May 2004 Monthly Operating Report for Callaway Unit 1
ML041670511
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/04/2004
From: Keith Young
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC05015
Download: ML041670511 (4)


Text

71.

AmerenUE PO Box 620 Calla way Plant Fulton, MO 65251 June 4, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC0501 5 Ladies & Gentlemen:

WAmeren DOCKET NUMBER 50-483 UE UNION ELECTRIC CO.

CALLAWAY PLANT UNIT I FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT MAY/2004 The enclosed Monthly Operating Report for May/2004 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.

Keith D. ng Manager, Regulatory Affairs KDY/JER/sl1k Enclosure

_ 2-a subsidiary ofAmeren Corporation

ULNRC05015 June 4, 2004 2

cc: Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street P.O. Box 360 Jefferson City, MO 65102-0360

Enclosure ULNRCO0OI 5 June 4, 2004 DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 REPORTING PERIOD: May/2004

1. DESIGN ELECTRICAL RATING (MWe-Net): 1171
2. MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 0 2,063.44 152,009.44
4. HOURS GENERATOR ON-LINE 0 2,014.99 150,008.99
5. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GENERATED (MWH) 0 2,293,210 165,537,049 Page 1 of 2

Enclosure ULNRC05015 June 4, 2004 UNIT SHUTDOWNS DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 REPORT: May /2004 TYPE METHOD OF CORRECTIVE F: FORCED DURATION SHUTTING DOWN ACTIONS/

NO. DATE S: SCHEDULED (HOURS) REASON THE REACTOR COMM ENTS 405 04-05-01 S 744 C 4 REFUEL 13

SUMMARY

Callaway Plant began May in its 13 th refueling outage. The outage continued through the end of the month.

REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4. CONTINUATION E: OPERATOR TRAINING / LICENSE EXAMINATION 5: OTHER (EXPLAIN)

F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)