ULNRC-04594, December 2001 Monthly Operating Report for Callaway Plant Unit 1

From kanterella
Jump to navigation Jump to search
December 2001 Monthly Operating Report for Callaway Plant Unit 1
ML020350282
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/09/2002
From: Witt W
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-04594
Download: ML020350282 (4)


Text

PO Box 620 Fulton, MO 65251 January 9, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 WAmeren Ue ULNRC-04594 Gentlemen:

DOCKET NUMBER 50-483 UNION ELECTRIC CO.

CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT DECEMBERJ2001 The enclosed Monthly Operating Report for December/2001 is submitted pursuant to Section 5.6.4 of the Callaway Unit I Technical Specifications.

Warren A. Witt Manager, Callaway Plant WAW/JER/slk Enclosure a subsidiary of Ameren Corporation Union Electric Callaway Plant

ULNRC-04594 January 9, 2002 Page 2 cc: Mr. Ellis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7EI Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.

Washington, DC 20037

Enclosure ULNRC-04594 January 9, 2002 DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

REPORTING PERIOD:

50-483 CALLAWAY UNIT 1 J. E. Ready 573/676-8617 573/676-4202 December/2001

1.

DESIGN ELECTRICAL RATING (MWe-Net): 1171

2.

MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE REACTOR RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 667 654 0.0 741,657 7,592 7,500 0.0 8,384,122 133,963 132,150 0.0 145,157,518 Page 1 of 2

3.
4.
5.

6.

Enclosure ULNRC-04594 January 9, 2002 UNIT SHUTDOWNS DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50-483 CALLAWAY UNIT 1 J. E. Ready 573/676-8617 573/676-4202 REPORT MONTH: December/2001 TYPE F: FORCED NO.

DATE S: SCHEDULED 3

12-3-01 F

DURATION (HOURS) 90 REASON B

METHOD OF SHUTTING DOWN THE REACTOR 1

CORRECTIVE ACTIONS/COMMENT

SUMMARY

The Callaway Plant operated at approximately 100% power for the month of December with one exception. On December 3, 2001 the plant was down Dowered and taken off line to repair a stator cooling water leak on a neutral bushing of the turbine generator. The leak was repaired and the plant was synchronized to the grid on December 7, 2001 REASON EQUIPMENT FAILURE (EXPLAIN)

MAINT. OR TEST REFUELING REGULATORY RESTRICTION OPERATOR TRAINING / LICENSE EXAMINATION ADMINISTRATIVE OPERATIONAL ERROR (EXPLAIN)

OTHER (EXPLAIN)

METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM

4. CONTINUATION 5: OTHER (EXPLAIN)

Page 2 of 2 A:

B:

C:

D:

E:

F:

G:

H: