t5c;:, ~
Commioted fo Nuclear Enccalence IIIIIEYF EXElE11 POWh KOC l 1o Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Monday, May 24, 2004 Start Time:
1800 NSB Cafeteria ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)
Operations Coordinators (SOC)
Maintenance Coordinators (MOC)
Engineer / Projects Coordinators (EOM)
Rad Protection Manager (RPM)
Site Safety Coordinator (SSC)
Shutdown Safety Assessor (SSA)
Site Management (SSM)
General Supervisors First Line Supervisors Agenda
- 1. Safety Issue Discussion (SSC).
- 2. Radiation Protection (RPM)
- 3. Operations Coordinator Turnover (SOC)
- 4. Shutdown Safety Assessment (SSA)
- a. Containment Fire Loading SAT /
UNSAT -.
Review Deficiencies S. Maintenance Coordinator Turnover (MOC)
- 6. Engineering Coordinator Turnover (EOM)
- 7. Major Projects Update (EOM)
- 8. Schedule Review (SOM)
- 9. Management Expectations (SSM)
- 10. ACEMAN Assessment Results (SOM)
- 11. Shift Goals (SOM)
BRIEFING NOTES
..,p r
S m_ _Ill v'
0I Items Included In Daily Package:
Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Defined Critical Path Work Activity Risk Assignment Outage Schedule 1
Committed to Nuclcar Excellence FCIDT ERC
- m328
-t eauff oEff"
- UlR28 Point Beach Nuclear Plant U1R28 Refueling Outage SafetV Topic for week of May 23-29, 2004 Theme for the week This week's theme deals with odds and ends for Completing the Outage. We are almost done.
A number of critical work activities will be conducted this week in containment and we will begin a major battery change out. It is time to review industry OE from other sites to make sure we've learned from their experiences. Nothing will stop our progress faster than a serious injury!
Daily Safety Snippets Sunday His there an obstruction In your way that inght not stay?
OE13857 May 2002, Fort Calhoun -While moving the reactor vessel head assembly during a refueling outage, the control pendant for the polar crane caught a handrail vertical support pipe, lifting the pipe out of its mount and causing it to fall 20 ft to the walkway below. Individuals were in the area at the time, but not injured. A review indicated the pendant caught on nearby equipment many times during past refueling outages and corrective actions were not put In place.
Are there any items were ourequipment gets caught during moves that we have not resolved?
Monday The big picture do we see? And communication is the key.
OE12357 January 2001, River Bend - A worker focused on a moving load and did not pay attention to the movement of the crane. He ended up being forced against a handrail by the cab of the crane, luckily resulting only In minor injuries.
The entire crew was focused on the load with no one person having oversight of the whole evolution.
During crane operations, do we designate an individual to swatch the big picture?'
Tuesday
'Peer checks - do we use theme December 1997, Byron - An electrician was taken to the hospital for treatment of second-degree bums on his hand and flash bums to his eyes as a result of a mishap. He was one of three electricians assisting a system engineer during a battery discharge test on a new battery bank when he accidentally shorted across the battery with one of the cables used to connect the battery to a resistor bank. An Investigation showed that the electricians and the system engineer had not verified the correct cable configuration. Also, the Injured electrician was not wearing low voltage gloves and had rolled up the sleeves of the long-sleeve shirt he was required to wear for this job.
WMat PPE do we wearduring battery work?
Wednesdav "Just a reminder to be told balance that loadr OE10902 March 2000, Seabrook - Electricians were offloading battery cells from a metal pallet on a forklift. The offload sequence went frorn Inside, closest to the forklift, to the outside, furthest from it. The result - Instability In the load and the pallet tipped under the weight of the batteries. The cells fractured spilling 19 gallons of sulfuric acidlwater electrolyte In the switchgear room. This OE Is not lust forbattery removal. Balance al your loads!
Thursdav
'AMake sure the scaffold doesn't slip and come down too quick. d OE14551 July 2002, Davis-Besse - A diamond deck plate slipped through a gap between two pieces of floor grating and dropped 20 ft to the level below, damaging an Instrument line. The rest of ourscaffokling is coming down.
Are we aware of the potential 'hoes' for material to go through?
Friday "Before heat up, make sure someone has done the clean-upil OE57698 April 2004, Palo Verde - Two mechanics received second degree burns to the face as the result of a flash fire that occurred as they began pre-heating for welding. Isopropyl alcohol was used to clean and liquid had accumulated in the casing of the equipment. The oncoming crew was not aware of this buildup as they began work.
Saturday "Always remember to verify first or you may take a ride in a hearse. -
1992, Palisades - An experienced electrical technician at Palisades was electrocuted when he failed to Install a circuit jumper before removing test equipment from a current transformer. The existing circuit configuration had not been anticipated during work planning, and the decision to use jumpers to maintain energized current transformer circuits during testing had not been reviewed by supervision.
2
q.
Point Beach Nuclear Plant Outage 1 R28 DAY Supporting Operational Excellence 50 Path IN P
Picture Meets
- 11nik n arr Pla-i-t
-vaAr Outaae Radiation Performance I-0 -
I I
- Uesn A
Meet zmceeuI miei u@
Men _
lfs i
This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.
uay 5u - May 2j Actual = 3.119 Cumulative = 77.202 Cumulative Forecast =77.389 Meets:
Exceeds:
<=92 Rem
<=88 Rem Actual Cum.
Dose:
Daily PCE goal reforecast on 4/23. Daily dose reforecast on 5123104.
Dose reforecast on 5/23/04 combining dose received for the RV Head repairs and also adding 17 rem to the outage goal to reflect the dose received for the repair.
77.202 Rem Meets: <= 18 Exceeds: <= 12 Actual PCE's:
10 SI_.
- STIi Stu Thomas I
Personnel Contamination Events Cummulative Dose Exposure 0
I1 r:
U1 i
z Actual Forecast
~
Goal Actual r
Goal 0
5 10 15 20 25 30 35 40 45 50 55 60 0 2 4 a a 10121416102022242620302234363404244454850525456506O
NMCE Committed to Nuclear Excellence Outage Status Report Plant:
Point Beach Unit 1 Day:
Monday Today's Date / Time:
5/24/04 1600 Outage Duration: Day 51 Of Refueling Outage Number U1R28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0
First Aid cases 0
Near misses 0
Total for this outage 1
Summary:
Radiological Dose to date 77.202 Projected to date
- 77.389 Outage Goal
- 92 R Difference
-.187
- Reforecast on 5/23 Number of PCEs 10 Summary-Dose reforecast on 5/23/04 combining dose received for the RV Head repairs and also adding 17 rem to the outage goal to reflect the dose received for the repair.
Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0
Summary:
Plant Status Mode:
0 Hot Standby (Mode 3) 0 Hot Shutdown (Mfode
- 4)
E Cold Shutdoun (Mode5)
ED Refueling Shutdown (Mode 6)
RCS:
Temperature:
80 Pressure:
Vented to Atmosphere RV Level:
24%
Time to Boil:
106 minutes Shutdown Safety Assessment Protected Equipment:
Major Activities Completed In Last 24 Hours Critical Path and Near Critical Path Activities (Next 24 HoursN_
Set Reactor Vessel Head
- Reactor Head Penetration #26 Relief Request Issues
- Drain RCS to 22% Reactor Vessel Level (Midloop)
- 'A' S/G Primary Manway Installation
- Nozzle Dam Removal
- Exit Midloop and Reduced Inventory Orange Path
- Move IP-IB RCP Motor to Pump Cubicle
- Remove Cavity Seal Ring
- Upper Cavity Decon
- Commence Reactor Head Assembly
- 'f3' S/G Primary Manway Installation Significant Outstanding Issues Date Issue Due Responsibility 5/17/04 Rx Head Relief Request 5/25/04 Jim Schweitzer 5/20104 D1051D106 Station Battery 5127/04 Harv Hanneman 5/22/04 Reactor Trip Relays 5/27/04 Mike Miller 5/24104 "A" S/G Hotleg Potential FME 5/24/04 Felicia Hennessy Upcoming Ma or Milestones
__Scheduled Actua l T Scheduled Actual Date Time Date Time A
e Time Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230 RCS Fill & Vent 4/23/04 1500 1
Head Lift 4/09/04 0900 4/21/04 1550 Heatup >2000 4125/04 0900 Refueled 4/14/04 0300 5/02/04 1848 Reactor Critical 4/28/04 0800 RV Headset 4/18/04 1900 5123/04 1338 On-Line 4/30/04 0100 4
Point Beach Nuclcar Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
I DATE:
Mlai 24,2004 TIME:
1400 KEY SAFETY FUNCTIONS:
REACTIVITY:
GREEN CORE COOLING:
POWER AVIAILABLE:
INVENTORY:
ORANGE GREEN ORANGE CONTAINMENT:
SFP COOLING:
PROTECTED EQUIPMENT:
GREEN NA COMMIENTS:
RCS Time to Boil is 106 minutes Fire Prot. Cond. III: Credit taken for fire rounds as fire prevention contingency PBF-1562 Revision 2 10130/02
References:
NP 103.6 NP 10.2.1 5
Page 5 of 9
Defined Critical Path MAY U
ID l
DESCRIPTION OD RD Cal U SYS EQID TF 24 25 26 1
4, 6,
8.10 12,14.16.18,20221 0, 2, 4, 6. 8.1012,14,16,18,20,221 0* 2 *.6. 8.10112.14.16,18,20,2 1
RPJF-152X UPPER CAVITY DECON -
6 2 1 1 CONT JOB FILE 1 3
E-1 PR CAVITY DECON -second pass second pass 24MAY04 13:5924MAY04 01:00A 1 EP0408490 HX-001A - HOT LEG FME 8 4 1 1
MS HX-OOiA 0
P0
-001A -HOT LEG FME INVESTIGATION INVESTIGATION 0408490- 24MAY04 15:5924MAY04 08:00A 1 MM0214053D HX-001B - CLOSE COLD LEG 3 1 1 1
MS HX-001B 0
M0214053 X-00 B-CLOSE COLD LEG PRIMARY MANWAY PRIMARY MANWAY 0214053-24MAY04 12:5924MAY04 11:00A 1 MM0214053E HX-001B - CLOSE HOT LEG 4 4 1 1
MS HX-0011B 0
MM021405 H-001 B-CLOSE HOT LEG PRIMARY MANWAY PRIMARY MANWAY 4MAY04 13:
0214053-24MAY04 16:59 1 MM0214051D HX-OO1A - CLOSE COLD LEG 3 3 1 1
MS HX-001A 0
MMO 4051 DHX001A - CLOSE COLD LEG PRIMARY MANWAY PRIMARY MANWAY 24MAY 16:00=0214051 - 24MAY04 18:59 1
MM-8480R REMOVE CAVITY SEAL RING 4 4 1 1
RC R-1 0
0pREMMOVE CAVITY SEAL RING 24MA 17:000214134-24MAY04 20:59 1 MM0214051E HX-001A -CLOSE HOT LEG 3
3 1 1 MS HX 001A 0
M0214051E 001A -XCLOSE HOT LEG PRIMARY MANWAY PRIMARY MANWAY 24 AY04 19:00l0214051-24MAY04 21:59 1 MM-8480N2 REM STUD HOLE CAPS 4
4 1 1
RC R-1 0
MM.8480N2REM STUD HOLE CAPS PRIOR TO RP DECON PRIOR TO RP DECON 24MAY04 21:00_0214134-25MAY04 00:59 O'
OP5A-030 RAISE RCS LEVEL TO 55%
1 1 1
CV OP-SA 0
OP5A.o3DfAISE RCS LEVEL TO 55% (2ND)
(2ND) 24MAY04 22:00N24MAY04 22:59 I
RCX02Z2 EXIT RCS AT REDUCED 0
0 1
1 XX MILESTONE 0
RCXO2Z2 EXIT RCS AT REDUCED INVENTORY (2ND)
INVENTORY (2ND)
- 24MAY04 22:59 2
RPJF-152B DECON UPPER CAVITY 3
3 1 2 CONT JOB FILE 1 0
RPJF.1s2BDECON UPPER CAVITY -POST STUD CAP REMOVAL
-POST STUD CAP REMOVAL 25MAY04 01:00_25MAY04 03:59 1 MM-8480N3 INSTALL VESSELHEAD 12 12 1 1
RC R-1 0
MM-848ON3INSTALL VESSEL HEAD STUDS STUDS 25MAY04 04:00 0214134-25MAY04 15:59 1 MM-8480N1 TENSION PREPS RV HEAD 2
2 1
1 RC R-1 0
MMj48ON1TENSION PREPS RV HEAD 25MAY04 16:00E0214134-25MAY04 17:59 1
MM-8480N TENSION RV HEAD 4
4 1
RC R-1 0
MM.848ONTENSION RV HEAD I
I I
l25MAY04 18:00_0214134 25MAY04 21:59 1
MM-8480K REPLACE RX HEAD 6
6 1
RC l R-1 0
MM48480KREPLACE RX HEAD INSULATION PER RMP
_INSULATION PER RMP 9096 _
25MAY04 22:000214134 26MAY04 03:59 IIR
- I
- uI I
I EM-8480P INSTALL CONOSEALS 4
4 1 1 RC R-1 0
EM43480PINSTALL CONOSEALS j
26MAY04 04:000214134-26MAY04 07:59 1
IC10.42B I&C CAVITY RESTORATION 3
3 1 1 XX ICP-10.042 l
IC1O.4231&C CAVITY RESTORATIO1 I
26MAY04 08:00_0300894-26MAY04 IC
-+/-
@PrimverShSysems.oInc Run Date 24MAY04 13:44 LT-16 DEFINED CRITICAL PATH Sheet 1 of 2 e
lFL-16 DEFINED CRITICAL PATH SET
Defined Critical Path MAY U l ID j
DESCRIPTION 00 RD Cal U SYS EQID TF 24 25 1
MM-8480M INSTALL HEAD VENT SPOOL 2
2 1
RC R-1 0
MMO8480MINSTALL HEAD VENT PIECE I
26MAY04 I 1:000214134 - 26MAY0O I
RCXOOZ RCS BOUNDARY WORK 0
0 1
1 RC CONDITION 0
RCXoOZRCS BOUNDARY V COMPLETE 26MAY04 13:00126MAY04 12:59 1
RCX03A BEGIN FILL & VENT PER 0
0 1
1 RC CONDITION 0
RCXO3ABEGIN FILL & VEN OP-4A 26MAY04 13:00l26MAY04 12:59 t
OP4A-020 ALIGN PZR & LOCAL VESSEL 2
2 1
1 CV OP4A 0
OP4A.o2CAUGN PZR & LOC LEVEL INSTRUMENTS 26MAY04 13:00W26MAY04 14:5E 1
OP4A 030 ALIGN VCT. LETDOWN &
2 2
1 1
CV OP.4A 0
OP4A-030AUGN VCT, LE CHARGING SYSTEMS I
26MAY04 15:OOU26MAY04 11 1
OP4A-040 RCS FILL TO 20-60 %
5 5
1 1
RC OP-4A 0
OP4A.4O4RCS FILL T(
PRESSURIZER LEVEL 26MAY04 17:00_26r Run Date 24MAY04 13:441 LT-16 DEFINED CRITICAL PATH Sheet 2 of 2 0 Primavera Systems, Inc.
FL-1 6 DEFINED CRITICAL PATH SET
Run Date 24MAY04 i3:46I Work Activity Risk Assignment Sheet I of 2 1 U
ACT WO GRPI HPE EQUIPMENT Activity Cal DUR START FINISH MAY I
JUN l
ST RISK Description ID 3
241 T 25 I WI261 T 27 I F-28I S 29 I S 30 lM 31I T I W2 I T 3 I F4 I S ilisil1.,1g l
ljs 121!
I__
1I CEI600R035 176 I CE8 I DR-Y ML-R-1 RX HEAD REPAIR 1
76 22MAY04 27MAY04 IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M CLOSEOUT ACTIVITY 07 00A 15:59 2134 35. 128CE I
__I-I 1
EM0215225A 76 EM I DR-N ML-N W-004A-M PERFORM SECOND MCE 1
4 26MAY04 26MAY04
[ICONTAINMENT REACTOR CAVITY COOUNG FAN MOTOR ORT3-N R-M W-004A-M 13:00 16:59 0215225 - 128EM 1
EM0215226A 76 EM DR-N ML-N W-04B-M PERFORM SECOND MCE 1
4 26MAY04 26MAY04
[)CONTAINMENT REACTOR CAVITY COOLING FAN MOTOR ORT3-N R-M W-004B-M 13:00 16:59 0215226 - 128EM i
m l
- 1-u i.i i
1 EP0408490 76 EPT I DR-N ML-Y I HX-001A HX-01A - HOT LEG FME 1
4 24MAY04 24MAY04
[STEAM GENERATOR ORT3-N R-M INVESTIGATION 08:OOA 15:59
( 108490- 128EN E
E.
UI I
1 IC10.428 76 IICI DR-Y MIY ICP-10.042 I&C CAVITY RESTORATION I
3 26MAY04 26MAY04 IREFUEUNG CAVITY PREPARATION ORT3 YR-M 08:00 10:59 0300894 - 1281C 1I MM-8480R 76 MM1 DRY ML-Yl R-1 REMOVE CAVITY SEAL RING 1 1 4 24MAY04 24MAY04 EREACTOR VESSEL AND ASSEMBLY I
ORT3-YR-M 17:00 20:59 0214134 - 128MM 1
MM-8480N2 76 MM1I DR-Y ML-Y R-1 REM STUD HOLE CAPS 1
4 24MAY04 25MAY04 IREACTOR VESSEL AND ASSEMBLY ORT3-YR-M PRIORTORPDECON 21:00 00:59 0214134 - 128MM MM-8480N3 76 MMI DR.Y MI-.Y R-1 INSTALL VESSEL HEAD 1
12 25MAY04 25MAY04 OREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M STUDS 04:00 15:59 0214134 -
128MM 1
MM-8480N1 76 MM1 DR-Y ML-Y R-1 TENSION PREPS RV HEAD 1
2 25MAY04 25MAY04 IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M 16:00 17:59 0214134 -
128MM I
MM-848ON 76 MMI DR-Y MI-YV R-1 TENSION RV HEAD I
1 4 125MAY04 25MAY04 EREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M 18:00 21:59 0214134 - 128MM I
MM-8480K 76 MMI DR-Y ML-Y R-1 REPLACE RX HEAD 1
6 25MAY04 26MAY04 IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M INSULATION PER RMP 9096 22:00 03:59 0214134 - 128MM 1
MM-8480L 76 MM1I DR-Y ML-Y R-1 INSTALL PZR VENT FLANGE 1
2 25MAY04 25MAY04 PREACTOR VESSEL AND ASSEMBLY ORT3-N R-M 22:00 23:59 0214134 - 128MM 1I MM-8480V1 76 MMI DR-Y ML-Y R-1 REMOVE ZIP LIFTS I1 10 26MAY04 26MAY04 OREACTOR VESSEL AND ASSEMBLY ORT3-N R-M 03:00 12:59 0214134 - 128MM I
MM-8480M 76 MM1 DR-Y MI-YV R-1 INSTALL HEAD VENT SPOOL 1
2 26MAY04 26MAY04 IREACTOR VESSEL AND ASSEMBLY ORT3-N R-M PIECE 11:00 12:59 0214134 -
128MM I
MM-8480P 76 MM1I DR-Y ML-YV R-1 RV HEAD DRESS RMP-9096 I1 10 26MAY04 26MAY04 OREACTOR VESSEL AND ASSEMBLY ORT3-N R-M 13:00 22:59 0214134 - 128MM 1
MM-8485J 76 MM3 DR-YML-YV P-001B P-1B - ALIGN B RCP PER 1
16 24MAY04 25MAY04
=
REACTOR COOLANT PUMP ORT3-Y R-M RMP 9002-4 07:OOA 03:59 0 14119 -
128MM 1 1MM-8485J1 76 MM3 DR-YMLIY P-001B P-001B - RECOUPLE B RCP 1
5 125MAY04 25MAY04
[REACTOR COOLANT PUMP ORT3-Y R-M PER RMP 90024 06:00l 10:59 0214119 - 128MM
__NMCI/WE ILT-81 HUMAN ERROR RISK BARCHART PBNP U1 Refueling 28 Outage'l FL-S1 HUMAN ERROR POTENTIAL O Primavera Systems, Inc.
