U1R28 OCC Interactive Turnover Meeting Agenda
ML052030067
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/23/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML052030067 (30)


Text

Committed to Nucdear

!c

?Dllr K

  • mm Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Sunday, May 23, 2004 Start Time:

1800 NSB Cafeteria BRIEFING NOTE.

ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)

Operations Coordinators (SOC)

Maintenance Coordinators (MOC)

Engineer / Projects Coordinators (EOM)

Rad Protection Manager (RPM)

Site Safety Coordinator (SSC)

Shutdown Safety Assessor (SSA)

Site Management (SSM)

General Supervisors First Une Supervisors Agenda

1. Safety Issue Discussion (SSC)
2. Radiation Protection (RPM)
3. Operations Coordinator Turnover (SOC)
4. Shutdown Safety Assessment (SSA)
a. Containment Fire Loading SAT /

UNSAT -* Review Deficiencies

5. Maintenance Coordinator Turnover (MOC)
6. Engineering Coordinator Turnover (EOM)
7. Major Projects Update (EOM)
8. Schedule Review.(SOM)
9. Management Expectations (SSM)
10. ACEMAN Assessment Results (SOM)
11. Shift Goals (SOM)

Items Included in Daily Package:

ANo a

}

Site Communication xq 5>

go b

Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Defined Critical Path Work Activity Risk Assignment e

7

-Outage Schedule

__\\_

/

1

Committed to Nuclear E rl ol 1)

Point Beach Nuclear Plant U1R28 Refueling Outage

  • tr 7

": 7,%6'4 fSafety Topic for week of May.23 --29, 2004 Theme for the week This week's theme deals with odds and ends for Completinci the Outage. We are almost done.

A number of critical work activities will be conducted this week in containment and we will begin a major battery change out. It is time to review industry OE from other sites to make sure we've learned from their experiences. Nothing will stop our progress faster than a serious iniuryl Daily Safety Snippets Sunday Is there an obstruction in your way that mlght not stay?'

OE13857 May 2002, Fort Calhoun -While moving the reactor vessel head assembly during a refueling outage, the control pendant for the polar crane caught a handrail vertical support pipe, lifing the pipe out of Its mount and causing it to faN 20 ft to the walkway below. Individuals were In the area at the time, but not Injured. A review indicated the pendant caught on nearby equipment many times during past refueling outages and corrective actions were not put In place.

Are there any items were ourequipment gets caught dunng moves that we have not resolved?

Mondav The big picture do we see? And communication is the key.

OE12357 January 2001, River Bend -A worker focused on a moving load and did not pay attention to the movement of the crane. He ended up being forced against a handrail by the cab of the crane, luckily resulting only in minor Injuries.

The entire crew was focused on the load with no one person having oversight of the whole evolution.

During crane operatons, do we designate an individual to 'watch the big picture?'

Tuesday "Peer checks - do we use them?'

December 1997, Byron - An electrician was taken to the hospital for treatment of second-degree burns on his hand and flash bums to his eyes as a result of a mishap. He was one of three electricians assisting a system engineer during a battery discharge test on a new battery bank when he accidentally shorted across the battery with one of the cables used to connect the battery to a resistor bank. An Investigation showed that the electricians and the system engineer had not verified the correct cable configuration. Also, the Injured electrician was not wearing low voltage gloves and had rolled up the sleeves of the long-sleeve shirt he was required to wear for this job.

Maiat PPE do we wear during battery work?

Wednesday

.7ust a reminder to be told, balance that load7P OE1 0902 March 2000, Seabrook - Electricians were offloading battery cells from a metal pallet on a forklift. The offload sequence went from Inside, closest to the forklift, to the outside, furthest from IL The result - Instability In the load and the pallet tipped under the weight of the batteries. The cells fractured spilling 19 gallons of sulfuric acki/water electrolyte In the switchgear room. This OEIs not just or battery removal. Balance all our loads!

Thursday Wake sure the scaffold doesn't slip and come down too quicark.

OE14551 July2002, Davis-Besse -A diamond deck plate slipped through a gap between two pieces of floor grating and dropped 20 ft to the level below, damaging an Instrument fine. The rest of our scaffolding is coming down.

Are we aware of the potential 'holes'formaterial to go though?

Friday "Before heat up, make sure someone has done the clean-upr OE57698 April 2004, Palo Verde - Two mechanics received second degree bums to the face as the result of a flash fire that occurred as they began pre-heating for welding. Isopropyl alcohol was used to clean and liquid had accumulated In the casing of the equipment. The oncoming crew was not aware of this buildup as they began work.

Saturdav "Always remneber to verify first or you may take a ride in a hearse. -

1992, Palisades - An experienced electrical technician at Palisades was electrocuted when he failed to install a circuit Jumper before removing test equipment from a current transformer. The existing circuit configuration had not been anticipated during work planning, and the decision to use Jumpers to maintain energized current transformer circuits during testing had not been reviewed by supervision.

2

Point Beach Nuclear Plant Outage 1 R28 DAY Supportinq Operational Excellence 49

. Path AN i_

Picture Meets Outage Radiation Performance fnnoenf IAnao Elu-.dne

__,a.S Vl~

3 L.~~

I I

II This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.

Day 49 - May 22 Actual = 1.034 Cumulative = 74.083 Cumulative Forecast =74.184 Daily PCE goal reforecast on 4/23. Daily dose reforecast on 5123104.

Dose reforecast on 5/23/04 combining dose received for the RV Head repairs and also adding 17 rem to the outage goal to reflect the dose received for the repair.

Meets:

Exceeds:

<=92 Rem

<=88 Rem Actual Cum.

Dose:

74.083 Rem

_=_

Meets: <= 18 Exceeds: <= 12 Actual PCE's:

10 S

.~

0 Stu Thomas I

Personnel Contamination Events Cummulative Dose Exposure I

i z

20-18^

16-P..

14 -

12-,.

10-p'..

"or 4

2-I 0

4 0

5 10 15 20 25 30 35 40 45 50 55 60 so 4

Actual

..Forecast Goal D60 te0 0

0 0 20 Actual Goal I,

Committed to Nuclear E tenco Outage Status Report Plant:

Point Beach Unit I Day:

Sunday Today's Date/ Time:

5/23/04 1600 Outage Duration: Day 50 Of Refueling Outage Number U1R28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0

First Aid cases 0

Near misses 0

Total for this outage 1

Summary:

Radiological Dose to date 74.083 Projected to date

  • 74.184 Outage Goal

-92 R Difference

-.101 Reforecast on 5/23 Number of PCEs 10 Summary: Dose reforecast on 5/23/04 combining dose received for the RV Head repairs and also adding 17 rem to the outage goal to reflect the dose received for the repair.

Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0

Summary:

Plant Status Mode:

a Hot Standby (Mode 3)

D Hot Shutdown (Mode 4) 0 Cold Shutdown (Mode5) 0 Refueling Shutdow n (Mode 6)

RCS:

Temperature:

80 Pressure:

Vented to Atmosphere RV Level:

70%

Time to Boll:

106 minutes Shutdown Safety Assessment Protected Equipment:

Major Activities Completed In Last 24 Hours Critical Path and Near Critical Path Activities (Next 24 Hours)_

  • Fraratome Underhead Inspection Equipment Removed Reactor Head Penetration #26 Relief Request Issues
  • Head Inspection Scaffold Removed
  • Drain RCS to 22% Reactor Vessel Level (Midloop)
  • Drained RCS to 70% Reactor Vessel Level
  • Upper Cavity Decon
  • Replaced RV Head O-Rings
  • Nozzle Dam Removal
  • Set Reactor Vessel Head
  • Primary Manway Installation
  • Move lP-IB RCP Motor Significant Outstanding Issues Date Issue Due Responsibility 5/17/04 Rx Head Relief Request 5/25/04 Jim Schweitzer 5/20/04 I

D105/D106 Station Battery 5/27/04 Harv Hanneman 5/22104 Reactor Trip Relays 5/27/04 Mike Miller Upcoming Ma or Milestones Scheduled Actual Scheduled Actual Date Time Date Time Date Time Date Cooldown <200° 4/03/04 2100 4/03/04 2230 RCS Fill'& Vent 4/23(04 1500 Head Lift 4/09/04 0900 4/21/04 1550 Heatup >2000 4/25/04 0900 Refueled 4114/04 0300 5/02/04 1848 Reactor Critical 4/28/04 0800 RV Headset 4/18/04 1900 5/23/04 1338 On-Line 4/30/04 0100

Point Beach Nuclear Plant PBNP SHUTDOWNN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

May 23, 2004 TIME:

1400 KEY SAFETY FUNCTIONS:

REACTIVITY:

GREEN CORE COOLING:

POWER AVAILABLE:

INVENTORY:

YELLOW GREEN YELLOW CONTAINMENT:

SFP COOLING:

GREEN NA PROTECTED EQUIPMENT:

COMMENTS:

  • Look Ahead: CORE COOLING and INVE NTORY will go ORANGE once we draindown to less than 55%

a Protected Equipment signs staged for OP-4F Reduced Inventory

  • Fire Protection Condition III: Credit is taken for fire rounds as fire prevention contingency.

PBF-1562 Revision 2 10/30/02

References:

NP 10.3.6 NP 10.2.1 hi Page6oflO

l_

_Defined Critical Path U

ID l

DESCRIPTION OD RD Cal U SYS EQID TF 23 2

I 25 2

_ _ 14, 1

1 022

, A 4,

8,10i82,14.16.18,20,221 0220 4.6.8,1012,14,16,18,20,22 1

OP4F-020 ESTABLISH OP 4F 24 1 1 1

RC OP-4F 3

S IUSH OP 4F REQUIREMENTS REQUIREMENTS 23MAY04 12:5922MAY04 18:00A I

MM-8480J REPLACE REACTOR HEAD 5

2 1

1 RC R-1 0

MMU480JRI LACE REACTOR HEAD 0214134-23MAY04 13:5923MAY04 10:OOA 1

IC0300731 SPEC 200 TECH SPEC -

7 4

5 1 MMS ICP-13.004 1

C030031SP C 200 TECH SPEC -TRAIN A TRAIN A T030071-23MAY04 15:5923MAY04 10:OOA I

HEAD-SET EACTOR VESSEL HEAD SET 0 0 1 1

XX MILESTONE 0

HEAD-S REACTOR VESSEL HEAD SET 23MAY04 14: o 1

MM-8480U INSTALL WALKWAY &

1 1 1 1

RC R-1 0

MMU 0OlNSTALL WALKWAY & CONTACT RP FOR SURVEY CONTACT RP FOR SURVEY 23MAY04 1 :0010214134-23MAY04 14:59 I

EM-84800 INSTALL PATCH CABLE FOR 1 1 1 1

RC R-1 0

EM 80dNSTALL PATCH CABLE FOR DEDICATED TIC'S DEDICATED T/CS 23MAY04 5:0010214134-23MAY04 15:59 I

01-11C TERMINATE NOZZLE DAM 1

1 1 1

RC ADMIN 4

.1I CTERMINATE NOZZLE DAM PROTECTED STATUS PROTECTED STATUS I I I

23MAY 16:00123MAY04 16:59 1

OP4D-205 DRAIN RCS TO 55% RX 2

2 1 1

RC OP-SA 0

O D.20DRAIN RCS TO 55% RX LEVEL PER OP-4D PT 3 00 LEVEL PER OP-4D PT 3 23MAY 16:0023MAY04 17:59 I

RCX02A2 ENTER RCS REDUCED 0

0 1 1

XX MILESTONE 0

X02A2 ENTER RCS REDUCED INVENTORY (2ND)

INVENTORY (2ND) 23M 1

OP4D-220 PLACE LT-447B IN SERVICE 1

1 1 1

RC OP-4D 0

OP4D.220PLACE LT-4479 IN SERVICE 23r Y04 18:00123MAY04 18:59 1

OP5A-060 DRAIN RCS TO 22 - 25% (2ND 2 2 1 1

RC OP-5A 0

OP5A-O6rPRAIN RCS TO 22 - 25% (2ND MIDLOOP)

MIDLOOP) 23 AY04 19:00E23MAY04 20:59 1 MIDLOOPA-2 START RCS AT MIDLOOP 0

1 1

XX MILESTONE 0

MIDLOOPA-2 START RCS AT MIDLOOP (2ND)

(2ND)

_ _ _23MAY04 20:59 1

EP04000421 HX-OOIA - REMOVE HOT LEG 1 1 1 1

MS HX-001A 0

EP0400042*1X-001A - REMOVE HOT LEG NOZZLE DAM NOZZLE DAM 3MAY04 21:0010400042-23MAY04 21:59 1

EP04000431 HX-001B - REMOVE HOT LEG 1 1 1 1

MS HX-001B 0

EP0400043IHX-001B - REMOVE HOT LEG NOZZLE DAM NOZZLE DAM 3MAY04 21:0010400043-23MAY04 21:59 1 EP0400042H HX-001A - REMOVE COLD 1 1 1 1

MS HX001A 0

EP0400U0421X.OOIA - REMOVE COLD LEG NOZZLE DAM LEG NOZZLE DAM 23MAY04 22:00E0400042-23MAY04 22:59 I

EP0400042P HX-OO1A - FME CLOSEOUT 1 1 1 1

MS HX-001A 0

EPo400042PHX-0O1A - FME CLOSEOUT INSP & INSTALL FME COVER INSP & INSTALL FME COVER 23MAY04 22:0010400042 - 23MAY04 22:59 1 EP0400043H HX-001B - REMOVE COLD 1 1 1 1

MS HX-001B 0

EP0400043HHX OOl B - REMOVE COLD LEG NOZZLE DAM LEG NOZZLE DAM 23MAY04 22:0010400043-23MAY04 22:59 Run Date 23MAY04 13:21 LT-16 DEFINED CRITICAL PATH Shoot I of 2 CPrimavera Systems, Inc.

FL-16 DEFINED CRITICAL PATH SET

Defined Critical Path I

U ID I

DESCRIPTION OD RD Cal U SYS EQID l TF 23 24 25 E

IXI I

I I

C 1

I 68A12,14,16,18,20.22[n02.4 8.10112,14,16,18,20.2210.2

.6.8.102114,16'18.2022 1

I 1

1 MS HX-O01B 0

EP0400043PHX-O0IB - FME CLOSEOUT INSP & INSTALL PME COVER INSP & INSTALL FME COVER 23MAY04 22:0010400043 - 23MAY04 22:59 1 RPDC-SGA3 SIG PLTFRM DECON AFTE 1

1 1 1 MS HX-001A 0

RPDC-SGA3A SIG PLTFRM DECON AFTER NOZZLE DAM REMOVAL NOZZLE DAM REMOVAL 23MAY04 23:00023MAY04 23:59 1 RPDC-SGB3 B SIG PLTFRM DECON AFTE 1 1 1 1 MS HX-001A 0

RPDC.SGB3B SIG PLTFRM DECON AFTER NOZZLE DAM REMOVAL NOZZLE DAM REMOVAL 23MAY04 23:00123MAY04 23:59 1 MM0214051D HX-001A-CLOSE COLD LEG 6 6 1 1

MS HX-001A 0

MM214051DHX-OOIA -CLOSE COLD LEG PRIMARY MANWAY PRIMARY MANWAY I

24MAY04 00:000214051 - 24MAY04 05:59 1 MM0214053D HX-001B - CLOSE COLD LEG 6

6 1 1 MS HX.001B 0

MM0214053DHX-01 B. CLOSE COLD LEG PRIMARY MANWAY PRIMARY MANWAY 24MAY04 00:00

&0214053 24MAY04 05:59 1 MM0214051E HX401A-CLOSE HOT LEG 5

5 1 1 MS HX-001A 0

MM0214051 E1_A - CLOSE HOT LEG PRIMARY MANWAY PRIMARY MANWAY 24MAY04 06:00_0214051 -24MAY04 10:59 1 MM0214053E HX-401B -CLOSE HOT LEG 5

5 1 1

MS HX-001B 0

MM0214053iX 001B3 -CLOSE HOT LEG PRIMARY MANWAY PRIMARY MANWAY I

24MAY04 06:000214053-24MAY04 10:59 1

OPSA-030 RAISE RCS LEVEL TO 55%

1 1 1 1 CV OP-SA 0

OPSA.03dWSE RCS LEVEL TO 55% (2ND)

D (2ND) 24MAY04 1 1:00124MAY04 11:59 1

MM-480R REMOVE CAVITY SEAL RING 4 4 1 1 RC R-1 0

MM.848soRRPVE CAVITY SEAL RING 24MAY04 11:00_0214134-24MAY04 14:59 1

RCX02Z2 EXIT RCS AT REDUCED 0

0 1 1 XX MILESTONE 0

RCX02Z2 EXIT RCS AT REDUCED INVENTORY (2ND)

INVENTORY (2ND)

  • 24MAY04 11:59 1 MM-8480N2 REM STUD HOLE CAPS 4

4 1 1

RC R-1 0

MM-848ON2!EM STUD HOLE CAPS PRIOR TO RP DECON PRIOR TO RP DECON 24MAY04 15:00_0214134 - 24MAY04 18:59 2

RPJF-1 52B DECON UPPER CAVITY 3

3 1 2 CONT JOB FILE 1 0

RPJF-152BDECON UPPER CAVITY -POST STUD CAP REMOVAI

-POST STUD CAP REMOVAL 24MAY04 19:00_24MAY04 21:59 I

MM-8480N3 INSTALL VESSEL HEAD 12 12 1 1

RC R-1 0

MM4.48ON3NSTALL VESSEL HEAD STUDS STUDS 0214134. 25MAY04 09:5924_MAY04 22_00 E

st'z'.

  • I _ _ EE1JvX 1 I

MM-8480N1 TENSIONPREPSRVHEAD 2

2 1 1 RC R-1 0

MM_848NTENSION PREPS RV HEAr 0214134-25MAY04 11 5925MAY04 10:00 1

MM-8480N TENSION RV HEAD 4

4 1 1

RC R-1 0

MM.8480NTENSION RV HEAD 0214134 -25MAY04 15:5925MAY04 12:00_

I MM-8480K REPLACE RX HEAD 6 6 1 1

RC R-1 0

MM.S48OKREPLACE RX HEAD INSULATION PER RMP 909 INSULATION PER RMP 9096 0214134-25MAY04 21:5925MAY04 16:00 Run Date 23MAY04 13:21l LT-16 DEFINED CRITICAL PATH Shoot 2 of 2 OPrimavera Systems. Inc.

I FL-16 DEFINED CRITICAL PATH SET

tun Date 23MAY04 113:23

. I Work Activity Risk Assignment I

Sheet I of2 U

ACT Iwo GRP HPE EQUIPMENT Activity Cal DUR START FINISH MAY ST l

RISK DesarIptlon ID 23 I

11Mg24 eTue 22 Wed26 4

Th I

>Z

&1 r I

p II Ir :1I 1

CEI600R035 76 CE8 DR-Y ML-Y R-1 RX HEAD REPAIR 1

76 22MAY04 26MAY04 IREACTOR VE!

