ML022600674
| ML022600674 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 09/09/2002 |
| From: | Witt W AmerenUE, Union Electric Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| ULNRC04726 | |
| Download: ML022600674 (4) | |
Text
Union Electric Callaway Plant U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 WAmeren UF ULNRC04726 Gentlemen:
DOCKET NUMBER 50-483 UNION ELECTRIC CO.
CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT AUGUST/2002 The enclosed Monthly Operating Report for August/2002 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.
Warren A. Witt Manager, Callaway Plant WAW/JER/slk Enclosure
'V V
a subsidiary of Ameren Corporation PO Box 620 Fulton, MO 65251 September 9, 2002
ULNRC04726 September 9, 2002 Page 2 cc: Mr. Ellis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.
Washington, DC 20037
Enclosure ULNRC04726 September 9, 2002 DOCKET NO.:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
FAX:
50483 CALLAWAY UNIT 1 J. E. Ready 573/676-8617 573/676-4202 REPORTING PERIOD:
August/2002
- 1.
DESIGN ELECTRICAL RATING (MWe-Net): 1171
- 2.
MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE REACTOR RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 744 744 0.0 840,751 5,511 5,476 0.0 6,173,400 139,474 137,615 0.0 151,330,918 Page 1 of 2
- 3.
- 4.
- 5.
6.
Enclosure ULNRC04726 September 9, 2002 UNIT SHUTDOWNS DOCKET NO.:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
FAX:
50-483 CALLAWAY UNIT 1 J. E. Ready 573/676-8617 573/676-4202 REPORT: August/2002 TYPE F: FORCED NO.
DATE S: SCHEDULED DURATION (HOURS)
METHOD OF SHUTTING DOWN REASON THE REACTOR CORRECTIVE ACTIONS/COMMENT,
SUMMARY
The Callaway Plant did not have a shutdown during the month of August.
REASON A: EQUIPMENT FAILURE (EXPLAIN)
B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING / LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM
- 4. CONTINUATION 5: OTHER (EXPLAIN)
Page 2 of 2