ML19330C684

From kanterella
Revision as of 00:00, 16 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-024/03L-0
ML19330C684
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/04/1980
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19330C685 List:
References
MP-2-4443, NUDOCS 8008110332
Download: ML19330C684 (1)


Text

,

,. . e .

I MUETt'E'E E[ Ells'E' U'E'[E.L'E'((ES l

+N [c'rY, eNa$ncIE .7 P.O. DOX 270 HARTFORD. CONNECTICUT OG101 . 4 em.w.w.*wer.nme<w w k $$!dkhb!$,5.'3;."" l

,i August 4, 1980

  • MP-2-4443 Mr. Boyce H. Grier Director, Region I Office of Inspection and Enforcement U. S. fluclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Facility Operating License flo. DPR-65 '

Docket No. 50-336 Peportable Occurrence R0-50-336/80-24/3L-0 -

Dear Mr. Grier:

This letter forwards Licensee Event Report 80-24/3L-0 required to be submitted within thirty days pursuant to Millstone Unit 2 Appendix

  • A Technical Specifications, Sec. tion 6." 1.9.b, conditions leading to operation in a degraded trade pennitted by a limiting condition for operation. An additional three copics of the report are enclosed.

Yours truly, NORTHEAST NUCLEAR ENERGY C MPANY fM /W

. J. M: ac[ka

.Sta ion Superintendent Milistone Nuclear Power Station EJM/JH/lls Mtachment: LER 80-24/3L-0 cc: Director, Office of Inspection and Enforcement, Washington, D.C. (30)

Director, Office of Management Infonaation and Program Control, Washington, D.C . (3)

U. S. Nuclear Regulatory Commission, c/o Document Management

~

Branch, Washington, D.C. 20555 h

8008110

_m_

_3_____________2_____

u