENC 2 15MAY04 15MAY04 215 OpI03 1j9g0 AXAL FLUX D FERENCE AND 0 AD POWER AND QUAD POWER 0000 W

  • 01:59 03C 590MAXAL FL DIFFERENCE AND AD POWER TILT RATIO 172 21 OP0301581 OP1 77 O-PC-023.5 CHARGING PUMP 3 15MAY04 15MAY04 214 1 1 CHAPNG IPNGt ROTATION AN ROTATION AND 00:00* 02.59 _P03 581CHARG PUMPROTA REVENTVEM E 173 0 l OP0301314 OP1 77 O-PC-049.7 WEEKLY VERIFiCATION 1 16MAY04 16MAY04 2091 oPo 314WEEKLY VERICATON O FA OFFACADE FREEZE 00:00, 00.59 030 3i4lFACADEFR EZEPROTE Run Date Prilmavera Systems, Inc.

14MAY04 13:32l I LT-03 STANDARD PUBLICATION FL-03 Execution Publication Set I Sheet 10 of 17

after 14MAY04 12:00 l U1R28 WORKING SCHEDULE after 14MAY04 12:00

_ U l RESP DESCRIPTION RD ES EF RISK - FMAY4 ;MAY SUniB EN 174 0

_O _o_1 OP0301332 OP2 S

76 O-PC-DAYS OPERATIONS DAY SHIFT 14 10MAY04 16MAY04

-l* -

DR-Y ML-Y 206PO si 1jfPjjl~j

.1012,14,16,18,20,221 0. 2.i4. 6. 8 .tA12,14,16,18,20,221 0. 2,.4,66. 1012,1t4,16,1 1 33 2 OPERA IONS DAY SHIFTW EKLY ROUTINE WEEKLY ROUTINE 08.OOA 11:59 ORT3-Y R-N m . _ _ l _ OPERATIO 175 0 OP0301351 OP2 77 O-PC-012 G-01 EDG VtBRATION I I16MAY04 16MAY04 209 OP0301351 C EDG VIBRAI (QUARTERLY) 08:00 08:59 0301351 G01 EMERGEN 176 0 OP0301353 OP2 77 O-PC-012.3 G-01 COOLANT I 16MAY04 16MAY04 209 OP0301353 1 COOLANT SAMPLING 08:00 08:59 0301353 0-01 EMERGEN 177 0 OP0301355 OP2 77 O-TS-081 TS-81. G-01 6 16MAY04 16MAY04 204 OP0301355 1.G41 W

^ - ---- D -

  • _-

EMERGENCYDIESEL_

08-00 1359_

X 0301355 G-01 E 178 0 OP0301394 OP3 76 O-PC-SWING OPS SWING SHIFT 35 12MAY04 18MAY04 182 OPC 0 1 39 4 OPS NGSHIFT WEEKL' ROUTINE WEEKLYROUTINE 16.00A 22.59 _ , _

179 0 OP0301326 OP3 76 04TO0072 IT-72.SERVICEWATER 1 114MAY04 15MAY04 .206 OP0 01326lT7Z S RVCEWATER VAL /ES VALVES 16:00- 1959 0 01326 M S' RVICE WATER VA.VES 180 2 U2GNDROt5 OP3 TG-01 DRAIN U2 MAIN I 14MAY04 14MAY04 0 I 2GNDR015D U2 MAIN ELEC RICAL GENERATOI t PER PC 21.3 ELECTRICAL 19:00 19-59 .l 2 MAIN GENERATO 181 0 OP0301428 OP3 77 O-Pt;078.3 MONTHLY NORTH 1 15MAY04 15MAY04 209 P0301428 MONTH Y NORTH SERVIC BUILDING SERVICEBUILDING 16:00" 16:59 03014283M Y NORTH SERVK E BLDG EVACU 182 0 OP0209766 OP3 77 04-PC053 IFY MSR SHELL SIDE 2 16MAY04 16MAY04 201 P09766 HIGH LEVEL 16_00 1759 0209766K

~1-183 1 CVCSPMT X

OPS B

CV PERFORM CVCS 8 12MAY04 14MAY04

-DR-N ML-N U

  • _-

15Sq-ePMTPERFOR CVCS WAKO FOR PMT WALKDOWN FOR PMT _ 0800A 19-59 ORT3-N R-N 184 1 SOPBS7B OPS T-013 LOWER RWST LEVELT0 20 13MAY04 15MAY04 63 LOWERl WSTLEVEL TO 41 41% 22.00A 07.59 185 1 IT-510BB OPS 75 04T-0510B LRPM TEST OF SI TEST I 14MAY04 14MAY04 DR-Y ML-Y 0 -51 BBLRPM TE r OF SI TEST LINE LINE 04.O0A 12:59 ORT3-N R-N IUSI TEST NEtSPY ADD EDUC LKG REDUCTIONt 'M 0215912 188 1 O-RT-0558 OPS 76 O-RT-055 POST LLRT HX-1A 2 14MAY04 14MAY04 DR-N ML-N 0 55BPOST U IT HX-1A BLOWK NN (CONTINGENC)

_ BLOWDOWN I .00A 13:59 ORT3-N R-N ASTEAM ENERATOR BLOWI OWN (P-51)021599 187 1 EP0403494A OPS 76 PT-RCS-1 OPERATING SUPPORT 4 14MAY04 14MAY04 DR-Y ML-Y 155 0 4OPEJ TING SUPPORT OF NlAL RCS WALK XN OF INrlIAL RCS 12.00z 15:59 ORT3-N R-N REACT R COOLANT SYST M (RCS) PRESSUR TEST.- IN040349 1881 11 IT-7l7 OPS 177' 04T-OM7 IT-770, SPRAY SYS 6 14MAY04 14MAY04 DR-V Mt-V 115 .T PR70.YSSYS RWST SUCT VLS RWST SUCT VLVS 13:00 18:59 ORT3-N R-N . Ut SPRAY SYSTEM RVSTSUCTrVLVS UKAGE TEST (RF)02 5927 189 1 IT-740 OPS 77 04T-0740 IT-740. MAIN STEAM 1 14MAY04 14MAY04 DR-N ML-N 242 rI. w40T.740,MAI STEAMBLOWDOJN BLOWDOWN 14:00 14:59 ORT3-N R-N UNIT I M, INSTEAM BLOWD WNVALVES (REFU LING)0215925 190 1 B52-427C OPS 76 B-42 BUS STAB PMT 1 14MAY04 14MAY04 DR-N ML-N 189 5 27CBUS TI PMT "1RC596"

_1RC-596 15_:00 15:59 ORT3-N R-N _ 02 52 48oV TOR CONTROL CE 4TER PAB SAFEGU S 191 1 SOP-BOtZ OPS B-0l SUPPLY 18-01 FROM 3 14MAY04 14MAY04 DR-N ML-N 0 SO -O1ZSUPPL) 18-01 FROM IA-01 tAW I-SOP-480-01 IA-Ot IAW I-SOP-480-001 16:00 18:59 ORT3-N R-M Run Date 14MAY04 13:32w LT-03 STANDARD PUBLICATION Sheet 11 of17 O Primavera Systems, Inc. l FL-03 Execution Publication Set S

after 14MAY04 12:00 U1R28 WORKING SCHEDULE afterM4MAY0412:00 -

U 0 RESP WO EQID DESCRIPTION R 14 _ MAY 14 at 15

_ . ST . . . . I ._* Iijl2j4 161 0 . 1012,14216,18 2 zlO*42.

0I *4 6 '8 Run 16

  • 101124ii Eli _I;-., t ie I 192 1 CL13BO10 OPs CL-13B CONDENSATE VALVE 10 14MAY04 15MAY04 DR-Y ML-Y 0 Cv 11B01OCONDE SATE VALVE UNEi Ip1S (CL-131 UNEUPS 16:00 01:59 ORT3-N R-N I)

(CL-13B1) _CONDENSJ TE VALVE LINEUP!

193 1 OP0300942 OPS 76 RM-03200C- RM-3200C PMT STROKE 1 14MAY04 14MAY04 DR-Y ML-Y 129 PER IT 330 17:00 17:59 ORT3-N R-N F r" 0 9g4 2 RM-3i )0C PMT STROKE F ER rr 330 13009421RE-' I1I/RE.212 MONITOI SUPPLY OPERAT(