I 2
Run Date 24MAY04 13:461 Work Activity Risk Assignment I
Sheet 2'of 2 l a
ACT ID WO ST GRP HPE RISK EQUIPMENT Activity Description Cal ID DUR I START I FINISH MAYV I
JtIHN 23TM241 2ihIT7I FT28 ; 5229 S30 M31 TI T3 F41S
' f_
1 MM-8485H 76 MM3 DR-Y ML-Y P-001B P-001B - REMOVE 1
6 25MAY04 25MAY04
[DREACTOR COOLANT PUMP ORT3 Y R-M BACKSEATLEAKAGE 11:00 16:59 0214119 - 128MM 1
MM-8486A 76 MM3 DR-Y ML.Y P-401B-M RECONNECT UPPER CC 1
4 25MAY04 25MAY04 OREACTOR COOLANT PUMP MOTOR ORT3-Y R-M PIPING RMP 9002-1 11:00 14:59 0215205 - 128MM 1
MM-8485QZ 76 MM3 DR Y ML-Y P-0011B P-001B - FINAL ASSEMBLY 1
13 25MAY04 26MAY04 EOREACTOR COOLANT PUMP ORT3-Y R-M AFTER COUPLING 15:00' 03:59 0214119 - 128MM NMCWE LT81 HUMAN ERROR RISK BARCHART PBNP U Refuelng 28 outage FL-81 HUMAN ERROR POTENTIAL O Primavera Systems, Inc. _
afler24MAYU4 72:rUU I
U1R28 WORKING SCHEDULE after 24MA Y04 12:00 p
I DU RESP WO EQID DESCRIPTION RD ES EF RISK MF MAY ST
- ~214,16J202210.2,46,6 1
8,10OZ14,16l&20,22i 0,2,4.6, jjjjji
_ r ST 1
I NRC-CALL13 ADM MILESTONE O.D. CALL NRC TO I
25MAY04 25MAY04 DR-Y ML-Y 0
NRC CALLI3O.D. CALL NRC TO WITNES. MODE 6TO N WITNESS MODE 6 TO 15:00 15:59 ORT3-Y R-N TOI_12_MAY NC-__LL_4OD.C 2
1 NRC-CALL14 ADM MILESTONE O.D. CALL NRC TO 1
26MAY04 26MAY04 DR-Y ML-Y 0
NRC ALL140.D. C WITNESS RCS FILL &
14:00 14:59 ORT3-Y R-N 3
1 AP0215129 APMI 76 X-01-C IX-01-C-INSPECTCAL 16 25MAY04 26MAY04 DR-N ML-N 0
AP02151 41-C -INSPECT CALAND SET AND SET 08:00 14:59 ORT3-N R-N 02151 MAIN 4
1 AP0216539 APM 76 TO-O-VARMPERFORMRETESTFOR 4 26MAY04 27MAY04 DR-N ML-N 13 AP 216539PERFO T-MOD 02-052 14:00 08:59 ORT3-N R-N 21653 5
1 AP0215133 APM 76 TG-01-G GENERATOR METERS 16 26MAY04 28MAY04 DR-N ML-N 0
AP 215133GENER ON C-01 CALIBRATION 14:00 11:59 ORT3-N R-N 11130 6 1 AP0215123 APR 76 A52-14 P-lB UNDERFREQ 6 12MAY04 25MAY04 DR-N ML-N 0
AP021512
-18 UNDERFRE(.
RELAY FUNCTI NAL TEST J _
I_1_1 IRELAY FUNCTIONAL 0900 1459 ORT3-NR-N I 021512 PWRTO1P-1B REACTOR OOLANTPUM 711 AP0215126 APR 76 F52-122 TRIP F52-122 FROM 5 126MAY04 26MAY04 I DR-N ML-N I 0
AP021512 P F52-122 F PROTECTIVE 0900I 1359 ORT3-N R-N I 214~~~~~~I ei I Ms3 t '
~
8 I 1 APSGNDOUT APS X-01 APPLETON REMOVE I 126MAY04 26MAY04 DR-N ML-N 294 APGND PPLI IGROUNDSFOR MAIN 15:00 15:59 ORT3-N R-N
[_
1 1 1
1
^
!^t1 9
M0300103 B3MS 77 RE-PC 46.1 VERIFY RTO As I 125MAY04 25MAY04 DR-Y ML-Y 15S M03001,03&RF RTO AS C4CULATED BY PF CS ICALCULATED BY PPCS 08:001 08:59 ORT3-Y R-N 030010 CALORIMETRIC 10 2
3BM0300124 lBMS 77 RE-PC 46.1 VERIFY RTO AS l
25MAY04 25MAY04 DR-Y ML-Y 150 BM0300124VRIFY RTO AS CALCULATED BY P CS CALCULATED BYPPCS 08:00I 08:59 ORT3-Y R-N I 030012 CALORIMETRIC 11 1
NG-HX15XVI lBMS 77 HX-015A1 EXTERNALAIR SIDE 4 25MAY04 25MAY04 DR-Y ML-Y 0
IG.-X15XVEXTEftNALAIRSIDEC ILINSPECTIO COIL INSPECTION 17:00 20:59 ORT3-Y R-N 02145210"CONTAINMENTA CIDENTRECI 12 1 NGSEM714-A BMS 76 W-001A1 W-I01AI SEM 7.14 6
25MAY04 25MAY04 DR-YML-Y 0
I GSEM714-W,01AISEM7.14MEA UREAIR FLO MEASURE AIR FLOW 17:00-22:59 ORT3-Y R-N I 021450 CONTAINMETACCIDENTR 13 1 NGSEM714-B lMS 76 W-001B1 W-OOB1 SEM 7.14 6 25MAY04 25MAY04 DR-Y ML-Y 0
I GSEM714.-!
9BI SEM 714 MEA URE AIR FLO0 MEASURE AIR FLOW 17:00 22:59 ORT3-Y R-N 021450 CONTAINMENTACCIDENT R 14 1 NGSEM714-C BMS 76 W-OO1CI W-001C1 - SEM 7.14 6 26MAY04 26MAY04 DR-Y ML-Y 0
NGSEM714SWO01Cl-EM 7.14 MEA MEASURE AIR FLOW 02:00 07:59 ORT3-Y R-N 021450 E ONTAINMENT 15 1 NGSEM714-D BMS 76 W-001D1I W-001DI - SEM 7.14 6 26MAY04 26MAY04 DR-Y ML-Y 0
I NGS<M71440Y-001D1 - SEM 7.14 MEA MEASURE AIR FLOW 02:00 07:59 ORT3-Y R.N 021450 iq ONTAINMENT tun Date 24MAY04 13:151 LT-03 STANDARD PUBLICATION Sheet 1 of22 C Primavera Systems. Inc.
I FL-03 Execution Publication Set I
aner z4mA Yu4 7 z:uu U1R28 WORKING SCHEDULE I
affer;WA Y04 12. 00 U
ID RESP WO EQID DESCRIPTION RD ES EF RISK MF MAY IIST on24 II5 Wed 26.
wo ~~~'101i.
1214,16.1920l,22(0,2.4.6.8,10i'l14,161p2022f 0.2.4.6.,107 14.
16 0
CE0310577 CE 76 Z-065A Z-65A INSTALL MR 3
10MAY04 24 MAY04 DR-Y ML.Y 152 S
77Z-5A INSTALL MR 030 I 03-044 07:OOA 14:59 ORT3-N R-N MANHOLE #10310577 17 0
CE0311772 CE 76 Z-065A Z-65A INSTALL HEAT 3
10MAY04 24MAY04 DR.Y ML-Y 152 Z 2Z65A INSTALL HEAT TR %CE - MR 03-044 TRACE - MR 03-044 07:OOA 14:59 ORT3-N R-N PMANHOL
- 10311772 18 0
EM405897Z5 CE 76 D-106 0-106 REMOVE CELLS 12 25MAY04 25MAY04 DR-Y ML-Y
- 0.
EM405897Z5 06 REMOVE CELLS 18, 21, 25.26 D 44.
18.21. 25, 26 AND 44.
07:00 18:59 ORT3-N R-N C040589 ltV DC STATION BJ TTERY 19 0
EM405897Z6 CE 76 D-106 D-106 REPLACE 12 25MAY04 26MAY04 DR-Y ML-Y 0
EM405897ZD 05 REPLACE 18,21,25.26 & 44 W1
.18.21,25,26 & 44 WITH 19:00 06:59 ORT3-N R-N 12 i/V DC STATIOt
"~~
Il
-_ U __.
i i I tMr1
- u11' 20 1
CE30000TI CE3 76 TG-01-T ENCAPSULATE 10 01MAY04 124MAY04 DR-Y ML-Y 113 NCAPgULATE INSULAT ON ON HP TURBI$4E COVER INSULATION ON HP 12:OOA 21:59 ORT3-Y R-N HIGH PRESSUR TURBINE030215I 21 1
CE44TGATI CE3 77 IST-SISI REINSULATE - FAC 110 17MAY04 I 03JUN04 DR-Y ML-Y 0
EINSULATE. FAC PRO 3 - TRB HALL 44 FT GEN AREA I
_ROG - TRB HALL 44FT 14:OOA 09:59 ORT3-Y R-N 22 1
CE408411TI CE3 76 PIPING DB-INSTALL INSULATION 3
24MAY04 24MAY04 DR-Y ML-Y 0
4 ITINSTAIL INSULATION F R P-28A MINI RE¢IRC FLANGE FOR P-28A MINI 08:OOA 14:59 ORT3-Y R-N SGFP MI{4 RECIRC FROM PUMP TO RESTRI9TING ORIFIC040 11 23 1
CE408412TI CE3 76 PIPING 08-INSTALL INSULATION 3
24MAY04 24MAY04 DR-Y ML-Y 0
NSTALL INSULATION F R P-28B MINI RECIRC FLANGE FOR P-28B MINI 08:OOA 14:59 ORT3-Y R-N SGFP MINI RECIRC FROM PUMP TO RESTRI1TING ORIFIC040 412 24 0
CE213365T1 CE3 77 SERVICE INSTALL INSULATION 5
24MAY04 24MAY04 DR-Y ML-Y 0
NSTA4L INSULATION FPR IFD-2411 FOR 1FD-2411 10:OOA 16:59 ORT3-Y R-N M
ISC EQUIPMENT REP IRISERVICE0306006 25 1
CE2141 17T CE3 82 MSR DUO-CH INSTALL INSULATION:
8 24MAY04 24MAY04 DR-Y ML-Y 19 CNSTALL INSULATION:
SR DUO-CHECKSI MSR DUO-CHECKS 10:OOA 19:59 ORT3-Y R-N Fb-9A-D SHELL SI E OUTLET CHECI(S0214117 26 0
CE406159TI CE3 77 SERVICE INSTALL INSULATION 2
24MAY04 24MAY04 DR-Y ML-Y 0
C o06159TNSTALL INSULATION AFTER VALVE W9RK IFD-196A AFTER VALVE WORK 18:00l 19:59 ORT3-Y R-N 0306006MISC EQUIPMENT EPAIRISERVICE' 27 1
TG-30955 CE3 76 TG-01-T FURMANITE INJECT HP 3
25MAY04 25MAY04 DR-Y ML-Y 108 TG.30955F RMANITE INJECt HP CASING HOF IZONTAL JOIN CASING HORIZONTAL 0800 1059 ORT3-Y R-N 030215 HIGH PRESSUIIE TURBINE 28 0
CE302178TI CE3 77 SERVICE INSTALL INSULATION 8
25MAY04 25MAY04 DR-Y ML-Y 0
CE302178TR STALL INSULATON FOR IFD-2518 FOR IFD-2518A 08:00I 15:59 ORT3-Y R-N 030600 ISC EQUIPMENT REPAI WSERVICE 29 0
CE216332T1 CE3 77 SERVICE INSTALL INSULATION 25 25MAY04 26MAY04 DR-Y ML-Y 117 CE216332 STALL INSULATInN FOR 1FD-204 FOR 1FD-204B 08:00I 16:59 ORT3-Y R-N 030600 Ml 30 1
CE26TGATIX CE3 77 IST-SISI REINSULATE - FAC 10 25MAY04 25MAY04 DR-Y ML-Y 129 CE26TGA )fZEINSULATE-FAC PROG - TRB ALL 28 FT GE PROG - TRB HALL 26 11:00 20:59 ORT3-Y R-N 63 SECONDARY INSERVICE INSPE, 31 0
CE216557TI CE3 77 SERVICE INSTALL INSULATION 8
25MAY04 25MAY04 DR-Y ML-Y 0
C 2165 LAON FOR IFD-282C FOR 1FD-282C 15:00l 22:59 ORT3-Y R-N 030600 MISC EQUIPMENT REPAIR/St 32 1
CE311945T1 CE3 76 INSUL-MS INSTALL INSULATION 4
26MAY04 26MAY04 DR-Y ML-Y 563 CE31945TINSTLL INS LATON FOR P FOR PZR MANWAY 00:00 03:59 ORT3-Y R-N 040b171NSU ON 33 0
CE213075TI CE3 77 SERVICE INSTALL INSULATION 10 26MAY04 26MAY04 DR-Y ML-Y 117 1 CE21307 N TALLINSULA FOR IFD-38 07:00I 16:59 ORT3-Y R-N I
030600 M.
Run Date 24MAY0413:151 LT-03 STANDARD PUBLICATION Sheet 2 of 22
@ Primavera Systems, Inc.
I FL-03 Execution Publication Set I
after 24MA YU4 7 Z:UU 1
U1R28 WORKING SCHEDULE I
aner Z4MA Yu4 7i:VV ST ID D
ESl1l4.16.1&L20,2210,24.6,8.l0i12,14,1Sla2O.22I0,2,4, r.112411 34 1 l CE26TOHSR I CE4 77 IST-SISI REM SCAFF. FAC 8 I01MAY04 24MAY04 DRV YML-Y PROG - TURB HALL 26_
09:OOA 19:59 ORT3-Y R-N 242 35 1 CE08TOHSR CE4 77 IST-SISI REMOVE SCAFF - FAC 10 05MAY04 24MAY04 DR-Y ML-Y 144 PROG - TURB HALL 8 10:OOA 21:59 ORT3-Y R-N 36 1
CE213968SR CE4 87 TG-01-G REMOVE 8
20MAY04 24MAY04 DR-Y ML-Y 146 SCAFFOLDING FOR 07:OOA 19:59 ORT3-Y R-N 37 1
CE408411SR CE4 76 PIPING DB-REMOVE 4
24MAY04 24MAY04 DR-Y ML-Y 243 SCAFFOLDING FOR 15:00 18:59 ORT3-Y R-N 38 1
CE408412SR CE4 76 PIPING DB-REMOVE 4
24MAY04 24MAY04 DR-Y ML-Y 243 SCAFFOLDING FOR 15:00 18:59 ORT3-Y R-N 39 1
CE213365SR CE4 82 FD-02411 REMOVE 10 24MAY04 25MAY04 DR-Y ML-Y 0
SCAFFOLDING FOR 17:00-10:59 ORT3-Y R-N 40 1
CE406159SR CE4 82 FD-00196A REMOVE SCAFFOLD 2
24MAY04 24MAY04 DR-Y ML-Y 144 AFTER VALVE WORK 20:00 21:59 ORT3-Y R-N 41 1
CE950096SR CE4 87 CV-00313A-REMOVE 4
24MAY04 25MAY04 DR-N ML-N 79 SCAFFOLDING FOR 22:00 01:59 ORT3-Y R-N 42 1 CE46COO1SR CE4 ICP-10.029 REMOVE 4
25MAY04 25MAY04 DR-Y ML-Y 0
p SCAFFOLDING FROM 06:00 09:59 ORT3-Y R-N 43 1
CE212694SR CE4 76 PIPING HB-REMOVE 20 25MAY04 26MAY04 DR-Y ML-Y 2
SCAFFOLDING FOR 08:00-03:59 ORT3-Y R-N 44 1
CE407589SR CE4 76 T-026 REMOVE 5
25MAY04 25MAY04 DR-Y ML-Y 84 SCAFFOLDING AT 15:00 19:59 ORT3-Y R-N 45 1
CE302178SR CE4 82 FD-02518A REMOVE 5
25MAY04 25MAY04 DR-Y ML-Y 129 SCAFFOLDING FOR 16:00' 20:59 ORT3-Y R-N 46 1
CESH82-SR CE4 PACKAGE 82 REMOVE 4
25MAY04 25MAY04 DR-Y ML-Y 60 SCAFFOLDING FOR 17:00-20:59 ORT3-Y R-N 47 1
CESH64-SR CE4 PACKAGE 64 REMOVE 4
25MAY04 25MAY04 DR-Y ML-Y 57 SCAFFOLDING FOR 20:00' 23:59 ORT3-Y R-N 48 1
CE-TS30-SI CE4 O-TS-030 MODIFY SCAFFOLDING 3
26MAY04 26MAY04 DR-Y ML-Y 0
FOR SI-V-09 TS-030 07:00 09:59 ORT3-Y R-N 49 1
CESH80-SR CE4 PACKAGE 80 REMOVE 4
26MAY04 26MAY04 DR-Y ML-Y 46 SCAFFOLDING FOR 07:00' 10:59 ORT3-Y R-N 50 1 CE216557SR CE4 82 FD-00282C REMOVE 5
26MAY04 26MAY04 DR-Y ML-Y 122 SCAFFOLDING FOR I 07:00 11:59 ORT3-Y R-N 04 CE4 04(
CE2 EM SCAFF - FAC PRO SECONDARY INSEI REM4VE SCAFF - FAC SECONDARY IN 3-6g RfEMOVE SCAFFOLDIN ELECTRICAL GENE 841igEMOVE SCAFFOLDIN 411[0CSGFP MINI RECIRC 841 EMOVE SCAFFOLDIN 141Z SG P MINI RECIRC F 3365sRREMqVE SCAFFOLDIN 3 - TURB HALL 26 FT OVERHD tVICE INSPECTIOU0303636 3ROG - TURB HALL 8 FT OVERHD ERVICE INSPEC4ION0303636 3 FOR MAIN GENERATOR MANWA RATOR0213968
- FOR P-28A MINI;RECIRC FLANGE ROM PUMP TO RiSTRICTING ORIF
- FOR P-28B MINI-RECIRC FLANGE ROM PUMP TO R0STRICTING ORIF
- FORIFD-2411 5QHX-21B HP FWH 5B SHELL SAF D AFTER VALVE *ORK 1FP-196A 5A PX-2570 ISOL4TION OLDING FOR CV-113A-S S
'Y 21Tt.i1ZA n
M~--WA
,E406159SR~kMC 040615dAH)
CE950096~RRE 995009M
'CE4 DVE SCAFFOL
(-21A HP FWH EMOVE SCAFF l1 P-1A/B R P #1 SEAL WATER RETURN ISOLA ION SOL I6C001S, E VE SCAFFOLDI1iG FROM SEAL BLE (ICP 10.2 SEAL TABLE OPgRATIONS FOR R FUELING CE212694 MOVE SCAFFOLDING FOR 1PIPIN HB-19 PAINTI 02126 SERV1I WATER TO I CE 07589S3 EMOVE:SCAFFOLDINO A BLOWDOWN 1 04075891
_iBIOWDOWN TANK C 302178S E5MOIE SCAFFOLDING OR 1FD-2518 030217 HX-22B MSR SHE I SIDE LEVEL CESH82-SRREMOVE SCAFFOLDIN FOR SHIELDII, CESH64-SRREMOVE SCAFFOL ING FOR SHIE CE-TS30-St DIFY SCAFFO0 EVENT 5 CHI CESH80-SRR OVE SCAFFC CE216557S OVE SCAFFC 021655 HX-22CM P11334S SI-REMOVE 0303887_SPRAY I 51 1 P1133-SR CE4 77 PIPE RC 25 NDE/I1SI - REMOVE SCAFFOLD - PZR 6
26MAY04 26MAY04 DR-Y ML-Y 07:00 1 12:59 1 ORT3-Y R-N 12 I
I Run Date 24MAY04 13:15 LT-03 STANDARD PUBLICATION l
Shoat 3 of 22 C Ptimavera Systems, Inc.
