I Point Beach Equipment Excellence April 2004 Path P

Picture Meets rt.

Corrective Maintenance Backlog ,C#ze Doesn't Meet Exceeds 3- 6 6.~

  • The number of on-line corrective maintenance work IAnalysis: Current corrective backlog remains below goal level but orders in the backlog does not include elective above forecast level. Review and oversite will support decreases. I maintenance. Outage preparations and performance decreased manpower available for corrective and elective maintenance support.

Meets: Exceeds: Action: A review of new items continues to be conducted. Increase Two Units < 75 utilization of the FIN team, implementation of short cycle maintenance, Two Units < 60 Actual 45 and pre-planned overtime will be used to assist in the continued reduction. Continued support of the PMO effort will assist in long

- *66 ~J * *OM0 range improvement in corrective maintenance backlog.

Jim Brander I

500 400

. 300 E

z 200 100 y._ 0 I Cl) oI I

Cl) oII 0

I Cl) 0 I

co) 0 I

co I

CO 0 0 I

0 t

I IL I

`t`

0 0 I

`

0 II 0

t I I I I

6. C -c a0) 0 2 n Z 2 )Z