194 0 TRAIN-CC OPS REDUCED INVENTORY 2 14MAY04 14MAY04 91 TRAIN-CCRE )UCED INVENTORN JITT CREW C JIlTT CREW C 19.00' 20:59 195 1 OP13AI10 OPS TG-01-T PLACE TURBINE ON. 2 14MAY04 14MAY04 DR-N ML-N 0 OP13AV' IPLACETURBINE N TURNING GEAR TURNING GEAR 22W00 23:59 ORT3-N RN WMAIN TURBINE PGENERATOR TURI IING GEAR 196 0 OP0405897F OPS 76 D-106 PLACE D-108/D-106 3 15MAY04 15MAY04 0 WNypLACE D-108M '-106INSERVICE Oi ID-04 INSERVICE ON D-04 00:00 02:59 5897 125V DC TATION BATTERY 197 1 OP13A120 OPS OP-13A FILL CONDENSER 4 15MAY04 15MAY04 DR-Y ML-Y 153 0 13A120FIL COND ENSER HOTWELL HOTWELL 02W00 05:59 ORT3-N R-N 198 1 OP0303383 OPS 76 SC-00966B SC-966B - PMT STROKE I 15MAY04 15MAY04 DR-Y ML-Y O OP0303313SC 966B PMT STROM EPER IT 60 PER IT 60 07:00 07:59 ORT3-N R-N 03033831P !R UQUID SAMPLE CONTAINMENT ISO ATION 199 1 OP0303382 OPS 82 SC-00953 SC-953 -PMT STROKE 1 15MAY04 15MAY04 DR-N ML-N 132 PER IT 60 . 10 00 10:59 ORT3-N R-N OP03033E2SC-953 -PMT STR )KE PER IT 60 030335 2EPZR LYUQID SPi CE SAMPLE CONTi NMENT ISOLAT 200 1 O-RT-036B OPS 77 O-RT-03B POST LLRT PZR UQUID 4 15MAY04 15MAY04 DR-N ML-N 129 SAMPLE UNE 10:00 13:59 ORT3-N R-N O-RT-036 3POST LLRT PZR. QUID SAMPLE UN 021597 4PRESSURI !ER UQUID SAMPLI UNE (P-288) 201 1 SOP4303A OPS B-03 PREPARATION TO 8 15MAY04 15MAY04 DR-N ML-N 0 OP-B03APREPARJ TION TO SUPPLY ¶ -03 FROM 1B-0 SUPPLY 1B-03 FROM 15:00 22:59 ORT3-N R-M 16-0.4 202 1 0148-050 OPS - T-036 FILL MFP P-288 LUBE OIl 4 15MAY04 15MAY04 DR-N ML-N 0 0148-O5OFILL MF P-2s8 LUBE OIL ESERVIORS RESERAORS 16:00' 19:59 ORT3-N R-N

) SYSTEM MULTI 11OR NON-NU 203 1 SOP-803B OP1S B-03 IPTE BRIEF TOCROSS 2 15MAY04 15MAY04 DR-N ML-N 0 SOP4303BIP1 EBRIEF TO CROS TIE 1B-.03 AND1 TIE 1B-03AND I8-4 19:00 20:59 ORT3-N R-N 204 1 SOP-803C OPS - -03 SUPPLY 18-03 FROM I 15MAY04 15MAY04 DR-N ML-N 0 SOP-3 3CSUPPLY 18-031 ROM 1B-04 lAW 18-04 IAW 23:00 23:59 ORT3-N R-M 1-SOP-480-001 205 1 IT-280A OPS 77 O-T-0280A MSNV STROKE TEST. 4 16MAY04 16MAY04 0 IT- t8OAMSIV STROKE rEST, IT-280A

.T-280A 00:00 03:59 021 899_U1 MS TOP VALVES S7 206 1 SOP-803D OPS 8-03 RESTORE 18-03 TO 2 16MAY04 16MAY04 DR-N ML-N 0 SOl -B03D RESTORE 1103 TO IA-05 IA IAS IAW 1-SOP480-001 01t00 02:59 ORT3-N R-M U

zu, 1 Uil3z-uju ur~z 0F3Z UK-N ML-N 16 0132-030GENE TEST 15:0' 1415 ORTS-N R-N 208 1 48XOIZ PPG B1 B01 BUS RELATED 0 14MAY04 14MAY04 DR-N ML-N 28 480VXO1ZBO I BUS RELATED EN -RGZED WORK CC 4IPLETE

_ ENERGIZED WORK 19:00 18:59 ORT3-N R-N IEN DOF 803 BUS WOF KWINDOW 209 1 CSB12Z 4 PPG

{ f _

MILESTONE

_ ~COMPLETE_

END FEED PUMP P28B 0 15MAY04 15MAY04 DR-N ML-N 256 CSB12ZE 4D FEED PUMP P2 B WORK WINDC

_ _I _WORKWINDOW 20:00 154 59 ORT3-NRN . _ I AN FEEDPUMPP.188 Run Date 14MAY04 13:321 LT-03 STANDARD PUBLICATION Sheet12of17 t Pdmavera Systems, Inc. A FL-03 Execution Publication Set S

after 14MA Y04 12:00 U1R28 WORKING -SCHEDULE after I4MA Y04 12:00 X U ID RESP WO E0ID DESCR IFTION RD ES I EF RISK MIP aY Mj1 sSn1 210 1 13KVXOIA PPG X-03 START HVSTATION AUX 0 16MAY04 16MAY04 DR-N ML-N 22 3KVX01ASTART I STATION AUX:

211 1 48OVAD1Z PPG B-03 B03 BUS RELATED 0 16MAY04 16rMAY04 OR-N MI-N 206 oVAOzBO3 BUS ELTED ENER1 ENERGIZED WORK 03:00 02.59 ORT3-N R-N IENDOF1 3BUS WORKV 212 1 MSA25Z PPG Mft.ESTONE ENDSIGACL-.1EWORK 0 16MAY04 16MAY04 DR-N MI-N 1531 msA2sZEND5`ACL-1EWO (OE CONTAINMEN 05:00 04:59 ORT3-N R-N IsIGB EOAR&

213 1 MSX0Iz PPG MILESTONE END MAIN STEAM 0 16MAY04 16MAY04 DR-N ML-N 173 MSXO1 ZEND MAINST SECONDARY WORK 1o-00 09:59 ORT3-N R-N IMAIN STEAM I 214 1 VNCCB51Z PPG MILESTONE END CONTAINMENT FAN 0 16MAY04 16MAY04 OR-N ML-N 35 VNCCBSI ZEND CONTAIN COOLERS CWORK 1&k00 09-59 ORT3-N R-N lEND CONTAR 215 1 4KVA01Z PPG A-01 CLOSE AO1 BUS 0 16MAY04 16MAY04 DR-N MI-N 106 4 ACIZCLOSE A RELATED WORK 13:00 12:59 ORT3-N R-N IAO1 BUS 215 1 VNCCA51Z PPG MILESONE END CONTAINMENT FANj 0 16MAY04 16MAY04 DR-N ML-N 23 CA51ZEND COOLERS A WORK 14-00 13:59 ORT3-N R-N ICOA 217 1 0123A-040 RP, Of-23A REMOVE AND DISPOSE 4 16MAY04 16MAY04 DR-Y ML-Y 0 0I23-040REOE AND DI=SPS TRI NUKE F TRI NUKE FILTERS 19:00 22.59 ORT3-Y R-N RMVPOT CAVITYFl 18 1 RP-AJRTEST RP H4P 45S8 SETUP 6' EL BREAT11ING 12 16MAY04 16MAY04 DR-Y ML-Y 0 RP.AIRTESTS rSEl.8BE AIR FOR NOZ2E DAM 07.00 18:59 ORT3-Y R-N 21I NQMOCKUPI RP MOCK UP TRAINING 8 16MAY04 16MAYD4 DR-V MI-V 43 ND.MD:KUIi MOCK (FOR NOZZLE DAM 13:00' 20-59 ORT3-V R-N 201 RPSH004-R RPI PACKAGE 4 REMOVE SHIELDING ON 3 14MAY04 14MAY04 DRYVMIV 142 PS004-RREMO SHIELDING ON RIGENHEAT EXCA GER REGEN HEAT 1200, 14:59 ORT3-V R-N 212 RPSH097-R RPI PACKAGE 96 REMOVE SHIELDING 2 15MAY04 15MAY04 DR-Y MLV 46 RPSHO97-RR AOVE SHIELDING :R SC-9SS FOR SC-955 0700' 08:59 ORT3-YR-N 222 1 Z22RP025 RP1 77 Z-02 INTERNALSULFT 6 15MAY04 15MAYD4 DR-Y MI Y 0 -2R 12 5 Z-022 - INTERNAL LIFT Mi - DECC RIG -DECON 11:00 16:59 ORT-Y R-N 0301t13 IR-l RCOR VESSEL IN" UFTIN 22 DS-91 SDS CONT ENGINEERIDRYNG 27 08APR04 19MAY04 DR-V. MI-V 16 D _SI-Igi ENG ~ERING WAL" - SUMP INTRUSIO~ISSUES WALKDOWN - SUMP 08-OQA 14:59 OR3YR-N U U--

224 SE0311772A SEC 781 Z-065A SECURITY SUPPORT 51 10MAY04 24MAAY04 120 W4o 1 msr-cut SUPPORTZ. z4 - MR 03-044 Z-065A - MR034344 07A 14:59---

251 GUPRT GGT0-T PROVIDE CRANE. 45 13APR0-4 18MAY04 DR-Y MI-V 194 G POPR ECRANE. RMG AND TOOLROOM(P)

I TGSU____[ RGGRRAN 09:OOA 16:59 ORT3-Y R-N- -

Rn Date 14MAY04 13:32( LT-03 STANDARD PUBLICATION Sheet 13 of 17 C Primavera Systems, Inc. IFL.03 Execution Publication SetI

after 14MAY04 12:00 U1R28 WORKING SCHEDULE after I4MA04 12:00

  1. U ID RESPl WO E010 DESCRIPTION RD ES F RISK MF I Fri 14 MAY a~t15 16mi

_ST _ _ X I I .10 12.14.16,1&20.210, 2. 4. 6. 8 r1n12.14n16n18200, 2. 4. 6. 81214.16.1 226 1 TG-30890 TGG 78 TG-01-T INSTALL HP CYLINDER 5 12MAY04 14MAY04 DR-Y ML.Y 0 1 IP CYUJNDER HTGX;LAND STEAM P1I IG HTIG!GLAND STEAM 0700A 16:59 ORT3-Y R-N HIGH RESSURETURBIN 0302153 PIPING __ I__ HIHRESUEURIN_0_25 227 1 TGO216167B TGG 76 E-1 REINSTALL DUCT I 14MAY04 14MAY04 DR-N ML-N 0 i AnL DUCowiNG ExE i FUSE INSPECTIO FOLLOWING EXCITER 09: 0A 12:59 ORT3-N R-N TG41 TURBI E GENERATOR E TER FUSE INSPECTION ITRI YEGEERATOR_______

