ML032591070

From kanterella
Jump to navigation Jump to search
August 2003 Monthly Operating Report for Callaway Plant, Unit 1
ML032591070
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/08/2003
From: Keith Young
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC04899
Download: ML032591070 (4)


Text

AmeronUE Callaway lant PO Box 620 Fulton, MO 65251 September 8, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 wAmeren UE ULNRC04899 Ladies & Gentlemen:

DOCKET NUMBER 50-483 UNION ELECTRIC CO.

CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT AUGUST/2003 The enclosed Monthly Operating Report forAugustl2003 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.

/t/42v71r Keith D. Young Manager, Regulatory Affairs KDY/JER/slk Enclosure q-a subsidiary fAmA ran Corporaton

ULNRC04899 Page 2 cc: Mr. Thomas P. Gwynn Acting Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S.. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102

Enclosure ULNRC04899 DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50-483 CALLAWAY UNIT 1 J. E. Ready 573/676-8617 573/676-4202 REPORTING PERIOD:

August/2003

1.

DESIGN ELECTRICAL RATING (MWe-Net): 1171

2.

MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE 3.

4.

5.

6.

NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE REACTOR RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH 744 744 0.0 851,040 5,565.5 5,550.5 0.0 6,413,053 147,082.5 145,146.5 0.0 159,957,149 Page 1 of 2

-t 6

b Enclosure ULNRC004899 UNIT SHUTDOWNS DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50-483 CALLAWAY UNIT I J. E. Ready 573/676-8617 573/676-4202 REPORT: August2003 TYPE F: FORCED NO.

DATE

&: SCHEDULED DURATION (HOURS)

METHOD OF SHUTTING DOWN REASON THE REACTOR CORRECTIVE ACTIONS/

COMMENTS

SUMMARY

The Callawav Plant operated at approximately 100% power, for the month of August.

A:

B:

C:

D:

E:

F:

G:

H.

REASON EQUIPMENT FAILURE (EXPLAIN)

MAINT. OR TEST REFUELING REGULATORY RESTRICTION OPERATOR TRAINING / LICENSE EXAMINATION ADMINISTRATIVE OPERATIONAL ERROR (EXPLAIN)

OTHER (EXPLAIN)

METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM

4. CONTINUATION 5: OTHER (EXPLAIN)

Page 2 of 2