Comnmtted to Nuclear Ex BI1CE Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Saturday, May 15, 2004 Start Time:
1800 NSB Cafeteria BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)
Operations Coordinators (SOC)
Maintenance Coordinators (MOC)
Engineer/ Projects Coordinators (EOM)
Rad Protection Manager (RPM)
Site Safety Coordinator (SSC)
Shutdown Safety Assessor (SSA)
Site Management (SSM)
General Supervisors First Line Supervisors Agenda
- 1. Safety Issue Discussion (SSC)
- 2. Radiation Protection (RPM)
- 3.
Operations Coordinator Turnover (SOC)
- 4. Shutdown Safety Assessment (SSA)
- 5. Maintenance Coordinator Turnover (MOC)
- 6. Engineering Coordinator Turnover (EOM)
- 7. Major Projects Update (EOM)
- 8. Schedule Review (SOM)
- 9.
Management Expectations (SSM)
- 10. ACEMAN Assessment Results (SOM)
- 11. Shift Goals (SOM)
Items Included in Daily Package:
Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Dcfined Critlial Path Not available 5/15/04 Work Activity Risk Assignment Outage Schedule_
k*lonnafznmft~recordwas4eoted Mi I
I I
I
Committed to Nuclear Enellence POIWg L1w
-PtS A e 1EYF Point Beach Nuclear Plant U1R28 Refueling Outage Theme for the week This week's theme covers Emeraencv Situations. Be it weather, fire or a medical emergency, are we ready to respond to those unexpected situations?
Daily Safet PPets Sunday
'You would be shocked if you found your emergency egress path blocked" Material is beginning to come out of containment as a lot of work Is wrapping up. Don't pile up tools and equipment In the walkway even for short periods of time. Always keep the egress paths open for use.
Monday
'Vf strong winds start to blow, do you know where to go?'
Do you know the proper location to go in the event of a tornado warning if you are In the trailers, turbine hall or PAB? NP1.9.21 covers the site's various shelter areas. Plan ahead and take the time now to review the NP with your group.
Tuesday
'Make sure to cleanup or a fire may start during heat up.
OEl 5310 Indian Point 3 - An oil vapor extractor for the main boiler feed pump failed. The tag out used to repair the extractor resulted In an Increased leakage of oil from the pump bearings onto lagging. A special
- log was created to monitor the leakage, but no plan existed for dealing with the safety hazards.
Maintenance repaired the extractor, retuming It to service. The next day a portion of oil soaked lagging on a main boiler feed pump caught fire and was quickly extinguished by an alert watchstander.
Wednesday
'rake heed - Don't block emelyency equipment you may need."
Last week on the 66ft of containment, the NRC noticed we blocked access to 2 fire extinguishers mounted on the stairwell handrail. A scaffold was built In the area that made access questionable. We then added a number of bags of Insulation It made access Impossible. Just a question - Why Is the NRC finding this Instead of us?.
Thursday "What number do you call if your co-worker takes a serious fall?"
What Is the plant's empergency number? 2911. This number Is only to be used for emergency situations.
Two weeks ago a work group was having trouble getting through to operations to communicate a change In equipment status. Rather than waiting, the Individual Involved decided to contact the control room via the emergency number. Needless to say this was not an appropriate use of 291 1.
Friday
'Make sure your fire watch Is alert to keep someone from getting hurt' OE12607 - LaSalle - A worker using an acetylene torch for cutting through a structural member that was behind a metal wall panel. Wall Insulation behind the member began to bum. The alert fire watch extinguished the fire within one minute of It beginning and no significant damage occurred.
Saturday "Debris buildup may result in an unplanned heat up' OE14899 River Bend Station - A small fire occurred under the exhaust piping on a diesel generator during testing. The fire was observed during routine checks of the generator and the control room was Immediately notified. The control room unloaded the generator while the operator extinguished the fire. The cause was Insulation debris that accumulated around the hot piping over time.
2
Point Beach Nuclear Plant Outage I R28 DAY 41 Supporting Operational Excellence Path i.N P
Picture Meets Outage Radiation Performance fnng:;n't Uca~t Pyrpp~dc I
II 3-gAMUi gA a
I'This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.
Meets:
<=75 Rem Actual Cum.
Exceeds:
<=71 Rem Dose:
55.049 Rem IDay 41 - May 14 l
Actual = 0.169 Cumulative = 55.049 Cumulative Forecast = 55.131 Daily PCE goal reforecast on 4123. Daily dose reforecast on 5/8104.
Reactor Head Repair Dose for May 14th is 1.328 vs. goal of 2.430.
RV Head Total Dose Is 10.354.
Meets: <=18 Exceeds: <=12 Actual PCE's:
9 C^3 S
I SI Stu Thomas
.I Personnel Contamination Events Cummulative Dose Exposure 20 18 fl 16
'u 14 1 12 a 10 028 0
2 6
zE 4 z
2 0
80 I
,.,I
~
I ---- O Ahm I1~
I/
4
.....Forecast Ooat E
0Va 0
0 40 20 s0 II t
11 I
4 I
I
I I
I I
I I
I I
I I
Acual Goal 0 2 468 I U1 Z1 41 01 t$ZLTrCZ4ZUZWUJZj4dWtKU4Z44404tSDUDZ 0 2 4 6 810-2141618224262830323436384(4244464
- 2
Nue _
Commnitted lo Nuclear Excoec t
Outage Status Report Plant:
Point Beach Unit I Day:
Saturday Today's Date / Time:
5/15104 1600 Outage Duration: Day 42 Of Refueling Outage Number U1R28 Safety Status Industrial -Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0
First Aid cases 0
Near misses 0
Total for this outage I
Summary:
Radiological Dose to date 55.049 Projected to date
- 55.131 Outage Goal 575 R Difference
-.082
- Reforecast on 5/8 Number of PCEs 9
Summary: Reactor Head Repair Dose for May 14"' is 1.328 vs. goal of 2.430. RV Head Total Dose is 10.354.
Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0
Summary:
Plant Status Mode:
El Hot Standby (Mode 3)
El Hot Shutdown (Mode 4)
Ea Cold Shutdown (Mode s) 3 Refueling Shutdown (Mode 6)
RCS:
Temperature:
81 Pressure:
Vented to Atmosphere RV Level:
Rod Latch Height Time to Boil:
30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> Shutdown Safety Assessment Protected Equipment:
Major Activities Completed in Last 24 Hours Critical Path and Near Critical Path Activities (Next 24 Hours)
Containment Spray Restoration Complete Cooldown & Final NDE of Reactor Head Repair Area
- Upper Internals Lift Rig Paint Stripping
- Upper Internals Lift Rig NDE
- Resp6nd to Unit 2 Reactor Trip
- Secondary Systems Recovery
- U2 Reactor Trip Recovery Significant Outstanding Issues Date Issue Due Responsibility 5/03/04 Reactor Vessel Head Repair Penetration #26 5/16/04 John Walsh 5/13/04 IP-IA RCP Motor Oil 5/15/04 Dan Laing 5/14/04 T-26 Steam Generator Blowdown Tank 5/17/04 Scott Manthei Upcoming M aor Milestones Scheduled Actual Scheduled Actual Date Time Date Time Date Time Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230
- RCS Fill & Vent 4/23/04 1500 Head Lift 4/09/04 0900 4/21/04 1550 Heatup >200° 4/25104 0900 Refueled 4/14/04 0300 5/02/04 1848 Reactor Critical 4/28/04 0800 RV Headset 4/18/04 1900 I
On-Line 4/30/04 j 0100 4
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST i,
OUTAGE SAFETY ASSESSMENT UNIT:
I DATE:
May 15, 2004 TIME:
1530 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
PONWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN GREEN GREEN GREEN YELLOW NA PROTECTED EOUIPMENT:
r COMMENTS:
z RCS Time to Boil is 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Using NP 10.3.6 Time To Boil curves.
Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1562 Revision 2 10RO02 5Page 5 or Refrences NP 10.3.6 NP 10.2.1
Run Date 1sMAY04 14:11 Work Activity Risk Assignment I
Sheet l' of Run13.1DaSARtFIIS15MAY04 14:11tW Sheet lofS2 15[M21 U
ACT WO I GRP HPE EQUIPMENT Activity START FINISH2 ID ST j
RISK Description toID I
CEI600R027 76 CE8 DR-Y ML-Y R-1 48 HOUR COOLDOWN OF 1
10 13MAY04 15MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M REPAIRED AREA 22:OOA 21:59
- 12134,
- 128CE I
CE1600R029 76 CE8 DR-Y ML-Y R-1 FINAL NDE OF REACTOR 1
12 15MAY04 16MAY04 EJREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M HEAD REPAIR AREA 22:00*
09:59 0213476 - 128CE 1
CE1600G020 76 CE8 DR-Y ML-Y R-1 SETUP AND PREPARE 1
45 16MAY04 18MAY04 I
IJREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M MOCKUP FOR NOZZLE 10:00 06:59 0213476 - 128CE I
CEI600R049 76 CE8 DR-Y ML-Y R-1 P REMOVE NOZZLE 1
2 16MAY04 16MAY04 DREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M EXTENSION 10:00 11:59 0213476 - 128CE 1
CEI600R050 76 CE8 DR-Y ML-Y R-1 P CHAMFER GRIND 1
4 16MAY04 16MAY04
[OREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M 12:00 15:59 0213476-128CE 1
CE1600R055 76 CE8 DR-Y ML-Y R-1 PREP TO INSTALL THERMAL 1
5 16MAY04 16MAY04
[lREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M SLEEVE AT P-26 16:00 20:59 0213476 - 128CE 1
SDI600GO10 76 CE8 DR-Y ML-Y R-1 REVISE PACKAGETO GRIND 1
72 17MAY04 20MAY04 I E ZIREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M OUT OVERLAP 07:00 06:59 0213476 - 128CE 1
SE-I60G-A 76 CE8 DR-Y ML-Y R-1 SR MGMT DECISION TO 1
0 17MAY04
- REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M GRIND OVERLAP 12:00 0213476 - 128CE Li
-CO 1
EM0215224 76 EM DR-N ML-N W-003B-M PERFORM MCE W-003BM 1
4 16MAY04 16MAY04 0CONTAINMENT CONTROL ROD DRIVE SHROUD FAN MOTOR ORT3-N R-M 13:00 16:59 0215224 - 128EM.,1~,l; Ew@.,[
_u-I IC5.11TMGA 76 ICI DR-YML-Y ICP-05.011 CHECK TAVG HIGH D
3 16MAAY04
[IFEEDWATER CONTROL VALVES (OUTAGE)
ORT3-N R-M SELECTOR 08:00 10:59 0300853 - 1281C I
IC2.19 76 ICI DR-N ML-N ICP-02.019.
ICP 2.19 SAFEGUARDS 5
6 17MAY04 17MAY04
[OPOST-REFUELING, PRE-STARTUP SAFEGUARDS LOGIC TES ORT3-N R-M LOGICTEST 06:00 11:59 0300813 - 1281C I
ORT-06 77 OPS DR-N ML-N O-RT-006 ORT 6 CS SEQUENCE 1
6 16MAY04 16MAY04 DCONTAINMENT SPRAY SEQUENCE TEST I
ORT3-N R-M 08:00 13:59 0215957 - 1280P NMC / WE LT-81 HUMAN ERROR RISK BARCHART
_____________________FL-8I HUMAN ERROR POTENTIAL C~d A."
PBNP U1 Refueling 28 Outage O Prdmavera Systems, Inc.
afterl15MAY04 12:00
- 1 UlR28 WORKING SCHEDULE I
after 15MA Y04 12: 00 Ul ID jRESPI WO ECRD DESCRIPTION RD IES I
EF RISK MPMAY S-u-n 16 0 inijw~~iiMon1 1
1 AP0215127B APM 76 X-01-A IX-01-A PERFORM CAL.
1 15MAY04 15MAY04 DR-N ML-N 0X0-A PERFORM CAL OF SUDDEN PFESSURE RELAY OF SUDDEN PRESSURE 09:OOA 12:59 ORT3-N R-N IMANPW EI TRANSFORMER E
4AS
_________R ELAY_
2 1
AP0215128 APM 76 X*OF8 X01-B4INSPECT CAL 16 15MAY04 17MAY04 DR-YML-Y 0 APO 1512X-01-fl. NSPECT CAL AND 3ET AND SET 13:00 10:59 ORT3-N R-N MA--N -OWE 3