228 1 TG-E01IDHI TGG 76 E-01 INSTALLEXCITERDOG 2 14MAY04 14MAY04 DRY ML(Y 0 1ISTAL. EXCITERDOG SE HOUSE 13:00 I 14:59 ORT3-Y R-N IT - 1* N E E AT XIE 322 229 1 CL-2B E

WCC

CL 28 MODE 6 TO MODE 5 CHECKLIST 140' 25APR04 0800A 20MAY04 07:59

-aDR-N ML-N ORT3-N R-N 0 L2 MODE6 TO ODE SCHECKUST 230 1 CL-2E WCC CL 2E MODE 3 TO MODE 2 309' 02MAY04 27MAY04 DR-N ML-N l L-2 MODE 3 TO !ODE 2 CHECKLIST CHECKLIST 19-OOA 08:59 ORT3-N R-N 231 1 CL-2F WCC CL 2F MODE 2 TO MODE 1 329- 02MAY04 28MAY04 DR-N ML-N C L.2 MODE 2 TO I I CHECKLIST 1DE CHECKLIST 19:00A 04:59 ORT3-N R-N 232 1 T-7110-R WCC - TG-01-G ITUTGD-1-GEM REVS-1 1 14MAY04 14MAY04 DR-YML-Y 0 T71 ITUTG-0 -GEMREVS-1 12:00 12.59 ORT3-YR-N I TU TG-014 EM REV5-1 00i711 233 1 T-8839-R WCC CRDMIRPI 1 RC CRDMERPI EM I 14MAY04 14MAY04 DR-Y ML-Y 164 T 8g1 RC CRD PEM REVO-2 REVO-2 12:00 12:59 ORT3-Y R-N I RC CRDW PI EMREVO-2 0018 19 Is: 234 0 T201475R WCC VNTB REMOVE TAG (OVNTB I 14MAY04 14MAY04 746 t i75RREMOVE TAG (0VNTB VNTB REVO2)

VNTB MM REVD-2) 12:00 12:59 235 0 T305787R WCC HX-245A REMOVE TAG (0VNOPS I 14MAY04 14MAY04 748 n 7oREMOVE TAG (0 VNOPS HX. AMM REV0.1)

HX-245A MM REV0-1) 12:00 12:59 236 1 T-0460-R WCC MS-5958 1 MS MS-5958 ICREVO-1 2 14MAY04 14MAY04 0 r.04 I MS MS-' 58 ICREVO-1 WCCI ~~~12:00 13:59 I MS MS-5 5 IC REVD-1l0004l 237 1 T48R WCC P-288 1CS P-28B EM REVO.3-1 2 14MAY04 14MAY04 DRlY ML-Y 0 Tw CS I P-28E EM REW3-11 12:00r 13:59 ORT3-N R-N I CS P-28BEM RE3-1 001s9 a 238 1 T-0510-R WCC W-1B1/1B2 1VNCCW-1BV1B2MM 3 14MAY04 14MAY04 70 .05 I1VNCCW'-B181B2MMREVt- I REVO-1 12:00 14:59 1VNCC -161/112 MM 1EOI0010510l 239 1 T-9031-H WCC- TG-01-T I TUTG-01-TREV12Z1.1 I 14MAY04 14MAY04 0T 1"1TUTr TR _ _EVI.._

15:00 15:59 001 IliTUTC *1-TREV12.1-1 240 0 T201676H WCC HX-258 HANG TAG (OVNTB T I 14MAY04 14MAY04 2 1 GTA (0VNTBHX-258, MRE1)

HX-258MMREVD.1) 15:00 15:59 241 0 T305786R WCC W-131 REMOVE TAG (0VNNSB 1 14MAY04 14MAY04 742 T35786RREM TAG (0 VNNSIB W. 31 MM REVO.1)

W-131 MMREVDO1) 16:00 16:59 242 1 T-8993-R WCC TG401-T 1 TUTG-01-TREV8.3-4 6 14MAY04 14MAY04 0 T 9 9311UT i.TR St 16:00 21:59 0 18993 I TTG01TR _ 1 L3.4 243 1 T40472-R WC RM-3200C 1 RM RM-3200C IC I 14MAY04 14MAY04 DR-Y MLIY 88 R M I200C REVO.