I FL-03 Execution Publication Set
§
atter 24MAYU4 72:UU I
U1R28 WORKING SCHEDULE aner ~mRA r(1q 72:UU
-1 a
aa
,I U
ID RESP CE44TOOISR I CE4 WO ST 77 EQID MSRDUO-CH z
DESCRIPTION REMOVE SCAFFOLDING FOR RD U
12 ES RISK MF MAY Mon24-Tu25 Wed26 E,1dj1Z4.ja12O,20 0.2.4.6.*8.,10112.14.1161R2fl.99 nl.2.
- 4. R.*R.1flh12.1 R, 26MAY04 I 26MAY04 DR-Y ML-Y 07:00-18:59 I ORT3-Y R-N 252 I
- CE44T001SRRE OVESCAFFC
" I Y1 53 I t CE9929774 CE5 INSTALL/MOD PLATFORMS 19 10MAY04 I 26MAY04 l DR-Y ML-Y 10:00A 14:59 ORT3-Y R-N 16 -XdI2q-74INSTAI4LJI)O PLATFOR~IS 54 1
CE0407589B CE5 76 T-026 CLOSEOUT 8D TANK 1 5 17MAY04 1 24MAY04 1 DR-Y ML-Y FOLLOWING REPAIRS 13:00A 16:59 ORT3-Y R-N l
55 11 CE0408118 CE5 76 MISC REPAIR FLOOR BEAM SOUTH OF IT-026 i
r I11 21MAY041 25MAY04 I DR-Y ML-Y 07:00A 14:59 l ORT3-Y R-N CE0212184 CE0210986 CES CE6 76 77 T-119A SE SEC T-119A-REMOVE TM 02-037 SEC SUPPORT MR 99-011'B 8
25MAY04 26MAY04 DR-Y ML-Y 10:00' 09:59 l ORT3-N R-N 139 05APR04 I 16JUN04 I DR-Y ML-Y 07:OOA 1 14:59 1 ORT3-Y R-N 4
CE0210989 CE6 76 SEC SEC. INSTALL NEW EQUIP MR 99-011-E 139 05APR04 I 16JUN04I DR-Y MLtY 08:OOA 14:59 ORT3-Y R-N 4
I 4-4 CE0210990 CE6 t
CE1600R035 I CE8 76 E
76 77 SEC R-1 CHEM-SAMIPI SEC REM ABANDONED EQUIP MR 99-01 VF RX HEAD REPAIR CLOSEOUT ACTIVITY RCS CL TSR 3.4.5.2 155 76 03MAY04 18JUN04 DR-Y ML-Y 08:OOA I 14:59 I ORT3-Y R-N P
SY" 40 07589 LOSEOUT BD TANK F LLOWNG REPAIRS BLOWDOWN TANK040 73 0
18REPAIR FLOOR BEAM S UTH OF IT-026
_ _ ^
MISC SYSTEM MULTI AND. OR NON-NUMI 0
CE0212t T-119A - REMOVt TM 02-037 02121 ICLEARWELL 16 S86 EC SPPORT MR 99-01 B 16 109895EC, IISTALL NEW EQUP MR 99O11E 0 ED 101gSEC RdM ABANDONED QUIP MR 99-0114 39HEAD REPAIR CLOtOUT ACTIVITY 223 CS CL. TSR 3.4.5.2 223 jO 0037CS Do TSR 3.4.5.1 3CS BORON SR 3.9.1.1 123 1
OOBAST BORON TSR 3.5.1_
123 -0 OgSGBDFO GAMMA SCANT 123 SO RE-229'ISOTOPIC 22MAY04 1 27MAY04 1 DR-Y ML-Y 07:OOA 15:59 l ORT3-Y R-M 1
CH0300363 CH 55 1 23MAY04 129MAY041 DR-Y ML-Y 05:OOA 11:59 ORT3-Y R-N 4-1-4 4.
62 1
CH0300376 CH 77 CHEM-SAMPI RCS DO TSR 3.4.5.1 55 23MAY04 129MAY04 DR-Y Mt-Y 05:OOA J 11:59 ORT3-Y R-N 1
CH0300406 CH 77 CHEM-SAMPIRCS BORON SR 3.9.1.11 55l23MAY04l29MAY04l DR-Y ML-Y I 06:OOA 11:59 ORT3-Y R-N CH0300200 CH-77 CHEM-SAMPI3 BAST BORON TSR 3.5.1.2 321 24MAY04 1 28MAY041 DR-Y MLtY 07:OOA 11:59 ORT3-Y R-N I
I 65 I
CH0300390 CH 77 CH-EM-SAMPI SGBDFO GAMMA SCANI 32 24MAY04 07:OOA 28MAY04 11:59 DR-Y ML-Y ORT3-Y R-N 4~~~~
4 4
1 CH0300445 CH 77 CHEM-SAMP1 RE-229 ISOTOPIC 32124MAY04128MAY041 DR-Y ML-Y 07:OOA 11:59 ORT3-Y R-N CH0300486 CH 77 CHEM-SAMPI RCS BORON SR 3.9.1.1 32 24MAY04 28MAY04 DR-Y ML-Y 07:OOA 1
11:59 I ORT3-Y R-N 123
=&eRCS 136RON SR39 R
r-_
SURF J
A.I 4
.L Run Date 24MAY04 13:151 LT.03 STANDARD PUBLICATION FL-03 Execution Publication Set Sheet 4 of 22 C Primavera Svstems. Inc.
afer Z4MA YU4 7 Z:UU 1
U1R28 WORKING SCHEDULE I
awer =em4 ruq -izuu ID RESP WO ST MAAv EQID DESCRIPTION RCS CL TSR 3.4.5.2 RD ES EF RISK MF U
123 Mon 24
.Tue'9 25.I
~
d2
?,1012.14.16,18,20,2210. 2.4.6. 8.10112,14.j,161820,2210..2. 4.6. 8 10X1j214.1ft H0nsRCS CL TSR 3A.4..2 1l1I 681 2 CH0300503 CH 77 rHEM-SAMPL 32 24MAY04 28MAY04l DRV YML-Y 07:00A 11:59 ORT3-Y R-N r
W l
69 2
CH0300516 I CH 77 CHEM-SAMPL RCS DO TSR 3.4.5.1 32 24MAY04 28MAY04 DR-Y ML-Y 07:00A 11:59 ORT3-Y R-N 123 _
Q5L16RCS D; TSR 3.4.5.1 I
I
'Ii" 70 2
CH0300529 CH 77 CHEM-SAMPl SGBDFO GAMMA SCAN 32 24MAY04 28MAY04 DR-Y ML-Y 123 07:00A 11:59 ORT3-Y R-N 71 2
CH0300555 CH 77 HEM-SAMPl RE-229 ISOTOPIC 32 24MAY04 28MAY04 DR-Y ML-Y 123 07:OOA 11:59 ORT3-Y R-N 72 1
CH0300354 CH 77
,HEM-SAMPl RCSH-3TSR3.4.1.1 1
25MAY04 25MAY04 DR-N ML-Y 151 07:00 07:59 ORT3-N R-N 73 1
CH0300454 CH 77 HEM-SAMP RCS DOSE 6
25MAY04 25MAY04 DR-N ML-Y 146 EQUIVALENT 1-131 07:00-12:59 ORT3-N R-N 74 1
CAMP-606 CH 77 CH CAMP-60 PERFORM CAMP-606.
3 25MAY04 25MAY04 DR-N ML-N 88 10:00 12:59 ORT3-N R-N 75 2
CH0300569 CH 77 HEM-SAMP RCS GROSS ACTIVITY 6
26MAY04 26MAY04 DR-N ML-Y 138 SR 3.04.16.01 07:00 12:59 ORT3-N R-N Xl 1 CAMP-1 13BD CH CAMP-113 CAMP-113SAMPLEB 3
26MAY04 26MAY04 DR-N MLY-0
- 0)
STEAM GENERATOR 13:00 15:59 ORT3-N R-N 77 1
OPIA-037 CH 76 MEM-SAMPJ SAMPLE 2
26MAY04 26MAY04 DR-N ML-Y 119 ACCUMULATORS 17:00 18:59 ORT3-N R-N
~~.
3 1
- 11 51jtt^
51:Kbs 78 2
EE0302354 EEP 77 TB-2' VIBRATION ROUTE 40 25MAY04 131MAY04 DR-Y MLY-112 DATA 07:00-14:59 ORT3-Y R-N 79 0
EE0302321 EEP 77 G-03 THERMAL VECTOR 4
25MAY04 25MAY04 DR-Y ML-N 579 DATA COLLECTION 08:00 l
11:59 ORT3-Y R-N 80 1
EE-W1A1-VB EEP 82 W-00iA1 W-001AI - PERFORM 2
25MAY04 25MAY04 DR-Y MLY-55 VIBRATION ANALYSIS 17:00 18:59 ORT3-Y R-N 81 1
EE-W1B1-VB EEP 82 W-OOIBI W-001B1 - PERFORM 2
25MAY04 25MAY04 DR-Y ML-Y 55 VIBRATION ANALYSIS 17:00 18:59 ORT3-Y R-N 82 1
EE-WIC1-VB EEP 82 W-001C1 W-001C1-PERFORM 2
26MAY04 26MAY04 DR-Y ML-Y 28 VIBRATION ANALYSIS 02:00 03:59 ORT3-Y R-N rH0QQ 29SGBDPO GAMMA SCAN l I
I H 5 5 RE 2291 ISOTOPIC
=m1 IIII II I
CH0300354RC 03003 54It CH0300454R~C 0300454w CAM P4 03004' S H-3 TSR 3.4.1.1I ISC CHEMISTRY :AMPLING S DOSE EQUIVALENT 1-131 3MISC CHEMISTRY SAMPLING 16PERFORM CAMI4.606.
'lCONT ATMc)S POST ACCIDE CH0300569R I l 030056 CAMP-I1 SAMPLE SY!
GROSS ACTI IMISC C 3BDCAMP-11 QNM OP1A-0375A 0300397A EE0302354V11 0302354 EE0302321 1 03023211 RATION ROUTE QATA fIi
HERMAL VECTOR DATA COLLECTI FREMERGENCY, DIESEL GENERA E.W1A1.VNW-001A1 - PERFORM Vl 021416iUCdNTAINMENT ACCI LE-W1 B1.VdW-0011 - PERFORM VIE 0214171RCqNTAINMENT ACCI EE.W1Ci.VBW-OlCi l
021417!^CONTA EE-V11D1.VdN-001D`-
?21417dNCONT.A pN rOR RATION ANAL DENT RECIRC RATION ANAL DENT RECIRC PERFORM VIBI INMENT ACCIE PERFORM VIBI NMENTACCIE 1 I EE-W1DI-VB I EEP 82 76 W-001DI D-106 W-001D1 -PERFORM VIBRATION ANALYSIS D-106 PERFORM FLOAT CHARGE 2
I 26MAY04 l 26MAY04 DR-Y ML-Y 02:00 1 03:59 1 ORT3-Y R-N 28 6
602 84 l 0 IEM4058973Z IEM 19MAY04 124MAY041 DR-Y ML-Y 00:OOA l 12:59 l ORT3-N R-N 5J,8973Z-106 PERFORM FLOA# CHARGE 1125V DC ST~TION BATTERYOpI05897 Run Date 24MAY04 13:15 LT-03 STANDARD PUBLICATION l
Sheet 5of22 t9 Pnmavera Systems. Inc.
I FL-03 Execution Publication Set I
after 24MA Y04 12:00 I
U1R28 WORKING SCHEDULE I
aTrer zqmA YU4 7 Z. UU ID RESPl WO EOID DESCRIPTION RD ES I
EF RISK IMFI MAY ST I Mon 24
_ 25 W
2_
I uI I
o II II I
13.n~gi in~R2,210..46.810iZ4,1la O,210 2
4 B.8.
Ol__
_16 44=194tq.
J,
_-__I_,,_F._
85 l 0 l EM405897Z8 EM 76 D-106 OBTAIN AND CHARGE 5 ADDmONAL CELLS I
21MAY04 24MAY04 DR-Y ML-Y 03:OOA 12:59 ORT3-N R-N 18 86 1
EM0305144 EM 76 P-030A-M DRAW OIL SAMPLE 1
23MAY04 24MAY04 DR-Y ML-Y 0
FROM CIRCULATING 05:00A 20:59 ORT3-N R-N 87 1
EZMRCP-J1 EM 76 P-001B-M P-401B - INSTALL 1 24MAY04 24MAY04 DR-Y ML-Y 0
GRATING AROUND B 05:OOA 12:59 ORT3-N R-N 88 1
EM0215227A EM 76 W-003A CONTINUE W-3A I
24MAY04 24MAY04 DR-N ML-Y 0
NSPECT (DISCONNECT 09:00A 12:59 ORT3-N R-N 89 1
EM0215228A EM 76 W-003B CONTINUE W-3B 1 24MAY04 24MAY04 DR-N ML-Y 0
INSPECT (DISCONNECT 09:00A 12:59 ORT3-N R-N 90 1
EM0216165B EM 77 HX-001A REMOVE ECT POWER 2
24MAY04 24MAY04 DR-Y ML-Y 113 INSIDE CONTAINMENT 12:00' 13:59 ORT3-N R-N 91 1
EM0216170A EM 76 FIRE-BARRI PERFORM RMP 58 FIRE 8 24MAY04 24MAY04 DR-Y ML-Y 88 BARRIER 12:00-19:59 ORT3-N R-N 92 1
EZMRCP-BI EM 76 P-401B-M REPLACE '8' RCP 4
24MAY04 24MAY04 DR-Y ML-Y 0
FLOOR PANEL SECOND 13:00 16:59 ORT3-N R-N 3
1 EZMRCP-C2 EM 76 P-01B-M P-OO1B-M - RETERM B 10 24MAY04 25MAY04 DR-Y ML-Y 0
RCP MOTOR 17:00 02:59 ORT3-N R-N 94 1
EM0305146 EM 76 P-030B-M DRAW OIL SAMPLE 2
24MAY04 24MAY04 DR-Y ML-Y 592 FROM CIRCULATING 21:00-22:59.
ORT3-Y R-N 95 0
EM0301792A EM 76 A52-DHVR-3 (A52-01) BKR MAINT.
4 24MAY04 25MAY04 DR-N ML-N 36 PORTION AT CUBICLE 23:00' 02:59 ORT3-N R-N 96 1 EM0215241A EM 76 411E02 (CONT) RMP 9308. DS-II 10 24MAY04 25MAY04 DR-Y ML-Y 582 BREAKER 23:00 08:59 ORT3-N R-N 97 1
EZMRCP-M EM 76 P-oo1B-M P-401B-M -
2 25MAY04 25MAY04 DR-Y ML-Y 6
RECONNECT LOWER 03:00 04:59 ORT3-N R-N 98 1
EM0215204 EM 76 P-OOIB-M P-OOtB1M-MCE 3
25MAY04 25MAY04 DR-Y ML-Y 0
ANALYZE MOTOR 04:00 06:59 ORT3-N R-N 99 1
EM0215207 EM 76 P-401B-M P-001B - ADJUST 2
25MAY04 25MAY04 DR-N ML-Y 56 BALANCE WEIGHTS (IF 06:00 07:59 ORT3-N R-N 100 1
EM0305166 EM 76 D-205 MONTHLY NON-SAFETY 4
25MAY04 25MAY04 DR-Y ML-Y 0
125V DC STATION 07:00-10:59 ORT3-N R-N 101 1
EM0215123 EM 76 A52-14 ASSIST APR DURING 6
25MAY04 25MAY04 DR-N ML-N 0
P-1B RELAY 09:00 14:59 ORT3-N R-N
- MA
-i Um I
.Mc
!5897Z8OBTAiN AND CHARGE $ ADDITIONAL CELLS I125V DC STATION BATTERY0 405897 05 i44DRAWOIL SAMPLE FROM CIRCULATiNG' CIRCULATING W TER PUMP MOTOP 0305144 ICP.J1P-0o1 B - INSTALL GRA NG AROUND B RCP MOTOR REACTOR dOOLANT PUMP M:DTOR0215205 IINUE W-3A ISPECT (DISCON ECT PORTION)
ICONTAINMINT CONTROL RP DRIVE SHROUDI FAN flNUE W-3B INSPECT (DISCOF qECT PORTION) 1CONTAINMdNT CONTROL RC D DRIVE SHROUD, FAN 165BREMQVE ECT POWER SIDE CONTAINMENT USTEAM GENERATOR021616 ftktZsERFORM RMP 58 FIR BARRIER SURVEILLANCE FIRE BARRIERS IN ONTAINMENT02i 6170 9-qREPLACE 'B' RCP FLO R PANEL SECOND TIME
@zgREACTOR COOLANT P MP MOTOR0215205 CP.C2P 001 b-M - RETERM B CP MOTOR 21520R EACTC1ffflP (1COOLANJT PUt MOI I~TOR
-2P EM030514(PAW OIL SAMP 030514ORCIRCULATING EM0301742A(po1) BKR I 0301T924.18 KV/
EMO2152491CONT) RMP 9 0215241 EiMRCP.MP-001B4
, 0215205REAC EM0215204P- 0 0 I9 0215204=RE EM0215207P- 0 0215207M1 EM0305166M(
0305166w EM021512 021512:
EM0215241 021524f X %.w'.ur.II '
uniFMr, MV I Ur E FROM CIRCULATING VATER PUMP MOTOR AINT. PORTION AT CUBICLE (3000.
