ML051960065

From kanterella
Jump to navigation Jump to search
U1R28 OCC Interactive Turnover Meeting Agenda
ML051960065
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/21/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051960065 (23)


Text

Commntted to Nucloar EXII

)

E UFd rMr fanf

  • U1R21 Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda FrIday, May 21, 2004 StaitTime:

- 1800

- NSB Cafeteria

- BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)

Operations Coordinators (SOC)

M'aintenance Coordinators (MOC)

Engineer/ Projects Coordinators (EOM)

Rad Protection Manager (RPM)

Site Safety Coordinator (SSC)

Shutdown Safety Assessor (SSA)

Site Management (SSM)

General Supervisors First Uine Supervisors Agenda

1.

Safety Issue Discussion (SSC)

2. Radiation Protection (RPM)
3. Operations Coordinator Turnover (SOC)
4. Shutdown Safety Assessment (SSA)
a. Containment Fire Loading SAT /

UNSAT -4 Review Deficiencies

5. Maintenance Coordinator Turnover (MOC)
6. Engineering Coordinator Tumoverj(EOM)
7.

Major Projects Update (EOM)

8. Schedule Review (SOM)
9. Management Expectations (SSM)
10. ACEMAN Assessment Results (SOM)
11. Shift Goals (SOM)

Items Included In Daily Package:

Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Defined Critical Path Work Activity Risk Assignment O utag ac fl c iico t

d M in ala ft is fted Oftmasn Ad.

Comninfttd to Neodear ExCellnC c Point Beach Nuclear Plant U1R28 Refueling Outage

.:~ ;wSafety~.Topicfor week of May 16-22, 2004 Theme for the week This week's theme is Material Handling. We are moving a lot of equipment this week, both big and small. It is a good time to review some basics in this area.

Daily Safety Snippets' Sundav "When you can - push a cart and use both hands."

OE 16141 - Farley. Electrician was pulling a cart with 350 lbs of batteries, through an area of multiple turns. He was pulling the cart, walking backwards when the wheels of the cart hit an edge of a raised deck plate. The cart began to tilt up and the handle (that was removable) pulled free. One battery hit the floor with enough force to crack the jar and 6 gallons of acid was spilled onto the floor.

  • -Monday "Check your slings or you might be wearing wings" April 1997. Employees at a construction site were positioning a 22,000 lb. generator with the use of a truck-mounted crane and four synethic slings. One of the slings failed, the generator fell and rolled onto the employees.' One employee was killed and a second hospitalized with multiple injuries. Do we always check our slings before use? Do we always stay out of the path of an overhead load?

Tuesday "Don't block your vision or you could be headed for a collision" OE12937 - October 2001. Forklift operator at Kewaunee was asked to lift a containment fan coil unit in order that a pallet could be placed underneath it. The approach was from an angle, rather than directly from the front due to 4x4's underneath the unit creating a frontal obstruction. The forklift operator maneuvered close to the area,* stopped and asked individuals to move. As they began to move, the back end of the forklift swung around, pinning a security officer to a doorframe.

Wednesday "If your load starts to slip, get out of the way - quick" December 1997. An employee at a hospital was pushing a food cart down a ramp when she lost control of it. As she tried to stop the cart, she was crushed between it and a wall. She was hospitalized for a fractured ankle and a lacerated ear.

Thursday "Gravity - It's not just an Idea, It's the law" OE17160 - September 30, 2003. A turbine crew at Byron was lifting a governor valve that was retuned from a vendor. The valve was turned from horizontal to vertical and a millwright began removing the plastic weather cover. While the valve was 4 ft above a truck bed, the millwright'

-placed his hand between the valve plug and the muffler. 'The valve shifted and the valve stem was not gagged as is normally done when returned from the vendor. The plug moved down through the muffler, crushing his hand.

Friday "Balance your load or get squished like a toad" OE12517-April 2001. Mechanics at Grand Gulf were removing a MSIV bonnet using nylon slings. Softeners were used on those places in which the sling contacted 90degree edges on the bonnet As the load was being adjusted to the vertical position, the load shifted and the softeners rolled out of position. The slings were then cut by the sharp edges and the bonnet dropped several inches onto a wooden shipping crate.

Saturday "Don't gamble and try to carry more than you can handle" NMC Safety Manual -

If you are not sure of the weight of a large object, get help from another worker to avoid injury."

Point Beach Nuclear Plant Outage 1 R28 DAY Supporting Operational Excellence 47 Path

-N A

JI%

Picture Meets Outaae Radiation Performance n--4 kA.^#

=vf-aarle I-VI I

.JU INS.,o a. ~

I TiTEX!

LeA This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.

Meets:

<=75 Rem

- Actual Cum.

Exceeds:

<=71 Rem Dose:

56.045 Rem Day 47 - May 20 Actual = 0203 Cumulative = 56.045 Cumulative Forecast = 68.718 Daily PCE goal reforecast on 4/23. Daily dose reforecast on 5/8/04.

Reactor Head Repair Dose for May 20th Is 2.011.

RV Head Total Dose is 14.146.

Meets: < 18 Exceeds: <=12 Actual PCE's:

. 10 S.PVI S

.Or 0

I Stu Thdmas' I

Personnel Contamination Events Cummulative Dose Exposure w

0C U

0 U

0 a

CD 0

so,.

60 40 20 r

I I

0 2 4 6 8101214161

~42(34363840444464a;02 Acual Forecast Goal 0 2 4 6 8 101214161820222426283a32343638402"444485052

Committed to Nuclear I Outage Status Report TPlant:

Point Beach Unit I Day:

Friday Today's Date I Time:

5/21/04 1600 Outage Duration: Day 48 Of Refueling Outage Number U1R28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0

First Aid cases 0

Near misses 0

Total for this outage I

Summary:

Radiological Dose to date 56.045 Projected to date

  • 68.718 Outage Goal
  • 75 R Difference

-12.673

.* Reforecast on 5/8 Number of PCEs 10 Summary: Reactor Head RepairDose forMay 20& is 2.011. RV Head Total Dose is 14.146.

Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0

Summary:

Plant Status Mode:

Hot Standby (Mode 3) l Hot Shutdown (Mode 4)

D Cold Shutdown (Mode 5J 3 Refueling Shutdown (Mode 6)

RCS:

Temperature:

81 Pressure:

Vented to Atmosphere.

RV Level:

Rod Latch Height Time to Boil:

30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> Shutdown Safety Assessment Protected Eaulpment:

Major Activities Completed In Last 24 Hours Critical Path and Near Critical Path Activities (Next 24 Hours)

  • Installed Reactor Head Pen #33 Thermal Sleeve
  • Reactor Head Pen #26 Relief Request Issues
  • Completed Reactor Head Pen #33 Thermal Sleeve NDE
  • D106 Battery Cell Charging
  • Removed Reactor Head Pen #26 Nozzle Extension
  • P-38A Aux Feed Water System I&C Calibration 1MS-20l912020 Loss of Voltage Test
  • IP-15A SI Pump Breaker Maintenance Significant Outstanding Issues Date Issue Due Responsibility 5/03/04 Reactor Vessel Head Repair Penetration #26 5/21/04 John Walsh 5/17104 Rx Head Relief Request 5/21/04 Jim Schweitzer 5/20/04 D105/D106 Station Battery 5/22/04 Harv Hanneman Upcomng Ma or Milestones Sch eduled Actual Scheduled Actual Date Time Date Time Date Time Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230 RCS Fill & Vent 4/23/04 1500 Head Lift 4/09/04 0900 4/21/04 1550 Heatup >2000 4/25/04 0900 Refueled 4/14/04 0300 5/02/04 1848 Reactor Critical 4/28/04 0

8 0

0 RV Headset 4/18/04 1900

__On-Line 4130/04 0100 4

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

May 21, 2004 TIME:

1530 KEY SAFETY FUNCTlONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN GREEN GREEN GREEN GREEN NA 4'-

PROTECTED EQUIPMENT:

COMMENTS:

AFW Motor Driven Pump, P-38A, Unprotected due to ICP 6.86 RCS Time to Boil is 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Using NP 10.3.6 Time To Boil curves and curve for core reload complete.

Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency.

PBF-1562 Revision 2 10130/02 5

Page 5 of 9

References:

NP 10.3.6 NP 10.2.1

Defined Critical Path MAY

_MAY U

ID l

DESCRIPTION OD RD Cal U SYS EQID TF 21 22 23 I

_4, 6, 8,10112.14,16.18,20.221 0 2.4, 6, 8,10112.14,16,18,20,221 0, 2.4.6. 8,10112.14,16,18.2l 1 SD-1600M93 ADDRESS ONGOING ISSUES 10 4 1

1 RC R-1 0

RESS ONGOING ISSUES WITH REUEF REQUEST WITH RELIEF REQUEST 02134T6-21MAY04 15:5913MAY04 13:00A 1

SE.1600-C SR MGMT DECISION TO 0

0 1 _

RC R-1 O

S 4600.C SR MGMT DECISION TO GRIND CHAMFER GRIND CHAMFER 21MAY 17:00+0213476 1 CEI600R050 P CHAMFER GRIND 4 4 1 1 RC R-1 0

Cl 600R0S0P CHAMFER GRIND 21 MAY 17:00*0213476 - 21 MAY04 20:59 I CE1600R055 PREP TO INSTALL THERMAL 5 5

1 1 RC R-1 0

CEM600R055PREP TO INSTALL THERMAL SLEEVE AT P-26 SLEEVE AT P-26 1MAY04 21:00_0213476-22MAY04 01:59

  • __U iii!

1 CEI600R030 INSTALL THERMAL SLEEVE 5

5 1 1

RC R-1 0

CE1600R030lNSTALL THERMAL SLEEVE AT PENETRATION 26 AT PENETRATION 26 22MAY04 02:00-_0213476 -22MAY04 06:59 1 CE160WR036 CLEAN AND FME CLOSEOUT 12 12 1 1

RC R-1 3

CE1BO5RO36CLEAN AND FME CLOSEOUT AREA FROM MACHINING AREA FROM MACHINING 22MAY04 07:00-0213476

- 22MAY04 18:59 I

EM-8480H CLEAN CONOSEAL PORTS 15 15 1 1

RC R-1 I

EM8480HCLEAN CONOSEAL PORTS 22MAY04 07:000~0214134.-

22MAY04 21:59 CE1600R035 RX HEAD REPAIR CLOSEOUT 21 21 1 1

RC R-1 0

CEI60OR035RX HEAD REPAIR CLOSEOUT ACTMTY ACTIVITY 22MAY04 07:00 0213476-23MAY04 03:59 1

CE-1600-8 REMOVE FRAMATOME 4

4 1 1

RC R.1 0

CE4600.#REMOVE FRAMATOME UNDERHEAD INSPECTION EQUIPMENI UNDERHEAD INSPECTION 22MAY04 22:00_0213472-23MAY04 01:59 I

CE.1600-50 REMOVE REMAINING 5

5 1

1 RC R-1 0

CE4600-50REMOVE REMAINING SCAFFOLDING POST 1800 INS SCAFFOLDING POST 1600 22MAY04 23:00_0213472-23MAY04 03:59 1 MM-8480G1 LIFT HEADTO REMOVE 3

3 1 1

RC R-1 0

MM.848OGjUFT HEAD TO REMOVE HEAD 04RINGS & MOVE UNEF HEAD O-RINGS & MOVE 23MAY04 02:00_0214134-23MAY04 04:59 I

SP-EVAL3 DECISION POINT TO 0

0 1 1

RC R-1 0

SP.EVAL3ECISION POINT TO RELEASE FRAMATOME RELEASE FRAMATOME 23MAY04 04:0010213472-23MAY04 03:59 I

CE-1600-98 COMPLETE ABOVE HEAD 1 1 1 1 RC R-1 0

CE4600.98COMPLETE ABOVE HEAD INSP AFTER SCAFFOLD REMOVEE INSP AFTER SCAFFOLD 23MAY04 04:0010213472 - 23MAY04 04:59 I

MM-8480G2 MOVE HEAD TO REPLACE 1 1 1 1 RC R-1 0

MM.S48MG2MOVE HEAD TO REPLACE HEAD O-RING' HEAD 0-RINGS 23MAY04 05:00X0214134-23MAY04 05:59 I

MM-8480G REPLACE RV HEAD 0 RINGS 4 4 1 1

RC R-1 0

. MM.8480GREPLACE RV HEAD 0 RINGS & INSPECT SEA

& INSPECT SEAL 0214134-23MAY04 09.5923MAY04 06:00 1 RPJF-151A INSTALL REACTOR HEAD 3

3 1 1

XX R-1 SKIRT 0

O RPJF.ISIAINSTALLREACTORHHEADSKIR SKIRT 23MAY04 10:00_23MAY04 12:59 Run Date 21MAY04 13:481 LT-16 DEFINED CRmCAL PATH Sheet10f2 OPulmavera Systems,lInc.

FL-16 DEFINED CRITICAL PATH SET

I Defined Critical Path MAY U

ID DESCRIPTION OD RD Cal SYS EQID TF 21 22 23 t

MM48480J REPLACE REACTOR HEAD 4

4 1 1 RC R-1 0

MMg48ojREPLACE REACTOR HEAK 0214134-23MAY04 16:5923MAY04 13:00_

1 MM-8480X HEAD WORK PRIOR TO 4

4 1

1 RC R-1 0

MM.84SOXHEAD WORK PRIOR TO DECO DECON 0214134-23MAY04 20:5923MAY04 17:00

".1i IC.