1 AP0215129 APM 78 X-01-C X-01-C-INSPECTCAL 16 17MAY04 19MAY04 DR-YML-Y 0
AP0215 29X-01-C.INSI ANDSET 11:00 08:59 ORT3-N R-N 0215 29jpfjP 4
1 AP0303888 APR 781 A-01 CALIBRATE IA-01 52 1 1MAY04 21MAY04 DR-N ML-N 225
~
~
EI-lNNT PCRLY NON-TECH SPEC Oa-Om 09159 ORT3-N R-N eggCA__E___
0 N I
RELAYS 5
1 AP021 5122 APR 761 A52-04 P-lA UNDERFREO.
6 17MAAY04 10MAY04 DR-N ML-N 0
APO22 P-1A LINDE RELAY FUNCTIONAL 12:00 08:59 ORT3-N R-N 02a 1 2
6 0
L1510OS-3 APS F52-151 LINE 151 OUT OF 7'
14MAY04 15MAY04 DR-N ML-N 0 15 LI3NEi5' OOSR IC ECNTIE SERVICE (SECOND 07.00A, 18:59 ORT3-N R-N OTO EVC CN IE
_ _ _ _ _ _TIM E)_
7 0
ATC151-3 APS F52.151 ATC WORK AT NORTH 5
14MAY04 15MAY04 DR-N ML-N 0 TC 5-3ATC WOKAT NORTH APPL TONSUBSTATION APPLETON SUBD 08:01A 15.59 ORT3-N R-N
~STATION_
8 0
L151SI-3 APS F52-151 SWITCHING LNE 151IN 2 15MAY04 15MAY04 DR-N MLN 10 151Sl-3 SWITC HINGULNE I 5IIN D17.00 18:59 ORT3-NR-N 9
1 AP0215099 APS 78 F89-112 SPECTICLEAN/LUBRICA7 3
17MAY04 17MAY04 DR-N ML-N 0
APZ 59 PECTICLEAWd OPERATOR 08:00
.10-.59 ORT3-N R-N 021509 X-03HWVSTN 1 0 0
AP0304870A APS 76 H52-DHPVR-DELIVER H52-05 TO 6
17MAY04 17MAY04 DR-N ML-N 0
AP030487OA H52-05' MAINTENANCE SHO 08:00 13:59 ORT3-N R-N 0304870 13.8KV 11 I¶ AP0215099A APS 76 F89-112 STROKEOPERATOR I
17MY417MAY04 DR-N ML-N 1621
-AP021 O
DURING TAGGING 11:00 11:59 ORT3-N R-NAPI ASI EVLTIN021 UxoHSi 1 2 0
BM307O1lSS BMS D-105 COLLECTAIRFLOW 3
17MAY04I 17MAY04 6951 nm3oTmIssdn rCTAIRFu DATA (DOOR CLOSED) 08:00' 10-59 1 3 0 1CEO3105717 CE 763 Z-065A Z-65A INSTALL MR 40 10)MAY04 21 MAY04 131 -EO:
05T7Z-85 ITALL MRO3044 03-044 07:00A4 14:59 14 0
CE0311772 CE 751 Z-065A Z-65AINSTALL HEAT 401 10MAY04 21MAY04 131 XO: '17Z-65AI ALHEAT TRAC
-MR 03-044 TRACE - MR 03-044 07.00A, 14:59
-E 1 5 0
CE30701IISS CE 76 D-105 PRE-JOB BRIEF D-105 4
17MAY04 17MAY04 DR-N ML-Y 0
CE08 1sp BRIEF D-'
REPLACEMENT 07:00, 10:59 ORT3-N R-N 0307011 125V DCST) 1 6 0 CE0307011A CE 76 D-105 R-TE EQUIPMENT 8
17MAY0-4 18MAY04 DR-N ML-Y CE030701 APESAE FORD-lOS I11:00) 10.59 ORT3-N R-N 0307b 1
REPLACEM ENT__
Run Date 15MA0 351LT03 STANDARD PUBLICATION SetIol C Prtmavera Systems, Inc.
I FL-03 Execution Publication Set
after 15MAY04 12:00 l
U1R28 WORKING SCHEDULE l
after 15MAY04 12:00 RESPI WO MAY A
U 17 J 0 ID CE0306041 CE30000TI EQID DESCRION RDl ES EF RISK ST CEI CE3 76 1 INTAKECRI INSPECTCRIB. INSTALL 1 12 05APR04 17MAY04 I DR-Y ML-Y BUOYS AND FISH I.I 10-O0A 13:59 ORT3-Y R-N MF 246 201 Sat 468 Su 1
1 Mon 17 1.1012.14t%%120,22D 0. 2, 4. 6, 8.1D12,14,16,18202210,22 O 2 4.i 6. 8 i10012,14,161
-r j01i INSPECt CRP iNSTALL B VYS AND FISH I
_-__1 3NTAKE
-E mn ENCAPSATE INSULATIO ON HP TURBINE C= -
Hl in U
Ii HI(
18'l 76 TG-01-T ENCAPSULATE I 10 01MAY04 17MAY04 I DR-Y ML-Y INSULATION ON HP 12.00A 16559 ORT3-Y R-N 19 II CE26TOHIr CE3 77 IST-SISI REINSULATE-FAC 172 04MAY04 21MAY04 DR-Y ML-Y PROG -TURB HALL 26 2000A j 14:59 ORT3-Y R-N 267 CE rOHnREINSU4 ATE *FAC PROG *iRB HALL 26 FT 4 HD 20 1 1 I CE44CGATI ICE3I 76 1 INSUL-MS REINSULATE-FAC 35 12MAY04 I 16MAY04 I DR-YML-Y 16 PROG-CTMT44FTGENJ _
17.00A 22:59 ORT3-YR-N 21 l 0 CE309512T1 CE3 77 SERVICE INSTALL INSULATION 1 2 13MAY04 I 15MAY04 DR-Y ML-Y 1SW-2861 20 00A 20.59 ORT3-Y R-N 169 I
CE.
GATlREINSULAE FAC PROG - TMT44 FT GEN 4EA 1_
EINSULAflON 018174 CE 2I~
l INSULATION 1SW 2861 MISC EQUIPMENT INEPARIRSERVICE0 6006 C -44TGAT1REINS
.0303636 CE2; OHSRREM
-FAC PROG-RB HALL26 FT
-EC 22 1 CE44TGATI CE3 77 IST-SISI REINSULATE-FAC 23 17MAY04 18MAY04 DR-Y MLtY 212 PRDG -TRB HALL44 FT 15:00' 21:59 ORT3-Y R-N Mom-E lllrflm M&ms
- -1i 1
23 1 CE26TOHSR CE4 77 IST-SISI REMSCAFF-FACPROGJ 23 01MAY04 17MAY04 DR-Y ML-Y 355
-TURBHALL26FT 0900A 14:59 ORT3-YR-N 24 1 I CE08TOHSR CE4 77 IST-SISI REMOVE SCAFF -FAC l 32 l 05MAY04 I 18MAY04 I DR-Y ML-Y PROG -TURB HALL sFT 10UA I
2259 ORT3-Y R-N 211 CE0t rOHSRREMB{E SCAFF. FAC p4.-TUB HALL 8+OVEO Sm I
S I
m I 25 1
CE215202SR CE4 76 P-001A-M REMOVESCAFFOLDINGl 4
15MAY04 l 15MAY04 r DR-YML-Y 276 F
fOR P-IA-M 1B:00 l
21:59 ORT3-Y R-N 26 1
CE408152SR CE4 87 SC-055-O REMOVESCAFFOLDINGI 5 15MAY04 15MAY04 244 FOR SC-955-O
[0 18:00' 22:59 CE CE 15202SRREM 0215202W 08152SRREM 0408152f0 3VE SCAFFOLDING EREACTOR COOLb DVE SCAFFOLDINC
!RC HOT LEG SA CE66CO01O FOR P-IA-M NT PUMP MOTOR FOR SC-955-O APLE ISOLATION O iREMOVE SCAFFC IF 27 1 CE66CD00SR I CE4 P-001B-M IREMOVE SCAFFOLDING1 10 16MAY04 16MAY04 FOR B RCP MOTOR 10-00 11959 DR-Y ML-Y ORT3-Y R-N 151 i
_ r 28111 28 P1402-SR ICE4 77 Z-022 REMOVE SCAFFOLDING 10 17MAY04 17MAY04
-Z-22 INTERNALS UFT 06:00' 15,59
. _ DR-Y MI-Y ORT3-Y R-N 0
29 1
CE300867SR CE4 76 ICP-05.047 REMOVE SCAFFOLDING 4
17MAY04 17MAY04 DR-Y ML-Y 239 FOR ICP 5.47 07:00 10:59 ORT3-Y R-N 3
1 CE933444SR CE4 76 W-001C2-A REMOVE SCAFFOLDING 5
17MAY04 17MAY04 DR-Y ML-Y 231 FOR W-1C2-A 14:00 18:59 ORT3-Y R-N 31 1
CE44CGASR CE4 77 IST-SISI REMOVE SCAFFOLDING 4
17MAY04 17MAY04 DR-Y ML-Y 231 FOR FAC PROG 15:00 18:59 ORT3-Y R-N 1ERATOR LDING FOR B RCP I EACTOR COOLANT P1402-SRREY 0301913f CE300867SRRE 03008670 CE9 CE CE I
IOTOR PUMP MOTOR WVE SCAFFOLD RR-1 I WOVE SCAFFOL ISECONDAR' 3444SRREMOV 1933U44
.4CGASRREMC 03036365 Z13968SRREMO 0213968=
32 1 1 CE213968SR I CE4 82 TG-01-G REMVE SCAFFOLDING FOR MAIN GENERATOR MN E2 T- 02 13BD TANK PIPING /
I INPINGMENT PLATEl 5
17MAY04 17MAY04 15:00 19:59 DR-Y ML-Y ORT3-Y R-N DR-Y ML-y ORT3-Y R-N 0
33 1 I CE0407589C CES 76 T-026 4
07MAY04 I 15MAY04 07:00A I 15:59 2 CEk589CT4M26 q0D TANK PIPING I IfPGMENT PLATElREPAIR BLOWD4WN TANK040758 lo Run Date 15MAY04 13:51 LT.03 STANDARD PUBLICATION Sheet 2 of 17 O Primavera Systems, Inc.
I FL.03 Execution Publication Set I
after 15MAY04 12:00 U1R28 WORKING SCHEDULE after 15MAY04 12:00
._.R2 WOKN SCHEDULE U
C 2 CE9929774 RESP CES wo ST n7
. EQID Z
DESCRIPJ1ON INSTALL/MOD PLATFORMS RD I ES EF I
RISK MIF MAY sa is Sun 16 Mon 17 4
1.9. A.
- 4. 6.1 I n.2 A.A.
iin119.14JR16§ 34 11 27 10MAY04 20MAY04 DR-Y ML-Y 10:00A 09.59 ORT3-Y R-N 49 :E9b29774 INSTALLPMOD PLATFORMS 0
I 4
4-4
+
4 4-35 1 I
CE9933444 CES 82 W-0o1c1 W-1C2-A. RE-WELD DAMPER PLENUM 12 15MAY04 I 17MAY04 09:00A 13:59 0 N-1 2A RE-WELU DAMPER PLENUM I
-I CONTA 36 1 i CE0408110 ICE51 20 PIPINGEB-I MS-2085ELBOW-10tI 16MAAY04 16MAY04 DR-Y ML-Y 0
_ REMOVE STANCHION 07:00 16:59 ORT-Y R-N CE0408110M! 2085 ELBOW-RE?
0408110 IREHE.
OVE STANCHION
.T STEAM TO THE F CE040T589BS EHEATERS B Al LOSEOUT BO TD 3T 1 CE0407589B CE5 76 T-026 CLOSEOUT BD TANK 20 17MAY04 19MAY041 DR-Y ML-Y FOLLOWING REPAIRS 08:00 09:59 ORT3-Y R-N 0
AnflvE7i 1 t4 4-4 I-*
38 11 CE0408118 CE0210986 CES CE6 78 TE 77 MISC SE SEC REPAIR FLOOR BEAM SOUTH OF 1T-026 8
17MAY04 I 18MAY04 I DR-Y ML-Y 10:00 09 59 ORT3-Y R-N 0
I 3
CE040811 04081' SREPAIR FLOO 8!
391 SEC SUPPORT MR 99-011P8 1681 05APR04 I 14JUN04 I DR-N ML-N 07:00A 14:59 ORT3-N R-N CEO110986SEC SUePORT MR 99O11W I
I-1-
I I
t14 I
44
+
4 I-4 1
CE0210989 CE6 76 SEC SEC. INSTALL NEW EQUIP MR 99011-E 1681 05APR04 14JUN04 I DR-N ML-N 08:OOA 14:59 ORT3-N R-N 3
rFimoSEC, INITALL NEW ECIUIP IR 99-0 1E
'I I
I 411 0 CE0210990 CE6 76 SEC
_ SEC REM ABANDONED 11711 03MAY04 15JUN04 I
EOUIPMR99-01VF I 08OOA 09-59 DR-N ML-N ORT3-N R-N 0 CEOl10990SEC RE4 ABANDONED EQt P MR 911 F am i -
Em.
m 42 CE1600R027 CE8 76 R-1 48 HOUR COOLDOWN I 10 I 13MAY04 I 15MAY04 l DR-Y ML-Y OFREPAIREDAREA 22:OOA 21:59 ORT3-YR-M 0
FJ6160RO248 HOLIR COOLDOWN OF I
__REACTOR YES7SE 43 1
CE1600R029 CEO 76 R-1 FINALNDEOFREACTOR 12 15MAY04 1IMAY04 DR-YML-Y 0
HEAD REPAIR AREA 22:00' 09.59 ORT3-Y R-M 44 1
CE1600R049 CE8 76 R-1 P-26-REMOVENOZZLE 2
16MAY04 16MAY04 DR-YML-Y 0
EXTENSION 10:00 11:59 ORT3-YR-M 45 1
CE1600GO20 CE8 76 R-1 SETUP AND PREPARE 45 16MAY04 18MAY04 DR-Y ML-Y 0
MOCKUP FOR NOZZLE 10 00 l
06:59 ORT3-YR-M 46 1
CE1600R050 CEO 76 R-1 P CHAMFER GRIND 4
16MAY04 16MAY04 DR-Y ML-Y 0
12:00 15:59 ORT3-Y R-M 47 1
CE16DOR055 CEB 76 R-1 PREP TO INSTALL 5
16MAY04 16MAY04 DR-Y ML-Y 15 THERMAL SLEEVE AT 16:00 20:59 ORT3-Y R-M 48 1
SDI6800010 CE8 76 R-1 REVISE PACKAGETO 72 17MAY04 20MAY04 DR-Y ML-Y 0
GRIND OUT OVERLAP 07:00 l
06:59 ORT3-Y R-M CEi600R02 g FINAL NDE OF RE EPAIRED AREA
.AND ASSEMBLY0D kCTOR HEAD REPA
__.02134G !
REACTOR VESF-I CEI600R04 021347 CE1600G02 021347 CE16001 021 CH0300362RC_
0300362=
1P REMOVE N(
SEOREACTORVE!
SETUP AND PREP 113476 IR AREA l.AND ASSEMBLY LO E EXTENSION SEL AND ASSEMB.
ARE MOCKUP FOR I'
NOZZLE GRINDI lNOZZLE GRIND 0-I---
tON P CHAMIF 476T3REACT(
E1600Ro5sPREPTI 0213476_
LTSR 3452 R GRIND sR VESSEL AND AS p tNSTALLTHERMA REACTOR VESSEL SDI600G0IORE 0213476E SE460 0213 3EMBLY L SLEEVE AT P-AND ASSEMBLY SE PACKAGE1 3-A SR MGMI T76REACTOI 49 1 11 SE-1600-A CEO 76 R-1 SR MGMT DECISION TO GRIND OVERLAP 0
17MAY04 12:00*
DR-Y ML-Y ORT3-Y R-M!
96 50 I 1 I CH0300362 CH 1 77 ICHEM-SAMPL RCS CL TSR 3.4.52 l 72 16MAY04 I 22MAY04 06.00*
11:59 262
-9
I
JJL a
u J.
a Run Date 15MAY04 13:51 LT.03 STANDARD PUBLICATION Sheet 3 of 17 C Prlmavera Sstems, Inc.
FL-03 Execution Publication Set I
after 15MAY04 12:00
] U1R28 WORKING SCHEDULE I
after 15MAY04 12:00
DESCRIPTION RDl ES EF RISK I MF Sat 15 MAY Siun 16 Mmn 17 192.IR.1&
51 1 1 1 CH0300375 CH 77 CHEM-SAMPL RCS DO TSR 3.45.1 72 16MAY04 22MAY04
.06:00 I11:59 262 52 1
CH0300405 CH 77 CHEM-SAMPL RCS BORON SR 3.9.1.1 72 16MAY04 22MAY04 262 06:00 11:59 53 1
CAMP-1138C CH CAMP-113 CAMP-113 N2 SPARGE 3
16MAY04 15MAY04 DR-N ML-N 0
AND SAMPLE B STEAM 08:00 10:59 ORT3-N R-N 54 1
CAMP 113AC CH CAMP-113 CAMP-113 N2 SPARGE 3
16MAY04 16MAY04 DR-Y ML-Y 0
AND SAMPLE A STEAM 20:00 22:59 ORT3-N R-N 55 1
CH03DO431 CH 77 CHEM-SAMPL RCS GROSS ACTIVITY 6
17MAY04 17MAY04 316 SR 3.04.16.01 07:00 12:59 56 1
CH0300418 CH 77 CHEM-SAMPL RCS FLTSR3.4.5.3 8
17MAY04 17MAY04 314 07:00a 14:59 57 2
CH0300541 CH 77 CHEM-SAM RCS FL TSR 3.4.5.3 8
17MAY04 17MAY04 314 07:00 14:59 58 0
CH0300199 CH 77 CHEM-SAMPL BAST BORON TSR 40 17MAY04 21MAY04 131 3.5.12 07:0Or 14:59 59 1
CH0300389 CH 77 CHEM-SAMPL SGBDFO GAMMA SCAN 40 17MAY04 21MAY04 131 07:00 14:59 60 1
CH0300444 CH CHEM-SAMPL RE-229 ISOTOPIC 40 17MAY04 21MAY04 131 07:00-14:59 61 2
CH0300485 CH 77 CHEM-SAMPL RCS BORON SR 3.9.1.1 40 17MAY04 21MAY04 131 07:00' 14:59 62 2
CH0300502 CH 77 CHEM-SAMPL RCS CLTSR 3.45.2 40 17MAY04 21MAY04 131 07:00 14:59 63 2
CH0300515 CH 77 CHEM-SAMPL RCS DOTSR 3.4.5.1 40 17MAY04 21MAY04 131 07:00' 14:59 64 2
CH0300528 CH 77 CHEM-SAMPL SGBDFO GAMMA SCAN 40 17MAY04 21MAY04 131 07:00 14:59 65 2 CH0300554 CH 77 CHEM-SAMPL RE-229 ISOTOPIC 40 17MAY04 21MAY04 131 07:00-14:59 68 0
EE0208969 EEP 77 G-01 THERMALVECTOR DAT4 4 16MAY04 16MAY04 208 COLLECTION 08:00' 11:59 67 1
EE0302137 EEP 76 P.058 P458-POST 1
17MAY04 17MAY04 DR-Y ML-Y 122 MAINTENANCE 07:0a 07:59 ORT3-Y R-N 1
EM0215241 EM 76 41/1E02 RMP§308. DS-1 14 06MAY04 17MAY04 DR-NML-N 65 MO BREAKER 19:00A 00:59 l ORT3-N R-N l CH03003T5RCS tOTSR 3.4.5.1 1CH03"004sRShO SR 3.9.1.1l 0300405_
CAMP-113B P-13 N25SPARG NITROGEN MIXI CAMP-113ACC In. 294.6R. 810112.14.16.1 E AND SAhPLE B rEMGENERAI 4G OF STEAM GEN TOR CHEMW AMP-1 13 N2 SPAR AND SAMPLE ENITROGEN MIXIG OF STEAM G CH0300431 R GROSS ACTIV 0300431 MISC CHI CH0300418R FLTSR 3A.5.3 0300418 MISC CH0300541 RC FLTSR 3..5.3 0300541 MISC CH0300199 BORONTSR 0300199 CH03003898 F
AM S 0300389 CH030044RE 2291ISTOPIC l 0300444 CH0300485R BORON SR 3.c 0300485 CH0300502RC CL SR 3A.5.2 03 00502 CH0300515R D TSR 3.4.5.1 0300515 CH0300528 OFO GAMMAS 1 H0300528 ICH0300554RE 29 ISOTOPIC EE020S969Al VECTOR D 0200969EMERGENCY I 4TA COLLECTION
)IESEL GENERATOI EE0302137 P-C 03021371f I 1TG401 TOE 58 - POST MAIN' YDROGEN SIDE KCIT ER FIELD Ci 15241 RMP 9348, DS-1 BREAKER AIWNTENANCE Run Date 15MAY04 13:511 LT-03 STANDARD PUBLICATION FL-03 Execution Publication Set I
Sheet 4 of 17 O Prlmavera Systems. Inc.
after 15MAY04 12:00
.1 U1R28 WORKING SCHEDULE I
after 15MAY04 12:00 U
ID EM0212645 RESPJ WO
^.^w EQID DESCRIPON RD ES EF RISK MF I It IS SatiS Sun 16 Mon 17 t.lflil2.1A.migim"~I.7 nl
- A.4 A.R RA.l1il.1A.IR.1
09MAY04 15MAY04 DR-N ML-N 11 MOTOR BEARINGS I I 09OA 16 59 ORT3-N R-N
.M0 l264 1W.384 O,
mdlom~
I REPLACE MOTOR UNMENT CONTROL M RMP 58 FIRE BA BEARINGS ROD DRIVE SHROI tRIER SURVEILLM D FAN MOTOR 021 645 70 Ji EM0216170 EM 76 FIRE4BARRI I PERFORM RMP 58 FIRE I 8 I 09MAY04 I 16MAY04 I DR-N ML-Y I 100 BARRIER 21:00A 01:59 ORT3-N R-N
.U I
F1RF RAPT Irw Nm rr~jTAiNU
- tfll617fl 71 1i EM0215202 EM 76 1 P.001A-M P-1A-M PERFORM OQ.
1 12MAY04 15MAY04 DR-N ML-Y 0
CHANGEFLUSH 0 00:OOA 12:59 ORT3-N R-N EMO 5202P.1A-M REACTORC 07638CTROU
'ERFORM OL CHAI OLANT PUMP MOT LESHOOTrREPAIR IGEIFLUSH D02115202 rB CRANE (SMALL
.,.....*u 721 EM0407M3C IEM 76 Z-014 TROUBLESHOOTREPAIR 6 I 12MAY04 16MAY04 TB CRANE (SMALL I
12.00A 1Z59 327 iOOK)
- Hi m
~
I TRBINE BL6G OVERHEAD CRANEO-407638 73 1 1 EM0215228 EM 76 W-003B W-38-M INSPECT AND 1 5 14MAY04 15MAY04 DR-N ML-N MAINTAIN FAN AND 07.00A 16:59 ORT3-N R-N 172 ElI 74 1
EM0312035A EM 76 P-028B-M IP-28B-M PERFORM 3
15MAY04 15MAY04 DR-Y ML-Y 0 E POST MCE TEST 1 1.00A 14:59 ORT3-N R-N 75 1
EM0216539 EM 76 TG-01-VARM REMOVE TEMPORARY 2
15MAY04 15MAY04 DR-N ML-N 0
METERING T-MOD 12.00*
13:59 ORT3-N R-N 76 1
EM0216169 EM 77 COM TEST ALL GAI-TRONICS 4
15MAY04 15MAY04 DR-N ML-Y 285 12.00 15:59 ORT3-N R-N 77 0
EM0215134 EM 77 COM GAJ-TRONICS TEST 15 15MAY04 16MAY04 DR-N ML-Y 727 r 12:00o 02:59 ORT3-N R-N I
WC0 l~8W-B-M ICOrn 1203SAiP-2 81 WSEAMC
- 1TG-0 Thi 161 6gTEST A 15134GAITRI NSPECT AND MADl INMENT CONTROL
-M PERFORM POSI NERATOR FEED P
.TEMPORARY ME BINE GENERATOR L GAI.TRONICS STEM MULTI ANDC NICS TEST TAIN FAN AND MO ROD DRIVE SHROI MCETEST IMP MOTOR03120:
ERING T-MOv 02-0 OUTPUT VARMETE R NON-NUMBEREE DR D FAN0215228 5
2 t0216539 EOLJIPMENTO2161
-r -- - -- ----
9 C
COM SY1 EM MULTI AN NON-NUMBERED OUIPMENT021I 781 0 EM0405897Z I EM 76 D-106 D-106 PERFORM 11081 15MAY04 19MAY04 EQUALIZING CHARGE 12:00 23:59 DR-N ML-Y ORT3-N R-N n Ct aa....f-l ni flRU rft A
VIADM-I I-
__I_
79 1
EM0306911 EM 76 TG-01-VARM 1TG-1-VARM READS 8
15MAY04 1SMAY04 DR-N ML-N 207 HIGH 'REPLACE 14:00*
21:59 ORT3-N R-N 80 1
EM0215199B EM 76 P-001A-M P-OOlA FINAL PMT PER 10 15MAY04 15MAY04 DR-N ML-N 0
9002-12 14:00 23:59 ORT3-N R-N 81 0
EM0304828 EM 77 P-OOIA/B-M INSPECT SPARE RCP 4
15MAY04 15MAY04 730
_ MOTOR 20.00*
23:59 82 0
EM0304873 EM 76 A52-DHVR-1 P-028A - BREAKER 24 15MAY04 16MAY04 DR-Y ML-Y 0
MAINTENANCE 1200-34 20.D0r 19.59 ORT3-N R-N 83 1
EM9937213 EM 76 Z-022 Z-022 - REPLACE CUT 10 15MAY04 16MAY04 DR-N ML-N 23 LGHT WIRING 21:00 06:59 ORT3-N R-N 84 1
EAMRCP-B1 EM 76 P-OOIA-M REPLACE A RCP 2
16MAY04 16MAY04 DR-Y ML-Y 360 FLOORPANEL 00:00 01:59 ORT3-N R-N 85 1
EM0215205 EM 76 P-001B-M INSPECTANDMAINTAIN 10 16MAY04 16MAY04 0
REACTOR COOLANT 00.00 09.59 86 1
EM0215203 EM 87 P-001A-M P-001A-M -2ND MCE 3
16MAY04 16MAY04 DR.Y ML-Y 0
TEST (1A52-04)IA-01) 01:00 03:59 ORT3-N R-N EM0 EMO 06911 1T7-1.
READS HIGH' ITO-Cl TURBINE 4 15 1 9 9 P
FAPMT PER 9 REACTOR CO4 EM0304828 SPARE RCI 0304828 3SPARE 1/2P-1i EM03048z3
-28A BREAKER N REPLACE METER
- ENERATOR OUTPI 22-12 UANT PUMP MOTC MOTOR JB REACTOR COOt PINTENANCE 1200 03048731 EM9937213
- 993T213 EAMRC 021 EM021 021 EMO0 E
r I
141 E-022. REPLACE C R-1
-431 REPLACE A I 5199UREACTOR1 5INSPECTAND IT LIGHT WIRING REACTOR VESSEI tCP FLOOR PANEL
)OOLANT PUMP MC AAINTAIN REACTO JTVARMETER0306 iR0215199 ANT PUMP MOTOR 34 (A52.05) 16 KVI1200 AMP VA INTERNALS LIFTIN
,TOR
% COOLANT NT PUMP MOTOR
.0411A-01)
MOTOR r CUBICLE 1200-31i
- UUM BREAKER I)II CUUM BREAKE 3 RIG AM204) 2ifl20 i
11 15203 P-OCA-M 21 1523MRE-ACTC R0304874AIP0OIA I 0304874M4~
D MCE TEST (1A52 iR COOLANT PUMP
'M BKR TESTING A l6 KV/120DAMPVA 87 I 0 1 EM0304874A I EM 76 A52-DHVR-1 IP-01A PM BKRTESTING AT CUBICLE 4
16MAY04 I 16MAY04 1 DR-Y ML-Y 04:00 07:59 ORT3-N R-N 215 Run Date 15MAY04 13:51I LT-03 STANDARD PUBLICATION l
Sheet5of 17
_ PrimaveraSystems.lnc.