000 AMP VACUU1I BREAKER 08, DS41 BREAKER MAINTENANCE ITG-01 TG EXCITiR FIELD CIRCUIT
- RECONNECT LpWER CC PIPING OR COOLANT P4MP MOTOR M - MCE ANALYZE MOTOR (1A52-1, kCTOR COOLANli PUMP MOTOR B - ADJUST BAL4,NCE WEIGHTS (I EACTOR COOLANT PUMP MOTOR NTHLY NON-SAFkTY 125V DC STA
!1125V DC STATIDN BATTERY SSIST APR DURING P-1 B RELAY Ft O^PWR TO11P-lB REACTOR
.AL AND TEST 6*AOI RELAY PER
@""1A-01 BUS TIME DELAY RE 01)
BREAKER IIA-02)
REQUIRED)
ION
!NCTIONAL TE!
- OOLANT PUM RMP 9302-1.
LAY I
EM0215246 EM 76 62/A01 CAL AND TEST62VA01 RELAY PER 1RMP 6
25MAY04 25MAY04 DR-N ML-N 09:00-14:59 ORT3-N R-N 0
I Run Date 24MAY04 13:15l LT-03 STANDARD PUBLICATION Sheet6of22 0 Pnmavera Systems, Inc.
I FL-03 Execution Publication Set S
aner X4MA YU4 7 Z:UU I
U1R28 WORKING SCHEDULE I
affer Z4MA YU4 7 Z. UU U
ID RESPl WO EQID DESCRIPTION RD ES EF RISK MF MAY T
Mon 2 Tue 25 Wed 26 ST
__,1011Z14Aa,20,22 0, 2.4.6.8,1011Z14.161 I
I Ii I
1031. 0 l EM0305264 EM 76 D-06 QUARTERLY STATION BATTERY INSPECTION 4
25MAY04 25MAY04 I DR-N ML-Y 11:00 14:59 ORT3-N R-N 576 104 0 EM0305176 EM 77 35-E MONTHLY FUNCTIONAL 5 25MAY04 25MAY04 DR-N ML-Y 575 CHECKtlNSPECTION 11:00-15:59 ORT3-N R-N 105 0 EM0305207 EM 76 125V STATION TECH SPEC 6
25MAY04 25MAY04 DR-N ML-Y 0
BATTERIES WEEKLY 11:00-16:59 ORT3-N R-N 106 1 EZMRCP-V EM 76 P-00IB-M P-01B-M - INSTALL 10 25MAY04 25MAY04 DR-N ML-Y 12 SHAFT & FRAME 11:00 20:59 ORT3-N R-N 107 1 EM-8480R EM R-1 JAT FOR CONOSEAL 5
25MAY04 25MAY04 DR-N ML-Y 0
INSTALLATION (DAYS) 12:00 16:59 ORT3-N R-N 108 1
EM0215247 EM 71 62VA02 CAL AND TEST 62VA02 7
25MAY04 25MAY04 DR-N ML-N 0
RELAY IRMP 9302-2 15:00 21:59 ORT3-N R-N 109 1
EZMRCP-F1 EM 76 P-001B-M P-001B-M -
5 25MAY04 25MAY04 DR-N ML-Y 0
RECONNECT OIL 18:00 22:59 ORT3-N R-N 110 1
EM-84800 EM R-I JIT FOR CONOSEAL 5
25MAY04 26MAY04 DR-Y ML-Y 0
INSTALLATION 23:00 03:59 ORT3-N R-N L1 I
EZMRCP-2C EM 76 P-001B-M P-001B - FINAL PMT 10 25MAY04 26MAY04 DR-N ML-Y 0
CD PER 9002-12 23:00 08:59 ORT3-N R-N 112 1 EM-8480P EM 76 R-1 INSTALL CONOSEALS 4
26MAY04 26MAY04 DR-N ML-N 0
04:00 07:59 ORT3-N R-N 113 0 EM0309075 EM 76 D-105 STATION BATTERY 3
26MAY04 26MAY04 DR-N ML-Y 0
INSP PER RMP 9046-1 07:00-09:59 ORT3-N R-N 114 0
EM405897Z3 EM 76 D-106 D-106 PERFORM 48 26MAY04 28MAY04 DR-Y ML-Y 0
FLOAT CHARGE 07:00 06:59 ORT3-N R-N 115 0 EM0309139 EM 76 D-106 STATION BATTERY 3
26MAY04 26MAY04 DR-N ML-Y 554 INSP PER RMP 9046-1 10:00 12:59 ORT3-N R-N 116 0
EM0407638E EM 76 Z-014 PERFORM REPAIRS TB 10 26MAY04 27MAY04 DR-Y ML-Y 238 CRANE (SMALL HOOK) 12:00-10:59 ORT3-N R-N 117 1
EM0215225A EM 76 W-004A-M PERFORM SECOND 4
26MAY04 26MAY04 DR-N ML-N 31 MCE W-004A-M 13:00 16:59 ORT3-N R-M EM0305 0305 EM0305 0305 EM0305 0305 EZMRC 0215 EM-8 El IASQUARTERLY STATION BATTERY
!64WI125V DCSTATION BATTER
- 76MONTHLY FUNITiONAL CHECK/
17 NORT" SERVICE BLDG E 0o7STATION TECH SPEC BATTERIE!
125V bYSTEM MULTI At
%VP-01B-M - INST*LL SHAFT & FRAI
'0 REACTOR COOL p80RJIT FOR CONOSEAL INSTALLAt l
REACTOR VESSEL ANt 40215247CAL AND TEST 62/A02 REL 021524 7l1A-02 BUS TIMEl EZMRCP.F1P-OOIB-M - RECONNEC 0215205 REACTOR CO(
EM-8480CJIT FOR CONO' l
REACT EZMRCP42CP-1B-FINAL 02152
'EM-8480pINSTAL 0214134_
EM030907 T t
l 0309074 EM405897Z3JD-0405897t EM03091 0309 1 EM0407 040 EM02I I '
EM021 I
0; INSPECTION NSPECTION MERGENCY LI o'WEEKLY pD/OR NON-NU IE VIBRATION NT PUMP MOl rION (DAYS)
ASSEMBLY LY 1RMP 9302-:
DELAY RELAY lTOIL COLLEC' LANT PUMP M EAL INSTALL)
)R VESSEL At, PMT PER 9002 REACTOR CO(
- CONOSEALS EACTOR VESS kTION BATTER 1125V DC STA 06 PERFORM 9STATION BAI l 125V DC 538=ERFORM T63 __!
5225AE!RFR 15225MCC 52268EER IIIIIII I
1181 1 EM0215226A EM 76 W-004B-M PERFORM SECOND MCE W-004B-M 4
26MAY04 I 26MAY04 DR-N ML-N 13:00 1 16:59 ORT3-N R-M 31 M
N M A T
CE-119 1
EM0215189 EMV 76 SI-00878C-SI-878C-O MOV 15 25MAY04 26MAY04 DR-N ML-N 0
ACTUATOR 19:00l 09:59 ORT3-N R N
-l02151 P-15BSIPUP 120 0
EM0405880C EMV 78 W-013B1 W-013B1 REMOVE 4
25MAY04 26MAY04 DR-N ML-N 0
EM0405840CW-013B1 REM VEJUMPER Pi JUMPER PER IWP 23:00-02:59 ORT3-N R-N 040588d CONTR LROOM RECI RunDate 24MAY0413:15 LT-03 STANDARD PUBLICATION lShoot_70of22 O Prlmavera Systems, Inc.
I FL-03 Execution Publication Set S
after 24MAY04 12:00 I
U1R28 WORKING SCHEDULE after 24MAYU4 12:00 I u RESP WO EQID DESCRIPTION RD ES EF RISK MF M
MAY IS.T Mon 24 Tile 25 Wed 26.
I*
jo STl6j202
_ 12 i4 6.,101 14rl20,22 710 2, 4. 6. 8.10il 214jai, 121 1
B52426CE EMV 76 B-42 BUS STAB PMT 1 26MAY04 26MAY04 DR-N ML-N 0
_1CC-719 02:00 02:59 ORT3-N R-N 0202527M480V MC TOR CONTROI 122 1
B52-428ME EMV 76 B-42 BUS STAB PMT 1
26MAY04 26MAY04 DR-N ML.N 562 852.428MEBUS SI B PMT "W-13
_W-l3B2 04:00 04:59 ORT3-N R-N 020252711480V OTOR CO 123 0 EM0405896B EMV 76 W-0211B W-0211B REMOVE 4
26MAY04 26MAY04 DR-N ML-N 0
.M0405896E JUMPER IWP 17:00 20:59 ORT3-N R-N 040589 124 1 EP0301904 EPI 76 SI VT-2 ASME XI 4
25MAY04 25MAY04 DR-Y ML-Y 92 _
EPO319043 1 2 ASME Xi PERIOPIC PRESS TEST CONT SPRA PERIODIC PRESS TEST 07:00 10:59 ORT3-Y R-N 03019 SI SYSTEM MULTI AND/OR NON-UMBERED E 125 1 EP0301910A EPI 77 Ul-CONTAIN INSPECTCTMTAND 1 26MAY04 126MAY04 DR-YML-Y a
EP0301910PLN PECTCTMTA FEEDWATER 07:00 07:59 ORT3-Y R-N 030191_CL NIT I CONTAI`
126 1 EP04000420 EPT 76 HX-001A DISCONNECT &
4 23MAY04 24MAY04 DR-N ML-Y 49 rpISC6NNECT & REMO E NOZL E DAM ANNUCIATOR PAN L I
REM°VE NOZZLE DAM I23:00A.I 15:59 ORT3-N R-N
-:TAM:GENERATOR040(042 127 1
EP0408490 EPTI 76 HX-001A HX-001A - HOT LEG 4
24MAY04 24MAY04 DR-N ML-Y 0
X-0015 - HOT LEG FME NVESTIGATION FME INVESTIGATION 08:OOA 15:59 ORT3-N R-M STEAMGENERATORO401490 tI I
EP0400043Q EPT 76 HX-001B DISCONNECT &
4 24MAY04 24MAY04 DR-N ML-Y 49 P
CPISC6NNECT & REMO E NOZZLE DAM ANNUCIATOR PAN L REMOVE NOZZLE DAM 12:00 15:59 ORT3-N R-N STEAMGENERATORO4O 043
-t 1 I Wl 1291 0 I FG0300155 I FGI 77 MISC REMOVE VEGETATION 35 25MAY04 28MAY04 DR-Y ML-Y FG030015 T
ON IN ISOLATIO ZONES IN ISOLATION ZONES 08:00 l 12:59 ORT3-Y R-N 0
130 0 FG0400314 FG2 77 EL-LTG I
EIC/TRN BLDG 11 24MAY04 25MAY04 DR-Y ML-Y 14 4 EICITRN BLDG EMERGE CY GHTIN INSP IEMERGENCY LIGHTINGl l 07:OOA l 14:59 ORT3YR-N LuEMERGCY LIGHTING 040314_
131 0
FG0300156 FG3 76 SAFE SD DOI INSPECT AND 16 125MAY04 26MAY04 DR-Y ML-Y 0
FG03001 5NSPECT AND MAINTAIN SAFE SHUTl MAINTAIN SAFE 18:00-22:59 ORT3-Y R-N 030015E 132 0 FG0300157 FG3 77 INDUSTRIALI -
INSPECTAND 16 26MAY04 27MAY04 DR-Y ML-Y 128 I
FG0300157N PECT AND MA MAINTAIN INDUSTRIAL 0700 I 1459 ORT3-Y R-N 133 0 HP0301854 HP I 77 HP RMS.
QUARTERLY 40 25MAY04 29MAY04 DR-Y ML-N 189 TEHP0301 U
RLY FUNCTIONAL TEST OF RM I
FUNCTIONAL TEST OFl 06:00-12:59 lORT3-Y R-N l l,
030 1
5 I_
134 1 IHP0301878 IHP I77 IRE-00126 IRE-126/1RE-127/1RE-121 6 I26MAY04 I26MAY04 IDR-Y ML-N I0 IIHP0 3 0 8781jRjEj?26/1 RE1 127/1~
CALIBRATION 06:00-11:59 ORT3-Y R-N l030187 UNIT1 C 135 0 RE-234-BIO HP HP RMS RE-234/235 AIR I
26MAY04 26MAY04 DR-Y ML-N 142 RE-234-81 2341235 AIR SAMPLE CHANGE OUT 08:00 I 08:59 ORT3-Y R-N Run Date 24MAY04 t3:16l LT-03 STANDARD PUBLICATiON l
Sheet 8 of22 Q Primavera Systems. Inc.
l FL-03 Execution Publication Set S
arrer I4MRYU4 72:UU I
U1R28 WORKING SCHEDULE aner z4MA rU4 7 :UU F,
U ID RESPI WO EQID DESCRIPTION RD ES EF RISK MF MAY I
n 24 Tue 25 Wed526 ST l
r_100 214.1 6,1a20,22i 0, 2.4.6 8.81011 ZI 4.1 61 20.22l 0.2. 4, 6, 8 A 2,11214,1 fil E z le;X.X1-
_ - i 136 I 0 H
1P0301869 l HP 77 RE-00230 RE-230 CALIBRATION 12 26MAY04 28MAY04 DR-Y ML-N 0 _
HP03 868CRE-230 C 12:00-12:59 ORT3-Y R-N
_8 137 1 ENGHEADI HRP R-1 OBTAIN CET I
26MAY04 26MAY04 DR-N ML-N 0 _
gNGHEAD1OBTAII CETDIMENSI DIMENSIONAL INFO AT 04:00 04:59 ORT3-N R-N 138 1 ENGHEAD2 HRP R-1 OBTAIN INFO FOR 3 26MAY04 26MAY04 DR-N ML-N 1
ENGHEAD20BTA N INFO FOR C CABLE REPLACEMENT 05:00 07:59 ORT3-N R-N 1Z~ -
- tXIIu~^ - - -
U _
139 0 IC0300674A IC 76 ICP-06.006 SERVICE WATER 8 24MAY04 24MAY04 DR-Y ML-Y 595 _
Q674 ERVCE WATER SYSTI M INSTRUMENTATION SYSTEM 08:00A 1959 ORT3-Y R-N SERVICEWATERS STEM0300674 140 1 IC0408447 IC 28 RC-00001B I1RC-00001B REPLACE 5 24MAY04 24MAY04 DR-Y ML-Y 99 1 04084471RC100001B REPLAC RELAY COIL RELAY COIL 18:00I 22:59 ORT3-Y R-N 0408447*WTRAIN B LOOP A RC FLOW TRIP MATRIX RELAY 141 1 IC0408448 IC 28 RC-00004A IRC-00004A REPLACE 5 24MAY04 24MAY04 DR-Y ML-Y 99 1 040$4481RC00004A REPLAC RELAY COIL RELAY COIL 18:001 22:59 ORT3-Y R-N 040844 IN A LOOP B RC LOW FLOW MATRIX RELAY 142 1 IC0300731A IC 76 ICP-13.004 SPEC 200 TECH SPEC-28 24MAY04 26MAY04 DR-N ML-N 564 IC0300741 PEC 200 TEC SPEC. TRAIN Al TRAIN A 23:00 02:59 ORT3-N R-N 030 SPEC 2 INTERNALS CA2 1 ICIO.29D IC 76 ICP-10.029 INSERT 6 25MAY04 25MAY04 DR-N ML-N 0
IC1.29DINSERT THIM 3LESIINSTALLHF4SEALS THIMBLES/INSTALL HP 00:00 05:59 ORT3-Y R-N 030P89 SEA. TABLE OPERATIONS FOR REFUE ING I
144 1 IC0408450 IC 28 RT4B IRT-4B REPLACE 5 25MAY04 25MAY04 DR-Y ML-Y 87 I
IC0408450IRT B REPLACE RELAY COIL RELAY COIL 0600 1059 ORT3-YR-N.
040845C INBREACTOR TRIP RELAY 145 1 IC0408451 IC 28 RT-5A I RT-5A REPLACE 5
25MAY04 25MAY04 DR-Y ML-Y 87 IC0408451 RT AREPLACE RELAY COIL RELAY COIL 06:00I 10:59 ORT3-Y R-N 0408451 IN A REACTOR TRIP RELAY 146 1 IC10.29E IC 76 ICP-10.029 ICP 10.29 RESTORE 22 25MAY04 26MAY04 DR-Y ML-Y 0
I IC10.2 FCP 10.29 RESTORE SEAL TABLE SEAL TABLE 10:00 07:59 ORT3-Y R-N l030081
. EAL TABLE OF 147 1 IC-CV-F&V3 IC SOP-CV-003 FILL & VENT FIl 16 PER 2 25MAY04 25MAY04 DR-Y ML-Y 26 IC-CV-F&V3FILL & VENT Fr,-116 PER SOP-CV 003 SOP-CV-003 11:00 12:59 ORT3-N R-N I
CVCS LETDOWNWPURIFICATI N FILL & VEN 148 1 IC5.14F&V IC 76 1ICP-05.01 FI-610 614 B RCP CC 3 26MAY04 26MAY04 DR-Y ML-Y 35 IC5.14F&VFI410 61 B RCP CC I
02:00 04:59 ORT3-Y R-N I300977WDIFF RENTIAL PRE!