Run Date 21MAY0413:48 LT-16 DEFINED CRICAL PATH Shoot 2 of 2 Prlm.vera Systems, I FL-16 DEFINED CRICAL PATH SET I

punDate 21MAY04 I Work Activity Risk Assignment I

Sht 2

U ACT WO GRP HPE EQUIPMENT Activity Cal DUR START FINISH MAY ID ST RISK Description ID0

-1 U201 4,

I CE1600G030 76 CE8 DR-Y ML-Y R-1 PERFORM ONSITE CREW 1

19 17MAY04 22MAY04 Z

REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M TRAINING FOR NOZZLE 07 OOA 0659 0213476 - 128C 1

SDI6S0G0I1 76 CE8 DR-Y ML-Y R-1 REVISE PACKAGETO GRIND 1

19 19MAY04 22MAY04 IRRACToR VESSEL AND ASSEMBLY ORT3-Y R-M OUT OVERLAP 09 :OA 06:59 0213476 - 128C I

CEI60WR050 76 CE8 DR-Y ML-Y R-1 P-26 -CHAMFER GRIND 1

4 21MAY04 21MAY04 EREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M 17:00 20:59 0213476 - 128CE 1

SE-1600-C 76 CE8 DR-Y ML-Y R-1 SR MGMT DECISION TO 1

0 21MAY04

  • REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M GRIND CHAMFER 17:00 0213476 - 128CE j1 CEI60WR055 76 CE8 DR-Y ML-Y R-1 PREP TO INSTALL THERMAL 1

5 21MAY04 22MAY04 REACTOR VESSEL AND ASSEMBLY L

ORT3-Y R-M SLEEVE AT P-26 21:00 01:59 0213476 - 128CE 1

CE1600R030 76 CE8 DR-Y ML-Y RV1 INSTALL THERMAL SLEEVE 1

5 22MAY04 22MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M AT PENETRATION 26 02:00 06:59 0213476 - 128CE I

SE-1600-D 76 CE8 DR-Y ML-Y R-1 SR MGMT DECISION TO 1

0 22MAY04

  • REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M INSTALL THERMAL SLEEVE 02:00 0213476 - 128CE 1

CE1600R035 76 CE8 DR-Y ML-Y R-1 RX HEAD REPAIR 1

21 22MAY04 23MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M CLOSEOUT ACTIVITY 07:00 03:59 0213476 - 128CE 1

CE1600R036 76 CE8 DR-Y ML-Y R-1 CLEAN AND FME CLOSEOUT 1

12 22MAY04 22MAY04 rZIREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M AREA FROM MACHINING 07:00 18:59 0213476-128CE

0 23MAY04

  • REACTOR VESSEL AND ASSEM ORT3-Y R-M INSTALL REACTOR HEAD 13:00 0213476 - 128CE j1 IC2.19 76 IC1 DR-N ML-N ICP-02 019 ICP 2.19 SAFEGUARDS 5

6 23MAY04 24MAY04

[===CJPOST.REFUEUNG ORT3-NR-M LOGICTEST 1500 0959 0300813-1281C 1 1 w

§ I

~

i;ld i

-4~d dM

_U j

MM-8480G1 76 MMI DR-Y ML-Y R-1 LIFT HEAD TO REMOVE 1

3 23MAY04 23MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-N R-H HEAD O-RINGS & MOVE 02:00 04:59 0214134 - 128MM 1

MM-8480G2 76 MM1 DR-Y ML-Y R-1 MOVE HEAD TO REPLACE I

I 23MAY04 23MAY04 IREACTOR VESSEL AND ASSEMBLY ORT3-N R-H HEAD O-RINGS 05:00 05:59 0214134 - 128MM I

MM-8480G 76 MM1 DR-Y ML-Y R-1 REPLACE RV HEAD 0 RINGS 1 4

23MAY04 23MAY04 EREACTOR VESSEL AND ASSEMBLI, ORT3-N R-H

& INSPECT SEAL 06:00 09:59 0214134 - 128MM I

MM-8480J 76 MMI DR-Y ML-N R-1 REPLACE REACTOR HEAD 1

4 23MAY04 23MAY04 EREACTOR VESSEL AND ASSE ORT3-N R-H 13:00 16:59 0214134 - 128MM I

MM-8480U 76 MM1 DR-Y ML-Y R-1 INSTALL WALKWAY &

1 1

23MAY04 23MAY04 OREACTOR VESSEL AND ASSE ORT3-Y R-H CONTACT RP FOR SURVEY 17:00 17:59 0214134 - 128MM I

MM-8480X 76 MM1 DR-Y ML-Y R-1 HEAD WORK PRIOR TO 1

4 23MAY04 23MAY04 EREACTOR VESSEL AND AS ORT3-Y R-H DECON 17:00 20:59 0214134 - 128MM I

MM-8485L 76 MM3 DR-Y ML-Y P001B REALIGN SEAL COLLTO 1

1 23MAY04 23MAY04 OREACTOR COOLANT PUMP ORT3-N R-M FLOOR DRAIN RMP 90024 04:00 04:59 0214119 - 128MM NMCI/WE LT-81 HUMAN ERROR RISK BARCHART NMC___________WE____

L-81 'HUMAN ERROR POTENTIAL C

PBNP U1 Refueling 28 Outage F

0 Primavera Systems, nc.

I L Run Date 21MAY04 13:501:

Work Activity Risk Assignment I

Sheet 2 or Z U l ACT WO GRP HPE EQUIPMENT Activity Cal DUR START FINISH 22 ID ST RISK Description ID

.2,1620104

.a 1

01100-60 OPS DR-N ML-N T-034A T-034A -FILL SI 1

8 22MAY04 23MAY04 ORT3-N R-M ACCUMULATOR 21:00 04:59 1280P I

IT-280A-18 77 OPS DR-N ML-N O-IT0280A MSIV STROKE TEST, IT-280A 1

4 22MAY0423MAY04 OCU MS STOP VALVES STROKE TEST (CS[

L ORT3-N R-M (MS02018) 23:00 02:59 0215899 - 1280P N'Psh 1,

W________________*__

NM WE LT-..81 HUMAN ERROR RISK BARCHART C P~tmavera S tomslPBNP U1 Refueling 28 OutageFLS H MA ER RPO NT L

after 21MAY04 12:00 I

U1R28 WORKING SCHEDULE I

after21MAY04 1Z:00 Ii MAY U

mn RESPI WO ST EQtD MILESTONE DESCRVION RD I ES RISK DR.Y ML-Y ORT3-Y R-N ue

1 1

NRC-CAIL10 ADM I.

O.D. CALL NRC TO II 23MAY04I 23MAY04 WVMNESSRVHEADSETl I110 00

.10.59 Mr 0

0 3

Fri 21 I. -

19A.AIt

9. A.4.1 8.1091AAFLI6.

,9.4.6.I i.in1ti.1i.imi I

Snt 22 Stin 23 IIRCCALL10O.D. C11M NRC TO WITNES RV HEAD SET 2 1 AP0215128 APM 76 X-01-B-INSPECTCAL 1 2 116MAY04 21MAY04 I OR-YML-Y ANDSET 10.00A 13:59 l ORT3-N R-N POI1512 8

X.0143.

EWMAIN POW NSPECT CAL AND 7RTRANSFORMER AP0215129)

SET PHASE B0215128 C1C. INSPECT CA

+

+

3 t

AP0215129 AP0303688 APM 76 X-01-C X-01-C-INSPECT CAL I 16 22MAY04 I 23MAY04 I DR-Y ML-Y AND SET 08:00o 14:59 I ORT3-N R-N 17 U

189

.AND SET

.4 1

APR 76 A-01 CALBRATElA-l 152 110MAY04 128MAY041 DR-NML-N NON-TECH SPEC I

16OOA 14:59 ORT3-N R-N wa0h 368sCALURBITE IA-41 NON-TECIH SPEC RELAYS I

I I

5 1

AP0215122 SR 78 A52-0 P-tA UNDERPRECL 6

21MAY04 22MAY04 DRNM-RELAY Fl)NCTIN 13:00' 09:59 OT-LSq it I l;" lo)}

IN4 1

L-reel; s 6

O) CE0310577 CE 76 Z-065A Z465A INSTALL MR 3

10MAY04 21MAYC4 CRYMY 16

_ _03-044 07.00A 14:59 OT 7

O CE0311772 CC 76 Z 065A Z-65A INSTALL HEAT 3

1OMAYD4 21MAYC4 DR-Y ML-Y 160 TRACE - MR 3-044 07.00A 14:59 ORT3-N R-N 8

0 EM405897Z5 CE 76 D-106 D-106 REMOVE CELLS 12 23MAY04 23MAY04 DR-Y ML-Y O

18. 21.25,26AND44.

01:00 1259 ORT3-N R-N PO:

6E0:

EO:

15j22 P-lA Uh 1os77Z-65A!

3MANHOL ATN72Z-HOI`

MANHOL ERFRENC RELAY TEST W

O1-A RATR OLN UMP 0215122 STALL MR 03-044

.#1 0310577 STALL HEAT TRAC

-#10311772 El 125V DC S EM4V541M 9

O EM45897ZI CE Li 76 76 D-106 D-106 REPLACE 12 23MAY04 I 24MAY04 DR-YML-Y 1821.25,26 & 44 WrrH 13:00 00 59 ORT3-N R-N c

  • MR 03-0U4 g405897z5D-106 R rATION BATTERYD
D-106 REPLACE1 125V DC S ON HP TURBINE C TURBINE0302153 CTMT44 FTGENA MOVE CELLS 18.

iq 1,21,25.26 & 44 WIT

  • ATION BATTERYO

_° 1

CE30000TI 1, 25,26 AND 44.

1PRECHARGED 3174 CE3 TG-01-T ENCAPSULATE INSULATION ON HP 10 I 01MAY04 I 21MAY04 12.00A 1 21:59 DR-Y ML-Y ORT3-Y R-N 145,E3o7n ENCAPSPJLATE INSULATIOt mi IHIGH PRESSUREI tER 11 1 CE44CGATI CE3 76 INSUL-MS REINSULATE-FAC 35 12MAY04 22MAY04 DR-Y ML-Y 64C PROG -CTMT44 FT GENl 17:00A l 2259 ORT3-Y R-N 12 1

CE44TGATI CE3 77 IST-SISI REINSULATE-FAC 110 17MAY04 01JUN04 DR-Y ML-Y O

I PROG-TRBHALL44FTl 1400A 09'.59 -

ORT3YR-N 13 1

CE408411TR CE3 75 PIPING DB-IREMOVEINSULATION 4

22MAY04 22MAY04 1

1 FOR P-28A MINI RECIRC 01:00 08:59

!UrGAin RJEINSl;TE ;FAC PROG.

INSULA-nON041

E4GATIREINSITE-FAC PROG 4IRB HALL 44 FT NRAREA mu CE40C CE40O 411TRREMOVE INS 084111-inU 412TR REMOVE INS J08412E1MN LILATION FOR P-28 ULATION FOR P-28 I

MINI RECIRC FLA

,MINI RECiRC FLA IGE IGE 14 1 1 CE40U412TR I CE3 75 1 PIPING 06-I REMOVE INSULATION IFOR P-28A MINI RECIRC 4 l 22MAY04 I 22MAY04 01:00 08:59 9

15 1

CE408412T1 CE3 75 PIPING 06-INSTALL INSULATION 1 6

22MAY04 24MAY04 l CE408412T1 NSTALLINSULAIlN FORP-28AMINI ECIRCFLANGE FOR P-28A MINI RECIRC 2200 l

07:59 04084 16 1

CE408411TI CE3 75 PIPING D-INSTALL INSULATION l 6 23MAY04 l 24MAY04 l CE4O9411TnINSTALLINSULA N FOR P-28A MINIECIRC FLANGE FOR P-28A MINI RECIRC1 02ZW00 11:59 1llt041-Run Date 21MAY04 13:21 LT-03 STANDARD PUBLICATION i

Sheet I of 14 o Prknavera Systems, Inc.

I FL-03 Execution Publication Set I

after 21MAY04 12:00 I

U1R28 WORKING SCHEDULE after 21MAY04 12:00 m

RESP WO ST EQID DESCRIPTION.

