ML023240196

From kanterella
Jump to navigation Jump to search
October 2002 Monthly Operating Report for Callaway Plant Unit 1
ML023240196
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/02/2002
From: Witt W
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC04771
Download: ML023240196 (4)


Text

S P Union Electric PO Box 620 Callaway Plant Fulton, MO 65251 November 2, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC04771 "WAmeren U1E Ladies & Gentlemen:

DOCKET NUMBER 50-483 UNION ELECTRIC CO.

CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT OCTOBER/2002 The enclosed Monthly Operating Report for October/2002 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.

Warren A. Witt Manager, Callaway Plant WAW/JER/slk Enclosure

/cvv a subsidiary ofAmeren Corporation

ULNRC04771 November 2, 2002 Page 2 cc: Mr. Ellis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102

Enclosure ULNRC04771 November 2, 2002 DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT 1 COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 REPORTING PERIOD: October/2002 I. DESIGN ELECTRICAL RATING (MWe-Net): 1171

2. MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 531 6,762 140,725
4. HOURS GENERATOR ON-LINE 529 6,714 138,826
5. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 00
6. NET ELECTRICAL ENERGY GENERATED (MWH) 585,169 7,577,759 152,735,277 Page 1 of 2

Enclosure ULNRC004771 November 2, 2002 UNIT SHUTDOWNS DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT 1 COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 REPORT: October/2002 TYPE METHOD OF CORRECTIVE

-- F: FORCED DURATION SHUTTING DOWN ACTIONS/

NO. DATE S:SCHEDULED (HOURS) REASON THE REACTOR COMMENTS 2 10/23/2002 S 216 C 1 Refueling outage 12

SUMMARY

The Callaway Plant began it's 12th refueling outage on October 23, 2002.

REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4. CONTINUATION E: OPERATOR TRAINING / LICENSE EXAMINATION 5: OTHER (EXPLAIN)

F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

Page 2 of 2 Th