December 2002 Monthly Operating Report for Callaway Plant Unit 1
ML030220462
Person / Time
Site: Callaway 
Issue date: 01/10/2003
From: Witt W
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC04791
Download: ML030220462 (4)


Text

Union Electric Callaway Plant U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 vYAmeren UE ULNRC04791 Gentlemen:

DOCKET NUMBER 50-483 UNION ELECTRIC CO.

CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT DECEMBER/2002 The enclosed Monthly Operating Report for December/2002 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.

~<

Warren A. Witt Manager, Callaway Plant WAW/JER/slk Enclosure a subsidiary ofAmeren Corporation PO Box 620 Fulton, MO 65251 January 10, 2003

ULNRC04791 January 10, 2003 Page 2 cc: Mr. Ellis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7El Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102

Enclosure ULNRC04791 January 10, 2003 DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50-483 CALLAWAY UNIT I J. E. Ready 573/676-8617 573/676-4202 REPORTING PERIOD:

DECEMBER/2002

1.

DESIGN ELECTRICAL RATING (MWe-Net): 1171

2.

MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE REACTOR RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 662 654 0.0 741,242 7,554 7,484 0.0 8,386,578 141,517 139,596 00 153,544,096 Page 1 of 2

3.
4.
5.

6.

Enclosure ULNRC04791 January 10, 2003 UNIT SHUTDOWNS DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50-483 CALLAWAY UNIT I J. E. Ready 573/676-8617 573/676-4202 REPORT: DECEMBER/2002 TYPE F: FORCED NO.

DATE S: SCHEDULED 3

12/14/2002 F

DURATION (HOURS) 90 METHOD OF CORRECTIVE SHUTTING DOWN ACTIONS/

REASON THE REACTOR COMMENTS A

3

SUMMARY

On December 14, 2002, the Callaway Plant experienced an automatic reactor trip on Over Temperature/Delta Temperature (OTDT). The trip occurred while completing a downpower from 100% to 85%, to secure the condensate pump for maintenance. While reducing power, OTDT penalty points resulted in a rod stop and turbine runback. Initial plant response was per design. The pump was repaired and the gain to the OTDT trip setpoint, was adjusted. On December 17, 2002, the plant was returned to service.

REASON A: EQUIPMENT FAILURE (EXPLAIN)

B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING / LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM

4. CONTINUATION 5: OTHER (EXPLAIN)