149 1 IC0408449 IC 28 RT-3A I1RT-3A REPLACE 5 26MAY04 26MAY04 DR-Y ML-Y 63 1 I
IC04084491RT A REPLACE F I
RELAY COIL 06:00I 10:59 ORT3-Y R-N 040844 9RIN A RE 150 1 IC0408452 IC 10 RT-8B I
1RT-8B REPLACE 8 26MAY04 26MAY04 DR-Y ML-Y 60 I
ICW4845 IRT B REPLACEF RELAY COIL I
06:00I 13:59 ORT3-Y R-N 04084 5IN 151 1 IC10.29F IC 76 ICP-10.029 REMOVE SEAL TBL 3 26MAY04 26MAY04 DR-Y ML-Y 51 IC1029 MOVESEAL CART 08:00 10:59 ORT3-Y R-N 030089 SEALTABL 152 1 IC10.42B IC 76 ICP-10.042 I&C CAVITY 3 26MAY04 26MAY04 DRY ML-Y 0
I4' IOA2B CCAVtYRES RESTORATION 08:00 10:59 ORT3-Y R-M 03008 REFUELINC Run Date 24MAY04 13:161 LT-03 STANDARD PUBLICATION l
Sheet 9 of 22 I Primavera Systems, Inc.
I FL-03 Execution Publication Set
after Z4MA YU4 7 Z:UU I
U1R28 WORKING SCHEDULE I
afler Z4MA YU4 7Z:UU
- l U
ID RESP WO EQID DESCRIPTION RD ES EF RISK MF MAY ST 1.21,6R0,20246
=O220,..68.0124.6 Z~,,i*:^m-E ii 153 1 IC1O.29G IC 76 ICP-10.029 ICP 10.29 SEAL TABLE 2
26MAY04 26MAY04 OR-Y ML-Y 52 IC10.29G CP 10.29 SEA!
PRESSURE SW CHECK 09:00 10:59 ORT3-Y R-N 030089tMSEAL TABL 154 1
IC0408453 IC 28 RT-1OA IRT-OA REPLACE 5
26MAY04 26MAY04 DR-Y ML-Y 57 IC04t84531RT10A F RELAY COIL 12:00-16:59 ORT3-Y R-N
_04C 453lylTF 155 1
IC0407616A IC 76 VBE-00448 1VBE-448 3
26MAY04 26MAY04 DR-Y ML-Y 0
IC04 7616 IBE144 MOUNTSENSOR AND 13:00-15:59 ORT3-Y R-N 0 0761tjR-1 156 1
IC0305574 IC 75 FIC-00110 FIC-A10 BORIC ACID 3
26MAY04 26MAY04 DR-Y ML-N 290 IC0305574FI(
DEVIATION ALARM 17:00 19:59 ORT3-Y R-N 0305574 zI
- zl~ luI I -
E 157 0 IC0300626 ICI 76 Z-031 ICP 6.8-2 CALIBRATE 5
23MAY04 24MAY04 DR-Y ML-Y 0 co 2
CP 6.8-4 CAUBRATE DR ER INSTRUMENT0TON DRYER 08:00A 16:59 ORT3-N R-N INSTqUMENT AIR DRYE R0300626 158 0 IC0300691 ICI 77 SEC METAL DETECTOR 4
25MAY04 25MAY04 DR-Y ML-Y 268 IC0300691ME ALDETECTOR OAUBLRATION TES CALIBRATION TEST 07:00-10:59 ORT3-Y R-N 0300691 SECSYSTEMMULTI ANDIOR NO -NUMBERED 159 1
IC573A-1A ICI 76 ICP-05.073 ICP-5.73T-34A 2
26MAY04 26MAY04 DR-Y ML-Y 11 l
IC573A.1 CP-.73 T34A ACC ACCUMULATOR LEVEL 06:00 07:59 ORT3-Y R-N 030087ECCUMULATO-160 1
IC0400553D ICI 76 SERVICE SERVICE MAINT 4
26MAY04 26MAY04 DR-Y ML-Y 0
IC0400553DSE VICE MAINT SUPPORT EQ VERIF -
07:00 10:59 ORT3-Y R-N 040055 MISC EQUI 161 1
IC4.22SMPA ICI 76 ICP-04.022 ICP 4.22 CONTAINMENT 6
26MAY04 26MAY04 DR-N ML-Y 0
IC422SMp C 4.22CONTAIN SUMP LEVEL KEYWAY 07:00-12:59 ORT3-N R-N 030083 CONTAII a
162 1
IC0400553F ICI 76 SERVICE SERVICE MAINT 6
26MAY04 26MAY04 DR-Y ML-Y 19 IC04005 3 SERVICE M SUPPORT EQ VERIF -
11:00 16:59 ORT3-Y R-N 0400 5 1M l 163 1
IC4.22SMPB ICI 76 ICP-04.022 ICP 4.22 CONTAINMENT 10 26MAY04 27MAY04 DR-N ML-Y 16 IC4.2 SMpBCP 4.22 SUMP NON-KEYWAY 13:00 11:59 ORT3-N R-N 0_ 00836 f
zI I
^ll~ul v
~"
l~es I>;h U
164 1 MM0214053D MMI 76 HX-001B HX-001B - CLOSE COLD I 24MAY04 24MAY04 DR-N ML-Y 0
14053DHX0p1B - CLOSE COLD LEG PRIMARY P4ANWAY LEG PRIMARY 11:00A 12:59 ORT3-Y R-N STEAM GENERATOR0214053 165 1 MM0214053E MM1 76 HX-401B HX-OOiB-CLOSEHOT 4
24MAY04 24MAY04 DR-N ML-Y 0 M j4 1 HX 01B9-CLOSEHOT.EGPRIMARY MANWAY LEG PRIMARY 13:00 16:59 ORT3-Y R-N
_STEA$
GENERATOR02 4053 166 1 MM0214051D MMI 76 HX-OO4A HX-001A - CLOSE COLD 3 24MAY04 24MAY04 DR-N ML-Y 0
M 14051-O091A - CLOSE COL LEG PRIMARY MANWAY LEG PRIMARY 16:00 18:59 ORT3-Y R-N 0 4051=STEAM GENERATOR 167 1
MM-8480R MMI 76 R-1 REMOVE CAVITY SEAL 4
24MAY04 24MAY04 DR-Y ML-Y 0
M 1-804EMVE CAVITY SEAL RING RING 17:00 20:59 ORT3-Y R-M 21413 REACTOR VESSE AND ASSEMBLY' 168 1 MM0214051E MMi 76 HX-OO1A HX-OO1A -CLOSE HOTl 3 24MAY04 24MAY04 DR-N ML-Y 0
M 0214051 EX01A -CLOSE H T LEG PRIMARY MANWAY LEG PRIMARY 19:00 21:59 ORT3-Y R-N 0214051OSTEAM GENEWTOR 169 1 MM-8480N2 MMI 76 R-1 REM STUD HOLE CAPS 4
24MAY04 25MAY04 DR-Y ML-Y 0
MM.848ON2REM STUD HOLE APS PRIOR TO 4P DECON l
PRIOR TO RP DECON 21:00 00:59 ORT3-Y R-M 021413_REACTOR ESSEL AND ASSEMBLY Run Date 24MAY04 13:16l LT-03 STANDARD PUBLICATION Sheet 10 of 22 C Primavera Systems, Inc.
I FL-03 Execution Publication Set 7
after 24MAY04 12:00 I
U1R28 WORKING SCHEDULE I
aner zqiwA r us# ic;uu
EF I
RISK I MF Tue 25 Wed 26 I
II ST I I
100214,16a20,221,2.4.6. 81011Z1411a6 JTkI1 h []Ie HIr'lyr^:id,"^a~'":P:1 i l 19 [l ElI
,l, I__
1701 1 MM0311945D IMMI 76 T-001 IT-I REPAIR DIAPHRAGM SCREW 4
25MAY04 25MAY04 DR-Y ML-Y 04:00 07:59 ORT3-N R-N 0
171 1
MM-8480N3 MMI 76 R-I INSTALL VESSEL HEAD 12 25MAY04 25MAY04 DR.Y ML-Y 0
STUDS 04:00 15:59 ORT3-Y R-M 172 1 MM-8480N1 MMI 76 R-1 TENSION PREPS RV 2
25MAY04 25MAY04 DR-Y ML-Y 0
HEAD 16:00 17:59 ORT3-Y R-M 173 1 MM0311945C MM1 76 T-001 T-1, MANAGEMENT I
25MAY04 25MAY04 DR-Y ML-Y 0
FME CLOSE OUT 17:00 17:59 ORT3-Y R-N 174 1
MM-8480N MMI 76 R-1 TENSION RV HEAD 4
25MAY04 25MAY04 DR-Y ML-Y 0
18:00 21:59 ORT3-Y R-M 175 1 MM0311945A MM1 76 T-001 T-1, RE-INSTALL 6
25MAY04 25MAY04 DR-N ML-Y 0
PRESSURIZER 18 :00 23:59 ORT3-Y R-N 176 1
MM-8480L MMI 76 R-1 INSTALL PZR VENT 2
25MAY04 25MAY04 DR-Y ML-Y 13 FLANGE 22:00 23:59 ORT3-N R-M 177 1
MMFMEREM MMI R-1 REMOVE FME BARRIER 4
25MAY04 26MAY04 DR-Y MLY 140 6
22:00 01:59 ORT3-N R-N
-Z8 1 MM-8480K MM1 76 R-I REPLACE RX HEAD 6
25MAY04 26MAY04 DR-Y ML-Y 0
INSULATION PER RMP 22:00 03:59 ORT3-Y R-M 179 1 MM-8858A MMI 82 W0oo1Ci W-1CI. FME CLOSE I
25MAY04 25MAY04 DR-Y ML-Y 0
OUT INSPECTION 23:00 23:59 ORT3-N R-N 180 1 MM-8480V1 MMI 76 R-I REMOVE ZIP LIFTS 10 26MAY04 26MAY04 DR-Y ML-Y 0
03:00 12:59 ORT3-N R-M 181 1 MM9924975B MM1 76 HS-1 HS.1. REINSTALL 6
26MAY04 26MAY04 DR-Y ML-Y 67 SNUBBER. AS-LEFT 04:00 09:59 ORT3-N R-N 182 1 MM0214184 MM1 76 Z-016 UXILIARY HOIST WIRE 8 26MAY04 26MAY04 DR-Y ML-Y 12 ROPE INSPECTION 09:00 16:59 ORT3-N R-N 183 1 MM-8480M MM1 76 R-I INSTALL HEAD VENT 2
26MAY04 26MAY04 DR-Y ML-Y 0
SPOOL PIECE 11:00 12:59 ORT3-N R-M 184 1 MM-8480P MM1 76 R-1 RV HEAD DRESS 10 26MAY04 26MAY04 DR-Y ML-Y 0
RMP-9096 13:00 22:59 ORT3-N R-M M00311945DIT-1 RI s 0311944MF I
M-848ON31NSTA
, 021413
11 1
II I
I II I
II I
I I
II II PAIR DIAPHRAGM SCREW RESSURIZER TANK L VESSEL HEAD $TUDS p_REACTpR VESSEL AND AM-848ON1TENSION PREPS RV HEA 0214134OREALCTOR VESSEL AN M0311945CT-1, MANAGEMENT FM!
031194IPRESURIZER TANK MM8484ONTENSION RV HEAD 02141 3.REACTOR VESS MM0311945AT-1 'RE4NSTALLPRE!
0311945_
PRESSURIZE MM48480'INSTALL PZR VI 02141 REACTOR VE MMFMEREMREMOVE FME B REACTOR MM.8480KREPLACE RX HE 02141
[REACT MM.88laW1C1. FME C 021417W=CNTINMEI MU-8480VIREMOVE
,0214i313 MlYJ992497SES 1 F
, 9924975 MM021414 021418g I
MM-84i 0214 MM 0:
SSEMBLY
) ASSEMBLY CLOSE OUT I L AND ASSE SURIZER MA I TANK NT FLANGE SSEL AND AS
~RRIER 6 VESSEL AND AD INSULAllO RVESSEL A
.OSE OUT INS IT ACCIDENT D3P UFTS 35REAC~
EINSTALL SNI IFX-iA SG M AUXIUARY HO RE oMINSTALL HE 30REACTO 98PVHEAC 1413 M0213478AP 0213418Z 185 1
MM0213478A IMMI 76 CPP-56 CPP-56 REMOVE TM FIBER OPTICS 8
26MAY04 27MAY04 DR-N ML-N 17:00-00:59 ORT3-N R-N 0
186 2 MM0406166 MM2 77 CV-00283B 2CV-283B TEST VALVE 2
19MAY04 24MAY04 DR-Y ML-Y 273 M
061662CV-2838 TEST VALVEV sn2712004 (SPARE)
BY 5/27ti2004 (SPARE) 23:00A 19:59 ORT3-N R-N
_l-2CHARGING FUMP DISCHARGE,RELIEF TO 2T4 % CT04061656 187 0 MM0201387 MM2 77 Z-017 WIRE ROPE 2
24MAY04 24MAY04 DR-Y ML-Y 273 M
02 O138?WIRF ROPE INSPECTION INSPECTION 18:00' 19:59 ORT3-N R-N I
02o1387SfP PLATFORM BP IDGEtOISTIRAILS Run Date 24MAY0413:161 LT-03 STANDARD PUBLICATION Sheet 11 of 22 O Primavera Systems, Inc.
