August 2002 Monthly Operating Report for Callaway Plant Unit 1
ML022600674
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/09/2002
From: Witt W
AmerenUE, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC04726
Download: ML022600674 (4)


Text

Union Electric PO Box 620 CallawayPlant Fulton, MO 65251 September 9, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC04726 WAmeren UFGentlemen:

DOCKET NUMBER 50-483 UNION ELECTRIC CO.

CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT AUGUST/2002 The enclosed Monthly Operating Report for August/2002 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.

Warren A. Witt Manager, Callaway Plant WAW/JER/slk Enclosure

'V V

a subsidiaryof Ameren Corporation

ULNRC04726 September 9, 2002 Page 2 cc: Mr. Ellis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.

Washington, DC 20037

Enclosure ULNRC04726 September 9, 2002 DOCKET NO.: 50483 UNIT NAME: CALLAWAY UNIT 1 COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 REPORTING PERIOD: August/2002

1. DESIGN ELECTRICAL RATING (MWe-Net): 1171
2. MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 744 5,511 139,474
4. HOURS GENERATOR ON-LINE 744 5,476 137,615
5. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GENERATED (MWH) 840,751 6,173,400 151,330,918 Page 1 of 2

Enclosure ULNRC04726 September 9, 2002 UNIT SHUTDOWNS DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT 1 COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 REPORT: August/2002 TYPE METHOD OF F: FORCED DURATION SHUTTING DOWN CORRECTIVE NO. DATE S: SCHEDULED (HOURS) REASON THE REACTOR ACTIONS/COMMENT,

SUMMARY

The Callaway Plant did not have a shutdown during the month of August.

REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4. CONTINUATION E: OPERATOR TRAINING / LICENSE EXAMINATION 5: OTHER (EXPLAIN)

F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

Page 2 of 2