-S AmerenUE Callaway Plant PO Box 620 Fulton, MO 65251 July 6, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC05027 Ladies & Gentlemen:

WAmerenUE DOCKET NUMBER 50-483 UNION ELECTRIC CO.

CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT June/2004 The enclosed Monthly Operating Report for June/2004 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.

K eith D. Young Manager, Regulatory Affairs KDY/JER/slk Enclosure jje2*

a subsidiary olAmeren Corporation

I ULNRC05027 July 6, 2004 Page 2 cc: Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street P.O. Box 360 Jefferson City, MO 65102-0360

Enclosure ULNRC05027 July 6, 2004 DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50483 CALLAWAY UNIT 1 J. E. Ready 573/676-8617 573/6764202 REPORTING PERIOD:

Junc/2004

1.

DESIGN ELECTRICAL RATING (MWc-Nct): 1171

2.

MAX. DEPEND. CAPACITY (MWc-Nct): 1125 THIS MONTIh YR TO DATE CUMULATIVE 3.

4.

5.

6.

NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE REACTOR RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 452.13 425.03 0.0 410,640 2,515.57 2,440.02 0.0 2,703,850 152,461.57 150,434.02 0.0 165,947,689 Page 1 of 2

1' Enclosure ULNRC05027 July 6, 2004 UNIT SHUTDOWNS DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50483 CALLAWAY UNIT 1 J. E. Ready 573/676-8617 573/6764202 REPORT: Junc /2004 TYPE F: FORCED NO.

DATE S: SCHEDULED 406 04-06-01 S

DURATION (HOURS) 294.97 METHOD OF SHUTTING DOWN REASON TIHE REACTOR C

4 CORRECTIVE ACTIONS/

COMMENTS REFUEL 13

SUMMARY

Callaway Plant began June in its 13'h refueling outage. The outage ended on June 13 at 06:58 when the output breaker was closed.

REASON A: EQUIPMENT FAILURE (EXPLAIN)

B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING / LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM

4. CONTINUATION 5: OTHER (EXPLAIN)

Page 2 of 2