November 2003 Monthly Operating Report for Callaway Plant, Unit 1
ML033530422
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/10/2003
From: Keith Young
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC04927
Download: ML033530422 (4)


Text

AmerenUE Callaway Plant PO Box 620 Fulton, MIO 65251 December 10, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop PI-137 Washington, DC 20555-0001 4Amere WEAf1evUF ULNRC04927 Ladies & Gentlemen:

DOCKET NUMBER 50-483 UNION ELECTRIC CO.

CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER/2003 The enclosed Monthly Operating Report for November/2003 is submitted pursuant to Section 5.6.4 of the Callaway Unit I Technical Specifications.

Keith D. Young Manager, Regulatory Affairs KDY/JER/slk Enclosure t."

Ljlz

a subsidiary of Ameren Corporation

ULNRC04927 December 10, 2003 Page 2 cc: Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102

Enclosure ULNRC04927 December 10, 2003 DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50-483 CALLAWAY UNIT I J. E. Ready 573/676-8617 573/676-4202 REPORTING PERIOD:

November/2003

1.

DESIGN ELECTRICAL RATING (MWe-Net): 1171

2.

MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE

3.

NUMBER OF HOURS REACTOR WAS CRITICAL

4.

HOURS GENERATOR ON-LINE

5.

REACTOR RESERVE SHUTDOWN HOURS

6.

NET ELECTRICAL ENERGY GENERATED (MWH) 720 720 0.0 835,235 7,685 7,654 0.0 8,827,575 149,202 147,250 0.0 162,371,671 Page 1 of 2

Enclosure ULNRC04927 December 10, 2003 UNIT SHUTDOWNS DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50-483 CALLAWAY UNIT I J. E. Ready 573/676-8617 573/6764202 REPORT: Novemberl2003 TYPE F: FORCED NO.

DATE S: SCHEDULED DURATION (HOURS)

METHOD OF SHUTTING DOWN REASON THE REACTOR CORRECTIVE ACTIONS/

COMMENTS

SUMMARY

The Callawav Plant operated at approximately 100% power for the month of November.

REASON A: EQUIPMENT FAILURE (EXPLAIN)

B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING / LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM

4. CONTINUATION 5: OTHER (EXPLAIN)

Page 2 of 2