Union Electric Callaway Plant U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 WAmeren U1E ULNRC-04620 Gentlemen:
DOCKET NUMBER 50-483 UNION ELECTRIC CO.
CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT FEBRUARY/2002 The enclosed Monthly Operating Report for February/2002 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.
Warren A. Witt Manager, Callaway Plant WAW/JER/slk Enclosure a subsidiary of Ameren Corporation PO Box 620 Fulton, MO 65251 March 13, 2002
ULNRC-04620 March 13, 2002 Page 2 cc: Mr. Ellis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.
Washington, DC 20037
Enclosure ULNRC-04620 March 13, 2002 DOCKET NO.:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
FAX:
REPORTING PERIOD:
50-483 CALLAWAY UNIT 1 J. E. Ready 573/676-8617 573/676-4202 February/2002
- 1.
DESIGN ELECTRICAL RATING (MWe-Net):
1171
- 2.
MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE REACTOR RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 358 314 0.0 334,598 1,096 1,050 0.0 1,181,834 135,059 133,200 0.0 146,339,352 Page 1 of 2
- 4.
- 5.
6.
Enclosure ULNRC-04620 March 13, 2002 UNIT SHUTDOWNS DOCKET NO.:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
FAX:
50-483 CALLAWAY UNIT 1 J. E. Ready 573/676-8617 573/676-4202 REPORT February/2002 TYPE F: FORCED NO.
DATE S: SCHEDULED 1
02-01-02 F
DURATION (HOURS) 358 METHOD OF SHUTTING DOWN REASON THE REACTOR B
1 CORRECTIVE ACTIONS/COMMENTS Foreign Material inspections
SUMMARY
From February 1 to February 15, the Callaway Plant was in an outage to remove the internal floating cover from the Condensate Storage Tank and to complete inspections of the Auxiliary Feedwater System for foreign material. These activities were necessary due to deterioration of the seal on the floating cover. At 21:45 on February 15, the plant was synchronized to the arid.
REASON A: EQUIPMENT FAILURE (EXPLAIN)
B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING / LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM
- 4. CONTINUATION 5: OTHER (EXPLAIN)