REV0. 1 17:00 17:59 ORT3-Y R-N 104721 R RM-3200C IC R 1 Run Data 14MAY04 13:32l LT-03 STANDARD PUBLICATION l Sheet 14 of 17 CPrimavera Systems, Inc. I FL.03 Execution Publication Set I

after 14MAY04 12:00 U1R28 WORKING SCHEDULE after f4MAY04 12:00

  • LI U IlD RESP WO I EQID DESCRlFnoN RD ES EF RISK MF FrMl4 SatYS Sun 16 I ST I. ,_ . I m'12.14AR18.20,22 0.2 4*6.8,l0l2214,16.18,22210.2,4.6 8 .10tl2,14,16 2441 1 l T-T048-R wCC P-28B I CS P-28B EM REVZ-t 3 14MAYD4 I 14MAY04 IDR- MI-Y 1 231 T..7fl4&1 cs P-28B EM REV2-1 18:00 20f59 ORT3-N R-N 0017048w 1 CS P-28B EM RE%2-1 245 1 T-9025-R WCC X-13 1480VX*13LOADING 1 14MAY04 14MAY04 . 423 T-9025-RI oV X.13 LOADINGI .AUTr OPS REVO-1 CAUT OPS REV0-1 19:00 1959 001902511 4sov X-13LOADINC CAUT OPS REVO-0 248 0 T201676R WCC HX-258 REMOVE TAG(OVNTB I 14MAY04 14MAY04 736 T201676 tREMOVE TAG(0% NTB HX-258 MM RE L'01)

HX-258 MM REVO-1) 2Z00 2259 E

247 0 T201626H WCC W-017 HANG TAG (OVNTBO I 15MAY04 15MAY04 DR-Y ML-Y S T201 ~26H HANG TAG (0' NTBOW-I7MMRE &01)

W-17 MM REVW-1) 00t00 00959 ORT3-N R-N I

248 0 T201638H WCC W-085 HANG TAG (0VNBI W-85 1 15MAY04 15MAY04 DR-Y ML-Y 0 '201638H HANG TA 3(0 VNBI W45 MM MM REVO-1) 03:00 03:59 ORT3-N R-N I ~EVO-1) 249 0 T210718H WCC W-085-M HANG TAG(OVNBIW-85 I 15MAY04 15MAY04 DR-Y ML-Y 0 '21071IHHANGTA 3(O VNBI W45 EM I EM REVO-1) 03:00 03:59 ORT3-N R-N U

250 1 T-3310-R WCC P-001A-M 1 RC P-IA-M RMP 9002-1 1 15MAYD4 15MAY04 0 T-3310-Ri RCF tA-M RMP 9002-1 KMREV 1 1 EM REV1-1 05:00 05:59 001331011 RC P-IA-M RMP 9002- EM REVI-1 251 2 T301009R WCC ICP-06.021 REMOVETAG (2 CV I 15MAY04 15MAY04 729 T301009RREMO /ETAG (2 CV F-9h IC REV 0-1)

F-39A IC REV 0-1) 05:00 05:59 252 0 T201626R WCC W-017 REMOVE TAG(O WrBO I 15MAY04 15MAY04 DR-Y ML-Y 728 T201626R9 EMOVE TAG (0VN1 5O W-17 MM REV0-W-17 MM REVO-1) 08:00 08:59 ORT3-N R-N )

253 0 T201638R WCC W-085 REMOVETAG (0VNBI 1 15MAY04 15MAY04 DR-Y ML-Y 0 T2O1638RR EMOVE TAG (0VN W-85 MM REVO-I W-85 MM REVO-1) 08:00 08:59 ORT3-N R-N 254 0 T210718R WCC W-085-M REMOVETAG(OVNBI 1 15MAY04 15MAY04 DR-Y ML-Y 0 T210718RR EMOVETAG(OVNI IW-8s5EMREV-1)

W-85 EM REVO-1) 08:00 08:59 ORT3-N R-N I

255 1 T-1763-R WCC SC-9668 I SC SC-9668 MMV 2 15MAY04 15MAY04 0 T-1763-1R SC SC-9685 WMVEV041 REV0-1 08:00 09:59 00117831 II SC SC-9668 MI REVO-1 256 0 T201642H WCC W-86 HANGTAG(OVNBI w-6 1 15MAY04 15MAY04 DR-Y ML-Y 0 T201642H HANG TAG (0 VNBl N 88MM REVO-1)

MM REV-1) 09:00 0959 ORT3-N R-N 257 1 T-3180-H WCC P-40A-M I RC P-IA-M BALANCE I 15MAY04 15MAY04 0 10HI RC P-IA-M ~ALANCE EM REV -1 EM REVO-1 13:00 13:59

.T 01 1318031 RCP-1A. ABALANCE EM RE '0-1 258 0 T201642R WCC W-46 REMOVETAG (OVNBI I 15MAY04 15MAYD4 DR-Y ML-Y 0 T !01642RREMOVET G(0 VNBI W-86 M IREVO-1)