FL.03 Execution Publication Set S
after 15MAY04 12:00 U1R28 WORKING SCHEDULE after 15MAY04 12:00 U
I lRESPl WO EQO DESCRIPTION RD ES I
MF RISK I
MAY
_II
-10 114,1&120.2210.2.4.6.8.10112.14,16,182210,2,4, 6,8,100261 ei;4t.
1lW r=c"l~
i_
- Ll_ 1M -3 h L 1 1 81 EM0406353 EM 76 D-05 INSPECT CELLS FOR ELECTWOLYTE I
1MAY047 I0 AY04 07:00' 07:59 0
89 1
EM0215222 EM 75 W-001C2-M LUBRICATE 1W.1C2 2
16MAY04 16MAY04 31 MOTOR BEARINGS 07:00 08:59 90 0
EM0306039 EM 77 ISFSI BLDG ISFSI SECURITY BLDG 8
16MAY04 16MAY04 715 MAINTENANCE -
07:00r 14:59 91 0
EM0309138 EM 76 D-106 STATION BATTERY INSP 3 16MAY04 16MAY04 0
PER RMP 9046-1 0800 10:59 92 0
EM0305246 EM 77 D-502 MONTHLY G-05 4
16MAY04 16MAY04 0
STARTING BATTERY 11:00 14:59 93 I
EM0215224 EM 76 W-003B-M PERFORM MCE 4
16MAY04 16MAY04 DR-N ML-N 0
W-003B-M 13:00' 16:59 ORT3-N R-M 94 0
EM0305252 EM 77 D-503 MONTHLY G-05 BLACK 5
16MAY04 16MAY04 0
START DIESEL 15.00 19-59 95 0
EM9932294 EM 76 A52-DHVR-1 1200-34 1P28AtAUX 2
16MAY04 16MAY04 DR-Y ML-Y 14 SWITCH GUARD 18:00 19:59 ORT3-N R-N 96 0
EM0407602 EM 76 A52-DHVR-1 REMOVE SIN 1200-35 1
16MAY04 16MAY04 DR-N ML-Y 14 FROM CUBICLE A52-04 19:00 19:59 ORT3-N R-N 97 0
EM0305238 EM 76 D-501 MONTHLY G-05 GT 6
16MAY04 17MAY04 0
GENERATOR 120V DC 2M.00 01:59 98 0
EM0305230 EM 76 D-23 MONTHLY SECURITY 4
17MAY04 17MAY04 DR-N ML-Y 25 SYSTEM BATTERY 02 00 05:59 ORT3-N R-N 99 0
EM0301793 EM 76 H52-HK-200 BREAKER 16 17MAY04 17MAY04 DR-N ML-Y 153 MAINTENANCE HK-2000 05:00 20.59 ORT3-N R-N 100 1 EM0215246 EM 76 62/A01 CALANDTEST62JA01 6
17MAY04 17MAY04 DR-N ML-N 0
RELAY PER 1RMP 06:00 11 :59 ORT3-N R-N 101 I
EM0400344A EM 76 P-028A-M IP-28A-M PERFORM 2
17MAY04 17MAY04 DR-Y ML-Y 187 LEAK CHECKS AT NOP I/
1000 11:59 ORT3-Y R-N EM040B353 INE
- 040635311 EM0215222WI 0215222E EMo30639ISF 03060391 EM0309138S 0309138!
EM0305S 0305:
EMO0 0o El PECT CELLS FOR I 15V DC STATION BI IRICATE 1W-1C2 M CONTAINMENT CO SI SECURITY BLDG LECTROLYTE TTERY fTOR BEARINGS VLING FAN MOTOR YMAINTENANCE -
ISI BUD i
SiP.TRUC IrTU iR 7ATION BATTERY n
- 125V DC STATIC
,46 MONTHLY G-05
'46G-05 GT (
15224 PERFORM M 15224CONT 03OS252 MONTHL' 0305252c EM99322941200 9932294OU4 EM0407602RE I 0407602114 EM0305238h 0305238 EM SP PER RMP 9046 4 BATTERY TARTING BATTER EN STARTING DIE'
- EW-003B-M INMENT CONTROI G-05 BLACK STAF 05 GT GEN AUXILL 34 IP2WAUX Sw1i I6 KV/1200 AMPV/
1OVE SIN 1200-35 1 16KV1I200AMPV$
ONTHLY G-05 GT C G-05 GT Gl 305MMONTHLY 3052301 SEC EM0301793BREA 0301793f EM0215246CAL 0215246^
EM040034 04003 EM021 021 ENV
'INSP EL ENGINE DE\\
ROD DRIVE SHI r DIESEL RY POWER DIE CCH GUARD
- UUM BREAKEJ ROM CUBICLE
,UUM BREAKEf
'NERATOR 120 NERATOR 120V ECURITYSYST JRTTY SYSTEM
[ER MAINTENA I
1021 1 EM0215122 EM 76 A52-04 ASSISTAPR DURING 1 6 1 17MAY04 I 18MAY04 I DR-N ML-N P-IA RELAY 12:00 08:59 ORT3-N R-N 0
kND TEST 621A1 In1A-01 BUS I1P-28A-M PER 4NSTEAM GE 5122ASSISTAP 5122 w
1304870BREAK p304870 EM9925005 30 99250051A EM030172AB 0301792
_ _I
_._1 1031 EM030470 EM
.76 H52-DHPVR-BREAKER MAINTENANCE 16 17MAY04 I 18MAY04 14:00 05:59 DR-Y ML-Y ORT3-N R-N 2
1041 01 EM9925005 IEMI 76 1A52-DHVR-3 13000-1 tX02-1AOl CELL 1II 17MAY04 17MAY04 I DR-N ML-N 164
_wr
_cH INSPECTION I 17:00f 17:59 ORT3-N R-N 1051 0 1 EM0301792A EM 76 A52-DHVR-3 BKR MAINT. PORTION AT 4 1 17MAY04 I 17MAY04 DR-N ML-N CUBICLE (A52-01) 17:00' 20:59 ORT3-N R-N ol Run Date 15MAY04 13:51 LT-03 STANDARD PUBLICATION l
Sheet 6 of 17 O Prfmavera Sstems, Inc.
I FL-03 Execution Publication Set
after 15MAY04 12:00 l
U1R28 WORKING SCHEDULE after 15MAY04 12:00
_ U ID RESP WO EQID DESCRIPTION RD ES EF RISK MF MAY
_S 31a102,14,1618,20,2210.2.4. 6. 8.10112,14,16,18,2,
.t
- 4. 6*8 10012,14.16,1 4
1121416 106 1
B52-427CE EMV 76 B-42 BUS STAB PMT 1
15MAY04 15MAY04 DR-N ML-N 210 27CEBUS ST) B PMT IRC.598
_ RC-5w 12W00 1259 ORT3-N R-N 1480V MOTO CONTROL CENI PAB SAFEGUARD 0202527 107 1 EM0215240 EMV 76 162-A S-2019 &202LOSSOF 8 16MAY04 16MAY04 DR-NML-N 0
EMO 15240M52019&
2OLOSSOFVOLT GETEST-IRM VOLTAGE TEST-13:00 20-59 ORT3-N R-N O 15240 T
RELAYFORIM 2019ACTUATI 108 0
EM040588C EMV 78 W-013B1 W-01381 REMOVE 4
17MAY04 17MAY04 DR-N ML-N 0
EM0405M CW-013B1 REM JUMPER PER IWP 1000 13:59 ORT3-NR-N 04058 0o=1CONTR 109 1 B52-428ME EMV 76 842 BUSSTABPMT W-1382 I
17MAY04 17MAY04 DR-N ML-N 690 E 52-428MEBUS' 15.00 15:59 ORT3-N R-N 020252734 110 1 NG44TFC1EV EPI 77 IST-SISI ENG EVAL FOR FAC I
05APR04 17MAYD4 DR-Y ML-Y 0
C1EVENG VAL FOR FAC PROO -TURB HALL44 GENAREA PROG -TURB HALL 44 12.00A 14:59 ORT3-Y R-N SECC 111 1 NG44CFC1EV EPI 77 IST-SISI ENG EVAL FOR FAC 1
29APR04 17MAY04 DR-Y ML-Y 0
CFCIEVENG VAL FOR FAC PR
-CTMT 44FT GE AREA PROG - CTMT 44FT GEN 08:00A 14:59 ORT3-Y R-N 9SECC 112 0 FG0309581 FC1 76 Z-066A Z-066AETC)SEAL 12 11 MAY04 17MAY04 DR-Y ML-Y 2
Sn salZ C)SEAL LEAKSIY WHOLE COVERS LEAKStMANHOLE 06:00A 16:59 ORT3-Y R-N I
_iutc 113 1 Z22FG030 FG1 77 Z-022 Z-022 - INTERNALS LIFT 9
15MAY04 15MAY04 DR-Y ML-Y 0
- INTERNALS RIG - STRIP PA NT FOR NOE RIG - STRIP PAINT FOR 09:OOA 20.59 ORT3-Y R-N R-1 REACTOR VES EL INTERNALS LIF ING RIG 114 1 FG302663RP FGI 76 FS-02852 PAINT FS-2852 8
15MAY04 16MAY04 24 FG302663F
- PAINT FS-2852 22:00 05:59 0302A 3 P
CWP SEAL WATE FLOW SWITCH 115 1 FG0212694 FGI 76 PIPINGHB-IPIPINGHB-19REPAINT 72 16MAY04 19MAY04 DR-Y ML-Y 0
FG )2 26941PIPING H 9 REPAINT OZOO 01:59 ORT3-Y R-N 212694 6
116 1
FG04081 18 FG1 76 MISC LEAD ABATEMENT ON 6
16MAY04 16MAY04 DR-Y ML-Y 17
. FG0408118 ABATEMENT FLOOR BEAM SC OF IT-026 FLOOR BEAM SOUTH OF 08:00 13:59 ORT3-Y RN 0408118 MISC S E MULTI AND/OR
-NNUMBERE 117 1 Z22FG035 FG1 77 Z-022 Z-22 INTERNALS LIFT 8
16MAY04 17MAY04 DR-Y ML-Y 0
Z22FGO35Z-22 NALS UFT RIG PAINTWELDS RIG - PAINT WELDS 17.00 00.59 ORT3-Y R-N 0301913 R-1 REACTC RVESSEL INTE 118 1 Z22FG038 FGI 77 Z-22 Z-22 INTERNALS LIFT 168 17MAY04 24MAY04 DR-Y ML-Y 191 IG38Z-22 LIFT RIG - P RIG - PAINT CURETIME 01:00 00.59 ORT3-Y R-N R-1 REA ORVESSEL INTER ALS LIFTING RIG 01913_
119 0 FG0300155 FG1 77 MISC REMOVE VEGETATION 35 17MAY04 20MAY04 DR-Y ML-Y 288 FG0300155RE 4VEVEGETATI IN ISOLATION ZONES 06:00 07:59 ORT3-Y R-N 0300155 120 0 FG0300135 FG2 77 HX-378A SERVICE HX-378A SBCC 10 16MAY04 16MAY04 DR-Y ML-Y 713 FG03001355 E
O-378A SB C COMP RM AC UI COMP RM AC UNIT 07:00 16-59 ORT3-Y R-N 0300135 SBCC OMPUT ROOM JR CONDMONI z
~w11s>{'s
""uPR^
121 0 FG0307325 FG3 76 DOOR REPLACE MORTISE 4
16MAY04 16MAY04 282 FG0307325REP(ACE MORTISE KSET l
LOCCKSET 18:00 21:59 0307325 SAFESHUTDO AREAFIRE/SE Run Date 15MAY04 13:51 LT-03 STANDARD PUBLICATION l
Sheet7of17 O Prlmavera Systems, Inc.
l FL-03 Execution Publication Set 7
4
after 15MAY04 12:00 U1R28 WORKING SCHEDULE after 15MAY04 12:00
.u IIIDl U
ID RESP wo ST EQID DESCRIPTION MAY RD ES 16MAY04 18:00u EF RISK MF 122 0
HP0301854 IC-CV-F&V2 HP 77 HP RMS QUARTERLY 40 FUNCTIONALTEST OF RMS 20MAY04 00.59 246 0
201 Srt 15
,SUn 16 I
Mon 17 HP410301 854QUAkI RERLY FUNCTIONIJL TEST OF RM I.
0301a54p_
_~
L Ij F&V2FILIL&=NT Fl-115&FI11 PERSOPCV-003[
I I
C S LETDOWN/P 1231 1 IC SOP-CV-003 I FILL&VENT FI-115& 1 1 FI-.116 PER SOP-CV-W3 12MAY04 i 17MAY04 11tO0A I 06:59 DR-Y ML-Y ORT3-N R-N 124 0 IC0311805 IC l7 FS-00230 RE-230 CLEAN FLOW I
14MAY04 15MAY04 DR-Y ML-Y 29.0 C SWITCH 1300A 12.59 ORT3-Y R-N 125 1
IC0408320 IC LRC-LW-003 LRC-LW-3FAILSHIGH 21 15MAY04 16MAY04 DR-Y ML-Y 535 11 00A 14:59 ORT3-Y R-N CC 1 T ICIALEAK IC 76 IAILEAKINSPECTION 30 16MAY04 18MAY04 DR-Y ML-Y 157 06:00' 13:59 ORT3-Y R-N 127 1 IC5.9RTRAL IC 76 ICP-05.009 VERIFY ROTOR I 1 16MAY04 16MAY04 DR-Y ML-Y 180 STOPPED ALARM CLEAR 12:00 12+/-59 ORT3-Y R-N 128 1
IC0306628A IC 76 lS06050A 1S-6050A REPLACE 2
16MAY04 16MAY04 DR-Y ML-Y I179 PROBE GAP 12:00 13:59 ORT3-Y R-N 19 I IC5.54A IC 76 ICP-05.054 P59B SOB/U PUMP 3
16MAY04 16MAY04 DR-YML-Y 178 STARTFUNCTION 12:00 14:59 ORT3-Y R-N 530 0 IC0300623 IC 76 ICP-13.001 RMSCALS-GROUP2 2
1 7MAY04 17MAY04 DR-YML-Y 9.