I FL-03 Execution Publication Sot
aner 24MA YU4 7 Z:UU I
U1R28 WORKING SCHEDULE di Ittr zqmm r U4 1 AGUU U
ID RESP WO EQID DESCRIPTION RD ES EF RISK MF MAY ST
~on 24 Tue 25 Wed 2 wo 10014js.2I2~ 0.2.4.6,810112114,11ala2022i0. 2.4,6, jjjjjjjj11 18 M01 11IMM17 MS-02018 IMS.2018-O, REPAIR 5 1 25MAY04125MAY041I DR.Y MI-Y 0
M241~
2Ol-REPAIR AO LEAK ON AC AIR LEAK ON 18 00' 22:59 ORT3-N R-N 021411IF-HX IA SG HEA ER MAIN STE 189 1 MM-8485J MM3 76 I P-001B P-001B-ALIGN B RCP 16 24MAY04 25MAY04 DR-YML-Y 2
Al
-OIBJAUGN B RCP PE RMP9002.4 PER RMP 9002-4 07:00A 03:59 ORT3-Y R.M RREACO R COOLANTPUMP0214119 190 1 MM-8485J1 MM3 76 P-001B P-001B - RECOUPLE B 5 125MAY04 25MAY04 DR-Y ML-Y 0
I MM-8485J1P 0
-B RECOUPLE B RCP PER RMP 9t 02-4 RCP PER RMP 9002-4 06:00I 10:59 ORT3-Y R-M 021411 REACTOR COLANT PUMP 191 1I MM-8486A MM3 76 P-001B-M RECONNECTUPPER 4
25MAY04 25MAY04 DR-Y ML.Y 0
MM-84 6ECNNECT UPPER CC PIPING MP 9002-1 CC PIPING RMP 9002-1 11:00 14:59 ORT3-Y R-M 1
0215 REACTOR COOLANT PUM MOTOR 192 1
MM-8485H MM3 76 P-001B P-001B - REMOVE 6
25MAY04 25MAY04 DR-Y ML-Y 1
MM-84 I
1 B - REMO*E BACKSEAT LE KAGE COLLE BACKSEATLEAKAGE 11:00 16:59 ORT3-Y R-M 0214 1 REACrOR COOLANT P MP 193 1 MM-8485QZ MM3 76 P-001B P-001B - FINAL 113125MAY04126MAY041 DR-MI-V 5
M -8485
-O011B - FINAL ASSEMBLY FTER COUPI ASSEMBLY AFTER 15:00l 03:59 ORT3-Y R-M 0214 REACT R COOLANT 194 1 MM0407622 MM3 76 CV-003020 1CV-302B. REPLACE 4 25MAY04 25MAY04 DR-Y MLY 0
MM0407622!CV302B. REPLACE LANGE FLANGE 18:00 21:59 ORT3-N R-N 0407621MMLP-1B RCP SEA WATER INJE I-I 1I 195 0 MM-8485-AB MM3 76 Z-772 REMOVE ZIP LIFT 2 26MAY04 26MAY04 DR-Y ML-Y 81 I
MM 85-AEREMOV r
I I
FROM ABOVE RCP-B 13:00 14:59 AORT3Y R-N
-E U
196 0 EP9927269A NDE 77 I S
CONDUCT 38 24MAY04 31MAY04 DR-VML 117 E~P9ACONDUCT CMUSTRUdTURAL INSPECTION CIVILISTRUCTURAL 10:OOA 0959 ORT3-YR-N 197 0 EP9927270A NDE 77 S
CONDUCT 38 24MAY04 31MAY04 DR-Y ML.Y 117 27 OACONOUCT CMLSTRU TURALINSPECTI(N CIVIUSTRUCTURAL l10OOA 0959 ORT3-YR-N 198 1 EP0301912 NDE 77 Z.021 EXAMINE REACTOR 10 25MAY04 1Y26MAY04 DR-V MI-V 21 P030191XAMINE REACTOR HEA UFT RIG WE HEAD LIFT RIG WELDS 16:00l 15:59 ORT3-Y R-N 030191 R-1 OFUTTANSUESM10 12:59AY04 DR-N100 4dW19 CN1EICFN O
I ~
199 1 NM0309240 NMS 77 I FE-02904A IFE-2904A-CALCHECK 2 25MAY04 25MAY04 DR-Y ML-Y 34 NMO309 4OFE-2904A - CAL' CHECK OF UT NSDUCERS I
OFLIT TRANSDUCERSI 11:00' 12:59 1ORT3-Y R-N I I0309 4W1 GICO4T RECIRC FAN MqOCR 200 1 NM0407660A NMS 77 I FE-02804A FE-2804A - CAL CHECK 2 25MAY04 25MAY04 DR-Y ML-Y 0
NM04076 0-2804A-CAL CHECK OF UT NSDUCERS OF UT TRANSDUCERS 1100 I 1259 ORT3-Y R-N I 0407 CONT RECIRC FAN M TOR CLR INLI 201 01 OP0301242 I OPO I 77 O-PC-021.4 WEEKLY 5 125MAY04 25MAY04l DR-Y ML.Y V
579-1 P030124 EKLYMISCELLAgEOUSDATAR NG MISCELLANEOUS DATAI 07:00 11 59 ORT3-Y R-N J
0301242EKLV MISELLANEOUS DA A READINGS 202l0 0OP0301294 OPI l 76 O-PC-MIDS OPERATIONS MID 17 21MAY04 1 27MAY041 DR-Y MI-V I 158 POIO1294OPERATIONS MID SHI"WEEKLY ROUTINE I I III I_ SHIFT WEEKLY 00:OOA 02:59 1 ORT3-YR-N I
Run Date 24MAY04 13:16l LT-03 STANDARD PUBLICATION Sheet 12 of 22 6 Primavera Systems, Inc l
FL-03 Execution Publication Set I
arrer Z4MA YU4 7 Z:UU I
U1R28 WORKING SCHEDULE I
affer 24MA YU4 7 Z:UU U l ID lRESP WO EQID DESCRIPTION lRDl ES EF I
RISK I MF MAY IST Mon 24 Tue 25 Wed 26
.1, i.;M im
']S 203 OP0301535 OPI 77 O-IT-0060 IT-60, UNIT 1 3
24MAY04 25MAY04 DR-Y ML-Y 53 OP0301 35T40, UNIT 1 C NTAINMENT ISOLATION CONTAINMENT 2300 01:59 ORT3-Y R-N 030153!4UNIT I CC NTAINMENT ISOLATION VALVES 204 0
OP0301301 OPI 77 O-PC-086 SAMPLE BDE I
26MAY04 26MAY04 DR-Y ML-Y 167 OOP 0 3A1 3 01SAMPLE BD BOTTOMS BOTTOMS 00.00 00.59 ORT3-Y R-N 030I301[ISAMPLE Bl E BOTTOMS A 205 1 OP0310122 OPI 77 PT-RMS-001 TEST RMS FUNCTION 1 26MAY04 26MAY04 167 OP031p122,EST RMS Fl NCTION OF SG OF SGBD VALVES 00:00 00:59 0310122IMAIN STEA VALVES FU 206 1 OP0301484 OP1 77 O-IT-0080 IT-80. UNIT 1 MAIN AND 2
26MAY04 26MAY04 0
OP030'48-80, UNIT I AIN AND RAD RADWASTE 00:00 01:59 U
030J49UNIIT I M IN AND RADW 207 2
OP0301611 OP1 77 TS-CONT-00 CONTISOL VALVE AND 2
26MAY04 26MAY04 DR-Y ML-Y 166 OPO3Ol61 CONT ISOLV LVE AND FLA FLANGE CHECKS 00:00' 01:59 ORT3-Y R-N 030,1611MCONT ISO VALVE AND 208 0 l OP0301386 OP21 76 O-PC-012.6 G-03 EDG VIBRATION 1 25MAY04 25MAY04 DR-N ML-N 174 OP030138 -03 EDG VIBRATION (QUARTERLY)
(QUARTERLY) 08:00 08:59 ORT3-Y R-N 0301386 G-03 EMERGENCY DIESEL GENERI TOR VIBRATI 209 0 OP0301357 OP2 77 O-PC-043.5 SERVICE WATER TO 2 125MAY04 25MAY04 DR-N ML-N 581 OP0301357 RVICE WATER Tp AUXIUARY FEE OWATER AUXILIARY 08:00-09:59 ORT3-Y R-N 030135 SERVICE WATER, TO AFW PUMP NE FLUSH 210 0 OP0301368 OP2 76 O-TS-083 TS-83. G-03 5
25MAY04 25MAY04 DR-N ML-N 0
OP0301368 G 03EMERGENCY DIESEL EMERGENCY DIESEL 08:00*
12:59 ORT3-Y R-N 030136 0-03EMER6ENCY DIESEL G NERATOR M 211 0 0 l OP0301334 lOP2 77 O-PC-DAYS OPERATIONS DAY 42 25MAY04 30MAY04 DR-Y ML-Y 133 lP030133 PERATIONSDAY HIFTWEEKLYR UTINE SHIFT WEEKLY 08:00-14:59 ORT3-Y R-N 301 212 0 OP0301372 OP2 76 PT-FP-002 DIESEL I
25MAY04 25MAY04 DR-N ML-N 575 0' 0S30 372D1EEL INGINE-DRIVEN FREPUMP ENGINE-DRIVEN FIRE 15:00 15:59 ORT3-Y R-N 5
0 0301372IDIESEL ENGINE-DRIVEN IREPUMP
_-_-II-213 0
OP0301395 OP3 77 O-PC-SWING OPSSWINGSHIFT 14 119MAY04 25MAY04 DR-Y ML-Y 161 P0 0139 PS SWINGSHIFTWEE LYROUTINE WEEKLY ROUTINE 16:OOA 22:59 ORT3-Y R-N OPERATIONSS WING SHIFT 214 1
OP0301550 OP3 771 O-PC-001.2 TB1 MONTHLY 14 19MAY04 25MAY04 DR-Y ML-Y 161 OP0Y0155TB1 M NTHLYHEATING ENTILATION HEATINGNENTILATION 16:OOA 22:59 ORT3-Y R-N l I MONTHLY HEATINGIVEN 215 2 U2GNDR-A OP3 T-01 DRAIN U2 MAIN I
24MAY04 24MAY04 DR-Y ML-Y 0
GNDR-ADRAIN U2 MAIN ELEC RICAL GENERATOR PER PC 21.3 ELECTRICAL 18:00 18:59 ORT3-N R-N 1U2:MAIN GENERATO PI 216 1
OP0301554 OP3 77 TS-CCW-001 CCSYSTEMVALVE 1
25MAY04 25MAY04 DR-Y ML-Y 167 PO3015S4CC SYqTEM VALVE POS ON CHECKS POSITION CHECKS 16:00 I
16:59 ORT3-Y R-N 0301554CCW FLOW PATH VAL EPOSmONV 217 0 OP0301426 OP3 77 O-PC-009.6 MONTHLY SHIFTING OF 2 25MAY04 25MAY04 DR-N ML-N 166 IPO301426MONT9LY SHIFTING OF -3AIB SERVIC K-3A/B SERVICE 16:00 I
17:59 ORT3-N R-N 0301426=MOOTHLY SHIFTING F K-3A/B SER 218 0
OP0308222 OP3 77 O-PC-045.1 BLOWDOWN AIR I
26MAY04 26MAY04 DR-N ML-N 160 P030822;IL RECEIVERS 16:00 I
16:59 ORT3-Y R-N 03082229P 219 2 OP0301640 OP3 77 O-PC-001.3 TB2 MONTHLY 32 26MAY04 30MAY04 DR-Y ML-Y 129 P0301640T82 HEATINGNENTILATION 16:00 1959 ORT3YR-N I 030164 Run Date 24MAY04 13:16l LT-03 STANDARD PUBLICATION Sheet 13 of 22 t Primavera Systems, Inc.
FL.03 Execution Publication Set
afferz~ Yu4 7 z:uu I
UIR28 WORKING SCHEDULE dittl AW J IV OCAAA
EF I
RISK I
M 6-4111I L-n I 220 0 1 OP0301396 OP3 77 O-PC-SWING OPS SWING SHIFT 49 26MAY04 01JUN04 DR-Y ML-Y 1
WEEKLY ROUTINE 16:00-22:59 ORT3-Y R-N
. I I
i I
A I
i IF M22 I
CR Tue 25
.Wed 26 P.1001214,16.11120,2A 0. 2, 4.6 ri 8.jn01114.1r,18202 Q. 2.4.
A...8 *12.14tir 112 35 221 1 1 PC-77.1 Ops 77 O-PC-077.1 AUTO FP VALVE TRIP TEST 16 22MAY04 25MAY04 DR-Y ML-Y 08:OOA 03:59 ORT3-N R-N 222 1
CL07B01 OPS CL-07B FILL & VENT SI VALVE 6
22MAY04 24MAY04 DR-Y ML-Y' 43 12:OOA 17:59 ORT3-N R-N 223 1
C-10J010 OPS CL-10J CONTAINMENT SW 2
24MAY04 24MAY04 DR-Y ML-Y' 21 VALVE 07:OOA 13:59 ORT3-N R-N 224 1
01124-30 OPS HX-001A DRAIN SG-A 15 24MAY04 25MAY04 DR-Y ML-Y 0
COMPLETELY 11 :OOA 02:59 ORT3-N R-N 225 1 PC-76.7 OPS 77 O-PC-076.7 AUTO DRY CHEMICAL 2
24MAY04 24MAY04 DR-N ML-Y 57 FIRE EXTINGUISHER 13:00 14:59 ORT3-N R-N 226 1 CL13AOIO OPS CL-13A MAIN STEAM VALVE 8
24MAY04 24MAY04 DR-N ML-N 125 LINEUPS 13:00 20:59 ORT3-N R-N 227 0 OP0300626B OPS 76 Z-031 RESTORE lAW 4
24MAY04 24MAY04 DR-Y ML-Yl 5
0-SOP-IA-002 18:00 21:59 ORT3-N R-N 228 1 OP5A-030 OPS OP-SA RAISE RCS LEVEL TO I 124MAY04 24MAY04 DR-N ML-Y' 0
55% (2ND) 22:00 22:59 ORT3-N R-N 229 1 OP5A-040 OPS OP-5A RAISE RCS LEVEL TO 1 24MAY04 24MAY04 DR-N ML-Y 0
70% (2ND) 23:00 23:59 ORT3-N R-N 230 1 01100-60 OPS T-034A T-034A. FILL SI 8
24MAY04 25MAY04 DR-N ML-N 0
ACCUMULATOR 23:00 06:59 ORT3-N R-N 231 1
CL04AO10 OPS CL-04A CL 4A PART 1, RCS 10 24MAY04 25MAY04 DR-YML-Y 28 F&V VALVE CHECKLIST 23:00 08:59 ORT3-N R-N 232 0 OP0300628A OPS 76 Z-039 ISOLATE lAW 2
25MAY04 25MAY04 DR-N ML-N 70 0-SOP-IA-002 SECTION 03:00' 04:59 ORT3-N R-N 233 0
OP0408415A OPS 77 O-IT-0010D IT-10A. P-38A1B AFW 3
25MAY04 25MAY04 DR-N ML-N 58 PUMPS AND VALVES 03:00 05:59 ORT3-N R-N 234 1 0162-030 OPS HX-001A REFILL SIG A TO 510^
4 25MAY04 25MAY04 DR-N ML-N 0
wlWLU Chemicals 03:00 06:59 ORT3-N R-N 235 1 OP0303211 OPS 77 TS-ECCS-00 SAFEGUARDS SYSTEM 3
25MAY04 25MAY04 DR-N ML-N 89 VENTING (MONTHLY) 07:00 09:59 ORT3-N R-N 236 1 IT-005B OPS 77 O-IT-0005B CTMT SPRAY PUMPS & 8 25MAY04 25MAY04 DR-Y ML-Y 0
VALVES TEST 07:00 14:59 ORT3-N R-N I
OPERATl(
AUTO FP ALVE TRIP TEST B
B01OIFILL & JENT SI VALVE FILL:& VENT SI VALVE L
J0110CONTAINMENT SW VALVE SERVICE WATER IN CONTA I I B -300RAIN So-A COMPLETELY I ___filling A
C-
<<UTO DRY CHEMICAL FIRE I MAINT/INSP FIXED AUTO I Li AOM1tAAIN S5EAM VALVE UNEl lMAIN STEAM VAL, OP 300626ERESTORE IAW 0-SOP-0300821INSTRUMENT Al:
OP5A-0t(RAISE RCS LEV ERAISE REACT OP5A-044RAISE RCS LE, IIRAISE REAC 0110-60T-034A - FILL I CLO4Ab1OCL 4A PART 1, IOP03006284AI0LATE I030062eMINSTF OP0408415D1-CA,
'04084 1 P-3 10162-03OREFILL l
laFilll 0303211 021589 01110-5 NLVE TRIP-TEST AND ALARM VERIqICATION TES1 OP 030t3 96OP'
)NS SWING SHIFT WEEKLY ROUTIINE03013960
_I I
I LINEUPS IJMENT
/G using auxiliary 1ted zXTlNGUISHER INSPECTION C FIRE EXTINGUISHING SYS021593 iPS IE LINEUPS FOR -EATUP A-002 I DRYER
-L TO 55% (2ND)
'R LEVEL TO EXIT REDUCED INVEN FEL TO 70% (2NDI OR LEVEL TO EX(T REDUCED INVE I ACCUMULATOR:
RCS F&V VALVE,CHECKUST FILL & VENT RCS VALVE LINEUPS IAW 0-SOP-IA-002 SECTION 5.2 UMENT AIR DRYER
.38A1B AFW PUMOS AND VALVES T V1B AUX FEEDWArER MOTOR-DRI fG A TO 510" WMLU Chemicals ng A SIG using auxiliary feed EEGUARDS SYST"M VENTING (MOI ISAFEGUARDS SYSTEM VENTING AT SPRAY PUMPS & VALVES TEST
=
r.034A -PRESSURIZE SI ACCUMUL I
rORY JTORY D HX-1A EN PUMPSNA ITHLY) lMONTHLY UN AP AND VALVE PTOR 2371 1 01100-50 OPS T-034A T-034A - PRESSURIZE SI ACCUMULATOR 16 25MAY04 26MAY041 DR-N ML-N l 09:00 00:59 ORT3-N R-N 0
L A-..J.
U I.
-I-Run Date 24MAY04 13:16l LT-03 STANDARD PUBLICATION Sheet 14 of 22 0 Primavera Systems, Inc.
FL-03 Execution Publication Set I
after 24MAY04 12:00 I
U1R28 WORKING SCHEDULE after 24MAY04 12:00 U
ID lRESPl WO EQID DESCRIPTION RDl ES I
.1_
.1__ _1_
14..18.1FL20,221 0.2.4,69, F i
E 5]
- -v_
RF-350A OPS 77 1 O-RF-350A RF-350A. FUEL HANDLING EQUIPMENT 8
25MAY04 125MAY04 I DR-Y ML-Y 14:00 21:59 ORT3-N R-N 53 239 1
O-RT-069 OPS 77 O-RT-069 PERFORM LLRT ON 4
25MAY04 25MAY04 DR-N ML-N 0
P-1B CCW LINES 15:00 18:59 ORT3-N R-N 2401 1 OP9C-060 OPS OP-9C SECURE 1
25MAY04 25MAY04 DR-N ML-Y 0
CONTAINMENT PURGE 16:00 16:59 ORT3-N R-N 241 1
SOPCCO02C OPS SOP-CC-002 FILL & VENT RCP/ELHX 6
25MAY04 26MAY04 DR-N ML-N 0
CCW SYSTEM 19:00 00:59 ORT3-N R-N 242 1
RPJF-1538 OPS LOWER CAVI SECURE CAVITY DRAIN 2 25MAY04 25MAY04 DR-Y ML-Y 0
21:00 22:59 ORT3-N R-N 243 1
25MAY04 25MAY04 DR-Y ML-Y 1
CONTAINMENT PURGE 23:00 23:59 ORT3-N R-N 244 1 I T-280A-18 OPS 77 o-1T-0280A MSIV STROKE TEST, 4
26MAY04 26MAY04 DR-N ML-Y 0
IT-280A (MS.02018) 00:00 03:59 ORT3-N R-N 245 1 O-RT-06789 OPS 77 O-RT-069 PMT STEP TO LEAK 1
26MAY04 26MAY04 DR-N ML-N 0
CHECK POST 01:00 01:59 ORT3-N R-N M24 1I OP9C-050 OPS I
OP-9C SECURE I
26MAY04 26MAY04 DR-N ML-N 0
CD CONTAINMENT PURGE 01:00 01:59 ORT3-N R-N 247 1 OP0215959 OPS 77 O-RT-01 1 ORT 11. CC.767 CHECK 3
26MAY04 26MAY04 DR-N ML-N 34 VALVE STROKE TEST 01:00 03:59 ORT3-N R-N 248 1 01100-70 OPS T-0348 T-034B - PRESSURIZE 16 26MAY04 26MAY04 DR-N ML-N 0
SI ACCUMULATOR 01:00 16:59 ORT3-N R-N 249 1 RPID-080 OPS O-RP-001D FWSH CAVITY DRAIN 24 26MAY04 27MAY04 DR-Y ML-Y 0
LINE 01:00 00:59 ORT3-N R-N 250 1 B52-426C OPS 76 B42 BUS STAB PMT 1
26MAY04 26MAY04 DR-N ML-N 0
IICC-719' 02:00 02:59 ORT3-N R-N 251 I1 B52-428M OPS 76 B-42 BUS STAB PMT I
26MAY04 26MAY04 DR-N ML-N 0
IW-13028 04:00 04:59 ORT3-N R-N 252 0 OP0405880 OPS 78 W-013B1 W-013B1 PMT PER WP 2
26MAY04 26MAY04 DR-N ML-N 0
01-128 E-FN 04:00 05:59 ORT3-N R-N 253 1 OP4A-035 OPS OP-4A OBTAIN TARGET 1
26MAY04 26MAY04 DR-Y ML-Y 0
BORON FROM RE PER 08:00 08:59 ORT3-N R-N 254 11 OP9C-055 OPS OP-9C RESTORE I
26MAY04 26MAY04 I DR-N ML-N 51 ICONTAINMENT PURGE 08:00 08:59 ORT3-N R-N MAY Tue 25 Wed 26 1 10i1Z14.1s1a2022j0.21 4.6).8 1011Z14.161I l
_I F-35C0ARF-350A. FUEL HANDUNG E UIPMENT REN 1215941L W;9!FUEL HANDLING EQUIPMENT I DbRT.069PERFORO LLRT ON P-1 B CCW LINES 0216002CCNVTOANDFROM
.1B (P-16/P-11 OP9C-o6OSECURE CONTAINMENT RURGE FOR CF SOPCC002CF LL & VENT RCP1EL-X CCW SYSTE I
RPJF-153BSECURE CAVITY )RAIN OP9C.965RESTORE CONYAINMENT PUF IT.280A.1 SISTROKI TEST, IT-280A 0210899M U MS 3TOP VALVES O-RTj06789PMT STEP L
D LEAK CHEC, IWCCW TO AND FROM P-1 I OPdC-050SECURE CO AINMENT Pt OP0g15959ORT 11. CC-67 CHECK VAI 021595k9CHEC VALVE STROP I 0100-70T-034B - PR SSURIZE SI A RPiD-080FLUSH CAVtTY DRAIN LINE I
I__
Bh2.426CBUS STAt PMT"ICC-719 02025271480V MC OR CONTROl I 352.428?*US S 1 3B PMT'W-13I 0202527L448OV AOTOR CONTf I P0405880w-0l3 I PMT PER NIF 040588(CO 1OL ROOM F OP4A-03 TAIN TARGE1 I
OP9C-05 STORE CONT I
O-RT-00 CCBACKDRP 021595 OPERATi I
255 I
O-RT-007 OPS 77 O-RT-007 VNCC BACKDRAFT DAMPER 4
26MAY04 26MAY04l DR-N ML-Y 08:00 11:59 ORT3-N R-N 0
LJh
£ U.L
.1 LJ...R I
Run Date 24MAY04 13:16 LT-03 STANDARD PUBLICATION Sheet 15 of 22 O Primavera Systems, Inc.