W-86 MM REVO-1) 14:00 14:59 ORT3-N R-N U

259 1 T-3180-R WCC P-401A-M 1 RC P-1A-M BALANCE 1 15MAY04 15MAY04 402 1 T-3180MR RCP- AM BALANCE EM EM REV0-1 16:00 16:59 001318011 RC; 1A-M BALANCE B 260 1 T-3322-R WCC P-001A-M RC P-IA-M RMP 9002-1 1 15MAY04 15MAY04 0 T.3322.R RC P-I MRMP ooz1 EM EM REV2-1 16:00 16:59 ,MEV2-1 001332211 RCI -AMRMP9002-11 281 1 T-1302-R WCC P-428B 1 CS P-288 MM REV01 4 15MAY04 15MAY04 DR-Y ML-Y 0 T-1302-R1 CS P-' B MM REVO-1 16:00 1959 ORT3-Y R-N 00113021 CS P-28B MM REVI -1 262 I T-2407-H wCC RMP I14.16KV RMP 93641 II 15MAY04 I 15MAY04 18 T.240T4114.161 X RMP 9364-1 UME KUCAL CORD El UMBIUCAL CORD EM 17.00 17:59 0012407H1 41 sKV RMP 9364-1 UL BILICAL CORD

_ _. _I . I Run Date 14MAY04 13:32 LT-03 STANDARD PUBLICATION Sheet 15 of 17 C Prfmavea Systems, Inc. FL-03 Execution Publication Set I

after14MAY04 12:00 l U1R28 WORKING SCHEDULE [ after 14MA Y04 12:00 ID RESP WO I E DESCRPPTFON RD ES EF I RISK J'MF MAY 2631 1 T-2709-R

~ #lulST I 15MAY04 I 15MAYD4 I

STr _3 14 I 2 1R0.5 a6

.ICN1.1i1hl2.2102,4,I6h~li21,618.2(I20,2.4.68.

1 riii4Iiiii Surl16 wCC MS-2018 I MS MS-2018 MMV 1 0 T-2709-R MS S-2018 MMV REVO

  • REVO-1 17:00 17:59 001278911 Mc MS-2018 MW RE' 3-1 264 1 T-8293'-H WCC HX-1B 1 MSHX-IBSMPOPS 1 15MAY04 15MAY04 DR-Y ML-Y 0 T-8293-111 MSI X-.B SMP OPS RE.

REVI-11 17:00 17:59 ORT3-Y R-N 001829331 M! HX-1B SMIPOPS RI VO-11 285 1 T-051 1-R WCC W-1C111C2 1VNCCW-ICIIIC2MM 3 15MAY04 15MAY04 14 1 T.0511-t VNC W-1C11C2 MM RI REVO-1 17:00 19:59 0010511=1 VNCC W-IC111C2 IMREVO-1 268 1 T1643-R WCC RMP-9133 1 AF RMP-9133 EM I 15MAY04 15MAY04 128 T-1643-R I AF RMP-9133 EM REVa-1 REVO-1 21:00 21:59 0011643 Ii AF RMP-9133 El I REVO-1 267 1 T-8293-R WCC HX-18 1MS HX-1B SMP OPS 1 15MAY04 15MAY04 DR-Y ML-Y 63 T-8293-R ¶ MS HX-1B SMP O 'S REVI-1 REV1-1 21:00 21:59 ORT3-Y R-N 0018293 I MS HX-1B SMP )PS REV1-1 268 1 T-0677-H WCC ICP-10.24 I ESF ICP-1024 IC 1 16MAY04 16MAY04 37 T.067,7H1 ESF I p.1024 IC REVt REVO-1 04:00 04:59 001067711 ESF ICP-1 024 IC RE\