06:00I 07:59 ORT3-Y R-N 131 1
tC5.471.
I01 76 ICP05.047 SECONDARY LEVEL 9
19APR04 16MAY04 DR-Y ML-Y 0
CONTROLLERS AND l 1l 0A 0959 ORT3-YR-N
~SW IT____
132 1 IC5.47A IC1I 76 ICP45.047 VERIFY DRN BOTTLE I1 15MAY04 15MAY04 DR-Y ML-Y I4 LVL ALARMS 07:00A 12+/-59 ORT3-Y R-N 133 1 lC5.11TMGA IC1 76 ICP-05.011 CHECKTAVGHIGH 3
16MAY04 16MAY04 DR-Y ML-Y 107 SELECTOR 08:00 I
10:59 ORT3-N R-M 134 1 ICORT6 O-RT-006 ORT6 CS SEQUENCE -
6 16MAY04 16MAY04 DR-NML-N 162 IC SUPPORT 08:00 13:59 ORT3-N R-N
)318 0 5RE-230 C IRE-230 WAS 5320LRC-LW-LEAN FLOW SWITC E WATER EFFLUEI I FAILS HIGH T MONrTOR INLET -LOWS0311805 I
I a0408320 ICIALEAKItA LE 0300800W c Rl I
C5.9R11 030 IC03064 030 030 AK INSPECTION Ii-I
ALjVERIF-YROTOl 1851 1TURBINE IN!
,28A1S-605A REPI 5628NTURB INDE L54AP59B SO RU F 1874M5ECOND, I
i1SECONDA4Y LEVEL CONTR2!~MS AND SWIT t STOPPED ALARM TRUMENTATION - I ACE PROBE GAP PENDENT OVERSF IMP START FUNCM RY PLANT LOW Rl lIC0300623 RM5 03006230UF J. CONTROLLERS
- 0300867 ELECTOR
.NTROL VALVES (0 FIC SUPPORT ENT SPRAY SEQUE
_MS
-L CONTROLLERS CLEAR tISCELLANEOUI EED PROTECTK ION NGE PRESSURE CCALS-GROUP AD MONITORIN(
ND SWITCHES' JTAGE).
t4CE TEST kND SWITCHES l
eFr
~nA I t
- ..AVERIFY DRI ISECONDAR)
I BOTTLE LVIALAI LEVEL CONTROLL ICS.1 ITMGAC MS
.RS AND SWITCHE!
ECK TAVG HIGH S I
-s~
_^
OlUnEt53t_
U-ICORT6c II ICS.47v 0300867 IT6 CS SEQUENC
_3 CONTAINN VERIFY GEN LVL A ISECONDARY LEV 103 1
IWA7.41 U IL1n 70 lCFV5.U41 I VEMRFT GtN LVL P.LMS I
1bMAY04 I 6tMAYU4 I DR-Y ML-YT 09:00 09.59 ORT3-Y R-N 40t 136 1 ICZW19 1W 76 76 ICP-4Z019 ICP-06.021 ICP Z19 SAFEGUARDS I
LOGIC TEST 6
17MAY04 17MAY04 06:0Wr 11:59 DR-N ML-N ORT3-N R-M c
ICZ19 1CP 419 SAFEGUAR 0300813IMPOST4REF 13712 1C0301009 I IC2 ICHEMICAL AND VOLUME 11I 10MAY04 16MAY04 DR-Y ML-Y CONTROL SYSTEM 18:OOA 04:59 ORT3-Y R-N a C03I1O9 CHEMIC4 E
AND VOLUMECC NTROL SYSTEM 1_
L P
I EEEEEECHE ICUAL ANDVrM VOUM f I.O 7n A
i f-m 1 W 7 -
I r
1ID rt7l um.. A I -
I I
.-,v...
v 1 C03 1.0j.
vU~u#
- 1.
I lvK II nr-u1 I Jo W..rlf
.ANI V
tiIOAMI tjPI MONITOR II rJMuVF4 I
0MAuW4 I UM-1 ML-Y 1800A 04:59 ORT3-Y R-N din 071oCLEAN INTAMINATDNMc NITOR
)NNEL CONTAMINA
,NTROL SYSTEMI nON MONITOR 18 301009 300710 PERSd I _______________
Run Date 15MAY04 13:51 LT-03 STANDARD PUBLICATION Sheet 8 of 17 O Primavera Systems, Inc.
I FL-03 Execution Publication Set I
after 15MAY04 12:00 I
U1R28 WORKING SCHEDULE 1.
after 15MA Y04 12:00 a
U ID RESP WO EQID DESCRIPTION RD ES EF RISK MF MAY ST Sat45 21 8S022n246 ST 31012,14,16,120,2210 2,4.6.8.10112.i4,16,18,20.221 0.12.4,6. 8,1Q12,14.
139 1 IC2.10 IC2 76 ICP-02,010 NI SR PRE CRICALITY 2
15MAY04 15MAY04 DR-N ML-N 0 _
lC210N SF RE CR"CA ETY ST TEST 18:00*
1959 ORT3-N R-N 0300 U RCE RANGE NUI EARINSTRUME ATION 140 1 ICPRE-COMP IC2 REI 101 MOVE REACTVITY 10 15MAY04 16MAY04 DR-Y ML Y 163 K 'RE-COMPM REACTIVTTY CO ITER TO CONTR OL ROOM COMPUTERTO 19.00*
04:59 ORT3-Y R-N ADVAD CED DIGITAL REA( TPMY COMPUTER NSTRUCTION 141 1
IC2.9 IC2 76 ICP-0Z009 ICP Z9 INTERMEDIATE 1
15MAY04 15MAY04 DR-N ML-Y 0
IC2.9K P z INTERMEDIA RANGETEST RANGE TEST 20-00 20-59 ORT3-N R-N 0300805 INTERMEDIATE RA GE NUCLEAR IN uMENTATON 142 1 IC2.15A IC2 76 ICP-0Z015 ICPZ15 RP 3
15MAY04 15MAY04 DR-YML-Y 49 IC2.1s CP15 RP PERM SNEINI LOGIC RITTEST PERMISSIVEINI LOGIC 21:00 23:59 ORT3-N R-N 0300807 REACTOR TECTION SYSTEM OGIC 143 1 1C0300795A IC5 76 I&C MISC REACTOR PROTECTION 5
13MAY04 15MAY04 DR-Y ML-Y 0
RC03 0
ARCT PROTECTION L C CA1B RELAY NANCE LGC CAB RELAY 1 1.00A 16:59 ORT3-Y R-N MISC WORK ACTIVITI 0300795 144 1
IC5.8 IC5 76 ICP-05.008 TURBINE SUPERVISORY 43 14MAY04 19MAY04 DR-Y ML-Y 0 C5 tHE SUP RVISORY INST C INST CALS 06.0A 10.59 ORT3-Y R-N 145 1 ICTUVIBSUP IC5 76 T-SUPERVIS INSTALL TURBINE 43 14MAY04 19MAY04 DR-Y ML-Y 0
SUP INST TURBINE V18RAiON SENSORS VIBRATION SENSORS OB.OA 10-59 ORT3-Y R-N 148 1
IC03026B3A
[C5 76 FS-2852 tIFS2852FLOWSWSET 3
17MAY04 17MAY04 DR-Y ML-Y 0
IC0302663A 1 852 fLOW SW UP AND CAL-2ND 06:00-08.59 ORT3-YR-N 0302613 P-30BCWPSEA 147 1 IC5.49D ICv 76 ICP-05.049 ICP 5.49 CS-2273 1
15MAY04 15MAY04 DR-Y ML-Y 70 IC5.DICP 5.49 CS 2273 HEATER BYP S LIMIT sw HEATER BYPASS UMIT 0800A 12.59 ORT3-Y R-N SECONDAR PLANT CONTROL=ALVES0300869 148 1 IC0214110 ICV 76 MS-02018 MS.2018POST 7
16MAY04 16MAY04 DR-YML-Y 0
IC0214110M 2018POSTINSPECTIONDIAGNOSTIC INSPECTION 07:00 13:59 ORT3-N R-N 0214110 HX-1A SG tEADER MAIN STEA STOP CONTR 149 1 1ICMS2018 ICV 76 MS-02018-O MS-2018MSIV 7
16MAY04 16MAY04 DR-YML-Y 0
ICMS2018M 2OI8MSIVDIAGN STIC DIAGNOSTIC 07 00*
13:59 ORT3-N R-N 0300903 HX-1A SG JEADER MAIN ST" STOP CTL OP 10 1 MM9924975A MMt 76 HS-1 HS-1. REBUILD&TEST 27 26APR04 17MAY04 DR-YML-Y 55 M 249 A1 S1.
EBULD&TEST S BER (SHOP)
SNUBBER (SHOP) 06.00A 16 59 ORT3-N R-N
_ I 151 1 MM-8856A1 MMI 82 HX-015A HX-01SA-PERFORM SW 6
16MAY04 16MAY04 DR-Y ML-Y 0
MM8856A1HX0 BA PERFORM SLEAK CHECK & IN ALL COVERS LEAK CHECK& INSTALL 06:00*
11:59 ORT3-N R-N l
0214055 W-1A1 ACCIDET RECIRC FAN W TOR COOLING 152 1 MM0215948 MMI 77 O-RF-510.2 RF-5102, MOVEZ-238 6
16MAY04 16MAY04 DR-Y ML-Y 256 MMO21594SRFM 5 0.MOVE Z-23B LTCHTOOLOUTO CTMT IILATCH TOOL OUT OF 06:00*
11:59 ORT3-N R-N 0215948 REMOVE Z-23 LATCH/UNLATCH TOOL FROM UNI 153 1 MM-8856A MM1 82 W-01AI W-1A1. FMECLOSEOU1 1
16MAY04 16MAY04 DR-Y ML-Y 1I MM-8 56AW1A1, FME CSE OUT INSPEC ON (AFTER SW INSPECTION (AFTER SW 12:00 12:59 ORT3-N R-N 0214167ECONTAINME TACCIDENT RECI CULATION FAN 154 1
MM-8857A1 MM1 82 HX-015B HX-158. PERFORM SW 6
17MAY04 18MAY04 DR-Y ML-Y 0
IM-I7A1HX-159, Pi LEAK CHECK & INSTALL 12:00 06:59 ORT3-N R-N 0214064 M
155 1 MM-8858A MMI 62 W-00C1 W-ICI FME CLOSE I1 17MAY04 17MAY04 DR-YML-Y 2
M 858AW1C1.
I OUT INSPECTION 14:00 14:59 ORT3-N R-N 2141751CONT Run Date 15MAY04 13:1 LT-03 STANDARD PUBLICATION Sheet 9 of 17 O Plrmavera S ems, Inc.
FL-03 Executlon Publication Set
after 15MAY04 12:00 l
U1R28 WORKING SCHEDULE after 15MAY04 12:00 U
ID RESP WO ED DESCRIPTION RD ES I
EF RISK MF MAY 1_21.6 2,202 4T 6_ 8.1012.14.16.18,20,2210. 2. 4. 6. 8 *102,14,16.1 156 1 Z22MM040 MM1 77 Z-022 Z-22 INTERNALS LIFT 2
17MAY04 17MAY04 DR-Y ML-Y 0
Z22MMO4OZ RIG-MOVETO CAVITY 17:00 18:59 ORT3-N.
0301913 157 1 MM0304995 MM2 76 P-0288 P028B - OVERHAUL
- 5. 30APR04 15MAY04 DR-Y ML-Y 0 M r 5P-M21B OVERHAUL MAIN PUMP MAIN FEED PUMP 15-00A 16:59 ORT3-N R-N STEMtGENERATOR FEE PUMP0304995 158 1 MM9919654 MM2 77 P4028B 1 P-288 STOP OIL 15 06MAY04 16MAY04 DR-Y ML-Y 0
196541P-283 STOP OILLEAKIIN BALLAFFLE LEAK/INSTALL BAFFLE 05 00A 15:59 ORT3-N R-N U
3 STEAM ENERATOR FEED UMP9919654 159 0 MM0201475 MM2 76 VNTB INSPECT/SERVICE OPS 4 12MAY04 15MAY04 0 M 0147 INSPEC TSERVICEOPS SHpP HVACEQLIIP SHOP HVAC EQUIP 10:OOA 15:59 s
VNTB rSIEM MULTI ANDt)R NON-NUMB EOUIPMENT0201 75 160 0 MM0405942 MM2 77 U-06335 IA-6335TEST BY 5121/04 3
15MAY04 15MAY04 336 M 11 2IA-&M TEST BY S21/04 (S ARE)
(SPARE) 06:00A 14:59 1T-162X VER STEAM DUMP A ACCUMULATOR I ELIEF0405942 161 0
MM0201626 MM2 76 W-017 LUBRICATE_ INSPECT 2
15MAY04 15MAY04 DR-Y ML-Y 0 M 01 26LUB ATE, INSPECTAND INTAIN FAN AND MAINTAIN FAN 13:00 14:59 ORT3-N R-N ETURBINE LDG OFFICE AIR C NDrONING FAN 1626 162 0 MM0201642 MM2 78 W.086 LUBRICATE FAN 4
15MAY04 15MAY04 DR-Y ML-Y 0 M 0142LUBRi TEFAN BEARING BEARINGS 14:00 17:59 ORT3-N R-N
[PAB TTERYAND INV TER ROOM VENT AN 0201642 163 0 MM0301086 MM2 76 HX-038B INSPECT AND MAINTAIN 4
15MAY04 15MAY04 337 M 0301086NS CTAND MAINTAI AC UNIT AC UNIT 18:00 21:59 0301086 CONTROL ROOM MR CONDmONING NIT V64 1 MM0301116 MM2 77 P-028A DRAW OIL SAMPLE FOR 2
15MAY04 15MAY04 DR-Y ML-Y 0
MM0301116 ORAWOL SAMPLElFOR ANALYSIS ANALYSIS 21:00' 22.59 ORT3-N R-N 0301116 TEAMGENER TOR FEED PUMP 165 1 MM0301117 MM2 77 P-028B DRAW OIL SAMPLE FOR 2
15MAY04 16MAY04 DR-Y ML-Y 334 MMO301 17DRAW OIL SAME FOR ANALYSIS ANALYSIS 23:00 00:59 ORT3-N R-N 0301 17[STEAM GEN TOR FEE PUM 166 0 MM0201849 MM2 76 HX-038A1/A CLEAN AND INSPECT HX 6 16MAY04 16MAY04 0
MM0201849 N AND INSPECT UNIT UNIT 0600 159 0201849 CABLE SPREA ING ROOM AIR CC 4DTONING UNI 167 2 MM0301161 MM2 77 ELECT PENE INSPECT AND MAINTAIN 4
16MAY04 16MAY04 329 MM03 II6 IN PECTAND MAINT N Q3 AND Q58 03AND 058 0700-10-59 0301161 UNIT2 ELECTRI AL PENETRATION 168 0
MM0309581A MM2 76 ZW066A BRODERSON CRANE 10 17MAY04 17MAY04 313 MM0309581ABRO DERSON CRANE SUPPORT FOR 060ocr 15:59 0309581 MAI 169 1 MMC301106 MM2 76 P-411A CHANGE OIL FLUSH B
17MAY04 17MAY04 0
MM0301106IANGEOL BEARINGS AND CLEAN 09:00 14:59 0301106 170 1 MM0214110 MMV 76 MS-02018 MS-2018-OPEN&
19 03MAY04 16MAY04 DR-YML-Y 0 MMC 14110MS-201 0OPEN&INSPEC VALVE.RMP93 INSPECTVALVE-22:00A 0659 ORT3-N RN H
H A SG HEADER MSTOP 0L0214110 E~
II; -
1 1]
171 1 NG44CFCIND NDE 77 IST-SISI NDEFORFACPROG-4 26APR04 17MAY04 DR-YML-Y 98N oFC NNDE ORFACPROG-CONTAINMENT44FT ENAREA CONTAINMENT44 FT 08:CIA I1259 ORT3-Y R-N I
- SECOND, 172 1
EP0301909 NDE 77 U1-CONWNlVISUALINSPECTION OF 5
30APR04 17MAY04 DR-VML-Y l
980 19 9 VISUAL NSP!CTION OF LINER PLATE CTMT UNER PLATE 0800A 12.59 ORT3-Y R-N UNIT 1C Run Date 15MAY04 '3F5'1 LT-03 STANDARD PUBLICATION S
Sheet 10 of 17 o Primavera Systems. Inc.
I FL-03 ExecutlDn PubLication Set l
after 15MAY04 12:00 U1R28 WORKING SCHEDULE after 15MAY04 12:00 IV ID RESPl WO EQtD DESCRIPTION RD ES EF RISK MF SuM ST
§o12,14,1611820l2210, 2,4, 6,8 112,14,16,18,20,2210, 2.4. 6.8,1012,14,16l1 173 1 ND0407589B NDE 76 T-026 T-026. NDE I 8
12MAY04 17MAY04 DR-Y ML.Y 2 Nr 0 7 5 8 g9BT NDE I RADIOGRAP OF PIPING RADIOGRAPHY OF 19OA 02.59 ORT3-Y R-N BLOWDC NN TANK04076 PIPING 174 1 P1402NDE NDE 77 Z-022 Z-022 -
INTERNALS LIFT 10 16MAY04 16MAY04 DR-Y ML-Y 0
P1402NDEZ.0
-INTERNALS RIG NDEEXAM (IV T)
RIG NDE EXAM (MT) 07.00 16:59 ORT3-Y R-N 0301913-1 R
CTOR VESSEL IN ERNALS IFTIN 175 1 ND0408110 NDE 20 PIPING EB-MS-2085 ELBOW -
2 16MAY04 16MAY04 DR-Y ML-Y 711 NDOAO8IIOMS-20 5 ELBOW-INSPEt r EXPOSED AR INSPECT EXPOSED 17:00 18:59 ORT3-Y R-N ND04081101NR EAT STEAM TO EREHEATERS AREA0481 R
STAT qEEETS 176 1 ND0408118 NOE 76 MISC T-26 BEAM-DETERMIN 3
17MAY04 17MAY04 DRYML-Y D
EXTENT OF REPAIR 07:00 09:59 ORT3-Y R-N 0408118 BEAC SDSTE 177 0
P015335 OPO 77DP-07 RY PIPE SYSTEM 81 15M1AY04 16MAY04 207p1 p is5DRY SYSTEM CIECKN CHECK 12:00 12.59 AUTO DRY PE FPS VALVETRI
-TEST/AL E
0-,,R~t1.:l-*
1781 0 OP0301293 OPI 76 04r-PMIDS IOPERATIONS MID SHIFT 35 1 14MAY04 20MAY04 WEEKLY ROUTINE I
00IDOA 06:59 182 OP0IO1129IOPERA1IONS MID SHIFT WJEY ROUTINE
-, -I-4-
I~-I-1791 0 OP0301314 OPI 76 O-PC-049.7 WEEKLY VERIFICATION OF FACADE FREEZE 1
16MAY04 I 16MAY04 00:00 00.59 21 oPO3N 03(
j 3 14 WEEKLYVERI 13141FACADE FRI 1CATION OF FACAJ EZE PROTECTION i
)E FREEZ ND BA HEAT TRAC NG
.1 ------ E -- IPs -, I I_
-'iU I U UvUi3zZ UOP fb O-+'U-UAYb IOPRAIK INbU!
DtA W
HI I
WEEKLY ROUTINE 1 UMAYU4 IbMAY04 08D0A 11:59 UR-Y ML-Y ORT3-Y R-N 2WM0P0II11332OPERA11ONS DAY SHIFT Wr:EKLY ROUTINE OPERATIONS t 181 0 l OP0301351 OP2 l 76 O-PC-012.1 G-01 EDGVIBRATION 1
16MAY04 16MAY04 211 (QUARTERLY) 08:00-08:59 182 0 OP0301353 OP2 76 O-PC-01Z3 G-01 COOLANT 1
16MAY04 16MAY04 211 SAMPLING 08:oc 08:59 183 0 OP0301359 OP2 76 PT-FP-003 ELECTRIC I
17MAY04 17MAY04 204 I MOTOR-DRIVEN FIRE 08:00' 08:59 1
A_
P I _I.......
OP0301351 C 03013511 OP0 3 0 1 3 53 C 0301353!
01 EDGVIBRATIOt G-01 EMERGENCY 01 COOLANT SACY G-01 EMERGENCY
)AY SHIFT WEEKLN (QUARTERLY) 3pESEL GENERATO ICLNG plESEL GENERATO OP0301359E 03013591 OP0301614r 0301614f ROUMTNE03013 I VIBRATION (0' R COOLANT SAh LECTRIC MOTO ELECTRIC MOT, AFEGUARD SYS SAFEGUARD S!
184 2
OP0301614 OP2 76 TS-ECCS-00 SAFEGUARD SYSTEMS VALVE AND LOCK I
17MAY04 I 17MAY04 08:00c 08:59 204 401 fl I flald)O Iff~I Iaff l'4I f
r un.
~l I'
fh~fA1
~
1t
~
I"i U
wl--UAJl -
to Ir~
BREATHERSIOL STRAINER ON.
4 1 I
- 0 0 j
0I 1
5 9 08:00, 09.59 I..
.~.
OP0300346 4 I.AN AIR BREA 0301346* AIR BREATHE E-s E
186 0 OP0301394 OP3 76 O-PC-SWING OPS SWING SHIFT 28 12MAY04 18MAY04 189 1394°P5 S1 NGSHIFTWEEKL ROUTINE WEEKLY ROUTINE 16:OOA 22:59 187 0
OP0301428 OP3 76 O-PC-078.3 MONTHLY NORTH 1
15MAY04 15MAY04 216 NORTH BUILDING I
B I
1 I
o1428EMO -LY NORTH SERVIlE BLDG EVACUATION ALARM TEST 188 0
OP0301326 OP3 76 O4TI0072 IT-72. SERICE WATER I 15MAY04 16BMAY04 206rpoo 0132-7Z WRECEWATERV VE VALVES 16:00' 1959 c
E RVICE WATER V E
Run Date 15MAY04 13:51 LT-03 STANDARD PUBLICATION Sheet 11 of 17 C Primavera Sstems, Inc.
FL-03 Execution Publication Set
after 15MAY04 12:00 l
U1R28 WORKING SCHEDULE after 15MAY04 12:00
_ Ul ID lRESPlWO l EQID DESCRIPTION RD ES I
EF RISK l MF MAY I
T.
g..31012,14,16,la2o,221 0.2.4. 6, 8.1002,14,16,18t2,22 2.4*6, 8.10112l14l16l1 19 0 OP0209766 OP3 76 O-PC-053 VERIFY MSR SHELL SIDE 2 16MAY04 16MAY04 208
_P 02 9766VERFY SR SHELL SIDE H GH LEVEL HIGH LEVEL 16 00 17:59 0209766EE ATER HEATER
'40 MSR SHELL 190 2 U2GNDROI6 OP3 TG-01 DRAIN U2 MAIN I
16MAY04 16MAY04 207 U2GNDR016D NU MAIN ELECTF CAL GENERAT ELECTRICAL 18:00 18:59 1_
M N GENERATOR 191 2
U2GNDROI7 OP3 TG-lo DRAIN U2 MAIN 1
16MAY04 16MAY04 0
U2GNDR017D N U2 MAIN ELECTF CAL GENERAT ELECTRICAL 18:00 18:59 JUL12 N GENERATOR 192 1 OP0301556 OP3 77 O-PC-025 PURIFY RWST I
17MAY04 17MAY04 202 P030tSS6PUR 16:00 16:59 03015561R
=, Eu -_
_- I -
193 1 CVCSPMT OPS I CV PERFORM CVCS B
12MAY04 15MAY04 DR N ML-N 246 C
PITPERFOR 1 CVCS WALKDOW 4 FOR PMT WALKDOWN FOR PMT 08 00A 1g-S9 ORT3-N R-N 194 1 B522427C OPS 76 B-42 BUS STAB PMT 15MAY04 15MAY04 DR-N ML-N 279 s2 2CBUS STA I PMT'IRC-5996
- 1RC-59r6 12:00 12.59 ORT3-N R-N 4sov MOTO CONTROL CENTE PAE SAFEGUARD 0202527 195 1 IT-740 OPS 77 0-7T-0740 IT-740, MAIN STEAM 15MAY04 15MAY04 DR-N ML-N 331 MAIN iTEAMBLOWWW BLOWDOWN 12zoo 12:59 ORT3-NR-N UNrr 1 MAIN 1EAM BLOWDOW VALVES (REFUELI G)0215925 196 1 OPW303363 OPS 76 SC-00966B SC-;96B - PMT STROKE 1
15MAY04 15MAY04 DR-Y ML-Y 0
0 S
3 3 C-W 966 PMT STROKE PE IT 60 PER IT 60 1kOO 12:59 ORT3-N R-N PZR UOUID AMPLE CONTAINM NT ISOLATION 030 383 t97 1 EP0403494A OPS 76 PT-RCS-1 OPERATING SUPPORT 4
1 SMAY04 15MAY04 DR-Y ML-Y 242 p OAOPER TING SUPPORT O NrnAL RCS WALK OWN OF INITIAL RCS 1Z.00 15:59 ORT3-N R-N REACT R COOLANT SYST M (RCS) PRESSUR TEST-IN1040349 198 1 O-RT-065 OPS 77 O-RT-065 LLRT OF RE-211/212 4
15MAY04 15MAY04 DR-Y ML-Y 0 R LRTOF E-2111212 RETURN UNE RETURN LINE 12:00 15:59 ORT3-N R-N RE-211 WD RE-212RETUF q (PX-2)0215996 199 1 IT-330 OPS 77 0-IT-0330 CNMT ISO VALVES 6
1SMAY04 15MAY04 DR-Y ML-Y 326 CNMT ISO v LvEs STROKE TEE r STROKE TEST 12W00 17:59 ORTIN R-N UN I CONTAINMENT I OLATION VALVES ( SD)0215910 200 1 CL13B0t0 OPS CL-13B CONDENSATE VALVE 10 15MAY04 15MAY04 DR-Y ML-Y 0 CLI o1oCONDEN ATEVALVE UNEU S (CL-13B LINEUPS 12:00 21:59 ORT3-N R-N CONDENSATE V YE LINEUPS 201 1
OP0303382 OPS 82 SC-00953 SC-953 -PMT STROKE I
15MAY04 15MAY04 DR-N ML-N 238 po 3 382SC453 MT STROKE PER 60 PER IT 60 15:00 15:59 ORT3-N R-N 03 2
IPZRU DSPACESAMPL CONTAINMENTI TiATON 202 1 O-RT-036B OPS 77 O-RT-036 POST LLRT PZR LIQUID 4
15MAY04 15MAY04 DR-N ML-N 235 PRPOST PZ LIQUID SA PLE LINE SAMPLE UNE 15:00 18:59 ORT3-N R-N 021 74 SSURER UUID SAMPLE LINE (P-28 203 1 IT-580 OPS 77 o-rT-0580 PASS LEAKAGE TEST 4
15MAY04 15MAY04 DR-Y ML-Y 292 r.ss0 PASS GE TEST 15:00 19:59 ORT3-N R-N 0 15922 IT 1 PASS LEAKA E REDUCTIONIPM ROGRAM TEST 204 1
0148-050 OPS T-036 FLL MFP P-28B LUBE Ol 4 15MAY04 15MAY04 DR-N ML-N 0
148-050 FILL PP P-28B LUBE OIL RESERVIORS RESERVIORS 17:00 20:59 ORT3-N R-N 10 SYSTEM MULTI WDIOR NON-NUME ERED EQUIPMENT 205 1 oP13A120 OPS OP-13A FILL CONDENSER 4
15MAY04 16MAY04 DR-V ML-Y 232 OP13A1 o FILL CONDENSE HOTWELL HOTWELL 22.00 01:59 ORT3-N R-N 206 1 OP13A110 OPS TG-01-T PLACE TURBINE ON 2
16MAYD4 16MAY04 DR-N ML-N 0
OP13 11OPLACETURBll IE ON TURNING GE vR TURNNG GEAR 00:00 01:59 ORT3-N R-N RMAINTUR INEMGENERATOR JRNING GEAR Run Date 15MAY04 13:51 LT-03 STANDARD PUBLICATION I
Sheet 12 of 17
. Primavera Systems, Inc.