RD ES I1 EF RISK' MV MAY

  • 17 j

I CE26TOH1SR ICE4 77 IST-SISI jREM SGAFF -FAC PROG I2310 1MAY04-f 22MAY041 DR-VYML-Y j-TURB HALL26 FT 0900A 114:59 IORT3-Y R-N flvFpRI I

267 Fri 21 Sat iun23 E2 OISR REM SAF.ACPROG.

RB HAL 26 F DN~

AYV INSERVICE'INS ETO EOOSRMESAF-FAC P

-UDHALLS8F OVERHO 18 I

CE0O8TOHSR CE4 77 IST-SISI REMOVE SCAFF - FAC 32 -05MAY04 25MAY04 DR-V ML-Y 154 PROG - TURB HALL. 8 FT 10:OOA 1 1:59 ORT3-Y R-N

~~~OVERHO_

19 1 -

CE212978S1 CE4 76 SA-0007 BUILD SCAFFOLDING 5 ~21MAY04 21MAY04 OR-V ML-Y 155 FOR I SA-27 09:OOA 16:59 ORT3-Y R-N 20 1 -- CE40154111ISI CE4 75 PIPING 08-BUILD SCAFFOLDING 8

21MAY04 22MAY04 C

FOR P-28A MINI RECiRC 17:00' 0059

~FLANGE_

3UIL CE4 CEA

)SCAFFOLDI?

~U1c II, 38411SIBU1WD 1408411M rn41.2StBUIL~D 408412M IG FOR ISA.27 LET SCAFFOLDING FOI SCAFFOLDING FOF P-28A MM~ RECIR, P-28A MMN RECIR' LiI I L.r-V6JZq

'I~

tot4 III 1l1FINU LX3-I ISUILU bLAH-ILUUINU I 5 IFOR P-28A MINI RECIRCO R

FAN=~

ZIMAYU4 J.ZZMAYU4 17:00' 00-.59 u

'FLANGE

FLANGE IL SUPPORT i.

j I -

1 i - i I -1.... -

I -- -.

1 -

I--

I l

".I;

-

1 l

r*

I. II Ia I -QQ tDUlLLJuJ~LI'.

FOR 101 1-077 FOR INSUL SUPPORT a

,C1MVVTIM4 I 04MATU9 ILJ-T ML-T 17:00 08:59 ORT3-Y R-N

~1'Icc 3lS97SIBUIW SCAFFOILDING P0*l1l11-07 FOR INSI 303636 I

23 1

CE933444SR CE4 76 W-M0C2-A REMOVE SCAFFOLDING 5

22MAY04 22MAY04 DR-VYML-Y 135 FOR`W-1C2-A 08:00' 12:59 ORT3-Y R-N 24 1

CE-CFCB-SR CE4 87 tIX-015835 REMOVE SCAFFOLDING 5

22MAY04 22MAY04 DR-V ML-Y C

FORB8CFC 14:00 1 8:59 ORT3-Y R-N 25 1

CE-10O-50O CE4 76 R-1 REMOVE REMAINING 5

22MAY04 23MAY04 DR-V ML-Y a

SCAFFOLDING POST 23:00 03:59 ORT3-Y R-N M60 INSP 281 1 CE04011081 CE5 78 PIPING EB-MS-2085 ELBOW -

5 19MAY04 21MAY04 DR-Y ML-Y 0

REPLACE EXISTING 0900GA 16:59 ORT3-YR-N

~ELBOW_

27 1 CE0408118 CE 7i MISC REPAIR FLOOR BEAM 20 21MAY04 26MAY04 DR-V ML-Y 0

SOUTH OF IT-026 07:OOA 07:59 ORT3-Y R-N 28 0

C0188 C6 77 SEC SEC SUPPORT MR.11471 05APR04 I16JUN04 1.DR-N MLN 1

99-OIIB 070Gb.

14:59 OR3N.

'~0 l

P flOnna rca

~ a

~

fl Cr, S~yr.,

Lit,

~ t r~m na i,,

ima r~r&

i CE933444SRF 99334441 CE-C CE-6MO

-ACTOR'VESSEL A S ELBOW-REPLA, X STEAM TO THE I FLOOR BEAM SOU

-MOVE SCAFFOLD MCONTAINIME FCB.SR REMIOVE S i301145~cc So REMOVE REMAJI 10 ASSEMBLY0213 E EXISTING ELB3M EHEATERS B AND H OF IT-=2

!NG FOR W-1IC2-A 4T COOLING FAN D

AFFOLDING FOR I N~TAINMENTACCIC IING SCAFFOLDIN(

172w.

)04O8110 SCHARGE DAM!

CFC EN4T RECIRC HE

POST NM0 INS; I1E0 U

IEO 08iiOBMS-20

~REHE, 08111 REPAIR

-Eo-J10oB8SEC SUPPORT MRW99-Ol1 I ElmI I -

4

-1.1

-1.

I.

EOUIP MR 99-01 1VE 081XA 14:59' ORT3-N R-N la 408SEC, IN~TALL NEW EQUIP IR 99-OiVE I

Il I

30 0

CE0210990 E6 76 SEC SEC REM ABANDONED 163,I 03MAYD4 18JUN04 DR-N ML-N.

EQUIPMR99-011'F 08.-WA' 14:S9 ORT3-N R-N 31 1

CE1600GO30 76 R-1 PERFORMONSITE 19 17MAYD4 22MAY04-DR-Y ML-Y CREW TRAINING FOR 07.MA 06:59 ORT3-Y R-M NOZZLE GRINDING 32 1

SD16 10 R-1 REVISE PACKAGETO 1 9 19MAY04 22MAYD4 DR-Y ML-Y a

GRIND OUT OVERLAP 09.WA 06:59 ORT3-Y R-M SEF 4~ABANDONED Q IP MR 99-0111"I S -

I -

I -

IM6L0G3PERF0OtM ONSITE CREW' RAINING FOR NOZ*EGRINDING

  • q

] CTRVESEL~fASSEMBLYO2134t6

~DIOGO0REIS~PACAGEO GINDOUT OVERLAP El I R CTORVESSEL A.tASSEMBLY02134t ji I I 1.0t:U 10 K-i bXMiMUMI UhUSIUN I U0 U I 1 MAYL)4I GRIND CHAMFE 17:0O~

UK-Y ML-Y ORT3-Y R-M.

U SE460C SRMjMDEC1SON TO G"ID CHAMFER oil 3476* REA$PTOR vEssEL ANDIASSEMBLY a _ __ _ __

.1 LI Run Date 21 MAY04 13:21 LT.03 STANDARD PUBLICATION Sheet 2ofl14 C rraeaSseiIc I

FL.03 Execution Publication Set

after 21MAY04 12:00 I

U1R28 WORKING SCHEDULE I

after 21MAY04 12:00

  1. lu ID CEI600R050 RESPI WO ST EQID R-1 lDESCRInPON P CHAMFER GRIND RD 4

ES EF RISK

.MF U

C I

Sat MAY Sun 23

2. 4.6. B10t1.14A16.1 CEI 12.IA.1
l. 9. 4 A. i 34 1 1 I.

CE8 76 21MAY04 21MAY04 DR-Y ML-Y 17:00' 20:59 ORT3-YR-M

'3 1 CEI600R055 CE8 76 R-1 PREP TO INSTALL THERMAL SLEEVE AT 5

21MAY04 22MAY041 DR-Y ML-Y 21:00 01:59 ORT3-Y R-M C

361 1 SEW6-OD CE8 76 R-1 SR MGMT DECISION TO INSTALLTHERMAL 0

22MAY04 02:00 DR-Y ML-Y ORT3-Y R-M 0

37 1

CEI600R030 CE8 76 R-1 INSTALL THERMAL 5

22MAY04 22MAY04 DR-Y ML-Y 0

SLEEVE AT 02:00' 06:59 ORT3-Y R-M 38 1

CE160OR036 CE8 76 R-1 CLEAN AND FME 12 22MAY04 22MAY04 DR-Y ML-Y a

CLOSEOUT AREA FROM 07:00W 18:59 ORT3-Y R-M 39 1

CE1600R035 CEO 76 R-1 RX HEAD REPAIR 21 22MAY04 23MAY04 DR-Y ML-Y I CLOSEOUTTACTMTY 07:00' 03:59 ORT3-Y R-M OR050 P 2 6 '

213476_

CEI600RO5 0213476 SE-CEII RE HAMFER GRIND REACTOR VESSEL PREP TO INSTALL

_REACTOR 600-D SR MGMTI 13476*REACTOI 00R030tNSTAULTI 1213476_RE CE160R036CL 0213476N

  • CE1600R035RX 02134763

. CE4t4REMOM kCTOR VESSEL ANI ANDASSEMBLY HIERMAL SLEEVE

/ESSEL AND ASSEI EC=tON TO INSTA VESSEL AND ASS ERMAL SLEEVEA NCTOR VESSEL AN LAN AND FME CLO T P-26

,LY LTHERMAL SLEE~

MBLY PENETRATION 26

)ASSEMBLY EOUT AREA FROM 1rCrn VESSQ AM E

MACHINING

)ASSEMBLY R VESSEL AND ON EQUIPMEN7 IRl f

t

@ \\ v W<__W f_

HEAD REPAIR CLO O1r ACcTnvTY REACTt 40 11 CE-1600.8 CE8 76 R-1 REMOVE FRAMATOME 4

22MAY04 23MAY04 I DR-Y ML-Y UNDERHEAD 22.00 01:59 ORT3-Y R-N E FRAMATOME U ASSEMBLY02134

)ERHEAD INSPEC-I

_I__

4-t 1-1 1

11 I

E 1*-t'--

41 I

SE-1600-E mm CH0300362 CE8 76 7

77 R-1 CHEM-SAMPL SR MGMT DECISION TO INSTALL REACTOR 0

23MAY04 13:00 DR-Y ML-Y ORT3-Y R-M SEIi00-E SR MGMT DE4ISION TO INSTALL *CTOR HEAD REACTOR VESSEL DNO ASSEMBLY021 476_

42 1 RCS CL TSR 3A.52 111 16MAY4 12MAY1 4

I_

05:00CA 11:59 300 : 4 0100382 RC5 CLlTSR 3.4.52

_- _ISCr CHEMIl RY 43 t

CH0300375 77 CHEM-SAMPL RCSDOTSR3.4.5.1 11 116MAY04 22MAY04 05:00A 11:59.

300 RC DTSR 3.4.5.1

.

_II MISC CHEMIS RY SAMPUNG030C SAMPUNG030C SAMPLING030C 362 375 405 44 1 l CH0300405 CHJ 77 CHEM-SAMPj RCS BORON SR 3.9.1.1 t i16MAY04 22MAY04 300 I'll 06.OOA 111:59 CHI000405RCS BC40N SR 3.9.1.1

_II MISCCHEMIb RY 4511 i CHo300406 CH 77 CHEM4SAMPL RCS BORON SR 3.9.1.1 72 12MAYC4 28MAY04

. 12.00 06:59 239 --

I R 3

,Ho oo40 RCS B~tON SR 3.9Q1.1_

14 0- i-mI

.=

r 48 II CAMP-113BD CH CAMP-113 CAMP-113IN2SPARGE AND SAMPLE B STEAM r

r 3

23MAY04 23MAY04 DR-N ML-N 04:00 06:59 ORT3-N R-N 47 1 0 EE0302321 EM0215241 EEP EM 77 76 G.03 4111E02 THERMAL VECTOR DAT2 4 23MAY0 Z3MAY04 COLLECTION 0800 11:59 0

U 185 U

11 I

EE0302321 TH*RMAL VECTOR DAfrACOLLECT1O1

EMERf3ENCYDIESELGEIIERATORO3O2321

CAMP-113BDCAH GEN MKING OFS1 NITRI

'-113 N2 SPARGE AND SAMPLE B STE LAM GENERATOR HEMISTR GENERATOR 48 11 RMP 9308. DS41 BREAKER

14.

10MAY04 24MAY04I DR-Y ML-Y 0Z00A 00.59.

ORT3-N R-N EM01541 9RMP94, DS-t REAKER ANTENCE I

_ 1-4-4.-i.

4.

I I

FMal73SRD-08 FLSHR RESt CAUlES GROUND 49 1 0

EM0307396 EM 76 D008 D408 FLASHER RESET 1 20 1 16MAY04I 23MAY04 I DR-N ML-N CAUSES GROUND I

12-OA 13:59 ORT3-N R-N 625 I

_JDOBD(

so5 0 EM0306039 EM 77 ISFSI BLDG ISFSI SECURIY BLDG I

MAINTENANC E -

4 17MAY04 22MAY04 I DR-Y ML-Y 07:00A 10:59 ORT3-N R-N 652 EM 060 39I SIiCURRryEBLDrMA4NANCE.

3iTRUCTURE03060:

I I

_ISFSI BULLDIN( I3 i9

____________.1. ________________________ L...

L L

1..........L..........I

.L

.L I.

I Run Date 21MY04 13:211 LT-03 STANDARD PUBLICATION Sheet30fl4 o Ptimavera Systems, Inc.

I FL-03 Execution Publication Set Il

9 after21MAY04 12:00 I

U1R28 WORKING SCHEDULE I

after 21MAY04 12:00 ID RESPI WO ST EQD D-10B DESCRIPTION RD ES RISK I r 91 Sat m2 SUn 23 MAY 6

MU 12.14.16.1 2.4. S.6 I.10lZ14.1 10

  • 2.t 4. 6. 8 0.1O12,14,161 051 1 O EM4058973Z EM 76 D-106 PERFORM FLOAT 23 19MAY04 I 22MAY04 DR-Y ML-Y CHARGE 00 00A 10.59 ORT3-N R-N 652 5Aa737D-106 0ERFORM FLOAT dHARGE E125V DC STA14N BATTERY0405S' 52 EM405897Z4

. H I

EM 7B D-99 D-99 OBTAIN AND 8

20MAY04 21MAY04 DR-Y ML-Y CHARGE NEW CELL I 14:OOA 19:59 ORT3-N R-N 410 5897Z4DJ" C a1 3TAIN AND CHARG 5V DC STATION BW NEW CELL ITIERY0405S97 l

l l

l 53 1 0 I EM030487ff EM 76 A52-DHVR-1 P-015ABREAKER 14 20MAY04 22MAY04 DR-N ML-Y MAINTENANCE 1200-221 2300A 20:59 ORT3-N R-N 0 EMo P04R76P-015AKREANTERMA NCE 1200-22 (A I

.59)

-4.16 KV/1200 AMPS 54 0

EM40589728 EM 76 D-106 OBTAIN AND CHARGE 5 35 21MAY04 22MAY04 DR-Y ML-Y 0

ADDITIONAL CELLS 03.00A 422:59 ORT3-N R-N 55 1

EM0305146A EM 76 P-030B-M ADDOLTOP-O30AlB 2

21MAY04 21MAY04 DR-YML-Y 0

PER WORK PLAN 12:00 13:59 ORT3-N R-N

.56 0

EM0304874A EM 76 A52-DHVR-1 (A52-04)1P-01A PM BKR 4

21MAY04 21MAY04 DR-Y ML-Y 0

TE ISTING ATCUBICLE 1200 15:59 ORT3-N R-N EMA 58972B 01TAJ AND CHARGE 5 A DIONAL CELLS 125VDC STAf1 EMo EMO EM0 0s14SAADD 0 ECIRCULATI W4874A(A524

_4.16 KV, 1512 2ASSIST mms LTO P-030A/B PEF 4G WATER PUMP &

)1P-0IA PM BKRT 1200 AMP VACUUM kPR DURING P-IA I WORK PLAN ADDI OTOR0305146 STING AT CUBICL BREAKER0304874 tELAY FUNCTIONA IPWRTO IP-IARI NDIJM E1200-31 TEST ACTOR COOLANT 5711 EM0215122 EM 76 A52-04 ASSISTAPR DURING I6 P-IA RELAY 21MAY04 22MAY04 DR-N ML-N 13:00 09-59 ORT3-N R-N 0

ACUUM BREAKI

~N BATTERY MP0215122 NT LMANDPOR NOI

~ENT I _____

581 0 I EM0301792A EM 76 A52-DHVR-3l (A5241) BKRMAINT.

4 I PORION AT CUBICLEI 21MAY04 21MAY04 DR-N ML-N 16:00-19:59 ORT3-N R-N 90 59 1

EM0216169 EM 77 COM

-TESTAILGAP-TRONICS 4

21MAY04 21MAY04 DR-N ML-N 7:

18:00 21:59 ORT3-N R-N 60 0

EMA0215134 EM 77 COM GAI-TRONICS TEST 15 21MAY04 22MAY04 DR-N ML-N 293 18:00 21:59 ORT3-N R-N 61 0

EM0305257 EM 77 4.16KV VISUALLY INSPECT 4

21MAY04 21MAY04 DR-N ML-N 663 TRANSFORMERS FOR 2000 23:59 ORT3-N R-N M01 E

E O1792A(A52-0 01792_4 40 2 1 616gTES1 0216169in 1102i5134GW^

I) BKR MAINT. POR 16 KV13000 AMP VA ALL GAI-TRONICS ICOM SYSTEM ML RONICS TEST.

nON AT CUBICLE (

UUM BREAKER

.n AND/OR NON-NI 100-01)

IMBERED EOUIPM1 0215134 r_.

.o~

.1 EM0303257V 03052571 EM SUALLY INSPECT I in4.16KVSYSM 305s1DRAW OIL 305i44ECIRCUL RANSFORMERS FC JLTI ANDIOR NON-I

AMPLE FROM CIR' kTING WATER PUM qL4JM wrI ML R

IUMBERED EQUIP

ULATING 2MOTOR 12 1 1 EM0305144 EM 76 P-030A-M DRAW OL SAMPLE FROM CIRCULATING 2

22MAY04 I 22MAY04 1 02:00 03:59 a

63 1

EM0305146 EM 765 P-030B-M DRAW OIL SAMPLE 2

22MAY04 22MAY04 657 FROM CIRCULATING 04:00-05:59 64 1

EM-8480H EM 76 R-1 CLEAN CONOSEAL 15 22MAY04 22MAY04 DR-Y ML-Y 1

PORTS 07:00 21:59 ORTS N R-N 65 0

EM0407638E EM 76 Z-014 PERFORM REPAIRS TB 10 22MAY04 23MAY04 282 CRANE (SMALL HOOK) 12:00' 10-59 66 0

EM405897X2 EM

78.

D-106 OBTAIN RMP 9046-1 2

22MAY04 23MAY04 DR-N ML-N 0)

DATA FOR 5 NEW CELLS 23:00 00-59 ORT3-N R-N 67 1

EM0213480 EM 76 480V 480V REMOVE TM 8

23MAY04 23MAY04 DR-Y ML-Y 0

POWER TO RV HEAD 02:00 09:59 ORT3-Y R-N I

+-

EM0305146 DRAW C 0305146ECIR(

EM.8480HCL A24A413A L SAMPLE FROM I ULATING WATER F

AN CONOSEALPK IRCULATING LMP MOTOR RTS IREACTORVESSEAAND AssEm 1-154 EM0401 04

. E SMEPERFORM RE1 AIRS TB CRANEA~LIA HOO) rr 'SR i

UMMINE HI 405897X2 OBTAINI 0405 EM021348048 C MP 9046-1 DATA F' S7-125V DC ST,

~

REMOVE TM POV

_3480 R 5 NEW CELLS TION BATTERY ER TO RV HEAED

  • 4soVSYSTEM 68t EM0215246 EM 76 62/AOt CAL AND TEST 621A01 RELAY PER 1RMP 623MAY04 06:00 23MAY04 I DR-N ML-N 11:59 ORT3-N R-N C 4 4-.J----4 I

¶-4 EMO 1A-0 EM02152 CONTAINMENTC t 152 4 r CALANDT'E BUS TIME DELAY I

£7ACONTINUEW4 ONTROL ROD DRJ%

ST 621AOt RELAY F ELAY02tS246W b INSPECT (DISCOI E SHROUD FAN 02' R?

iRMP 9302-1 NECTPORTIO S227_

.6 EM02152Z7A EM 76 W-003A

  • CONTINUE W-3A INSPECT (DISCONNECT 4

23MAY04 I 23MAY04 I DR-N ML-Y 12.00 15:59 ORT3-N R-N C

I

.II Run Date 21MAY04 13:21 LT.03 STANDARD PUBLICATION Sheet 4 of 14 O Pftaverm Systems, Inc.

I FL-03. Execution Publication Set

.I

after21MAY04 12:00 I U1R28 WORKING SCHEDULE I

after 21MAY04 12:00 9 U ID RESPI WO Ecw DESCR - nON RDt ES EF RISK MF MAY W

M IT9

]jjj 6

4 70 EM02 15228A EM 76 W-003B CONTINUE W-38 4

23MAY04 23MAY04 DR-N ML-Y.

EM0215 28ACONTINUE W-3 INSPECT (DISCO NECT PORTION INSPECT(DISCONNECT 1200 15:59.

ORT3-N R-N CONTAINMENT ONTROL ROD DR SHROUD FAN021 228=

PORTiON NT_

71 1

EM0216170A EM 76 FIRE-BARRI PERFORM RMP 58 FIRE 8

23MAY04 24MAY04 DR-N ML Y 102 EM021i 170APERFORMR S FIRE BARRIE SURVEILLANCI BARRIER 17.00 00-59 ORT3-N R-N FIRE BAR ERSIN CONTAIN ENT02161703 SURVERIANCE__

72 1

EZMRCP-L EM 76 P-001B-M P-1B-M MOVE MOTOR 8

23MAY04 24MAY04 DR-Y ML-Y 0

EZMRCP-LF 1BM MOVE MO FROM STAND A 0 SET ON PUMP FROM STAND AND SET 17:00 00.59 ORT3-N R-N REACTOR OOUAT PUMP MC OR0215205

~ -

ON PUIMP 73 1

EM0215188 EMV 76-S008781 St8788-0 MOV 4

19MAY04 21MAY04 DR-N ML-N 0

MO151Be ISi MOVACTUATOR CHECK-OUT ACTUATOR CHECK-OUT 12O0A 15:59 ORT3-N R-N P-15A S PUMP LOOP B INJ CTION OPERATOR 215188 74 0

EM0405696B EMV 76 W-021B W-021B REMOVE 4

22MAY04 22MAY04 DR-N ML-N 0

E 40 5 96BW-021B REMOVEJUMPER 0O1-128 E-n JUMPER.t P 17:00 20.59 ORT3-N R-N 0405896 PABEXRAUSTST FAN 01-128E-FN

__58_6_

_A____ST__TA_____

75 0

EM0405881D EMV 76 W-030A REMOVE 2

22MAY04 22MAY04 DRN ML-N 0

EM04 1SSSDW-030A REN EJUMPER PER WP 01-12SE-R JUMPER PER IWP 21:00 22:59 ORT3-N R-N F-23 29 PAB EXAUST ILTER FAN 040SI81 01-128'E-FN__

76 1

B52-421 iME EMV 76 B-42 BUS BRACING PMT I

23MAY04 23MAY04 DR-N ML-N 0

B52-42 ME BUS BRACt PMTW-21A" 1N-21A' 00.00 00-59 ORT3-N R-N 00 1827E4aO MOTOF CONTROL CEN 77 1

B52-4212ME EMV 76 B-42 BUS BRACING PMT I

23MAY04 23MAY04 DR-N ML-N 52-4 I2MEBUS BRACI PMTW-30A

-3W 01:00 01:59 ORT3-N R-N MOTOR OLCNTR SAEGUAROSO 025271 Ei~ -lleP s m

1iX 11 78

1.

FG0212694 FG1 76 PIPINGHB-IPIPINGHB-19REPAINT 101 16MAY04 25MAY04 DR-Y ML-Y 0

21IPItN HB-19REPAINT I

12-OOA 15-59 ORT3-Y R-N 79 1

Z22FG038 F1 77 Z-022 Z-22 INTERNALS LIFT 76 16MAY04 24MAY04 DR-Y ML-Y 190 LZ-2 2 FT RG.

NT CURE TIME RIG-PAINTCURETIME 101M0A 15:59 ORT3-Y R-N 80 HP7.516E HP HPPURGET PURGEVALVETEST 2

22MAY04 22MAY04 DR-Y ML-Y 151 HP7.51.SE GEVALVETEST P PIPL.516) T

. II.

(HPIP 7.51.6)

I OI0700 108:59 1ORT3-Y R-N

.T I

Ur CONTAINM NIT PURGE TRIP TE ST 81 0

HP0301869 HP ln RE-00230 RE-230CALIBRATION 8

22MAY4 22MAY04N

_II 0900 I

1

.0301869W WATER EFFLU rMOMTOR 82 2

HP0301882 HP 77 RE-00217 2RE-217 CALIBRATiON 6

23MAY04 23MAY04 0

HP0301882 2

7CALlBRATIO III0600I 11:59 C

IPONENT COOLINGWATER LIQUID MO IOR0301882 83 0

HP0301854 HP 77 HP RMS QUARTERLY 40 23MAY04 26MAY04 209 A

l03 0 1 E

5 4 RLY FUN ESTOFRM FUNCTIONAL TEST OF 0800 I

1459 1Pl301854PHYSICSRAD ONMONTORINSYSTEM0301854 RMS 84 0I HP0301867 HP 77 RE-00226 RE-22f CALIBRATION 8

23MAY04 24MAY04 123 HP0301867RE CAUBRATIOI 12:0_I 08l59 COMBNEDA EJECTORRHIGHPNGEMONrTORO3 867-1E Ui~l~l~! -I I

E 85 1 IC;CV-F&V2 I

SOP-CV-003 FILL & VENT Fl-I 15 & I1 12MAYD4 23MAY04 DR-Y ML-Y 69

-nV2FILLa& NTFl-115&FF-11 PERSOP-CV-003I l 116PERSOP-CV-003 11 0A 12:59 ORT3-N R-N SLE Run Date 21MAY04 13:21l LT-03 STANDARD PUBLICATiON S

Sheet 5 of 14 C Prlmavea Systems,Inc.

I FL-03 Executon PublicationSet I

after 21MAY04 12:00

_I U1R28 WORKING SCHEDULE I

after 21MAY04 12:00 U

ID RESP WO E

DESC N

ES EF RISK _

MAY I

- -Fri 21 R t 72Si n 2 pi, S7 31M12114.1611120.221 0. 2. 4

  • 6. 8.10 l1l4.16,18,20.221 0. 2 *4
  • 6
  • 8.10112i14.1611 u ff 'Mi'1ult^}--

86 0

10214264 IC 7'6 ICP-06.086 P-3A AUXILIARY 5 20MAY04 21MAY04 DR-N ML-N 0 Co, 2 4P-3A At IL V FEEDWA7 R MOTOR-FEEDWATER MOTOR-2300A 16:59 ORT3-N R-N AAUX1 Y FEEDWATER YSTEM CALIBRATK N PROCEDURE02 264 87 2

