ML043240018
| ML043240018 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 11/10/2004 |
| From: | Keith Young AmerenUE, Union Electric Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| ULNRC05088 | |
| Download: ML043240018 (4) | |
Text
AmerenUE Callaway Plant PO Box 620 Fulton, MIO 65251 November 10, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop PI -137 Washington, DC 20555-0001 ULNRC05088 Ladies & Gentlemen:
wAmeren Uf DOCKET NUMBER 50-483 UNION ELECTRIC CO.
CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT October/2004 The enclosed Monthly Operating Report for October/2004 is submitted pursuant to Section 5.6.4 of the Callaway Unit I Technical Specifications.
nerith D. R u oyng f Manager, Regulatory Affairs KDY/JER/slk Enclosure
,-<6,
'-' q a subsidiary ofAmeren Corporation
ULNRC05088 November 10, 2004 Page 2 cc: Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street P.O. Box 360 Jefferson City, MO 65102-0360
Enclosure ULNRC05088 November 10, 2004 DOCKET NO.:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
FAX:
50-483 CALLAWAY UNIT I J. E. Ready 573/676-8617 573/676-4202 REPORTING PERIOD:
Octoberf2004 I.
DESIGN ELECTRICAL RATING (MWe-Net): 1171
- 2.
MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE
- 3.
NUMBER OF HOURS REACTOR WAS CRITICAL
- 4.
HOURS GENERATOR ON-LINE
- 5.
REACTOR RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY GENERATED (MWH) 745 745 0.0 868,542 5,468.57 5,393.02 0.0 6,128,519 155,414.57 153,387.02 0.0 169,372,358 Page 1 of 2
Enclosure ULNRC05088 November 10, 2004 UNIT SHUTDOWNS DOCKET NO.:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
FAX:
50-483 CALLAWAY UNIT I J. E. Ready 573/676-8617 573/676-4202 REPORT: October /2004 TYPE F: FORCED NO.
DATE S: SCHEDULED DURATION (HOURS)
METHOD OF SHUTTING DOWN REASON THE REACTOR CORRECTIVE ACTIONS/
COMMENTS
SUMMARY
Callaway Plant operated at approximately 100% power for the month of October.
REASON A: EQUIPMENT FAILURE (EXPLAIN)
B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING / LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM
- 4. CONTINUATION 5: OTHER (EXPLAIN)
Page 2 of 2