February 2003 Monthly Operating Report for Callaway, Unit 1
ML030770661
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/10/2003
From: Witt W
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC04818
Download: ML030770661 (4)


Text

PO Box 620 Fulton, MO 65251 March 10, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P 1-137 Washington, DC 20555-0001 wAmeren 11E ULNRC04818 Ladies & Gentlemen:

DOCKET NUMBER 50-483 UNION ELECTRIC CO.

CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT FEBRUARY/2003 The enclosed Monthly Operating Report for February/2003 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.

Warren A. Witt Manager, Callaway Plant WAW/JER/slk Enclosure a subsidiary ofAmeren Corporation AmerenUE Callaway Plant p

ý If 6A

ULNRC04818 March 10, 2003 Page 2 cc: Mr. Ellis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7El Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102

Enclosure ULNRC04818 March 10, 2003 DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50-483 CALLAWAY UNIT 1 J. E. Ready 573/676-8617 573/676-4202 REPORTING PERIOD:

FEBRUARY/2003

1.

DESIGN ELECTRICAL RATING (MWe-Net): 1171

2.

MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE REACTOR RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 672 672 00 784,805 1,416 1,416 00 1,657,710 142,933 141,012 00 155,201,806 Page 1 of 2

3.
4.

5 6.

Enclosure ULNRC04818 March 10, 2003 UNIT SHUTDOWNS DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50-483 CALLAWAY UNIT 1 J. E. Ready 573/676-8617 573/676-4202 REPORT:FEBRUARY/2003 TYPE F: FORCED NO.

DATE S: SCHEDULED DURATION (HOURS)

METHOD OF SHUTTING DOWN REASON THE REACTOR CORRECTIVE ACTIONS/

COMMENTS

SUMMARY

The Callaway Plant did not have a unit shutdown during the month of February, 2003.

REASON A: EQUIPMENT FAILURE (EXPLAIN)

B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING / LICENSE EXAMINATION F. ADMINISTRATIVE G OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM

4. CONTINUATION 5: OTHER (EXPLAIN)

Page 2 of 2