IC0310477 IC 76 ICP-10.021 CAIJBRATE ROD 2

21MAY04 21MAY04 DR-N ML-N 673 C 047 7CALFB ROD POSIT ON DI CATION POSION INDICATION 12:00 13:59 ORT3-N R-N

.ROD P0 ION INDICATION Al JUSTMENT AT POVER0310477 88 1

IC0408417 IC RE-00211 REPLACE IRE-21 11212 3 21MAY04 21MAY04 0 C 841yREPLAC IRE-211 1t21.2 12:00 14:59 0408417

'89 1

IC0300732 IC 76 ICP-w06.050 ICP 6.50-2 SPEC 200 13 22MAY04 22MAY04 DR-N ML-Y IC0300732 1CP.50-2 SPEC 200 RA K C-171 INTER S

RACK C-171 INTERNALS 06:00 18:59 ORT3-NR-N 0300 732 SI C200 CABINETC-71 RCK INSTR 90 1

IC0300731 iC 76 ICP-13.004 SPEC 200 TECH SPEC-36 22MAY04 24MAY04 115 IC0300731 SP C 200 TECH SPEC TRAIN A TRAIN A 19-00 06:59 SPEC 200 INT RNALS 731 91 1

ICSGLVLBFL IC 76 SG LEVEL X BACKFILL 8

23MAY04 23MAY04 DR-Y ML-Y 0

NARROWhVIDE 07:00 14:59 ORT3-Y R-N

_*.PO TO SUPPORT UPPO00939 92 1

ICs.8 IC1 76 ICP-05.008 TURBINE SUPERVISORY 22 14MAY04 23MAY04 DR-Y ML-Y 0-C&

INE SU ISOY INST CA INST CALS O0.O0A 16:59 ORT3-Y R-N TU 93 1

ICTUVIBSUP IC 76 T-SUPERVIS INSTALL TURBINE 22 14MAY04 23MAY04 DR-Y ML-Y 98 SUp INST TURBINE VIBRA ON SENSORS VIBRATION SENSORS 06 00A 16:59 ORT3-Y R-N _

314 1

IC0300991 I11 76 ICP-06.050 ICP 6.50-1 SPEC 200 4

21MAY04 21MAY04 DR-N ML-Y 304 30099 I S0-1 SPEC 200 RACK C-170 INTERNW S RACK C-170 INTERNALS 18:00 21:59 ORT3-N R-N 0300991 SPEC 200 CABINE T C-170 RACK IN UMENTCAUBRA 95 0

IC0300626 ICI 76 Z-031 ICP 6.8-2 CALIBRATE 8

23MAY04 23MAY04 DR-Y ML-Y C

IC03 0)S2SICP B82 CAL RYER INRUNIATiO DRYER 06:00~

13:59 ORT3-N RN INSTRP68-RAEDYE NUMENTATIIORYR 96 1

IC5.54CLOS IC1 76 ICP-05.054 ICP 5.54 CLOSE OUT 8

23MAY04 23MAY04 DR-Y ML-Y 110 ICS.54CLO ICP S54 CLOSE RESOLUTIO RESOLUTION 08:00 15:59 ORT3-Y R-N SECOND PLANT LOW RANG - PRESSURE INST. UMENTS0300S74 97 1

IC2.19 IC 76 ICP-0Z 0

IC ICP 2.19 SAFEGUARDS 6

23MAY04 24MAY04 DR-N ML-N 0

IC2.19 CP2.19SAFEGU SLOGiCTE LOGIC TEST 15:00 09:59 ORT3-N R-M I OST-REFUELING I RE-STARTUP UARDS LOGIC 0300813 1II UE

-1'u11 I -

98 1

ICWALEAK IC5 76 IA LA.LEAK INSPECTION 15 16MAY04 23MAY04 DR-Y MLY 106 IA LEAK I 4SPECTION 18.00A 21:59 ORT3-Y R-N 99 1

IC0300733 IC5 76 ICP-06.050 ICP 6.503 SPEC 200.

5 21MAY04 21MAY04 DR-N ML-Y 306 CP.50-3 SPEC 2011 RACK C-13 INTEI NA.

RACK C-173 INTERNALS 090A 16:59 ORT3-N R-N SPEC 2 CABINETC-173 RACK INSTRUMENCABRATI 100 1 IC5.8GAP IC5 ICP-05.008 GAP VOLTAGE CHECK 3

23MAY04 23MAY04 DR-Y ML-Y 239

.lIC58WP GAP VOLTAGE HECK ON GEA ON GEAR 14:00 16:59 iORT3-Y R-N TURBINE SUPERSORY INSTRUM ATION 101 1 IC0306305 ICV 76 MSMM05 lMS-2053 CHECK 2

22MAY0i4.22MAY04 DR-Y ML-Y C

IC03Mi301SO s CHECK SOIEN MsD (5)

SOLENOIDS (5) 1700 1859 ORT3-V R-N 030i5305-IN STEAM DUMPT CONDENSER C 1021 1 1IC0306309 ICV 76 MS-02057 IMS-2057CHECK 2

22MAY04 22MAY04 DR-YML-Y 0

0 o

3 0630 5 1MO9 3CHECKSOL E

NDS(S)

SOLENOIDS(5) 19-00 20-59 ORT3-Y R-N.306o MAIN STEAM DUM TO CONDENSE Run Date 21MAY0 I3:211 LT-03 STANDARD PUBLICATION l

Sheet6of14 0 Prlmavera Systems, Inc.

I FL-03 Execution Publication Set I

after 21IMA Y04 12:00 U1R28 WORKING SCHEDULE I

after 21MA Y04 12:00 U

l ID RESPI WO EQtD.

DESCRIPTIO PMINS EF.

RISK F

FI SMAY on2

-ST E 1 Di1,4.11.221 0 24, 6,2.14,16, 1022.,, m

,01,4.

1103 1 MM992495 MM1 76 HS-1 HS-1. REBUILD& TEST 5

281APR04121MAY04 DR-YML V 13 29AHS1.1 REUILO & TEST S MIER (SHOP)

SNUBBER (SHOP) 0600A 16.59 ORT3-N R-HX-lA SG MAIN'STEAMI.1J WEST SNUBBE 924075 10-4 1 MM-8858A MM1 812 W-001C1 W.ICI. FME CLOSE 1

21MAY04 21MAY04 DR-YML-Y 2

S8WICI.F ME CLOSE OUTTIN4;PECTION OUT INSPECTION 12.00, 1259 ORT3-N R-N CNANME 4TACCIDENT RECII TCUAON FAN 0214175 105 1 MM9924975B MM1 75 HS-1 HS-1, REINSTALL 6

22MAY04 22MAY04 DR-Y ML-Y 71 MM99249T55BHS-l, REINSTALLSN BER, AS-LET VT-SNUBBER, AS-LEFT 06:00' 11:59 ORT3-N R-N 9275 H-1A SOMNJ STEAMILINEWVES SNUBBER 106 11 MM-885AI MM1 82 HIX-015B1 H-Xl 58. PERFORM SW 8

22MAY04 22MAY04 DR-V ML-Y 0

MM45g57A1 IS5O, PERFORM S LEAK CHECK & It STALL COVERS LEAK CHECK & INSTALL 08:00' 13:59 ORT3-N P-N 0214064 W-IBI AC [DENT RECIRC FA MOTOR COOLIh 1071 I1 MM-8857A MM 1 82 W-001BI W-IBI. FME CLOSEO

~ I 22MAY04 22MAY04 DR-VYML-.Y 0

MM-Be7

-8, M CLOSE U INSPECTION ( F SW TEST)

INSPECTION (AFTER SW 19-00 1"-9 ORT3-N R-N 02I4171EC ONAJNMENTACCI 3ETRECIRCUL 1081 1 MM-880G1 MM1 76 R-I LIFT HEAD TO REMOVE 3

23MAY04 23MAY04 DR-V ML-Y 0

MM-8480G LFT HEAD TO h OVE HEAD 0-RING; &MOVEULNEF HEAD 0-RINGS & MOVE 02:00 04:59 ORT3-N R-H REACTOR yES ELAND ASSEMBLY)214134=

109 1 MM-8480G2 MM1 76 R-1 MOVE HEAD TO 1

23MAY04 23MAY04 DR-V ML-Y 0

MM.84=02MOV HEAD TO REPLAC HEAD 0-RINGS REPLACE HEAD 05:00 05:.59 ORT3-N R-H REACTOR ~ SSEL AND ASS& BLY0214i341 110 1 MM-8480G MMI 76 R-1 REPLACE RV HEAD 0 4

23MAY04 23MAY04 DR-V ML-Y 0

N I810REPLACE HEADO0RINGSISPC SEAL RINGS 8, INSPECT SEAL 06:00 09:59 ORT3-N R-H REACTOF VESSEL AND ASSE MBLY021141134 11 I

MMIB81 M 76 R-1 HEAD INSTALLATION 2

23MAY04 23MAY04 DR-Y ML-Y 0

MM WjiHEAD INTIT BRIEF 2IPTE BRIEF.

lo-.0 11:59 ORT3-N R-N R kCTORVESSEL.AN ASSEMBLYO2i4i 1121 1 MM-84802 MMI 761 R-1 HEAD INSTALLATION JrT I

23MAY04 23MAY04 DR-V ML.Y 0MM49480J2HA INsTALLATiONm rINFO SHARING INFO SHARING 12.00 12.59 ORT3-N R-N RECTOR VESSEL WDASSEMBLY02141341 113 1 MM-8480J MM1 76 R-1 REPLACE REACTOR 4

23MAY04 23MAY04 DR-V ML-N 0

h

.4 0j REPLACE lECTOR HEAD HEAD 13:00 16:59 ORT3-N R-H REACTOR VESSE -AND ASSEMBLYO: 14134M 114 1

MM-84801.

MMI 76 R-1 INSTALL WALKWiAY &

1 23MAY04 23MAY04 DR-Y ML-YV 0

M aMUINSTALI.WAL AY& CONTACT WFOR SURVEY CONTACT PP FOR 17:00 17:59 ORT3-Y R-H RECO LNAS L021411341 115 1

MM-a48X MM1 761 R-1 HEADWORKPRIORTO 4

23MAY04 23MAY04 DR-Y ML-Y 0

M xHEAD WORK TO DECON DECON 17:00 20.59 ORT3.Y R-H REACTOR EANDASS 8L0214134E L.

g gI g

-i -

!-s g -j

-*o -

-i 116 2 MM0406166 MM2 77' CV-00283B 2CV-283BTEST VALVE 2

19MAY04 21MAY04 DR-V ML-Y 306 U 666 R TESTYVALVE BY 12004 (SPARE)

BY 5127)2004 (SPARE) 23-OOA 19-59 ORT3-N R-N 2 -28 CHARGING PMP DISCHARGERE JEF TO 2T-4 VCOT 06166 117 I

MM0400324A MM2 75 VNPSE-0321 IVNPSE-322&4-4, 27 21MAY04 23MAY014 DR-Y MLY 40 VSE31& 44, INSTALL VALVE R MOVAL RIGGING INSTALL VALV 09-OQA 15.59 ORT3-N R-N

=

U-

-uw.

118 0 MM0305515 MM21 76 HX-02B HIX-288 MOISTURE IN, 9

21MAY04 22MAY04 DR-V ML-Y ~0 M

SIHX2BOISTURE IN FEWELC FREONIREPLACE 12:00 09-.59 ORT3-N R-N TURBINE BLDGC--CEACCHrLLER 305515

119 11 MM0214080A MM2 76 HX-020A HX-20A. CLOSELP 6

21MAY04 21MAY04 DR-Y ML-Y 0M I4BAHX- )A, CLOSE LP ATRHEATER k EEDWATER HEATER0 15:00 23:59 ORT3-N R-N 0214080M WLP FEDARHEATER 4A 120 11 MM04081412 MM21 75 PIPING DB-P-2SB MINI RECIRC.

4 22MAY04 22MAY04 0M0042-8 MINI RECIRC, VERIFY TORQUE N BLIND FLANG VERIFY TOROUE ON 1800 21:59 00:1 Run Date 21MA0 1:1LT03 STANDARD PUBLICATION She7of1 C Primavera Systems. Inc.

IFL-03 Execution Publication Set

after 21MAY04 12:00 I

U1R28 WORKING SCHEDULE I

after 21MAY04 12:00 S

U

.ID Pl WO EQID DESCRITION l

RD ES EF RISK MF MAY ST~

-u2

_1l2l.14.16Sla2Onn2 0.2.4,6.8.012.14.161&20,22102, 4*6*8*10112,14,16,1 121 0

MM0201389 MM2 76 W-032 LUBEAND INSPECTFAN 6

22MAY04 22MAY04 DR-Y ML-Y 0

MM0201369LUB AND INSPECT FA IAS REQUIRED AS REQUIRED 18:00 23:59 ORT3-N R-N 0201369 W

PAB ExHAUS FAN 122 1 MM0408411 MM2 75 PIPING DB-P-28A MINI RECfRC.

4 22MAY04 23MAY04 0

MM0408411.28AMINIRECIRC VERIFYTOROUE NUBUNOFLANG VERIFY TORQUE ON 22Z00 01:59 04084 -

123 0 MM0201387 MM2 77 Z-017 RE ROPE INSPECM 4