.ORT3-Y R M CLOSEOUTACTIVITY 07:OOA 15:59 213476-12BC I

EP0400042Z 76 EPT DR-Y ML-Y HX-001A IPTE BRIEF PRIOR TO 1

2 23MAY04 23MAY04 ISTEAM GENERATOR ORT3-Y R-H NOZZLE DAM REMOVAL 18:00 19:59 0400042 - 128EN 1

EP04000421 76 EPT DR-N ML-Y HX-OOiA HX-001A - REMOVE HOT LEG 1

1 23MAY04 23MAY04 ISTEAM GENERATOR ORT3-N R-H NOZZLE DAM 21:00 21:59 0400042 -

128EN 1

EP04000431 76 EPT DR-N ML-Y HX-001B HX-001B - REMOVE HOT LEG I

I 23MAY04 23MAY04 ISTEAM GENERATOR ORT3-N R-H NOZZLE DAM 21:00 21:59 0400043 - 128EN 1

EP0400042H 76 EPT DR-N ML-Y HX-001A HX-001A - REMOVE COLD 1

1 23MAY04 23MAY04 IsTEAM GENERATOR ORT3-N R-H LEG NOZZLE DAM 22:00 22:59 0400042 - 128EN I

EP0400042P 76 EPT DR-N ML-Y HX-401A HX-001A - FME CLOSEOUT I

I 23MAY04 23MAY04 ISTEAM GENERATOR ORT3-N R-H INSP & INSTALL FME COVER 22:00 22:59 0400042 - 128EN 1

EP0400043H 76 EPT DR-N ML-Y HX-001B HX-001B - REMOVE COLD 1

1 23MAY04 23MAY04 ISTEAM GENERATOR ORT3-N R-H LEG NOZZLE DAM 22:00 22:59 0400043 - 128EN I

EP0400043P 76 EPT DR-N ML-Y HX-001B HX-001B - FME CLOSEOUT 1

1 23MAY04 23MAY04 ISTEAM GENERATOR ORT3-N R-H INSP & INSTALL FME COVER 22:00 22:59 0400043 - 128EN 1

EP04000420 76 EPT DR-N ML-Y HX-001A DISCONNECT & REMOVE 1

4 23MAY04 24MAY04 OSTEAM GENERATOR ORT3-N R-H NOZZLE DAM ANNUCIATOR 23:00 02:59 0400042 - 128EN 1

EP04000430 76 EPT DR-N ML-Y HX-001B DISCONNECT & REMOVE 1

4 23MAY04 24MAY04 OSTEAM GENERATOR ORT3-N R-H NOZZLE DAM ANNUCIATOR 23:00 02:59 0400043 -

128EN I

IC2.19 76 ICI DR-N ML-N ICP-02.019 ICP 2.19 SAFEGUARDS 5

1 23MAY04 23MAY04 E ]POST-REFUEUNG, PRE-STARTUP SAFEGUARDS LOGIC TES ORT3-N R-M LOGIC TEST 08:OOA 12:59 03 0813 - 1281C I

IC2.16SUP2 71 ICC5I DR-Y ML-Y ICP-OZ01f ICP 2.16 OVERPRESSURE 1

4 23MAY04 23MAY04 EJOVERPRESSURIZATION MmGATING SYSTEM ORT3-N R-M MITIGATION BISTABLE CHK 18:00' 21:59 0408446 - 1281C I

U U -

I MM-8480J 76 MMI1 DR-YML-N R-1 REPLACE REACTOR HEAD 1 2 23MAY04 23MAY04 I IREACTOR VESSEL AND ASSEMBLY ORT3-N R-H 10:OOA 13:59 14134 - 128MM I

MM-8480U 76 MMI DR-YML-V R-1 INSTALL WALKWAY &

1 1

23MAY04 23MAY04 IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M CONTACT RP FOR SURVEY 14:00 14:59 0214134 - 128MM 1

MM-8480X 76 MM1 DR-Y ML-Y R-1 HEAD WORK PRIOR TO 1

4 23MAY04 23MAY04 OREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M DECON 14:00 17:59 0214134 - 128MM I

MM-8480R 76 MMI DR-Y ML-Y R-1 REMOVE CAVITY SEAL RING 1

4 24MAY04 24MAY04 WREACTOR VESSEL AND ASSEMBLY ORT3-Y R-H 11:00 14:59 0214134 - 128MM 1

MM-8480N2 76 MM1 DR-Y ML-Y R-1 REM STUD HOLE CAPS 1

4 l24MAY04 24MAY04 EREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M PRIOR TO RP DECON

'15:00 18:59 0214134 - 128MM 1

MM-8480N3 76 MM1 DR-Y MLY-R-1 INSTALL VESSEL HEAD 1

12 24MAY04 25MAY04 REACTOR VESSEL AND ASSEMBL ORT3-Y R-H STUDS 22:00 09:59 0214134 - 128MM

  • ,I NMC IWE LT-81 HUMAN ERROR RISK BARCHART

_PBNP U1 Refueling 28 FL-81 HUMAN ERROR POTENTIAL O Primavera Systems, Inc.

i Outage

Run Date 23MAY04 13:231 Work Activity Risk Assignment I

Sheet 2 of 2 U

ACT WO GRPl HPE I ECUIPMENT I Activity CallDURl START FINISH MAY ID STI RISK Description ID

[

I, 8

1 MM-8480N1 76 MM1 DR-Y ML-Y R-1 TENSION PREPS RV HEAD 1

2 25MAY04 25MAY04 BREACTOR VESSEL AND ASSEMBL ORT3-Y R-H 10:00 11:59 0214134 - 128MM 1

MM-8480N 76 MM1 DR-Y ML-Y R-1 TENSION RV HEAD 1

4 25MAY04 25MAY04 EREACTOR VESSEL AND ASSE ORT3-Y R-H 12:00 15:59 0214134 - 128MM 1

MM-8480K 76 MM1 DR-Y ML-Y R-1 REPLACE RX HEAD 1

6 25MAY04 25MAY04 REACTOR VESSEL AND A ORT3-Y R-H INSULATION PER RMP 9096 16:00 21:59 0214134 - 128MM I

MM-8480L 76 MMI DR-Y ML-Y R-1 INSTALL PZR VENT FLANGE 1

2 25MAY04 25MAY04

[IREACTOR VESSEL AND ASSE ORT3-N R-H 16:00 17:59 0214134 - 128MM I

MM-8485L 76 MM3 DR-Y ML-Y P-001 B REALIGN SEAL COLL TO 1

1 23MAY04 23MAY04 REACTOR COOLANT PUMP ORT3-N R-M FLOOR DRAIN RMP 9002-8 12:00 12:59 214119 - 128MM 1

MM-8485J 76 MM3 DR-Y ML-Y P-001B P-001B-ALIGNB RCP PER 1

20 24MAY04 25MAY04 I

IREACTORCOOLANT PUMP ORT3-Y R-M RMP 9002-4 07:00 02:59 0214119 - 128MM 1

MM-8485J1 76 MM3 DR-Y ML-Y P-OOlB P-OOiB - RECOUPLE B RCP 1

5 25MAY04 25MAY04 FIREACTOR COOLANT PUMP ORT3-Y R-M PER RMP 9002 4 03:00 07:59 0214119 - 128MM 1

MM-8485H 76 MM3 DR-Y ML-Y P-001B P-001B - REMOVE 1

6 25MAY04 25MAY04 E=REACTOR COOLANT PUMP ORT3-Y R-M BACKSEAT LEAKAGE 08:00 13:59 0214119 - 128MM I

MM-8486A 76 MM3 DR-Y ML-Y P-001B-M RECONNECT UPPER CC 1

4 25MAY04 25MAY04

[1REACTOR COOLANT PUMP MOTO ORT3-Y R-M PIPING RMP 9002-1 08:00 11:59 0215205 - 128MM 1

MM-8485QZ 76 MM3 DR-Y ML-Y P-001B P-001B - FINALASSEMBLY 1

13 25MAY04 26MAY04

[E=IREACTOR COOLANT PU ORT3-Y R-M AFTER COUPLING 12:00' 00:59 0214119 - 128MM E

I OP4D-205 OPS DR-Y ML-Y OP-5A DRAIN RCS TO 55% RX 1

2 23MAY04 23MAY04 ILOWER REACTOR LEVEL TO 55%

ORT3-N R-H LEVEL PER OP-4D PT 3 16:00 17:59 1280P 1

OP5A-060 OPS DR-Y ML-Y OP-4D DRAIN RCS TO 22 - 25% (2ND 1 2

23MAY04 23MAY04 I

ORT3-N R-H MIDLOOP) 19:00 20:59 1280P 1

01100-60 OPS DR-N ML-N T-034A T-034A - FILL Si 1

8 24MAY04 24MAY04 ORT3-N R-M ACCUMULATOR 12:00 19:59 1280P NMC /WE LT-81 HUMAN ERROR RISK BARCHART PBNP U1 Refueling 28 Outage FL-81 HUMAN ERROR POTENTIAL C Primavera Systems, Inc.

I

---  -

I. - - --- -

arterx£imR vua ic:uu U1R28 WORKING SCHEDULE I ater 23MAY04 12:00 I

I I

I I

I I

I AA A

u t I RESPI wo ST EQID DESCRIPTION O.D. CALL NRC TO WITNESS DRAIN RCS RD I

1 ES EF RISK MF M

l AY Mon 24=

Tue 25 1

1 NRC-CALL11 IADM MILESTONE 23MAY04 23MAY041 DR-Y ML-Y 16:00 16:59 ORT3-Y R-N 0

di NRC NR, 2

1 NRC-CALL12 ADM MILESTONE OD. CALL NRC TO I

23MAY04 23MAY04 DR-Y ML-Y 0

WITNESS REMOVE 18:00 18:59 ORT3-Y R-N 3

1 NRC-CALL13 ADM MILESTONE O.D. CALL NRC TO 1

25MAY04 25MAY04 DR-Y ML.Y 0

WITNESS MODE 6 TO 09:00 09:59 ORT3-Y R-N 4

1 AP0215129 APM 76 X-01-C X-01-C-INSPECTCAL 16 24MAY04 26MAY04 DR-NML-N 5

AND SET 12:001 09:59 ORT3-N R-N V1;1; 4:1 0Mas 1

5 1

AP0303688A APR 76 A-01 (CONT) CALIBRATE 50 124MAY04 29MAY04 DR-N ML-N 178 IA-01 NON-TECH SPEC 12:00 16:59 ORT3-N R-N 6

1 AP0215123 APR 76 A52-14 P-1B UNDERFREO.

6 125MAY04 25MAY04 DR-N ML-N 0

RELAY FUNCTIONAL 08:00 13:59 ORT3-N R-N

-7 1

DM0300103 BIMS 77 RE-PC 46.1 VERIFY RTO AS 1

25MAY04 25MAY04 DR-Y ML-Y 150 V

CALCULATED BY PPCS 08:00*

08:59 ORT3-Y R-N 8

2 BM0300124 BMS I77 RE-PC 46.1 VERIFY RTO AS I1 25MAY04 125MAY04 DR-Y ML-Y 150 CALCULATED BY PPCS 08:00 I

08:59 ORT3-Y R-N 9

1 NG-HX15XVI BMS 77 HX-015A1 EXTERNAL AIR SIDE 4

25MAY04 25MAY04 DR-Y ML-Y 0

COIL INSPECTION 1100 14:59 ORT3-Y R-N 10 1 NGSEM714.A BMS 76 W-001AI W-001A1 SEM 7.14 6

25MAY04 25MAY04 DR-Y ML-Y 0

MEASURE AIR FLOW 11:00I 16:59 ORT3-Y R-N VIA A1 rn-. -

CALLI 10.0. CALL NRC TO WIl

-CALL12D.D.:CALL NRC TO WV I :

NESS DRAIN RCS'TO MIDLOOP rNESS REMOVE NOZZLE DAMS NRC-CALLI: ).D. CALL NRC I

t AP02b5129§201-C -INSPECT CAL AND SE II-I AP0303 j88pLCONT) CAUqRATE IA-01 NON-ECH SPEC RE 0336 d

3 I

AP0215`1231[2UNDERFRE 02151123_PWR T BM0300103V 0300103w BM0300124V 0300124 NG4-XI5 0214 NGSEM71 0214 NGSEM71 0214 11 I

NGSEM714-B I BMS 76 W-001B1 W-001B1 SEM 7.14 MEASURE AIR FLOW Z-65A INSTALL MR 03-044 6

25MAY04 125MAY04 I DR-Y ML-Y 11:00 1 16:59 1 ORT3-Y R-N 0

I

-RIFY RTO AS lALORIMETRI ERIFY RTO AS lALORIMETRI (VeXTERNAL i21_

CONT l4 -AW00tA1I SE 14N-001B1 SE NE0302153 12 0 CE0310577 CE 76 Z-065A 3

10MAY04 24MAY04 DR-Y MLY 07:OOA 09:59 ORT3-N R-N 157 -Eo051o77Z45A INSTALL MR 034

-'I~

I E

4-4 4

+

4-4l 13 0

CE0311772 CE 76 Z-65A Z-65A INSTALL HEAT TRACE - MR 03-044 3

10MAY04 124MAY041 DRY ML-Y 07:OOA 09:59 ORT3-N R-N CE0j111772Z45AIiNSTALLHEATTR 157 I1E l

l l

l 14 15 0

CE0212184 CE30000TI CE 3

CE3 76 76 T-119A TG-01-T T-1 19A -REMOVE TM 02-037 ENCAPSULATE INSULATION ON HP 8

10 24MAY04 24MAY041 DR-ML-Y 07:00 14:59 ORT3-N R-N 0

134 CE0212184T-0212184 JMANHOLE #10310577 kCE-MR03-044 IMANHOLE#10311772 19A - REMOVE i1i 02.037 CLEARV.LL TANK ON ON HP TURBINE COVER HWIGH k'ESSURE TURD I

I 01MAY04 124MAY04 DR-Y MLY 12:OOA 16:59 ORT3-Y R-N 0OO1TtENCAPSULATE INSULAT

-I, Run Date 23MAY04 13:02l LT-03 STANDARD PUBLICATION Sheet I of 21 C Primavera Systems, Inc.

I FL-03 Execution Publication Set F

rZ 6%vI j46#8Fwrle I

-VI&VW I

U7RZI WORKING SCHEDULE duer zimA rU4 71:UU I

I ID RESP WO ST EQID DESCRIPTION RD ES EF RISK DR-Y ML-Y ORT3-Y R-N MF MAAV Sun 23 IMon24' Tue 25

-E~JTGATIEINSULTE-ACPROO3 - TRB HALL 44 FT GEN AREA I

15 1 CE44TGATI CE3 77 IST-SISI I REINSULATE-FAC 11101 17MAY04 01JUN04

'ROG - TRB HALL 44 FT I 14:OOA 20:59 0

a 17 0

CE406159TI CE3 77 SERVICE INSTALL INSULATION 2

24MAY04 24MAY04 DR-Y ML-Y 0

AFTER VALVE WORK 07:00 08:59 ORT3-Y R-N 18 0

CE309503TI CE3 77 SERVICE INSTALL INSULATION 6

24MAY04 24MAY04 DR-Y ML-Y 169 FOR 1CS-66 07:00-12:59 ORT3-Y R-N 19 0

CE212852TI CE3 77 SERVICE INSTALL INSULATION 8

24MAY04 24MAY04 DR-Y ML-Y 167 FOR 1FD-40 07:00' 14:59 ORT3-Y R-N 20 0

CE213365Tl CE3 77 SERVICE INSTALL INSULATION 8

24MAY04 24MAY04 DR-Y ML-Y 0

FOR IFD-2411 07:00' 14:59 ORT3-Y R-N 21 0

CE216557Tl CE3 77 SERVICE INSTALL INSULATION 8

24MAY04 24MAY04 DR-Y ML-Y 0

FOR 1FD-282C 07:00 14:59 ORT3-Y R-N 22 0

CE302178TI CE3 77 SERVICE INSTALL INSULATION 8

24MAY04 24MAY04 DR-Y ML-Y 0

FOR 1FD-2518A 07:00 14:59 ORT3-Y R-N 23 0

CE213075TI CE3 77 SERVICE INSTALL INSULATION 10 24MAY04 24MAY04 DR-Y ML-Y 165 FOR 1FD-38 07:00-16:59 ORT3-Y R-N 4 1 CE214117TI CE3 82 MSR DUO-CH INSTALL INSULATION:

10 24MAY04 24MAY04 DR-Y ML-Y 22 MSR DUO-CHECKS 07:00 16:59 ORT3-Y R-N 25 0

CE216332Tl CE3 77 SERVICE INSTALL INSULATION 25 24MAY04 25MAY04 DR-Y ML-Y 150 FOR 1FD-204B 07:00 15:59 ORT3-Y R-N 26 1

CE40841 ITI CE3 76 PIPING DB-INSTALL INSULATION 6

24MAY04 24MAY04 DR-Y ML-Y 0

FOR P-28A MINI 08:00*

13:59 ORT3-Y R-N 27 1

CE408412Tl CE3 76 PIPING DB-INSTALL INSULATION 6

24MAY04 24MAY04 DR-Y ML-Y 0

FOR P-28B MINI 08:00-13:59 ORT3-Y R-N 28 1

TG-30955 CE3 76 TG-01-T FURMANITE INJECT HP 3 25MAY04 25MAY04 DR-Y ML-Y 124 CASING HORIZONTAL 08:00-10:59 ORT3-Y R-N 29 1

CE26TGATIX CE3 77 IST-SISI REINSULATE - FAC 10 25MAY04 25MAY04 DR-Y ML-Y 147 PROG - TRB HALL 26 FT 09.00 18:59 ORT3-Y R-N 30 1

CE26TOHSR CE4 77 IST-SISI REM SCAFF - FAC 8

01MAY04 24MAY04 DR-Y ML-Y 247 PROG - TURB HALL 26 09:OOA 14:59 ORT3-Y R-N 31 1

CE08TOHSR CE4 77 IST-SISI REMOVE SCAFF - FAC 32 05MAY04 25MAY04 DR-Y ML-Y 143 PROG - TURB HALL 8 10:WOA 22:59 ORT3-Y R-N 32 1 CE213968SR CE4 87 TG-O1-G REMOVE 8

20MAY04 24MAY04 DR-Y MLY-167 SCAFFOLDING FOR 07:OOA 14:59 ORT3-Y R-N CE40O1B TON.

03060060 CE309503T#N!

0306006 CE-212852Tf N!

030600do CE21336 5TIN!