269 1 T-7043-R WCC P-28A-M 1 CS P-28A-M EM REV0-1 1 16MAY0 16MAY04 DR-Y ML-Y 0 T-7043-R CS P-, 8A1M EM REVO-1 04:00 04:59 ORT3-Y R-N 001704311 CS; -2BA-M EM REV, 270 1 T-7047-H WCC P-028A-M I CS P-28AM EM REVI-1 1 16MAY04 16MAY04 DR-Y ML-Y 0 T.7047-H I CS P-' 8A-M EM REVI-04:00 04:59 ORT3-Y R-N 001704731 CS '-28A-M EM REV 271 1 T-7421-R WCC HX-01A I MS HX-1AWLU MMV 1 16MAY04 16MAY04 0 T-7421-RI MS H -4A W11U1 MMV F I REV2-1 04:00 04:59 001742131 MSI IX-1AWLU MMV 272 1 T-8170-H WCC TG-01-T 1 TU TG-O01-T REV9-1 1 16MAY04 16MAY04 DR-Y ML-Y 705 T.8170H1 TUTC -01.T REV9-1 04:00 04:59 ORT3-Y R-N 001817011 TUI G-01-T REV9-1 273 1 T-83T6-H WCC FD-196A I MSFD-1916ACE RMV-11 I 16MAY04 I 16MAY04 DR-Y ML-Y 0 T-8376,H1 MS FT-196A CE REV2-04:00 04:59 ORT3-Y R-N 001837611 MSI D-196A CE REV 274 1 T-8377-R WCC FD-196A I MSFD-196ACEREV-1 1I 16MAY04 16MAY04 DR-Y ML-Y 0 1 T-8377-R MS FT -19_ CEREVI-04:00 04:59 ORT3-Y R-N 00183771 MSi D-196A CE REV 275 1 T-8868-H WCC HX-1A I MS HX-1A WLU MMV 1 16MAY04 16MAY04 0 T.8868-14I MS 10 IA WLU MMVF REV3.1 04:00 04:59 001886811 MSI X-1A WLU MMV 276 1 T-8930-H WCC HX-1A 1 MS HX-1A SMIP OPS 1 16MAY04 16MAY04 1 T.8930.H 1 MS tO 1A SMP OPS R REV1-1 04:00 04:59 001893031 MSI IX-1A SMP OPS I 277 1 T-5947-H WCC MAIN I MS MAIN STEAM MW 2 16MAY04 16MAY04 DR-N MIL-N 0 T 5947H1IMS MI IN STEAM MMV REV2-1 04:00 05:59 ORT3-N R-N 0015947E1 M MAIN STEAM M 278 1 T-5949-H WCC T-23 1 FD T-23 MMV REV2-1 2 16MAY04 16MAY04 0 T-5949.H1 FD T- 3 MMV REV2-1 04:00 05:59 0015949-1 Ft T-23 MMV REV2 279 11 T-0964-H WCC 621A01 1 MRR62/AO0 RMP 1 I 16MAY04 J 16MAY04 0 T-0964-H1 MRF 62/A01 RMP 931 9302-1 EM REV-01 05:00 05:59 001098431 Ml R 62'A1I RMP9 28C1T376-R IWCC F1>196A II MS FD196A CE REV2-11 TI 16MAY04 16MAY04 DR-Y ML-YV 4 T-8376R I MS FD-196A CE REV.

_ _______ CI .1 _SFD_19_ACER 05:00 05:59. OR3-Y R-N 001837631 M! FD-196A CE RE 2811 1 T-868-R IWCC HX-1A I MS HX-1AWLU MW 1 16MAY04 I 16MAY04 0 T 8868.R1 MS I X.IAWLI MMV I REV3-1 05:00 05:59 0018868K1 MKF HX-1A WLU MM I Z......J J I .1. 1 1 £ Run Date 14MAY04 13:32 LT.03 STANDARD PUBLICATION Sheet 16 of 17 o Prfnavera SYstes, ncI FL-03 Execution Publication Set I

after 14MAY04 12:00 U1R28 WORKING SCHEDULE after 14MAY04 12:00 lU I RESp WO l EalD DESCRfPTION RD ES EF RISK M MAY III ST . I 112,14,16,1&20,221 14 02,2.4, 6, 8 J,1o12,14,16,18,20.22 sat I 0. 2 . 41 6, 8 Sutn16 51ol2,14.16.11 252 1 T-5947-R WCC MAIN 1 MS MAIN STEAM MMV I 16MAY04 16MAY04 3 T.5947-R 1 MAIN STEAM M REV2-1 0600 06:59 001594711 MN S7TEAM 283 1 T-5948-R WCC T- 23 FDT23 MW REV1-1 I 16MAY04 16MAY04 3 T-594R I FC T-23 MMV REVI 06:00 06:59 W U159481 DT-23 MMW 284 1 T-5949-R WCC T-23 1FDT-23MMVREV2-1 4 16MAY04 16MAY04 173 T-5949-R D MW REV2 06:00 09:59 0015949 FD T-.23 MM 285 1 T-7047-R WCC P-028A-M 1CS P-28AM EM REV1-1 I 16MAY04 16MAY04 DR-Y ML-Y 76 T-7047-R CS P-28M El 09:00 09:59 ORT3-Y R-N 0017047 1 CS P-28A-M 285 t T-8930-R WCC HX-1A 1 MS HX.1A SMP OPS 1 16MAY04 16MAY04 0 T-930-R HX1A SMF

_ REVI-1 09:00 09.59 001893 1 MS HX-1A S 287 1 T-9894-R WCC W-001C1 1 VNCCW-1C1IIC2 EM 1 16MAY04 16MAY04 0 T.9894R VNCC W.1Cin REVO-1 09:00 09-59 0009894 1 VNCCW-tC 288 1 T-0964-R WCC 621A01 I MRR62LA01 RMP 1 15MAY04 16MAY04 DR-YML-Y 0 T 6 MRR 621Z 9302-1 EM REVO-1 12t00 12:59 ORT3-Y R-N 00 M 1 MRR 62 289 1 T-5553-R WCC HX-15A 1 VNCC HX-15A MM 2 18MAY04 16MAY04 0 T-5 5 VNCC fX IRI REV2-1 12:00 13:59 001 553E1 VNCC Run Dae 14MAY04 13:32. LT.03 STANDARD PUBUCATION Shoet 17 of 17 O Fyk"avera Systems. In FL-03 Execution Publication Set