23MAY04 23MAY04 DR-Y ML-Y 290 M0201387WIRE ROPE INSPECTION 07:00-1059 ORT3-N R-N SFP PLA RM BRIDGE/HOIRAJLS0201387 -

124 1 MM-8485L 76 P001B REALIGN SEAL COLL TO 1I 23MAY04 23MAY04 DR-YML-Y V

52 _

MM

,5LREALIJGN SEAL OLLTO FLOOR DI RMP 9002-FlOOR DRAIN RMP 04:00 04:59 ORT3-N R-M REA TOR COOLANT PU P02141191 l

125 11 MM0214110A lMMV; 76 l MS-02018 l MS-2018. REATTACH 4

21MAY04 21lMAY041 DR-Y ML-Y 88 M---2141-0AM*8 REATTACHUT-UTBRAC-l UNISTRUT BRACKET 18:00 21:59 ORT3-N R-N 0214110 I-tHX-1A SG HEADE MAIN STEAMSTCONTROL 126 1 MM02141108 MMV 7

MS-02018 IMS-218-0 REPAIRAIR 5

22MAY04 22MAY04 DR-YML-Y 0

MM0 214110 M5-201

  • REPAIRAR ONACTUATOF LEAKONACTUATOR 17:00 21:59 ORT3-N R-N c02141 MAINSTEAM I

as a Di I

I MD I*

I g 127 1 l NO048110OA NDEI 76 PIPING EB-MS-2085 ELBOW-6 21MAY04 21MAY04 DR-Y ML-Y 0 ND 8110AM S20SELBOW-PERFOtMODE PERFORM NDE 1700 22:59 ORT3-YR-N 8110 REHEAT STEA TO THE REHEA S BANDD 28 1

CE4600-98 NOE 76 R-1 COMPLETEABOVE I

23MAY04 23MAY04 DR-YML-Y 0

CE400.98COM LTE ABOVE WINSP AFTER S OLD REMOVEE HEAD INSP AFTER 04:00 04:59 ORT3-Y R-N REACTOR VISSEL AND ASSEM LY021347221 l~ ~.

!K-IS il

-Uil-129 0 OP030 1294 OP1 75 0-PC-MIDS OPERATIONS MID SHIFT 38 21MAY04 27MAY04 DR-Y MI-Y 158 Op 1294OPERAIIONSMtDSHIFT VROUTINE WEEKLY ROUTINE 00 00A 02Z59 ORT3-Y R-N _

130 2 0P0301591 OPI 77 TS-RE-004 FLUX DIFFERENCE 2

22MAY04 22MAY04 194 l

opo3591 AXIAL FLUX RENCEAND AD POWER AND QUAD POWER' 00:00*1 01:59 030I 591EQUAD POWER TILT RATlO CHECKS 131 2

0P0301582 OP1 77 04PC-023.5 CHARGING PUMP 3

22MAY04 22MAY04 lP19 3

Op 0t 582 CHARGING ROTATION ROTATION AND 00 00l 0Z59 030 M2 CHARGI PUMP ROTATl REVENTIVE MAI CE 9 to kSfil 61

.112 ll!

132 0

OP0301333 OP2 l 76 0PCDAYS OPERATIONS DAY SHIFT 17 I18MAY04 23MAY04 DR-Y ML-Y 182p 1333OPERAIONSDAYSHIFT YROUTINE WEEKLY ROUTINE 0800A 14:59 ORT3-Y R-N I

OPER 133 0 OP0301362 OP2 76 l

C04-028.1 TESTOF FIRE.

1 21MAY04 21MAY04 DR-N ML-N 198 P 362TEST OfFIREEVACUAT AND EVACUATKONAND 1200*

12Z59 ORT3-YR-N TESTOFFIR EVACUATION ANFISHERMEN T ALA0301362 134 0 OP0301364 0P2 77 l04PT07&2 JOCKEY PUMP AND 2

22MAY04 22MAY04 194 OP030 1364 KEY UMPAND CCUMULATOR ESSURE ACCUMULATOR 08:00.

09t59 0301384 FIRE MAIN MAINT EOUI SURVEILLANCE 135 0 OP0301386 OP2 77 O-PC;0tZ6l G-03 EDG VIBRATION 1

23MAY04 23MAY04 188 OPo3o1386 3EDG VBRAB N(QUARTERLY (QUARTERLY) 08:00*

08:59 G-03 EMERGENCY DIESEL G0 TOR VIBRATIO1 I (OUART0301386 136 0 OP0301368 OP2 77 O-TS-083 TS-83.G-03 5

23MAY04 23MAY04 0

OP03013 8TS83.-3EMEGENCY DIESEL EMERGENCY DIESEL 08:001 12:59 G_ 3 EMERGENCY DIrSEL GENERATOR lONTHlY0301368 Run Date 21MAY04 13:21 LT-03 STANDARD PUBLICATION Sheet8of14 C P tmavsra Systems, inc.

I FL-03 Execution Publication Set I

after21MAY04 12:00 U1R28 WORKING SCHEDULE after21MAY04 12:00 U

U ID RESP WO EQID I

DESCRIPTION RD ES I

EF RISK MF MAY ST IFri 11 sat "

Suin23 1i 8 ACH 12,1.1618,2,22 0!

mi 2_

I 4 6_

I tI1,&19021

,68 11.41 w

0 AjIjjcjjjjj rnfljjjj 137 0 OP0301395 OP3 77 04-C-SWING OPS SWING SHIFT 32 19MAY04 25MAY04 DR-Y ML-Y 164 p

  • 1395OPS NG SHIFTWEEKL ROUTINE

_WEEKLY ROUTINE 160WA 19:59 ORT3-Y R-N

  • _m 138 0 OP030141 8 OP3 77 T-132 SODIUM BISULFITE I

21MAY04 21MAY04 DR-Y ML-Y 195 PC 01418 SODW BtSULFITE STORA ETANK LOOP 0

STORAGETANKLOOP 16:00 16:59 ORT3-Y R-N 0 01418SODl U BiSuLFTE STOR kGETANK 139 O OP0301433 OP3 77 04P;0B.8 VERIFYAANY OOS CONT 1

21MAY04 21MAY04 DR-Y ML-Y 195 OP 01433VERIFY kWY OS CONT tSt LVALVES ARE ISOLVALVES ARE 16 00 16:59 ORT3-Y R-N 0 14331CONT NMENTISOLATIO VALVES OUTOF CE CHEC 140 1 OP0301550 OP3 77 O-PC-Mt;.2 TB1MONTHLY 32 21MAY04 25MAY04 DR-YML-Y 164 p

0155oTBI1MO lYHEATI NILATION HEATiNGNENTILATION 16:00t 1959 ORT3-Y R-N O 1550 6*

141 0 OP0301420 OP3 77 04-C-045.2 RADWASTE HEAT 3

22MAY04 22MAY04 186 PO301420 RADOW iTE HEATTRACE I UPS LOG TRACE AMPS LOG 16:00 18:59 0301420 MJNTHLYRADWAST1 SYSTEM HEAT 142 2 U2GNDR018 OP3 TG-01.

DRAIN tJ2 MAIN 1

22MAY04 22MAY04 DR-Y ML-Y 0

U2GNDR0I6 RAIN U2 MAIN EU CIRICAL GENERA OR PER PC 21.3 ELECTRICAL 19.00 19-.59*

ORT3-Y R-N I

1Sa1@]W -E_

1431 1 CL13F010 OPS CL-13F CIRC WATER VALVE LINEUPS 2

17MAY04 21MAY04 DR-YMLY 20:WOA 13:59 ORT3-Y R-N 12 CL1:

UV 144 1 CL1 3A005 OPS CL-13A MAIN STEAM VALVE I

20MAY04 21MAY04 DR-Y ML-Y 11 CL1 LINEUPS UPSTREAM OF 08:WaA 12:59 ORT3-Y R-N r45 1 PC-77.1 OPS 77 04PC077.1 AUTO FP VALVETRIP 20 21MAY04 22MAY04 DR-Y MLY 78 iV, TEST 12:00 07:59 ORT3-N R-N 147 1 OP0215188 OPS 76 St-0087T88-SW788 PMT STROKE I

21MAY04 21MAY04 DR-N ML-N 0 PC PER IT-210 16:00 16:59 ORT3-N R-N 146 0 AC-375C;IZ OPS P-038A EXIT AFW TSAC 3.7.5.C 0

21MAY04 DR-N ML-N 48 FOR ICP 6.86A 16:59 ORT3-N R-N 148 1 CL13A010 OPS CL-13A MAIN STEAM VALVE 24 22MAY04 22MAY04 DR-N ML-N 154

_UNEUPS 0000 23:59 ORT3-N R-N i

r 1,

3 010CIRC WA

  • CIRCUwAn k005 MAIN STI IMAIN STEAM t AUTO FP VJ rER VALVE LINEUP 4lG WATER SYSTEB AM VALVE LINEUP VALVE LINEUPS FC ILVE TRIP TEST (CL-13F)

VALVE LINEUPS 3 UPSTREAM OF M R HEATUP A fl. 6IA* t...

-frn rI A..

ALARM VEMFICATION TES'

I 1491 1 OP13A080 OPS OP-13A STARTA CIRCULATiNG1 2 WATER PUMP 22MAY04 22MAY04 I DRN ML-N 0

02-00 03:59 ORT3-N RN jS188W4 7813 ISIBaIP-1SA rSC-3Z EXT A CL13 Of PMT STROKE PER 3I PUMP LOOP B IN

WTSAC 3.7.5.C Fl WCIOMAIN STEAM 13AOWSTARTAC II' I

0I F M~ VALVt 1 1M!- 1 r-210 ECTION OPERATO R ICP &86A ALVE LINEUPS 1500 Ol-39J OPS SECUREPAB 1

22MAY04 22MAY04 0

_VENTILATION FOR 15:.001 15:59 151 1

WP13A070 OPS OP-13A VENT CONDENSATE 4

22MAY04 22MAY04 DR-N ML-N 0

SYSTEM 15:00 18:59 ORT3-N R-N I-=1 RCULATING WATE 3 SECURE PAS VE I

)P13AD70VENT CO

_VE IPi3A090STARTUr t

I 'pU MMAIN STEAMS IPUMP NIlLATION FORJU 4DENSATE SYSTEI qT CONDENSATE!

CONDENSATE SY.

MLVE LINEUPS F RPER REMOVAL 11521 1 OP13A090 OPS OP-13A STARTUP CONDENSATEI 4 SYSTEM 22MAY04 22MAY04 I DR-N ML-N 15:00 18:59 ORT3-N R-N C

153 1 01100-60 OPS T-034A T-034A - FILL SI 8

22MAY04 23MAY04 DR-N ML-N 0.

01100-6 34A-FLL SI AC UMULATOR ACCUMULATOR 21:00 04:59 ORT3-N R-M3 154 1 IT-280A-18 OPS 77 04T-0280A MSIV STROKE TEST, 4

22MAY04 23MAY04 DR-N ML-N C

.T2A.1gMS STIROKE TEST, IT WCA (MS42018 IT-280A(MS-02018) 23:00 02:59 ORT3-N R-M 021 99_U1MS OP VALVES STF Run Date 21MAY04 13:2i LT-03 STANDARD PUBLICATION Sheet 9 of 14 O Pdm SYsems. I.

I FL.03 Execution Publication Set l

'k.;

after 21MAY04 12:00 I

U1R28 WORKING SCHEDULE I

after21MAY04 12:00 F

U ID RESP WO EQID DESCRPTION RD ES I

EF RISK MF MAY

_ _ST

_1 3112,14,1611120.2210 2. 4. 6. 8 10 1Z 14 I& 1&20,2210. 2. 4.6. 8,1012.1416.1

[film at 22.-40,1116,'1am2 EN-

-~r~

- 1 _

jj jj; 155 1 OP5B-040 OPS OP-SB RECIRC RWST a

22MAYD4 23MAY04 DR-V ML-V 0

ops-oREciRC RwST tSAMPLE SAMPLE 23:00 06:59 ORT3-N R-N PL %CE RWST ON RECIRC & SAMPLE AT >2850 PPM BOR )N 156 1

B524211M OPS 76 B-42 BUS BRACING PMT I

23MAY04 23MAYD4 DR-N ML-N 0

852-4 IIMBUS BRACIN PMTW-21A7

W-21A' 00o00 00.59 ORT3-N R-N 020 527E48W MOTO CONTROL CEN 157 1 B52-4212M OPS 76 842 BUS BRACING PMT I

23MAY04 23MAY04 DR-N ML-N 0

B55 212MBUS BRACI t

PMTW-3wA

.W-30A 01:00 01:59 ORT3-N R-N MOTOR C )NTROL CENTER P %B SAFEGUARDS0 025271

158 0 O-39E OPS 01-39 RESTORE PAB 2

23MAY04 23MAY04 0

0.-39ERESTORE P VENTILATION

_VENTILATlON 0Z00 03:59 159 0

OP0300626A OPS 76 Z-031 ISOLATE LAW 2

23MAY04 23MAY04 0

Op0so26AISO ATE LAW 0-SOPA 302 SECTION 5.

0-SOP4A4002 SECTION 03:00 04:59 INST RUMENT AIR DRYE 0300626E 160 1 OP40-200 OPS O-RP-001B DRAIN UPPER CAVITY 3

23MAY04 23MAY04 DR-Y ML-N 0

OP4D-200DI WN UPPER CAVIT TO 70 % REACTO VESSEL LEVEL TO 70 % REACTOR 04:00 06:59 OR3-N R-N m

