PO Box 620 Fulton, MO 65251 May 7, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 WAmeren UE ULNRC-04654 Gentlemen:
DOCKET NUMBER 50-483 UNION ELECTRIC CO.
CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT APRIL/2002 The enclosed Monthly Operating Report for April/2002 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.
Warren A. Witt Manager, Callaway Plant WAW/JER/slk Enclosure zK&
a subsidiary of Ameren Corporation Union Electric Callaway Plant
ULNRC-04654 May 7, 2002 Page 2 cc: Mr. Ellis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7El Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.
Washington, DC 20037
Enclosure ULNRC-04654 May 7, 2002 DOCKET NO.:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
FAX:
50-483 CALLAWAY UNIT 1 J. E. Ready 573/676-8617 573/676-4202 REPORTING PERIOD:
April/2002
- 1.
DESIGN ELECTRICAL RATING (MWe-Net): 1171
- 2.
MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE REACTOR RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 719 719 0.0 828,117 2,559 2,513 0.0 2,854,589 136,522 134,663 0.0 148,012,107 Page 1 of 2
- 3.
- 4.
- 5.
6.
Enclosure ULNRC-04654 May 7, 2002 UNIT SHUTDOWNS DOCKET NO.:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
FAX:
50-483 CALLAWAY UNIT 1 J. E. Ready 573/676-8617 573/676-4202 REPORT April/2002 TYPE F: FORCED NO.
DATE S: SCHEDULED DURATION (HOURS)
METHOD OF SHUTTING DOWN REASON THE REACTOR CORRECTIVE ACTIONS/COMMENT:
SUMMARY
The Callaway Plant did not have a shutdown during the month of April.
REASON EQUIPMENT FAILURE (EXPLAIN)
MAINT. OR TEST REFUELING REGULATORY RESTRICTION OPERATOR TRAINING / LICENSE EXAMINATION ADMINISTRATIVE OPERATIONAL ERROR (EXPLAIN)
OTHER (EXPLAIN)
METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM
- 4. CONTINUATION 5: OTHER (EXPLAIN)
Page 2 of 2 A:
B:
C:
D:
E:
F:
G:
H: