AmerenUE Callaway Plant PO Box 620 Fulton, MO 65251 August 11, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 WAmerienUE ULNRC04886 Ladies & Gentlemen:
DOCKET NUMBER 50-483 UNION ELECTRIC CO.
CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT JULY/2003 The enclosed Monthly Operating Report for July/2003 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.
Warren A. Witt Manager, Callaway Plant WAW/JER/slk Enclosure
'-CIraq a subsidiary ofAmeren Corporation
If ULNRC04886 August 11, 2003 Page 2 cc: Mr. Thomas P. Gwynn Acting Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102
I Enclosure ULNRC04886 August 11, 2003 DOCKET NO.:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
FAX:
50-483 CALLAWAY UNIT I J. E. Ready 573/676-8617 573/676-4202 REPORTING PERIOD:
JULY/2003
- 1.
DESIGN ELECTRICAL RATING (MWe-Net): 1171
- 2.
MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE 3.
4.
5.
6.
NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE REACTOR RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 744 744 0.0 851080 4821.5 4806.5 0.0 5562013 146338.5 144402.5 0.0 159106109 Page 1 of 2
Enclosure ULNRC004886 August 11, 2003 UNIT SHUTDOWNS DOCKET NO.:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
FAX:
50-483 CALLAWAY UNIT I J. E. Ready 573/676-8617 573/676-4202 REPORT: July/2003 TYPE F: FORCED NO.
DATE S: SCHEDULED DURATION (HOURS)
METHOD OF SHUTTING DOWN REASON THE REACTOR CORRECTIVE ACTIONS/
COMMENTS
SUMMARY
The Callawav Plant operated at approximately 100% power, for the month of July.
REASON A: EQUIPMENT FAILURE (EXPLAIN)
B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING / LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM
- 4. CONTINUATION 5: OTHER (EXPLAIN)