I FL-03 Execution Publication Set I
arrer z4mA 7u4 71z:uu I
U1R28 WORKING SCHEDULE I
anerz4mR YU4 7z:uu F,
u ID RESP WO EQID DESCRIPTION RD ES EF RISK MF MAY ST on 24 T
25 We 26 A
2 1 41IR20,22jj
,2j4j%,8io1ZI 4.lil 2 O 0,22x02 4.6.8.io2A.ir1_
256 1 OP021518B9 OPS 76 SI-00878C-SI-878C PMT STROKE 1
26MAY04 26MAY04 DR-N ML-N 0 _
oP02151 l 9SI78C PMT:
PER IT-210 10:00 10:59 ORT3-N R-N 021511 tSP-15B SI PL 257 1
OP0215225 OPS W-004A OPERATIONS TO 2
26MAY04 26MAY04 0
OP0215 250PERATIOI, PLACE W-004A IN 11:00 12:59 258 1 OP0215226 OPS W-004B OPERATIONS TO 2
26MAY04 26MAY04 DR-N ML-N 0
OP0215 26OPERATO PLACE W-004B 11:00 12:59 ORT3-N R-N
[MCONTAII 259 1 TS-033 OPS 77 O-TS-033 TS-33. UIC ACCIDENT 3
26MAY04 26MAY04 DR-N ML-N 0
T -033TS-33, U1C FAN COOLER UNITS 12:00 14:59 ORT3-N R-N 260 1 RETEST05 OPS RETESTS WCC RUN S-5 REPORT 0
26MAY04 26MAY04 DR-N ML-N 0
I R1 i FOR RCS F&V 13:00 12:59 ORT3-N R-N
_INSURE 261 1
OP4A-020 OPS OP-4A ALIGN PZR & LOCAL 2
26MAY04 26MAY04 DR-N ML-N 0
OP A-020AUGN P VESSEL LEVEL 13:00 14:59 ORT3-N R-N OFILLI 262 1
CL10JO20 OPS CL-10J SERVICE WATER 8
26MAY04 26MAY04 DR-N ML-N 79 CL OJ020SERVICE VALVE 13:00 20:59 ORT3-N R-N 263 0 01-39J OPS01-39J SECURE PAB 1
26MAY04 26MAY04 DR-N ML-N 0
01-39JSECU VENTILATION FOR 15:00-15:59 ORT3-N R-N PQ4 1
OP4A-030 OPS OP-4A ALIGN VCT. LETDOWN 2
26MAY04 26MAY04 DR-N ML-N 0
a P4A-30AUGI CHARGING SYSTEMS 15:00 16:59 ORT3-N R-N EFII 265 1
IT-330 OPS 77 O-IT-0330 CNMT ISO VALVES 6
26MAY04 26MAY04 DR-Y ML-Y 79 IT.33OCNMT STROKE TEST 15:00 20:59 ORT3-N R-N 7
3 021591dC 266 1
OP0407699 OPS 82 P-002A P-002A, PMT RUN 2
26MAY04 26MAY04 DR-N ML-N 81 OP0407 699P4 17:00 18:59 ORT3-N R-N 0407690 267 1 OP4A-040 OPS OP-4A RCS FILL TO 20-60 %
5 26MAY04 26MAY04 DR-N ML-N 0
I OP4A-04CRC PRESSURIZER LEVEL 17:00 21:59 ORT3-N R-N I
I IU I
I 268 1 MSX02Z PPGl MILESTONE CLOSE NON CL-1E SIG 0 124MAY04 24MAY04 DR-Y ML-Y 110 ISX02ZCLOSE NON CL 1E SIG SLOWDOWN BLOWDOWN 17:00 16:59 ORT3-N R-N IS/G BLOWDOWN NON LA1E 269 1 MIDLOOPZ-2 PPG MILESTONE END OF RCS AT 0
24MAY04 DR-Y ML-Y 0
MIDLOOPZ-END OF RCS AT MIDLOOP (2ND)
MIDLOOP (2ND) 21:59 ORT3-N R-N 271 1
480VAOIA PPG 8-03 START 480V BUS 0
24MAY04 24MAY04 DR-Y ML-Y 0
480VA01ASTART 480V B S RELATED ENERGIZED WORK RELATED ENERGIZED 23:00 22:59 ORT3-N R-N IBEGINNINGO0ATRAINBUSWdRK WINDOW 2259IBEINN fa RI U
272 1 480VAOIZ PPG B-03 603 BUS RELATED 0
24MAY04 24MAY04 DR-Y ML-Y 592 480VAOtZB03 BUS RELA ED ENERGIZED WYORK COMPLET ENERGIZED WORK 23:00 22:59 ORT3-N R-N I lEND OF B03 BUS WORK WINDOV 270 1
RCX02Z2 PPG MILESTONE EXIT RCS AT REDUCED 0
24MAY04 DR-Y ML-Y 0
RCX02Z2 EXIT RCS AT FEDUCED INVENT6RY (2ND)
INVENTORY (2ND) 22:59 ORT3-N R-N
- SAFEIY MO ITOR PLANT OPEWATING STATE M ESTONE 273 1
RCX31Z PPG MILESTONE END RCS WORK 0
24MAY04 24MAY04 DR-Y ML-Y 0
RCXj1ZEND RCS WO K WILARGE HOT iEG VENT WILARGE HOT LEG 23:00 22:59 l ORT3-N R-N IPRESSURIZEF Run Date 24MAY04 13:16l LT-03 STANDARD PUBLICATION l
SheOt 16 of 22 O Primavera Systems, Inc.
I FL-03 Execution Publication Set I
after 24MAY04 12:00 I
U1R28 WORKING SCHEDULE I
airrer £4WR rtU4 7Zc:UU U I ID lRESP WO I EQID I
DESCRIPTION RD ES EF RISK MF MAY I
ST Mon 24lTue 25 Wed 264
- I
_13.nlil.F-0210.12,4.68li1416,120,22iO2468li~~ii 274 1 1 ADMIN-81 PPG ADMIN Startup Readiness Meeting to Exit Cold 4
25MAY04 25MAY041 DR-Y ML-Y 02:00 05:59 ORT3-N R-N 118 275 1 SIA01X PPG MILESTONE START HHSI A LOOP 0
25MAY04 25MAY04 DR-Y ML-Y 0
MODE 5 WORK 07:00 06:59 ORT3-N R-N 276 1 SIA01Y PPG MILESTONE END HHSI A LOOP 0
25MAY04 25MAY04 DR-Y ML-Y 92 MODE 5 WORK 07:00 06:59 ORT3-N R-N 277 1 SIBOIX PPG MILESTONE START HHSI B LOOP 0
25MAY04 25MAY04 DR-Y ML-Y 0
MODE 5 WORK 07:00 06:59 ORT3-N R-N 278 1 4KVA01Z PPG A-01 CLOSE A01 BUS 0
25MAY04 25MAY04 DR-Y ML-Y 21 RELATED WORK 16:00 15:59 ORT3-N R-N 279 1 EXITRFSD PPG MILESTONE EXIT REFUELING 0
25MAY04 DR-Y ML-Y 569 SHUTDOWN 21:59 ORT3-N R-N 280 1 4KVB01Z PPG 4.16KV CLOSE A02 BUS 0
25MAY04 25MAY04 DR-Y ML-Y 33 RELATED WORK 23:00 22:59 ORT3-N R-N 281 1
VNCCB51Z PPG MILESTONE END CONTAINMENT 0
26MAY04 26MAY04 DR-Y ML-Y 0
FAN COOLERS C WORK 01:00 00:59 ORT3-N R-N 282 1 CCX03Z PPG
_ MILESTONE FINISH COMPONENT 0
26MAY04 26MAY04 DR-Y ML-Y 0
COOLING TO RCP &
02:00 01:59 ORT3-N R-N 283 1 RCA1 IZ PPG MILESTONE CLOSE RCP A MOTOR 0
26MAY04 26MAY04 DR-Y ML-Y 30 WORK WINDOW 02:00 01:59 ORT3-N R-N 284 1 MSA25Z PPG MILESTONE END S/G A CL-1E 0
26MAY04 26MAY04 DR-Y ML-Y 563 WORK OUTSIDE 04:00 03:59 ORT3-N R-N 285 1 ADMIN-82 PPG ADMIN Startup Readiness 4
26MAY04 26MAY04 DR-Y ML-Y 117 Meeting to Exit Hot 07:00 10:59 ORT3-N R-N 286 1 RCB11Z PPG MILESTONE CLOSE RCP B MOTOR 0
26MAY04 26MAY04 DR-Y ML-Y 23 WORK WINDOW 09:00 08:59 ORT3-N R-N 287 1 SIB01Y PPG MILESTONE END HHSI B LOOP 0
26MAY04 26MAY04 DR-Y ML-Y 63 MODE 5 WORK 12:00 11:59 ORT3-N R-N 288 1 RCINTACT PPG MILESTONE RCS INTACT 0
26MAY04 DR-Y ML-Y 554 12:59 ORT3-N R-N 289 1 RCXOOZ PPG CONDITION RCS BOUNDARY WORK 0 26MAY04 26MAY04 DR-Y ML-Y 0
COMPLETE 13:00 12:59 ORT3-N R-N 290 1 RCX03A PPG CONDITION BEGIN FILL & VENT 0
26MAY04 26MAY04 DR-Y ML-Y 0
PER OP-4A 13:00 12:59 ORT3-N R-N ADMIN-BIStartup Ri
- ~star1 I
SIA01)(ST I
I I
SIA01YEIh I
SIBOIXST IEI adiness Meeting tb Exit Cold Shutd up Readiness Meeting NRT HHSI A LOO0. MODE 5 WORK D HHSI A LOOP MODE 5 WORK
%RT HHSI B LOO-MODE 5 WORK 0 HIGH HEAD SAFETY INJECTION 4KVA01ZCLOSEA01 BUS RELATE lA01 BUS WORK OR OUT)
EXITRFSIY EXIT REFUEUN(
lEXIT REFUELII 4KVBI1ZCLOSE A02 BU lA02 BUS WORI VNC B51ZEND CONTA
?
lEND CONT.
l CX03ZFlNISH CO l
lIEND CHAF RCAt 1ZCLOSE RC IEND REA(
MSA25ZEND S/
IS1G B1 I
ADMIN-82S l '
RCB11t Si~
RCINI RI Rl mwn X
LOOP WORK D WORK GE SHUTDOWN IG SHUTDOWI
'RELATEDWl OR OUTAGE NMENT FAN C INMENT FAN(
APONENT COC GING MAKEUI
'A MOTOR W4 TOR COOLAN I A CL-1E WOS ECONDARY &
rtup Readiness jStartup Rea
'LOSE RCP B END REACTOF 101YEND HHSI ISTART HI' ACT RCS INT,
- XOOZRCS BO(
IRCS FIS X03ABEGIN Fl IRCS PRI 5KVX01ZMAIN HIGH 291 1
345KVXO1Z PPG X-01 MAIN TRANSFORMER WORK COMPLETE 0
26MAY04 26MAY04 DR-Y ML-Y 15:00 I
14:59 I ORT3-N R-N 0
,Run Date 24MAY04 13:16l LT-03 STANDARD PUBLICATION Sheet 17 of 22 OPnImavera Systems. Inc.
l FL-03 Execution Publication Set
aner z4MA Yu4 7z:uu I
U1R28 WORKING SCHEDULE I
aWer4mAYU4 7z:uu U
ID lRESPl WO I EOID I
DESCRIPTION RDl ES I
EF Mon 24 TI MAY i
I1*0214,16,18,2o2210,2.4,
8,p10i1214,1ajpF1.20,22,Q
.4,5,.0124,6 Iu ILe I
I I
SU I
IO I
Le LiI 292 1 RP0408417 RP 76 RE-00211 IRE-211i212 REPLACE 1
22MAY04 24MAY04 DR-N ML-N 21 UB4171RE-2111212 REPLACE D TECTORS DETECTORS 08:OOA 12:59 ORT3-N R-N TUNIr 1 CONTAINMENT AIR P RTICULATE MONITOR0408417 293 1
RPJF-153C RP LOWER CAVI FILL TRANSFER CANAL 2
25MAY04 26MAY04 DR-Y ML-Y 0
RPJF.-13CFILL TRANSFE CANAL WITH WITH Di WATER FOR 23:00 00:59 ORT3-Y R-N 294 1
KEYWAY03 RP HP 2.14 ESTABLISH KEYWAY 1
26MAY04 26MAY04 DR-Y ML-Y 0
KEYWAY0£5T,BUSH KEYWA ACCESS (POST 06:00.
06:59 ORT3-Y R-N II 295 1 KEYWAY04 RP HP 2.14 END KEYWAY ACCESS 1
26MAY04 26MAY04 DR-Y ML-Y 0
I (EYWAY04END
_I 16:00 16:59 ORT3-Y R-N 296 1
RPJF-152X RP1 JOB FILE 1 UPPER CAVITY DECON 2
24MAY04 24MAY04 DR-Y ML-Y 0 RPJ 152XUPPERCAVITY DECON. second pass
- second pass 01 OOA 13:59 ORT3-Y R-N _-
R UPPER CP;VITY DECON
-I I
297 1 RPSH015-R RPI PACKAGE 15 REMOVE SHIELDING 3
24MAY04 24MAY04 DR-Y ML.Y 102 RP H015-RREMOVE SHIELDING F R SC-9541HOT LEG PIPE FOR SC-954/HOT LEG 17:00 19:59 ORT3-Y R.N 298 2 RPJF-152B RP1 JOB FILE I DECON UPPER CAVITY 3
25MAY04 25MAY04 DR-Y ML-Y 0
RPJ".152BOECON UP ER CAVITY -POSj STUD CAP REM VAL
-POST STUD CAP 01:00 03:59 ORT3-Y R-N S
299 1 RPSH011-R RP1 PACKAGE 11 REMOVE SHIELDING -
5 25MAY04 25MAY04 DR-Y ML-Y 0
RPSH01RiRE MOVE SHIELDING,
- REGEN DOOR AP REGEN DOOR GAP 07:00.
11:59 ORT3-Y R-N
_0_
2 5 300 1
RPSH013-R RPI PACKAGE 13 REMOVE SHIELDING.
4 25MAY04 25MAY04 DR-Y ML.Y 42 RPSHt 13RREMOVE SHILDING - REGEN UCKS REGEN RACKS 12:00 15:59 ORT3-Y R-N W 14 301 1
RPSH082-R RP1 PACKAGE 82 REMOVE SHIELDING 3
25MAY04 25MAY04 DR-Y ML-Y 0
RP' H0824RREMOVE SHIELDING FOR D AN (FROM RX FOR D-FAN (FROM RX 14:00 16:59 ORT3-Y R-N 302 1 RPJF.153 RP1 JOB FILE I LOWER CAVITY DECON 7
25MAY04 25MAY04 DR.Y ML-Y 0
R JF-153LOWER CAVITY DECON 14:00 20:59 ORT3-Y R-N LOWER CAVITY ECON 303 1 RPSH064-R RP1 PACKAGE 64 REMOVE SHIELDING 3 25MAY04 25MAY04 DR-Y ML.Y 0
RPSH0644REMOVE SHIELDING FO R LETDOWN PI FOR LETDOWN PIPING 17:00 19:59 ORT3-Y R-N 304 1 RPSH006-R RPI PACKAGE 6 REMOVE SHIELDING 5 26MAY04 26MAY04 DR-Y ML-Y 0
RPSH006RREMOVE SHI LDING PRESS PRESSURIZER 00:00 04:59 ORT3-Y R-N 305 1 RPSH027-R RPI PACKAGE 27 REMOVE SHIELDING 5 26MAY04 26MAY04 DR-Y ML-Y 69 RPSH027-RREMOVE SHI ING PZR GF PZR GRATING 00:00 04:59 ORT3-Y R.N 306 1 RPSH080-R RPI PACKAGE 80 REMOVE SHIELDING 3 26MAY04 26MAY04 DR-Y ML-Y 2
I RPSH080.RREMOVE HIELDING UNE UNDER HEAD 02:00 04:59 ORT3-Y R-N 307 1 RPJF-121-B RP1 76 R-1 RESTORE RHLDA 5 26MAY04 26MAY04 DR-Y ML-Y 0
g RPk.121.eRESTORE HLA AFTER AFTER HEAD SET 02:00 06:59 ORT3-Y R-N 921 3472RI CTOR VESSE 308 1 RPSH043-R RPI PACKAGE 43 REMOVE SHIELDING B 4 26MAY04 26MAY04 DR-Y ML-Y 0
RPSH043 EMOVE SHIEI RCP CUBICLE 09:00 12:59 ORT3-Y R-N 309 1 CL2O-005 RP1 CL-20 CLEAN HORIZONTAL 20 26MAY04 27MAY04 DR-Y ML-Y 28 CL2-00 LEAN HORIZ SURFACES IN 09:00 04:59 ORT3-Y R-N
_1 Run Date 24MAY04 13:16 LT-03 STANDARD PUBLICATION Sheet 18 of 22 0 Primavera Systems, Inc.
I FL-03 Execution Publication Set
after z4mA T u4 7 z. uu U1R28 WORKING SCHEDULE after AC19MA T U4 1 Z. uu IF
_ST24Toe
_25W
-ed26 I
.~10 214,16.1 8,22210. 2, 4 6.8,10112,14.1 al 20,2210p 2, 4. 6g il24 110 1 RPSH063-R RPI lPACKAGE 631 REMOVE SHIELDING 3
26MAY04 26MAY04 DR-Y ML-Y 37 RPSH063-RRE
_FOR SAMPLE PIPING B 1 17:00 19:59 ORT3-Y R-N 11 I
SD-1600-92 SDM 76 R-1 HEAD REPAIR ECN 3
25MAY04 25MAY04 DR-Y ML-Y 0 _
S 4600.92HEAD REPAIR ECH DESIG APPROVAL (F IEIIINDESIGNAPPROVAL 15:00 17:59 ORT3-Y R-N 0213471REACTOR VESSEL At ASSEMBLY
=L~I
-lsessll U~ 5_
112 SDGSI-191 SDS CONT ENGINEERING 11 08APR04 25MAY04 DR-Y ML-Y 24 D SI-191ENGINEERING WALKD SUMP INTROSION ISSUES I
WALKDOWN - SUMP 08:OOA 14:59 ORT3-Y R-N 1
113 0l SE03111772A SEC 76 Z-065A SECURITY SUPPORT 3
10MAY04 24MAY04 DR-Y ML-Y 152 2ASECUhITY SUPPORT Z. 65A - MR 03-044:
Z-065A - MR 03-044 07:00A 14:59 ORT3-Y R-N MANHOLL #10311772 314 0
SE0300156A SEC 76 SAFE SD DO SUPPORT FG INSPECT 8
25MAY04 26MAY04 DR-Y ML-Y 223 SE0300156ASUPPORT FG INSPEC SAFE SHUTDC SAFE SHUTDOWN FIRE 18:00 01:59 ORT3-Y R-N 030015 SAFE Stl TDOWN AREA 115 0
SECQDRILLC SEC DRILL SECURITY 5
26MAY04 26MAY04 DR-Y ML-Y 548 I
SEC DRILLCSECUR FORCE-ON-FORCE 14:00I 18:59 ORT3-Y R-N 3 I~1 CL-213 WCC CL 2B MODE 6 TO MODE5 34-1 25APR04 25MAY04 DR-V MI-V 0 LMODE 6 TO MODE 5 CHECKLIST CHECKLIST 08:OOA 2159 ORT3-N R-N I 1I 317 1
CL-2E WCC CL 2E MODE 3 TO MODE 2 2001 02MAY04 01JUN04 DR-Y ML-Y 0 C L-3MODE TO MODE 2 CHECKLST CHECKLIST 19:OOA 19:59 ORT3-N R-N I
318 1
CL-2F WCC CL 2F MODE 2 TO MODE1 1220102MAY04 02JUN04 DR-Y ML-Y 0 L-ODE 2 TO MODE I CHECKLIST CHECKLIST 19:OOA 15:59 ORT3-N R-N I
319 1 T-2071-R WCC W-4A/B 1 VNRC W-4AIB EM I
24MAY04 24MAY04 DR-Y ML-Y 46 T-2
-R1 VNRC W.4AIB EM REVO-1 REVO-1 12:00 12:59 ORT3-N R-N I VNRC W-4AB EM REVD-1 00 2071 320 1
T-3426-R lWCCl P-001B I RC P-1B RMP 1
24MAY04 24MAY04 DR-Y ML-Y 0 C I RC P-10 RMP 900241119 M REVO-1 9002-8/19MM REVO-1I 12:00 12:59 ORT3-N R-N I RC P.-B RMP 9002-8/19 MM REV0-10013426 321 1
T-8933-R WCC TG-01-T l TU TG-01-T REV12-1 I
24MAY04 24MAY04 DR-Y ML-Y I r.9 R1 TU TG41-T REV12-1 12:00 12:59 ORT3-N R-N I TU TG-014 REV12-10018931 322 1
T-9105-R WCC P-1A-M I
RC P-IA-M RMP I 1 24MAY04 24MAY04 DR-Y ML-Y 37 T-91 1
RC P13-M RMP 9002-1 E REV4-1 II02-1 EM REV4-1 12:00 12:59 ORT3-N R-N I RC P-IA-M RMP 9002-1 EM EV4-10019105 323 1
T-8381-H WCC CV-00302B 1 CV CV-302B MMV I1 24MAY04 24MAY04 DR-Y ML-Y I 2-C H1 CCV4028 MMV REVO-1 REV01 I
13:00 13:59 ORT3-N R-N I CV CV-302B MMV REVO-1 018381 324 1
T-9079-R WCC W-3AB I 1VNCRD W-3A/B EM I
24MAY04 24MAY04 DR-Y ML-Y 85 T-9 R
1 VNCRDW3AIB EM REV3 1 REV3-1 13:00 13:59 ORT3-N R-N VNCRD W-3A/B EM REV3- 0019079 3251 01 T300626R WCCI Z-031 lREMOVE TAG (0 IA Z-31l 1 24MAY0424MAY04 DR-Y ML-Y I 0
T 0626RREMdjVE TAG (0 IA Z-31 IC REV0-1)
IC REVO-1) 17:00 1759 ORT3-N R-N I Run Date 24MAY04 13:16 LT-03 STANDARD PUBLICATION Shoot 19 of 22 O Primavera Systems, Inc.
I FL-03 Execution Publication Set
after 24MAY04 12:00 U1R28 WORKING SCHEDULE I
after 24MA Y04 12:00 f
ed 26 1
S l
1 T-9169-R wCC PRIMARY 1 RC PRIMARY MANWAYS EPI REV4-1 1
24MAY04 24MAY04 DR-Y ML-Y 22:00 22:59 ORT3-N R-N 63 327 1
T-9170-R WCC PRIMARY I RC PRIMARY 1 24MAY04 24MAY04 DR.Y ML-Y 63 MANWAYS MM REV3-1 22:00 22:59 ORT3-N R-N 328 1 T-9171-R WCC SG PRIMARY 1 RC SG PRIMARY 1
24MAY04 24MAY04 DR-Y ML-Y 6t MANWAYS EPT REV3-1 22:00 22:59 ORT3-N R-N 329 1 T-9205-R WCC PZR 1 RC PZR MANWAY 1
24MAY04 24MAY04 DR-N ML-Y 19 OPS REV1-1 22:00 22:59 ORT3-N R-N 330 1 RETEST08 WCC RETESTS WCC RUN S-8 REPORT 0
25MAY04 25MAY04 DR-Y ML-Y 138 FOR RCS >350 DEG F 02:00 01:59 ORT3-Y R-N 331 1 T-2088-H WCC 62/A02 1 MRR 62tA02 RMP 1
25MAY04 25MAY04 DR-Y ML-Y 11 9302-2 EM REVO-1 03:00 03:59 ORT3-Y R-N 332 1 T-7750-H WCC P-1B-M I RC P-1B-M RMP I
25MAY04 25MAY04 DR-Y ML-Y 0
9002-1 EM REV2.3-1 03:00 03:59 ORT3-Y R-N 333 1 T-7750-R WCC P-001B-M 1 RC P-1B-M RMP 1
25MAY04 25MAY04 DR-Y ML-Y 7
9002-1 EM REV2.3-1 07:00 07:59 ORT3-Y R-N 2a4 1
T-2614-H WCC SI-878C 1 SI SI-878C EM REVO-1 2
25MAY04 25MAY04 DR-N ML-N 10
.- I07:00-08:59 ORT3-N R-N 335 1 T-7342-H WCC OPS I 01-100B OPS REVO-1 2
25MAY04 25MAY04 DR-N ML-N 0
07:00 08:59 ORT3-N R-N 336 1 T-2408-H WCC RMP 1 4.16KV RMP 9364-2 1 25MAY04 25MAY04 DR-N ML-N 0
UMBILICAL CORD EM 08:00' 08:59 ORT3-Y R-N 337 1
T-9200-H WCC 62VA01 1 MRR 62/A01 RMP 1 25MAY04 25MAY04 DR-N ML-N 0
9302-1 EM REV1-1 08:00 08:59 ORT3-N R-N 338 1 T-3700-R WCC P-001B 1 RC P-1B RMP 9002-415 2 25MAY04 25MAY04 DR-N ML-N 47 MM REVO-1 11:00 12:59 ORT3-N R-N 339 1
T-2408-R WCC RMP 1 4.16KV RMP 9364-2 1
25MAY04 25MAY04 17 UMBILICAL CORD EM 15:00 15:59 340 1
T-9200-R WCC 621A01 I MRR 62VA01 RMP I
25MAY04 25MAY04 DR-N ML-N 0
9302-1 EM REV1-1 15:00 15:59 ORT3-N R-N 341 1
T-7510-R WCC P-001B-M 1 RC P-1B-M RMP 2
25MAY04 25MAY04 DR-Y ML-Y 2
9002-1 MM REV2-1 15:00 16:59 ORT3-Y R-N 342 1
T-3374-H WCC P-OOIB-M 1 RC P-1B-M RMP 3
25MAY04 25MAY04 0
9002-1 EM REV3-1 15:00 17:59 T.91691 RC PRIMARYI 0019163i RC PRIMARN T.9170TR! RC PRIMARY I 00191ihIt RC PRIMARN T-9171-.1 RC SG PRIMAI 0019`1G11 RC SG PRIM T.9205' 1 RC PZR MANY 00192q41 RC PZR MA~
RETESTO8WCC RUN lINSUREA
- T-2088-H1 MRR 6 001208911 MRR
- T-77T5o-H RC P-1 ooinsT171 RC P T-7750-R 001n77 1
T-2614-HI 0012614.
T-7342-H1 001T34UN T-2408-H1 001240BJ T-920041 0019201 T-370 0013 4ANWAYS EPI REV4-1 MANWAYS EPI REV4-1 IANWAYS MM REV3-1 MANWAYS MM RWV3-1 Wy MANWAYS EP4 REV3-1 kRY MANWAYS EIT REV3-1 AY OPS REVI-1 WAY OPS REVI-1 S-8 REPORT FORRCS >350 DEG F
,L RETEST ARE CbMPLETED IA02 RMP 9302-2 FM REV0.1 52VA02 RMP 9302-2 EM REVO-1 M RMP 9002-1 Eh4 REV2.3-1 1B-M RMP 9002-1 EM REV2.3-1 C P-1 B-M RMP 90p2-1 EM REV2.3-1 RC P-1B-M RMP 9002-1 EM REV2.3-I SI-878C EM REVb-1 I SI SI-878C EM RtV0-1 1 100B OPS REVOLI 1 01-100B OPS R6VO-1 4.16KV RMP 9364t2 UMBIUCAL COI I 4.16KV RMP 93q4-2 UMBILICAL CC MRR 62/A01 RMP930241 EM REV1-1 1 MRR 62VA01 RMO 9302-1 EM REVI P-B RMFP 9002-415 MM REY o
I RC P-1B RMP 9002-4/5 MM F T.2406.4.16KV tMP 9364-2 UMB11 001240E1 4.16KV RMP 9364-2 UM T.9200R1 MRR 671A01 RMP 9302-1 001920cJ1 MRR 62A01 RMP 9302-T.7510.RC P-1b-M RMP 9002.1 IV 001751 1 RC te19-M RMP 9002-T-3374.C P-IB-M RMP 9002-1 E 001337_41 RO P-1B-M RMP 900:
CL-2CMOIE 5 TO MODE 4 C tD EM REV0-1 RD EM REVO-
.1 3-1 EVO-1 ICAL CORD ER ILICAL CORD EM REV1-1 I EMREVI-1 M REV2-1 I MM REV2-1 A REV3-1
-1 EM REV3-1 iECKUST I
CL-2C WCC CL 2C MODE 5 TO MODE 4 CHECKLIST 106 25MAY04 30MAY04 I DR-N ML-N 18:00 03:59 ORT3-N R-N 0
Run Date 24MAY04 13:16 LT-03 STANDARD PUBLICATION Sheet 20 of 22 C Primavera Systems, Inc.
I FL-03 Execution Publication Set
after 24MA YU4 7 ZXU I
U1R28 WORKING SCHEDULE I
arrer Z4MA YU4 7 ZXU f
U ID RESP WO I EQID DESCRIPTION RD ES EF RISK MF MAY ST I
Io n
24 Tue 25 IWed 26r I
I I
I I I_
0.t11Ztp 4.1AA20.22 O0. 2.4.6 S. 8.10112l14,151a20,22 O0.2.4 *6,.8,11 12l4l1Vl Z41 l _1 _- _-_
144 I
CL-2D wCC CL 2D MODE 4 TO MODE 3 CHECKLIST 123 25MAY04 30MAY04 DR-N ML-N 18:00 20:59 ORT3.N R-N a
345 1 T-2088-R WCC 621A02 1 MRR 62VA02 RMP I
25MAY04 25MAY04 DR-N ML-N 0
9302.2 EM REVO-1 22:00 22:59 ORT3-N R-N 346 1
T-8022-H WCC IWP I 480V IWP 01-128-E-FN I
25MAY04 25MAY04 DR-N ML-N 0
(W-13B1) EM REVO-2 22:00-22:59 ORT3-N R-N 347 1 T-8381-R WCC CV-00302B 1 CV CV-302B MMV I
25MAY04 25MAY04 101 REVO-1 22:00 22:59 348 1 T.9173-R WCC MS-02018-O I MS MS-2018-0 MMV 1 25MAY04 25MAY04 DR-Y ML-Y 0
REVO-1 23:00 23:59 ORT3-N R-N 349 1 T-5555-R WCC HX-15C I VNCC HX-15C MM 1 26MAY04 26MAY04 DR-Y ML-Y 0
REV1-1 00:00 00:59 ORT3-Y R-N 350 1 T-9172-R WCC PZR 1 RC PZR MANWAY MM I
26MAY04 26MAY04 DR-N ML-Y 16 REV3-1 00:00 00:59 ORT3-Y R-N 351 1
T-9894-R WCC W-001C1 1 VNCC W-1C111C2 EM 1 26MAY04 26MAY04 DR-Y ML-Y 0
REV0-1 00:00 00:59 ORT3-N R-N 352 1 T-7460-H WCC MR 01-128 1 480V MR 01-128 1 26MAY04 26MAY04 DR-Y ML-Y 0
I-1B52-426C (CC-719) 01:00 01:59 ORT3-Y R-N 353 1 T-8022-R WCC IWP 1 480V IWP 01-128'E-FN 1
26MAY04 26MAY04 DR-N ML-N 0
(W-13B1) EM REV0-2 03:00 03:59 ORT3-N R-N 354 1
T-7460-R WCC MR 01-128 1 480V MR 01-128 2
26MAY04 26MAY04 DR-Y ML-Y 31 1B52426C (CC-719) 03:00 04:59 ORT3-Y R-N 355 1 T-8019-R WCC W-01381 1 40VIWP 0-128-E-FN 2 26MAY04 26MAY04 DR-N ML-N 0
(W-13B1) CAUT REVO-1 06:00 07:59 ORT3-N R-N 356 1 T-0678-R WCC ICP-10.29 1 FM ICP-10.29 IC 1
26MAY04 26MAY04 0
REVO0I 08:00 08:59 357 0
T201997H WCC W-013B1 HANG TAG (0 VNCR I 26MAY04 26MAY04 DR-N ML-N 9
W-1381 MM REV0-1) 08:00 08:59 ORT3-N R-N 358 1 T-3374-R WCC P-OO1B-M 1 RC P-1B-M RMP I 26MAY04 26MAY04 26 9002-1 EM REV3-1 09:00 09:59 359 0 T212184R WCC T-119A REMOVE TAG (0 WT 1
26MAY04 26MAY04 DR-N MLY 556 TM-02-037 REMOVAL 10:00 10:59 ORT3-N R-N 360 1 T-2614-R WCC SI-878C I SI SI-878C EM REVO-1 1
26MAY04 26MAY04 0
11:00 11:59 II II I
CL-2DMODE 4 TO MODE 3 C T.2088 I MRR 621A02 RA 00120~41~MRR 62IA021 T-8022.H1 480V rWP 01-12 001 80i11 480V IWP 01 -
T.83814Rj11CV CV-302B M 001 83~11 I CV CV-302B I T-9173.RI-MS MS-2018-o1gi7331 MS MS-2011 T.5~5~55.RVNCC HX-i!
001555j IVNCCHX T-9172..RIRC PZR MAI 001biX RCPZR M T.90~4.Ri1VNCC W-1IC 0009894fL1 VNCC W-1 T.7460.ljl480V MR 0 0I91746CM!1480V MF
- T-8022-RAIw 48V
.0018022*1 480V
- T-74604-RIA 480V M
- 001746d~1 480' T-a019-RI 481 0018019"1 T-O678-RI 00106,75t T2019971f T-3374-F 001337A T21218.4 iECKUST P 9302-2 EM R tMP 9302-2 EN 8SE-FN (W-13B 128-E-FN (W-1 AV REVO-1 AMV REVO-1
) MMV REVO-1
- -O MMV REVO C MM REV11 15C MM REVI-iWAY MM REV MNWAY MM RV I1C2 EM REVO CIIIC2 EM RE 1-128 1B52-426 01-128 1B524 P 01-128*E-FN WP 01-128'E-1 1 01-128 1B52-
'MR 01-128 1E iV IWP 01-1281 480V IWP 01-1 FM ICP-10.29 Ii 1 FM ICP-10.2$
ANG TAG (O VP 1 RCP-B-MR 11 RC P-1B-M RREMOVE TA qSI-S878C 1t41 SI Sl-871 IICL-4D RC 19ji CL-4D T-261 0012 T-489 0014 361 I
T4894-R WCC RC-500 1 CL-4D RC-500 REVO-I 2
26MAY04 26MAY04 11:00 12:59 0
J L
JL.......L L
J Run Date 24MAY04 13:16l LT-03 STANDARD PUBLICATION Sheet 21 of 22 O Primavera Systems, Inc.
I FL-03 Execution Publication Set I
aner Z4MA YU4 7Z:UU I U1R28 WORKING SCHEDULE dUlf cf Iimm YU-# Il;.uU r
U ID RESF wo ST EOID DESCRIPTION RD ES EF RISK I MF I MAYv MnD4 Tue 25 Wed 26 n1f,121i.1Fm.9q nl O9. A. A.
4
.1n8191AA1AR1ft82,2n94 0 29. A. 6. 8.ll,)
1A.1r1 I -
162 I
T-0681-R WCC ICP-4.22 1 WL ICP-4.22 IC REVO-1 I
26MAY04 26MAY04 DR-Y MLY 13:00 13:59 1 ORT3-Y R-N 49 163 1 T-7151-R WCC 1F52-122 1 345KV1F52-122APS 1 26MAY04 26MAY04 DR-YML-Y 0
REV4-1 14:00 14:59 ORT3-Y R-N 164 1
T-8024-H WCC IWP 1 480VIWP01-128-E-FN 2 26MAY04 26MAY04 DR-Y ML-Y 0
(01-39) EM REV0-2 15:00 16:59 ORT3-N R-N 365 1
T-8321-R WCC KEYWAY IFM KEYWAYVBE-448 1
26MAY04 26MAY04 46 IC REVO-1 16:00 16:59 366 0
T201369H WCC W-032 HANG TAG (0 VNPAB I
26MAY04 26MAY04 DR-Y MLY 34 W-32 MM REV0-1) 16:00 16:59 ORT3-N R-N 367 1 T-7342-R WCC OPS 1 01-1008 OPS REVO-1 1
26MAY04 26MAY04 82 17:00 17:59 368 1
T-8334-R WCC RV BOTTOM 1RCRVBOTTOM CE I
26MAY04 26MAY04 DR-Y ML-Y 61 REVI-1 17:00 17:59 ORT3-Y R-N II-IIIIII II, I
I II I
I Il T-4 01 I1 681.Ge LICF 1068111 IWLIC
-7151i.S3451V 101715111 345 T-8024440' 0018024W1RI T-8321i R n
00183211 1 T201369HHAF T-7342.1(
001734%l T8334 I
00183341 T-9673 4 00096711 369 I
T-9673-R WCC KEYWAY I 1FM KEYWAY DSS REVO-1 1
26MAY04 26MAY04 17:00 17:59 45 Run Date 24MAY04 13:16l LT.03 STANDARD PUBLICATION Shoot 22 of22 O Primavera Systems. Inc.
I FL-03 Execution Publication Set I