161 1

RPIB-040 OPS O-RP-001B IPTEBRIEF OF DRAINTO 2 23MAY04 23MAY04 DR-N ML-N 0

RP1 IPTE BRIEF OF DI AINTO70% LVI 70% LVL 05:00 06:59 ORT3-N R-N PL MP DOWN UPPER CAVTY TO 70% REA TOR LEVELE 162 1 OP5B-030 OPS OP-5B BLEND TO RWST &

6 23MAY04 23MAY04 DR-Y ML-Y 153 0 5130BLEND TO T & SAMPLE SAMPLE 07:00 12:59 ORT3-N R-N 163 1 OP4F-020 OPS OP-4F ESTABLISH OP 4F 12 23MAY04 23MAY04 DR-Y ML-N 0

OP4F_. ESTABLISH OP4F RE REQUIREMENTS 07:00 18:59 ORT3-N R-N 164 1

RPlD-020 OPS O-RP-OOlD PUMP DOWN LOWER 12 23MAY04 23MAYD4 DR-Y ML-.

0 RPil20PUM DOWNLOWERC WTYPER RP-IC CAVITYPERRP-10 07:00 18:59 ORT3-N R-N 165 1 011-SO OPS T-034A T-034A-PRESSURIZE SI 16 23MAY04 23MAY04 DR-N ML-N 0

01100-50T-0

- PRESSURIZE Si CCUMULATO ACCUMULATOR 07:00 22:59 ORT3-N R-N 156 0 OP03C0B26B OPS 76 Z-031 RESTORE LAW 4

23MAY04 23MAY04 32

o. O0 M26BRESTORE W 0-S0P4A-X00 0-SOP4A-002 15:00 18:59 0300626 167 1 0162-040 OPS HX-001 B DRAIN SG-B & REFILL TC 16 23MAY04 24MAY04 DR-N ML-N 0

)162-040 DRAIN

& REFILL TO

r. SIU ChemicaIl

>48% S/U Chemk.als 15:00 06:59 ORT3-N R-N I ffing SIG B using au ilary feed 168 SIM-ML OPS MID LOOP S1MIJIATOR 3

23MAY04 23MAY04 0

Si!MiLM-I LOOP SIMULATO INMM SHARIN INFO SHARING 16:00 18:59 169 1 RPlB-070 OPS O-RP-001B HEATUP TO 95 DEG FTC I 23MAY04 23MAY04 DR-Y ML-Y 43 RPIB-07 HEATUPTO95DE FTOTENSIO0 TENSION 17:00 17:59 ORT3-N R-N 170 1 OP0303211 OPS 77 TS-ECCS-00 SAFEGUARDS SYSTEM 3

23MAY04 23MAY04 125 C P0303211 SAFEGU RDS SYSTEM VE NG (MONTHLY VENTING (MONTHLY) 17:00 19.59 SAFEG s SYSTEM VE nNG (MONTHLY) U IT 103032113 171 1

CL04A010 OPS CL-04A CL4A PART 1. RCS F&V 10 23MAY04 24MAY04 DR-Y ML-Y 45 CL04A010CL4APFT 1, RCSF&VV LVE CHECKLIM VALVE CHECKLIST 17:00 02 59 ORT3-N R-N L & VENT RCS VA VE LINEUPSE 172 1 CL07B010 OPS CL-07B FIlL & VENTSI VALVE 24 23MAY04 24MAY04 DR-Y ML-391 CLOTB010FILL VENTSI VALVE 17:00 16:59 ORT3-N R-N FILL & VENT SI VA VE LINEUPSE Run Date 21M 03 STANDARD PUBLICATION O Primavera Systems, Inc.

FL.03 Execution Publication Set I

after 21MAY04 12:00 I

U1R28 WORKING SCHEDULE I

after 21MA Y04 7Z:UU l

U ID RESpF WO EQI D DESCRIPTION RD ES EF RISK MF MAY

_ 5_

.10l12.14,19192ff2l01 2s4. 6 8sa 14,16,1&s2(1 0 l

22 4-6 8.10112,14.16,1 173 1

SIX01Z PPG MILESTONE END SAFETY INJECTION 0

21MAY04 21MAY04 DR-N ML-N 41 SIx iZEND SAFE Y RECTION DUA TRAIN WORK DUALTRAJN WORK 14:00 13:59 ORT3-N R-N ISI BORATI N PATH UNAVAIA ILE 174 1 VNCCB51Z PPG MILESTONE END CONTAINMENT FAN 0

21MAY04 21MAY04 DR-N ML-N 81 VNC BSIZEND CO TAINMENT FAN COOLERS C WORK COOLERS CWORK 15:00 14:59 ORT3-N R-N JEND CON TAINMENT FAN CC LERS CWORK (B WN) 175 1 MSX02Z PPG MILESTONE CLOSE NON CL-1E SG 0

21MAY04 21MAY04 DR-N ML-N 180 SX02ZCLO NONCL-iESFG0I BLOWDOWN 17:00 15:59 ORT3-N R-N B OWDOWN NON CL 1E 176 1 MSX01Z PPG MILESTONE END MAIN STEAM 0

22MAY04 21MAY04 DR-N ML-N 0

MS (0iZEND MAIN sn AM SECONDARY% KRK SECONDARY WORK 00:00 23:59 ORT3-N R-N IMAIN STEAM I TURBINE BUILDIN 177 1 CSXO1Z PPG CS CONDENSATE WORK 0

22MAY04 22MAY04 DR-N ML-N 0

CSXOIZCONDEN ATE WORK COMP EM COMPLETE 15:00 14:59 ORT3-N R-N ICONDEN ATE SYSTEM 178 1 VNCCAS2Z PPG MILESTONE END CONTAINMENT FAN 0 22MAY04 22MAY04 DR-N ML-N 52

.NCCAS2END COI AINMENT FAN CC OLERS B WORIP COOLERS B WORK

.20:00 19.59 ORT3-N R-N END B C rMT FAN COOLER, (A TRAIN) WORKI 179 1 CSB12Z PPG MILESTONE END FEED PUMP P28B 0

22MAY04 22MAY04 DR-N ML-N 211 CSB12ZENI FEED PUMP P28S WORKWINDOW WORKWINDOW 22:00 21:59 ORT3-N R-N IMAIN FEED PUM P-288 180 1 MSA2SZ PPG MILESTONE END SIG A CL-1E WORK 0 23MAY04 23MAY04 DR-N ML-N 39 M A25ZEND SI1 A CE WORK OUTSID CONTAINMEN OUTSIDE CONTAINMENT 03:00 02:59 ORT3-N R-N SIG B S ONDARY & FEED1 3EAM BLOWDOW IN CTMTI 181 1

ENFPC03U PPG MILESTONE ENTER S1D FIRE PROT 0

23MAY04 23MAY04 DR-N ML-N 124 ENFP 03UENTER SID FM E PROT COND RI t

COND III 04:00 03:59 ORT3-N R-N 182 1 CSA12Z PPG MILESTONE CLOSE FEED PUMP 0

23MAY04 23MAY04 DR-N ML-N 218 CSA12ZCLOS FEED PUMP P2A WORKrnNDOH P2aA WORK WINDOW 06:00 05:59 ORT3-N R-N MAIN FED PLMP P-28A]

183 1

4KVA0IZ PPG A-01 CLOSE A01 BUS 0

23MAY04 23MAY04 DR-N ML-N 67 4KVAO ZCLOSE A01 BUS ?ELATED WORI(

RELATED WORK 13:00 1259 ORT3-N R-N AD BUS WORK OR AGEI 184 1 HEAD-SET PPG MILESTONE REACTOR VESSEL HEA0 0 23MAY04 DR-N ML-N 0

HEA 3-SETREACTOR V H

SSEL WAD SE1 SET 17:00 ORT3-N R-N SAFET MONITOR PLANT PERATING STATE ILESTONE*

185 1 RCX31Z PPG MILESTONE END RCS WORK 0

23MAY04 23MAY04 DR-N ML-N 0

RCX31ZENDR SWORK WLARMG HOT LEG VENI WfLARGE HOT LEG 17:00 16:59 ORT3-N R-NOPES-RZRI 186 1 RP.IB-073 PPG O-RP-OOI1B RELAX CLOSURE POST I

23MAY04 23MAY04 DR-N ML-N 43 RP1B-IRELAX CLOSURE I' REACTOR SSEL HEAD SET REACTOR VESSEL HEAD _

17-00 17.59 ORT3-N R-N ESTAB.ISH CONTAINMENT CLOSURE FOR CO OFFLOADE

~

f

-~;( -

187 1

PABSURVEY RP PERFORM MCA 29 21MAY04 22MAY04 DR-Y ML-Y 271 A

EVPER RM MCAANALY OF RADATION ANYSIS OF RADIATON_

12:00' 16:59 ORT3-Y R-N 188 1

RP0408417 RP RE-00211 PMT CALIBRATION OF 5

21MAY04 22MAY04 0

C417PMT CA1RATIONOF IRE 211/212 IRE-211 1212 15:00 08:59 417-"'

189 1 RPAIRTEST RP HP 458 SETUP 8 EL BREATHIN 24 22MAY04 23MAY04 DR-Y ML-Y 12 RPAIRTESTSE UPr EL B AIR FOR NO DAM REMOVAL AIR FOR NOZZLE DAM 1 00 1159 ORT3-Y R-N STEAM GENER TOR 190 1 RPJF-152D RPI JOB FILE 1 NIGHT SFT UPPER 5

22MAY04 22MAY04 DR-Y ML-Y 0

I RP, F-1520 NIGHT S UPPER CAVflY C CON BRIEF CAVITY DECON BRIEF 02:00 19.59 ORT3-Y R-N PPER CAVITY DE N

RUn Date 21MAY04 13:21l LT-03 STANDARD PUBLICATION Sheet 11 of 14 0 PrImavema Svstems. Inc.

I FL-03 Execution Publication Set I

after 21MAY04 12:00 U1R28 WORKING SCHEDULE I

after 21MAY04 12:00 I,

i U

ID RESP WO EQ0I DESCRIPTION RD ES EF RISK MF Ft 21 MAY FrI 2 1

1

~~Sat 2

",2 ST 0

1214.16,8l20,22.496l8,10llz14,169182 0,2210@

2 i46 191 1 RPJF 152C RP1 JOB FLE I DAY SHIFT UPPER 5

22MAY04 22MAY04 DR-Y ML-Y RPJF-1 2CDAY SHIFTUPP CAVITY DECON RIEF CAvIC y DECON BRIEF 1100 15:59 ORT3-Y R-N UPPER A

DECON 192 1 RPJF-t52A RPI RPJF-152 SET UP AND STAGE 10 22MAY04 22MAY04 DR-Y ML-Y 0

RPJF.1 2ASET UP AND ST GE CAVITY DECO EQtiPMENT CAVITY DECON 11 00 20:59 ORT3-Y R-N 193 1

RPPRPHX1A RP1 HX-001A A S/G PLTFRM SETUP 24 22MAY04 23MAY04 DR-Y ML.Y 14 RPPRtPH 1AASIG PLTFRM ETUP FOR N D AM REMOVAL FOR NOZZLE DAM 1200-t1:59 ORT3-Y R-N STEAM GENER TO Rin 194 1

RPPRPHXIB RP1 HX-001B B SIG PLTFRM SETUP 24 22MAY04 23MAY04 DR-Y ML-Y 12 RPPRP 1B 3Sf PLTFRM ETUP FOR N0 DAM REMOVA FOR NOZZLE DAM 1Z.00 11:59 ORT3-Y R-N STEAM GENE O

R 195 1 RPJF-151A RP1 R-1 SKIRT.

INSTALL REACTOR 3

23MAY04 23MAY04 DR-Y ML-Y 0 _

_F_

IAINSTALL REA OR HEAD S HEAD SKIRT 10:00 12 59 ORT3-Y R-N INSTAlL R CTOR HEAD 510 T Il96 1

SD-4W0093 SDM 76 R-1 ADDRESS ONGOING 4

13MAY04 21MAY04 DR-Y ML-Y 0

bo"3ADDE ONGOING ISSUE WITH RELIEF RE EST ISSUES WITH RELIEF 130A 15:59 ORT3-Y R-N REAC R ESSEL AND AEMLY0213476

-u II

.a a

1 SDGSI-191 SDS CONT ENGINEERING 11 08APR04 24MAY04 DR-Y ML-Y 32 D St-191ENG ERNGW

-SUMP INTRUSIO ISSUES WALK.OWN - SUMP 08-OA 1459 ORT3-Y R-N E.-

N*l I~ll>; -

0 SE031172A SEC 768 Z-065A SECURITY SUPPORT 18 10MAY04 25MAY04 147 EO' 1T'ASECU SYSUPPORTZ-06

-MR 03444 1

Z-065A-MR03-044 07OOA 1159

.u re-U 199 1

SP-EVAL3 1 SP 76 R-1 DECISION POINT TO 0

23MAY04 23MAY04 DR-Y ML-Y 0 _

SP-EVAL3 DECs POINT TO EFRAMATOM RELEASE FRAMATOME 040o0 0359 ORT3-Y R-N REACTOR EL AND ASSEME Y02134721 U

ilUlu Al '

200 1 TGSUPPORT TGG TG-01-T PROVIDE CRANE.

23 13APR04 24MAY04 DR-Y ML-Y 207 rS TPROVCRANE,"RIGGE AND TOOLROOM UPPORT RIGGER AND 0900A 14:59 ORT3-Y R-N E I_ -

