February 2005 Monthly Operating Report for Callaway Plant, Unit 1
ML050820216
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/11/2005
From: Keith Young
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC05131
Download: ML050820216 (4)


Text

-

AmerenUE PO Box 620 Ca/laway Plant Fulton, MO 65251 March 11, 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC05131 Ladies & Gentlemen:

"Ameren DOCKET NUMBER 50-483 UNION ELECTRIC CO.

UE CALLAWAY PLANT UNIT I FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT February 2005 The enclosed Monthly Operating Report for February 2005 is submitted pursuant to Section 5.6.4 of the Callaway Unit I Technical Specifications.

4t> Alj or Keith D. Young Manager, Regulatory Affairs KDY/JWH/slk Enclosure a subsidiary of Ameren Corporation

i ULNRC05131 March 11, 2005 Page 2 cc: Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street P.O. Box 360 Jefferson City, MO 65102-0360

Enclosure ULNRC05131 March 11,2005 DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I COMPLETED BY: J. Hiller TELEPHONE: 573/676-4259 FAX: 573/676-4202 REPORTING PERIOD: February 2005

1. DESIGN ELECTRICAL RATING (MWe-Net): 1171
2. MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 672 1387.27 158,265.84
4. HOURS GENERATOR ON-LINE 672 1369.77 156,220.79
5. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GENERATED (MWH) 787,769 1,588,550 172,674,767 Page 1 of 2

Enclosure ULNRC05131 March 11,2005 UNIT SHUTDOWNS DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I COMPLETED BY: J. Hiller TELEPHONE: 573/676-4259 FAX: 573/676-4202 REPORT: February 2005 TYPE METHOD OF CORRECTIVE F: FORCED DURATION SHUTTING DOWN ACTIONS/

NO. DATE S: SCHEDULED (HOURS) REASON THE REACTOR COM M ENTS

SUMMARY

Callaway Plant operated at approximately 100% power for the month of February.

REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4. CONTINUATION E: OPERATOR TRAINING / LICENSE EXAMINATION 5: OTHER (EXPLAIN)

F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

Page 2 of 2