January 2004 Monthly Operating Report for Callaway Plant, Unit 1
ML040500768
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/12/2004
From: Keith Young
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC04954
Download: ML040500768 (4)


Text

i-

-c; AmerenUE Callaway Plant PO Box 620 Fulton, MO 65251 February 12,2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 WAmerenUE ULNRC04954 Ladies & Gentlemen:

DOCKET NUMBER 50-483 UNION ELECTRIC CO.

CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT JANUARY/2004 The enclosed Monthly Operating Report for January/2004 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.

Keith D. Young Manager, Regulatory Affairs KDY/JER/slk Enclosure a subsidiary olAmeren Corporation

ULNRC04954 February 12, 2004 Page 2 cc: Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street P.O. Box 360 Jefferson City, MO 65102-0360

Enclosure ULNRC04954 February 12,2004 DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50-483 CALLAWAY UNIT I J. E. Ready 573/676-8617 573/676-4202 REPORTING PERIOD:

January/2004

1.

DESIGN ELECTRICAL RATING (MWe-Net): 1171

2.

MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE 3.

4.

5.

6.

NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE REACTOR RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 713.63 707.87 0.0 818,778 713.63 707.87 0.0 818,778 150,659.63 148,701.87 0.0 164,062,617 Page I of 2

  • Enclosure ULNRC04954 February 12, 2004 UNIT SHUTDOWNS DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50-483 CALLAWAY UNIT I J. E. Ready 573/676-8617 573/676-4202 REPORT: January/2004 TYPE F: FORCED NO.

DATE S: SCHEDULED 401 01/27/04 F

DURATION (HOURS) 36 METHOD OF SHUTTING DOWN REASON THE REACTOR A

3 CORRECTIVE ACTIONS/

COMMENTS LER 2004-002-00

SUMMARY

At 17:30 on 01-27-04, Callaway Plant experienced an unexpected turbine trip, followed by a reactor trip. It was determined that the switch yard output breakers opened due to a generator distance relay failure. The plant was returned to service at 05:39 on 01-29-04. This event will be reported in LER 2004-002-00.

A:

B:

C:

D:

E:

F:

G:

H:

REASON EQUIPMENT FAILURE (EXPLAIN)

MAINT. OR TEST REFUELING REGULATORY RESTRICTION OPERATOR TRAINING / LICENSE EXAMINATION ADMINISTRATIVE OPERATIONAL ERROR (EXPLAIN)

OTHER (EXPLAIN)

METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM

4. CONTINUATION 5: OTHER (EXPLAIN)

Page 2 of 2