-9 - r Committed to Nuclcar Er"c"c UUURIEY UF FOIflE BEACH

  • UIR2B Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Wednesday, June 9, 2004 Start Time: 0600 NSB Cafeteria BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)

Operations Coordinators (SOC)

Maintenance Coordinators (MOC)

Engineer / Projects Coordinators (EOM)

Rad Protection Manager (RPM)

Site Safety Coordinator (SSC)

Shutdown Safety Assessor (SSA)

Site Management (SSM)

General Supervisors First Line Supervisors Agenda

1. Safety Issue Discussion (SSC)
2. Radiation Protection (RPM)
3. Operations Coordinator Turnover (SOC)
4. Shutdown Safety Assessment (SSA)
a. Containment Fire Loading SAT / UNSAT -+ Review Deficiencies
5. Maintenance Coordinator Turnover (MOC)
6. Engineering Coordinator Turnover (EOM)
7. Major Projects Update (EOM)
8. Schedule Review (SOM)
9. Management Expectations (SSM)
10. ACEMAN Assessment Results (SOM)
11. Shift Goals (SOM)

Items Included in Daily Package:

- Site Communication

- Safety Snippet

- Outage Alara Report

- Outage Status Report

- Defined Critical Path

.zz'z

- Work Activity Risk Assignment

- Outage Schedule I

1

e'; . Nii Committed la Nuclear ExCIt~~

Outage Status Report Plant: Point Beach Unit I Day: Wednesday Today's Date / Time: 6/09/04 0400 Outage Duration: Day 67 Of Refueling Outage Number U1R28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0 First Aid cases 0 Near misses 0 Total for this outage I Radiological Dose to date 87.505 Projected to date *91.992 Outage Goal *92 R Difference -4.487

  • Reforecast on 5/23 Number of PCEs 12 Summary:

Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0 Summary:

Plant Status Mode: 3 Power Operation E Hot Shutdown (aode4) D Cold Shutdown (fode5) EJ Refueling Shutdown (mode 6)

(Mode 1)

RCS: Temperature: 553 Pressure: 2235 psig Pzr Level: 27%

Time to Boil: N/A Shutdown Safety Assess ent Protected Equipment:

  • None Major Activities Completed In Last 24 Hours Critical Path and Near Critical Path Activities (Next 24 Hours)
  • NI Axial Offset Cal - 50% PAT Currents
  • ORT 4 Turbine Over Speed Testing
  • Increase PAT to 50 %
  • Unit Online (1548 on 6/8/04)
  • Start 2nd CS Train
  • Increase power to 28%
  • Increase Pwr to 75%
  • Cleared Chemistry Hold (0240 on 6/9/04)
  • Flux Map at 75% Power Significant Outstanding Issues Date Issue Due Responsibility

_.U _ _ -_ _-; pcom ing Ia lor Milestones . - .

Scheduled Actual Scheduled Actual Date Time Date Time Date Time Date Time Cooldown <2000 4/03/04 2100 4103/04 2230 RCS Fill & Vent 4/23/04 1500 5/31/04 0653 Head Lift 4/09/04 0900 4/21/04 1550 Heatup >2000 4/25/04 0900 6/2/04 1341 Refueled 4/14/04 0300 5/02/04 1848 Reactor Critical 4/28/04 0800 6/7/04 0243 RN' Headset 4/18/04 1900 5/23/04 1338 On-Line 4/30/04 0100 618/04 1548 2