ML082730707
| ML082730707 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 09/29/2008 |
| From: | Jack Cushing Plant Licensing Branch III |
| To: | Lois James Plant Licensing Branch III |
| Cushing, Jack /NRR/DORL/LPL3-1, 415-1424 | |
| References | |
| Download: ML082730707 (4) | |
Text
- Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings@ (67 FR 36920), May 28, 2002 September 29, 2008 MEMORANDUM TO: Lois M. James, Branch Chief Plant Licensing Branch III-1 Division of Operating Reactor Licensing FROM:
Jack Cushing, Senior Project Manager/RA/
Plant Licensing Branch III-1 Division of Operating Reactor Licensing
SUBJECT:
FORTHCOMING PRE-APPLICATION MEETING WITH FPL ENERGY POINT BEACH, LLC TO DISCUSS THEIR PROPOSED ALTERNATE SOURCE TERM AMENDMENT DATE & TIME:
Tuesday, October 14, 2008 2:00 PM - 4:00 PM LOCATION:
U.S. Nuclear Regulatory Commission (NRC)
Two White Flint North 11545 Rockville Pike, Room T-2B1 Rockville, Maryland 20852 PURPOSE:
This meeting is to discuss issues associated with the Point Beach Nuclear Plant proposed alternate source term amendment.
CATEGORY 1:
- This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and Region 3.
NRC FPL Energy Point Beach, LLC J. Cushing TBD R. Taylor R. Dennig, et al.
Docket Nos. 50-266 and 50-301
Enclosure:
Agenda cc w/encl: See next page MEETING CONTACTS:
Jack Cushing, NRR Peter Tam, NRR 301-415-1424 301-415-1451 Jack.Cushing@nrc.gov Peter.Tam@nrc.gov
ML082730707 NRC-001 OFFICE LPL3-1/PM LPL3-1/LA LPL3-1/BC NAME JCushing THarris(BTully for)
LJames(TWengert for)
DATE 09/29/08 09/29/08 09/29/08
AGENDA*
NUCLEAR REGULATORY COMMISSION MEETING WITH FPL Energy Point Beach, LLC Alternate Source Term (AST) Pre-Application Meeting October 14, 2008 2:00 p.m. - 4:00 p.m.
2:00 PM Welcome/Introduction 2:05 PM FPL Energy Point Beach, LLC Presentation (Previous AST Issues, Analysis Assumptions, Modifications, Schedule) 2:30 PM Discussion of Submittal 3:30 PM BREAK 3:45 PM Opportunity for Public Remarks 3:55 PM Closing Remarks 4:00 PM ADJOURN
- Tentative Schedule - Topics and time subject to change Enclosure
Point Beach Nuclear Plant, Units 1 and 2 cc:
Licensing Manager FPL Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, WI 54228 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Mr. J. A. Stall Executive Vice President, Nuclear and Chief Nuclear Officer FPL Group P. O. Box 14000 Juno Beach, FL 33408-0420 T. O. Jones Vice President, Nuclear Operations Mid-West Region Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Peter Wells Acting Vice President, Nuclear Training and Performance Improvement Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 John Bjorseth Plant General Manager Point Beach Nuclear Plant 6610 Nuclear Road Mark E. Warner Vice President, Nuclear Plant Support Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Antonio Fernandez Senior Attorney FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Mano Nazar Senior Vice President and Nuclear Chief Operating Officer FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420 Abdy Khanpour Vice President Engineering Support FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420 J. Kitsembel Electric Division Public Service Commission of Wisconsin P. O. Box 7854 Madison, WI 53707-7854 Mr. M. S. Ross Managing Attorney FPL Energy, LLC P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Larry Meyer Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 Two Rivers, WI 54241