ML050550082

From kanterella
Jump to navigation Jump to search

January 2005 Monthly Operating Report for Callaway Plant Unit 1
ML050550082
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/11/2005
From: Keith Young
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC05119
Download: ML050550082 (4)


Text

il:;

AmerenUE Callaway Plant PO Box 620 Fulton, MO 65251 February 11, 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC051 19 Ladies & Gentlemen:

wAmerenUE DOCKET NUMBER 50-483 UNION ELECTRIC CO.

CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT January 2005 The enclosed Monthly Operating Report for January 2005 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.

Keith D. Young Manager, Regulatory Affairs KDY/JWH/slk Enclosure I

a subsidiary ofAmeren Corporation

r ULNRC05119 February 11, 2005 Page 2 cc: Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Conmmission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street P.O. Box 360 Jefferson City, MO 65102-0360

Enclosure ULNRC051 19 February 1 1, 2005 DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50483 CALLAWAY UNIT I J. Hiller 573/6764259 573/676-4202 REPORTING PERIOD:

January 2005 I.

DESIGN ELECTRICAL RATING (MWe-Net): 1171

2.

MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE 3.

4.

5.

6.

NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE REACTOR RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 715.27 697.77 0.0 800,781 715.27 697.77 0.0 800,781 157,593.84 155,548.79 0.0 171,886,998 Page 1 of 2

,j~i Enclosure ULNRC05119 February 11, 2005 UNIT SHUTDOWNS DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50-483 CALLAWAY UNIT I J. Hiller 573/676-4259 573/676-4202 REPORT: January 2005 TYPE F: FORCED NO.

DATE S: SCHEDULED 501 01/19/2005 F

DURATION (HOURS) 29 METHOD OF SHUTTING DOWN REASON THE REACTOR A

3 CORRECTIVE ACTIONS/

COMM ENTS

SUMMARY

At 12:51 on 01/19i2005, Callaway Plant experienced an unexpected reactor trip. The trip was due to a control cabinet power supply failure related to maintenance activities. The plant was returned to service at 17:35 on 01/20/2005. This event will be reported in accordance with 10 CFR 50.73.

REASON A: EQUIPMENT FAILURE (EXPLAIN)

B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING / LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM

4. CONTINUATION 5: OTHER (EXPLAIN)

Page 2 of 2