l FL.03 Execution Publication Set I
I
after 15MAY04 12:00 I
U1R28 WORKING SCHEDULE I.
after 15MAY04 12:00 U
l ID RESP WO EQID DESCRIPTION RD ES I
F RISK MF
,MA ST a465Sun16Mo j1
.T.
_.-_31012.14.t16=0,2210.e2.84
. 6.28.ltit2.14 t6,18120,221 0, 2.e4,6. 8,1t2t.6.1 207 1 ORT-006 OPS 77 O-RT-006 ORT 6 CS SEOUENCE 6
16MAY04 16MAY04 DR-N ML-N 0
ORT-mo 6 CS SEQUENC 08 00-13:59 ORT3-N R-M 0215957 CONTAWN ETSPRAY SEQU CETEST 208 1 IT-280A OPS 77 04T-0280A MSIV STROKE TEST.
4 16MAY04 16MAY04 0
IT-280AMSN STRO KETEST. IT-280A IT-280A 14:00 17.59
_2158991U1 h S STOP VALVES 1ROKETEST(C 209 1 0132-030 OPS 0-32 GENERATOR 60# AIR 24 16MAY04 17MAY04 DR-N ML-N 0
0132.030 GENERA1 OR 60# AIR TEST TEST 15:00*
14:59 ORT3-N R-N
[
m l
GENE 210 1 X03-010 OPS X-03 IPTEBRIEF TO 2
17MAY04 17MAY04 DR-N ML-N 0
X 3-010FMTE BRIEF O DE-ENERGIZ DE-ENERGIZE X-03 01:00' 02Z59 ORT3-N R-N
- HIGH VOTAGE STATION 211 1
X03-020 OPS X-03 DEENERGIZE X-03 2
17MAY04 17MAY04 DR-N ML-N 0
X03-020DEENER IZE X-03 03:00 04:59 ORT3-N R-N RHIGH OLTAGE STATI 212 1 852-428M OPS 76 8-42 BUS STAB PMTIN-1387 I 17MAY04 17MAY04 DR-N ML-N 0
52.428MBUS 1 15:00 15:59 ORT3-N R-N 0202S273480 213 0 OP0310365A OPS G-02 ALIGN GO2TO 1A05&
I 17MAY04 17MAY04 0
F0 10365AALIG 2A05 PER OI35A 15:00-15:59 I
214 0
0P0405880 OPS 78 W-013B1 W-01381 PMTPERIWP 2
17MAY04 17MAY04 DR-N ML-N 0
C P04058OW-012 01-128-E-FN 15:00 16:59 ORT3-N R-N 0405880EC(
215 0 OP0310365C OPS G-02 PROTECT G02 14-17MAY04 18MAY04 0
OF D3103BC PROT o
15:00 04:59 mg 216 1 Z22OPSOI OPS 77 Z-02 Z-22, MOVE 1
17MAY04 17MAY04 Z22PsoI Z-22 MANIPULATOR AWAY 16:00 16:59 0301913DR-
~~~
.I- -
217 1 MSA25Z PPG MILESTONE END S/G A CL-1E WORK 0
16MAY04 16MAY04 DR-N ML-N 271 MSA25ZE SiG A CL-IE OUTSIDE CONT UNMENT OUTSIDE CONTAINMENl 08:00 07.59 ORT3-N R-N IS rG 0 SECONDARY FEED/STEAMAsLc VDOWN IN CTM 218 1 VNCCA51Z PPG MILESTONE END CONTAINMENT FAN 0 16MAY04 16MAY04 DR-N ML-N 47 VNCCASIZEND CONT MENTFAN COO ERSAWORK COOLERS A WORK 14:00 13:59 ORT3-N R-N ICONTAIN FAN COOLER A (A-TRAIN) 219 1 RCXOIZ PPG MILESTONE CLOSE ROD DRIVE 0
16MAY04 16MAY04 DR-N ML-N 149 RCX01ZCLO ROD DRIVE CON tOLWORKWIN CONTROLWORK 17:00 16:59 ORT3-N R-N.ENDF DRIVE CONTR LSYSTEM WOF 220 1 CSB12Z PPG MILESTONE END FEED PUMP P288 0
16MAY04 16MAY04 DR-N ML-N 343 CSB12ZE S0 FEED PUMP P2t BWORK WINOC WORK WINDOW 20 00 19:59 ORT3-N R-N IN AIN FEED PUMP P-86 221 1
MSX01Z PPG MILESTONE END MAIN STEAM 0
17MAY04 16MAY04 DR-N ML-N 270 MS W1ZEND MAIN STE AM SECONDAR SECONDARY WORK 00.00 23:59 ORT3-N R-N IMAIN STEAM I V TURBINE BUIL 222 1 CWXOIZ PPG MILESTONE END CIRC WATER &
0 17MAY04 17MAY04 DR-N ML-N 199 CWXOiZ END CIRC WAT CONDENSER WORK 09.00 08:59 ORT3-N R-N WW END CIRC 223 1 CSA12Z PPG MILESTONE CLOSE FEED PUMP 0
17MAY04 17MAY04 DR-N ML-N 0
CSAI; ZCLOSE FEED I P28A WORK WINDOW 10:00 09.59 ORT3-N R-N IMAIN FEED P1 224 1
4KVA0IZ PPG A-01 CLOSE A01 BUS 0
17MAY04 17MAY04 DR-N ML-N 193 4 VAOiZCLOSEA RELATED WORK 13:00 12:59 ORT3-N R-N
_A01 BUS Run Date 15MAY04 13:51 LT-03 STANDARD PUBLICATION Sheet 13 of 17 O Pnmavera Systems, Inc.
FL.03 Execution Publication Set
after 15MAY04 12:00 U1R28 WORKING SCHEDULE after 15MAY04 12:00
.10012.14.16,1M20.221 0. 2. 4. 6, 8.1002.14,16.18M.02210. 2. 4. 6. 8.10112.14,16.1 MMin@'u inin;__
225 1
VNCCB51Z PPG MILESTONE END CONTAINMENT FAN 0
17MAY04 17MAY04 DR-N ML-N 28 VNCC851ZEN COOLERS C WORK 17:00 16:59 ORT3-N R-N
-i
-~
E
!1---
U w
I-226 1 RPJF-152D RP1 JOB FILE 1 NIGHT SHIFT UPPER 5
16MAY04 16MAY04 DR-Y ML-Y-70 RPJF.152D NI SHIFT UPPER DECON BR CAVITY DECON BRIEF 18-oo 22:59 ORT3-Y R-N UPPER CAVITY ECON 227 1 Z22RP007 RPI 77 Z-022 Z-22 CONSTRUCT 4
17MAY04 17MAY04 DR-Y ML-Y 0
2RPOO7Z-22 CONS RUCT SCAFFOl SCAFFOLD 02:00 05 59 ORT3-Y R-N I
R-1 IEACTOR VESS 228 1 RPJF-152C RP1 JOB FILE I DAY SHIFT UPPER 5
17MAY04 17MAY04 DR-Y ML-Y 61 RPJF-t52CDAY SHIFT UPPER C CAVITY DECON BRIEF 0:00' 10-59 ORT3-Y R-N 1
UPPER CAV 229 1 Z22RPO45 RPI 77 Z-022 Z.22 REMOVE LDA 1
17MAY04 17MAY04 DR-Y ML-Y 0
Z22RP45Z.22 WALLS 16:00 16:59 ORT3-Y R-N 03019133R.
230 1
SD-1600-93 SDM 76 R-1 ADDRESS ONGOING 143 13MAY04 21MAY04 DR.Y ML.Y 0 sD4 gADDRE ONGOING ISSUE WMTH RELIEF REC ISSUES WITH RELIEF M13:0A 1M59 ORT3-Y R-N 231 SD..GSI-191 SDS CONT ENGINEERING 27 08APR04 20MAY04 DR-Y ML-Y 49 0 191 SKl ENG ERING WALKDOw I SUMP INTRUSIO ISSUES WALKDOWN - SUMP 08 00A 09.59 ORT3-Y R-N
_D. As.
a IZ -
- I~
-1U
- 232 0 SE0311772A lSEC 76 Z-06SA SECURITY SUPPORT 48 10MAY04 245MAY0 123 E 1772ASEculTYSUPPORTZ.06 A-MR03-M44 JZ-065A - MR 03.044.
4 07-OOA 14:59 ur U -
233 1 TGSUPPORT TGG TG-01-T PROVIDE CRANE.
89 13APR04 21MAY04 DR-Y ML.Y 214 GS PORTPROE CRANE RIGGE AND TOOLROOM UPPORT(PT2)
RIGGER AND 0900A 15:59 ORT3-Y R-N 234l 1l CI-2B1 WCC CL 2B MODE 6 TO MODE 5 227' 25APR04 24MAY04 DR-N ML-N 0 L.2 MODE 6TO ODES CHECKLIST I CHECKLIST 08)O0A 22.59 ORT3-N R-N I
235 1 CL-2E WCC CL2E MODE3TOMODE2 396' 02MAY04 31MAY04 DR-N ML-N
-2MODE3TO 0E2 CHECKLISTI CHECKLIST 19:00A 23:59 ORT3-N R-N 236 1 CL-2F WCC CL2F MODE 2 TO MODE1 416' 02MAY04 01JUN04 DR-N ML-N 0 L2MODE 2 TO ODE I CHECKLIST CHECKLIST 19:00A 19:59 ORT3-N R-N 237 1 T-0472-R WCC RM-3200C 1RMRM-3200CIC 1
15MAY04 15MAY04 DR-YMLY 69 RM 2 1RMRM CICREVOl1 REVO1 1200 1259 ORT3-Y R-N I RM IC REV 00104 2 238 1 T-7110-R WCC TG-01-G ITUTG-01-GEMREVS-1 I
15MAY04 15MAY04 DR-Y ML-Y 52 T T1 i TUTG-0 -G EM REVS-4 12:00 1259 ORT3-YR-N ITUTG-01 EMREV5-1001711 239 0 T210718R WCC W-085-M REMOVETAG(OVNBI 1
15MAY04 15MAY04 DR-Y ML-Y 0 `21 I8RREMOVEi AG(0VNBIW.85 REV'04) 0 W-85 EM REV0.1) 12:00 12 59 ORT3-N R-N Run Date 15MAY04 13:51 LT-03 STANDARD PUBLICATION Sheet 14 of 17 O Primnavera Systems, Inc.
FL-03 Execution Publication Set
after 15MAY04 12:00 I
U1R28 WORKING SCHEDULE I
after 15MAY04 12:00 I
U ID RESF WO ST EQID MAY DESCRI171ON RD ES EF RISK MF Sat 15 l tn I A Mnn 17 t.I.
L
-lI)A1-49 4a l
-"I n-3-A-A - a.4f.4 4AAR -1AI.on.,) A.' -A. ~=
A.4n.fl4'3-A.4r-A I
I I
I I
I I -
I -
I.-
I.-.