-_--U 201 1 CL-2B WCC CL 2B MODE 6 TO MODE5 101 25APR04 25MAY04 DR-N ML-N 0

MODE 6TO #0D 5 CHECKLISTl.

I CHECKLIST 08OOA 1659 ORT3-N R-N 202 1 CL-2E WCC CL2E MODE 3 TO MODE 2 266- 02MAY04 01JUN04 DR-NML-N 0 L2MODE3TO E 2 CHECKLST CHECKLIST 1900A 13.59 ORT3-N R-N 203 1 CL-2F WCC CL2F MODE2TOMODE1 286- 02MAYD4 02JUN04 DR-NML-N 0 L-MODE2TO NODEICHECKLIST CHECKLIST 19:00A.

09.59 ORT3-N R-N 204 1 T-2407-H WCC I

RMP 1 4.16KVRMP9364-1 1

21MAY04 21MAY04 DR-N ML-N 0 T.24 7414.16KVF MP93641 UMBILCACORD EMREV I l

l______

UMBILICAL CORD EM 12kO0'0 1259 ORT3-N R-N I 4.16KVRM 9364-1 UMBILICAL CORD EM REV-1 0 12407 M51 1 T-9087-R WCCJ I

P-28B 1 CSP-288EMREVZ2-1 1

21MAY04 21MAY04 DR-N ML-N 33 T.9741 CSP-28 EMREV2.2-1 12:00 12:59 ORT3-NR-N ICSP-28B AREV22-10019087 r--Y____4____13

____21__

___LT-_______Shoot______

___12____

of______14__

Run Date 21MAY04 13:211 LT-03 STANDARD PUBLICATION Sheet120f14 C Primavera Systems, Inc.

FL.03 Execution Publication Set I

after 21MAY04 12:00

1. U1R28 WORKING SCHEDULE I

after21MAY04 12:00 ii MAY IUl ID IRBP WO l EOD0 DESCRIPTION.

RD1 ES I EF RI SK IMF 21r&

2ISu3 IU"

.I

~Ffj 12 n

Sin 23 IIIST I__10112.14,lr31&20.2210,2,4,6,8f191214,16,1&20,2210.2t4,6,8.1OI12,14,16,i I C L->

206 1 T-9105-R WCC P-1A-M I RC P-1A-M RMP 9002.1 1 21MAY04 21MAY04 105.91 1 RC P.1 M RMP 90021 EM I EV4-I EMREV4-1 1200 12.59 1 RCP-1A-M MP9002.1 EMRE 4.10019105 207 1 T-9193-R WCC P-707A 1 RM P-707A MM I

21MAY04 21MAYD4 18 r.91 1 RM P.TC AMM REVO.1.1 REV0.1-1 1200 12.59 I RM P-707A M REVO 1100191 3 208 0 T202035R WCC P-0708 REMOVE TAG (- FO I

21MAY04 21MAY04 DR-N ML-N 674 R20 5RREMOVE TAG ( FO P.708 REVO-1)

P-708 MM REVO.1) 1Z00 12:59 ORT3-Y R-N 209 1 T-2f10-R WCC SW857A 1 Si S857A EM REVO-1 2

21MAY04 21MAY04 DR-N ML-N 0 r.25 R1 5iS 85 ; EM REVO-1 12:00 13:59 ORT3-N R-N ISt IS857 EM REVO-1 001261 210 1 T-0511-R WCC W.1CI1/C2 1VNCCW-1CI1/C2MM 3

21 MAY04 21 MAY04 DR-N ML-N 0 r os 1VNCC iCi/I C2 MM REV0 I REVO-1 12:00 14:59 ORT3-N R-N I VNCC 1C111C2 MM REV[.10010511 211 1

T-9082-R WCC P-288 1 CS P-288 MM REVW2-1 3

21MAY04 21MAY04 DR-N ML-N 30

.9s 2.R1 CS P-28 MM REV0.2-1 13:00 15:59 ORT3-N R-N I CS 8 MM REV2-100 19082 212 1 T-9894-R WCC W-001C1 1VNCCW-ICI11C2EM 1

21MAY04 21MAY04 DR-N ML-N 0 T.98E 4-R 1 VNCC WICI1C2 EM REVM-REVO-1 14:00 14:59 ORT3-N R-N El VNCC 1-C11C2 EM REVO 10009894 213 1 T-2613-R WCC SI"78B 1 SIS%878M EM REV-1 2

21MAY04 21MAY04 DRN ML-N 26

-2 6131Sl S 788 EM REVO-1 17:00 18:59 ORT3-N R-N 0126131 I SW878B EM REVO-214 1 T-7908-R WCC MAIN I MS MAIN STEAM CE I

21MAY04 21MAY04 DR-Y ML-Y 0

T.790 R 1 MS MAIN STE M CE REV2-1 REV2-1 23:00 23:59 ORT3-Y R-N W1Tr7 0o¶ MS MAIN STEAM CE REV2-1 215 1 T-1272-R WCC HX-20A I CS HX-20A MM REVO-1 3

22MAY04 22MAY04 0

T.1 '2-R I CS HX-20A M REVO.1 00_00 02 59 001 272_1 CS HX DA MM REVO-1 215 1 T-2407-R WCC RMP I 4.16KVRMP9364-1 1

22MAY04 22MAY04 DR-N ML-N 83 T-2407 R1 4.16KVRMP93 41 UMBJCALCO D EM REV0-1 UMBIUCALCORD EM 10:00 10:59 ORT3-N R-N 00124 71 4.16KV RMP9 1 UMBIlCAL.C RD EM REVO-1 217 0 T305515R WCC HX-028B REMOVE PERMIT (O 1

22MAY04 22MAY04 DR.Y ML-Y 652 T30551! RREMOVE PERMIT (0 VNTBO HX-288 M REVO.1)

VNTBO HX-28B MM 10:00 10:59 ORT3-Y R-N 3

218 1

T-80244H WCC IWP 1 480VIWPOI-128E-FN 2

22MAY04 22MAY04 0

T.024H41 480V 01.i28E-FN(O

)EM REVO-2 (01.39) EM REV0-2 15:00 16:59 0018024E1480 IWP01-128E-FN I39)EM REV0-219 0 T201369H WCC W-032 HANG TAG (O VNPAB 1

22MAY04 22MAY04 1

T2013B9H HANG 1 G (O VNPA8 W-32 M REVO-1)

W.32 MM REVO1).

16:00 16:59 3

220 1 T-9173-R WCC MS-02018-O 1 MS MS-2018-0 MMV t

22MAY04 22MAY04 DR-N ML-N 0

T.9173 11 MS MS-2018-0 MV REVO-1 REVO-1 22W00 22 59 ORT3-N R-N 00191 ElMS MS-2018 MMVREVO-1 221 1

T-8024-R WCC NwP 1 480V rWP 01-128BE-FN 1

22MAY04 22MAY04 I

T-8024R1 48 0 IWP 01.128 E-FN (

.39) EM REVO2 (01-39) EM REVO-2 23:00 23:59 1 480VIrP 01-128E$N (01-9) EM REVO-2001 241 222 1 T-8694-R WCC IwP 1 480V NWP 01-128 E-FN I

22MAY04 22MAY04 0

r S6944R 4SoV IN 01-12rE-FN (W-2

) CAUT REVI-1 (W-21A) CAUT REV1-1 23:00 23:59 1 480V rwP 1-128-E-FN (W-21A CAUT REV1-1 0018 341 223 0

T201369R WCC W-032 REMOVE TAG (OVNPAB I

23MAY04 23MAY04 57 T201369RREMI VETAG (0 VNPAB

-.32 MM REV0-1I W-32 MM REVO-1) 00:00 00:59 224 1 RETEST04 WCC RETESTS WCC RUN S-4 REPORT 0

23MAY04 23MAY04 DR-N ML-N 0

.To4WCC RUN s4 REPORT FOR P CONDmON FOR LTOP CONDmON 01:00 W059 ORT3-N R-N INSURE ALL STARE COMP ETEDl Run Date 21MAY04 13:21 LT.03 STANDARD PUBLICATION Sheet 13 of 14 O Primavera Syems, Inc.

FL-03 Execution Publication Set

after21MAY04 12:00 I

U1R28 WORKING SCHEDULE after 21MAY04 12:00 U

ID RESP WO ECD DESCRICIN RD ES EF RISK M_

MY 1

t 2 2

ST 21 Sa

2 ti2

.1 1.14m -

-02

-6.8 D'

w4,6,m,202210.2,4,6,8,1jjjjj6.

G2Z am atl 1-3_

225 1 T-7449-R WCC W-003A 1 VNCRD W-3A OPS 1

23MAY04 23MAY04 126

.7449-R1 VNCRD

-3A OPS REVO-1 REVO-1 0200 02:59 1 VNCR1 W-3A OPS REVO-1 0174491 226 1

T-7043-R WCC P-028A-M I CS P-28A-M EM REVO-1 I

23MAYD4 23MAY04 DR-N ML-N 0

T704 1 CS P AM EM REV-1 04:00 04:59 ORT3-N R-N I

P-28AWM EM REV )1 00170433 227 1 T-7047-H WCC P-028A-M 1 CS P-28A-M EM REV1-1 I 23MAY04 23MAY04 DR-N ML-N 0

T.7047-H i CS P-IA EM REV1-1 04:00 04:59 ORT3-N R-N I t P-28A-M EM REV -1 00170471 228 1 T-8695-R WCC IWP 1 48V IW 01-126E-FN I

23MAY04 23MAY04 DR-Y ML-Y 634 T.8695-R1 480V VP 01-126'E-FN (

21X) EM REV1-1 (W-21X) EM REV1-1 04:00 04:59 ORT3-Y R-N 1 180V WP 01-128E N (W-21X) EM REV.100186951 229 1 T-0964-H WCC 62tA01 1 MRR 6VA01 RMP 1

23MAY04 23MAY04 DR-N ML-N 0

T-0964H 1 MRR 62A01 RMP 9 02.1 EM REV0-1 9302-1 EM REMV-1 05:00 05:59 ORT3-N R-N 1 MRR 62/A0 RMP 9302-1 EM RE 1 00109643 230 1 T-7047-R WCC P-02BA-M I CS P-28A-M EM REV1-1 I 23MAY04 23MAY04 DR-N ML-N 0

T.7047;R 1 CS P. IAM EM REV1.1 05:00 05:59 ORT3-N R-N CS P-28A-M EM RE /1-1 00170471 231 0

T300626H WCC Z-031 HANG TAG (0 UA Z-31 IC 1 23MAY04 23MAY04 0

T300 26 HANG TAG (0 731 ICREVP-1)

REVO-1) 05:00 05:59 3

232 1 T-7342-H WCC OPS 1 01-100B OPS REV0-1 2

23MAY04 23MAY04 0

T.7342441 01 B

'OPS REVO-1 05:00 06:S9

-1

-1008 OPS R 1

0017342E 233 1 T-8607-R WCC RC-522A I RC RC-522A CAUTION 1

23MAY04 23MAY04 13 T.8607.R RC RC-522A CAU ON TAG REVO-1 TAG REVO-1 07:00 07:59 1 RC RC-22A CAU17ON TAG REV0-1 00186071 234 1 T-8845-H WCC RV HEAD 1 RC RV HEAD RMP.9W 1

23MAY04 23MAY04 0

T 8845IH RC RV HEAD RMP 96 MM REV2-1 MM REV2-1 10:00 10.59 1 R RV HEAD RMP-09 i MM REV2-1 0018 51 235 1

T-9079-H WCC W4AtB 1 VNCRD W-3Ai8 EM I

23MAY04 23MAY04 T 9079 1 VNCRD W 3ArB EM REV3-1 RE1 10 00 10:59 1VNCRDW 3h I EM REV3-1 001s9 g

236 1

T-8843-R WCC W-3AJB 1 VNCRD W-3AIB EM 1

23MAY04 23MAY04 0

T 1 YNCRD W EM REV2-i REV2-1 11:00

.11:59 1 VNCRD W-3 JB EM RE'V2-1E0018 R

237 1

T-0964-R WCC 62VA01 1 MRR 62/A01 RMP 1

23MAY04 23MAYD4 DR-N ML-N 0

T-0964-R1 MRR 62tA01 RMP 9 02.1 EM REY0-1 9302-1 EM REVO-1 12:00 12-59 ORT3-N R-N 1 RR 62tA01 RMP 9 32-1 EM REVO-1 00 1

238 0 T300626R WCC Z-031 REMOVE TAG (0 IAZ-31 1

23MAY04 23MAY04 0

T300626 REMOVE TAG (0 Z-31 IC REV0-1)

IC REV01) 14:00 14:59 3

239 1 T-9079-R WCC W-3AJB I VNCRD W-3N8 EM 1

23MAY04 23MAY04 105 T W7q.R1 VNCRD W 3AtB EM REV3-1 REV31-16:00 1659 IVN DW-3ABEMRE

-100190793 240 1 T-8022-H WCC IWP 1 480V IWP 01-128tE-FN 1

23MAYD4 23MAY04 DR-N ML-N 0

T-8022-H 1 480V nP01-128EE-FN (W 3B1) EM REV0-(W-1381) EM REVO-2 17:00 17:59 ORT3-N R-N 1 480V1WP01128-E (N

(W-13B1) EM R 20018022 Run Date 21MAY04 13:21 LT-03 STANDARD PUBLICATION Sheet14of14 I

PrimaveraSystemslnc I

FL.03 Execution Publication Set

-.