0306006 CE-216557TrtN 030600wll~

CE-30217BTP'N 030600151 CE213075TPNI 03060060 CE214117TLN, 0214117K

-e.4 ard

TALL INSULATION AFTER VALVE MISC EOUIPMEN1 REPAIRISERVIC TALL INSULATION FOR ICS-66 l_MiSC EaUIIMENT REPAIRIS TALL INSULATIOil FOR 1 FD-40 MISC EQUIPMENT REPAI TALL INSULATION FOR IFD-2411 MISC EQbIPMENT REPAI

$TALL INSULATION FOR I FD-282C 1I111MISC EQUIPMENT REPAI TALL INSULATIO4 FOR IFD-2518A MISC EOIJIPMENT REPAI

$TALL INSULATION FOR IFD-381 MISC EQUIPMENT REP) iTALL INSULATIO4: MSR DUO-CHEI FD-9-D SHELL SIDE 01

$TALL INSULATION FOR IFD-204B lORK 1FD-196A RVICE SERVICE SERVICE SERVICE SERVICE lRISERVICE KS ITLET CHECKS I

%.U. I UJa& I %;L flnfltflf R AIC

______- p CE408411Tj 04054111 CE408412Tj 040841 STALL INSULATION FOR P-28A MINI SGFP MINI RECIRC FROM P STALL INSULATION FOR P-288 MINI IIISGFP MINI RECIRC FROM P TG.30955F 0302153 CE26TGATI)

, 0303636

,.lX RECIRC FLAN IMP TO RESTI RECIRC FLAN

)MP TO RESTI JRMANITE INJI

,HIGH PRES REINSULATE -

CE24TOHSIREM SCAFF - FAC PRO3 - TURB HALL 2S FT OVERHD

'E0[ToHsRREMqVE SCAP1F -

F~,rL~

T O IIVERHD Ir

_ar I INU3

-U'

E2j3968SRREMwVE SCAFFOLD;IN FOR MAN GENIRATOR MANWAN I

I 1 CR-M&Al GEN1.ERA-rnR

-r S

15MS WJJUU 33 1 l CE933444SR I CE4 82 W-001C2-A REMOVE SCAFFOLDING FOR 5

24MAY04 08:00' 24MAY04 12:59 DR-Y ML-Y l 86 ORT3-Y R-N N

-- 9

\\

p;\\u-[E I

wN CE933444S MOVE SCAFFOLpING FOR W-1C2.

993344_CONTAINMENT COOLING FAt l21!9fiR A

I DISCHARGE I

.I.

I.

Run Date 23MAY04 13:ln1 LT-03 STANDARD PUBLICATION Shoet 2 of 21 C Primavera Systems, Inc.