.- I -
I 2401 T-0510-R wCc W-tBII1B2 I1 VNCCW-1B11IB2 MM REV0 1 3
15MAY04 I 15MAY04 12:00 14:59 7C r-0s 241 1
T-3310-R WCC P-001A-M I RC P-IA-M RMP 9002-1 1 15MAY04 15MAY04 0 r-3 EM REV1-1 13:00 13:59 242 0 T201642H WCC W-086 HANG TAG (O VNBI W46 1 15MAY04 15MAY04 DR-Y ML-Y 0 T201 MM REVD 1) 13:00 13:59 ORT3-N R-N 243 1 T-1763-R WCC SC-9668 1 SC SC-9668 MMV 2
15MAY04 15MAY04 0
T REVO-1 13:00 14:59 244 0
T201 626R WCC W-017 REMOVE TAG (O VNTBO 1
15MAY04 15MAY04 DR-Y ML-Y 738 T201 W-17 MM REV0-1) 15:00 15:59 ORT3-N R-N 245 1
T-7048-R wCC P-28B 1 CS P-28B EM REV2-1 3
15MAY04 15MAY04 DR-Y ML-Y 26 T-7C 15:00 17:59 ORT3-N R-N 00 246 0 T201475R WCC VNTB REMOVE TAG (0 VNTB I
15MAY04 15MAY04 737 T2 VNTB MM REVO-2) 16:00 16:59 247 0 T201642R WCC W-086 REMOVE TAG (0 VNBI 1
15MAY04 15MAY04 DR-Y ML-Y 220 W-86 MM REV0-1) 18:00 18:59 ORT3-N R-N 248 1 T-3180-H WCC P-001A-M 1 RC P-1A-M BALANCE 1
15MAY04 15MAY04 0
3 EM REVO-1 21:00 21:59 249 1 T-3180-R WCC P-001A-M I RC P-1A-M BALANCE 1
16MAY04 16MAY04 537 EM REV0-1 00:00 00:59 250 1 T-3322-R WCC P-001A-M RC P-IA-M RMP 9002-1 1
16MAY04 16MAY04 0
EM REV2-1 00.00 00.59 251 1
T-2407-H WCC RMP 1 4.16KVRMP9364-1 1
16MAY04 16MAY04 34 UMBLICAL CORD EM 01:00 01:59 252 0 T201849H WCC HX-038A1tA HANG TAG (O VNCSR 1
16MAY04 16MAY04 2
HX-38AUA2 MM REV0-1) 03:00 03:59 253 2 T301009R WCC ICP-06.021 REMOVE TAG (2 CV 1
16MAY04 16MAY04 724 F-39A IC REV 0-1) 05:00 05:59 254 1 T-2709-R WCC MS-2018 1 MS MS-2018 MMV 1
16MAY04 16MAY04 0
REV0-1 07:00 07:59 255 1 T-8293-H WCC HX-1B 1 MS HX-IB SMP OPS I
16MAY04 16MAY04 DR-Y ML-Y 0
REV1-1 07:00 07:59 ORT3-Y R-N 256 1 T-8293-R WCC HX-1B 1 MS HX-1B SMP OPS 1
16MAY04 16MAY04 DR-Y ML-Y 73 REVI-1 11.00 11:59 ORT3-YR-N 257 0 T201849R WCC HX-038A11A REMOVE TAG (O VNCSR I
16MAY04 16MAY04 717 HX-38A1A2 MM REV0-1) 1200 1259
-R 1 VNCC VW 3I VNCCV R 1RCP-IA
[II RCP-IA-42H HANG TA IN 3-RI SC SC-9 Ml SCSC-'
26RREMOVE I
.R1 CS P.28
'048_1 C 1475RREMOV 201842RREM T.3180-H 0013180 T-31 001 T-T 001 T0 01 1B1tB12MM REV0-f-18111B2 MM REV0 M RMP 9002-1 EM A RMP 9002-1 EM R 3(O VNBI W-88 MM 68 MMV REVO-1 668 MMV REV0-10 rAG(O NTBoW-1 3 EM REV2-1 P-28B EM REV2-1 TAG (0 VNTB VNT VE TAG (0 VNBI W IRC P-A-M BALAP A1 RC P-1A-M BALP 80-R 1 RC P-iA-M B 318011 RC P-1A-M 22RRC P-1A-M RM 332211 RC P-IA-M 407-H I 4.16KV RMI
'1240711 4.16KV RI 1201849H HANG TA, II T301009RREMOU T-2709-R 1 N 001270911 T-8293-H 1 001829311 T-829l 0018; T2011 T-55 001 10010510 EVI-1 V1-1 0013310
- 1) 11 11763 MM REV01) l MM REV0-2) 8W MM REV0-1)
CE EM REVO-1 UCE EM REVO-1 3ALANCE EM REVO
'9002-1 EM REV2-1 IMP 9002-1 EM RE) 9364-1 UMBIUCAL 4P 9364.1 UMBLICf
.R 1 MS HX-1B SMI 9331 MS KX-IB Sh 49RREMOVE TAG a
WRI VNCC HX-1lS i553K 1 VNCC H) 2-1 CORD EM REVO-1 L CORD EM REVO-1 11A2 MM REVO-1)
IC REV 041)
EVO-1 tEV-11 REVI-1 OPS REVI-1 IP OPS REV1-1 0 VNCSR HXI38A1l 6 MM REV2.1 I15A MM REV2-1 I2MM REVO-1) 258 1 T-5553-R WCC HX-15A I VNCCHX-15AMM REV2-1 2
16MAY04 I 16MAY04 12:00 13:59 0
Run Date 15MAY04 13:51 LT-03 STANDARD PUBLICATION l
Sheet 15 of 17 OPrfIaverSs ns Inc.
FL-03 Execution Publication Set
after 15MAY04 12:00 U1R28 WORKING SCHEDULE after 15MAY04 12:00
- lUI l ID RESP WO ]
ElD I
DESCRIPTION RD ES EF RISK MF Sun 16 A
Mon 17 ST ii.n I hbiiin 1
in l
l ST X 8,10112,14.1,1&120.221 0.2.4.6.28.10112,14,16,18,20,221 0,l2.4.*6,B10122l14.1 I
_I.
Lef
_ao*
g i I !! ~
2591 1 T-1302-R wcC P-028B 1 CS P-28B MM REtV0' 1 4
16MAY04 1t6MAY04 DR-Y ML-Y 16:00 19:59 ORT3.Y R-N a
260 1
T-0677-H WCC ICP-10.24 1 ESF ICP-1 024 IC I
16MAY04 16MAY04 23 REV0-1 18:00 18:59 261 1
T-8170-H WCC TG-01-T I TU TG-01-T REV9-1 I
16MAY04 16MAY04 DR-YML-Y 710 18:00 18:59 ORT3-Y R-N 262 1 T-8868-H WCC HX-IA 1 MS HX-1A WLU MMV I
16MAY04 16MAY04 a
REV3-1 18:00 18:59 263 1 T-8930-H WCC HX-IA 1 MS HX-1A SMP OPS I
16MAY04 16MAY04 1
REV 18:00 18:59 264 1 T.5947-H WCC MAIN 1 MS MAIN STEAM MMV 2
16MAY04 16MAY04 DR-N ML-N a
REV2-1 18:00 19:59 ORT3-N R-N 255 1 T-5949-H WCC T-23 1 FD T-23 MMV REV2-1 2
16MAY04 16MAY04 0
18:00 19:59 266 1 T-868-R WCC HX-1A I MS HX-1A WLU MW I
16MAY04 16MAY04 0
REV3-1 19:00 19:59 267 1 T-5947-R WCC MAIN 1 MS MAIN STEAM MMV 1
16MAY04 16MAY04 3
35 REV2-1 20:00 20 59 268 1 T-5948-R WCC T-23 1 FD T-23 MMV REVI-1 1
16MAY04 16MAY04 3
20:00 20:59 269 1 T-5949-R WCC T-23 I FD T-23 MMV REV2-1 4
16MAY04 16MAY04 270 20-00 23:59 270 1 T.1643-R WCC RMP-9133 1 AF RMP-9133 EM I
16MAY04 16MAY04 118 REVO-1 21:00 21:59 271 1
T-8930-R WCC HX-1A '
16MAY04 16MAY04 0
REV1-1 23:00 23:59 272 1 T-7043-R WCC P-028A-M 1 CS P-28A-M EM REV0-1 1
17MAY04 17MAY04 DR-Y ML-Y 0
04:00 04:59 ORT3-Y R-N T-1302-R I CS P-:
0011302f01 T-0677-I ES 001067711 E T48170-H I T 0018170111 T.18868.HIM!
T.8930+1 IM-'
0018930111 f T.59474HI M!
0015947~11 T-59494H1 FD 0015949E1M T48868-Ri 001886811 T.5947'-R I 0015947f T.5948-RI 001 5948f T.5949-R1 0015949w T.1643-IF 0011641 T.893 0018 88 MM REVO-1 CS P-288 MM REVC ICP.10.24 IC REVO F ICP-1 0.24 IC RE\\
rG-1.T REV9-1 J TG-01-T REV9-1 HX.1AWLU MMVIR S HX-IAWLU MMV HX.IA SMP OPS R S HX-1A SMP OPSI MAIN STEAM MMY MS MAIN STEAM MI T 23 MMV REV2-1 FD T-23 MW REV2 HX-IAWLU MM MS HX-IAWLU MM MS MAIN STEAM M I MS MAIN STEAM FD T 23 MMY REVI I FD T-23 MMV RE\\
-D T-23 MMW REV2 M1 FD T-23 MM\\
I AF RMP.9133 EM I 1 AF RMP-9133 Et 4R1 MSHX.1ASMI 3011 MS HX-1A SI T.7043-R I CS P-0017043M1 CSF T.7047T4 1 CS P-:
001704711 CS T.0964-H 1 MRS o0010AIo11 MF T-3T778HI 345 001377801 T301106HH T-7047.R 0017047 0-1 REV3-1 tIEV1.1 AVREV2-1 I
REV2 1
/REV3-1 aV REV2-1 AMV REV2-1 I
1-1 REV2-1 I REVOD1 OPS REVI.1 P OPS REVI-1 8A-M EM REVO0
.28A-M EM REV 8A-M EM REVI-28A-M EM REV 62A01 RMP 93' R 62/AOI RMP V F89-112 APSI ISKV F89-112AF ANG TAG (1 CC I CS P-28A-M E II CS P-28A-M 2731 1 T-7047-H WCC P-28A-M ICSP-28A-MEMREVI-11 I 17MAY04 I 17MAY04 I DRY ML-Y 04:00.
04:59 ORT3-Y R-N 0
_ l I_______
L 2741 1 T-0964-H WCC 62/A01 1 MRR 62A01 RMP I 1 9302-1 EM REVO-1 17MAY04 I 17MAY04 05:00 05:59 0
275 1 T-3778-H WCC F89-112 1 345KVF89-112APS 2
17MAY04 17MAY04 REVO-1 0500 0659 276 1 T301106H WCC P-011A HANGTAG(1CCP-11A 1
17MAY04 17MAY04 a
MM REVO.1) 08:00 08:59 277 1 T-7047-R wcC P-028A-M I CS P-28A-M EM REVI-11 1 17MAY041 17MAY04 DR-YML-Y 09:00 09:59 ORT3-Y R-N 0
.1J A
A
- .-.L.
L 1
.2.
Run Date 1sMAY04 13:01 LT*03 STANDARD PUBLICATION Sheet16cf17 C Primavema Systems, Inc.
I FL-03 ExecutIon Publication Set I
after 15MAY04 12:00 U1R28 WORKING SCHEDULE after 15MAY04 12:00 LU ID RESPI Wo EaID DESCRtPTION RD ES EF RISK MF MAY S
Eun --
-6 Monjiilj I
I ST
.1 12,14.16,1a202210,2,4 6 8 l012.14,16,1820,2210 2 46B8101i2,1416.1 278 1
T-8022-H WCC MtP 1 480V IWP 01-128 E-FN I
17MAY04 17MAY04 DR-N ML-N 0
T-8022-1 41-1 (W-1311) EM REVO-2 09-0_
s 09 59 ORT3-N R-N 0018022 1480VIWPo1 279 1 T-3778-R WCC Fs112 1 345KV F89-112 APS 2
1tMAY04 17MAY04 0
T3 I 35KV Fs REVD1 11:00 1Z59 0013 81 345KV 280 1 T-0691-R WCC ICP-2.19 I ESF ICP-Z19 IC REV0-1 1
17MAY04 17MAY04 205 T0 1-R1 ESF ICP.
12:00 12.59 001 eMII ESF IC 281 1
T4s964-R WCC 82tA01 1 MRR 62tA01 RMP I
17MAY04 17MAY04 DR-Y ML-Y 0
T R1 PMRR 62).
9302-1 EM REV01 1200 1259 ORT3-Y R-N 001 96411 MRR 6 282 1 T-8022-R WCC WP 1 480V IfP 01-128 E-FN 1
17MAY04 17MAY04 DR-N ML-N 0
4022-R1 480V (W-13B1) EM REV0D2 14:00 14:59 ORT3-N R-N 0180221 48a 283 1 T-0511-R WCC W-IC1IIC2 1 VNCCW-1C1IIC2MM 3
17MAY04 17MAY04 0
- I.R 1 VNCC REVO-1 14:00 16:59
_.ii 284 1 T301106R wCC P-011A REMOVE TAG (1 CC 1
17MAY04 17MAY04 690 13O1106RREM P-1IAMMREVO-1) 15:00 15:59 I
285 1 T-9894-R WCC W-001C1 1VNCCW-1CVI1C2EM I
17MAY04 17MAY04 0
T-9894-R1 VN REVO-1 18:00 16:59 0009894l1 286 0 T310365H WCC HX-5sA-1 HANG TAG (o DG G1 2
17MAY04 17MAY04 0
T31o365HHAN HX-55A1/2 MM REVO-4) 16:00 17:59 287 1 T-8019-R WCC W-013B11 1480VFWPOI-128 E-FN 2
17MAY04 17MAY04 DR-N ML-N 0
T-81s-RI (W-13B1) CAUT REVD-1 17:00 18:59 ORT3-N R-N 0018019m Run Date 15MAY04 13:51 LT-03 STANDARD PUBUCATION Sheet 17 of 17 Prdmavera Svstems, Inc.
FL-03 Execution Publication Set