MONTHYEARML0428703722004-09-17017 September 2004 Amerenue - Callaway Plant OL Amendment 1248 Replacement Steam Generators, Non-Proprietary, NSSS Systems Project stage: Request ML0427903332004-09-17017 September 2004 Special Report Twentieth Year Inservice Containment Building Tendon Surveillance and Concrete Inspection Project stage: Request ULNRC-05056, Technical Specification Revisions Associated with Steam Generator Replacement Project2004-09-17017 September 2004 Technical Specification Revisions Associated with Steam Generator Replacement Project Project stage: Request ML0428603522004-09-17017 September 2004 Amerenue - Callaway Plant OL Amendment 1248 Replacement Steam Generators, Non-Proprietary Project stage: Request ML0429304812004-10-20020 October 2004 Notice of Forthcoming Meeting with Union Electric Company on the Callaway Plant Project stage: Meeting ML0430903882004-11-0404 November 2004 Docket No. 50-483 - Licensees Slides for Meeting Held on November 4, 2004, to Discuss Its Application on the Steam Generators Replacement in Fall 2005 (Tac No. MC4437) Project stage: Meeting ML0431703532004-11-10010 November 2004 Letter, Request for Additional Information from Public Disclosure, CAW-04-1868, TAC No. MC4437 Project stage: RAI ML0431302892004-11-17017 November 2004 Summary of Meeting with Union Electric Company for the Licensee to Present Its Application Dated September 17, 2004, to Replace the Steam Generators in the Fall of 2005 Project stage: Meeting ML0434301682004-12-20020 December 2004 RAI, Containment Integrity for the Steam Generator Replacement in the Fall of 2005 (TAC MC4437),12/20/04 Ltr to G. Randolph Project stage: RAI ML0505500822005-02-11011 February 2005 January 2005 Monthly Operating Report for Callaway Plant Unit 1 Project stage: Request ULNRC-05117, Technical Specification Revisions Associated with the Steam Generator Replacement Project2005-02-11011 February 2005 Technical Specification Revisions Associated with the Steam Generator Replacement Project Project stage: Other ML0607503552005-02-25025 February 2005 Init Exam - 08/2005 - Public Forms Project stage: Request ML0512206202005-05-0404 May 2005 Forthcoming Meeting with Union Electric Co. to Discuss Revision of TSTF-449 and Response to Questions on Replacement of Steam Generators to Be Installed in Fall 2005 Project stage: Meeting ML0511501022005-05-0404 May 2005 RAI, Steam Generator Replacement License Amendment Request, TAC MC4437 Project stage: RAI ML0514301542005-05-18018 May 2005 Enclosure - 05/18/05, Meeting Summary -Plots Referenced in Licensees Response to Question 46 Project stage: Meeting ULNRC-05145, Technical Specification Revisions Associated with the Steam Generator Replacement Project2005-05-26026 May 2005 Technical Specification Revisions Associated with the Steam Generator Replacement Project Project stage: Request ML0515704582005-05-26026 May 2005 Response to NRC Guidance Regarding Mitigation Strategies Project stage: Other ML0514601112005-06-0303 June 2005 Summary of Meeting with Callaway on 05/18/05 for the Licensee to Discuss Its Draft Response to the Request for Additional Information on Its Application Dated 09/17/2004 Project stage: Draft RAI ULNRC-05169, Technical Specification Revisions Associated with the Steam Generator Replacement Project2005-07-15015 July 2005 Technical Specification Revisions Associated with the Steam Generator Replacement Project Project stage: Request ULNRC-05178, Technical Specification Revisions Associated with the Steam Generator Replacement Project2005-07-29029 July 2005 Technical Specification Revisions Associated with the Steam Generator Replacement Project Project stage: Request ULNRC-05188, Technical Specification Revisions Associated with the Steam Generator Replacement Project2005-08-16016 August 2005 Technical Specification Revisions Associated with the Steam Generator Replacement Project Project stage: Request ULNRC-05192, Supplemental Technical Specification Revisions for the Steam Generator Replacement Project2005-09-0606 September 2005 Supplemental Technical Specification Revisions for the Steam Generator Replacement Project Project stage: Request ML0524201542005-09-0707 September 2005 Withholding from Public Disclosure, Responses to NRC Request for Additional Information on WCAP-16265-P, Rev. 0, Callaway Replacement Steam Generator Program NSSS Licensing Report, Dated February 2005 (CAW-05-1944) Project stage: RAI ML0524300462005-09-0707 September 2005 Withholding from Public Disclosure, Setpoint Methodology Portion of the Response to (NRC) Request for Additional Information, Questions 1 and 2 (CAW-05-1998) Project stage: RAI ML0524301332005-09-0707 September 2005 Request for Withholding Information from Public Disclosure (CAW-05-2007) (Tac. MC4437) Project stage: Withholding Request Acceptance ML0527300832005-09-29029 September 2005 Technical Specifications, Amendment Regarding the Steam Generator Replacement Project Project stage: Other ML0525700542005-09-29029 September 2005 License Amendment, Regarding the Steam Generator Replacement Project Project stage: Other 2005-05-18
[Table View] |
Text
il:;
AmerenUE Callaway Plant PO Box 620 Fulton, MO 65251 February 11, 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC051 19 Ladies & Gentlemen:
wAmerenUE DOCKET NUMBER 50-483 UNION ELECTRIC CO.
CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT January 2005 The enclosed Monthly Operating Report for January 2005 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.
Keith D. Young Manager, Regulatory Affairs KDY/JWH/slk Enclosure I
a subsidiary ofAmeren Corporation
r ULNRC05119 February 11, 2005 Page 2 cc: Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Conmmission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street P.O. Box 360 Jefferson City, MO 65102-0360
Enclosure ULNRC051 19 February 1 1, 2005 DOCKET NO.:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
FAX:
50483 CALLAWAY UNIT I J. Hiller 573/6764259 573/676-4202 REPORTING PERIOD:
January 2005 I.
DESIGN ELECTRICAL RATING (MWe-Net): 1171
- 2.
MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE 3.
4.
5.
6.
NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE REACTOR RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 715.27 697.77 0.0 800,781 715.27 697.77 0.0 800,781 157,593.84 155,548.79 0.0 171,886,998 Page 1 of 2
,j~i Enclosure ULNRC05119 February 11, 2005 UNIT SHUTDOWNS DOCKET NO.:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
FAX:
50-483 CALLAWAY UNIT I J. Hiller 573/676-4259 573/676-4202 REPORT: January 2005 TYPE F: FORCED NO.
DATE S: SCHEDULED 501 01/19/2005 F
DURATION (HOURS) 29 METHOD OF SHUTTING DOWN REASON THE REACTOR A
3 CORRECTIVE ACTIONS/
COMM ENTS
SUMMARY
At 12:51 on 01/19i2005, Callaway Plant experienced an unexpected reactor trip. The trip was due to a control cabinet power supply failure related to maintenance activities. The plant was returned to service at 17:35 on 01/20/2005. This event will be reported in accordance with 10 CFR 50.73.
REASON A: EQUIPMENT FAILURE (EXPLAIN)
B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING / LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM
- 4. CONTINUATION 5: OTHER (EXPLAIN)
Page 2 of 2