I FL-03 Execution Publication SetI

alias 1A.Vu I

U1R28 WORKING SCHEDULE I

arter 23MA Y04 12:00 I

A I

I I

I I

a I

U ID RESP WO ST 76 EQID PIPING HB-DESCRIPTION REMOVE SCAFFOLDING FOR RD ES EF RISK MF

~~~~~~~~101121416,162020 0,i2,4 6.t8 11Z jsl2.A024,.

.10112,14.IRI 34 1 I CE212694SR I CE4 20 24MAY04 25MAY04 DR-Y ML-Y 08:00' 03:59 ORT3-Y R-N 0

35 1

CE406159SR CE4 82 FD-00196A REMOVE SCAFFOLD 2

24MAY04 24MAY04 DR-Y MLY 171 AFTER VALVE WORK 09:00 10:59 ORT3-Y R-N 36 1

CE950096SR CE4 87 CV-00313A-REMOVE 4

24MAY04 24MAY04 DR-N ML-N 83 SCAFFOLDING FOR 12:00' 15:59 ORT3-Y R-N 37 1

CE408411SR CE4 76 PIPING DB-REMOVE 4

24MAY04 24MAY04 DR-Y ML-Y 244 SCAFFOLDING FOR 14:00 17:59 ORT3-Y R-N 38 1

CE4OB412SR CE4 76 PIPING DB-REMOVE 4

24MAY04 24MAY04 DR-Y ML-Y 244 SCAFFOLDING FOR 14:00 17:59 ORT3-Y R-N 39 1

CE216557SR CE4 82 FD-00282C REMOVE 5

24MAY04 24MAY04 DR-Y ML-Y 162 SCAFFOLDING FOR 15:00 19:59 ORT3-Y R-N 40 1

CE302178SR CE4 82 FD-02518A REMOVE 5

24MAY04 24MAY04 DR-Y ML-Y 162 SCAFFOLDING FOR 15:00' 19:59 ORT3-Y R-N 41 1

CE213365SR CE4 82 FD-02411 REMOVE 10 24MAY04 25MAY04 DR-Y ML-Y 0

SCAFFOLDING FOR 15:00-08:59 ORT3-Y R-N 42 1 CE46CO01SR CE4 ICP-10.029 REMOVE 4

24MAY04 24MAY04 DR-Y ML-Y 0

SCAFFOLDING FROM 19:00 22:59 ORT3-Y R-N 43 1

CESH82-SR CE4 PACKAGE 82 REMOVE 4

25MAY04 25MAY04 DR-Y ML-Y 66 SCAFFOLDING FOR 05:00' 08:59 ORT3-Y R-N

  • CE212694SIe 0212694 CE4061595S 040615!

CE9500 99!

CE4I CE4(

CE CE CE SERVII EMOVE SCAFFOLDING FOR IPIPING IEMOVE SCAFFO(JD AFTER VALVE' EHX-21A HP FW SA PX-2570 ISO0 6SI'MOVE SCAFFOLDING FOR C

)09_1P-lAi RCP #1 SEAL Wi MI ISFREMOVE SCAFFOLDING FOF 0841_ISGFP MINI RECIRC FF 412SRMOVE SCAFFOLDING FOF 40841 SGFF MINI RECIRC FF 16557SFMV~E SCAFFOLDING F 0216557HX-22C MSR LS-25:

02178SIeLM_0E.SCAFFOLDING F1 030217EI.II-22B MSR SHEL 13365SRRMeM SCAFFOLDING F HB-19 PAINTlh

- WATER TO I YORK IFD-196 ATION V-313A-S TER RETURN P-28A MINI RE OM PUMP TO P-288 MINI RE OM PUMP TO

)R IFD-282C OILC-2515 UPF

)R IFD-2518A SIDE LEVEL C

)R 1FD-2411 OX-21B HP FA 4G FROM SEAI

'ERATIONS F(

IE SCAFFOLDI H4-SRREMOV nl2llRinI I000mmmm CE46C001SRREMOVE SCAFFOLD ISEAL TABLE C

'CESH82-SRREMC CE!

44 1 1 CESH64-SR CE9929774 CE4 PACKAGE 64 z

REMOVE SCAFFOLDING FOR INSTALL/MOD PLATFORMS 4

25MAY04 25MAY04 DR-Y ML-Y 14:00-17:59 1 ORT3-Y R-N 57 45 1 CES 77 24 110MAY04 1 26MAY04 l DR-Y ML-Y 10:OOA 14:59 ORT3-Y R-N 16 297741NSTAC MOD PLATFOF III U

I



t i.-+/-

4

+

4-46 l 1 CE0407589B I CE5 76 T-026 CLOSEOUT BD TANK I 10 I 17MAY04 I 24MAY04 I DR-Y ML-Y FOLLOWING REPAIRS I I 13:OOA 16:59 l ORT3-Y R-N 40 ET0589CLOSEOUT BDTANK F LOWNO REPAI

  • E1 I*

A It RS DOWN TANK 0407 Ar Ht z jwl 673 I4-4-

+-

I I

I4-Il 47 1 1 CE04081 18 CE0210986 CE5 CE6 76 7

77 MISC E

SEC REPAIR FLOOR BEAM SOUTH OF 1T-026 SEC SUPPORT MR 99-011B 17 21MAY04 26MAY04 DR-Y ML-Y 07:OOA 1 07:59 1 ORT3-Y R-N 0a I

18 oa11IREPAIl FLOOR BEAM SUTH iOF1T026 48 10 144 05APR04 I 16JUN04 I DR-Y ML-Y 07:OOA 14:59 ORT3-Y R-N oE0s10986SECS PPORTMR99-01 *B

- h II 49 10 CE0210989 CE6 76 SEC SEC. INSTALL NEW EQUIP MR99-011-E 1

144 05APR041 16JUN04 I DR-Y ML-Y 08:OOA 14:59 ORT3-Y R-N 16 CE0 10989SEC. INSTALLNEW EQUIP MR

... lu.

I,.

.-. ..-..

I w S -

I 

.T I

4+

50 1 0 CE0210990 CE6 76 SEC SEC REM ABANDONED EQUIP MR 99-011-F 160 03MAY04 I 18JUN04 I DR-Y ML-Y 08:00A 14:59 ORT3-Y R-N 0

E0: loggoSEC RdM A8ANDONEDIUIPMR99-011-0" I

Run Date 23MAY04 13:02l LT-03 STANDARD PUBLICATION Sheot 3 of 21 0 Primavera Systems, Inc.

I FL-03 Execution Publication Set

U

__f I V I

U7H26 WURKING SCHEDULE I

anerZJMAYU4 7Z:UU

  1. IU 51l1 ID CE1600R035 CH0300406 RESP CEB Wo ST EQID I

DESCRIPTION RD ES EF RISK M

I 76 7

77 MAY R-1 RX HEAD REPAIR CLOSEOUT ACTIVITY 76 22MAY04 26MAY04 DR-Y ML-Y 07:OOA 15:59 ORT3-Y R-M IFSun 23 Mon 24 rTue 25 53 E~:003RXHEAD REPAIR CLOSlOUT ACTMVTY 23H Cs0 RONSR3.9.

52 I 1 CH

,HEM-SAMPI RCS BORON SR 3.9.1.11 66 23MAY04 29MAY04 DR-Y ML-Y 06:OOA 11:59 ORT3-Y R-N 2

53 1

CH0300432 CH 77

-HEM-SAMPl RCS GROSS ACTIVITY 6

24MAY04 24MAY04 DR-Y ML-Y 154 SR 3.04.16.01 07:00' 12:59 ORT3-Y R-N 54 1

CH0300419 CH 77

,HEM-SAMPI RCS FL TSR 3.4.5.3 8

24MAY04 24MAY04 DR-Y ML-Y 152 07:00-14:59 ORT3-Y R-N 55 2

CH0300542 CH 77 HEM-SAMPL RCS FLTSR 3.4.5.3 8

24MAY04 24MAY04 DR-Y ML-Y 152 07:00-14:59 ORT3-Y R-N 56 1

CH0300376 CH 77 CHEM-SAMPI RCS DO TSR 3.4.5.1 40 24MAY04 27MAY04 DR-Y ML-Y 243 07:00' 13:59 ORT3-Y R-N 57 0

CH0300200 CH 77 HEM-SAMPL BASTBORONTSR 40 24MAY04 28MAY04 DR-YML-Y 120 3.5.1.2 07:00' 14:59 ORT3-Y R-N 58 1

CH0300390 CH 77

,HEM-SAMPI SGBDFO GAMMA SCAN 40 24MAY04 28MAY04 DR-Y ML-Y 120 07:00' 14:59 ORT3-Y R-N 59 1

CH0300445 CH 77 HEM-SAMPI RE-229 ISOTOPIC 40 24MAY04 28MAY04 DR-Y ML-Y 120 07:00-14:59 ORT3-Y R-N 60 2

CH0300486 CH 77

,HEM-SAMPI RCS BORON SR 3.9.1.1 40 24MAY04 28MAY04 DR-Y ML-Y 120 07:00-14:59 ORT3-Y R-N 61 2

CH0300503 CH 77 HEM-SAMPI RCS CL TSR 3.4.5.2 40 24MAY04 28MAY04 DR.Y ML-Y 120 07:00-14:59 ORT3-Y R-N 62 2

CH0300516 CH 77 EM-SAMPI RCS DO TSR 3.4.5.1 40 24MAY04 28MAY04 DR-Y ML-Y 120 07:00' 14:59 ORT3-Y R-N 63 2

CH0300529 CH 77 HEM-SAMPL SGBDFO GAMMA SCAN 40 24MAY04 28MAY04 DR-Y ML-Y 120 07:00-14:59 ORT3-Y R-N 64 2

CH0300555 CH 77 HEM-SAMPI RE-229 ISOTOPIC 40 24MAY04 28MAY04 DR-Y ML-Y 120 07:00-14:59 ORT3-Y R-N 65 1

CH0300363 CH 77 HEM-SAMPL RCS CL TSR 3.4.5.2 72 24MAY04 30MAY04 DR-Y ML-Y 211 07:00-12:59 ORT3-Y R-N 66 1

CH0300354 CH 77 HEM-SAMPl RCS H-3 TSR 3.4.1.1 1

25MAY04 25MAY04 DR-N ML-Y 151 07:00' 07:59 ORT3-N R-N 67 1

CH0300454 CH 77 HEM-SAMP RCS DOSE 6

25MAY04 25MAY04 DR-N ML-Y 146 EQUIVALENT 1-131 07:00' 12:59 ORT3-N R-N CH0300432; 0300432 CH0300419R 0300419 CH030054 030052 CH0300376 t

=

s GROSS ACTMVTiY SR 3.04.16.01 MISC CHEOSTRY SAMPLING S FL TSR 3.4.5.3 1 MISC CHEMISTRY SAMPLI S FL TSR 3.4.5.3 :

MISC CHtMISTRY SAMPLI S DO TSR 3.4.S.1 G

Q II I

II I

CH CH CH CH CH CH CH CH.

CH 03003i7_

030020 T BORON TSR 3 '5.1.2 03030 BFO GAMMA SOAN 030045R 229 ISOTOPIC D30044_

0300486R BORON SR 3.9J.1.1 030048i 0300503R CL TSR 3.4.5.2 030050 03 00 5 6R DO TSR 3.4.5.1 0300529S BDFO GAMMA SCAN 0300 0300555W229 ISOTOPIC 03005 0300363R CL TSR 3.4.5.2 030036 CH0300354RC 0300354PK CHo3OO454eC 030045'U CAMP-Si 03O04" 5S H-3 TSR 3.4.1 ISC CHEMIST!

s DOSE EQUIV MISC C 61PERFORM C/

MCONT A 68 1

CAMP-606 CH 77 CH CAMP-60 PERFORM CAMP-606.1 3 125MAY04 10:00' 25MAY04 I DR-N ML-N 12:59 ORT3-N R-N 82 Run Date 23MAY04 13:02l LT-03 STANDARD PUBLICATION Sheet 4 of 21 O Primavera Systems, Inc.

I FL.03 Execution Publication Set I

Arier zJMA ruq Iz:uu I

U1R28 WORKING SCHEDULE aner ZJMA YU4 7 ZXU lU ID lRESPl WO I EQID I

DESCRIPON RD ES EF RISK

- M MAY PEF23 Mon 24 Tue 25 69 1 CAMP-113AD CH CAMP-113 CAMP-113 N2 SPARGE 3 25MAY04 25MAY04 DR-Y MLY 0

CAMP 13ACCAMP-1 I & SAMPLE A STEAM _

1300 15:59 ORT3-N R-N

.NIT 70 1 CAMP-113BD CH CAMP-1 13 CAMP-1 13 SAMPLE B 3 25MAY04 25MAY04 DR-NMI-V

0.

CAMP 13BDCAMP.11 STEAM GENERATOR _

13:00 15 59 ORT3-N R-N

_NZ C~~~~~~~~

3; a I t: 4IPtwiI Elil M :IS 71 0

EE030232t EEP 77' G-03 THERMAL VECTOR 4 23MAY04 23MAY04 DR-Y ML-N 622 EE0 THERMAL VECTOR DAT COLLECTION DATA COLLECTION 13:00 16:59 ORT3-Y R-N M lEMEqGENCY DIESEL C NERATOR03023}1 72 2 EE0302354 EEP 77 TB-2 VIBRATION ROUTE 40 25MAY04 31MAY04 DR-Y ML-Y 112 EE0302354VIE RATION ROUT DATA 07:00 14:59 ORT3-Y R-N UNIT 2 TU BINE BLDG STRUCTURE03023 73 1 EE-W1A1*VB EEP 82 W-001A1 PERFORM VIBRATION 2 25MAY04 25MAY04 DR-Y MI-Y 55 EE-WiA1 VEPERFORM ANALYSIS-W-1A1 11:00 12:59 ORT3-Y R-N 0214 07UCONTAI 74 1 EE-WIB1-VB EEP 82 W-001Bi PERFORM VIBRATION 2 25MAY04 25MAY04 DR-Y MI-Y 55 EE-WiBI vePERFORM ANALYSIS-W-1Bi 11:00 12:59 ORT3-YR-N 0214 71iECONTAIt 75 0 EM4058973Z EM 76 D-106 D-106 PERFORM I

19MAY04 23MAY04 DR-Y ML-Y 626 8973ZD-106: PERFORM FLOA 'CHARGE FLOAT CHARGE 00OOA 1259 ORT3-N R-N 125V DC STATION BATTERY0 05897 T 56 0

EM405897Z8 EM 76 D-106 OBTAIN AND CHARGE 1 1 21MAY04 23MAY04 DR.Y ML-Y 0

897Z5OBTAIIN AND CHARGE ADDITIONAL CELLS ADDITIONAL CELLS 03:OOA 12:59 ORT3-N R-N 125V DC ST'TION BATTERY 05897 I

77 1

EM0305144 EM 76 P-030A-M DRAW OIL SAMPLE 1 23MAY04 23MAY04 DR-V MI-V 0

1 s4 4DRAW OIL SAMPLE FR CIRCULATING FROM CIRCULATING 05:OOA 12:59 ORT3-N R-N CIRCULATING WATER PUMP OTOR0305144 78 1

EM0305146 EM 76 P-030B-M DRAW OIL SAMPLE 2 23MAY04 23MAY04 DR-Y ML-Y 624 EM 0q1 46DRAW)OIL SAMPLE FRO A CIRCULATING FROM CIRCULATING 13:00I 14:59 ORT3-Y R-N I

CIRCULA`1NG WATER PU P MOTOR 030514 79 1

EM-84800 EM 76 R-1 INSTALL PATCH CABLE I

23MAY04 23MAY04 DR-Y ML-Y 0 M 480NSTALL PATCH CABLE I OR DEDICATED TICS FOR DEDICATED T/C'S 15:00 1 5:59 ORT3-N R-N 021 1134REACT6R VESSEL AND SSEMBLY 80 1

EZMRCP-L1 EM 76 P-001B-M P-1B-M, HIGH RISK 3

23MAY04 23MAY04 DR-Y ML-Y 0

RCP.L1S=M. HIGH RISK B IEF & JIT INFO SPARING BRIEF & JIT INFO 18:00 20:59 ORT3-N R-N 021520qREACTOR COO NT PUMP MOTOR!

81 1

EZMRCP-L EM 76 P-001B-M P-1B-M MOVE MOTOR 4

23MAY04 24MAY04 DR-Y ML-Y 0

EZMRCP <P-1B-M MOVE M TOR FROM STAND AND SET ON PtMP FROM STAND AND SET 21:00 00:59 ORT3-N R-N 0215201REACTOR QOLANTPUMP MbTOR 82 1

EM0216165B EM 77 HX-001A REMOVE ECT POWER 2

23MAY04 24MAY04 DR-Y ML-Y 116 EM02161d5BREMOVE ECT OWER INSIDE CqNTAINMENT INSIDE CONTAINMENT 23:00' 00:59 ORT3-N R-N 0216i6U.STEAM GE ERATOR 83 1

EZMRCP-B1 EM 76 P-001B-M REPLACE 'B' RCP 4 24MAY04 24MAY04 DR-Y ML-Y 2

EZMRCP4B1REPLACE 'RCP FLOOR PA1EL SECOND TM FLOOR PANEL SECOND 01:00 04:59 ORT3-N R-N 01 520REA:

OR COOLANT PLMP MOTOR 84 1

EZMRCP-J1 EM 76 P-001B-M P-001B-INSTALL 6 24MAY04 24MAY04 DR-Y ML-Y 0

EZMtCP.J1P-001B -IN TALLGRATING AROUND B RCP MOTOR GRATING AROUND B 01:00 06:59 ORT3-N R-N 021520R CTOR COOLANYT PUMP MOTOR 85 1

EM0216170A EM 76 FIRE-BARRI PERFORM RMP 58 FIRE 8

24MAY04 24MAY04 DR-Y ML-Y 87 EM0216170 E FORM RMP 58 FIRE B3ARRIER SU ILLANCE BARRIER 07:00' 1459 ORT3-N R-N 0216170 FIRE-BA-I ERS IN CONTA NMENT Run Date 23MAY04 13:02i LT-03 STANDARD PUBLICATION Sheet 5 of 21 O Primavera Systems, Inc.

I FL-03 Execution Publication Set I

aner zimlRT u4 i z:uu I

U1R28 WORKING SCHEDULE I

after 23MAY04 12:00

  1. lUl ID lRESP WO l EQID l

DESCRIPTION RD ES l

EF I

RISK IMFMA ST I

I Mo 24 l

T 2

1 1

01121,611n,20246 !]l~4lagO21,,4681121.a j I 86 1 1 EZMRCP-C2 EM 76 P-001B-M P-001 B-M - RETERM B RCP MOTOR 10 24MAY04 24MAY041 DR-Y ML-Y 07:00 16:59 ORT3-N R-N 0

87 0

EM0305185 EM 76 D-600 MONTHLY DIESEL FIRE 4

24MAY04 24MAY04 DR-Y ML-Y 0

PUMP BATTERY 08:00' 11:59 ORT3-N R-N 88 1

EM0215227A EM 76 W-003A CONTINUE W-3A 4

24MAY04 24MAY04 DR-N ML-Y 0

NSPECT (DISCONNECT 09:00-12:59 ORT3-N R-N 89 1

EM0215228A EM 76 W-003B CONTINUE W-3B 4

24MAY04 24MAY04 DR-N ML-Y 0

NSPECT (DISCONNECT 09:00 12:59 ORT3-N R-N 90 1 EM0215241A EM 76 41/1E02 (CONT) RMP 9308, DS-I 10 24MAY04 24MAY04 DR-Y ML-Y 593 BREAKER 12:00 21:59 ORT3-N R-N 91 1

EM0215246 EM 76 62/A01 CAL AND TEST 621A01 6

24MAY04 24MAY04 DR-N ML-N 0

RELAY PER 1RMP 13:00' 18:59 ORT3-N R-N 92 0

EM405897Z3 EM 76 D-106 D-106 PERFORM 48 24MAY04 26MAY04 DR-Y ML-Y 0

FLOAT CHARGE 13:00 12:59 ORT3-N R-N 93 0

EM0301792A EM 76 A52-DHVR-3 (A52-01) BKR MAINT.

4 24MAY04 24MAY04 DR-N MI-N 45 PORTION AT CUBICLE 14:00-17:59 ORT3-N R-N

-.24 1

EZMRCP-M EM 76 P-001B-M P-001 B-M -

2 24MAY04 24MAY04 DR-Y ML-Y 13 RECONNECT LOWER 17:00 18:59 ORT3-N R-N 95 1

EM0215204 EM 76 P-001B-M P-001 B-M - MCE 3

24MAY04 24MAY04 DR-Y ML-Y 0

ANALYZE MOTOR 18:00 20:59 ORT3-N R-N 96 1

EM0215247 EM 71 62VA02 CAL AND TEST 62VA02 7

24MAY04 25MAY04 DR-N ML-N 0

RELAY 1RMP 9302-2 22:00 04:59 ORT3-N R-N 97 1

EM0215207 EM 76 P-0011B-M P-00113 - ADJUST 2

25MAY04 25MAY04 DR-N ML-Y 53 BALANCE WEIGHTS (IF 03:00 04:59 ORT3-N R-N 98 1

EM0407740A EM 82 P-001B-M P-1B-M PERFORM 10 25MAY04 25MAY04 DR-N ML-Y 41 COLD OIL FLUSH 03:00-12:59 ORT3-N R-N 99 1

EM0305166 EM 76 D-205 MONTHLY NON-SAFET 4

25MAY04 25MAY04 DR-Y ML-Y 0

125V DC STATION 07:00-10:59 ORT3-N R-N 100 1

EM0215123 EM 76 A52-14 ASSISTAPR DURING 6

25MAY04 25MAY04 DR-N ML-N 0

P-1B RELAY 08:00 13:59 ORT3-N R-N 101 1 EZMRCP-V EM 76 P-401B-M P-01B-M - INSTALL 10 25MAY04 25MAY04 DR-N MLY 12 SHAFT & FRAME 08:00 17:59 ORT3-N R-N 102 0 EM0305264 EM 76 D-06 QUARTERLY STATION 4

25MAY04 25MAY04 DR-N ML-Y 144 BATTERY INSPECTION 11:00 14:59 ORT3-N R-N II I

II f

EZMRCP-C2?4 021520in EM0305185I 030518-i EM021522TA 0215221 EM02i5228J 021522i EM0211 021 EMO 0:

EM40!

EMO 01B-M - RETERM B RCP MOTOR

_REA0C1TOR COOLANT Pi ONTHLY DIESEL IRE PUMP BATT P-35B DIESEI FIRE PUMP BAT CONTINUE W-3A INSPECT (DISCON CONTAINMiNT CONTROL RC CONTINUE W-3B I)SPECT (DISCON CONTAINMENT CONTROL RC 241 OCONTI)RM9308, DS41 BREAK 241 1TG-01 TG EXCI

15246 AL AND TtST 621A01 RELAY 1524I 1A01 BUS TIME DEL 897z30 106 PER9ORM FLOAT CHA MP MOTOR RY ERY/RACK CO NECT PORTIOI DDRIVE SHRC ECT PORTIOI DRIVE SHRC R MAINTENA?'

FER FIELD CIR ER IRMP 930 RELAY tGE I

10589

1111 I

01792p.52-01) BCR MAINT. PORTIC 3017921_4.16KV/3000 AMP VA(

EZMRCP.

01-M - RECONNECT 021520!1REpCTOR COOLANT EM0215204P01B-M - MCE ANAV 021520_REACTOR COOU EM0215247CAL AND TEST E 02152471A-02 EI?0215207P-OO1B-0215207lREAC EMb407740 B-1M t

'040774 EM030516CM 0305160 EM0215123A 0215123 EZMRCP-Vt 021520A EM0305 0305 EM0305 0305 MAT CUBICLE UUM BREAKEI LOWER CC Pli PUMP MOTOF ZE MOTOR (1/

NT PUMP MOI 21A02 RELAY I BUS TIME DEL DJUST BALAI rOR COOLANI ERFORM COLE AOuArf NTHLY NON-S,

  • i25VDCSI SSIST APR DU PWRT 01B-M - INSTA 264QUARTER 16125V 176MONTHLY I 76_

1031 0 EM0305176 EM 77 35-E MONTHLY FUNCTIONAL CHECKINSPECTION 5

25MAY04 26MAY04 DR-N ML-Y 11:00 07:59 1 ORT3-N R-N 143 Run Date 23MAY04 13:02l LT-03 STANDARD PUBLICATION Sheet 6 of 21 O Primavera Systems. Inc.

I FL-03 Execution Publication Set l

d1tur cjrw.#4yu4 iz:uu I

U1R28 WORKING SCHEDULE arTer XJMA TU4 7 Z:UU I Dn RESPI WO EQID DESCRIPTION RD ES EF RISK MF MAY Sun 23 Mon 24 Tue 25 I ST I

I I

'1012 14,16.1120,22 0O. 2.4

  • 6. 8.1011214,1i,22n.246, ~n1241i 104 0 EM0305207 EM 76 125V STATION TECH SPEC 6

25MAY04 26MAY04 DR-N ML-Y 0

EM030! o7STATION TE BATTERIES WEEKLY 11 :00 08:59 ORT3-N R-N 0305 WO N7 105 1 EM-8480R EM R-1 JIT FOR CONOSEAL 5

25MAY04 25MAY04 DR-N ML-Y 0

EM 80RJIT FOR C INSTALLATION (DAYS) 12:00 16:59 ORT3-N R-N

.RE 106 1 EZMRCP-F1 EM 76 P-001B-M P- 001B-M -

5 25MAY04 25MAY04 DR-N ML-Y 0

EZ

,RCP-FIP0 0 10 RECONNECT OIL 15:00 19:59 ORT3-N R-N 021520 107 1 EM-8480Q EM R-1 JIT FOR CONOSEAL 5

25MAY04 25MAY04 DR-Y ML-Y 0

I EM-8480 UWI INSTALLATION 17:00 21:59 ORT3-N R-N 108 0 EM0405880C EMV 78 W-013B1 W-013B1 REMOVE 4 124MAY04 124MAY04 DR-N ML-N 0

EMo4 _88oC-13Bl REMOVE JUMPER PE R IWP 01-128E JUMPER PER IWP 13:00 16:59 ORT3-N R-N I 0588tCONPOL ROOM RECI C FAN I

109 1

B52-428ME EMV 76 842 BUS STAB PMT I

24MAY04 24MAY04 DR-N ML-N 596

'I B52428MP8US'STAB PMT W-13 2" IW-13B2T 18:00 18:59 ORT3-N R-N l 0202527N480V MOTOR COtM OL CENTER P, 110 1

EM0215189 EMV 76 SI-00878C-SI-878C-O MOV 15 24MAY04 25MAY04 DR-N ML-N 0

EM0215189SI-78C7O MOV CTUATOR CHE ACTUATOR 22:00 18:59 ORT3-N R-N 02151 a1 I EP0301904 EPI 76 SI VT-2 ASME XI 4

24MAY04 124MAY04 DR-Y ML-Y 101 EP_3 1g04VT-2 ASME XIIPERIODIC PRESS TEST - CONT S I

PERIODIC PRESS TESTl 12:00 115:59 1ORT3-YR-N I,03Cl1904=Sl SYSTEM MULTI ANDICR NON-NUMBE 112 1

EP0301910A EPI 77 n

IU-CONTAIN INSPECTCTMTAND I

25MAY04125MAY04 DR-YML-Y 11 EP030191ONSPECTCTMTAl FEEDWATER 0700 0759 ORT3-Y R-N 030191CL NIT I CONTAII_

-rL '--

e U

1 113 1 EP0400042Z EPT 76 HX-001A IPTE BRIEF PRIOR TO 2

23MAY04 23MAY04 DR-Y ML-Y 0 ER PRIOR TO NOZZLE DAM REOVAL NOZZLE DAM 18:00 19:59 ORT3-Y R-H I40004STEAMGENERATOR 114 1 EP04000421 EPT 76 HX-001A HX-001A - REMOVE 1 23MAY04 23MAY04 DR-N ML-Y 0

EP0400042!X-001A - REMO E HOT LEG NOZZLE DAM HOT LEG NOZZLE DAM 21:00 21:59 ORT3-N R-H 04000421STEAM GENER1 TOR 115 1 EP04000431 EPT 76 HX-001B HX-00B-REMOVE I

23MAY04 23MAY04 DR-N ML-Y 0

EP0400043tX-OO1B - REMO E HOT LEG NOZZLE DAM HOT LEG NOZZLE DAM 21:00 21:59 ORT3-N R-H 04000430STEAM GENER TOR 116 1 EP0400042H EPT 76 HX-001A HX-001A - REMOVE I1 23MAY04 23MAY04 DR-N MLY-0 EP04000420HXOO1A -REM VE COLD LEG NdZZLE DAM COLD LEG NOZZLE 22:00 22:59 ORT3-N R-H 0400042STEAM GENEF ATOR 117 1 EP0400042P EPT 76 HX-001A HX-001A - FME I

23MAY04 23MAY04 DR-N ML-Y 0

EP0400045pHX-01A - FME LOSEOUT INSP & INSTALL FME C VER CLOSEOUT INSP I

22:00 22:59 ORT3-N R-H l0400042STEAM GENE ATOR 118 1 EP0400043H EPT 76l HX-001B HX-001B-REMOVE I1 23MAY04 23MAY04 DR-N ML-Y 0

EP0400043X-001B-REM VECOLDLEG NCIZZLE DAM COLD LEG NOZZLE 22:00 22:59 ORT3-N R-H 04000.j3STEAM GENE ATOR 119 I EP0400043P EPT 76 HX-001B HX-OO1B-FME I

23MAY04 23MAY04 DR-N MLY-0 EP0400043FHX001B-FME LOSEOUTINSP&INSTALLFMECIVER CLOSEOUT INSP &

22:00 22:59 ORT3-N R-H 0400043tSTEAM GENE ATOR Run Date 23MAY04 13:02l LT-03 STANDARD PUBLICATION Sheet 7 of 21 0 Primavera Systems. Inc.

l FL-03 Execution Publication Set I

altur C.mm rlj-# Ic.uu 1

U1R28 WORKING SCHEDULE I

arrer 1e11WA rU4 7ie.UU

  1. Iu EP04000420 I EPT WO ST 76 EQID DESCRIPTION RDI ES EF RISK MAY MF Sur) 23 IMon 24 9Te2

!,10OZ1416,11120,2210, 2.4. 6, 8.10112,14jamo.2210.2. 4. 6. 8,10112,14,161 HX-001A DISCONNECT &

4 23MAY04 24MAY04 DR-N ML-Y REMOVE NOZZLE DAM 23:00 02:59 ORT3-N R-H a

121 1 EP0400043Q EPT 76 HX-001B DISCONNECT &

4 23MAY04 24MAY04 DR-N ML-Y 65 REMOVE NOZZLE DAM _

23:00 02:59 ORT3-N R-H 122 1 Z22FG038 FG1 87 Z-022 Z-22 INTERNALS LIFT 4

16MAY04 23MAY04 DR-Y ML-Y 214 RIG. PAINT CURE TIME 16:OOA 15:59 ORT3-Y R-N 123 0 FG0300155 FG1 77 MISC REMOVE VEGETATION 35 24MAY04 27MAY04 DR-Y ML-Y 192 IN ISOLATION ZONES 08:00-12:59 ORT3-Y R-N 1

-g I*

01 1.

124 0 FG0400314 FG2 77 EL-LTG EIC/TRN BLDG 16 24MAY04 25MAY04 DR-Y ML-Y 144 EMERGENCY LIGHTINGl 07:00-14:59 ORT3-Y R-N 125 1 FG0300159 FG2 76 FP REMOVE FIRE 8 25MAY04 25MAY04 DR-Y ML-Y PROTECTION 07:00 14:59 ORT3-Y R-N 126 0 HP0301854 HP 77 HP RMS QUARTERLY 40 124MAY04 29MAY04 DR-Y ML-N 194

\\

FUNCTIONAL TEST OF 12:00-07:59 ORT3-Y R-N 127 1 HP0301878 HP 77 RE-00126 RE-126/1RE-127/lRE-12 6 24MAY04 25MAY04 DR-Y ML-N 8

CALIBRATION 1 14:00 08:59 ORT3-Y R-N e[ISI'lSL' L>

El I

Li I

  1. A 128 1 1-C0300732 IC 76 ICP-06.050 ICP 6.50-2 SPEC 200 12 22MAY04 23MAY04 DR-N MI-V 6151 RACK C-171 09:OOA 23:59 ORT3-N R-N 0 1IC0300674A IC 76 ICP-06.006 SERVICE WATER 10 23MAY04 24MAY04 DR-Y ML-Y 606 l

SYSTEM l

23:00 08:59 ORT3-Y R-N 130 1 1IC0300731A IC 76 ICP-13.004 SPEC 200 TECH SPEC-28 24MAY04 25MAY04 DR-N ML-N 575 TRAIN A 12:00 15:59 ORT3-N R-N 1131 1

IC10.29D1 IC 76 ICP-10.029 INSERT 6 124MAY04 24MAY04 DR-N ML-N 0

THIMBLES/NSTALL HP 13:00 18:59 ORT3-Y R-N 132 1 IC10.29E IC 76 ICP-10.029 ICP 10.29 RESTORE 20 124MAY04 25MAY04 DR-Y ML-Y 0

SEAL TABLE 23:00 18:59 ORT3-Y R-N 133 1 IC-CV-F&V3 IC SOP-CV-003 FILL & VENT F-116 PER 2 125MAY04 25MAY04 DR-Y ML-Y 23 SOP-CV-003 08:00 09:59 ORT3-N R-N 33 134 11 CTUI1SU I C11 6 I -UPERVIS1 INSTAILTURBINE 16 14MAY04 124MAY04 DR-V MI-VY 8

I I L BUICl VIBRATION SENSORS 06:OOA 16:59 ORT3-Y R-N i

EP0400042 ESONNECT 4 040004in STEAM EP0400043 NNECT i 0400044iSTEAM of-22 INTERNALS UFT RIl IR-1 RE*CTOR VESSEL IN I

FG0300151 0300155J I

FG0400314EIC

, REMOVE NOZZLE DAM ANNUCIAl ENERATOR L

REMOVE NOZZLE DAM ANNUCIAl ENERATOR

-PAINT CURE TIME rERNALS LIFTINg RIG0301913

'MOVE VEGETATION IN ISOInATIO I

OR PANEL OR PANEL ZONES tTRN BLDG EMEqGENCY UGHTIN4 INSP 04003141

  • IE

-ME FG0300159RE 030015wM WOVE FIRE PR FP S' II III HPo3d I1854UARTERLY FUNCTIONAL TE*T OF RMS 013ig B-HP IC0O 7 321CP 6.5d-2 SPEC 200 RAC lI

)3018TB7R-126111E 12711128

30018l, (C4171 INTERNA4S tINET C-171 RACIf INSTRUMENTC ER SYSTEM INSTRUMENTATION SERVICE WATER SYSTEM 2 S pSPEC 200 TEOH SPEC >TRAINl kLIBRATIONl JNIT I CONTA LIBRATIo3007:

I U

spi 2nn nx IC03006 4AERVICE WAT 0300EI7 i

IC0300-1 a---

03C0731 ISPE l

IC0:

l029d1NSERT THIMBLESnNSTALL t O0890_SEXL TABLE OPERA IIC10.19ECP 10.29 REST 030089 IC-CV-F&V3F I 'I P SEALS IONS FOR RE ORE SEAL TAE W-LUL b VENT Fl-1 ICVCS LETRC (INSTRUMEN IcT NBSupINSTALL TURBINE VIBRATION SENSORS,

_I BN BINE I

I SUPERVISORI Run Date 23MAY04 13:02l LT-03 STANDARD PUBLICATION 7

Sheet 8 of 21 0 Primavera Svstems, Inc.

I FL-03 Execution Publication Set

d1IM XXVIAMAF IC;UU I

U1R28 WORKING SCHEDULE I aner z3MAY04 1:oo I#

l URESP WO I EQID DESCRIPTION RD ES EF RISK MF SUn 2_

1

  • Oil 214.161 L20220. 2,4,6, 4

810112,14.16,18,20.,2210

.4.6.8j10j1214j1j IC2.19 ICI 78 ICP-02.019 ICP 2.19 SAFEGUARDS 1 23MAY04 23MAY04 DR-N ML-N 0

ICP 2.19 SAFEGUARDS LOGI TEST LOGIC TEST 08:OOA 12:59 ORT3-N R-M POST-REFUELING PRE-STA UP SAFEGUARDS LOGIC TES030 13 136 0 IC0300626 ICI 76 Z-031 ICP 6.8-2 CALIBRATE 5 23MAY04 23MAY04 DR-Y ML-Y 0

CP 6.8.> CAUBRATE DR ER INSTRUMENTITION DRYER 08:OOA 16:59 ORT3-N R-N INSTLIJMENT AIR DRY R0300626 137 1 1IC0300731 IC1 76 ICP-13.004 SPEC200TECH SPEC-4 23MAY04 23MAY04 DR-N ML-N 1

SPEC 200TECH SPEC -T NA TRAIN A 10:OOA 15:59 ORT3-N R-N SPEC 2b0 INTERNALSO3 0731 138 1 IC5.8GAP ICI ICP-05.008 GAP VOLTAGE CHECK 3 24MAY04 24MAY04 DR-Y ML-Y 223 IC5.8GAPGAF VOLTAGE CHECq ON GEAR ON GEAR.

06:00' 08:59 ORT3-Y R-N RBINE SUPERVISORY INSTRUM NTATION 139 0 IC0300690 ICI 77 C-207 CHECK FAN 1 24MAY04 24MAY04 DR-Y ML-Y 282 IC0300690C CK FAN OPERABILITY OPERABILITY 07:00' 07:59 ORT3-Y R-N 030069C

.TERNATE SHUT6OWN INVERTER VB INST PANE 140 2 IC0304491 IC1 76 AF FT-40361FT-4037 LOOP 1 24MAY04 24MAY04 DR-Y ML-Y 282 1 IC0304491FT 036/FT-4037 LOqP CHECK CHECK 07:00 07:59 ORT3-Y R-N 0304491A -SYSTEM MULTI rLNDIOR NON-NU BERED EQUI 141 1

IC0304505 ICI 76 AF FT-4036/FT-4037 LOOP 1 24MAY04 24MAY04 DR-Y ML-Y 282 IC0304505FT 0361FT-4037 LOdP CHECK CHECK 07:00' 07:59 ORT3-Y R.N 030450W -SYSTEM MULTI 'NDIOR NON-NU BERED EQUI 142 1 IC4.22SMPA IC1 76 ICP-04.022 ICP 4.22 CONTAINMENT 6 25MAY04 25MAY04 DR-N ML-Y 0

IC4.22SMP ACP.22 CONTAIN SUMP LEVEL KEYWAY 06:00*

11:59 ORT3-N R-N a

0300U83 CONTAIN

'143 0 IC0300691 IC1 77 SEC METAL DETECTOR 4

25MAY04 25MAY04 DR-Y ML-Y 268 a

IC0300691M AL DETECTO CALIBRATION TEST 07:00' 10:59 ORT3-Y R-N 0300691 SEC SYS 144 1 IC0400553D ICI 76 SERVICE SERVICE MAINT 4

25MAY04 25MAY04 DR-Y ML-Y 0

IC0400553DSE CE MAINT SUPPORT EQ VERIF -

07:00 10:59 ORT3-Y R-N a

040055 MISC EQUI 145 1 IC0400553F ICi 76 SERVICE SERVICE MAINT 6 25MAY04 25MAY04 DR-Y ML-Y 24 IC04005 3FSERVICE M SUPPORT EQ VERIF -

11:00 16:59 ORT3-Y R-N a

0400 5_M 146 1 IC4.22SMPB ICI 76 ICP-04.022 CCP 4.22 CONTAINMENT 10 25MAY04 26MAY04 DR-N ML-Y 28 I IC4.22 MPECP 4.22 C SUMP NON-KEYWAY 12:00 10:59 ORT3-N R-N 03 83 147 1 IC573A-IA ICI 76 ICP-05.073 ICP-5.73 T-34A 2

25MAY04 25MAY04 DR-Y ML-Y 3

IC 73A-1kCP-5 7 ACCUMULATOR LEVEL 14:00 15:59 ORT3-Y R-N l

30087EACI 1: -

1 U; -

I

-11;I 148 1 ICIALEAK IC5 76 IA IA LEAK INSPECTION 6

16MAY04 23MAY04 DR-Y ML-Y 104 CIADEAIA LEAKXINSPECTION I

18:OOA 23:59 ORT3-Y R-N IA SYSTEM

_TI AAND/OR NOI-NUMBERED EQ IPMENT03008 149 1 IC2.16SUP2 IC5 71 ICP-02.016 ICP 2.16 4 23MAY04 23MAY04 DR-Y ML-Y 14 IC.16SUPiCP216OVERPRESS REMIGATIONBISTABLECHK OVERPRESSURE 18:00*

21:59 ORT3-N R-M l040844OVERPRESSUR ZA1ON MmGATIkG SYSTEM

=

M MM992497

__6 REBUILD & TEST 24MAY04 DR-MI-V L & TES SNUBBER (SHOP) 1 1 M

j 7

l SNUBBER(SHOP) 1 06:OOA 01:59 ORT3-N R-N HX-1A SG AAIN STEAM LINl WEST SNUBBERl9924975 151 1 MM-8480J MM1 76 R-1 REPLACE REACTOR 2 23MAY04 23MAY04 l DR-Y ML-N 0

ojREPLAdE REACTOR HEAp I _I II_

j j

HEAD f_10:00A 13:59 l ORT3-N R-H REACTOR;VESSEL AND ASIEMBLY0214134 J

Run Date 23MAY04 13:02l LT-03 STANDARD PUBLICATION Shoot 9 of 21

© Primavera Systems, Inc.

I FL-03 Execution Publication Set 7

atuiI

£CMM r u I £.UU I

U1R28 WORKING SCHEDULE I

arrer z4mA 1(14 7 Z.UU

  1. lu ID RESPl WO I EQID I

DESCRIPTION l

ESI EF RISK I MF I MAY ST ES Sun 2.31 Mon 24Tle2

_ i HM I

M I

i I

MM-8480U MMI 76 R-1 INSTALL WALKWAY &

CONTACT RP FOR 1

23MAY04 23MAY04 O R-YML-Y 14:00 14:59 ORT3-Y R.M 0

153 1 MM-84BOX MM1 76 R-1 HEAD WORK PRIOR TO 4 23MAY04 23MAY04 DR-Y ML.Y 0

DECON 14:00 17:59 ORT3-Y R-M 154 1 MM-8857A MMI 82 W-001BI W-1B1, FME CLOSE I

23MAY04 23MAY04 DR-. ML.Y 0

OUT INSPECTION 18:00 18:59 ORT3-N R-N 155 1 MM-8858A MM1 82 W-00C1 W-1C1, FME CLOSE 1 23MAY04 23MAY04 DR-Y ML-Y 0

OUT INSPECTION 18:00 18:59 ORT3-N R-N 156 1 MM0214184 MM1 76 Z-016 AUXILIARY HOIST WIRE 8 23MAY04 24MAY04 DR-. ML-Y 63 ROPE INSPECTION 18:00 01:59 ORT3-N R-N 157 1 MM0214051D MM1 76 HX-001A HX-001A - CLOSE COLD 6 24MAY04 24MAY04 DR-N ML-Y 0

LEG PRIMARY 00:00 05:59 ORT3-Y R-N 158 1 MM0214053D MMI 76 HX-001B HX-001B. CLOSE COLD 6 24MAY04 24MAY04 DR-N ML-Y 0

LEG PRIMARY 00:00 05:59 ORT3-Y R-N 159 1 MM9924975B MMI 76 HS-1 HS-1. REINSTALL 6

24MAY04 24MAY04 DR-V ML.Y 111 SNUBBER, AS-LEFT 02:00 07:59 ORT3-N R-N r410 I MM0214051E MMI 76 HX-001A HX.001A - CLOSE HOT 5 24MAY04 24MAY04 DR-N ML-Y 0

LEG PRIMARY 06:00 10:59 ORT3-Y R-N 161 1 MM0214053E MM1 76 HX-001B HX-001B -CLOSE HOT 5 24MAY04 24MAY04 DR-N ML.Y 0

LEG PRIMARY 06:00 10:59 ORT3-Y R-N 162 1 MM-8480R MM1 76 R-1 REMOVE CAVITY SEAL 4 24MAY04 24MAY04 DR-Y ML-Y 0

RING 11:00 14:59 ORT3-Y R-H 163 1 MM-8480N2 MM1 76 R-1 REM STUD HOLE CAPS 4 24MAY04 24MAY04 DR-Y ML-Y 0

PRIOR TO RP DECON 15:00 18:59 ORT3-Y R-M 164 1 MM0311945D MMI 76 T-001 IT-1 REPAIR 6

24MAY04 25MAY04 DR-Y ML-Y 0

DIAPHRAGM SCREW 20:00 01:59 ORT3-N R-N 1165 1 MM-8480N3 MM1 76 R-1 INSTALL VESSEL HEAD 12 24MAY04 25MAY04 DR-Y ML.Y 0

STUDS 22:00 09:59 ORT3-Y R-H 166 1 MM-8480N1 MM1 76 R-1 TENSION PREPS RV 2

25MAY04 25MAY04 DR-Y ML-Y 0

HEAD 10:00 11:59 ORT3-Y R-H 167 1 MM0311945C MMI 76 T-001 T-1, MANAGEMENT I

25MAY04 25MAY04 DR-YML-Y 0

FME CLOSE OUT 11:00 11:59 ORT3-Y R-N 168 1 MM-8480N MM1 76 R-1 TENSION RV HEAD 4

25MAY04 25MAY04 DR-Y ML-Y 0

12:00 15:59 ORT3-Y R-H MM-MM-Ml 4 LONSTALL WALKWAY &CC EREACTOR VESSEL AND A!

4 80XHEAD WPORK PRIOR TO C REAPTOR VESSEL AN M.8857AW-1BI FMECLOSEC 0214171CdNTAINMENT ACCI M.8858AW.1¢1, FMECLOSEC 021417ICqNTAINMENT ACCI 102141W4AUXIUARY HOIST WIF 021418 REACTOR MM0214651DHX-0O1A-CL 02140515TE MM0214053DHX-001 B -CL 021405_SSTE MM94249753HS-l. REI 992497I_

IMM0214051 I 0214051 -

I

'MM0214053FHX5 021405 MM-84 0214 Ml NTACT RP FOR SURVEY SEMBLY0214134:

ECON D ASSEMBLY0214134 UT INSPECTION (AFTER SW TEST)

)ENT RECIRCULATION FAN UT INSPECTION

)ENT RECIRCULfTION FAN E ROPE INSPECTION CAVITY MANIPULATOR

)SE COLD LEG P IMARY MANWAY kMGENERATORI

)SE COLD LEG PhIMARY MANWAY kM GENERATOR :

4STALL SNUBBEI AS-LEFT VT-3 X-1A SG MAIN STEAM LINE WEST S DIA - CLOSE HOY, LEG PRIMARY M ESTEAM GENEFATOR 01B - CLOSE HOTI LEG PRIMARY M ESTEAM GENERiATOR oRE MOVE CAVI4Y SEAL RING 34iREACTOP VESSEL AND Al 4-848ON2REM STUD HOLE CAPS PRI 021413_REACTOR VESSEL A MM0311945D1T1 REPAIR DIAPf 0311945_PRESSUR Mm.a4gON3INSTALL VESSE 02141_in MM-8480t 1

02141:

I PMM03119 0311 MM4 021 I

MM0311 031 NUBBER

%NWAY

%NWAY SEMBLY R TO RP DEC ND ASSEMB RAGM SCREV ZER TANK L HEAD STUD!

EREACTORV ITENSION PRI

  • REACTOF I5CT-1. MANAI M4PRESSUF 18oN TENSION I l13_REi 45 T i.

RE-IN 194!F 191IMM0311945A IMMi 76 T-001 T-1. RE-INSTALL PRESSURIZER 6

25MAY04 25MAY041 DR-N ML.Y 12:00 1 17:59 1 ORT3-Y R-N 0

L 1 I_

.... R...I.

I Run Date 23MAY04 13:02l LT-03 STANDARD PUBLICATION l

Sheet 10 of 21

© Primavera Systems, Inc.

I FL-03 Execution Publication Set I

Ulmv

'Catrffq IUlf O'CAM I

U7R28 WORKING SCHEDULE I

aner ZJMA YU4 7 Z:UU

  1. U ID RESPl WO I EQID I

DESCRIPTION RD ES EF RISK MF Sun M

An24T

~_I 10,1011Z,14,16.1a 2

2 0

6, 2§48 6810i1Z14.16,1a20,22l 0

.2.4 a6, 8,100214116A E I I-grg Lei =

I l IQ Ii" CR -j :4IIIIs 170 1 MM-8480L MMI 76 R-1 INSTALL PZR VENT 2 125MAY04 25MAY04 DR-Y ML Y 13 _

MM.848OLINS FLANGE 16:00 17:59 ORT3-N R-H 021413; 171 1

MMFMEREM MM1 R-1 REMOVE FME BARRIER 4 125MAY04 25MAY04 DR-Y ML Y 140 UMFMEREMREr 6

16:00 19 59 ORT3-N R-N 172 1

MM-480K MMI 76 R-1 REPLACE RX HEAD 6

25MAY04 25MAY04 DR-Y ML-Y 0

MM-84s80 INSULATION PER RMP 16:00 21 59 ORT3-Y R-H 02141 rli! ^lrs I,, I M MT-s' MRv,, _2 1-T ai _n 173 2

MM0406166 MM2 77 CV-00283B 2CV-283B TEST VALVE 2

19MAY04 23MAY04 DR-Y ML-Y 284 M

061662CV 283B TEST VALVEI Y 5s7n2oo4 (SPARE)

BY 5/27/2004 (SPARE) 23:OOA 19:59 ORT3-N R-N 2P-2B CHARGING UMP DISCHARGE' RELIEF TO 2T-4 CT0406166 174 0

MM0201387 MM2 77 Z-017 WIRE ROPE 2

23MAY04 23MAY04 DR-Y ML-Y 284 MM o1387WRE IOPE INSPECTIO INSPECTION 15:00 16:59 ORT3-N R-N 02 387IhSFP PLATFORM BRIDG IHOISTIRAILS 175 1

MM0408412 MM2 76 PIPING DB-P.280 MINI RECIRC.

4 23MAY04 23MAY04 DR-Y ML-Y 0

M 0408412P 28 MINI RECIRC, ERIFY TORQUE ON BUND FLANG VERIFY TORQUE ON 18:00*

21:59 ORT3-N R-N 040841_

SGFP MINI REC C FROM PUMP TO RESTRICTING RIFIC 176 1

MM0408411 MM2 76 PIPING DB-P-28A MINI RECIRC, 4

23MAY04 24MAY04 DR-Y ML-Y 0

MMo404d iP28A MINI REC RC, VERIFY TOROUE ON BUND FL 4NG VERIFY TORQUE ON 22:00 01:59 ORT3-N R-N 04084115SGFP MIN RECIRC FROM PUMP TO RESTRIC ING ORIFIC 177 0 MM0201997 MM2 76 W-013B1 INSPECT FAN AND 8

24MAY04 25MAY04 DR-Y ML-Y 0

t MMo201g 7iNSPECT FAN ND LUBE BEA LUBE BEARINGS 23:00 19:59 ORT3-N R-N 020199 G

El--

UI 178 1 MM-8485L MM3 76 P.001B REALIGN SEAL COLL 1

23MAY04 23MAY04 DR-Y ML-Y 43 M 85LREAUGN SEAL COLL TO LOOR DRAIN RM1P 9002-8 TO FLOOR DRAIN RMP 12:00 12:59 ORT3-N R-M REACTOR COOLANT PUMPO 14119 179 1 MM-8485J MM3 76 P-001B P00o1B -ALIGN B RCP 20 24MAY04 25MAY04 DR-Y ML-Y 0

MM.8485 IPDB -AAUGN B ROP PER RMP 9002 PER RMP 9002-4 07:00 02:59 ORT3-Y R-M 0214119 REACTO COOLANT Pt 180 1 MM-8485J1 MM3 76 P-001B P-001B - RECOUPLE B 5

25MAY04 25MAY04 DR-Y ML-Y 0

MM.8485J1P OO1B -

ECOUPLE SF RCP PER RMP 9002-4 03:00 07:59 ORT3-Y R-M 021411 EACTOR COOI 181 1

MM-8486A MM3 76 P-001B-M RECONNECTUPPER 4

25MAY04 25MAY04 DR-Y ML-Y 0

C MM.8486 CONNECT UP CC PIPING RMP 9002-1 08:00 11:59 ORT3.Y R-M 021520 REACTOR 182 1 MM-8485H MM3 76 P.0018 P-0018 - REMOVE 6

25MAY04 25MAYO4 DR-Y ML-Y 4

MM-8485 1B -REMOV BACKSEATLEAKAGE 08:00 13:59 ORT3-Y R-M 021411 REACT 183 1 MM-8485QZ MM3 76 P-001B P-001B FINAL 13 25MAY04 26MAY04 DR-Y ML-Y 5

MM-84 5QPi-F ASSEMBLY AFTER 12:

00:59 ORT3-Y R-M 021 11 G

,2[^'E!A

18 MM i

-1

' Gi__

141 1 MM214B 76 MS-02018 MS2018-REPAIR 5

24MAY04 24MAY04 DR-V ML-V 0

I l

MM0214110BR 2018-0, REPAIR',AIR LEAK ONAA ATOR IIjAIR LEAK ON 07:00' 11:59 ORT3-N R-N 021411 H1A SG HEqDER MAIN STASTOP CONTI

]1, b122 1-!. 1-e m< _

185 1 l ND0311835 INDEI77 HX-001B I

HX-13B-EXAMINE l

123MAY04 I 23MAY04 DR-N ML-Y I 0

I NDo31183sHX*1B-EXAMINS SEAUNGSURFACE I _

____l l_SEALING SURFACE 22:00 l_22:59 lORT3-N R-N l J 03118151STEAM GENEFATOR

'Run Date 23MAY04 13:021 LT-03 STANDARD PUBLICATION Sheet 11 of 21 0 Primavera Systems, Inc.

I FL-03 Execution Publication Set I

I u-intzo vvuft'?XIVL U~iE;bL)ULb-daItf £.JMVI 7U4 iZ:UU U

ID lRESP WO EQID DESCRIPTION lRDl ES I

EF I

RISK MF MAY I

IIST 23 Ma 24 I_

I piW O

I 1

iw7imr.i 20, 2 L.

1 6

8,1iZl4.laia20221.2,46 186 1 ND0311836 NDE 77 HX-001A HX-1A-EXAMINE 1 23MAY04 23MAY04 DR-N ML-Y 0

ND03136NX1A "EXAMI iE SEAUNG SURFACE SEALING SURFACE 23:00 23:59 ORT3-N R-N 0311843STEAM GEN RATOR 187 0 EP9927269A NDE 77 S

CONDUCT 40 24MAY04 28MAY04 DR-Y MLY 120 EP9927269ACC NDUCT CMLIST1RUCTURAL INSPE TION CIVILISTRUCTURAL 07:00 14:59 ORT3.Y R-N 99272690_

188 0 EP9927270A NDE 77 S

CONDUCT 40 24MAY04 28MAY04 DR-Y ML-Y 120 EP9927270A UCT CMnnSTRUCTURAL INSPE TION CIVIUSTRUCTURAL 07:00' 14:59 ORT3-Y R-N 9927Z7 I

I 189 1 EP0301912 NDE 77 Z-021 EXAMINE REACTOR 10 25MAY04 26MAY04 DR-Y ML-Y 27 EP03019 2EXAMINE R HEAD LIFT RIG WELDS 10:00 09:59 ORT3-Y R-N _

03019 GS z 1T11:1W L, KM l

0!=l:41W~:111, __-li _1:011 190 1 NM0309240 NMS 77 FE-02904A FE-2904A - CAL CHECK 2 24MAY04 24MAY04 DR-Y ML-Y 48 e

NM030924C_ 2904A -CAL CHECK OFUTTRANSD JCERS (C CFC)

OF UT TRANSDUCERS 07:00' 08:59 ORT3-Y R-N 030924

-1C1 CONT RE(1IRC FAN MOTOR CLR INLET FLO I

191 1 NM0407660A NMS 77 FE-02804A FE-2804A - CAL CHECK 2

24MAY04 24MAY04 DR-Y MLY 0

NM0407660Pl 2804A - CAL CHECK OF UT TRANSD JCERS (A CFC]

OF UT TRANSDUCERS 07.00 08:59 ORT3-Y R-N 0407661

-1A1 CONT RECURC FAN MOTOR I LR INLET FLO 192 0 OP0301242 OP0 77 1O-PC021.4 WEEKLY 5

25MAY04 25MAY04 DR-Y ML-Y 579 1

0IP030124; EKLY MISCEU MISCELLANEOUS DATAI 0700I 11:59 ORT3-Y R-N 0301242 1 EEKLYI 1931 0 OP0301294 OPI 76 O-PC-MIDS OPERATIONS MID 124 121MAY04 27MAY04 DR-Y MLY 158 P04 012giOPERJTIONS MID SHIFWEEKLY ROUTINg I

03I1I3I SHIFT WEEKLY I

jIj00:00A I 02N59 1

194 0 OP0301333 OP2 76 O-PC-DAYS OPERATIONS DAY 6 18MAY04 24MAY041 DR-YML-Y 179 P

33OPER4TIONSDAYSHI WEEKLYROUTInIE SHIFT WEEKLY 08:00A 10:59 ORT3-Y R-N OPERATONS AY SHIFT WEEK YROUTINEO3 195 0 OP0301386 OP2 76 O-PC-012.6 G-03 EDG VIBRATION 1

23MAY04 23MAY04 DR-N ML-N 183 P0 01386G-03 EDG VIBRATION (0 JARTERLY)

(QUARTERLY) 13:00-13:59 ORT3-Y R-N IG-03 EMEIkGENCY DIESEL GENERATOR VIBRATION (QUARTO3 1386 196 0 OP0301368 OP2 76 O-TS-083 TS-83, G-03 5

23MAY04 23MAY04 DR-N ML-N 0

0

-TS 83.0p03 EMERGENC DIESEL EMERGENCY DIESEL 13:001 17:59 ORT3-Y R-N G-03 EMERGENCY DI SEL GENERATOq MONTHLY03013 8 197 2 OP0301619 OP2 76 O-TS-032 TS-32, 3

24MAY04 24MAY04 DR-Y MLY 179 OP0301619 -32. MISCELLANEOUS EQUIPMEN' MISCELLANEOUS 08:00' 10:59 ORT3-Y R-N 030161i MISCELLANEOUS EQUIPMENT CECKS (MONT 198 0

OP0301372 OP2 76 PT-FP-002 DIESEL 1 24MAY04 24MAY04 DR-N MLN 177 O

,P03 I372DIESELENGINE-DRIVEN FIRE UMP ENGINE-DRIVEN FIRE 12:00 12:59 ORT3-Y R-N 03 372IDIESEL ENGINE-DRIVEN FIR PUMP FUNCT 199 0 OP0301357 OP2 77 O-PC-043.5 SERVICEWATERTO72 25MAY04 25MAY04 DR-NML-N 581 I

OP0301357S RVICEWATEI AUXILIARY 08:00-09:59 ORT3-Y R-N 030135 7SERVICE WA

?00 0

0P0301334 l

OP2 l77 0-PDAYS OPERATIONS DAY 42 25MAY04 30MAY04 DR-Y ML-Y 133 OP030133 SERATIONS D

SHIFT WEEKLY 08:00-14:59 ORT3-Y R-N OPERATIONSDA SHIFTWEEKLYROUTINE 03013 tun Date 23MAY04 13:02l LT-03 STANDARD PUBLICATION l

Sheet 12 of 21 0 Prlmavera Systems, Inc.

FL-03 Execution Publication Set

I (iIl¶LU WVVVrANUM LHfrUULf: r I

doIWV £.iIVI ru'11 ie:uu 0~J I

REPWO I EQID DESCRIPTION RD IES EF RISK MFISn2 MAYTie2 JID RE P ST n 24e~

i AflugjWLI l

201 0

0P0301395 0P31 77 0-PC-SWING OPS SWING SHIFT 21 119MAY04 25MAY04 DR-Y MI.-V 1610P0 0139 SWNSIFW~:YO TIE 202 1

0P0301550 0P31 77 O-PC-001.2 TBl MONTHLY 32 23MAY04 27MAY04 DR-V ML-Y 150 OP015 IM(NTHLY HEATING VENTILATION HEATINGANENT1IATION 15:00' 19:59 ORT3-Y R.N C

5C___1 203 0

0P0301426 0P3 77 O-PC-009.6 MONTHLY SHIFTING OF 2

24MAY04 24MAY04 DR-N MI-N 173i P030142 6'RONTHLY SHIFTING OF-AB SERVIC K-3A/B SERVICE 16:00' 17:59 ORT3-N R-N 030142IAMO~THLY SHIFTING CF K-3AIB SERI 204 2 U2GNDR-A 0P31 TG-01 DRAIN U2 MAIN 1 24MAY04 24MAY04 DR-Y ML-V 0

U2GNDR.ADRAIN 1J2 MAIN ELEC7 ICAL GENER, ELECTRICAL 18:00' 18:59 ORT3-N R-N EU.2:MAIN GENERATO 205 1 0P0301,554 0P3 77 TS-CCW-001 CC SYSTEM VALVE I 1 25MAY04 25MAY04 BR-V ML-V 167 P0301554CC POSmTON CHECKS 18:00' 16:59 ORT3-Y R-N 0301554CC 206 1

PC-77I OPS 77 O-PC-077.1 AUTO FP VALVE TRIP 15 122MAY04 24MAY04I DR-V MI-V

59.

FP VALVE TRIP TEST TEST 08:OOA 03:59 ORT3-N R-N U

FPS IALVE TRIP-TEST AND ALARM VERIF ICATION TES1 207 1

CL07BO10 OPS CL-07B FILL & VENT Si VALVE 6

22MAY04 23MAY04 DR-V ML.-V 61LOBIFL & ~~ENT SI VALVE 12:OOA 17:59 ORT3-N R-N FILL-& VENT SI VALVE LINEUPS 208 1 CL13AO1O OPS CL-13A MAIN STEAM VALVE 6

22MAY04 23MAY04 DR-N ML-N 146 LAOWAN STEAM VALVE UN PS LINEUPS 12:OOA 17:59 ORT3-N R-N MAI?' STEAM VALVE L NEUPS FOR HEAtUP 209 1 OP4F-020 OPS OP-4F ESTABLISH OP 4F 1 22MAY04 23MAY04 DR-V ML-V 3 P 0ESTABL4SH OP 4IF REQUII EMENTS REQUIREMENTS 18:OOA 12:59 ORT3-N R-N 210 I

01124-40 OPS HX-OOiB DRAIN SG-B 2

22MAY04 23MAY04 DR-V MI-V 0I-4RAN Sd-B COMPLETELY COMPLETELY 22:OOA 13:59 ORT3-N R-N Filig 5( busing auxilliary f ~d 211 1 RP1D-020 OPS O-RP-001D PUIMP DOWN LOWER 4 23MAY04 23MAY04 DR-V MI-V 0 P LIOOPMP DPWN LOWER CAV TV PER RP-I D CAVITY PER RP-1D 04:0OA 15:59 ORT3-N R-N PUMP DOWN LOWER CA flTY 212 1 RP10-070 OPS O-RP-OO1B HEATUPT095DEG F I

23MAY04 23MAY04 DR-V MI.-V 5 P-OHEATU9(TO095 DEG F TO ENSION TO TENSION 14:00 14:59 ORT3-N R-N 213 1 0162-040 OPS HX-O01B REFILL SIG B TO 510' 4

23MAY04 23MAY04 DR-N MI-V 39 016d 04REFILL. SIG 8 TO slO" wWm U Chemicals w/WL.U Chemicals 14:00 17:59 ORT3-N R-N

=Filln~ SIG B3 using MAuI iary feed 214 1 OP4D-BRF OPS BRIEF FOR RCS DRAIN I

23MAY04 23MAY04 01P4 -RF13PIEF IOR RCS DRAIN T: REDUCED INVEN~TORY TO REDUCED 15:00 15:59I 215 1 0123A-30 OP§01-23A REMOVE PORTABLE 4

23MAY04 23MAY04 DR-V MI.-Y 3101214-30REMOVE'PORTABLE CAVI IFILTER UNIT CAVrIY FILTER UNIT 15:00 181:59 ORT3-N R-N REAOVE PORTABLE CAVITY FILTER bT 216 1 Ol-IIC OPS ADMIN TERMINATE NOZZLE 1 23MAY04 23MAY04 DRYV MI-V 0

I-1I CTERMINATE NOZZLE DA0 PROTECTED ST4ThS IIDAM PROTECTED 16:00 16:59 ORT3-N R-N U

217 1 OP4D-205 OPS1 OP-5A DRAIN RCS TO 55% RX 2 23MAY04 23MAY04 DR-V MI.-V 0 OP

-20!DRAIN RCS TO 55% RX L;-LI PER OP-4D P 3 LEVEL PER OP-4D) PT 3 16:00 17:59 ORT3-N R-H

  • IOW~ER REACTOR LO ILTO 55%

218 1 RPJF-153A OPSI JOB FILE I PUMP UIC DECON 3

23MAY04 23MAY04 DR-V ML-Y 34 RP

-15ALM 9I1C DECON WAST WASTE 16:00 18:59 ORT3-N R-N MLOWER CAVITY DEC N PREPARATION Run Date 23MAY04 13:021 LT-03 STANDARD PUBLICATION ISheet 13 of 21 C Primavera Systems, Inc.

IFL-03 Execution Publication Set

I U7i'd WUKAING SCHEDULE afferZ3MAY04 12:00

  1. Ul ID IRESPl WO I EQID I

DESCRIPTION RD ES EF I

RISK MF I

M MAY I

F1J O 24 Tits 25

~I I

j:I

_ _11 I M _4 I.

I I

I I

I I

2191 1 OP4D3-220 OPS OP-41 PLACE LT-4478 IN SERVICE I

23MAY04 1

23AY04 I DR-V MI-18:00 151:59 ORT3-N R-N 0

220 0 OP0300626B OPS 76 Z-031 RESTORE IAW 4

23MAY04 23MAY04 DR-Y ML-Y 29 4 0-SOP-IA-002 18:00 21:59 ORT3-N R-N 221 1

OP5A-060 OPS OP-5A DRAIN RCS TO 22-25% 2 23MAY04 23MAY04 DR-Y ML-Y 0

(2ND MIDLOOP) 19:00 20:59 ORT3-N R-H 222 1 CL10J010 OPS CL-10J CONTAINMENT SW 10 23MAY04 24MAY04 DR-Y ML-Y 0

VALVE 21:00 06:59 ORT3-N R-N 223 1 OPSA-030 OPS OP-5A RAISE RCS LEVEL TO I

24MAY04 24MAY04 DR-N ML-Y 0

55% (2ND) 11:00 11:59 ORT3-N R-N 224 1 OP5A-040 OPS OP-5A RAISE RCS LEVEL TO I

24MAY04 24MAY04 DR-N ML-Y 0

70% (2ND) 12:00 12:59 ORT3-N R-N 225 1

IT-330 OPS 77 0-IT-0330 CNMT ISO VALVES 6

24MAY04 24MAY04 DR-Y ML-Y 0

STROKE TEST 12:00 17:59 ORT3-N R-N 226 1 IT-005B OPS 77 O-IT-0005B CTMT SPRAY PUMPS & 8 24MAY04 24MAY04 DR-Y ML-Y 0

VALVES TEST 12:00 19:59 ORT3-N R-N 237 1

01100-60 OPS T-034A T-034A-FILL SI 8

24MAY04 24MAY04 DR-N ML-N 0

ACCUMULATOR 12:00 19:59 ORT3-N R-M 228 1

CL04AO1O OPS CL-04A CL 4A PART 1. RCS 10 24MAY04 24MAY04 DR-Y ML-Y 33 F&V VALVE CHECKLIST 12:00 21:59 ORT3-N R-N 229 1 IT-280A-18 OPS 77 O-IT-0280A MSIV STROKE TEST.

4 24MAY04 24MAY04 DR-N ML-Y 0

IT-280A (MS-02018) 13:00 16:59 ORT3-N R-N 230 1 PC-76.7 OPS 77 O-PC-076.7 AUTO DRY CHEMICAL 2

24MAY04 24MAY04 DR-N MLY 56 FIRE EXTINGUISHER 14:00 15:59 ORT3-N R-N 231 1

01124-30 OPS HX-001A DRAIN SG-A 16 24MAY04 25MAY04 DR-Y ML-Y 0

COMPLETELY 17:00 08:59 ORT3-N R-N 232 1 B52-428M OPS 76 B-42 BUS STAB PMT 1 24MAY04 24MAY04 DR-N ML-N 0

NW-13B2.

18:00 18:59 ORT3-N R-N 233 0 OP0405880 OPS 78 W-013B1 W-013B1 PMT PER IWP 2

24MAY04 24MAY04 DR-N ML-N 0

01-128.E-FN 18:00 19:59 ORT3-N R-N 234 1 TS-033 OPS 77 O-TS-033 TS-33. U1C ACCIDENT 3

24MAY04 24MAY04 DR-N ML-N 0

FAN COOLER UNITS 18:00 20:59 ORT3-N R-N 235 1

SUMPA2 OPS CONT DRAINIVERIFY SUMP A 2

24MAY04 24MAY04 DR-N ML-N 594 19:00 20:59 ORT3-N R-N OF 1P40-22OPLACE LT-44T8 IN SE NPLACE REDUCED IN 300626DREStORE IAW 0-SOP 030062INSTRUMENT A OP5A-06CDRAIN RCS TO 22-0 CLI JOIIiCONTAINMENT S OP5A.

OPs 021 IT.

021 Oil

  • CLO4 IT-2 0:o MCE

'ENTORY LEVEL XMTRS IN SERVIC A-002 IDRYER 5% (2ND MIDLOOP)

VVALVE W ICE WATER IN,ONTAINMENT 13(ASE RCS LEVEL TO 55% (2ND]

ERAISE REACtOR LEVEL TO EX

-04CAISE RCS LEVEL TO 70% (2NI ERAISE REA9TOR LEVEL TO E 330CNMT ISO VALVES STROKE TE SglCUNrt 1 CONTAINMEN1 i05BCTMT SPRAY PUMPS & VALVE 589CONTAINMENT SPI 0-60T-034A - FILL SI ACCUMULATO I

k010CL 4A PART 1 RCS F&V VALV FILL & VENT RC OA-1 BMSIV STRO(E TEST, IT-280A 15899nU1 MI STOP VALVES S 3C'76.7AUTO DRY' CHEMICAL FIRE I 215931EMAINTANSP FIXED AUTO 01124.30DRAI SG=ACOMP3 B52.428MBUSiSTAB PMT W-13 0202527*486V MOTOR CONTm OP040588W'-013B1 PMT PER IWi 040588MCONTROL ROOM R TS-033TS-3iI, UIC ACCIDENT SUMPA2ORANIVERIFY SUMF UCONT SYSTEM M OP0303211SLFEGUARDS SYS' 0303211=SAFEGUARDS T REDUCED I I)

(IT REDUCED ST ISOLATION V,

TEST IAY PUMP ANW

, CHECKUST 2'VALVE LINEI MS-02018) rROKE TEST (

XTINGUISHER DC FIRE EXTI1

.LY Foring A S/G us 32" OL CENTER P

'01-128*E-FN ECIRC FAN

-AN COOLER I A

JLTI AND/OR EM VENTING SYSTEM VEN1 I

2361 1 0P0303211 I OPS 77 TS-ECCS-00 ISAFEGUARDS SYSTEM 3

24MAY04 24MAY04 DR-N MI-N 20:00 1 22:59 1 ORT3-N R-N 90 VENTING (MONTHLY)

I

.I.

I tun Date 23MAY04 13:021 LT-03 STANDARD PUBLICATION Sheet 14 of 21 O Prlmavera Systems, Inc.

I FL-03 Execution Publication Set -

anur zimA r u4 'ie:uu I

U1R28 WORKING SCHEDULE anerzmAycI4 7z:uu

  1. U ID RESPl WO I EOID DESCRIPTION lRD ES I

EF I

RISK I MF MAY I Su~

n 23 11~2~026 Mon 24 Te2 III IST I P.

1011Z1416.11120,22i 0 21416,8,1011Z,14,1ala20,22 0,2,416, 8,1011Z14,1 237 1 01100.50 OPS T-034A T-034A - PRESSURIZE 16 24MAY04 25MAY04 DR-N ML.-N 0

01100-50T434A - PRESSORIZE SI ACCU SI ACCUMULATOR 22:00 13:59 ORT3-N R-N I

238 0 OP0300628A OPS 76 Z.039 ISOLATE lAW 2 25MAY04 25MAY04 DR-N MI-N 70 s

OPb300628,5OLA IAW 0-SOP4A 0-SOP-IA-002 SECTION 03:00.

04 59 ORT3-N R-N

,030062MIN UMENT AIR D 239 1 RPJF-1538 OPS LOWER CAVI SECURE CAVITY DRAIN 2 25MAY04 25MAY04 DR-Y MI-V 0

RPJF 153 ECURE CAVI 09:00 10:59 ORT3-N R-N 240 0 OP0408415A OPS 77 O-4T-010D IT-t0A. P-38A/B AFW 3 25MAY04 25MAY04 DR-N ML-N 52 OP0408415 TIOA. P-3%

PUMPS AND VALVES 09:00 11:59 ORT3-N R-N 040841 P-38A/B A 241 1 0162-030 OPS HX-001A REFILL SIG A TO 5101 4 25MAY04 25MAY04 DR-N ML-N 0

0162.03 E.U. SIG A w/WLU Chemicals 09:00 12:59 ORT3-N R-N IF llng A 242 1 OP9C-060 OPS OP-9C SECURE I

25MAY04 25MAY04 DR-N ML.-Y 0

OP9C-0 =SECURE CO CONTAINMENT PURGE 10:00 10:59 ORT3-N R-N I

243 1 O-RT-069 OPS 77 O-RT-069 PERFORM LLRTON 4 25MAY04 25MAY04 DR-NMI-N 0

IO-R 0C9PERFOR P-I CCW LINES 12:00 15:59 ORT3-N R-N 021 i00lC 244 1 RP1D-080 OPS O-RP-0011D FLUSH CAVITY DRAIN 24 25MAY04 26MAY04 DR-Y MLY 0

RP D-080FLUSHC LINE 13:00 12:59 ORT3-N R-N 245 1 RF-350A OPS 77 O-RF-350A RF-350A, FUEL 8 25MAY04 25MAY04 DR-Y ML-Y 47 RF-350 F-350 CD HANDLING EQUIPMENT 14:00 21:59 ORT3-N R-N 215941 246 1 01100-70 OPS T-034B T-034B - PRESSURIZE 16 25MAY04 26MAY04 DR-N ML-N 0

1100-70T-034E I

SI ACCUMULATOR 14:00 05:59 ORT3-N R-N 247 0 01-39J OPS01-39J SECURE PAB I

25MAY04 25MAY04 DR-N ML-N 0

01-39JSEC VENTILATION FOR 16:00 16:59 ORT3-N R-N I

248 1 SOPCCO02C OPS SOP-CC-002 FILL & VENT RCPIELHX 6 25MAY04 25MAY04 DR-N ML-N 0

IS PCCO02CFIU CCW SYSTEM 16:00 21:59 ORT3-N R-N 249 1 OP9C-065 OPS OP-9C RESTORE 1 25MAY04 25MAY04 DR-Y ML-Y 01 OP9C-06CRE CONTAINMENT PURGE _

17:00 17:59 ORT3-N R-N I

wI

=

1 250 1 HEAD-SET PPG MILESTONE REACTOR VESSEL 0 23MAY04 DR-Y ML-Y V

HE0 -SETREACTOR VESSEL HEAD SET HEAD SET 14:00 ORT3-N R-N

  • SAFETY MONITOR PLANT PERATING STATW MILESTONE 251 1 RP1B-073 PPG O-RP-001B RELAX CLOSURE POST 1 23MAY04 23MAY04 DR-Y ML-Y 45 RP1 -73RELAX CLOSURE POST R EACTOR VESSEL HEAD SET REACTOR VESSEL 14:00 14:59 ORT3-N R-N JESTABL&I CONTAINMEN CLOSURE FOR 6ORE OFFLOAD 252 1 MSX02Z PPG MILESTONE CLOSE NON CL-1E SIG 0 23MAY04 23MAY04 DR-Y ML-Y 124 SX02ZCLOSE NON CL-1E S/G LOWDOWN BLOWDOWN 17:00 16:59 ORT3-N R-N ISIG BOWDOWN NON L-1E 253 1 CAP56609 PPG ADMIN ENSURE CAP 056609 0

23MAY04 DR-Y ML-Y 0 C P56609 ENSURE CAP 056609 OMPLETE COMPLETE 17:59 ORT3-N R-N 254 1 RCX02A2 PPG MILESTONE ENTER RCS REDUCED 0 23MAY04 DR-Y ML-Y 0

R X02A2 ENTR RCS REDUCE INVENTORY (2NQ)

INVENTORY (2ND) 18:00 ORT3-N R-N

  • SAFETY MONITOR P NT OPERATINO STATE MILESTOI IE Run Date 23MAY0413:02 LT-03 STANDARD PUBLICATION Sheet 15 of 21 O Primavera Systems, Inc.

FL-03 Execution Publication Set I

aiter £icim ru4 7i uU I UIR28 WORKING SCHEDULE. I afner 23MAY04 12:00 r

U1 ID lRESPl WO I EQID DESCRIPTION lRDl ES EF I

RISK MF MAY

__e_25 ST 1o 24 I I

_42 STPPG1...6

,Qj1ja~2.2,24.,,0I1.6 VNCCA52Z PPG MILESTONE END CONTAINMENT I 0 23MAY04 123MAY04 DR-Y ML-Y FI PAM COOL 0

ERS WAO 40-nA 4185n ORT3-NKI 0R-N 23 U'dI**

,.S

.. UV

,u.fl v..,r

.rI

,,i 256 1 VNCCB51Z PPG MILESTONE END CONTAINMENT 0

23MAY04 23MAY04 DR-Y ML-Y 22 FAN COOLERS C WOR 20:00 19:59 ORT3-N R-N 257 1 MIDLOOPA-2 PPG MILESTONE START RCS AT 0

23MAY04 DR-Y ML-Y 0

MIDLOOP (2ND) 20:59 ORT3-N R-N 258 1 CSB12Z PPG MILESTONE END FEED PUMP P28B 0

23MAY04 23MAY04 DR-Y ML-Y 187 WORKWINDOW 22:00 21:59 ORT3-N R-N 259 1 CSA12Z PPG MILESTONE CLOSE FEED PUMP 0

24MAY04 24MAY04 DR-Y ML-Y 198 P28A WORK WINDOW 02:00 01:59 ORT3-N R-N 260 1 MIDLOOPZ-2 PPG MILESTONE END OF RCS AT 0

24MAY04 DR-Y ML-Y 0

MIDLOOP (2ND) 10:59 ORT3-N R-N 262 1

480VAOIA PPG B-03 START 480V BUS 0

24MAY04 24MAY04 DR-Y ML-Y 0

RELATED ENERGIZED 12:00, 11:59 ORT3-N R-N 263 1

480VAOIZ PPG B-03 803 BUS RELATED 0

24MAY04 24MAY04 DR-Y ML-Y 130 ENERGIZED WORK 12:00 11:59 ORT3-N R-N 1 1 RCX02Z2 PPG MILESTONE EXIT RCS AT REDUCED 0

24MAY04 DR-Y ML-Y 0

4 INVENTORY (2ND) 11:59 ORT3-N R-N 264 1 RCX31Z PPG MILESTONE END RCS WORK 0

24MAY04 24MAY04 DR-Y ML-Y 0

W/LARGE HOT LEG 12:00 11:59 ORT3-N R-N 265 1 ADMIN-81 PPG ADMIN Startup Readiness.

4 24MAY04 24MAY04 DR-Y ML-Y 124 Meeting to Exit Cold 14:00 17:59 ORT3-N R-N 266 1 MSA25Z PPG MILESTONE END S/G A CL-1E 0

24MAY04 24MAY04 DR-Y ML-Y 0

WORK OUTSIDE 17:00 16:59 ORT3-N R-N 267 1 4KVA01Z PPG A-01 CLOSE A01 BUS 0

24MAY04 24MAY04 DR-Y ML-Y 35 RELATED WORK 20:00 19:59 ORT3-N R-N 268 1 SIAOIX PPG MILESTONE START HHSI A LOOP 0

24MAY04 24MAY04 DR-Y ML-Y a

MODE 5 WORK 20:00 19:59 ORT3-N R-N 269 1 SIA01Y PPG MILESTONE END HHSI A LOOP 0

24MAY04 24MAY04 DR-Y ML-Y 93 MODE 5 WORK 20:00 19:59 ORT3-N R-N 1270 1

SIBOIX PPG MILESTONE START HHSI B LOOP 0

24MAY04 24MAY04 DR-Y ML-Y C

MODE 5 WORK 20:00 19:59 ORT3-N R-N 271 1

4KVB01Z PPG 4.16KV CLOSE A02 BUS 0

25MAY04 25MAY04 DR-Y ML-Y RELATED WORK 06:00 05:59 ORT3-N R-N (NCCA52ZEND CONTAINMENT IENO B CTMT FAN C(

VNCCB51ZEND CONTAINMEN

!END CONTAINMEN iIDLOOPA-2 START RCS AT N CSB1gZEND FEED PUM I lMAIN FEED PU CSAI2ZCLOSE FE

[MAIN FEE MIDLOOPZ 480V 480V RCX0 RC A

'AN COOLERS B WORK LERS (A TRAIN):WORK FAN COOLERS 4 WORK

'FAN COOLERS c WORK (B TRAIN)

DLOOP (2ND)

P28B WORK W14DOW PP-28B 2D PUMP P28A WORK WINDOW PUMP P-28A 2 END OF RCS Ar, MIDLOOP (2ND) 0I1ASTART480V BUS RELATED ENE 1BEGINNING OF A TRAIN BUS 'A 01Z803 BUS RELATED ENERGIZED lEND OF 803 BUS WORK WIND(

Z2 EXIT RCS ATiREDUCED INVEN

  • SAFETY MONITOR PLANT OP M31ZEND RCS WORK W/LARGE HO' IPRESSURIZER IMIN-8lStartup ReldIness Meeting to

=Staripp Readiness Mee, MSA25ZEND 9/G A CL1E WORK ISIG B:SECONDARY & F 4KVA01ZCLOSE A01 BUS RI lAp1 BUS WORK O SIA01XSiART HHSI A 1001 SIA01YEND HHSI A LOOP I':

SIB01XShART HHSI B LOO, IE*JD HIGH HEAD Si 4KVB01ZCLO lA02 E

RGIZED WORY ORK WINDOW WORK COMPL W

'ORY (2ND)

.RATING STA'

'LEG VENT Exit Cold Shu ing OUTSIDE CON

~EDISTEAM'1B LATED WORK OUTAGE MODE' 5 WOR AODE 5 WORI MODE 5 WOF

,FETY INJECT]

'E A02 BUS RE 3US WORK OF XITRFSD EXI`

  • E) 272 1

EXITRFSD PPG MILESTONE I EXIT REFUELING SHUTDOWN 0

25MAY04 I DR-Y ML-Y 15:59 ORT3-N R-N 575 a

u JI.

Run Date 23MAY04 13:02l LT-03 STANDARD PUBLICATION Sheet 16 of 21 a Primavera Systems, Inc.

I FL-03 Execution Publication Set I

offer z3MA Y04 7 Z:VU I

U1R28 WORKING SCHEDULE after 23MA Y04 12:00

  1. l1U l ID IRESPl WO I EQID DESCRIPTION lRDl ES I

EF RISK I MF I123 l

Mon 24 TuMAY 11I f-, I,

I I

T II I0 I

I i! I_

273 1 RP0408417 RP 76 RE-00211 IRE-2111/212 REPLACE 1 22MAY04 23MAY04 DR-N ML-N 26 54171RE-2111212 REPLACE D ETECTORS DETECTORS 08:OOA 12:59 ORT3-N R-N UNIT 1 CONTAINMENT AIR PA RTICULATE MONITOR0408417 274 1 KEYWAY03 RP HP 2.14 ESTABLISH KEYWAY 1 25MAY04 25MAY04 DR-Y ML-Y I

IkEYWAY02ESTAB SH KEYWAY ACCESS (POST 04:00 04:59 ORT3-Y R-N I

275 1 RPJF-153C RP LOWER CAVI FILL TRANSFER CANAL 2 25MAY04 25MAY04 DR-Y ML-Y I

RPJF.1 3CFILL TRAN WITH DI WATER FOR 11:00 12:59 ORT3-Y R-N I

I -11

-9141 U

ire 1in V

E s 276 1 RPJF.152 RPI JOB FILE I UPPER CAVITY DECON 11 23MAY04 24MAY04 DR-Y ML-Y 0

RPJ 52UPPER CAVITY DECON 15:00 01:59 ORT3-Y R-N UPPER C VITY DECON I

277 1 RPDC-SGA3 RP1 HX-001A A SIG PLTFRM DECON I

23MAY04 23MAY04 DR.Y ML-Y 0

RPDC-St'A34 SIG PLTFRR DECON AFTER NbZZLE DAM REM VAL AFTER NOZZLE DAM 23:00 23:59 ORT3-Y R-N ISTEAM GEN RATOR 278 1 RPDC-SGB3 RP1 HX-001A B SIG PLTFRM DECON I

23MAY04 23MAY04 DR-Y ML-Y 0

RPDC-SGB3B SIG PLTFRM DECON AFTER NOZZLE DAM REM VAL AFTER NOZZLE DAM 23:00 23:59 ORT3-Y R-N ESTEAM GEN RATOR 279 1 RPSH015-R RP1 PACKAGE 15 REMOVE SHIELDING 3 24MAY04 24MAY04 DR.Y ML-Y 98 RPSH01 -RREMOVE SHIE¢DING FOR SC.95 /HOT LEG PIP FOR SC-9541HOT LEG 11:00 13:59 ORT3-Y R-N 1

280 2 RPJF-152B RP1 JOB FILE 1 DECON UPPER CAVITY 3 24MAY04 24MAY04 DR-Y ML-Y 0

RPJF.152BDECON UPPER CAVr Y -POST STU

-POST STUD CAP 19:00 21:59 ORT3-Y R-N 281 1 RPSH082-R RPI PACKAGE 82 REMOVE SHIELDING 3 25MAY04 25MAY04 DR-Y ML-Y t

RP4H0824IREMOVE HIELDING FO FOR D-FAN (FROM RX 02:00 04:59 ORT3-Y R-N 282 1 RPJF-153 RP1 JOB FILE I LOWER CAVITY DECON 7

25MAY04 25MAY04 DR-Y ML-Y 0

a RPJF.153LOWER c,VrTY DECON 02:00 08:59 ORT3-Y R-N LOWER CAVI 283 1 RPSH011-R RPI PACKAGE 11 REMOVE SHIELDING -

5 25MAY04 25MAY04 DR-Y ML-Y 0

RPSH011-R OVE SHIELDI REGEN DOOR GAP 07:00 11:59 ORT3-Y R-N 284 1 RPSH064-R RP1 PACKAGE 64 REMOVE SHIELDING 3 25MAY04 25MAY04 DR-Y ML-Y 0

I RPSH06 -4REMOVE S FOR LETDOWN PIPING 11:00 13:59 ORT3-Y R-N I

285 1 RPSH013-R RPI PACKAGE 13 REMOVE SHIELDING -

4 25MAY04 25MAY04 DR-Y ML-Y 32 RPSH 13RREMOVE REGEN RACKS 12:00 15:59 ORT3-Y R-N 286 1 RPSH08O-R RP1 PACKAGE 80 REMOVE SHIELDING 3 25MAY04 25MAY04 DR.Y ML-Y 2

a RP H080-RREMO UNDER HEAD 14:00 16:59 ORT3-Y R-N 287 1 RPJF-121-8 RP1 76 R-1 RESTORE RHLDA 5

25MAY04 25MAY04 DR-Y ML-Y 0

RP. F.1214-ESTO AFTER HEAD SET 14:00 18:59 ORT3-Y R-N 213472 z -

illlv

-3 U;=

-E 288 11 SD-1600-92 I 76 R-1 HEAD REPAIR ECN 3 125MAY04 I25MAY04 DR-VML-Y 1

SD4600-9 EAD REPAIR DESIGNAPPROVAL 09:00 11:59 ORT3-YR-N 021347q _REACTOI RunDate 23MAY04 13:02j LT-03 STANDARD PUBLICATION Shoot 170 f21

© Prmavera Systems. Inc.

FL-03 Execution PublicatIon Set

alms* £.flVIM fua IZ.UtJ i UlR28 WORKING SCHEDULE I

afterZ3MAY04 12:00 U

ID lRESPI WO I EQID I

DESCRIPTION RDl ES lEF RISK MF MAY Tue l

I I I

I IIII I1

.10 4

1,1 1 6,18 20,2210.2.4. R. 6 '1012,14,l~1a20,2210,244,6,8,IOjj 289 _

SD GSI-191 I SDS CONT ENGINEERING 11 08APR04 125MAY04 DR-YML-Y 29 D S I

1191ENGINEERING WALK N-SUMP INTRUSION ISSUES WALKDOWN - SUMP 08:OOA 0959 ORT3-Y R-N _

SII3I

-! U~le

!I 290 0 I SE0311772A SEC 76 Z-065A SECURITY SUPPORT 3

10MAY04 24MAY04 DR-Y ML-Y 157 EO 11mASECUWi1YSUPPORT 265A.MR03-044' Z-065A - MR 03-044 07:OOA 09:59 ORT3-Y R-N MANHOLE #10311772 291 1

TG-LP1-HS TGG TG-01-T1 LPI TURBINE - HOOD 1 24MAY04 24MAY04 DR-Y ML-Y 0

TG-LPi1-H 1 TURBINE - HO0D SPRAY VERIFI ATION SPRAY VERIFICATION 08:00 08:59 ORT3-Y R-N _PI LOW PRESS4RE TURBINE 292 1 TG-LP2-HS TGG TG-01-T2 LP2 TURBINE - HOOD 1 24MAY04 24MAY04 DR-Y ML-Y 0

TG-LP24H 2 TURBINE - H0O0 SPRAY VERIFI ATION SPRAY VERIFICATION 08:00 08:59 ORT3-Y R-N LP2 LOW PRESSURE TURBINE 293 1 TG0213970A TGG 76 TG-01-T1 INSTALL LPI LOW 4

24MAY04 24MAY04 DR-Y ML-Y 0

TG0213970 NSTALL LPI LOV PRESSURE TUR INE MANWA PRESSURE TURBINE 09.00 12:59 ORT3-Y R-N 1

021397 _UI LOW PRESSURE TURBIN 294 t

TG0213971A TGG 76 TG-01-T2 INSTALL LP2 LOW 4

24MAY04 24MAY04 DR-Y ML-Y 0

I TG0213971 NSTA.

LP2 LOW PRESSURE TUR INE MANWA PRESSURE TURBINE 09:00 12:59 ORT3-Y R-N 0213971 LP2 LOW POESSURE TURBIN IS5 1

CL-2B WCC CL 2B MODE 6 TO MODE 5 521 25APR04 25MAY04 DR-Y ML-Y 0 L MODE 6 TO MODE S CHECKLI T

0 CHECKLIST 08:OOA 15:59 ORT3-N R-N 296 1 CL-2E WCC CL2E MODE3TOMODE2 18- 02MAY04 01JUN04 DR-YML-Y 0 1-ODE3 TOMODEO2CHECK T

CHECKLIST 19:OOA 13:59 ORT3-N R-N I

297 1 CL-2F WCC CL 2F MODE 2 TO MODE 1 38- 02MAY04 02JUN04 DR-Y ML-Y 0 L-$ODE 2 TO MAODE I CHECKUT, CHECKLIST 19:OOA 09:59 ORT3-N R-N 298 1 T-2071-R WCC W-4A/B 1 VNRC W-4A/B EM I1 23MAY04 23MAY04 64 r.2 R1 VNRC 4An EM REV0-1l REV0-1 12:00 12:59 1 VNRC W-4A(B EM REV0.1 0 2071 299 1 T-3426-R WCC P-OO1B I RC P-1B RMP 1 23MAY04 23MAY04 DR-Y ML-Y 0

R1 RC P-16 RMP 9002-8119 M REVO-1 9002-8119 MM REVO-1 12:00 12:59 ORT3-N R-N 1 RC P-1B F<MP 9002-/19 MM REVO-1 0013426 300 1 T-7449-R WCC W-003A I VNCRD W-3A OPS I

23MAY04 23MAY04 DR-I ML-Y 104.7 91 VNCRD;W.3A OPS REVO-'

REVO-1 12:00I 12:59 ORT3-N R-N 1 VNCRD W3A OPS REV0-1 017T449 301 1 T-8607-R WCC RC-522A I RC RC-522A CAUTION 1 23MAY04 23MAY04 DR-Y ML-Y 5 r

.48 R RC RC-S22A CAUTION T G REV0-1 TAG REVO-1 12:00 12:59 ORT3-N R-N I RC RC-52TA CAUTION TAG,EVO-10018607 302 1 T-9079-H WCC W-3AIB I VNCRD W-3A/B EM I 1 23MAY04 23MAY04 DR-Y ML-Y 0

4..g s

VNCRD'W-3A/B EM REV3 I REV341 12:00 12:59 ORT3-N R-N I VNCRD W,3AAB EM REV3-1 q019079 303 1 T-9105-R WCC P-1A-M 1 RC P-1A-M RMP I 123MAY04 23MAY04 DR-Y ML-Y 58 r-91

-1 RC P-14M RMP 9002-1 E REV4-1 9002-1 EM REV4-1 12:00 12:59 ORT3-N R-N I RC P-IA-M RMP 9002-1 EM EV4-10019105 304 1 T-0691-R WCC ICP-2.19 I ESF ICP-2.19 IC 1 23MAY04 23MAY04 DR-Y ML-Y 76 -o igL1 ESF ICP-2.19 IC REV0.1 REVO-1 13:00 13:59 ORT3-N R-N IN ESF ICP.2.19 IC REVO-100 0691 lun Date 23MAY04 13:021 LT-03 STANDARD PUBLICATION Shoot 18 of 21 C Primavera Systems, Inc.

I FL-03 Execution Publication Set r

aner ZJMR YU4 7 Z:uu I

U1R28 WORKING SCHEDULE I

after 23MA Y04 12:00

  1. lRES WO I EQID DESCRIPTION RD ES EF RISK MF MAY 2

T ST I Sun 23 Mo 24Ze2 I

i I

I I

I I,

1012,141 n,10,22 I

srk;X 11111:1411NE, L1!11

^ ^

I I

T-8381-H wcC CV-00302B 1 CV CV-302B MMV REVO-1 I

23MAY04 23MAYa4 DR-Y MLY 13:00 13:59 ORT3-N R-N 52 -83

06 1 T-8843-R WCC W-3AAB 1 VNCRD W-3A/B EM 1 23MAY04 23MAY04 DR-Y ML-Y 19 REV2-1 13
00 13:59 ORT3-N R-N 107 1 T-8639-R WCC 01.11 1 RC 01-11 OPS REV3.2 I

23MAY04 23MAY04 DR-Y ML-Y 6

16:00 16:59 ORT3-N R-N 108 0 T300626R WCC Z-031 REMOVE TAG (0 IA Z-31 1 23MAY04 23MAY04 DR-Y ML-Y 0

IC REVO-1) 17:00 17:59 ORT3-N R-N 109 1 T-5555-R WCC HX-15C I VNCC HX-15C MM I

23MAY04 23MAY04 DR-Y ML.Y 0

REV1-1 19:00 19:59 ORT3-Y R-N 110 1 T-9894-R WCC W-001C1 1 VNCC W-1C111C2 EM 1 23MAY04 23MAY04 DR-Y ML.Y 0

REVO-1 19:00 19:59 ORT3-N R-N I11 1 T-9197-R WCC BREATHING I SA BREATHING AIR 1 23MAY04 23MAY04 DR-Y ML-Y 123 HPIP'S HP REVO-1 23:00 23:59 ORT3-N R-N 112 0 T212184H WCC T-119A HANG TAG (O WT 1 24MAY04 24MAY04 DR-N ML-Y 1

TM-02-037 REMOVAL 05:00 05:59 ORT3-N R-N US 1 T300995H WCC MS-02348-0 HANG TAG (1 MS 1 24MAY04 24MAY04 DR-N ML-Y 84 MS-2348-0 IC REVO-1) 05:00 05:59 ORT3-N R-N 114 1 T-9169-R WCC PRIMARY 1 RC PRIMARY I

24MAY04 24MAY04 DR-Y MLY 68 MANWAYS EPI REV4-1 11:00 11:59 ORT3-N R-N 115 1 T-9170-R WCC PRIMARY 1 RC PRIMARY 1 24MAY04 24MAY04 DR-Y MLY 68 MANWAYS MM REV3-1 11:00 11:59 ORT3-N R-N 116 1 T-9171-R WCC SG PRIMARY 1 RC SG PRIMARY I

24MAY04 24MAY04 DR-Y ML-Y 66 MANWAYS EPT REV3-1 11:00 11:59 ORT3-N R-N 117 1 T-9205-R WCC PZR 1 RC PZR MANWAY I

24MAY04 24MAY04 DR-N ML-Y 24 OPS REVI-1 11:00 11:59 ORT3-N R-N 118 1 T-8022-H WCC IWP I 480V IWP 01-128 E-FN 1 24MAY04 24MAY04 DR-N ML-N 0

(W-13B1) EM REVO-2 12:00 12:59 ORT3-N R-N 119 1 T-9173-R WCC MS-02018-0 I MS MS-2018-0 MMV 1 24MAY04 24MAY04 DR-Y ML-Y 0

REV0-1 12:00 12:59 ORT3-N R-N 120 1 T-9200-H WCC 621A01 1 MRR 62/A01 RMP 1 24MAY04 24MAY04 DR-N ML-N 0

9302-1 EM REV1-1 12:00 12:59 ORT3-N R-N 121 1

T-8933-R WCC TG-01-T 1 TU TG-01-T REV12-1 1 24MAY04 24MAY04 DR-Y MLY 0

13:00 13:59 ORT3-N R-N r-sa To 1.1jl CV CV-302B MMV REV0.1 E1 CV CV-302P MMV REV0-1 C 3 -R1 VNCRD:W-3AtB EM REV2 11 VNCRD \\V-3AIB EM REV2-1 539gR1 RC 01611 OPS REV3-2 I86391 RC 6,-11 OPS REV3-2 0626RREMcVE TAG (0 IA Z-31 I:I T-5555 I VNCC HX-15C MM I 001 555 IVNCC HX.15C MI T-9894.RIVPCC W-1C1/1C2 E o009894 1

'VNCC W-IC11C2 T.9197-R1 SA BREATHII 0019j9711 SABREATF T212184HHANG T300995HHANG

'l lI T-916 0019 T-917

0019, T-917 I00194 T-920 0019; I

T-8c 001 T-91 I

001 T-92 001 T4 TV-0tC P18381 1

0018843 IC REVO-1) 1EV1-1 REV1-1 M REVO-1 EM REVO-1 IG AIR HPIP'S HPiREV0-1 ING AIR HPIPS HO, REVO-1 TAG (0 WV TM-024037 REMOVAL Cl TAG (1 MS MS-2348-0 IC REVO-1) p4 1 RC PRIMARY'MANWAYS EPI R 6W11 RC PRIMAR1Y MANWAYS EPI I RC PRIMARYMANWAYS MM R

'7cU1 RC PRIMAFRY MANWAYS MM I RRC SG PRIMARY MANWAYS El 131 I RC SG PRIMARY MANWAYS I

..pjRC PZR MAN11AY OPS REV1.1 I0 1 RC PZR MANWAY OPS REVI.

I2241 480V IWP 04-128E-FN (W-131 8022d1 480V rwp b¶-28aE-FN (W-1 734E1 MS MS-201 1-0 MMV REVO-1

)17311 MS MS-2018-0 MMV REVO-1 D0-Hl MRR 621A0i RMP 9302-1 EM I 320tI1 MRR 62IA1l RMP 9302-1 EN 93 3-R1TU TG-01-T REV`12-1 1189341 TU TG-01-T REV12-1 079 RIVNCRD W,3AIB EM REV3-1 19071 VNCRD W-3A/B EM REV3-1 REVO-1)

-V4-1 PEV4-1

V3-1 1EV3-1 IT REV341 PT REV3-1 11 EM REVO-2 IBI) EM REVO-

!EVI-1 REV1-1 122 1 T-9079-R wCC W-3AIB 1 VNCRD W-3A/B EM REV3-1 1

24MAY04 24MAY041 DR-Y MI-Y 13:00 13:59 ORT3-N R-N 79 I

L _ _ _ _ _

L _ _ _ _ _ I I _____

-I I

I tun Date 23M04 13:02 LT-03 STANDARD PUBLICATION, Shet 19 of21 a Pimavera Systems, Inc.

I FL-03 Execution Publication Set T

Out;#

'Cjlnz411-1u.1uv I

U1R28 WORKING SCHEDULE I-

. after 23MA Y04 12:00

  1. lU ID lRESPI WO I EQID I DESCRIPTION R ES I EF I RISK MF IS MA I

RD

_I Su 23

'1 ST@li;@

n 24

_u

.2.5

'210 T 124 T.19 REOV IA

n.

WT A4A0 24A0 6R-ML.Y 59912,184,16E a2YE 2210 2.4 6T TM-0 1234RMOAaL 1231 0 T2121 4R wCc T-119A REMOVE TAG (O WT TM-02-037 REMOVAL 1

24MAY04 24MAY04 DR-NML-Y 115:00 -

15:59 ORT3-N R.N 599 124 1 T-2088MH WCC 62VA02 1 MRR 62VA02 RMP 1 24MAY04 24MAY04 DR-Y ML.Y 4

9302-2 EM REVO-1 17:00 17:59 ORT3-Y R-N 125 1 T-2408-H WCC RMP 1 4.16KV RMP 9364-2 1 24MAY04 24MAY04 DR-N ML-N 14 UMBILICAL CORD EM 17:00.

17:59 ORT3-Y R-N 126 1 T-7750-H WCC P-1B-M 1 RC P-1B-M RMP I

24MAY04 24MAY04 DR-Y ML-Y 0

9002-1 EM REV2.3-1 17:00 17:59 ORT3-Y R-N 127 1 T-8022-R WCC IWP 1 480V IWP 01-128 E-FN I 24MAY04 24MAY04 DR-N ML-N 0

(W-13B1) EM REVO-2 17:00 17:59 ORT3-N R-N 128 1 T-9200-R WCC 62/AO1 1 MRR 62/A01 RMP I

24MAY04 24MAY04 DR-N ML-N 0

9302-1 EM REV1-1 19:00 19:59 ORT3-N R-N 129 1 RETEST08 WCC RETESTS WCC RUN S-8 REPORT 0

24MAY04 24MAY04 DR-Y ML-Y 138 FOR RCS >350 DEG F 20:00 19:59 ORT3-Y R-N 130 1 T-2614-H WCC SI-878C i Si SI-878C EM REVO-1 2 24MAY04 24MAY04 DR-N ML-N 0

20:00.

21:59 ORT3-N R-N 31 1 T-7342-H WCC OPS 1 01-100B OPS REVO-1 2

24MAY04 24MAY04 DR-N ML-N 0

20:00 21:59 ORT3-N R-N 332 1 T-8019-R WCC W-013B1 I 480V rWP 01-128 E-FN 2 24MAY04 24MAY04 DR-N ML-N 0

(W-13B1) CAUT REVO-1 20:00 21:59 ORT3-N R-N 333 1 T-7750-R WCC P-0018-M 1 RC P-1B-M RMP 1 24MAY04 24MAY04 DR-Y ML.Y 0

9002-1 EM REV2.3-1 21:00 21:59 ORT3-Y R-N 334 0 T201997H WCC W-01381 HANG TAG (O VNCR I

24MAY04 24MAY04 DR-N ML-N 0

W-13B1 MM REVO-1) 22:00 22:59 ORT3-N R-N 335 1 T-2088-R WCC 62VA02 I MRR 621A02 RMP I

25MAY04 25MAY04 DR-N ML-N 0

9302-2 EM REVO-1 05:00 05:59 ORT3-N R-N 336 1 T-3700-R WCC P-001B 1 RC P-1B RMP 9002-4/5 2 25MAY04 25MAY04 DR-N ML-N 44 MM REVO-1 08:00 09:59 ORT3-N R-N 337 1 T-9209-R WCC 01-124 1 MS01-124 OPS 1 25MAY04 25MAY04 DR-Y ML-Y 581 REVI-1 09:00 09:59 ORT3-Y R-N 338 1 T-0681-R WCC ICP-4.22 1 WL ICP-4.22 IC 1 25MAY04 25MAY04 DR-Y ML-Y 27 REVO-1 12:00 12:59 ORT3-Y R-N 339 1 T-7510-R WCC P-0011B-M 1 RC P-1B-M RMP 2

25MAY04 25MAY04 DR-Y ML-Y 2

9002-1 MM REV2-1 12:00 13:59 ORT3-Y R-N I

II II I

2121 84RREMOVErTAG (0 WT TM02.

T.2088 I MRF4 62EA02 RMP 930:

001208JI MqR 62VA02 RMP 93 T-24084jJ 4.16KV RMP 9364-2 ui 00124081 436KV RMP 9364-2 T-7750.-H RC '-1B-M RMP 9002.

001775C11 Rq P-1B-M RMP 900 TW80224R1 480V IWP 01-128 E-FN 0018022 1 48bV IWP 01-128-E-I T.9200RI MRR 62/A01 RMP 9:

001920i11:MRR62A01 RMP RETESTO8ICC RUN S-8 REPC JII>SURE ALL RETEI T.2614.IIVSI SI-878C EM RE 00126141 Si SI-878C EM T-73424-I0100B OPS RE%

0017342I

-101-100B OPS I T-80194!4580V PWP 01-1281 001801I 148VIWP 01-1 T.T750-R1 RC P-1B-M RMP 001775C1 RC P-1B-M Rh T201997H4ANG TAG (O VP IT 2088 IMR 001208w 1 MI I

T-3700TR 0013705 T-92094 0019201 T-0I 004 T-7!

o001 T-3 001 37 REMOVAL

.2 EM REVO-1 2-2 EM REW-1 BIUCAL CORD IMBILICAL COF EM REV23-1

-1 EM REV2.3 W.13B1) EM RI 4 (W-13B1) EN 02-1 EM REVI-9302-1 EM RE\\

RT FOR RCS >

TARE COMPL

  • 01 IEV0-1

)-I EVO-1

-FN (W-13B1) C 8 E-FN (W-131

)002-1 EM REV

'9002-1 EM R RW-13B1 MY 62/A02 RMP 9:

R 62VA02 RMP RC P-1B RMPI 1 RCP-1BRR I MS 01-1 24 OF 1 MS01-124 61 I pWL ICP-4

)6811 WL ICF I0.RIRC P.lB.

F5111111 RC P.

!1` IRCP-i 143Hi P-1B 137_1RC!

340 1

T-3374-H wcc P-00113-M I RC P.1B-M RMP 9002-1 EM REV3-1 3

25MAY04 25MAY04 12:00 14:59 0

I I

tun Date 23MAY04 13:02 LT-03 STANDARD PUBLICATION Sheet 20 of 21 D Ptimavera Systems, Inc.

FL-03 Execution Publication Set

arrer Z3MA YU4 7 z:uU I

U1R28 WORKING SCHEDULE I

after 23MAY04 12:00

  1. 1 U I ID RESPl WO I EQID I

DESCRIPTION l RDl ES I

EF RISK MF MAY ST n 23

~Mon 94Tie5 I

I

.124,16,1a20,2210.2.4,6.8.10i12,14t 11a20,2210.2.4.6.8.l0112,14T16 Gt~ ~ ] tS Z11194 ils II iJL.

341 1

CL-2C WCC CL 2C MODE 5 TO MODE 4 106 25MAY04 29MAY04 DR-N ML.N 0

2CMODE5T CHECKLIST 12:00 21:59 ORT3-N R-N 342 1

CL-2D WCC CL 2D MODE 4 TO MODE 3 123. 25MAY04 30MAY04 DR-N ML-N 0

C.-2DMODE 4 T CHECKLIST 12:00 14:59 ORT3-N R-N 343 1 T-2408-R WCC RMP 1 4.16KV RMP 9364-2 1

25MAY04 25MAY04 15 1 2408RI4.16K UMBILICAL CORD EM 14:00 14:59 1 01240 1 4.1 344 1

T-8024-H WCC IWP 1 480V IWP 01-128 E-FN 2 25MAY04 25MAY04 DR-Y ML-Y 0

T-8024-I4 48 (01-39) EM REVO-2 16:00 17:59 ORT3-N R-N 00180241 345 0 T201369H WCC W-032 HANG TAG (O VNPAB 1 25MAY04 25MAY04 DR-Y ML-Y 0

T201369HH W-32 MM REVO-1) 17:00 17:59 ORT3-N R-N Run Date 23MAY04 13:02 LT-03 STANDARD PUBLICATION Sheet 21 of 21 C Primavera Systems, Inc.

FL-03 Execution Publication Set